ATJ 16/03 (Pindaan 2015)
JKR 20401-0062-15
ATJ 16/03 (Pindaan 2015)
©2015 Jabatan Kerja Raya Malaysia.
KERAJAAN MALAYSIA
Hak Cipta Terpelihara.
Tidak dibenarkan mengeluarkan mana-mana bahagian artikel, ilustrasi dan
isi kandungan buku ini dalam apa jua bentuk dan dengan apa jua cara sama ada
secara elektronik, mekanikal, salinan, rakaman atau cara lain sebelum
mendapat keizinan bertulis daripada penerbit. A GUIDE FOR
A GUIDE FOR ENVIRONMENTAL PROTECTION & ENHANCEMENT WORKS
ENVIRONMENTAL PROTECTION
& ENHANCEMENT WORKS
A GUIDE FOR
ENVIRONMENTAL PROTECTION & ENHANCEMENT WORKS
Jabatan Kerja Raya
Cawangan Jalan
Ketua Pengarah Kerja Raya
Jabatan Kerja Raya Malaysia
Jalan Sultan Salahuddin
50582 Kuala Lumpur
Jabatan Kerja Raya
A GUIDE FOR ENVIRONMENTAL PROTECTION & ENHANCEMENT WORKS
CONTENTS PAGE
CHAPTERS
1.0 Introduction 1
2.0 Environmental Requirements 7
3.0 Contractual Requirements 21
4.0 Specifications 23
5.0 Method of Measurement 46
6.0 Bill of Quantities 81
7.0 Best Management Practices 95
8.0 Standard Drawings and Figures 109
REFERENCES
APPENDIX 1 : Standard Specifications for Road Works JKR/SPJ/2013-S2 125
Section 2: Earthworks
APPENDIX 2: Government Requirements (Need Statement) 146
(Terms of Reference) (For Design and Build Projects)
APPENDIX 3: Standard Report Format for: 155
(i) Environmental Management Plan (EMP)
(ii) Environmental Monitoring Report (EMR)
(iii) Environmental Audit Report(EAR)
(iv) Environmental Closure Audit Report (ECAR)
APPENDIX 4: Malaysia National Water Quality Standards 166
APPENDIX 5: Malaysia Marine Water Quality Criteria and Standard 168
vi
CHAPTER 5
METHOD OF MEASUREMENT
46
5.15 Rain Gauge
Unit
The units of measurement for rain gauge shall be in Number (nr).
Measurement
The measurement for payment shall be the number of rain gauge installed at
site and as approved by the S.O ang made as follow :-
i) 80% on complete installation to the satisfaction of the S.O
ii) 20% on maintenance ;
Item Coverage
The item for rain gauge shall be in accordance with the Preambles to the Bill
of Quantities General Directions and shall includs :-
a) supply and installation of rain gauge at location as direct by S.O
including all other necessary equipment and fasilities ;
b) maintenance of rain gauge system and associated equipment.