0% found this document useful (0 votes)
288 views1 page

Work Permit-201-Deyaar Building

This work permit is for minor works at the Deyaar Building located at Plot No. 373-430 in Al Barsha First, Dubai. The permit is issued to Glass Jet Industries LLC to carry out works at unit DEYAAR BUILDING-201 from March 29, 2023 to May 12, 2023. Any changes to the approved drawings or contractor require approval from the National Marine Services Fitout Management Team.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
288 views1 page

Work Permit-201-Deyaar Building

This work permit is for minor works at the Deyaar Building located at Plot No. 373-430 in Al Barsha First, Dubai. The permit is issued to Glass Jet Industries LLC to carry out works at unit DEYAAR BUILDING-201 from March 29, 2023 to May 12, 2023. Any changes to the approved drawings or contractor require approval from the National Marine Services Fitout Management Team.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WORK PERMIT

Work Permit Type : Minor Issue Date : 29/3/2023


Work Permit Ref : 390 - 4382 Expiry Date : 12/5/2023

1. Unit Information
Unit Number DEYAAR BUILDING-201

Project Name Deyaar Building on Plot No. 373-430 at Al Barsha First, Dubai

Location AL BARSHA 1 : AL BARSHA : DEYAAR BUILDING

Developer Name DEYAAR DEVELOPMENT PJSC

2. Owner Details
Name DEYAAR DEVELOPMENT PJSC

Trade License No
3.Tenant Details
Name DUNHILL PROPERTIES REAL ESTATE BROKERAGE

Trade License No
4. Contractor Details
Name GLASS JET INDUSTRIES LLC

Trade License No 787987

General Note :
· The Contractor and Consultant shall bear the full liability for errors in design, execution, stability and safety of the
building in accordance with current state laws and this letter is issued without any responsibility on Deyaar
Development PJSC or and Deyaar Community Management LLC.

· The Contractor shall work according to the permit approved drawing, with full adherence to the Health, Safety
Environment regulations on site.

· In case of any changes in the design after obtaining this work permit, the Fitout contractor must obtain approval
from NMS Fitout Management Team prior to starting the work.

· If the owner / Tenant changed his appointed Fitout contractor after obtaining this work permit .Approval must be
obtained from NMS Fitout Management Team prior to starting the work.

This is a computer generated no signature is required, any scratches or changes in the paper make it void.

You might also like