R E L I O N ® 670 SERIES
The software and hardware described in this document is furnished under a license and may
be used or disclosed only in accordance with the terms of such license.
This product includes software developed by the OpenSSL Project for use in the OpenSSL
Toolkit. (http://www.openssl.org/) This product includes cryptographic software written/
developed by: Eric Young ([email protected]) and Tim Hudson ([email protected]).
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or product names
mentioned in this document may be trademarks or registered trademarks of their respective
holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
Disclaimer
The data, examples and diagrams in this manual are included solely for the concept or product
description and are not to be deemed as a statement of guaranteed properties. All persons
responsible for applying the equipment addressed in this manual must satisfy themselves that
each intended application is suitable and acceptable, including that any applicable safety or
other operational requirements are complied with. In particular, any risks in applications where
a system failure and/or product failure would create a risk for harm to property or persons
(including but not limited to personal injuries or death) shall be the sole responsibility of the
person or entity applying the equipment, and those so responsible are hereby requested to
ensure that all measures are taken to exclude or mitigate such risks.
This document has been carefully checked by ABB but deviations cannot be completely ruled
out. In case any errors are detected, the reader is kindly requested to notify the manufacturer.
Other than under explicit contractual commitments, in no event shall ABB be responsible or
liable for any loss or damage resulting from the use of this manual or the application of the
equipment.
Conformity
This product complies with the directive of the Council of the European Communities on the
approximation of the laws of the Member States relating to electromagnetic compatibility
(EMC Directive 2004/108/EC) and concerning electrical equipment for use within specified
voltage limits (Low-voltage directive 2006/95/EC). This conformity is the result of tests
conducted by ABB in accordance with the product standard EN 60255-26 for the EMC directive,
and with the product standards EN 60255-1 and EN 60255-27 for the low voltage directive. The
product is designed in accordance with the international standards of the IEC 60255 series.
Table of contents
Table of contents
Section 1 Introduction....................................................................................................... 11
1.1 This manual........................................................................................................................................11
1.2 Intended audience............................................................................................................................ 11
1.3 Product documentation..................................................................................................................12
1.3.1 Product documentation set.......................................................................................................12
1.3.2 Document revision history......................................................................................................... 13
1.3.3 Related documents......................................................................................................................13
1.4 Document symbols and conventions...........................................................................................14
1.4.1 Symbols......................................................................................................................................... 14
1.4.2 Document conventions...............................................................................................................15
1.5 IEC61850 edition 1 / edition 2 mapping...................................................................................... 15
1
Commissioning manual
Table of contents
2
Commissioning manual
Table of contents
3
Commissioning manual
Table of contents
10.4.8 High Speed distance for series compensated line zones, quadrilateral and mho
characteristic ZMFCPDIS .........................................................................................................101
10.4.8.1 Measuring the operating limit of set values.....................................................................104
10.4.8.2 Measuring the operating time of distance protection zones.......................................104
10.4.8.3 Completing the test...............................................................................................................105
10.4.9 Power swing detection ZMRPSB ........................................................................................... 105
10.4.9.1 Verifying the settings............................................................................................................106
10.4.9.2 Testing the power swing detection function ZMRPSB ..................................................107
10.4.9.3 Testing the tR1 timer............................................................................................................. 107
10.4.9.4 Testing the block input, interaction between FDPSPDIS or FRPSPDIS
and ZMRPSB ........................................................................................................................... 107
10.4.9.5 Completing the test.............................................................................................................. 108
10.4.10 Power swing logic PSLPSCH................................................................................................... 108
10.4.10.1 Testing the carrier send and trip signals.......................................................................... 108
10.4.10.2 Testing the influence of the residual overcurrent protection...................................... 109
10.4.10.3 Checking the underreaching zone...................................................................................... 109
10.4.10.4 Completing the test.............................................................................................................. 109
10.4.11 Pole slip protection PSPPPAM................................................................................................ 109
10.4.11.1 Verifying the settings............................................................................................................ 110
10.4.11.2 Completing the test............................................................................................................... 112
10.4.12 Out-of-step protection OOSPPAM......................................................................................... 112
10.4.12.1 Verifying the settings.............................................................................................................113
10.4.12.2 Test of point RE (RFwdR, XFwdX).............................................................................................116
10.4.12.3 Test of the boundary between zone 1 and zone 2, which is defined by the
parameter ReachZ1................................................................................................................ 120
10.4.12.4 Test of the point SE (RRvsR, XRvsX)........................................................................................123
10.4.13 Automatic switch onto fault logic ZCVPSOF........................................................................127
10.4.13.1 Activating ZCVPSOF externally............................................................................................128
10.4.13.2 Initiating ZCVPSOF automatically and setting mode to impedance...........................128
10.4.13.3 Initiating ZCVPSOF automatically and setting mode to UILevel ................................. 128
10.4.13.4 Completing the test...............................................................................................................128
10.4.14 Phase preference logic PPLPHIZ ............................................................................................128
10.4.14.1 Completing the test...............................................................................................................129
10.5 Current protection......................................................................................................................... 129
10.5.1 Instantaneous phase overcurrent protection 3-phase output PHPIOC ........................ 129
10.5.1.1 Measuring the operate limit of set values.........................................................................130
10.5.1.2 Completing the test...............................................................................................................130
10.5.2 Four step phase overcurrent protection 3-phase output OC4PTOC.............................. 130
10.5.2.1 Verifying the settings............................................................................................................ 130
10.5.2.2 Completing the test............................................................................................................... 131
10.5.3 Instantaneous residual overcurrent protection EFPIOC ................................................... 131
10.5.3.1 Measuring the operate limit of set values......................................................................... 131
10.5.3.2 Completing the test............................................................................................................... 132
10.5.4 Four step residual overcurrent protection, (Zero sequence or negative sequence
directionality) EF4PTOC .......................................................................................................... 132
10.5.4.1 Four step directional earth fault protection..................................................................... 132
4
Commissioning manual
Table of contents
5
Commissioning manual
Table of contents
6
Commissioning manual
Table of contents
10.9.2.5 Checking the operation of the du/dt and di/dt based function .................................168
10.9.2.6 Completing the test...............................................................................................................169
10.9.3 Fuse failure supervision VDSPVC........................................................................................... 169
10.9.3.1 Completing the test...............................................................................................................170
10.10 Control..............................................................................................................................................170
10.10.1 Synchrocheck, energizing check, and synchronizing SESRSYN........................................170
10.10.1.1 Testing the synchronizing function.................................................................................... 171
10.10.1.2 Testing the synchrocheck check..........................................................................................172
10.10.1.3 Testing the energizing check............................................................................................... 174
10.10.1.4 Testing the voltage selection...............................................................................................175
10.10.1.5 Completing the test............................................................................................................... 177
10.10.2 Autorecloser for 1/2/3-phase operation SMBRREC ........................................................... 177
10.10.2.1 Preparation of the verification ........................................................................................... 179
10.10.2.2 Switching the autorecloser for 1/2/3-phase operation function to On and Off.......179
10.10.2.3 Verifying the autorecloser function SMBRREC ............................................................... 180
10.10.2.4 Checking the reclosing conditions .................................................................................... 180
10.10.2.5 Completing the test...............................................................................................................182
10.10.3 Apparatus control APC............................................................................................................. 182
10.10.4 Single command, 16 signals SINGLECMD............................................................................. 182
10.10.5 Interlocking................................................................................................................................. 182
10.11 Scheme communication............................................................................................................... 183
10.11.1 Scheme communication logic for distance or overcurrent protection ZCPSCH ......... 183
10.11.1.1 Testing permissive underreaching..................................................................................... 183
10.11.1.2 Testing permissive overreaching........................................................................................183
10.11.1.3 Testing blocking scheme......................................................................................................184
10.11.1.4 Testing delta blocking scheme........................................................................................... 184
10.11.1.5 Checking of unblocking logic...............................................................................................184
10.11.1.6 Completing the test...............................................................................................................185
10.11.2 Phase segregated scheme communication logic for distance or overcurrent
protection ZC1PPSCH .............................................................................................................. 185
10.11.2.1 Testing permissive underreaching..................................................................................... 185
10.11.2.2 Testing permissive overreaching........................................................................................185
10.11.2.3 Testing blocking scheme......................................................................................................186
10.11.2.4 Completing the test...............................................................................................................186
10.11.3 Current reversal and Weak-end infeed logic for distance protection 3-phase
ZCRWPSCH .................................................................................................................................186
10.11.3.1 Current reversal logic............................................................................................................ 186
10.11.3.2 Weak end infeed logic............................................................................................................187
10.11.3.3 Completing the test...............................................................................................................188
10.11.4 Local acceleration logic ZCLCPSCH.......................................................................................188
10.11.4.1 Verifying the settings............................................................................................................188
10.11.4.2 Completing the test...............................................................................................................188
10.11.5 Scheme communication logic for residual overcurrent protection ECPSCH ............... 188
10.11.5.1 Testing the directional comparison logic function.........................................................189
10.11.5.2 Completing the test.............................................................................................................. 190
10.11.6 Current reversal and weak-end infeed logic for residual overcurrent protection
ECRWPSCH .................................................................................................................................190
7
Commissioning manual
Table of contents
8
Commissioning manual
Table of contents
Section 13 Troubleshooting..............................................................................................217
13.1 Checking the self supervision signals........................................................................................ 217
13.1.1 Checking the self supervision function................................................................................. 217
13.1.1.1 Determine the cause of an internal failure........................................................................ 217
13.1.2 Self supervision HMI data.........................................................................................................217
13.1.2.1 General IED status.................................................................................................................. 217
13.2 Fault tracing.................................................................................................................................... 218
13.2.1 Internal fault indications.......................................................................................................... 218
13.2.2 Using front-connected PC........................................................................................................219
13.2.3 Diagnosing the IED status via the LHMI hint menu............................................................220
13.2.4 Hardware re-configuration......................................................................................................222
13.3 Repair instruction.......................................................................................................................... 223
13.4 Repair support................................................................................................................................224
13.5 Maintenance....................................................................................................................................224
9
Commissioning manual
10
1MRK 505 345-UEN B Section 1
Introduction
Section 1 Introduction
The commissioning manual contains instructions on how to commission the IED. The manual
can also be used by system engineers and maintenance personnel for assistance during the
testing phase. The manual provides procedures for the checking of external circuitry and
energizing the IED, parameter setting and configuration as well as verifying settings by
secondary injection. The manual describes the process of testing an IED in a substation which
is not in service. The chapters are organized in the chronological order in which the IED should
be commissioned. The relevant procedures may be followed also during the service and
maintenance activities.
This manual addresses the personnel responsible for commissioning, maintenance and taking
the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic equipment.
The commissioning and maintenance personnel must be well experienced in using protection
equipment, test equipment, protection functions and the configured functional logics in the
IED.
11
Commissioning manual
Section 1 1MRK 505 345-UEN B
Introduction
Decommissioning
Commissioning
Maintenance
Engineering
Operation
Installing
Engineering manual
Installation manual
Commissioning manual
Operation manual
Application manual
Technical manual
Communication
protocol manual
Cyber security
deployment guideline
IEC07000220-4-en.vsd
IEC07000220 V4 EN-US
The installation manual contains instructions on how to install the IED. The manual provides
procedures for mechanical and electrical installation. The chapters are organized in the
chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The manual
can also be used by system engineers and maintenance personnel for assistance during the
testing phase. The manual provides procedures for the checking of external circuitry and
energizing the IED, parameter setting and configuration as well as verifying settings by
secondary injection. The manual describes the process of testing an IED in a substation which
is not in service. The chapters are organized in the chronological order in which the IED should
be commissioned. The relevant procedures may be followed also during the service and
maintenance activities.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and setting of
the IED. The manual also describes how to identify disturbances and how to view calculated
and measured power grid data to determine the cause of a fault.
12
Commissioning manual
1MRK 505 345-UEN B Section 1
Introduction
The application manual contains application descriptions and setting guidelines sorted per
function. The manual can be used to find out when and for what purpose a typical protection
function can be used. The manual can also provide assistance for calculating settings.
The technical manual contains operation principle descriptions, and lists function blocks, logic
diagrams, input and output signals, setting parameters and technical data, sorted per
function. The manual can be used as a technical reference during the engineering phase,
installation and commissioning phase, and during normal service.
The point list manual describes the outlook and properties of the data points specific to the
IED. The manual should be used in conjunction with the corresponding communication
protocol manual.
The cyber security deployment guideline describes the process for handling cyber security
when communicating with the IED. Certification, Authorization with role based access control,
and product engineering for cyber security related events are described and sorted by
function. The guideline can be used as a technical reference during the engineering phase,
installation and commissioning phase, and during normal service.
13
Commissioning manual
Section 1 1MRK 505 345-UEN B
Introduction
The electrical warning icon indicates the presence of a hazard which could
result in electrical shock.
The warning icon indicates the presence of a hazard which could result in
personal injury.
The caution hot surface icon indicates important information or warning about
the temperature of product surfaces.
Class 1 Laser product. Take adequate measures to protect the eyes and do not
view directly with optical instruments.
The information icon alerts the reader of important facts and conditions.
The tip icon indicates advice on, for example, how to design your project or
how to use a certain function.
Although warning hazards are related to personal injury, it is necessary to understand that
under certain operational conditions, operation of damaged equipment may result in
degraded process performance leading to personal injury or death. It is important that the
user fully complies with all warning and cautionary notices.
14
Commissioning manual
1MRK 505 345-UEN B Section 1
Introduction
• Abbreviations and acronyms in this manual are spelled out in the glossary. The glossary
also contains definitions of important terms.
• Push button navigation in the LHMI menu structure is presented by using the push button
icons.
For example, to navigate between the options, use and .
• HMI menu paths are presented in bold.
For example, select Main menu/Settings.
• LHMI messages are shown in Courier font.
For example, to save the changes in non-volatile memory, select Yes and press .
• Parameter names are shown in italics.
For example, the function can be enabled and disabled with the Operation setting.
• Each function block symbol shows the available input/output signal.
• the character ^ in front of an input/output signal name indicates that the signal
name may be customized using the PCM600 software.
• the character * after an input signal name indicates that the signal must be
connected to another function block in the application configuration to achieve a
valid application configuration.
• Dimensions are provided both in inches and millimeters. If it is not specifically mentioned
then the dimension is in millimeters.
15
Commissioning manual
Section 1 1MRK 505 345-UEN B
Introduction
16
Commissioning manual
1MRK 505 345-UEN B Section 1
Introduction
17
Commissioning manual
Section 1 1MRK 505 345-UEN B
Introduction
18
Commissioning manual
1MRK 505 345-UEN B Section 1
Introduction
19
Commissioning manual
Section 1 1MRK 505 345-UEN B
Introduction
20
Commissioning manual
1MRK 505 345-UEN B Section 1
Introduction
21
Commissioning manual
22
1MRK 505 345-UEN B Section 2
Safety information
Read the entire manual before doing installation or any maintenance work on
the product. All warnings must be observed.
Class 1 Laser product. Take adequate measures to protect your eyes and do not
view directly with optical instruments.
Do not touch the unit in operation. The installation shall take into account the
worst case temperature.
Observe the warnings during all types of work related to the product.
GUID-C9B6638A-57E7-4E05-9A33-A60E359C54AF v1
Only electrically skilled persons with the proper authorization and knowledge of
any safety hazards are allowed to carry out the electrical installation.
M2366-2 v2
M2362-2 v1
Do not touch circuitry during operation. Potentially lethal voltages and currents
are present.
M2364-2 v1
Always use suitable isolated test pins when measuring signals in open circuitry.
Potentially lethal voltages and currents are present.
23
Commissioning manual
Section 2 1MRK 505 345-UEN B
Safety information
M2370-2 v1
GUID-BEDD698E-356C-4CF9-9DAE-64DB3CEADEAD v1
Dangerous voltages can occur on the connectors, even though the auxiliary
voltage has been disconnected.
M2369-2 v3
M2367-2 v1
M2372-2 v1
Never remove any screw from a powered IED or from a IED connected to
powered circuitry. Potentially lethal voltages and currents are present.
SEMOD168311-3 v1
Take adequate measures to protect the eyes. Never look into the laser beam.
GUID-11CCF92B-E9E7-409C-84D0-DFDEA1DCBE85 v1
GUID-5D1412B8-8F9D-4D39-B6D1-60FB35797FD0 v1
Whenever changes are made in the IED, measures should be taken to avoid
inadvertent tripping.
GUID-F2A7BD77-80FB-48F0-AAE5-BE73DE520CC2 v1
24
Commissioning manual
1MRK 505 345-UEN B Section 2
Safety information
M2695-2 v2
M2696-2 v1
Do not connect live wires to the IED. Internal circuitry may be damaged
M2697-2 v2
M2698-2 v2
M2693-2 v1
Changing the active setting group will inevitably change the IEDs operation. Be
careful and check regulations before making the change.
M19-2 v3
Observe the maximum allowed continuous current for the different current
transformer inputs of the IED. See technical data.
25
Commissioning manual
26
1MRK 505 345-UEN B Section 3
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
(Customized)
Differential protection
HZPDIF 87 1Ph high impedance 0-3 3-A02 3-A02 3-A02 3-A02
differential protection
REFPDIF 87N Restricted earth fault 0–2
protection, low impedance
L3CPDIF 87L Line differential protection, 1 1 1
3 CT sets, 2–3 line ends
L6CPDIF 87L Line differential protection, 1 1-A04 1 1-A04 1
6 CT sets, 3–5 line ends
LT3CPDIF 87LT Line differential protection, 1 1-A05 1-A05
3 CT sets, with inzone
transformers, 2–3 line ends
LT6CPDIF 87LT Line differential protection, 1 1-A06 1-A06 1-A06 1-A06
6 CT sets, with inzone
transformers, 3–5 line ends
LDLPSCH 87L Line differential protection 1 1 1 1 1
logic
LDRGFC 11REL Additional security logic for 0-1
differential protection
Impedance protection
ZMQPDIS, 21 Distance protection zone, 0-5 1-B10 1-B10 1-B10 1-B10
ZMQAPDIS quadrilateral characteristic 3-B11 3-B11 3-B11 3-B11
ZDRDIR 21D Directional impedance 0-2 1-B11 1-B11 1-B11 1-B11
quadrilateral
ZMCPDIS, 21 Distance measuring zone, 0-5 3-B16 3-B16 3-B16 3-B16
ZMCAPDIS quadrilateral characteristic
for series compensated
lines
ZDSRDIR 21D Directional impedance 0-2 1-B16 1-B16 1-B16 1-B16
quadrilateral, including
series compensation
FDPSPDIS 21 Phase selection, 0-2 1-B11 1-B11 1-B11 1-B11
quadrilateral characteristic 1-B16 1-B16 1-B16 1-B16
with fixed angle
Table continues on next page
27
Commissioning manual
Section 3 1MRK 505 345-UEN B
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
(Customized)
28
Commissioning manual
1MRK 505 345-UEN B Section 3
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
(Customized)
Current protection
PHPIOC 50 Instantaneous 0-3 1 1 1 1
phase overcurrent
protection
OC4PTOC 51_671) Four step phase 0-3 1 1 1 1
overcurrent
protection
EFPIOC 50N Instantaneous 0-1 1-C24 1-C24 1-C24 1-C24
residual overcurrent
protection
EF4PTOC 51N Four step residual 0-3 1-C24 1-C24 1-C24 1-C24
67N2) overcurrent
protection
NS4PTOC 46I2 Four step 0-2 1-C24 1-C24 1-C24 1-C24
directional negative
phase sequence
overcurrent
protection
SDEPSDE 67N Sensitive directional 0-1 1-C16 1-C16 1-C16 1-C16
residual overcurrent
and power
protection
LCPTTR 26 Thermal overload 0–2 1 1 1 1
protection, one time
constant, Celsius
LFPTTR 26 Thermal overload 0–2 1 1 1 1
protection, one time
constant, Fahrenheit
CCRBRF 50BF Breaker failure 0-2 1 2 1 2
protection
STBPTOC 50STB Stub protection 0-2 1-B11 1B 1-B11 1B
1-B11 1-B11
CCPDSC 52PD Pole discordance 0-2 1 2 1 2
protection
GUPPDUP 37 Directional 0-2 1-C17 1-C17 1-C17 1-C17
underpower
protection
GOPPDOP 32 Directional 0-2 1-C17 1-C17 1-C17 1-C17
overpower
protection
BRCPTOC 46 Broken conductor 1 1 1 1 1
check
VRPVOC 51V Voltage restrained 0-3
overcurrent
protection
Voltage protection
Table continues on next page
29
Commissioning manual
Section 3 1MRK 505 345-UEN B
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
(Customized)
Frequency protection
SAPTUF 81 Underfrequency 0-6 2-E02 2-E02 2-E02 2-E02
protection
SAPTOF 81 Overfrequency 0-6 2-E02 2-E02 2-E02 2-E02
protection
SAPFRC 81 Rate-of-change 0-2 2-E02 2-E02 2-E02 2-E02
frequency
protection
Multipurpose protection
CVGAPC General current and 0-4 4-F01 4-F01 4-F01 4-F01
voltage protection
General calculation
SMAIHPAC Multipurpose filter 0-6
1) 67 requires voltage
2) 67N requires voltage
30
Commissioning manual
1MRK 505 345-UEN B Section 3
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
Control
SESRSYN 25 Synchrocheck, 0-2 1 2 1 2
energizing check and
synchronizing
SMBRREC 79 Autorecloser 0-4 1 2 1 2
1-H04 2-H05 1-H04 2-H05
APC10 3 Apparatus control for 0-1 1-H27 1-H27
single bay, max 10
apparatuses (1CB) incl.
interlocking
APC15 3 Apparatus control for 0-1 1-H08 1-H08
single bay, max 15
apparatuses (2CBs) incl.
interlocking
QCBAY Apparatus control 1 1 1 1 1
LOCREM Handling of LRswitch 1 1 1 1 1
positions
LOCREMCTRL LHMI control of PSTO 1 1 1 1 1
SLGAPC Logic rotating switch for 15 15 15 15 15
function selection and
LHMI presentation
VSGAPC Selector mini switch 20 20 20 20 20
DPGAPC Generic communication 16 16 16 16 16
function for Double
Point indication
SPC8GAPC Single point generic 5 5 5 5 5
control 8 signals
AUTOBITS AutomationBits, 3 3 3 3 3
command function for
DNP3.0
SINGLECMD Single command, 16 4 4 4 4 4
signals
I103CMD Function commands for 1 1 1 1 1
IEC 60870-5-103
I103GENCMD Function commands 50 50 50 50 50
generic for IEC
60870-5-103
I103POSCMD IED commands with 50 50 50 50 50
position and select for
IEC 60870-5-103
I103POSCMDV IED direct commands 10 10 10 10 10
with position for IEC
60870-5-103
I103IEDCMD IED commands for IEC 1 1 1 1 1
60870-5-103
Table continues on next page
31
Commissioning manual
Section 3 1MRK 505 345-UEN B
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
32
Commissioning manual
1MRK 505 345-UEN B Section 3
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
33
Commissioning manual
Section 3 1MRK 505 345-UEN B
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
34
Commissioning manual
1MRK 505 345-UEN B Section 3
Available functions
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
(Customized)
Station communication
LONSPA, SPA SPA communication 1 1 1 1 1
protocol
ADE LON communication 1 1 1 1 1
protocol
HORZCOMM Network variables via 1 1 1 1 1
LON
PROTOCOL Operation selection 1 1 1 1 1
between SPA and IEC
60870-5-103 for SLM
RS485PROT Operation selection for 1 1 1 1 1
RS485
RS485GEN RS485 1 1 1 1 1
DNPGEN DNP3.0 1 1 1 1 1
communication
general protocol
Table continues on next page
35
Commissioning manual
Section 3 1MRK 505 345-UEN B
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
(Customized)
DNPGENTCP DNP3.0 1 1 1 1 1
communication
general TCP protocol
CHSERRS485 DNP3.0 for EIA-485 1 1 1 1 1
communication
protocol
CH1TCP, CH2TCP, DNP3.0 for TCP/IP 1 1 1 1 1
CH3TCP, CH4TCP communication
protocol
CHSEROPT DNP3.0 for TCP/IP and 1 1 1 1 1
EIA-485
communication
protocol
MST1TCP, DNP3.0 for serial 1 1 1 1 1
MST2TCP, communication
MST3TCP, protocol
MST4TCP
DNPFREC DNP3.0 fault records 1 1 1 1 1
for TCP/IP and EIA-485
communication
protocol
IEC 61850-8-1 Parameter setting 1 1 1 1 1
function for IEC 61850
GOOSEINTLKRCV Horizontal 59 59 59 59 59
communication via
GOOSE for interlocking
GOOSEBINRCV GOOSE binary receive 16 16 16 16 16
GOOSEDPRCV GOOSE function block 64 64 64 64 64
to receive a double
point value
GOOSEINTRCV GOOSE function block 32 32 32 32 32
to receive an integer
value
GOOSEMVRCV GOOSE function block 60 60 60 60 60
to receive a measurand
value
GOOSESPRCV GOOSE function block 64 64 64 64 64
to receive a single
point value
GOOSEVCTRRCV Horizontal
communication via
GOOSE for VCTR
GOOSEVCTRCONF GOOSE VCTR
configuration for send
and receive
MULTICMDRCV, Multiple command and 60/10 60/10 60/10 60/10 60/10
MULTICMDSND transmit
FRONT, LANABI, Ethernet configuration 1 1 1 1 1
LANAB, LANCDI, of links
LANCD
GATEWAY Ethernet configuration 1 1 1 1 1
of link one
Table continues on next page
36
Commissioning manual
1MRK 505 345-UEN B Section 3
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
(Customized)
37
Commissioning manual
Section 3 1MRK 505 345-UEN B
Available functions
RED670 (A32)
RED670 (B32)
RED670 (A31)
RED670 (B31)
RED670
(Customized)
38
Commissioning manual
1MRK 505 345-UEN B Section 3
Available functions
39
Commissioning manual
40
1MRK 505 345-UEN B Section 4
Starting up
Section 4 Starting up
Testing the proper IED operation is carried out at different occasions, for example:
• Acceptance testing
• Commissioning testing
• Maintenance testing
This manual describes the workflow and the steps to carry out the commissioning testing.
Factory acceptance testing (FAT) is typically done to verify that the IED and its corresponding
configuration meet the requirements of the utility or industry. This test is the most complex
and in depth, as it is done to familiarize the user with a new product or to verify a new
configuration. The complexity of this testing depends on several factors, such as:
Site acceptance testing (SAT or commissioning testing) is typically done to verify that the
installed IED is correctly set and connected to the power system. SAT requires that the
acceptance testing has been performed and that the application configuration is verified.
Maintenance testing is a periodic verification that the IED is healthy and has correct settings,
depending on changes in the power system. There are also other types of maintenance
testing.
Before starting up commissioning at site, check that the following items are available.
41
Commissioning manual
Section 4 1MRK 505 345-UEN B
Starting up
Do not insert anything else to the female connector but the corresponding
male connector. Inserting anything else (such as a measurement probe) may
damage the female connector and prevent a proper electrical contact between
the printed circuit board and the external wiring connected to the screw
terminal block.
Check that the auxiliary supply voltage remains within the permissible input voltage range
under all operating conditions. Check that the polarity is correct before energizing the IED.
Check all connections to external circuitry to ensure correct installation, before energizing the
IED and carrying out the commissioning procedures.
Energize the power supply of the IED to start it up. Keep the DC power supply on until the Root
menu or the selected default screen is shown on the HMI before interrupting the DC power
supply again. The energization could be done in a number of ways, from energizing a whole
cubicle with many IEDs to energizing each single IED one by one.
If HW (i.e. I/O and/or communication boards etc.) have been changed (i.e. removed, replaced,
or added), the user should re-configure the IED by navigating in the local HMI menu to: Main
menu/Configuration/Reconfigure HW modules to activate the changed hardware modules in
order to enable the self-supervision function to detect possible hardware errors.
To ensure that the IED is according to the delivery and ordering specifications documents
delivered together with each IED, the user should also after start-up use the built in HMI to
check the IED's:
When the IED is energized, the green LED starts flashing instantly. After approximately 55
seconds the window lights up and the window displays ‘IED Startup’. The main menu is
displayed and the upper row should indicate ‘Ready’ after about 90 seconds. A steady green
light indicates a successful startup.
42
Commissioning manual
1MRK 505 345-UEN B Section 4
Starting up
1 2 3
t (s)
0 t1 t2
xx04000310-1-en.vsd
IEC04000310 V2 EN-US
If the upper row in the window indicates ‘Fail’ instead of ‘Ready’ and the green LED flashes, an
internal failure in the IED has been detected. See section"Checking the self supervision
function" to investigate the fault.
The communication between the IED and PCM600 is independent of the communication
protocol used within the substation or to the NCC.
The communication media is always Ethernet and the used protocol is TCP/IP.
Each IED has an RJ-45 Ethernet interface connector on the front. The front Ethernet connector
shall be used for communication with PCM600.
When an Ethernet-based station protocol is used, PCM600 communication can use the same
Ethernet port and IP address.
• Direct point-to-point link between PCM600 and the IED front port. The front port can be
seen as a service port.
• Indirect link via a station LAN or from remote via a network.
The physical connection and the IP address must be configured in both cases to enable
communication.
Setting up IP addresses
The IP address and the corresponding communication subnetwork mask must be set via the
LHMI for each available Ethernet interface in the IED. Each Ethernet interface has a default
factory IP address when the IED is delivered. The IP adress and the subnetwork mask might
have to be reset when an additional Ethernet interface is installed or an interface is replaced.
43
Commissioning manual
Section 4 1MRK 505 345-UEN B
Starting up
• The default IP address for the IED front port is 10.1.150.3 and the corresponding
subnetwork mask is 255.255.255.0, which can be set via the local HMI path Main menu/
Configuration/Communication/Ethernet configuration/FRONT:1.
IED RJ-45
PCM600
Tx Tx
Rx Rx
IEC09000096-2-en.vsd
IEC09000096 V2 EN-US
44
Commissioning manual
1MRK 505 345-UEN B Section 4
Starting up
IEC13000057-1-en.vsd
IEC13000057 V1 EN-US
45
Commissioning manual
Section 4 1MRK 505 345-UEN B
Starting up
IEC13000058-1-en.vsd
IEC13000058 V1 EN-US
IEC13000059-1-en.vsd
IEC13000059 V1 EN-US
46
Commissioning manual
1MRK 505 345-UEN B Section 4
Starting up
IEC13000060-1-en.vsd
IEC13000060 V1 EN-US
IEC13000062-1-en.vsd
IEC13000062 V1 EN-US
47
Commissioning manual
Section 4 1MRK 505 345-UEN B
Starting up
The PC and IED must belong to the same subnetwork for this set-up to work.
The PC and IED must belong to the same subnetwork for this set-up to work.
When writing a configuration to the IED with PCM600, the IED is automatically set in
configuration mode. When the IED is set in configuration mode, all functions are blocked. The
red LED on the IED flashes, and the green LED is lit while the IED is in the configuration mode.
When the configuration is written and completed, the IED is automatically set into normal
mode. For further instructions please refer to the users manuals for PCM600.
Check that the wiring is in strict accordance with the supplied connection
diagram.
The CTs must be connected in accordance with the circuit diagram provided with the IED, both
with regards to phases and polarity. The following tests shall be performed on every primary
CT connected to the IED:
• Primary injection test to verify the current ratio of the CT, the correct wiring up to the
protection IED and correct phase sequence connection (that is L1, L2, L3.)
• Polarity check to prove that the predicted direction of secondary current flow is correct
for a given direction of primary current flow. This is an essential test for the proper
operation of the differential function and directional protection functions.
• CT secondary loop resistance measurement to confirm that the current transformer
secondary loop DC resistance is within the specification for the connected protection
functions. When the measured loop resistance is near the calculated value for maximum
DC resistance, perform a complete burden test.
• CT excitation test in order to confirm that the current transformer is of the correct
accuracy rating and that there are no shorted turns in the current transformer windings.
Manufacturer's design curves must be available for the current transformer to compare
the actual results.
• Earthing check of the individual CT secondary circuits to verify that each three-phase set
of main CTs is properly connected to the station earth and only at one electrical point.
• Insulation resistance check.
While the CT primary is energized, the secondary circuit shall never be open
circuited because extremely dangerous high voltages may arise.
48
Commissioning manual
1MRK 505 345-UEN B Section 4
Starting up
Both the primary and the secondary sides must be disconnected from the line
and the IED when plotting the excitation characteristics.
Check that the wiring is in strict accordance with the supplied connection diagram.
• Polarity check when applicable; this test is often omitted for CVTs
• VT circuit voltage measurement (primary injection test)
• Earthing check
• Phase relationship
• Insulation resistance check
The primary injection test verifies the VT ratio and the wiring all the way from the primary
system to the IED. Injection must be performed for each phase-to-neutral circuit.
The RTXP test switch is designed to provide the means of safe testing of the IED. This is
achieved by the electromechanical design of the test switch and test plug handle. When the
test plug handle is inserted, it first blocks the trip and alarm circuits then it short circuits the
CT secondary circuit and opens the VT secondary circuits making the IED available for
secondary injection.
When pulled out, the test handle is mechanically stopped in half withdrawn position. In this
position, the current and voltage enter the protection, but the alarm and trip circuits are still
isolated and the IED is in test mode. Before removing the test handle, check the measured
values in the IED.
Not until the test handle is completely removed, the trip and alarm circuits are restored for
operation.
49
Commissioning manual
Section 4 1MRK 505 345-UEN B
Starting up
Verify that the contact sockets have been crimped correctly and that they are
fully inserted by tugging on the wires. Never do this with current circuits in
service.
Current circuit
Voltage circuit
Do not insert anything else to the female connector but the corresponding
male connector. Inserting anything else (such as a measurement probe) may
damage the female connector and prevent a proper electrical contact between
the printed circuit board and the external wiring connected to the screw
terminal block.
Preferably, disconnect the binary input connector from the binary input cards. Check all
connected signals so that both input level and polarity are in accordance with the IED
specifications.
Preferably, disconnect the binary output connector from the binary output cards. Check all
connected signals so that both load and polarity are in accordance with IED specifications.
50
Commissioning manual
1MRK 505 345-UEN B Section 5
Configuring the IED and changing settings
The customer specific values for each setting parameter and a configuration file have to be
available before the IED can be set and configured, if the IED is not delivered with a
configuration.
Use the configuration tools in PCM600 to verify that the IED has the expected configuration.
Each function included in the IED has several setting parameters, which have to be set in order
to make the IED behave as intended. A factory default value is provided for each
parameter.The Parameter Setting Tool in PCM600 is used when changing setting parameters.
Make sure that the DC supply is not turned off when the IED saves the written
configuration.
The IED uses a FLASH disk for storing configuration data and process data like counters,
object states, Local/Remote switch position etc. Since FLASH memory is used, measures have
been taken in software to make sure that the FLASH disk is not worn out by too intensive
storing of data.
This means, that to be absolutely sure that all data have been saved to FLASH, it is necessary
to leave the IED with auxiliary power connected after all the commissioning is done (including
setting the Local/Remote switch to the desired position) for at least one hour after the last
commissioning action performed on the IED.
After that time has elapsed, it will be safe to turn the IED off, no data will be lost.
The analog input channels must be configured to get correct measurement results as well as
correct protection functionality. Because all protection algorithms in the IED utilize the
primary system quantities, it is extremely important to make sure that connected current
transformer settings are done properly. These data are calculated by the system engineer and
normally set by the commissioner from the local HMI or from PCM600.
The analog inputs on the transformer input module are dimensioned for either 1A or 5A. Each
transformer input module has a unique combination of current and voltage inputs. Make sure
the input current rating is correct and that it matches the order documentation.
The primary CT data are entered via the HMI menu under Main menu/Configurations/Analog
modules
51
Commissioning manual
Section 5 1MRK 505 345-UEN B
Configuring the IED and changing settings
The following parameter shall be set for every current transformer connected to the IED:
Table 8: CT configuration
Parameter description Parameter name Range Default
Rated CT primary current in A CTPRIMn from 0 to 99999 3000
n = channel number
This parameter defines the primary rated current of the CT. For two set of CTs with ratio
1000/1 and 1000/5 this parameter is set to the same value of 1000 for both CT inputs. The
parameter CTStarPoint can be used in order to reverse the direction of the CT. This might be
necessary if two sets of CTs have different star point locations in relation to the protected
busbar.
For main CTs with 2A rated secondary current, it is recommended to connect the secondary
wiring to the 1A input.
Take the rated permissive overload values for the current inputs into
consideration.
I/O modules configured with PCM600 (BIM, BOM or IOM) are supervised.
Each logical I/O module has an error flag that indicates signal or module failure. The error flag
is also set when the physical I/O module of the correct type is not detected in the connected
slot.
52
Commissioning manual
1MRK 505 345-UEN B Section 6
Establishing connection and verifying the SPA/IEC communication
If the IED is connected to a monitoring or control system via the rear SPA/IEC port, the
SPA/IEC port has to be set either for SPA or IEC use.
The SPA/IEC port is located on the rear side of the IED. Two types of interfaces can be used:
When using the SPA protocol, the rear SPA/IEC port must be set for SPA use.
Procedure
When using the IEC protocol, the rear SPA/IEC port must be set for IEC use.
Procedure
53
Commissioning manual
Section 6 1MRK 505 345-UEN B
Establishing connection and verifying the SPA/IEC communication
When the setting is entered the IED restarts automatically. After the restart the selected
IEC port operates as an IEC port.
2. Set the slave number and baud rate for the rear IEC port.
The slave number and baud rate can be found on the local HMI under Main menu/
Configuration/Communication/SLM configuration/Rear optical SPA-IEC-DNP port/
IEC60870–5–103
Set the same slave number and baud rate as set in the IEC master system for the IED.
To verify that the rear communication with the SMS/SCS system is working, there are some
different methods. Choose one of the following.
Procedure
1. Use a SPA-emulator and send “RF” to the IED. The answer from the IED should be the type
and version of it, for example, “REL670 2.1...”.
2. Generate one binary event by activating a function, which is configured to an event block
where the used input is set to generate events on SPA. The configuration must be made
with the PCM600 software. Verify that the event is presented in the SMS/SCS system.
During the following tests of the different functions in the IED, verify that the events and
indications in the SMS/SCS system are as expected.
To verify that the IEC communication with the IEC master system is working, there are some
different methods. Choose one of the following.
Procedure
1. Check that the master system time-out for response from the IED, for example after a
setting change, is > 40 seconds.
2. Use a protocol analyzer and record the communication between the IED and the IEC
master. Check in the protocol analyzer’s log that the IED answers the master messages.
3. Generate one binary event by activating a function that is configured to an event block
where the used input is set to generate events on IEC. The configuration must be made
with the PCM600 software. Verify that the event is presented in the IEC master system.
During the following tests of the different functions in the IED, verify that the events and
indications in the IEC master system are as expected.
The SPA communication is mainly used for SMS. It can include different numerical IEDs with
remote communication possibilities. The fiber optic loop can contain < 20-30 IEDs depending
on requirements on response time. Connection to a personal computer (PC) can be made
directly (if the PC is located in the substation) or by telephone modem through a telephone
network with ITU (CCITT) characteristics.
54
Commissioning manual
1MRK 505 345-UEN B Section 6
Establishing connection and verifying the SPA/IEC communication
55
Commissioning manual
56
1MRK 505 345-UEN B Section 7
Establishing connection and verifying the LON communication
LON communication is normally used in substation automation systems. Optical fiber is used
within the substation as the physical communication link.
The test can only be carried out when the whole communication system is installed. Thus, the
test is a system test and is not dealt with here.
M14804-3 v3
Gateway
Star coupler
RER 111
IEC05000663-1-en.vsd
IEC05000663 V2 EN-US
The fiber optic LON bus is implemented using either glass core or plastic core fiber optic
cables.
57
Commissioning manual
Section 7 1MRK 505 345-UEN B
Establishing connection and verifying the LON communication
The LON protocol is specified in the LonTalkProtocol Specification Version 3 from Echelon
Corporation. This protocol is designed for communication in control networks and is a peer-
to-peer protocol where all the devices connected to the network can communicate with each
other directly. For more information of the bay-to-bay communication, refer to the section
Multiple command function.
The hardware needed for applying LON communication depends on the application, but one
very central unit needed is the LON Star Coupler and optical fibers connecting the star coupler
to the IEDs. To interface the IEDs from the MicroSCADA with Classic Monitor, application
library LIB520 is required.
The HV Control 670 software module is included in the LIB520 high-voltage process package,
which is a part of the Application Software Library in MicroSCADA applications.
The HV Control 670 software module is used for control functions in the IEDs. The module
contains a process picture, dialogues and a tool to generate a process database for the
control application in MicroSCADA.
When using MicroSCADA Monitor Pro instead of the Classic Monitor, SA LIB is used together
with 670 series Object Type files.
The HV Control 670 software module and 670 series Object Type files are used
with both 650 and 670 series IEDs.
Use the LON Network Tool (LNT) to set the LON communication. This is a software tool
applied as one node on the LON bus. To communicate via LON, the IEDs need to know
The node address is transferred to LNT via the local HMI by setting the parameter
ServicePinMsg = Yes. The node address is sent to LNT via the LON bus, or LNT can scan the
network for new nodes.
The communication speed of the LON bus is set to the default of 1.25 Mbit/s. This can be
changed by LNT.
58
Commissioning manual
1MRK 505 345-UEN B Section 7
Establishing connection and verifying the LON communication
M11888-3 v4
The setting parameters for the LON communication are set via the local HMI. Refer to the
technical manual for setting parameters specifications.
If the LON communication from the IED stops, caused by setting of illegal communication
parameters (outside the setting range) or by another disturbance, it is possible to reset the
LON port of the IED.
M11643-1 v3
Path in the local HMI under Main menu/Configuration/Communication/SLM configuration/
Rear optical LON port
These parameters can only be set with the LON Network Tool (LNT).
These parameters can only be set with the LON Network Tool (LNT).
59
Commissioning manual
Section 7 1MRK 505 345-UEN B
Establishing connection and verifying the LON communication
60
Commissioning manual
1MRK 505 345-UEN B Section 8
Establishing connection and verifying the IEC 61850 communication
For IEC 61850-8-1 redundant communication, both rear OEM ports are utilized. In this case IEC
61850-9-2LE communication can not be used.
To enable IEC 61850 communication the corresponding OEM ports must be activated. The rear
OEM port AB and CD is used for IEC 61850-8-1 communication. The rear OEM port CD is used
for IEC 61850-9-2LE communication. For IEC 61850-8-1 redundant communication, both OEM
port AB and CD are used exclusively.
IEC 61850-9-2LE communication can only be used on OEM rear port X311:C, D.
61
Commissioning manual
Section 8 1MRK 505 345-UEN B
Establishing connection and verifying the IEC 61850 communication
There are no settings needed for the IEC 61850-9-2LE communication in the local HMI branch
Station communication. Make sure that the optical fibers are connected correctly.
Communication is enabled whenever the merging unit starts sending data.
To verify that the communication is working a test/analyzing tool, for example ITT600, can be used.
62
Commissioning manual
1MRK 505 345-UEN B Section 9
Testing IED operation
• Calculated settings
• Application configuration diagram
• Signal matrix (SMT) configuration
• Terminal connection diagram
• Technical manual
• Three-phase test equipment
• Process bus, IEC61850-9-2LE, MU test simulator, if IEC 61850-9-2LE process bus
communication is used.
• PCM600
The setting and configuration of the IED must be completed before the testing can start.
The terminal diagram, available in the technical reference manual, is a general diagram of the
IED.
Note that the same diagram is not always applicable to each specific delivery
(especially for the configuration of all the binary inputs and outputs).
Therefore, before testing, check that the available terminal diagram corresponds to the IED.
The technical manual contains application and functionality summaries, function blocks, logic
diagrams, input and output signals, setting parameters and technical data sorted per
function.
The test equipment should be able to provide a three-phase supply of voltages and currents.
The magnitude of voltage and current as well as the phase angle between voltage and current
must be variable. The voltages and currents from the test equipment must be obtained from
the same source and they must have minimal harmonic content. If the test equipment cannot
indicate the phase angle, a separate phase-angle measuring instrument is necessary.
Prepare the IED for test before testing a particular function. Consider the logic diagram of the
tested protection function when performing the test. All included functions in the IED are
tested according to the corresponding test instructions in this chapter. The functions can be
tested in any order according to user preferences. Only the functions that are used (Operation
is set to On) should be tested.
63
Commissioning manual
Section 9 1MRK 505 345-UEN B
Testing IED operation
This IED is designed for a maximum continuous current of four times the rated
current.
When using a MU test simulator, make sure it is set to the correct SVID and that
the system frequency is set to the same as in the IED.
Please observe the measuring accuracy of the IED, the test equipment and the
angular accuracy for both of them.
Please consider the configured logic from the function block to the output
contacts when measuring the operate time.
After intense testing, it is important that the IED is not immediately restarted,
which might cause a faulty trip due to flash memory restrictions. Some time
must pass before the IED is restarted. For more information about the flash
memory, refer to section “Configuring the IED and changing settings”.
If a test switch is included, start preparation by making the necessary connections to the test
switch. This means connecting the test equipment according to a specific and designated IED
terminal diagram.
Put the IED into the test mode to facilitate the test of individual functions and prevent
unwanted operation caused by other functions. The busbar differential protection is not
included in the test mode and is not prevented to operate during the test operations. The test
switch should then be connected to the IED.
Verify that analog input signals from the analog input module are measured and recorded
correctly by injecting currents and voltages required by the specific IED.
To make testing even more effective, use PCM600. PCM600 includes the Signal monitoring
tool, which is useful in reading the individual currents and voltages, their amplitudes and
phase angles. In addition, PCM600 contains the Disturbance handling tool. The content of
reports generated by the Disturbance handling tool can be configured which makes the work
more efficient. For example, the tool may be configured to only show time tagged events and
to exclude analog information and so on.
Check the disturbance report settings to ensure that the indications are correct.
For information about the functions to test, for example signal or parameter names, see the
technical manual. The correct initiation of the disturbance recorder is made on start and/or
64
Commissioning manual
1MRK 505 345-UEN B Section 9
Testing IED operation
release or trip from a function. Also check that the wanted recordings of analog (real and
calculated) and binary signals are achieved.
Parameters can be entered into different setting groups. Make sure to test
functions for the same parameter setting group. If needed, repeat the tests for
all different setting groups used. The difference between testing the first
parameter setting group and the remaining is that there is no need for testing
the connections.
During testing, observe that the right testing method, that corresponds to the actual
parameters set in the activated parameter setting group, is used.
Set and configure the function(s) before testing. Most functions are highly flexible and permit
a choice of functional and tripping modes. The various modes are checked at the factory as
part of the design verification. In certain cases, only modes with a high probability of coming
into operation need to be checked when commissioned to verify the configuration and
settings.
Put the IED into the test mode before testing. The test mode blocks all protection functions
and some of the control functions in the IED, and the individual functions to be tested can be
unblocked to prevent unwanted operation caused by other functions. In this way, it is possible
to test slower back-up measuring functions without the interference from faster measuring
functions. The test switch should then be connected to the IED.Test mode is indicated when
the yellow StartLED flashes.
It is important that the IED function to be tested is put into test mode, even if the MU is
sending data marked as "test". The IED will interpret these data as valid if it is not in test
mode.
The IED can be equipped with a test switch of type RTXP8, RTXP18 or RTXP24. The test switch
and its associated test plug handle (RTXH8, RTXH18 or RTXH24) are a part of the COMBITEST
system, which provides secure and convenient testing of the IED.
When using the COMBITEST, preparations for testing are automatically carried out in the
proper sequence, that is, for example, blocking of tripping circuits, short circuiting of CTs,
opening of voltage circuits, making IED terminals available for secondary injection. Terminals 1
and 8, 1 and 18 as well as 1 and 12 of the test switches RTXP8, RTXP18 and RTXP24 respectively
are not disconnected as they supply DC power to the protection IED.
The RTXH test-plug handle leads may be connected to any type of test equipment or
instrument. When a number of protection IEDs of the same type are tested, the test-plug
65
Commissioning manual
Section 9 1MRK 505 345-UEN B
Testing IED operation
handle only needs to be moved from the test switch of one protection IED to the test switch of
the other, without altering the previous connections.
Use COMBITEST test system to prevent unwanted tripping when the handle is withdrawn,
since latches on the handle secure it in the half withdrawn position. In this position, all
voltages and currents are restored and any re-energizing transients are given a chance to
decay before the trip circuits are restored. When the latches are released, the handle can be
completely withdrawn from the test switch, restoring the trip circuits to the protection IED.
If a test switch is not used, perform measurement according to the provided circuit diagrams.
Connect the test equipment according to the IED specific connection diagram and the needed
input and output signals for the function under test. An example of a connection is shown in
figure 10.
Connect the current and voltage terminals. Pay attention to the current polarity. Make sure
that the connection of input and output current terminals and the connection of the residual
current conductor is correct. Check that the input and output logical signals in the logic
diagram for the function under test are connected to the corresponding binary inputs and
outputs of the IED under test.
The MU test equipment must be connected to the CD port on the OEM module
when process bus IEC61850-9-2LE communication is used.
To ensure correct results, make sure that the IED as well as the test equipment
are properly earthed before testing.
66
Commissioning manual
1MRK 505 345-UEN B Section 9
Testing IED operation
IL1 IL1
IL2 IL2
IL3 IL3
IN IN (I4,I5)
Test equipment
UL1 UL1
UL2
IED
UL2
UL3 UL3
UN UN
UN (U4,U5)
TRIP L1
TRIP L2
TRIP L3
IEC 61850
IEC09000652-1-en.vsd
IEC09000652 V1 EN-US
Figure 10: Connection example of the test equipment to the IED when test equipment is
connected to the transformer input module
Release or unblock the function to be tested. This is done to ensure that only the function or
the chain of functions to be tested are in operation and that other functions are prevented
from operating. Release the tested function(s) by setting the corresponding Blocked
parameter under Function test modes to No in the local HMI.
When testing a function in this blocking feature, remember that not only the actual function
must be activated, but the whole sequence of interconnected functions (from measuring
inputs to binary output contacts), including logic must be activated. Before starting a new test
mode session, scroll through every function to ensure that only the function to be tested (and
the interconnected ones) have the parameters Blocked and eventually EvDisable set to No and
Yes respectively. Remember that a function is also blocked if the BLOCK input signal on the
corresponding function block is active, which depends on the configuration. Ensure that the
logical status of the BLOCK input signal is equal to 0 for the function to be tested. Event
function blocks can also be individually blocked to ensure that no events are reported to a
remote station during the test. This is done by setting the parameter EvDisable to Yes.
Any function is blocked if the corresponding setting in the local HMI under Main
menu/Test/Function test modes menu remains On, that is, the parameter
Blocked is set to Yes and the parameter TestMode under Main menu/Test/IED
test mode remains active. All functions that were blocked or released in a
previous test mode session, that is, the parameter Test mode is set to On, are
reset when a new test mode session is started.
Procedure
67
Commissioning manual
Section 9 1MRK 505 345-UEN B
Testing IED operation
Verify that the connections are correct and that measuring and scaling is done correctly. This
is done by injecting current and voltage to the IED.
Besides verifying analog input values from the merging unit via the IEC/UCA 61850-9-2LE
process bus, analog values from the transformer input module can be verified as follows.
Apply input signals as needed according to the actual hardware and the
application configuration.
68
Commissioning manual
1MRK 505 345-UEN B Section 9
Testing IED operation
IEC10000032-1-en.vsd
IEC10000032 V1 EN-US
Forcing of binary inputs and outputs is a convenient way to test wiring in substations as well
as testing configuration logic in the IEDs. Basically it means that all binary inputs and outputs
on the IED I/O modules (BOM, BIM, IOM & SOM) can be set to a value (i.e active or not-active),
selected by the user, while the IED is in test mode. For inputs, this is true regardless of the
actual signal voltage present on the input. For outputs, any output relay can be forced to be
active or not, regardless of the current requested state of the output in the IED logic
configuration.
69
Commissioning manual
Section 9 1MRK 505 345-UEN B
Testing IED operation
To enable forcing, the IED must first be put into IED test mode. While the IED is not in test
mode, the LHMI/PCM600 menus that relate to forcing will not have any effect on the input/
output status due to safety reasons.
IEC15000029 V1 EN-US
It may be convenient to control the input on mentioned component from, for example, an LHMI
function key or similar during commissioning to quickly and easily enter IED test mode.
Once the IED is in IED test mode, the LHMI/PCM600 menus can be used to control input/
output signals freely.
• Edit the input/output value directly to select the desired logical level, by doing following:
1. Select the value line of the desired signal, see figure 12.
2. Press the Enter key to edit the value.
70
Commissioning manual
1MRK 505 345-UEN B Section 9
Testing IED operation
IEC15000021 V1 EN-US
On the LHMI, these edit changes have immediate effect. This means that the
value changes directly when the up/down arrow is pressed (i.e. there is no need
to press the Enter key to effectuate the change).
When navigating away from a LHMI forcing menu for an I/O board, the user is prompted to
either leave the signals forced, or to revert all of them back to the unforced state.
IEC15000022 V1 EN-US
It is possible to power-cycle the IED in this state without losing the forcing
states and values. This means that once a signal is forced, and the IED remains
in IED test mode, the input or output will appear “frozen” at the value selected
by the user, even if the IED is switched off and back on again.
• Set the status of a signal to Forced, in the forcing menu that corresponds to the I/O card
in question. See example of LHMI menu in figure 13
71
Commissioning manual
Section 9 1MRK 505 345-UEN B
Testing IED operation
IEC15000020 V1 EN-US
The signal “freezes” and will not change value even if, for example, a binary input signal voltage
changes level, or if a binary output is activated as the result of a protection function block
activating.
In PCM600 the concept is a bit different compared to LHMI. The forcing is accomplished by
entering a forcing session. Within such a session, multiple signals on multiple I/O boards may
be edited and changed at the same time and has no effect on the IED. Once the user is
satisfied with the forcing setup, then all the changes can be effectuated simultaneously
towards the IED, potentially changing inputs and outputs on multiple I/O boards at the same
time. It is also possible to abort this operation (described in step 6 below) and to undo all
forcing.
1. Right click on the IED in the plant structure and select Signal Monitoring.
2. Click on the List View tab.
3. Click Forcing Session in the menu IED/Start Forcing.
IEC15000023 V1 EN-US
4. Click Start editing signal value for forcing on the tool bar.
IEC15000024 V1 EN-US
The Signal Monitoring menu changes and indicates the forcing values that can be edited.
72
Commissioning manual
1MRK 505 345-UEN B Section 9
Testing IED operation
IEC15000025 V1 EN-US
IEC15000026 V1 EN-US
This commits the values to the IED and exits the editing session.
7. Click Cancel to abort the changes and revert back to actual IED values.
IEC15000032 V1 EN-US
Regardless if the forcing changes are commited or canceled, the forcing is still
active.
To force more signals, click the button Start editing signal value for forcing again.
9.8.4 How to undo forcing changes and return the IED to normal
operation GUID-00E2BAD8-A29E-4B9D-80E6-E12F59E019BD v1
Regardless of which input/output signals have been forced, all forced signals will return to
their normal states immediately when the IED is taken out of test mode.
When the forcing is removed by exiting from IED test mode, both input and
output signals may change values. This means that logic input signals may
activate functions in the IED and that output relays may change state, which
can be potentially dangerous.
73
Commissioning manual
Section 9 1MRK 505 345-UEN B
Testing IED operation
• If the IED test mode was entered through the test mode function block:
1. Deactivate the control input on that block.
This immediately undoes all forcing, regardless of how it was accomplished and disabled
all the way to force signals.
This immediately undoes all forcing, regardless of how it was accomplished and disabled.
IEC15000031 V1 EN-US
This may change both binary input values and output relay states and will undo
any forcing done by using the LHMI.
If the IED is left in test mode, then it is still possible to perform new forcing
operations, both from LHMI and from PCM600
74
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
• Disturbance recorder
• Event list
• Event recorder
• Fault locator
• Trip value recorder
• Indications
If the disturbance report is set on, then its sub-functions are also set up and so it is not
possible to only switch these sub-functions off. The disturbance report function is switched
off (parameter Operation = Off) in PCM600 or the local HMI under Main menu/Settings/IED
Settings/Monitoring/Disturbance report/DRPRDRE:1.
When the IED is in test mode, the disturbance report can be made active or inactive. If the
disturbance recorder is turned on during test mode, recordings will be made. When test mode
is switched off all recordings made during the test session are cleared.
Setting OpModeTest for the control of the disturbance recorder during test mode are located
on the local HMI under Main menu/Settings/IED Settings/Monitoring/Disturbance report/
DRPRDRE:1.
A Manual Trig can be started at any time. This results in a recording of the actual values from
all recorded channels.
75
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Evaluation of the results from the disturbance recording function requires access to a PC
either permanently connected to the IED or temporarily connected to the Ethernet port (RJ-45)
on the front. The PCM600 software package must be installed in the PC.
Disturbance upload can be performed by the use of PCM600 or by any third party tool with IEC
61850 protocol. Reports can automatically be generated from PCM600. Disturbance files can
be analyzed by any tool reading Comtrade formatted disturbance files.
It could be useful to have a printer for hard copies. The correct start criteria and behavior of
the disturbance recording function can be checked when IED protective functions are tested.
When the IED is brought into normal service it is recommended to delete all recordings, made
during commissioning to avoid confusion in future fault analysis.
The result from the event recorder and event list can be viewed on the local HMI or, after
upload, in PCM600 as follows:
When the IED is brought into normal service it is recommended to delete all events resulting
from commissioning tests to avoid confusion in future fault analysis. All events in the IED can
be cleared in the local HMI under Main Menu//Clear/Clear internal event list or Main menu/
Clear/Clear process event list. It is not possible to clear the event lists from PCM600.
When testing binary inputs, the event list (EL) might be used instead. No uploading or
analyzing of registrations is then needed since the event list keeps running, independent of
start of disturbance registration.
Use the technical manual to identify function blocks, logic diagrams, input and output signals,
setting parameters and technical data.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
76
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Connect single-phase or three-phase test set to inject the operating voltage. The
injection is done across the measuring branch.
The required trip and alarm voltage, as well as the used stabilizing
resistance value must be set in the function. Note as well that used CT
input in the IED must have ratio set as 1:1. This is essential for the
measurement of the expected value. Normally a slightly higher operating
value is no problem as the sensitivity is not influenced much.
2. Increase the voltage and make note of the operate value U>Trip. This is done by manual
testing and without trip of the test set.
3. Connect the trip contact to the test set to stop the test set for measurement of trip
times below.
4. Reduce the voltage slowly and make note of the reset value. The reset value must be high
for this function.
5. Check the operating time by injecting a voltage corresponding to 1.2 ˣ U>Trip level. Make
note of the measured trip time.
6. If required, verify the trip time at another voltage. Normally 2 ˣ U>Trip is selected.
7. If used, measure the alarm level operating value. Increase the voltage and make note of
the operate value U>Alarm. This is done with manual test and without trip of the test set.
8. Measure the operating time on the alarm output by connecting the stop of the test set to
an output from tAlarm. Inject a voltage 1.2 ˣ U>Alarm and measure the alarm time.
9. Check that trip and alarm outputs operate according to the configuration logic.
10. Finally check that start and alarm information is stored in the event menu and if a serial
connection to the SA is available verify that the correct and only the required signals are
presented on the local HMI and on the SCADA system.
Information on how to use the event menu is found in the operator's manual.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. Connect the test set for single-phase current injection to the protection terminals
connected to the CT in the power transformer neutral-to-earth circuit.
2. Increase the injection current and note the operating value of the protection function.
3. Check that all trip and start contacts operate according to the configuration logic.
4. Decrease the current slowly from operate value and note the reset value.
5. Connect the timer and set the current to ten times the value of the IDMin setting.
77
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The test of the line differential protection is done with the different IEDs geographically
separated from each other. It is important to note that local actions, in one IED, may cause
operation in remotely located IEDs. In the test of the line differential function actions must be
done in all involved IEDs.
When the protection at one end is activated to Test mode, this information is
automatically sent to remote end IEDs through the LineDiffLogic function block
and the remote functions are then also blocked automatically.
Before test the trip signal to the circuit breaker must be blocked, for example by applying the
COMBITEST test switch.
Line differential protection must be set in test mode. This involves switching the IED to Test
mode and the functions involved in the test. For the Differential protection there are settings
to Test mode and also the activation of the local function with setting "Release local".
Remember also for example the trip function block deblocking to be able to measure trip
times. In the test mode the injected current is communicated to the remote IEDs and sent
back to the IED under test. The echoed current is switched in phase so that current in phase L1
is returned in phase L2, current in phase L2 is returned in phase L3 and current in phase L3 is
returned in phase L1. The amplitude of the returned current can be set separately as a ratio of
the injected current.
Take a line with three IEDs, for example, set the return current from each remote IED to be
50% of the injected current. Inject a current Iinjected, L1 in phase L1 to get the following
differential and bias currents:
Phase L1:
78
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Phase L2:
Phase L3:
IDiffL3 = IBiasL3 = 0
EQUATION1460 V2 EN-US
Procedure
1. Block the trip signal from all involved IEDs with local operation released. See below.
2. Set Test mode to On for the Line differential function for test.
3. Release the local function with setting ReleaseLocal in local HMI under: Main menu/Test/
Line differential test/LineDiffLogic
4. Set the factor of the return currents to 1/(number of current IEDs = 1).
5. Inject a current in phase L1 and increase the current until the function operates for
phases L1 and L2.
The injected operate current must correspond to the set IdMin. The service values for
IDiffL1, IBiasL1, IDiffL2 and IBiasL2 must be equal to the injected current.
6. Repeat step 4 by current injection in phases L2 and L3.
7. Inject a symmetrical three-phase current, and increase the current until operation is
achieved in all three phases.
The injected operate current must correspond to the set IdMin. The service values for
IDiffL1, IBiasL1, IDiffL2, IBiasL3, IDiffL3 and IBiasL3 must be equal to the injected current.
8. Read the transmission delay.
9. Measure the operating time by injection of a single-phase current in phase 1.
The injected current must be 4 times the operating current. The time measurement is
stopped by the trip output.
Note that tripping times at this loop test includes sending the local currents to remote
side and with a factor sending them back. This means that tripping times are virtually
double to the times achieved at a real fault or at bench testing.
10. Check the negative sequence fault discriminator by injecting a three-phase current with
changed phase sequence: switch phases L1 and L2. The injected current will now be seen
as a pure negative-sequence current where the phase angle between the local negative-
sequence current and the remote negative-sequence currents will be 120°.
With the current above IMinNegSeq, the signal external fault (EXTFAULT) must apply. No
trip must be generated.
11. Disconnect the test equipment and reconnect the current transformers.
12. Read and check the service values of the three-phase current.
13. Switch off the test mode and the release local.
14. With a through load current (maximum current of line ends) of minimum 20% of IBase the
current IDiff and IBias are read in all phases.
IDiff must be less than 10% of the maximum line end current and IBias must be equal to
the largest line end current.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
79
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
After finishing a loop test with line in service and before leaving test mode,
the setting ReleaseLocal in local HMI under: Main menu/Test/Line differential
test/LineDiffLogic must be set to BlockAll. If not, the load current might
cause incorrect operation of the differential function at restarts of the line
differential protection IED.
Prepare the IED for verification of settings outlined in section 1 “Overview” and section 2
“Preparing for test” in this chapter.
1. Connect the test set for three phase current injection and three phase voltage to the
appropriate IED terminals.
2. Inject symmetrical phase voltages equal to the rated voltage.
3. Decrease the injected voltage in phase L1 and note the operated value (start value) of the
function.
4. Increase the voltage slowly and note the reset value.
5. Connect a trip output contact to a timer.
6. Reduce the injected voltage stepwise to 90 % of the operate level, and check the time
delay.
7. Repeat points 3– 6 for phases L2 and L3.
8. Inject symmetrical phase voltages equal to the rated voltage.
9. Decrease the injected phase-phase voltage L1-L2 and note the operated value (start
value) of the function.
10. Increase the voltage slowly and note the reset value.
11. Connect a trip output contact to a timer.
12. Reduce the injected voltage stepwise to 90 % of the operate level, and check the time
delay.
13. Repeat points 9 – 12 for phases L2-L3 and L3-L1.
80
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Connect the test set for three phase voltage injection (L1, L2, L3) or residual voltage
injection (N) to the appropriate IED terminals. This is dependent on how the IED is fed
from the CT .
2. Increase the injected zero sequence current and note the operate value (start value) of
the studied step of the function.
3. Decrease the current slowly and note the reset value.
4. Connect a trip output contact to a timer.
5. Set the injected current to 200 % of the operate level of the tested stage, switch on the
current and check the time delay.
1. Connect the test set for three phase current injection to the appropriate IED terminals.
2. Inject a symmetrical three phase current larger than the set value IUC<
3. Decrease the injected current in phase L1 and note the operate value (start value) of the
studied step of the function.
4. Increase the current slowly and note the reset value.
5. Connect a trip output contact to a timer.
6. Decrease the injected current stepwise to 50 % of the operate level and check the time
delay.
7. Repeat steps 3 – 6 for phases L2 and L3.
Continue to test another function or end the test by changing the test mode setting to off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings outlined in section "Requirements" and section
"Preparing for test" in this chapter.
Measure operating characteristics during constant current conditions. Keep the measured
current as close as possible to its rated value or lower. But make sure it is higher than the set
minimum operating current.
Ensure that the maximum continuous current to the IED does not exceed four times its rated
value, if the measurement of the operating characteristics runs under constant voltage
conditions.
The test procedure has to take into consideration that the shaped load encroachment
characteristic is active. It is therefore necessary to check the setting. To verify the settings
with the shaped load encroachment characteristic the test should be carried out according to
figures 14 and 15 and tables 17 and 18. In cases where the load encroachment characteristic is
activated tests according to the adjusted figures should be carried out.
To verify the settings for the operating points according to the following fault types should be
tested:
81
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
The shape of the operating characteristic depends on the values of the setting parameters.
The figures illustrating the characteristic for the distance protection function
can be used for settings with and without load encroachment. The solid lines
designate the diagram applicable when the load current compensation is
active. The solid line and all test points except 13 are valid for this case.
When the load current compensation is inactive, the dotted lines and test point
13 are valid. Test points 5, 6, and 7 are not valid for this measurement.
1 2
80%
11 3
50%
X1 10 4
12
120° D
a 5 A rgL
6 b=
R (Ohm/phase)
7 13
9 c 20°
8
40% of RLdFw
80% of RLdFw
0.5 x RFPP
IEC05000368-3-en
IEC05000368 V3 EN-US
Figure 14: Distance protection characteristic with test points for phase-to-phase
measurements
R 0
2 X X1set
R R1set
3 X 0.8 x X1set
4 X 0.5 x X1set
5 X 0.85 x RFPP x tan (ArgRLd) ArgLd = angle for the maximal load transfer
R 0.85 x RFPP
6 X RLdFw x tan (ArgLd)
R RLdFw
Table continues on next page
82
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
R –0.23 x X1set
R –0.37 x X1 set
12 X 0.5 x X1set
R 0.5 x R1set
1 2
80%
11 3
50%
X1+XN 10 4
12
120° 5 LD
a Arg
6 b=
R (Ohm/loop)
7 13
9 20°
8
c
40% of RLdFw
80% of RLdFw
alt. 80% of
RFPE
RFPE (Load
encroachment)
IEC05000369-3-en.vsd
IEC05000369 V3 EN-US
Figure 15: Distance protection characteristic with test points for phase-to-earth
measurements
Table 18 is used in conjunction with figure 15.
R 0
2 X (2 x X1set+ X0set)/3
R 2 x R1set+ R0set)/3
83
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
R 0.5 x (2 x R1set+R0set)/3 +
RFPEset
5 X 0.85 x RFPEset x tan(ArgLdset) ArgLd = angle for the maximal load transfer
R 0.85 x RFPE
6 X RLdFwset x tan(ArgLdSet)
R RLdFwset
7 X 0
R RLdFwset
R 0.4 x RLdFwset
9 X –0.8 x RLdFwset x
tan(ArgDir=20°)
R 0.8 x RLdFwset
Procedure:
1. Subject the IED to healthy normal load conditions for at least two seconds.
2. Apply the fault condition and slowly decrease the measured impedance to find the
operating value of the phase-to-phase fault for zone 1 according to test point 1 in
figure 14 and table 17. Compare the result of the measurement with the set value.
3. Repeat steps 1 to 2 to find the operating value for test points 2, 3 in table 17.
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
4. Repeat steps 1 to 3 to find the operating value for the phase-to-earth fault L3–E
according to figure 15 and table 18.
84
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Procedure:
1. Subject the IED to healthy normal load conditions for at least two seconds.
2. Apply the fault condition to find the operating time for the phase-to-phase fault
according to test point 12 in figure 14 and table 17 for zone 1. Compare the result of the
measurement with the setting t1PP.
3. Repeat steps 1 to 2 to find the operating time for the phase-to-earth fault according to
test point 12 in figure 15 and table 18. Compare the result of the measurement with the
setting t1PE.
4. Repeat steps 1 to 3 to find the operating time for all other used measuring zones.
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The phase selectors operate on the same measuring principles as the impedance measuring
zones. So it is necessary to follow the same principles as for distance protection, when
performing the secondary injection tests.
Measure operating characteristics during constant current conditions. Keep the measured
current as close as possible to the rated value of its associated input transformer, or lower.
But ensure that it is higher than the set minimum operating current.
Ensure that the maximum continuous current to the IED does not exceed four times its rated
value, if the measurement of the operating characteristics runs under constant voltage
conditions.
To verify the settings the operating points according to figures 16 and 17 should be tested. See
also tables 19 and 20 for information.
85
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
X ( W / loop)
4 85% 3
( X 1 + XN ) 5
ArgNegRes 60°
2 R ( W / loop)
7
6
50% of RLdFw
RFFwPE IEC09000734-4-en.vsd
IEC09000734 V4 EN-US
Figure 16: Operating characteristic for phase selection function, forward direction
single-phase faults
86
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
X ( W / phase)
4 85% 3
X1 ArgLd
5
ArgNegRes
60°
2
R ( W / phase)
6 7
ArgDir
50% RLdFw
0.5·RFFwPP IEC09000735-3-en.vsd
IEC09000735 V3 EN-US
Figure 17: Operating characteristic for phase selection function, forward direction
phase-to-phase faults
Procedure:
87
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1. Supply the IED with healthy conditions for at least two seconds.
2. Apply the fault condition and slowly decrease the measured impedance to find the
operate value for of the phase-to-earth loop L3, test point 1, according to figure 16.
Compare the result of the measurement with the expected value according to table 19.
The corresponding binary signals that inform about the operation of the phase selection
measuring elements are available in the local HMI under
Main menu/Test/Function status/Impedance Protection/PhaseSelection(PDIS, 21)/
FDPSPDIS:x.
3. Repeat steps 1 to 2 to find the operate values for the remaining test points according to
figure 16 and table 19.
4. Repeat steps 1 to 3 to find the operate value for the phase-to-phase fault in L1 — L2
according to figure 17 and table 20.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
10.4.3 Full scheme distance protection, mho characteristic ZMHPDIS M14944-3 v10
Prepare the IED for verification of settings outlined in section "Requirements" and section
"Preparing for test" in this chapter.
Consider releasing of the zone to be tested by setting the phase selector FMPSPDIS to On .
Keep the current constant when measuring operating characteristics. Keep the current as
close as possible to its rated value or lower. But make sure it is higher than the set minimum
operating current.
Ensure that the maximum continuous current in an IED does not exceed four times its rated
value, if the measurement of the operating characteristics runs under constant voltage
conditions.
In the following, three test points are proposed. The mho characteristic always goes through
the origin, which automatically gives a fourth point for the characteristic.
88
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
X 1
ZPP
3 2
50%
ZAngPP R Ohm/phase
IEC07000009-4-en.vsd
IEC07000009 V4 EN-US
Change the magnitude and angle of phase-to-phase voltage to achieve impedances at test
points 1, 2 and 3. For each test point, observe that the output signals, START, STLx and STPP
are activated where x refers to the actual phase to be tested. After the timer tPP for the actual
zone has elapsed, also the signals TRIP, TRPP and TRx shall be activated.
For simplicity, the same test points as for phase-to-phase faults are proposed, but
considering new impedance values.
89
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
50%
ZAngPE R
Ohm/loop
IEC07000010-4-en.vsd
IEC07000010 V4 EN-US
Check also in the same way as for phase-to-earth fault for each test point that the output
signals STPE, are activated where x refers to the actual phase to be tested. After the timer tPE
for the zone has elapsed, also the signals TRIP, TRPE and TRx shall be activated.
There is no specific test routine for this function. The function is tested in conjunction with
other impedance (mho) functions.
Prepare the IED for verification of settings as outlined in section "Preparing for test" in this
chapter.
Consider releasing Zone 1 with the Phase selection with load encroachment, quadrilateral
characteristic (FRPSDPIS). If the autorecloser is not released and in service, trip will always be
three phase.
Measure operating characteristics during constant current conditions. Keep the measured
current as close as possible to its rated value or lower. But make sure it is higher than 30% of
the rated current.
90
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Ensure that the maximum continuous current in an IED does not exceed four times its rated
value, if the measurement of the operating characteristics runs under constant voltage
conditions.
The test procedure has to take into consideration that the shaped load encroachment
characteristic is active. It is therefore necessary to check the setting. To verify the settings
with the shaped load encroachment characteristic the test should be carried out according to
figures 20 and 21 and tables 23 and 24. In cases where the load encroachment characteristic is
activated tests according to the adjusted figures should be carried out.
To verify the settings for the operating points according to the following fault types should be
tested:
The shape of the operating characteristic depends on the values of the setting parameters.
The figures illustrating the characteristic for the distance protection function
can be used for settings with and without load encroachment. The solid lines
designate the diagram applicable when the load current compensation is
active. The solid line and all test points except 13 are valid for this case.
When the load current compensation is inactive, the dotted lines and test point
13 are valid. Test points 5, 6, and 7 are not valid for this measurement.
1 2
80%
11 3
50%
X1 10 4
12
120° LD
a 5 Arg
6 b=
R (Ohm/phase)
7 13
9 c 20°
8
40% of RLdFw
80% of RLdFw
0.5 x RFPP
IEC05000368-3-en
IEC05000368 V3 EN-US
Figure 20: Distance protection characteristic with test points for phase-to-phase
measurements
Table 23 is used in conjunction with figure 20.
91
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1 2
80%
11 3
50%
X1+XN 10 4
12
5 D
a
120°
A rgL
6 b=
R (Ohm/loop)
7 13
9 20°
8
c
40% of RLdFw
80% of RLdFw
alt. 80% of
RFPE
RFPE (Load
encroachment)
IEC05000369-3-en.vsd
IEC05000369 V3 EN-US
Figure 21: Distance protection characteristic with test points for phase-to-earth
measurements
Table 24 is used in conjunction with figure 21.
R 0
2 X X1set
R R1set
3 X 0.8 x X1set
4 X 0.5 x X1set
5 X 0.85 x RFPP x tan (ArgRLd) ArgRLd = angle for the maximal load transfer
R 0.85 x RFPP
6 X RLdFw x tan (ArgLd)
R RLdFw
7 X RLdFw x tan (ArgLd)
R 0
8 X –0.2143 x RFPP/2 Exact: 0.8 x RFPP/2 (ArgDir)
R 0.8 x RFPP/2
9 X –0.4 x RLdFw x tan(ArgDir)
R 0.4 x RLdFw
10 X 0.5 x X1set Exact –0.5 x R1set x tan(ArgNegRes-90)
R –0.23 x X1set
R –0.37 x X1 set
92
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
R 0.5 x R1set
R 0
2 X (2 x X1set+ X0set)/3
R 2 x R1set+ R0set)/3
R 0.5 x (2 x R1set+R0set)/3 +
RFPEset
5 X 0.85 x RFPEset x tan(ArgLdset) ArgLd = angle for the maximal load transfer.
R 0.85 x RFPE
6 X RLdFwset x tan(ArgLdSet)
R RLdFwset
7 X 0
R RLdFwset
R 0.8 x RLdFwset
R 0.8 x RLdFwset
13 X 0
R RFPE
Procedure:
93
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1. Subject the IED to healthy normal load conditions for at least two seconds.
2. Apply the fault condition and slowly decrease the measured impedance to find the
operating value of the phase-to-phase fault for zone 1 according to test point 1 in
figure 20 and table 23. Compare the result of the measurement with the set value.
3. Repeat steps 1 to 2 to find the operating value for test points 2, 3 in table23.
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
4. Repeat steps 1 to 3 above to find the operating value for the phase-to-earth fault L3-E
according to figure 21 and table 24.
Procedure:
1. Subject the IED to healthy normal load conditions for at least two seconds.
2. Apply the fault condition to find the operating time for the phase-to-phase fault
according to test point 10 in figure 20 and table 23 for zone 1. Compare the result of the
measurement with the setting tPP.
3. Repeat steps 1 to 2 to find the operating time for the phase-to-earth fault according to
test point 10 in figure 21 and table 24. Compare the result of the measurement with the
setting tPE.
4. Repeat steps 1 to 2 to find the operating time for all other used measuring zones.
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
Prepare the IED for verification of settings as outlined in section "Preparing for test" in this
chapter.
The phase selectors operate on the same measuring principles as the impedance measuring
zones. So it is necessary to follow the same principles as for distance protection, when
performing the secondary injection tests.
Measure operating characteristics during constant current conditions. Keep the measured
current as close as possible to the rated value of its associated input transformer, or lower.
But ensure that it is higher than 30% of the rated current.
Ensure that the maximum continuous current of an IED does not exceed four times its rated
value, if the measurement of the operating characteristics runs under constant voltage
conditions.
To verify the settings the operating points according to figures 22 and 23 should be tested.
See also tables 25 and 26 for information.
94
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
X ( W / loop)
4 85% 3
( X 1 + XN ) 5
ArgNegRes 60°
2 R ( W / loop)
7
6
50% of RLdFw
RFFwPE IEC09000734-4-en.vsd
IEC09000734 V4 EN-US
Figure 22: Operating characteristic for phase selection function, forward direction
single-phase faults
X ( W / phase)
4 85% 3
X1 ArgLd
5
ArgNegRes
60°
2
R ( W / phase)
6 7
ArgDir
50% RLdFw
0.5·RFFwPP IEC09000735-3-en.vsd
IEC09000735 V3 EN-US
Figure 23: Operating characteristic for phase selection function, forward direction
phase-to-phase faults
95
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
The table showing test points for phase-to-earth loops is used together with figure 22.
The table showing test points for phase-to-phase loops is used together with figure 23.
Procedure:
1. Supply the IED with healthy conditions for at least two seconds.
2. Apply the fault condition and slowly decrease the measured impedance to find the
operate value for of the phase-to-earth loop L3, test point 1, according to figure 22.
Compare the result of the measurement with the expected value according to table 25.
The corresponding binary signals that inform about the operation of the phase selection
measuring elements are available in the local HMI under
Main menu/Test/Function status/Impedance Protection/PhaseSelection(PDIS, 21)/
FRPSPDIS:x .
3. Repeat steps 1 to 2 to find the operate values for the remaining test points according to
figure 22 and table 25.
96
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
4. Repeat steps 1 to 3 to find the operate value for the phase-to-phase fault in L1 — L2
according to figure 23 and table 26.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
Measure operating characteristics during constant current conditions. Keep the measured
current as close as possible to its rated value or lower. But make sure it is higher than the set
minimum operating current.
Ensure that the maximum continuous current to the IED does not exceed four times its rated
value, if the measurement of the operating characteristics runs under constant voltage
conditions.
The test procedure has to take into consideration that the shaped load encroachment
characteristic is active. It is therefore necessary to check the setting. To verify the settings
with the shaped load encroachment characteristic the test should be carried out according to
figures 24 and 25 and tables 27 and 28. In cases where the load encroachment characteristic is
activated tests according to the adjusted figures should be carried out.
To verify the settings for the operating points according to the following fault types should be
tested:
The shape of the operating characteristic depends on the values of the setting parameters.
The figures illustrating the characteristic for the distance protection function
can be used for settings with and without load encroachment. The solid lines
designate the diagram applicable when the load current compensation is
active. The solid line and all test points except 13 are valid for this case.
When the load current compensation is inactive, the dotted lines and test point
13 are valid. Test points 5, 6, and 7 are not valid for this measurement.
97
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1 2
80%
11 3
50%
X1 10 4
12
120° D
a 5 A rgL
6 b=
R (Ohm/phase)
7 13
9 c 20°
8
40% of RLdFw
80% of RLdFw
0.5 x RFPP
IEC05000368-3-en
IEC05000368 V3 EN-US
Figure 24: Distance protection characteristic with test points for phase-to-phase
measurements
R 0
2 X X1set
R R1set
3 X 0.8 x X1set
4 X 0.5 x X1set
5 X 0.85 x RFPP x tan (ArgLd) ArgLd = angle for the maximal load transfer
R 0.85 x RFPP
6 X RLdFw x tan (ArgLd)
R RLdFw
7 X 0
R RLdFw
8 X –0.2143 x RFPP/2 Exact: 0.8 x RFPP/2 (ArgDir=20°)
R 0.8 x RFPP/2
9 X –0.4 x RLdFw x tan(ArgDir=20°)
R 0.4 x RLdFw
10 X 0.5 x X1set Exact –0.5 x R1set x tan(ArgNegRes=30°)
R –0.23 x X1set
R –0.37 x X1 set
98
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
R 0.5 x R1set
13 X 0
R 0.5 x RFPP
1 2
80%
11 3
50%
X1+XN 10 4
12
5 D
a
120°
A rgL
6 b=
R (Ohm/loop)
7 13
9 20°
8
c
40% of RLdFw
80% of RLdFw
alt. 80% of
RFPE
RFPE (Load
encroachment)
IEC05000369-3-en.vsd
IEC05000369 V3 EN-US
Figure 25: Distance protection characteristic with test points for phase-to-earth
measurements
Table 28 is used in conjunction with figure 25.
R 0
2 X (2 x X1set+ X0set)/3
R 2 x R1set+ R0set)/3
R 0.5 x (2 x R1set+R0set)/3 +
RFPEset
5 X 0.85 x RFPEset x tan(ArgLdset) ArgLd = angle for the maximal load transfer
R 0.85 x RFPE
6 X RLdFwset x tan(ArgLdSet)
R RLdFwset
99
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
R 0.8 x RLdFwset
9 X –0.8 x RLdFwset x
tan(ArgDir=20°)
–0.8 x RLdFwdset x
tan(ArgDir=20°)
R 0.8 x RLdFwset
13 X 0
R RFPE
Procedure:
1. Subject the IED to healthy normal load conditions for at least two seconds.
2. Apply the fault condition and slowly decrease the measured impedance to find the
operating value of the phase-to-phase fault for zone 1 according to test point 1 in figure
24 and table 27. Compare the result of the measurement with the set value.
3. Repeat steps 1 to 2 to find the operating value for test points 2, 3 in table 27
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
4. Repeat steps 1 to 3 to find the operating value for the phase-to-earth fault L3-E according
to figure 25 and table 28.
Procedure:
100
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Subject the IED to healthy normal load conditions for at least two seconds.
2. Apply the fault condition to find the operating time for the phase-to-phase fault
according to test point 12 in figure 24 and table 27 for zone 1. Compare the result of the
measurement to the setting tPPZ1.
3. Repeat steps 1 to 2 to find the operating time for the phase-to-earth fault according to
test point 12 in figure 25 and table 28. Compare the result of the measurement to the
setting tPEZ1.
4. Repeat steps 1 to 2 to find the operating time for all other used measuring zones.
The zones that are not tested have to be blocked and the zone that is tested has to be
released.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings outlined in section "Requirements" and section
"Preparing for test" in this chapter.
Measure operating characteristics during constant current conditions. Keep the measured
current as close as possible to its rated value or lower. But make sure it is higher than the set
minimum operating current.
Ensure that the maximum continuous current to the IED does not exceed four times its rated
value, if the measurement of the operating characteristics runs under constant voltage
conditions.
The test procedure has to take into consideration that the shaped load encroachment
characteristic is active. It is therefore necessary to check the setting. To verify the settings
with the shaped load encroachment characteristic the test should be carried out according to
figures 26 and 27 and tables 29 and 30. In cases where the load encroachment characteristic is
activated tests according to the adjusted figures should be carried out.
To verify the settings for the operating points according to the following fault types should be
tested:
• One phase-to-phase fault
• One phase-to-earth fault
The shape of the operating characteristic depends on the values of the setting parameters.
The figures illustrating the characteristic for the distance protection function
can be used for settings with and without load encroachment. The solid lines
designate the diagram applicable when the load current compensation is
active. The solid line and all test points except 13 are valid for this case.
When the load current compensation is inactive, the dotted lines and test point
13 are valid. Test points 5, 6, and 7 are not valid for this measurement.
101
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1 2
80%
11 3
50%
X1 10 4
12
120° D
a 5 A rgL
6 b=
R (Ohm/phase)
7 13
9 c 20°
8
40% of RLdFw
80% of RLdFw
0.5 x RFPP
IEC05000368-3-en
IEC05000368 V3 EN-US
Figure 26: Distance protection characteristic with test points for phase-to-phase
measurements
R 0
2 X X1set
R R1set
3 X 0.8 x X1set
4 X 0.5 x X1set
5 X 0.85 x RFPP x tan (ArgLd) ArgLd = angle for the maximal load transfer
R 0.85 x RFPP
6 X RLdFw x tan (ArgLd)
R RLdFw
7 X RLdFw x tan (ArgLd)
R 0
8 X –0.2143 x RFPP/2 Exact: 0.8 x RFPP/2 (ArgDir=20°)
R 0.8 x RFPP/2
9 X –0.4 x RLdFw x tan(ArgDir=20°)
R 0.4 x RLdFw
10 X 0.5 x X1set Exact –0.5 x R1set x tan(ArgNegRes=30°)
R –0.23 x X1set
R –0.37 x X1 set
102
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
R 0.5 x R1set
13 X 0
R 0.5 x RFPP
1 2
80%
11 3
50%
X1+XN 10 4
12
5 D
a
120°
A rgL
6 b=
R (Ohm/loop)
7 13
9 20°
8
c
40% of RLdFw
80% of RLdFw
alt. 80% of
RFPE
RFPE (Load
encroachment)
IEC05000369-3-en.vsd
IEC05000369 V3 EN-US
Figure 27: Distance protection characteristic with test points for phase-to-earth
measurements
Table 30 is used in conjunction with figure 27.
R 0
2 X (2 x X1set+ X0set)/3
R 2 x R1set+ R0set)/3
R 0.5 x (2 x R1set+R0set)/3 +
RFPEset
5 X 0.85 x RFPEset x tan(ArgLdset) ArgLd = angle for the maximal load transfer
R 0.85 x RFPE
6 X RLdFwset x tan(ArgLdSet)
R RLdFwset
103
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
R 0.8 x RLdFwset
9 X –0.8 x RLdFwset x
tan(ArgDir=20°)
R 0.8 x RLdFwset
13 X 0
R RFPE
Procedure:
1. Subject the IED to healthy normal load conditions for at least two seconds.
2. Apply the fault condition and slowly decrease the measured impedance to find the
operating value of the phase-to-phase fault for zone 1 according to test point 1 in
figure 26 and table 29. Compare the result of the measurement with the set value.
3. Repeat steps 1 to 2 to find the operating value for test points 2, 3 in table 29.
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
4. Repeat steps 1 to 3 to find the operating value for the phase-to-earth fault L3-E according
to figure 27 and table 30.
Procedure:
104
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Subject the IED to healthy normal load conditions for at least two seconds.
2. Apply the fault condition to find the operating time for the phase-to-phase fault
according to test point 10 in figure 26 and table 29 for zone 1. Compare the result of the
measurement with the setting t1PP.
3. Repeat steps 1 to 2 to find the operating time for the phase-to-earth fault according to
test point 10 in figure 27 and table 30. Compare the result of the measurement with the
setting t1PE.
4. Repeat steps 1 to 2 to find the operating time for all other used measuring zones.
Observe that the zones that are not tested have to be blocked and the zone that is tested
has to be released.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
The aim is to verify that the settings of the Power swing detection function ZMRPSB is
according to the setting table and to verify that ZMRPSB operates as expected.
Prepare the IED for verification of settings outlined in section "Requirements" and
section "Preparing for test" in this chapter.
Before starting this process, all impedance measuring zones shall be set and in operation. Test
the outer resistive boarder in forward and reverse direction, RLdOutFw and RLdOutRv and the
inner reactive boarder in forward and reverse direction X1InFw and X1InRv. See figure 28.
The corresponding resistive border for the inner resistive boundary and outer resistive
boundary is calculated automatically from the setting of kLdRFw and kLdRRv.
The inner zone of ZMRPSB must cover all zones by at least 10% margin.
The test is mainly divided into two parts, one which aim is to verify that the settings are in
accordance to the selectivity plan and a second part to verify the operation of ZMRPSB. The
proposed test points for validation of the settings are numbered according to figure 28
Test of the interactions or combinations that are not configured are not considered in this
instruction.
105
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
X1OutFw X ZL
X1InFw
RLdOutRv j j
2
1 R
RLdInRv RLdOutFw
RLdInFw
X1InRv
4
X1OutRv
IEC09000226_1_en.vsd
IEC09000226 V1 EN-US
Figure 28: Operating principle and characteristic of the power swing detection function
(settings parameters in italic)
Where:
RLdInFw = RLdOutFw · kLdRFw
RLdInRv = RLdOutRv · kLdRRv
X1OutFw = X1InFw + (RLdOutFw - RLdInFw)
X1OutRv = X1InRv + (RLdOutFw - RLdInFw)
Preconditions
The following output signal shall be configured to binary output available: ZOUT, measured
impedance within outer impedance boundary.
1. Keep the measured current as close as possible to its rated value or lower. Keep it
constant during the test, but ensure that it is higher than the set minimum operating
current.
2. Ensure that the maximum continuous current to the IED does not exceed four times its
rated value, if the measurement of the operating characteristics runs under constant
voltage conditions.
3. Make the necessary connections and settings of the test equipment for test of point 1
according to figure 28.
106
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
4. Decrease the measured three-phase impedance slowly and observe the operation value
for the signal ZOUT.
5. Compare the operation value with the set value.
6. Do the necessary change of the setting of the test equipment and repeat step 4 and step
5 for point 2, 3 and 4 according to figure 28.
Preconditions
The following output signals shall be configured to binary outputs: ZOUT, measured
impedance within outer impedance boundary, ZIN, measured impedance within inner
impedance boundary and START, power swing detection.
1. Slowly decrease the measured impedance in all three phases until the START signal gets
activated.
2. Increase the measured voltages to their rated values.
3. Decrease instantaneously voltages in all three phases to the values, which are
approximately 20% lower than the voltage that gives the set value R1LIn at the
predefined test current.
4. The START signal must not appear.
5. Increase the measured voltages to their rated values.
Preconditions
• The input I0CHECK, residual current (3I0) detection used to inhibit the start output must
be configured to the output signal STPE on the FDPSPDIS or FRPSPDIS function.
• The input BLKI02, block inhibit of the start output for subsequent residual current
detection is connected to FALSE.
1. Program the test equipment for a single-phase to earth fault and energize FDPSPDIS or
FRPSDIS and check that the input BLOCK on the power swing detection function ZMRPSB
is activated.
2. Make a test sequence so that a single-phase to earth fault occurs after that the trajectory
of the impedance has passed the outer and inner boundary of ZMRPSB during power
swing. Use the result from test of ZMRPSB above to determine when the fault shall be
applied. The earth-fault must be activated before tR1 has elapsed.
3. Start the sequence and observe that the START signal will not be activated.
10.4.9.4 Testing the block input, interaction between FDPSPDIS or FRPSPDIS and
ZMRPSB M13888-73 v7
Precondition
The BLOCK input is configured and connected to STPE output on the FDPSPDIS or FRPSPDIS
function.
1. Make a test sequence so that a single phase-to-earth-fault occurs after that the
trajectory of the impedance has passed the outer boundary but not the inner boundary
of the power swing detection function ZMRPSB. Use the result from test of ZMRPSB
above to instance when the fault shall be applied.
2. Start the test sequence by continuously reducing the voltage and observe that the
output signal ZOUT may come, but not START.
107
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
Most readily available test equipment does not permit simulation of power-swing conditions
and the simultaneous occurrence of different faults with controlled fault impedance. For this
reason it is necessary to enable the logic by connecting the STPSD input signal to some other
functional signal, which is used for testing purposes.
Make sure that the existing configuration permits monitoring of the CS, TRIP signals on the
binary outputs of the IED. If not, configure connections to unused binary outputs, for test
purposes.
Procedure
1. Set the operation of all distance zones, which are supposed to be blocked by the
operation of ZMRPSB, to Off.
2. Configure the STPSD functional inputs to the TRIP output of the underreaching power-
swing zone, if the underreaching communication scheme is used.
3. Start instantaneously any kind of fault within the underreaching power-swing zone and
check, that:
• The CS signal appears after the time delay, which is equal to the sum of set time
delays for the underreaching zone tnPP or tnPE (dependent on the type of fault)
and for the carrier send security timer tCS. Also add the usual operate time for the
underreaching zone (approximately 30ms).
• The TRIP signal appears after the time delay, which is equal to the sum of set time
delays for the underreaching zone tnPP or tnPE (dependent on the type of fault)
and for the trip security timer tTrip. Also add the usual operate time for the
underreaching zone (approximately 30ms).
4. Simulate the receiving of the carrier signal so that the functional input signal CR becomes
a logical one.
5. Configure the STPSD input to connect to the output START of the carrier accelerating
zone (Power-swing overreaching zone).
6. Initiate any kind of fault within the carrier accelerating zone and check that the TRIP
signal appears after the time, which is equal to the time delay set on the trip timer tTrip.
Also consider the (average) operate time of the carrier acceleration zone (approximately
30ms).
108
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Additionally connect the IED according to the test instructions for the four step residual
overcurrent protection function EF4PTOC, if the Power swing logic (PSLPSCH) is configured in
a way that is controlled by this protection.
Procedure
Procedure
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
109
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
It is assumed that setting of the pole slip protection function PSPPPAM is done according to
impedances as seen in figure 29 and figure 30.
The test is done by means of injection of three-phase current and three-phase voltage from a
modern test device. This test device shall be able to give voltage and current with the
possibility to change voltage and current amplitude and the angle between the injected
voltage and current. The parameter setting shall be according to the real application chosen
values.
Procedure
1. Feed the IED with current and voltage corresponding to a normal operation point
Injected voltage U equal to base voltage (UBase) and the injected current I equal to half
the base current (IBase). The angle between the voltage and current shall be 0°.
2. With maintained amplitude of the injected voltage the current amplitude and angle is
changed to a value ZC/2.
This is done with a speed so that the final impedance is reached after 1 second. As the
injected voltage is higher than 0.92 UBase no START signal should be activated.
3. With reduced amplitude of the injected voltage to 0.8 UBase the current amplitude and
angle is changed to a value ZC/2.
This is done with a speed so that the final impedance is reached after 1 second. As the
injected voltage is lower than 0.92 UBase the START signal should be activated.
4. With reduced amplitude of the injected voltage to 0.8 UBase the current amplitude and
angle is changed via ZC/2 to a value corresponding to half IBase and 180° between the
injected current and voltage.
This is done with a speed so that the final impedance is reached after 1 second. As the
injected voltage is lower than 0.92 UBase the START signal should be activated. In
addition to this the signal ZONE1 should be activated.
5. Set N1Limit to 1 and repeat step 4.
Now the signals TRIP1 and TRIP should be activated.
6. With reduced amplitude of the injected voltage to 0.8 UBase the current amplitude and
angle is changed via ZC + (ZA – ZC)/2 to a value corresponding to half IBase and 180°
between the injected current and voltage.
This is done with a speed so that the final impedance is reached after 1s. As the injected
voltage is lower than 0.92 UBase the START signal should be activated. In addition to this
the signal ZONE2 should be activated.
7. Set N2Limit to 1 and repeat step 6.
Now the signals TRIP2 and TRIP should be activated.
110
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Zone 1 Zone 2
EB X’d XT EA
ZS
IED
B A
jX
ZA
Pole slip
impedance
movement
Zone 2
ZC
TripAngle Zone 1
WarnAngle
f
R
ZB
IEC07000099_2_en.vsd
IEC07000099 V2 EN-US
111
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
AND START
0.2 £ f(Ucos) £ 8Hz
d ³ StartAngle
AND ZONE1
Z cross line ZA - ZC
AND ZONE2
Z cross line ZC - ZB
Counter
aa³b
N1Limit b AND TRIP1
d £ TripAngle OR TRIP
Counter
a a³b
N2Limit b AND TRIP2
IEC07000100_2_en.vsd
IEC07000100 V2 EN-US
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
The out-of-step protection OOSPPAM function in the IED can be used for both generator
protection and as well for line protection applications.
The main purpose of the OOSPPAM function is to detect, evaluate, and take the required
action during pole slipping occurrences in the power system.
The OOSPPAM function detects pole slip conditions and trips the generator as fast as
possible, after the first pole-slip if the center of oscillation is found to be in zone 1, which
normally includes the generator and its step-up power transformer. If the center of oscillation
is found to be further out in the power system, in zone 2, more than one pole-slip is usually
allowed before the generator-transformer unit is disconnected. A parameter setting is
available to take into account the circuit breaker opening time. If there are several out-of-step
relays in the power system, then the one which finds the center of oscillation in its zone 1
should operate first.
Two current channels I3P1 and I3P2 are available in OOSPPAM function to allow the direct
connection of two groups of three-phase currents; that may be needed for very powerful
generators, with stator windings split into two groups per phase, when each group is
equipped with current transformers. The protection function performs a simple summation of
the currents of the two channels I3P1 and I3P2.
112
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
The test of the out-of-step protection function is made to verify that the trip is issued if the
following events happen.
• the impedance, seen by the function, enters the lens characteristic from one side and
leaves it from the opposite side
• the trip is issued according to the settings TripAngle and tBreaker
The tripping zone needs to be detected and confirmed. The test may be performed by taking
into account the following key points that are shown in Figure 31:
IEC10000141 V2 EN-US
Figure 31: Trajectory of the impedance Z(R, X) for the injected current with two
components: a 50 Hz component and a 49.5 Hz current component
The test of the out-of-step protection function requires the injection of the analog quantities
for a quite long time. The rating of the analogue channels is considered in order to avoid any
hardware damage. The test current is lower than the continuous permissive overload current
Iovrl of the protection current channels of the transformer module.
If the rated secondary current Irs of the analog channel is 1 A, then the maximum current test Its
is
I ts ≤ I ovrl = 4 × I rs = 4 A
EQUATION14041 V1 EN-US (Equation 1)
I rp 9000
I t ≤ I ovrl , p = I ovrl × = 4× = 36000 A
I rs 1
EQUATION14042 V1 EN-US (Equation 2)
Reference is made to the numerical values of the example, explained in the “Setting guidelines”
of the Application Manual. A test current equal to 2.5 time the base current of the generator is
chosen; this choice is related to the selected test voltage that is applied while testing the point
SE and RE.
113
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
The parameter ReachZ1 defines the boundary between zone 1 and zone 2; it is expressed in
percent of the parameter ForwardX. If the setting of ReachZ1 = 12%, then corresponding
primary value of the reactance is
The calculation of the test voltage, that is related to ReachZ1, is based on the impedance ZRZ1
that has imaginary part XRZ1 and real part RRZ1 :
Hence the reference voltage of the test of the boundary between zone 1 and zone 2 is
If the test voltage is lower than Vt,RZ1 (or in opposition), then the test is related to the zone 1; if
the test voltage is higher than Vt,RZ1, then the test is related to the zone 2.
Considering the resistances and reactances which are related to the settings (ForwardR,
ForwardX) and (ReverseR, ReverseX):
ForwardR 8.19
RFwdR = × ZBase = × 0.9522 = 0.078 Ω
100 100
EQUATION14048 V1 EN-US (Equation 8)
ForwardX 59.33
X FwdX = × ZBase = × 0.9522 = 0.565 Ω
100 100
EQUATION14049 V1 EN-US (Equation 9)
ReverseR 0.29
RRvsR = × ZBase = × 0.9522 = 0.003Ω
100 100
EQUATION14050 V1 EN-US (Equation 10)
ReverseR 29.6
X RvsX = × ZBase = × 0.9522 = 0.282 Ω
100 100
EQUATION14051 V1 EN-US (Equation 11)
114
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
The previous calculations are in primary values. They are transferred to secondary values to
perform injections by a test set. Primary values are transferred to secondary values by taking
into account the CT ratio and the VT ratio (respectively 9000/1 A and 13.8/0.1 kV in the
example).
The magnitude of the secondary voltages, that are related to the points RE and SE of the R-X
plane, needs to be checked.
RE (RFwdR, XFwdX):
VVT ,s 0.1
Vt ,FwdZs = Vt ,FwdZ × = 11931 × = 86.45V
VVT , p 13.8
EQUATION14054 V1 EN-US (Equation 14)
SE (RRvsR, XRvsX):
VVT ,s 0.1
Vt ,RvsZs = Vt ,RvsZ × = 5899 × = 42.75V
VVT , p 13.8
EQUATION14055 V1 EN-US (Equation 15)
The tests, which are described in this section, may require voltages that have magnitude equal
to 110% of the previous values. The continuous permissive overload voltage of the protection
voltage channels of the TRM module is 420 V; so the previous voltages may be applied to the
analog channels of the IED continuously. Limitations may be related to the available test set;
the current It was calculated by using a factor 2.5 (instead of the maximum value 4) in order to
reduce the magnitude of the test voltage for the points RE and SE.
Test sets usually do not have a feature to simulate a real network during a power swing and
apply the related analog quantities at the terminal of the generator. The scope of the present
test is not a simulation of a real network. Voltages and currents are supplied in order to
measure an impedance that changes in the time and traverses the plane R-X and, in particular,
the area inside the lens characteristic. The test may be performed by applying:
• Symmetric three-phase voltage at 50 Hz. The magnitude depends on the point of the
characteristic that needs to be verified. The following three main points of the line
segment SE-RE need to be checked:
• the point RE (RFwdR, XFwdX)
• a point which is related to the parameter ReachZ1 (boundary between zone 1 and
zone 2)
• the point SE (RRvsR, XRvsX)
• arctan (ForwardX/ForwardR) for tests in the quadrant 1 and 2 of the R-X plane
• arctan (ReverseX/ReverseR) -180° for tests in the quadrant 3 and 4 of the R-X plane
• Symmetric three-phase current, where the current is the summation of two currents that
have the same magnitude, but different frequencies.
It 20918
I 50 = I tf = = = 10459 A
2 2
GUID-F02E8D18-FF87-45BE-8142-E8FA19F6966B V1 EN-US (Equation 16)
The first current I50 has frequency 50 Hz, magnitude 10459 A (that is, 1.162 A secondary)
and phase angle 0º.
The second current Itf has magnitude 10459 A (that is, 1.162 A secondary), phase angle
180º (at the starting time of the test) and frequency:
115
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
• 49.5 Hz for the test as generator in the quadrant 1 and 2 of the R-X plane
• 50.5 Hz for the test as generator in the quadrant 3 and 4 of the R-X plane
When the trajectory of the impedance, that is seen by the protection function,
traverses the lens characteristic then a pole slipping is detected. The present
procedure avoids tests of points of the line SE-RE that are too close to the R-
axis because in that case the voltage is close to zero and, therefore, the
impedance may approach a not defined quantity 0/0.
The accuracy of the impedance reach is ±2% of the base impedance; that is
considered while evaluating the test results.
For the test as motor the frequency current may have 50.5 Hz in the quadrant 1
and 2 of the R-X plane and 49.5 Hz in the quadrant 3 and 4.
If the device is in test mode, the recording of the disturbances are enabled by the setting in
Main menu/Settings/IED Settings/Monitoring/Disturbance report/DisturbanceReport/
DRPRDRE:1: set the parameter OpModeTest to On.
1. Check the Application Configuration: verify that hardware voltage and current channels of
the IED are properly connected to SMAI function blocks, and that the proper analog
outputs of SMAI’s are connected to the analog inputs of the function block OOSPPAM.
2. Connect three-phase voltage channels of the test set to the appropriate IED terminals.
3. Connect in parallel two groups of three-phase currents of the test set to the appropriate
IED terminals.
4. Connect the appropriate trip output of the IED to the input channel of the test set that
monitors the trip.
5. Go to Main menu/Settings/IED Settings/Impedance protection/OutOfStep(78,Ucos)/
OOSPPAM(78,Ucos):1, and make sure that the function is enabled, that is, Operation is set
to On.
The trajectory of the impedance does not enter the lens characteristic. GUID-5C5E9BEB-AA60-474E-ACEC-B972ACFE6FA2 v1
VVT ,s 0.1
Vts = 1.1 × Vt ,FwdZ × = 1.1 × 11931 × = 95.1V
VVT , p 13.8
EQUATION14057 V1 EN-US (Equation 17)
116
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 18)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 19)
∠I50s=0°
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 20)
∠Itfs=0°
frequency of Itfs = 50 Hz
• Check that the service values (VOLTAGE, CURRENT, R(%), X(%)) are according to the
injected quantities and that ROTORANG is close to 0 rad.
For this particular injection the service values are:
• VOLTAGE = 13.12 kV
• CURRENT = 20918 A
• R = 9.01%
• X = 65.27%
• ROTORANG = 0.04 rad
Note that these values identify a point outside the lens characteristic, even if it is close to the
point RE. Neither START nor TRIP is issued.
VVT ,s 0.1
Vts = 1.1 × Vt ,FwdZ × = 1.1 × 11931 × = 95.1V
VVT , p 13.8
EQUATION14057 V1 EN-US (Equation 21)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 22)
frequency of Vts = 50 Hz
I50s=0 A
Itfs=0 A
117
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
VVT ,s 0.1
Vts = 1.1 × Vt ,FwdZ × = 1.1 × 11931 × = 95.1V
VVT , p 13.8
EQUATION14057 V1 EN-US (Equation 23)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 24)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 25)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 26)
∠Itfs = 180º
frequency of Itfs = 49.5 Hz
Expected result: the protection function does not issue either start or trip.
The trajectory of the impedance traverses the lens characteristic in zone 2 GUID-9F0FE404-6D83-4308-9FE4-13259CE7D07A v1
VVT ,s 0.1
Vts = 0.9 × Vt ,FwdZ × = 0.9 × 11931 × = 77.81V
VVT , p 13.8
EQUATION14063 V1 EN-US (Equation 27)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 28)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 29)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 30)
∠Itfs = 0º
118
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
frequency of Itf = 50 Hz
• Check that the service values (VOLTAGE, CURRENT, R(%), X(%) ) are according to the
injected quantities and that ROTORANG is close to 3.14 rad. For this particular injection
the service values are:
• VOLTAGE = 10.74 kV
• CURRENT = 20918 A
• R = 7.37%
• X = 53.40%
• ROTORANG = -3.09 rad
Note that these values identify a point inside the lens characteristic, in the zone 2, that is
close to the point RE. The START is issued, but no TRIP is performed.
VVT ,s 0.1
Vts = 0.9 × Vt ,FwdZ × = 0.9 × 11931 × = 77.81V
VVT , p 13.8
EQUATION14063 V1 EN-US (Equation 31)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 32)
frequency of Vts = 50 Hz
I50s = 0 A
Itfs = 0 A
VVT ,s 0.1
Vts = 0.9 × Vt ,FwdZ × = 0.9 × 11931 × = 77.81V
VVT , p 13.8
EQUATION14063 V1 EN-US (Equation 33)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 34)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 35)
∠I50s = 0º
frequency of I50s = 50 Hz
119
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 36)
∠Itfs = 180º
frequency of Itfs = 49.5 Hz
Expected result: start of the protection function and trip in zone 2, when trip conditions are
fulfilled.
10.4.12.3 Test of the boundary between zone 1 and zone 2, which is defined by the
parameter ReachZ1 GUID-BE180E07-7D4B-4842-81FB-244DE8897430 v1
The trajectory of the impedance traverses the lens characteristic in zone 2GUID-17F6AC8D-1F57-4245-A61D-776D469DD153 v1
VVT ,s 0.1
Vts = 1.1 × Vt ,RZ 1 × = 1.1 × 1435 × = 11.44V
VVT , p 13.8
EQUATION14065 V1 EN-US (Equation 37)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 38)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 39)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 40)
∠Itfs = 0º
frequency of Itfs = 50 Hz
• Check that the service values (VOLTAGE, CURRENT, R(%), X(%)) are according to the
injected quantities and that ROTORANG is close to 3.14 rad. For this particular injection
the service values are:
• VOLTAGE = 1.58 kV
• CURRENT = 20918 A
• R = 1.08%
• X = 7.85%
• ROTORANG = -3.04 rad
120
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Note that these values identify a point inside the lens characteristic, in the Zone 2, that is close
to the boundary between zone 1 and zone 2. The START is issued, but no TRIP is performed.
VVT ,s 0.1
Vts = 1.1 × Vt ,RZ 1 × = 1.1 × 1435 × = 11.44V
VVT , p 13.8
EQUATION14065 V1 EN-US (Equation 41)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 42)
VVT ,s 0.1
Vts = 1.1 × Vt ,RZ 1 × = 1.1 × 1435 × = 11.44V
VVT , p 13.8
EQUATION14065 V1 EN-US (Equation 43)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 44)
frequency of Vt = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 45)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 46)
∠Itfs = 180º
frequency of Itfs = 49.5 Hz
Expected result: start of the protection function and trip in zone 2 when trip conditions
are fulfilled.
121
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
The trajectory of the impedance traverses the lens characteristic in zone 1 GUID-12F82DD8-A4CE-48C9-944B-0CF3B3F6C9F9 v1
VVT ,s 0.1
Vts = 0.9 × Vt ,RZ 1 × = 0.9 × 1435 × = 9.36V
VVT , p 13.8
EQUATION14066 V1 EN-US (Equation 47)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 48)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 49)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 50)
∠Itfs = 0º
frequency of Itf = 50 Hz
• Check that the service values (VOLTAGE, CURRENT, R(%), X(%)) are according to the
injected quantities and that ROTORANG is close to 3.14 rad. For this particular injection
the service values are:
• VOLTAGE = 1.29 kV
• CURRENT = 20918 A
• R = 0.89%
• X=6.42%
• ROTORANG = -3.04 rad
Note that these values identify a point inside the lens characteristic in zone 1, that is close
to the boundary between zone 1 and zone 2. The START is issued, but no TRIP is
performed.
122
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
VVT ,s 0.1
Vts = 0.9 × Vt ,RZ 1 × = 0.9 × 1435 × = 9.36V
VVT , p 13.8
EQUATION14066 V1 EN-US (Equation 51)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 52)
frequency of Vts = 50 Hz
I50s = 0 A
Itfs = 0 A
VVT ,s 0.1
Vts = 0.9 × Vt ,RZ 1 × = 0.9 × 1435 × = 9.36V
VVT , p 13.8
EQUATION14066 V1 EN-US (Equation 53)
ForwardX 59.33
∠Vts = arctan = arctan = 82..14°
ForwardR 8.19
EQUATION14058 V1 EN-US (Equation 54)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 55)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 56)
∠Itfs = 180º
frequency of Itfs = 49.5 Hz
Expected result: start of the protection function and trip in zone 1 when trip conditions
are fulfilled.
The trajectory of the impedance traverses the lens characteristic in zone 1 GUID-2DD20D2E-6188-4631-A584-5E68B212E011 v1
123
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
VVT ,s 0.1
Vts = 0.9 × Vt ,RvsZ × = 0.9 × 5899 × = 38.47V
VVT , p 13.8
EQUATION14067 V1 EN-US (Equation 57)
ÐVts = arctan ç
æ ReverseX ö - 180° = arctan æ 29.60 ö - 180° = -90.56°
÷ ç ÷
è ReverseR ø è 0.29 ø
EQUATION14068 V1 EN-US (Equation 58)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 59)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 60)
∠Itfs = 0º
frequency of Itf = 50 Hz
• Check that the service values (VOLTAGE, CURRENT, R(%), X(%)) are according to the
injected quantities and that ROTORANG is close to 3.14 rad. For this particular injection
the service values are:
• VOLTAGE = 5.31 kV
• CURRENT = 20918 A
• R = -0.26%
• X = -26.65%
• ROTORANG = -3.06 rad
Note that these values identify a point inside the lens characteristic in zone 1 that is close
to the point SE. The START is issued, but no TRIP is performed.
VVT ,s 0.1
Vts = 0.9 × Vt ,RvsZ × = 0.9 × 5899 × = 38.47V
VVT , p 13.8
EQUATION14067 V1 EN-US (Equation 61)
ÐVts = arctan ç
æ ReverseX ö - 180° = arctan æ 29.60 ö - 180° = -90.56°
÷ ç ÷
è ReverseR ø è 0.29 ø
EQUATION14068 V1 EN-US (Equation 62)
frequency of Vts = 50 Hz
I50s = 0 A
Itfs = 0 A
124
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
VVT ,s 0.1
Vts = 0.9 × Vt ,RvsZ × = 0.9 × 5899 × = 38.47V
VVT , p 13.8
EQUATION14067 V1 EN-US (Equation 63)
ÐVts = arctan ç
æ ReverseX ö - 180° = arctan æ 29.60 ö - 180° = -90.56°
÷ ç ÷
è ReverseR ø è 0.29 ø
EQUATION14068 V1 EN-US (Equation 64)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 65)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 66)
∠Itfs = 180º
frequency of Itfs = 50.5 Hz
Expected result: start of the protection function and trip in zone 1 when trip conditions
are fulfilled.
The trajectory of the impedance does not enter the lens characteristic GUID-189FECED-12A7-4A41-BCCF-D93C0FF9FA41 v1
VVT ,s 0.1
Vts = 1.1 × Vt ,RvsZ × = 1.1 × 5899 × = 47.02V
VVT , p 13.8
EQUATION14069 V1 EN-US (Equation 67)
ÐVts = arctan ç
æ ReverseX ö - 180° = arctan æ 29.60 ö - 180° = -90.56°
÷ ç ÷
è ReverseR ø è 0.29 ø
EQUATION14068 V1 EN-US (Equation 68)
frequency of Vts = 50 Hz
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 69)
∠I50s = 0º
frequency of I50s = 50 Hz
125
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 70)
∠Itfs = 0º
frequency of Itf = 50 Hz
• Check that the service values (VOLTAGE, CURRENT, R(%), X(%)) are according to the
injected quantities and that ROTORANG is close to 0 rad. For this particular injection the
service values are:
• VOLTAGE= 6.49 kV
• CURRENT= 20918 A
• R= –0.32%
• X=–32.57%
• ROTORANG= 0.08 rad
Note that these values identify a point outside the lens characteristic, even if it is close to
the point SE. Neither START nor TRIP is issued.
VVT ,s 0.1
Vts = 1.1 × Vt ,RvsZ × = 1.1 × 5899 × = 47.02V
VVT , p 13.8
EQUATION14069 V1 EN-US (Equation 71)
ÐVts = arctan ç
æ ReverseX ö - 180° = arctan æ 29.60 ö - 180° = -90.56°
÷ ç ÷
è ReverseR ø è 0.29 ø
EQUATION14068 V1 EN-US (Equation 72)
frequency of Vts = 50 Hz
I50s = 0 A
Itfs = 0 A
VVT ,s 0.1
Vts = 1.1 × Vt ,RvsZ × = 1.1 × 5899 × = 47.02V
VVT , p 13.8
EQUATION14069 V1 EN-US (Equation 73)
ÐVts = arctan ç
æ ReverseX ö - 180° = arctan æ 29.60 ö - 180° = -90.56°
÷ ç ÷
è ReverseR ø è 0.29 ø
EQUATION14068 V1 EN-US (Equation 74)
frequency of Vts = 50 Hz
126
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
I CTs 1
I 50 s = I 50 × = 10459 × = 1.162 A
I CTp 9000
EQUATION14059 V1 EN-US (Equation 75)
∠I50s = 0º
frequency of I50s = 50 Hz
I CTs 1
It fs = Itf × = 10459 × = 1.162 A
I CTp 9000
EQUATION14062 V1 EN-US (Equation 76)
∠Itfs = 180º
frequency of Itfs = 50.5 Hz
Expected result: the protection function does not issue either start or trip.
GUID-7C9F1163-0186-41DA-9D5F-DDA589323B9F v1
After each test it is possible to download and study the related disturbance recording.
IEC10000142-1-en.vsd
IEC10000142 V1 EN-US
Figure 32: Boolean output signals for the injected current with two components: a 50 Hz
current component and a 49.5 Hz current component
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The automatic switch onto fault logic function ZCVPSOF is checked using secondary injection
tests together with the Scheme communication logic for distance or overcurrent protection
function and with the dead line detection function (DLD), which is embedded in ZCVPSOF.
127
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
ZCVPSOF is activated either by the external input BC, or by the internal DLD. FUFSPVC is done
with a pre-fault condition where the phase voltages and currents are at zero. A reverse three-
phase fault with zero impedance and a three-phase fault with an impedance corresponding to
the whole line is applied. This fault shall cause an instantaneous trip and result in a TRIP
indication.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings outlined in section "Requirements" and section
"Preparing for test" in this chapter.
The Phase preference logic function PPLPHIZ is tested with a three-phase testing equipment
for distance protections. PPLPHIZ is tested in co-operation with the Distance protection zone,
128
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
quadrilateral characteristic function ZMQPDIS. The distance protection and the phase
preference logic shall be set to values according to the real set values to be used. The test is
made by means of injection of voltage and current where the amplitude of both current and
voltage and the phase angle between the voltage and current can be controlled.
During the test the following binary signals (outputs) shall be monitored:
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
• Phase-to-earth fault
129
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Ensure that the maximum continuous current, supplied from the current source used for the
test of the IED, does not exceed four times the rated current value of the IED.
1. Inject a phase current into the IED with an initial value below that of the setting.
2. Set the operation mode to 1 out of 3.
3. Increase the injected current in the Ln phase until the TRL (n=1–3) signal appears.
4. Switch the fault current off.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. Connect the test set for current injection to the appropriate IED phases.
If there is any configuration logic that is used to enable or block any of the four available
overcurrent steps, make sure that the step under test is enabled (for example, end fault
protection).
If 1 out of 3 currents for operation is chosen: Connect the injection current to phases L1
and neutral.
If 2 out of 3 currents for operation is chosen: Connect the injection current into phase L1
and out from phase L2.
If 3 out of 3 currents for operation is chosen: Connect the symmetrical three-phase
injection current into phases L1, L2 and L3.
2. Connect the test set for the appropriate three-phase voltage injection to the IED phases
L1, L2 and L3. The protection shall be fed with a symmetrical three-phase voltage.
3. Block higher set stages when testing lower set stages by following the procedure
described below:
130
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
3.1. Set the injected polarizing voltage slightly larger than the set minimum polarizing
voltage (default is 5% of UBase) and set the injection current to lag the appropriate
voltage by an angle of about 80° if forward directional function is selected.
If 1 out of 3 currents for operation is chosen: The voltage angle of phase L1 is the
reference.
If 2 out of 3 currents for operation is chosen: The voltage angle of phase L1 – the
voltage angle of L2 is the reference.
If 3 out of 3 currents for operation is chosen: The voltage angle of phase L1 is the
reference.
If reverse directional function is selected, set the injection current to lag the
polarizing voltage by an angle equal to 260° (equal to 80° + 180°).
3.2. Increase the injected current, note the operate value of the tested step of the
function and compare it to the set value.
3.3. Decrease the current slowly, note the reset value and compare it to the reset ratio
95%.
4. If the test has been performed by injection of current in phase L1, repeat the test,
injecting current into phases L2 and L3 with polarizing voltage connected to phases L2,
respectively L3 (1 out of 3 currents for operation).
5. If the test has been performed by injection of current in phases L1 – L2, repeat the test,
injecting current into phases L2 – L3 and L3 – L1 with the appropriate phase angle of
injected currents.
6. Connect a trip output contact to a timer.
7. Set the injected current to 200% of the operate level of the tested stage, switch on the
current and check the time delay.
For inverse time curves, check the operate time at a current equal to 110% of the operate
current for txMin.
8. Check that all operate and start contacts operate according to the configuration (signal
matrixes).
9. Reverse the direction of the injected current and check that the protection does not
operate.
10. If 2 out of 3 or 3 out of 3 currents for operation is chosen: Check that the function will not
operate with current in one phase only.
11. Repeat the above described tests for the higher set stages.
12. Check that start and trip information is stored in the event menu.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
• Phase-to-earth fault
Ensure that the maximum continuous current, supplied from the current source used for the
test of the IED, does not exceed four times the rated current value of the IED.
131
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1. Inject a phase current into the IED with an initial value below that of the setting.
2. Increase the injected current in the Ln or in the neutral (summated current input) phase
until the TRIP signal appears.
3. Switch the fault current off.
Observe to not exceed the maximum permitted overloading of the current circuits in the
IED.
4. Compare the measured operating current with the set value.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. Connect the test set for single current injection to the appropriate IED terminals.
Connect the injection current to terminals L1 and neutral.
2. Set the injected polarizing voltage slightly larger than the set minimum polarizing voltage
(default 5% of Ur) and set the injection current to lag the voltage by an angle equal to the
set reference characteristic angle (AngleRCA), if the forward directional function is
selected.
If reverse directional function is selected, set the injection current to lag the polarizing
voltage by an angle equal to RCA+ 180°.
3. Increase the injected current and note the value at which the studied step of the function
operates.
4. Decrease the current slowly and note the reset value.
5. If the test has been performed by injection of current in phase L1, repeat the test,
injecting current into terminals L2 and L3 with a polarizing voltage connected to
terminals L2, respectively L3.
6. Block lower set steps when testing higher set steps according to the instructions that
follow.
7. Connect a trip output contact to a timer.
8. Set the injected current to 200% of the operate level of the tested step, switch on the
current and check the time delay.
For inverse time curves, check the operate time at a current equal to 110% of the operate
current for txMin.
9. Check that all operate and start contacts operate according to the configuration (signal
matrixes)
10. Reverse the direction of the injected current and check that the step does not operate.
11. Check that the protection does not operate when the polarizing voltage is zero.
12. Repeat the above described tests for the higher set steps.
13. Finally, check that start and trip information is stored in the event menu.
132
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Do as described in "Four step directional earth fault protection", but without applying
any polarizing voltage.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
GUID-F7AA2194-4D1C-4475-8853-C7D064912614 v4
GUID-F973601F-BC67-4E4F-A4CA-BE6253E2FB92 v3
Procedure
1. Connect the test set for injection of three-phase currents and voltages to the
appropriate CT and VT inputs of the IED.
2. Inject pure negative sequence current, that is, phase currents with exactly same
magnitude, reversed sequence and exactly 120° phase displaced into the IED with an
initial value below negative sequence current pickup level. No output signals should be
activated. Check under NS4PTOC function Service Values that correct I2 magnitude is
measured by the function.
3. Set the injected negative sequence polarizing voltage slightly larger than the set
minimum polarizing voltage (default 5 % of Ub) and set the injection current to lag the
voltage by an angle equal to the set reference characteristic angle (180° - AngleRCA) if the
forward directional function is selected.
If reverse directional function is selected, set the injection current to lag the polarizing
voltage by an angle equal to RCA.
4. Increase the injected current and note the value at which the studied step of the function
operates.
5. Decrease the current slowly and note the reset value.
6. Block lower set steps when testing higher set steps according to the instructions that
follow.
7. Connect a trip output contact to a timer.
8. Set the injected current to 200% of the operate level of the tested step, switch on the
current and check the time delay.
For inverse time curves, check the operate time at a current equal to 110% of the operate
current in order to test parameter txmin.
9. Check that all operate and start contacts operate according to the configuration (signal
matrixes)
10. Reverse the direction of the injected current and check that the step does not operate.
11. Check that the protection does not operate when the polarizing voltage is zero.
12. Repeat the above-described tests for the higher set steps.
13. Finally, check that start and trip information is stored in the event menu.
133
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
NI NI
L1U U1
L2U U2
L3U U3
NU NU
TRIP
IEC09000021-2-en.vsd
IEC09000021 V2 EN-US
10.5.6.1 Measuring the operate and time limit for set values SEMOD175060-12 v2
1. Set the polarizing voltage to 1.2 · UNRel> and set the phase angle between voltage and
current to the set characteristic angle (RCADir). Note that the the current lagging the
voltage.
Take setting RCAComp into consideration if not equal to 0.
2. Inject current until the function picks up, and make sure that the operate current of the
set directional element is equal to the INcosPhi> setting.
134
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
The I Dir (3I0 · cosφ) function activates the START and STDIRIN output.
3. Assume that φ´ is the phase angle between injected voltage (3U0) and current (3I0) i.e. φ
´ = RCADir-φ. Change φ´ to for example 45 degrees. Increase the injected current until
the function operates.
4. Compare the result with the set value and make sure that the new injected 3I0 · cos φ is
equal to the setting INcosPhi>..
Take the set characteristic into consideration, see Figure 34 and Figure 35.
5. Measure the operate time of the timer by injecting a current two times the set INcosPhi>
value and the polarizing voltage 1.2 · UNRel>.
kSN × Sref
Tinv =
3I 0 test × 3U 0 test × cos (j )
IECEQUATION2402 V2 EN-US (Equation 77)
RCADir = 0o
3I0
Operate area
j
-3U0 = Uref
3I0 × cos j
ROADir
IEC06000650_2_en.vsd
IEC06000650 V2 EN-US
135
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
RCADir = 0º
Operate area
-3U0 =Uref
Instrument
transformer
angle error
RCAcomp
Characteristic after
angle compensation
IEC06000651-3-en.vsd
IEC06000651 V3 EN-US
1. Set the polarizing voltage to 1.2 · UNRel> and set the phase angle between voltage and
current to the set characteristic angle (RCADir). Note that the current lagging the voltage.
2. Inject current until the function picks up, and make sure that the operate power is equal
to the SN> setting for the set directional element.
Note that for operation, both the injected current and voltage must be greater than the
set values INRel> and UNRel> respectively.
The function activates the START and STDIRIN outputs.
3. Assume that φ´ is the phase angle between injected voltage (3U0) and current (3I0) i.e. φ
´ = RCADir-φ. Change φ´ to for example 45 degrees. Increase the injected current until
the function operates.
4. Compare the result with the set value and make sure that the new injected 3I0 · 3U0 · cos
φ is equal to the setting SN>. Take the set characteristic into consideration, see figure 34
and figure 35.
5. Measure the operate time of the timer by injecting 1.2 · UNRel> and a current to get two
times the set SN> operate value.
136
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Set the polarizing voltage to 1.2 · UNRel> and set the phase angle between voltage and
current to the set characteristic angle (RCADir). Note that the current lagging the voltage.
2. Inject current until the function picks up, and make sure that the operate current is equal
to the INDir> setting for the set directional element.
Note that for operation, both the injected current and voltage must be
greater than the set values INRel> and UNRel> respectively.
ROADir = 80º
Operate area
3I0
-3U0
IEC06000652-3-en.vsd
IEC06000652 V3 EN-US
137
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
The expected value depends on whether definite time tINNonDir or inverse time was
selected.
4. Continue to test another function or complete the test by setting the test mode to Off.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
Check that the input logical signal BLOCK is logical zero and that on the local HMI, the logical
signal TRIP, START and ALARM are equal to logical zero.
10.5.7.1 Measuring the operate and time limit of set values M14950-8 v3
Testing the protection without external temperature compensation (NonComp) M14950-10 v10
1. Quickly set the measured current (fault current) in one phase to about 300% of IRef (to
minimise the trip time), and switch the current off.
2. Reset the thermal memory on the local HMI under Main menu/Reset/Reset
temperature/ThermalOverload1TimeConst(PTTR,26)/LFPTTR:x, Main menu/Reset/
Reset temperature/ThermalOverload1TimeConst(PTTR,26)/LCPTTR:x,
3. Switch the fault current on and take note of the temperature, available on the local HMI
under Main menu/Test/Function status/Current protection/
ThermOverLoad1TimeConst(PTTR,26)/LFPTTR:x/TEMP, Main menu/Test/Function
status/Current protection/ThermOverLoad1TimeConst(PTTR,26)/LCPTTR:x/TEMP,
4. Check the time until the actual temperature TEMP has reached the AlarmTemp level
during injection.
Monitor the signal ALARM until it appears on the corresponding binary output or on the
local HMI.
5. Measure the LCPTTR/LFPTTRprotection trip time.
Use the TRIP signal from the configured binary output to stop the timer.
6. Take the TEMP readings.
Compare with the setting of TripTemp.
7. Activate the BLOCK binary input.
The signals ALARM, START and TRIP should disappear.
8. Reset the BLOCK binary input.
138
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The Breaker failure protection, 3-phase activation and output function CCRBRF should
normally be tested in conjunction with some other function that provides a start signal. An
external START signal can also be used.
To verify the settings in the most common back-up trip mode 1 out of 3, it is sufficient to test
phase-to-earth faults.
At mode 2 out of 4 the phase current setting, IP> can be checked by single-phase injection
where the return current is connected to the summated current input. The value of residual
(earth fault) current IN set lower than IP> is easiest checked in back-up trip mode 1 out of 4.
10.5.8.1 Checking the phase current operate value, IP> M12104-23 v12
The check of the IP> current level is best made in FunctionMode = Current and BuTripMode = 1
out of 3 or 2 out of 4.
1. Apply the fault condition, including START of CCRBRF, with a current below the set IP>.
2. Repeat the fault condition and increase the current in steps until a trip occurs.
3. Compare the result with the set IP>.
Note! If No CBPos Check or Retrip off is set, only back-up trip can be used to
check set IP>.
10.5.8.2 Checking the residual (earth fault) current operate value IN> set below
IP> M12104-80 v9
Check the low set IN> current where setting FunctionMode = Current and setting BuTripMode
= 1 out of 4
139
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1. Apply the fault condition, including START of CCRBRF, with a current just below set IN>.
2. Repeat the fault condition and increase the current in steps until trip appears.
3. Compare the result with the set IN>.
4. Disconnect AC and START input signals.
The check of the set times can be made in connection with the check of operate values above.
Choose the applicable function and trip mode, such as FunctionMode = Current and
RetripMode = CB Pos Check .
1. Apply the fault condition, including start of CCRBRF, well above the set current value.
Measure the time from START of CCRBRF.
2. Check the re-trip t1 and back-up trip times t2 and t3.
In applicable cases, the back-up trip for multi-phase start t2MPh and back-up trip 2, t2
and t3 can also be checked. To check t2MPh, a two-phase or three-phase start shall be
applied.
Checking the re-trip with current check, RetripMode = CB Pos Check M12104-48 v6
140
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Apply the fault condition, including start of CCRBRF, with phase current well above set
value IP>.
2. Interrupt the current, with a margin before back-up trip time, t2. It may be made at issue
of re-trip command.
3. Check that re-trip is achieved, if selected, but no back-up trip is obtained.
The normal mode BuTripMode = 1 out of 3 should have been verified in the tests above. In
applicable cases the modes 1 out of 4 and 2 out of 4 can be checked. Choose the mode below,
which corresponds to the actual case.
Applies in a case where a signal from CB supervision function regarding CB being faulty and
unable to trip is connected to input CBFLT.
1. Repeat the check of back-up trip time. Disconnect current and START input signals.
2. Activate the input CBFLT. The output CBALARM (CB faulty alarm) should appear after set
time tCBAlarm. Keep the input activated.
3. Apply the fault condition, including start of CCRBRF, with current above set current value.
4. Verify that back-up trip is obtained without intentional delay, for example within 20ms
from application of start.
141
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
4. Verify that phase selection re-trip and back-up trip are achieved after set times.
5. Disconnect the start signal(s). Keep the CB closed signal(s).
6. Apply input signal(s), for start of CCRBRF.
7.
8. Arrange disconnection of CB closed signal(s) well before set back-up trip time t2.
9. Verify that back-up trip is not achieved.
Checking the case with fault current above set value IP> M12104-241 v6
The operation shall be as in FunctionMode = Current.
Checking the case with fault current below set value I>BlkCont M12104-281 v9
The case shall simulate a case where the fault current is very low and operation will depend on
CB position signal from CB auxiliary contact. It is suggested that re-trip without current check
is used, setting RetripMode = No CBPos Check.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
Logical signals for STBPTOC protection are available on the local HMI underMain menu/
Settings/Setting group N/Current protection/Stub(PTOC,50STB)/STBPTOC:x
142
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Check that the input logical signals BLOCK and RELEASE and the output logical signal
TRIP are all logical zero.
2. Activate the input RELEASE on the STBPTOC function block
3. For a short while inject a current (fault current) in one phase to about 110% of the set
operating current, and switch the current off.
Observe to not exceed the maximum permitted overloading of the current circuits in the
IED.
4. Switch the fault current on and measure the operating time of STBPTOC.
Use the TRIP signal from the configured binary output to stop the timer. The operation
should be instantaneously.
5. Activate the input BLOCK on the STBPTOC function block.
6. Switch on the fault current (110% of the setting).
No TRIP signal should appear.
7. Switch off the fault current.
8. For a short while inject a current (fault current) in same phase to about 90% of the set
operating current, and switch the current off.
9. Switch the fault current on.
No TRIP signal should appear.
10. Switch off the fault current.
11. Reset the RELEASE binary input.
12. Switch the fault current on.
No TRIP signal should appear.
13. Switch the fault current off.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. External detection logic, Contact function selection = ContSel setting equals CCPDSC
signal from CB. Activate the EXTPDIND binary input, and measure the operating time of
CCPDSC.
Use the TRIP signal from the configured binary output to stop the timer.
2. Compare the measured time with the set value tTrip.
3. Reset the EXTPDIND input.
4. Activate the BLKDBYAR binary input.
This test should be performed together with Autorecloser SMBRREC.
5. Activate the EXTPDIND binary input.
No TRIP signal should appear.
6. Reset both BLKDBYAR and EXTPDIND binary inputs.
7. Activate the BLOCK binary input.
8. Activate EXTPDIND binary input.
NO TRIP signal should appear.
9. Reset both BLOCK and EXTPDIND binary inputs.
143
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
10. If Internal detection logic Contact function selection = ContSel setting equals Pole
position from auxiliary contacts. Then set inputs POLE1OPN...POLE3CL in a status that
activates the pole discordance logic and repeats step 2 to step 6.
11. Unsymmetrical current detection with CB monitoring: Set measured current in one phase
to 110% of current release level. Activate CLOSECMD and measure the operating time of
the CCPDSC protection.
Use the TRIP signal from the configured binary output to stop the timer.
12. Deactivate the CLOSECMD: Set measured current in one phase to 90% of Current Release
level. Activate CLOSECMD.
NO TRIP signal should appear.
13. Repeat the previous two steps using OPENCMD instead of CLOSECMD. Asymmetry
current detection with CB monitoring: Set all three currents to 110% of Current Release
level. Activate CLOSECMD.
NO TRIP signal should appear due to symmetrical condition.
14. Deactivate the CLOSECMD. Decrease one current with 120% of the current unsymmetrical
level compared to the other two phases. Activate CLOSECMD and measure the operating
time of the CCPDSC protection.
Use the TRIP signal from the configured binary output to stop the timer.
15. Deactivate the CLOSECMD. Decrease one current with 80% of the current unsymmetrical
level compared to the other two phases. Activate CLOSECMD.
NO TRIP signal should appear.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The underpower protection shall be set to values according to the real set values to be used.
The test is made by means of injection of voltage and current where the amplitude of both
current and voltage and the phase angle between the voltage and current can be controlled.
During the test, the analog outputs of active and reactive power shall be monitored.
1. Connect the test set for injection of voltage and current corresponding to the mode to
be used in the application. If a three-phase test set is available this could be used for all
the modes. If a single-phase current/voltage test set is available the test set should be
connected to a selected input for one-phase current and voltage.
144
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Arone
S = U L1L 2 × I L1* - U L 2 L 3 × I L 3*
EQUATION1698 V1 EN-US (Equation 81)
PosSeq
S = 3 × U PosSeq × I PosSeq*
EQUATION1699 V1 EN-US (Equation 82)
L1L2
S = U L1L 2 × ( I L1* - I L 2* )
EQUATION1700 V1 EN-US (Equation 83)
L2L3
S = U L 2 L 3 × ( I L 2* - I L 3* )
EQUATION1701 V1 EN-US (Equation 84)
L3L1
S = U L 3 L1 × ( I L 3* - I L1* )
EQUATION1702 V1 EN-US (Equation 85)
L1
S = 3 × U L1 × I L1*
EQUATION1703 V1 EN-US (Equation 86)
L2
S = 3 × U L 2 × I L 2*
EQUATION1704 V1 EN-US (Equation 87)
L3
S = 3 × U L 3 × I L 3*
EQUATION1705 V1 EN-US (Equation 88)
2. Adjust the injected current and voltage to the set values in % of IBase and UBase
(converted to secondary current and voltage). The angle between the injected current
and voltage shall be set equal to the set direction Angle1, angle for stage 1 (equal to 0° for
low forward power protection and equal to 180° for reverse power protection). Check
that the monitored active power is equal to 100% of rated power and that the reactive
power is equal to 0% of rated power.
3. Change the angle between the injected current and voltage to Angle1 + 90°. Check that
the monitored active power is equal to 0% of rated power and that the reactive power is
equal to 100% of rated power.
4. Change the angle between the injected current and voltage back to 0°. Decrease the
current slowly until the START1 signal, start of stage 1, is activated.
5. Increase the current to 100% of IBase.
6. Switch the current off and measure the time for activation of TRIP1, trip of stage 1.
7. If a second stage is used, repeat steps 2 to 6 for the second stage.
145
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The overpower protection shall be set to values according to the real set values to be used. The
test is made by means of injection of voltage and current where the amplitude of both current
and voltage and the phase angle between the voltage and current can be controlled. During the
test the analog outputs of active and reactive power shall be monitored.
1. Connect the test set for injection of voltage and current corresponding to the mode to
be used in the application. If a three phase test set is available this could be used for all
the modes. If a single phase current/voltage test set is available the test set should be
connected to a selected input for one phase current and voltage.
2. Adjust the injected current and voltage to the set rated values in % of IBase and UBase
(converted to secondary current and voltage). The angle between the injected current
and voltage shall be set equal to the set direction Angle1, angle for stage 1 (equal to 0° for
low forward power protection and equal to 180° for reverse power protection). Check
that the monitored active power is equal to 100% of rated power and that the reactive
power is equal to 0% of rated power.
3. Change the angle between the injected current and voltage to Angle1 + 90°. Check that
the monitored active power is equal to 0% of rated power and that the reactive power is
equal to 100% of rated power.
4. Change the angle between the injected current and voltage back to Angle1 value. Increase
the current slowly from 0 until the START1 signal, start of stage 1, is activated. Check the
injected power and compare it to the set value Power1, power setting for stage 1 in % of
Sbase.
5. Increase the current to 100% of IBase and switch the current off.
6. Switch the current on and measure the time for activation of TRIP1, trip of stage 1.
7. If a second stage is used, repeat steps 2 to 6 for the second stage.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
10.5.13.1 Measuring the operate and time limit of set values SEMOD175021-7 v6
146
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Check that the input logical signal BLOCK to the BRCPTOC function block is logical zero
and note on the local HMI that the output signal TRIP from the BRCPTOC function block is
equal to the logical 0.
2. Set the measured current (fault current) in one phase to about 110% of the set operating
current IP>.
Observe to not exceed the maximum permitted overloading of the current circuits in the
terminal.
3. Switch on the fault current and measure the operating time of BRCPTOC.
TRIP is controlled by Gate 13 in the configuration.
Use the TRIP signal from the configured binary output to stop the timer.
4. Compare the measured time with the set value tOper.
5. Activate the BLOCK binary input.
6. Switch on the fault current (110% of the setting) and wait longer than the set value tOper.
No TRIP signal should appear.
7. Switch off the fault current.
8. Set the measured current (fault current) in same phase to about 90% of the set operating
current IP>. Switch off the current.
9. Switch on the fault current and wait longer than the set value tOper.
No TRIP signal should appear.
10. Switch off the fault current.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. Connect the test set for three-phase current injection and three-phase voltage injection
to the appropriate IED terminals.
2. Go to Main menu/Settings/IED Settings/Current protection/VoltageRestOverCurr
( 51V,2(I>/U<))/VRPVOC (51V,2(I>/U<)):1/General and make sure that the function is
enabled, that is, Operation is set to On.
3. The test of the function may be performed by injecting restrain voltage and increasing
the injected current(s). Note the value at which the START and STOC signals are set.
The set operate value in secondary amperes is calculated according to the following
equations:
First part of the characteristic (Restrain voltage ≤ 25% of UBase):
147
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
StartCurr CT sec
× IBase ×
100 CTprim
IECEQUATION2434 V1 EN-US (Equation 91)
CT ratio 10 000/1A
VT ratio 10 kV/100 V
StartCurr 100%
VDepFact 25%
UHighLimit 100%
IBase 10 000 A
10 kV
A test for each section of the characteristic of the function VRPVOC may be performed;
that may be achieved by applying the following voltages:
First section of the characteristic:
If VDepMode = Slope, the minimum measured phase-to-phase voltage is lower than
0,25*UBase; if VDepMode = Step, the minimum measured phase-to-phase voltage is
lower than UHighLimit/100*UBase:
• UL1: Ampl = 10 / √3; Angle = 0°
• UL2: Ampl = 10 / √3; Angle = 240°
• UL3: Ampl = 100 / √3; Angle = 120°
148
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
6. Repeat steps 4 and 5 applying voltages that are related to the second and the last
section of the characteristic; the function operates when IL1 is slightly higher than: 0.5 A
in the second section; 1A in the last section.
7. Connect the trip output contact to the input channel of the test set in order to stop the
injection and measure the trip time.
8. If definite time delay is used for the overcurrent step, set the setting Characterist = IEC
Def. Time. Apply the voltages related to the last part of the characteristic and inject a
current IL1 200% higher than the set operation level, and check the definite time delay for
trip (the signals TROC and TRIP of the protection function VRPVOC are active in trip
condition).
9. If inverse time delay is used for the overcurrent step, the parameter setting Characterist
shall be properly set; we can refer, for example, to the setting IEC Very inv.; If the IEC Very
inverse time characteristic is selected, the trip signals TROC and TRIP will operate after a
time defined by the equation:
13.5 * k
t [s] =
I
−1
StartCurr
IECEQUATION2435 V1 EN-US (Equation 92)
where:
t Operate time in seconds
I Measured value (for example, phase current)
StartCurr Set operate value
This means that if the measured phase current jumps from 0 to 2 times the set operate
level and time multiplier k is set to 1.0 s (default value), then the TROC and TRIP signals
will operate after a time delay equal to 13.5 s ± tolerance.
Taking into account the above explanation, inject the voltages related to the last part of
the characteristic and inject a current IL1 200% higher than the set operation level, and
check the trip time delay.
10. Check the start and operate information that are stored in the event menu.
11. The previous step 8 or 9 may be repeated also for the first and second section of the
characteristic.
12. Supply the IED with symmetric three-phase voltages at their rated values. Go to Main
menu/Settings/IED Settings/Current protection/VoltageRestOverCurr(51V,2(I>/U<))/
VRPVOC(51V,2(I>/U<)):1/Undervoltage and set the setting Operation_UV = On to
activate the undervoltage stage.
13. Slowly decrease the voltage in two phases simultaneously, until the STUV and START
signals appear.
14. Note the operate value. The set operate value in secondary volts is calculated according
to the following equation:
149
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
15. Increase slowly the applied voltages of the previous two phases and note the reset value.
16. Check that the trip output of the relay is connected to the input channel of the test in
order to stop the injection and measure the trip time.
17. Inject symmetric three-phase voltages at their rated value and check that the STUV and
START signals reset as well as the trip signals of the function block (TRIP and TRUV).
18. Instantaneously decrease the voltage in two phases simultaneously to a value 20% lower
than the set operate value (take into account the previous note if VRPVOC is configured
in ACT with the undervoltage seal-in feature).
19. Measure the definite time delay for the TRUV and TRIP signals and compare it with the
set value tDef_UV.
20. Check that start and operate information is stored in the event menu.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
Verification of START value and time delay to operate for Step 1 M13796-29 v9
1. Check that the IED settings are appropriate, especially the START value, the definite time
delay and the 1 out of 3 operation mode.
2. Supply the IED with three-phase voltages at their rated values.
3. Slowly decrease the voltage in one of the phases, until the START signal appears.
4. Note the operate value and compare it with the set value.
150
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
U1 < VT sec
× UBase ×
100 VTprim
IECEQUATION2431 V1 EN-US (Equation 95)
5. Increase the measured voltage to rated load conditions.
6. Check that the START signal resets.
7. Instantaneously decrease the voltage in one phase to a value about 20% lower than the
measured operate value.
8. Measure the time delay for the TRIP signal, and compare it with the set value.
9. Check the inverse time delay by injecting a voltage corresponding to 0.8 × U1<.
For example, if the inverse time curve A is selected, the trip signals TR1
and TRIP operate after a time corresponding to the equation:
k1
t (s ) =
U
1 − U1 <
IECEQUATION2428 V1 EN-US (Equation 96)
where:
t(s) Operate time in seconds
k1 Settable time multiplier of the function for step 1
U Measured voltage
U1< Set start voltage for step 1
For example, if the measured voltage jumps from the rated value to 0.8 times the set
start voltage level and time multiplier k1 is set to 0.05 s (default value), then the TR1 and
TRIP signals operate at a time equal to 0.250 s ± tolerance.
10. The test above can be repeated to check the inverse time characteristic at different
voltage levels.
11. Repeat the above-described steps for Step 2 of the function.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
151
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Verification of single-phase voltage and time delay to operate for Step 1 M13806-50 v8
U1 > VT sec
× UBase ×
100 VTprim
IECEQUATION2427 V1 EN-US (Equation 98)
4. Decrease the voltage slowly and note the reset value.
5. Set and apply about 20% higher voltage than the measured operate value for one phase.
6. Measure the time delay for the TR1 signal and compare it with the set value.
7. Check the inverse time delay by injecting a voltage corresponding to 1.2 × U1>.
8. Repeat the test to check the inverse time characteristic at different over-voltage levels.
9. Repeat the above-described steps for Step 2 of the function.
1. The tests above can be repeated for 2 out of 3 and for 3 out of 3 operation mode.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
152
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
6. Measure the time delay for the TR1 signal and compare it with the set value.
7. Check the inverse time delay by injecting a voltage corresponding to 1.2 × U1>.
For example, if the inverse time curve A is selected, the trip signals TR1
and TRIP operate after a time corresponding to the equation:
k1
t (s ) =
U
U1 > − 1
IECEQUATION2429 V1 EN-US (Equation 99)
where:
t(s) Operate time in seconds
k1 Settable time multiplier of the function for step 1
U Measured voltage
U1> Set start voltage for step 1
8. Repeat the test for Step 2 of the function.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
10.6.4.1
Verifying the settings
M6583-49 v4
1. Enable function.
2. Connect a symmetrical three-phase voltage input from the test set to the appropriate
connection terminals of the overexcitation protection OEXPVPH is configured for a three-
phase voltage input.
A single-phase injection voltage is applied if the function is configured for a phase-to-
phase voltage input.
OEXPVPH is conveniently tested using rated frequency for the injection voltage and
increasing the injection voltage to get the desired overexcitation level.
3. Connect the alarm contact to the timer and set the time delay tAlarm temporarily to zero.
4. Increase the voltage and note the operate value V/Hz>.
5. Reduce the voltage slowly and note the reset value.
6. Set the alarm time delay to the correct value according to the setting plan and check the
time delay, injecting a voltage corresponding to 1.2 · V/Hz>.
7. Connect a trip output contact to the timer and temporarily set the time delay tMin to
0.5s.
8. Increase the voltage and note the V/Hz>> operate value
9. Reduce the voltage slowly and note the reset value.
10. Set the time delay to the correct value according to the setting plan and check the time
delay tMin, injecting a voltage corresponding to 1.2 · V/Hz>>.
11. Check that trip and alarm contacts operate according to the configuration logic.
153
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
12. Set the cooling time constant temporarily to min value (1min.) to quickly lower the
thermal content.
13. Wait for a period equal to 6 times Tcooling switch 20 minutes on a voltage 1.15 · V/Hz>
and check the inverse operate time.
Wait until the thermal memory is emptied, set the cooling time constant according to the
setting plan and check another point on the inverse time curve injecting a voltage 1.3 · V/
Hz>.
14. Finally check that START and TRIP information is stored in the event menu.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
1. Connect voltages to the IED according to valid connection diagram and figure 37.
2. Apply voltage higher than the highest set value of UDTrip, U1Low and U2Low to the U1
three-phase inputs and to one phase of the U2 inputs according to figure 37.
The voltage differential START signal is set.
154
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
UL1 UL1
UL3 UL3
IED
UN UN
UL1
UL2 2
UL3
IEC07000106-1-en.vsd
IEC07000106 V2 EN-US
Figure 37: Connection of the test set to the IED for test of U1 block level
where:
1 is three-phase voltage group1 (U1)
2 is three-phase voltage group2 (U2)
3. Decrease slowly the voltage in phase UL1 of the test set until the START signal resets.
4. Check U1 blocking level by comparing the voltage level at reset with the set undervoltage
blocking U1Low.
5. Repeat steps 2 to 4 to check U1Low for the other phases.
1. Connect voltages to the IED according to valid connection diagram and figure 38.
155
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
UL1 UL1
UL3 UL3
IED
UN UN
UL1
UL2 2
UL3
IEC07000107-1-en.vsd
IEC07000107 V2 EN-US
Figure 38: Connection of the test set to the IED for test of U2 block level
where:
1 is three-phase voltage group1 (U1)
2 is three-phase voltage group2 (U2)
2. Apply voltage higher than the highest set value of UDTrip, U1Low and U2Low to the U1
three-phase inputs and to one phase of the U2 inputs according to figure 38.
The voltage differential START signal is set.
3. Decrease slowly the voltage in phase UL3 of the test set until the START signal resets.
4. Check U2 blocking level by comparing the voltage level at reset with the set undervoltage
blocking U2Low.
Procedure
1. Connect voltages to the IED according to valid connection diagram and figure 39.
156
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
UL1 UL1
UL3 UL3
IED
UN UN
UL1
UL2 2
UL3
IEC07000108-1-en.vsd
IEC07000108 V2 EN-US
Figure 39: Connection of the test set to the IED for test of alarm levels, trip levels
and trip timer
where:
1 is three-phase voltage group1 (U1)
2 is three-phase voltage group2 (U2)
4. Check the alarm operation level by comparing the differential voltage level at ALARM with
the set alarm level UDAlarm.
5. Continue to slowly decrease the voltage until START signal is activated.
6. Check the differential voltage operation level by comparing the differential voltage level
at START with the set trip level UDTrip.
7. Repeat steps 1 to 6 to check the other phases.
Observe that the connections to U1 must be shifted to test another phase. (UL1 to UL2,
UL2 to UL3, UL3 to UL1)
Procdure
1. Connect voltages to the IED according to valid connection diagram and figure 39.
2. Set Ur (rated voltage) to the U1 inputs and increase U2 voltage until differential voltage is
1.5 · operating level (UDTrip).
3. Switch on the test set. Measure the time from activation of the START signal until TRIP
signal is activated.
157
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
4. Check the measured time by comparing it to the set trip time tTrip.
5. Increase the voltage until START signal resets. Measure the time from reset of START
signal to reset of TRIP signal.
6. Check the measured time by comparing it to the set trip reset time tReset.
Procedure
1. With the protection in test mode, view the differential voltage service values in each
phase on the local HMI under Main menu/Test/Function status/Voltage protection/
VoltageDiff(PTOV,60)/VDCPTOV:x.
The IED voltage inputs should be connected to the VTs according to valid
connection diagram.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. Check that the input logical signals BLOCK, CBOPEN and VTSU are logical zero.
2. Supply a three-phase rated voltage in all three phases and note on the local HMI that the
TRIP logical signal is equal to the logical 0.
3. Switch off the voltage in all three phases.
After set tTrip time a TRIP signal appears on the corresponding binary output or on the
local HMI.
Note that TRIP at this time is a pulse signal, duration should be according
to set tPulse.
4. Inject the measured voltages at rated values for at least set tRestore time.
5. Activate the CBOPEN binary input.
6. Simultaneously disconnect all the three-phase voltages from the IED.
No TRIP signal should appear.
7. Inject the measured voltages at rated values for at least set tRestore time.
158
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
The Signal Monitoring tool in PCM600 shows the service values that are available on the Local
HMI as well.
Values of the logical signals for PAPGAPC are available on the local HMI under: Main menu/
Tests/Function status/Voltage protection/RadialFeeder(27, U<)/PAPGAPC(27, U<):1
159
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
• Check that TRIP and TRL1 are generated with the conditions described after a set delay
time of t1Ph and the outputs ARST and ARSTL1 are also activated. .
• Check that activated trip signals and start signals are blocked by enabling BLKTR and
BLKST.
• Check that all activated signals are disabled by BLOCK input.
• If required, perform creating faults on the remaining phases in the similar way.
Continue to test another function or end the testing by setting the parameter TestMode to Off
under: Main menu/Tests/IED test mode/TESTMODE:1
Restore connections and settings to their original values if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. Check that the IED settings are appropriate, for example the START value and the time
delay.
2. Supply the IED with three-phase voltages at their rated values.
3. Slowly decrease the frequency of the applied voltage, until the START signal appears.
4. Note the operate value and compare it with the set value.
5. Increase the frequency until rated operating levels are reached.
160
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Check that the IED settings are appropriate, for example the StartFrequency, UMin , and
the tDelay.
2. Supply the IED with three-phase voltages at rated values.
3. Slowly decrease the magnitude of the applied voltage, until the BLKDMAGN signal
appears.
4. Note the voltage magnitude value and compare it with the set value UMin.
5. Slowly decrease the frequency of the applied voltage, to a value below StartFrequency.
6. Check that the START signal does not appear.
7. Wait for a time corresponding to tDelay, make sure that the TRIP signal does not appear.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. Check that the settings in the IED are appropriate, for example the START value and the
time delay.
2. Supply the IED with three-phase voltages at their rated values.
3. Slowly increase the frequency of the applied voltage, until the START signal appears.
4. Note the operate value and compare it with the set value.
5. Decrease the frequency to rated operating conditions.
6. Check that the START signal resets.
7. Instantaneously increase the frequency of the applied voltage to a value about 1% lower
than the operate value (a step change more than 2% will increase the time delay).
8. Measure the time delay for the TRIP signal, and compare it with the set value. Note that
the measured time consists of the set value for time delay plus minimum operate time of
the start function (80 - 90 ms).
161
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1. Check that the settings in the IED are appropriate, for example the StartFrequency, UMin,
and the tDelay.
2. Supply the IED with three-phase voltages at their rated values.
3. Slowly decrease the magnitude of the applied voltage, until the BLKDMAGN signal
appears.
4. Note the voltage magnitude value and compare it with the set value, UMin.
5. Slowly increase the frequency of the applied voltage, to a value above StartFrequency.
6. Check that the START signal does not appear.
7. Wait for a time corresponding to tDelay, make sure that the TRIP signal does not appear.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
1. Check that the settings in the IED are appropriate, especially the START value and the
definite time delay. Set StartFreqGrad, to a rather small negative value.
2. Supply the IED with three-phase voltages at their rated values.
3. Slowly decrease the frequency of the applied voltage, with an increasing rate-of-change
that finally exceeds the setting of StartFreqGrad, and check that the START signal
appears.
4. Note the operate value and compare it with the set value.
5. Increase the frequency to rated operating conditions, and zero rate-of-change.
6. Check that the START signal resets.
7. Instantaneously decrease the frequency of the applied voltage to a value about 20%
lower than the nominal value.
8. Measure the time delay for the TRIP signal, and compare it with the set value.
162
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
One of the new facilities within the general current and voltage protection function CVGAPC is
that the value, which is processed and used for evaluation in the function, can be chosen in
many different ways by the setting parameters CurrentInput and VoltageInput.
These setting parameters decide what kind of preprocessing the connected three-phase CT
and VT inputs shall be subjected to. That is, for example, single-phase quantities, phase-to-
phase quantities, positive sequence quantities, negative sequence quantities, maximum
quantity from the three-phase group, minimum quantity from the three-phase group,
difference between maximum and minimum quantities (unbalance) can be derived and then
used in the function.
Due to the versatile possibilities of CVGAPC itself, but also the possibilities of logic
combinations in the application configuration of outputs from more than one CVGAPC
function block, it is hardly possible to define a fully covering general commissioning test.
Procedure
163
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
The current restraining value has also to be measured or calculated and the influence on the
operation has to be calculated when the testing of the operate value is done.
Procedure
Procedure
1. Connect the test set for injection of three-phase currents and three-phase voltages to
the appropriate current and voltage terminals of the IED.
2. Inject current(s) and voltage(s) in a way that relevant measured (according to setting
parameter CurrentInput and VoltageInput) currents and voltages are created from the
test set.
Overall check in principal as above (non-directional overcurrent feature)
3. Operate value measurement
The relevant voltage restraining value (according to setting parameter VoltageInput) has
also to be injected from the test set and the influence on the operate value has to be
calculated when testing of the operate value is done.
4. Operate time measurement
Definite times may be tested as above (non-directional overcurrent feature). For inverse
time characteristics the START value (to which the overcurrent ratio has to be calculated)
is the actual pickup value as got with actual restraining from the voltage restraining
quantity.
Please note that the directional characteristic can be set in two different ways either just
dependent on the angle between current and polarizing voltage (setting parameter
DirPrinc_OC1 or DirPrinc_OC2 set to or in a way that the operate value also is dependent on the
angle between current and polarizing voltage according to the I · cos(F) law (setting
parameter DirPrinc_OC1 or DirPrinc_OC2 set to I · cos(F). This has to be known if a more
detailed measurement of the directional characteristic is made, than the one described below.
Procedure
1. Connect the test set for injection of three-phase currents and three-phase voltages to
the appropriate current and voltage terminals of the IED.
2. Inject current(s) and voltage(s) in a way that relevant measured (according to setting
parameter CurrentInput and VoltageInput) currents and voltages are created from the
test set.
3. Set the relevant measuring quantity current to lag or lead (lag for negative RCA angle and
lead for positive RCA angle) the relevant polarizing quantity voltage by an angle equal to
the set IED characteristic angle (rca-dir) when forward directional feature is selected and
the CTstarpoint configuration parameter is set to ToObject.
164
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Procedure
1. Connect the test set for injection three-phase voltages to the appropriate voltage
terminals of the IED.
2. Inject voltage(s) in a way that relevant measured (according to setting parameter
VoltageInput) voltages are created from the test set.
3. Overall check in principal as above (non-directional overcurrent feature) and
correspondingly for the undervoltage feature.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The Current circuit supervision function CCSSPVC is conveniently tested with the same three-
phase test set as used when testing the measuring functions in the IED.
The condition for this procedure is that the setting of IMinOp is lower than the setting of
Ip>Block.
1. Check the input circuits and the operate value of the IMinOp current level detector by
injecting current, one phase at a time.
2. Check the phase current blocking function for all three phases by injecting current, one
phase at a time. The output signals shall reset with a delay of 1 second when the current
exceeds 1.5 · IBase.
3. Inject a current 0.1 · IBase to the reference current input I5.
4. Increase slowly the current in one of the phases current input and check that FAIL output
is obtained when the current is about 0.9 · IBase.
165
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The verification is divided in two main parts. The first part is common to all fuse failure
supervision options, and checks that binary inputs and outputs operate as expected according
to actual configuration. In the second part the relevant set operate values are measured.
10.9.2.1 Checking that the binary inputs and outputs operate as expected M1405-9 v8
1. Simulate normal operating conditions with the three-phase currents in phase with their
corresponding phase voltages and with all of them equal to their rated values.
2. Connect the nominal dc voltage to the DISCPOS binary input.
• The signal BLKU should appear with almost no time delay.
• The signals BLKZ and 3PH should not appear on the IED.
• Only the distance protection function can operate.
• Undervoltage-dependent functions must not operate.
3. Disconnect the dc voltage from the DISCPOS binary input terminal.
4. Connect the nominal dc voltage to the MCBOP binary input.
• The BLKUand BLKZ signals should appear without any time delay.
• All undervoltage-dependent functions must be blocked.
5. Disconnect the dc voltage from the MCBOP binary input terminal.
6. Disconnect one of the phase voltages and observe the logical output signals on the
binary outputs of the IED.
BLKU and BLKZ signals should appear simultaneously wether the BLKU and BLKZ reset
depends on the setting SealIn “on” or “off”. If “on” no reset, if “off” reset.
7. After more than 5 seconds disconnect the remaining two-phase voltages and all three
currents.
• There should be no change in the high status of the output signals BLKU and BLKZ.
• The signal 3PH will appear.
8. Establish normal voltage and current operating conditions simultaneously and observe
the corresponding output signals.
They should change to logical 0 as follows:
• Signal 3PH after about 25ms
• Signal BLKU after about 50ms
• Signal BLKZ after about 200ms
10.9.2.2 Measuring the operate value for the negative sequence function M1405-46 v11
Measure the operate value for the negative sequence function, if included in the IED.
166
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Simulate normal operating conditions with the three-phase currents in phase with their
corresponding phase voltages and with all of them equal to their rated values.
2. Slowly decrease the measured voltage in one phase until the BLKU signal appears.
3. Record the measured voltage and calculate the corresponding negative-sequence voltage
according to the equation (observe that the voltages in the equation are phasors):
3 ⋅ U 2 = U L1 + a 2 ⋅ U L2 + a ⋅ U L3
EQUATION707 V2 EN-US (Equation 100)
Where:
are the measured phase voltages
UL1 , U L2 and U L3
IEC00000275 V1 EN-US
2 ×p
j 3
a = 1× e 3
= -0,. 5 + j
2
IECEQUATION00022 V2 EN-US
4. Compare the result with the set value of the negative-sequence operating voltage
(consider that the set value 3U2> is in percentage of the base voltage UBase).
5. Repeat steps 1 and 2. Then slowly increase the measured current in one phase until the
BLKU signal disappears.
6. Record the measured current and calculate the corresponding negative-sequence current
according to the equation (observe that the currents in the equation are phasors):
3 × I 2 = I L1 + a × I L 2 + a × I L 3
2
Where:
are the measured phase currents
I L1 , I L 2 and I L 3
IECEQUATION00020 V1 EN-US
2 ×p
j 3
a = 1× e 3
= -0,. 5 + j
2
IECEQUATION00022 V2 EN-US
7. Compare the result with the set value of the negative-sequence operating current.
Consider that the set value 3I2< is in percentage of the base current IBase.
10.9.2.3 Measuring the operate value for the zero-sequence function M1405-72 v10
Measure the operate value for the zero-sequence function, if included in the IED.
1. Simulate normal operating conditions with the three-phase currents in phase with their
corresponding phase voltages and with all of them equal to their rated values.
2. Slowly decrease the measured voltage in one phase until the BLKU signal appears.
3. Record the measured voltage and calculate the corresponding zero-sequence voltage
according to the equation (observe that the voltages in the equation are phasors):
167
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
3 × U0 = U L1 + UL2 + U L3
IEC00000276 V1 EN-US (Equation 106)
Where:
UL1 , U L 2 and U L3
are the measured phase voltages
IEC00000275 V1 EN-US
4. Compare the result with the set value of the zero-sequence operating voltage (consider
that the set value 3U0> is in percentage of the base voltage.)
5. Repeat steps 1 and 2. Then slowly increase the measured current in one phase until the
BLKU signal disappears.
6. Record the measured current and calculate the corresponding zero-sequence current
according to the equation (observe that the currents in the equation are phasors):
3 × I 0 = I L1 + I L2 + I L3
IECEQUATION00019 V1 EN-US (Equation 108)
Where:
are the measured phase currents
I L1 , I L 2 and I L 3
IECEQUATION00020 V1 EN-US
7. Compare the result with the set value of the zero-sequence operate current. Consider
that the set value 3I0< is in percentage of the base current IBase.
10.9.2.4 Measuring the operate value for the dead line detection function GUID-4ABF1FD4-F6D3-4109-AFE5-552875E558A0 v4
1. Apply three-phase voltages with their rated value and zero currents.
2. Decrease the measured voltage in one phase until the DLD1PH signal appears.
3. This is the point at which the dead line condition is detected. Check the value of the
decreased voltage with the set value UDLD< (UDLD< is in percentage of the base voltage
UBase).
4. Apply three-phase currents with their rated value and zero voltages.
5. Decrease the measured current in one phase until the DLD1PH signal appears.
6. This is the point at which the dead line condition is detected. Check the value of the
decreased current with the set value IDLD< (IDLD< is in percentage of the base current
IBase).
10.9.2.5 Checking the operation of the du/dt and di/dt based function M1405-96 v11
Check the operation of the du/dt and di/dt based function if included in the IED.
1. Simulate normal operating conditions with the three-phase currents in phase with their
corresponding phase voltages and with all of them equal to their rated values.
2. Change the voltages and currents in all three phases simultaneously.
The voltage change must be higher than the set value DU> and the current change must
be lower than the set value DI<.
• The BLKU and BLKZ signals appear without any time delay. The BLKZ signal will be
activated only if the internal deadline detection is not activated at the same time.
• 3PH should appear after 5 seconds, if the remaining voltage levels are lower than
the set UDLD< of the dead line detection function.
3. Apply normal conditions as in step 1.
168
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
The BLKU, BLKZ and 3PH signals should reset, if activated, see step 1 and 2.
4. Change the voltages and currents in all three phases simultaneously.
The voltage change must be higher than the set value DU> and the current change must
be higher than the set value DI<.
The BLKU, BLKZ and 3PH signals should not appear.
5. Repeat step 2.
6. Connect the nominal voltages in all three phases and feed a current below the operate
level in all three phases.
7. Keep the current constant. Disconnect the voltage in all three phases simultaneously.
The BLKU, BLKZ and 3PH signals should not appear.
8. Change the magnitude of the voltage and current for phase 1 to a value higher than the
set value DU> and DI<.
9. Check that the start output signals STDUL1 and STDIL1 and the general start signals
STDU or STDI are activated.
10. Check that the start output signals for the current and voltage phases 2 and 3 are
activated by changing the magnitude of the voltage and current for phases 2 and 3.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
GUID-004BFFE4-B1C1-4C0E-8D7A-ABE7B566AB28 v2
169
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
7. After more than 5 seconds increase the measured voltage back to the value slightly below
USealIn level. MAINFUF signal should not reset.
8. Slowly increase measured voltage to the value slightly above USealIn until MAINFUF signal
resets.
9. Record the measured voltage and compare with the set value USealIn.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
This section contains instructions on how to test the synchrocheck, energizing check, and
synchronizing function SESRSYN for single, double and 1½ breaker arrangements.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
At commissioning and periodical checks, the functions shall be tested with the used settings.
To test a specific function, it might be necessary to change some setting parameters, for
example:
• AutoEnerg = Off/DLLB/DBLL/Both
• ManEnerg = Off
• Operation = Off/On
• Activation of the voltage selection function if applicable
The tests explained in the test procedures below describe the settings, which can be used as
references during testing before the final settings are specified. After testing, restore the
equipment to the normal or desired settings.
A secondary injection test set with the possibility to alter the phase angle and amplitude of
the voltage is needed. The test set must also be able to generate different frequencies on
different outputs.
Figure 40 shows the general test connection principle, which can be used during testing. This
description describes the test of the version intended for one bay.
Figure 41 shows the general test connection for a 1½ breaker diameter with one-phase voltage
connected to the line side.
170
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
IED
Test UMeasure
U-Bus
equipment U3PBB1 Ph/N
N Ph/Ph
Input Phase
L1,L2,L3
L12,L23,L31
UMeasure
U-Line
U3PLN1 Ph/N
Ph/Ph
UL1
UL2
Input Phase
UL3
L1,L2,L3
N
N L12,L23,L31
IEC05000480-4-en.vsd
IEC05000480 V4 EN-US
Figure 40: General test connection with three-phase voltage connected to the line side
IED
Test U-Bus1
equipment U3PBB1 UMeasure
Ph/N
N Ph/Ph
U-Bus2
U3PBB2
Input Phase
N L1,L2,L3
U-Line2
U3PLN2 L12,L23,L31
N
UMeasure
Ph/N
U-Line1 Ph/Ph
U3PLN1
Input Phase
L1,L2,L3
L12,L23,L31
N N
IEC05000481-5-en.vsd
IEC05000481 V5 EN-US
Figure 41: General test connection for a 1½ breaker diameter with one-phase voltage
connected to the line side
171
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
FreqDiffMax = 50.2 Hz
FreqDiffMin = 50.01 Hz
tBreaker = 0.080 s
1. Apply voltages
1.1. U-Line = 100% UBaseLine and f-Line = 50.0 Hz
1.2. U-Bus = 100% UBaseBus and f-Bus = 50.15Hz
2. Check that a closing pulse is submitted at a closing angle equal to calculated phase angle
value from the formula below. Modern test sets will evaluate this automatically.
Closing Angle = |( (fBus– fLine) * tBreaker * 360 degrees) |
fBus= Bus frequency
fLine= Line frequency
tBreaker = Set closing time of the breaker
3. Repeat with
3.1. U-Bus = 100% UBaseBus and f-bus = 50.25 Hz, to verify that the function does not
operate when frequency difference is above limit.
4. Verify that the closing command is not issued when the frequency difference is less than
the set value FreqDiffMin.
During the test of SESRSYN for a single bay arrangement, these voltage inputs are used:
U-Line UL1, UL2 or UL3 line 1 voltage input on the IED according to the connection in
SMT
U-Bus Bus voltage input on the IED according to the connection in SMT
The settings used in the test shall be final settings. The test shall be adapted to site setting
values instead of values in the example below.
1. Apply voltages U-Line (for example) = 80% GblBaseSelLine and U-Bus = 80%
GblBaseSelBusGblBaseSelBus with the same phase-angle and frequency.
2. Check that the AUTOSYOK and MANSYOK outputs are activated.
3. The test can be repeated with different voltage values to verify that the function
operates within the set UDiffSC. Check with both U-Line and U-Bus respectively lower
than the other.
4. Increase the U-Bus to 110% GblBaseSelBus, and the U-Line = 90% GblBaseSelLine and
also the opposite condition.
5. Check that the two outputs for manual and auto synchronism are not activated.
172
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Apply voltages U-Line (for example) = 100% GblBaseSelLine and U-Bus = 100%
GblBaseSelBus, with a phase difference equal to 0 degrees and a frequency difference
lower than FreqDiffA and FreqDiffM.
2. Check that the AUTOSYOK and MANSYOK outputs are activated.
The test can be repeated with other phase difference values to verify that the function
operates for values lower than the set ones, PhaseDiffM and PhaseDiffA. By changing the
phase angle on the voltage connected to U-Bus, between ± dφ degrees, the user can
check that the two outputs are activated for a phase difference lower than the set value.
It should not operate for other values. See figure 42.
U-Bus
No operation
+dj
U-Line operation
-dj
U-Bus
en05000551.vsd
IEC05000551 V1 EN-US
Test with a frequency difference outside the set limits for manual and auto synchronizing
check respectively.
1. Apply voltages U-Line equal to 100% GblBaseSelLine and U-Bus equal to 100%
GblBaseSelBus, with a frequency difference equal to 0 mHz and a phase difference lower
than the set value.
2. Check that the AUTOSYOK and MANSYOK outputs are activated.
3. Apply voltage to the U-Line equal to 100% GblBaseSelLine with a frequency equal to 50
Hz and voltage U-Bus equal to 100% GblBaseSelBus, with a frequency outside the set
limit.
4. Check that the two outputs are not activated. The test can be repeated with different
frequency values to verify that the function operates for values lower than the set ones. If
a modern test set is used, the frequency can be changed continuously.
173
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
During the test of the energizing check function for a single bay arrangement, these voltage
inputs are used:
General M2377-271 v6
When testing the energizing check function for the applicable bus, arrangement shall be done
for the energizing check functions. The voltage is selected by activation of different inputs in
the voltage selection logic.
Live voltage level is fixed to 80% UBase and dead voltage level to fixed 40% UBase.
The test shall be performed according to the settings for the station. Test the alternatives
below that are applicable.
174
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Verify the local HMI setting AutoEnerg to be Off and ManEnerg to be DBLL.
2. Set the parameter ManEnergDBDL to On.
3. Apply a single-phase voltage of 30% GblBaseSelBus to the U-Bus and a single-phase
voltage of 30% GblBaseSelLine to the U-Line.
4. Check that the MANENOK output is activated after set tManEnerg.
5. Increase the U-Bus to 80% GblBaseSelBus and keep the U-Line equal to 30%
GblBaseSelLine. The outputs should not be activated.
6. Repeat the test with ManEnerg set to DLLB with different values on the U-Bus and the U-
Line voltage.
If the UB1/2OK inputs for the fuse failure are used, they must be activated, during tests below.
Also verify that deactivation prevents operation and gives an alarm.
1. Connect the analog signals to the voltage inputs, in pair of two for U1 and U2. (Inputs
U3PBB1, U3PBB2, U3PLN1, U3PLN2)
2. Activate the binary signals according to the used alternative. Verify the measuring
voltage on the synchronizing check function SESRSYN. Normally it can be good to verify
synchronizing check with the same voltages and phase angles on both voltages. The
voltages should be verified to be available when selected and not available when another
input is activated so connect only one voltage transformer reference at each time.
3. Record the voltage selection tests in a matrix table showing read values and AUTOSYOK/
MANSYOK signals to document the test performed.
175
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
176
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
WA1
WA2
WA1_QA1 WA2_QA1
(SESRSYN 1) (SESRSYN 3)
TIE_QA1
(SESRSYN 2)
LINE1_QB9 LINE2_QB9
LINE1 LINE2
IEC11000274-3-en.vsd
IEC11000274 V3 EN-US
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Verification of the Autorecloser for 1/2/3-phase operation function SMBRREC for single-phase,
two-phase or three-phase reclosing attempts can be considered to consist of two parts.
• One part to verify the internal logic and timing of the function
• One part to verify its interaction with the protection system
This section deals with verification of SMBRREC itself. However, it is practical to start
SMBRREC by activating a protection function, for example, by secondary injection tests.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The purpose of verification before commissioning is to check that entered selections, setting
parameters and configuration render the intended result. The function is flexible with many
options and facilities. At commissioning only the selections and settings intended for use are
verified. If one chooses to reduce some time settings in order to speed up verification, be
careful to set the parameters at intended operational values at the end of the verification
procedure. One such parameter is the tReclaim time that must be timed out before a new test
sequence can be performed.
The verification test is performed together with protection and trip functions. Figure 44
illustrates a suggested testing arrangement, where the circuit-breaker (CB) is simulated by an
177
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
external bi-stable relay (BR), for example a relay type RXMVB2 or RXMD or Breaker Simulator of
ABB. The following manual switches are used:
If no bi-stable relay or breaker simulator is available, replace it with two self-reset auxiliary
relays and use a self-holding connection.
Use a secondary injection IED test set to operate the protection function. The test set shall be
switched off when a trip signal is given or when the BR comes to open position to simulate real
conditions.
The CB simulation can be made more elaborate, including simulation of the operating gear
condition, CBREADY of either the type ready for a Close-Open (CO) cycle, or the type ready for
an Open-Close -Open (OCO) cycle.
The CB condition CBREADY of a type, CO, shall be high (true) until a closing operation is
performed. It then goes low (false) for a recharging time of about 5 - 10s. After that it is high
again.
A CB condition CBREADY of a type, OCO shall be high (true) before and during tripping (Start
reclosing). During tripping it goes low for a recharging time, for example, 10s. It may thus be
low at the instant of reclosing. After each Open or Close operation it may need a recharging
period before it goes high again.
178
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
IED
CLOSE CB
BR
SC
Trip
ST
CB POS
SRY
CB READY
To test
set
+ -
IEC04000202-1-
en.vsd
IEC04000202 V2 EN-US
1. Check the function settings on the local HMI under Main menu/Settings/Setting group
N/Control/Autorecloser79,5(0–>1)/SMBRREC:x
If any timer settings are reduced to speed up or facilitate the testing, they shall be set to
normal after testing. A temporary label on the IED can be a reminder to restore normal
settings after which a verification test should be performed.
2. Decide if a synchronizing check function SESRSYN shall be included in the test.
If SESRSYN as an internal function or external device is not operated by the injection,
input signal SYNC must be connected as a permanent high signal or controlled by a
switch.
3. Read and make notes of the reclosing operation counters on the local HMI under Main
menu/Test/Function status/Control/AutoRecloser79,5(0–>1)/SMBRREC:x
Possibly reset the counters to Zero. Counters are reset in the reset menu.
4. Make arrangements for the simulation of the CB, for example as in figure 44.
5. Make arrangements for indication, recording and time measurements.
The signals for CBPOS, START, CLOSECB, READY and other relevant signals should
preferably be arranged for event recording with time tagging. If that is not possible,
other means of time measurement and recording should be arranged.
179
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Select the test cases to be run according to what is applicable to the particular application. It
can be, for example,
When checking the influence of a releasing condition it is suggested to first run a sequence
with the condition fulfilled. When the condition signal is removed, and a new sequence is run, it
indicates that the result was due to the changed condition. In case of a blocking signal the
procedure should be similar. Start without the blocking or inhibit signal, and then run a
sequence with the blocking or inhibit signal added.
180
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Check that the autorecloser function SMBRREC is operative, for example, by making a
reclosing shot without the INHIBIT signal.
2. Apply a fault and thereby a START signal. At the same time, or during the open time,
apply a signal to the input INHIBIT.
3. Check that the reclosing sequence is interrupted and no reclosing takes place.
1. Check that the autorecloser function SMBRREC is operative, for example by making a
reclosing shot.
Keep the CBREADY signal high.
2. Set the breaker simulating relay BR in Open position.
3. Close the BR relay and apply immediately a fault and thereby a START signal.
4. Check that no reclosing takes place.
1. Check that the autorecloser function SMBRREC is operative, for example by making a
reclosing shot.
Keep the CB simulator BR closed. Remove the CBREADY signal by opening SRY.
2. Apply a fault and thereby a START signal.
3. Check that no reclosing takes place.
1. Check that the autorecloser function SMBRREC is operative, for example, by making a
three-phase reclosing shot with the SESRSYN synchronizing check condition.
Set the SESRSYN function to Off to eliminate the signal connected to input signal SYNC.
2. Apply a fault causing three-phase trip and thereby a START and a TR3P signal.
3. Wait for the tSync time-out limit.
Check that no reclosing is made.
1. Check that the autorecloser function SMBRREC is operative, for example by making a
reclosing shot.
Set the autoreclosing operation to Off, for example by external control.
The output READY shall be low, and PREP3P shall be high.
2. Apply a single phase fault and thereby a START signal.
3. Check that a definitive three phase trip and no reclosing takes place.
The two functions can be checked individually by carefully applying START, WAIT, and INHIBIT
signals.
181
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
It is also possible to verify the two functions together by using CB simulating equipment for
two CB circuits. There should be interconnections from the master to the slave function,
WFMASTER - WAIT, and UNSUCCL - INHIBIT, as shown in the illustration referred to above.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
The apparatus control function consists of four types of function blocks, which are connected
in a delivery-specific way between bays and to the station level. For that reason, test the total
function in a system, that is, either in a complete delivery system as an acceptance test (FAT/
SAT) or as parts of that system.
For the single command function block, it is necessary to configure the output signal to
corresponding binary output of the IED. The operation of the single command function
(SINGLECMD) is then checked from the local HMI by applying the commands with Mode = Off,
Steady or Pulse, and by observing the logic statuses of the corresponding binary output.
Command control functions included in the operation of different built-in functions must be
tested at the same time as their corresponding functions.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
182
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Values of the logical signals are available on the local HMI under Main menu/Tests/Function
status/Control/Apparatus control/Interlocking. The Signal Monitoring in PCM600 shows the
same signals that are available on the local HMI.
The interlocking function consists of a bay-level part and a station-level part. The interlocking
is delivery specific and is realized by bay-to-bay communication over the station bus. For that
reason, test the function in a system, that is, either in a complete delivery system as an
acceptance test (FAT/SAT) or as parts of that system.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
Check the scheme logic during the secondary injection test of the impedance or overcurrent
protection functions.
Activation of the different zones verifies that the CS signal is issued from the intended zones.
The CS signal from the independent tripping zone must have a tSendMin minimum time.
Check the tripping function by activating the CR and CRG inputs with the overreaching zone
used to achieve the CACC signal.
It is sufficient to activate the zones with only one type of fault with the secondary injection.
183
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
7. Apply healthy normal load conditions to the IED for at least two seconds.
8. Apply a fault condition within the permissive zone.
9. Check that trip time complies with the zone timers and that correct trip outputs, external
signals, and indications are obtained for the actual type of fault generated.
Check the unblocking function (if the function is required) when checking the communication
scheme.
184
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings outlined in section "Requirements" and section
"Preparing for test" in this chapter.
Check the scheme logic during the secondary injection test of the impedance protection
functions.
Activating of the different zones and phases verifies that the CSLx signal are issued from the
intended zones. The CSLx signal from the independent tripping zone must have a tSendMin
minimum time.
Check the tripping function by activating the CRLx inputs with the overreaching zone used to
achieve the CACCLx signals.
It is sufficient to activate the zones with all types of fault with the secondary injection.
185
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
7. Apply healthy normal load conditions to the IED for at least two seconds.
8. Apply a fault condition within the permissive zone.
9. Check that trip time complies with the zone timers and that correct trip outputs, external
signals, and indications are obtained for the actual type of fault generated.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
Values of the logical signals for ZCRWPSCH are available on the local HMI under Main menu/
Tests/Function status / Scheme communication / ZCRWPSCH(85) /ZCRWPSCH:1.
The Signal Monitoring in PCM600 shows signals that are available on the Local HMI.
The current reversal logic and the weak-end infeed functions are tested during the secondary-
injection test of the impedance or overcurrent protection zones together with the scheme
communication logic for the distance protection function ZCPSCH.
It is possible to check the delay of the CS send signal with tDelayRev by changing from a
reverse to a forward fault.
By continuously activating the CR input and changing from a reverse to a forward fault, the
delay tDelayRev can be checked.
186
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
The reverse zone timer must not operate before the forward zone fault is
applied. The user might need to block the reverse zone timer setting during
testing of current reversal.
The forward zone timer must be set longer than the tDelayRev set value.
1. Check the blocking of the echo with the injection of a CRL signal >40ms after a reverse
fault is applied.
2. Measure the duration of the echoed CS signal by applying a CRL receive signal.
3. Check the trip functions and the voltage level for trip by reducing a phase voltage and
applying a CRL receive signal.
If wanted, change all settings cyclically for other faults (L2-N and L3-N).
187
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The logic is checked during the secondary injection test of the impedance measuring zones.
1. Provide the IED with conditions equivalent to normal load for at least two seconds.
2. Deactivate the conditions for accelerated function.
3. Apply a phase-to-earth fault at 100% of line impedance.
4. Check that the fault is tripped with the second zone time delay.
5. Provide the IED with conditions equivalent to normal load for at least two seconds.
6. Activate the condition for accelerated function either by the autorecloser or by the loss-
of-load.
7. Apply a phase-to-earth fault at 100% of line impedance.
8. Check that the fault is tripped instantaneously.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
Before testing the communication logic for residual overcurrent protection function ECPSCH,
the four step residual overcurrent protection function EF4PTOC has to be tested according to
the corresponding instruction. Once this is done, continue with the instructions below.
If the current reversal and weak-end infeed logic for earth-fault protection is included, proceed
with the testing according to the corresponding instruction after the testing the
188
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
communication logic for residual overcurrent protection. The current reversal and weak-end-
infeed functions shall be tested together with the permissive scheme.
1. Inject the polarizing voltage 3U0 at 5% of UBase (EF4PTOC) where the current is lagging
the voltage by 65°.
2. Inject current (65° lagging the voltage) in one phase at about 110% of the set operating
current, and switch the current off with the switch.
3. Switch the fault current on and measure the operating time of the communication logic.
Use the TRIP signal from the configured binary output to stop the timer.
4. Compare the measured time with the set value tCoord.
5. Activate the CR binary input.
6. Check that the CRL output is activated when the CR input is activated.
7. Switch the fault current on (110% of the set operating current) and wait longer than the
set value tCoord.
12. Switch the fault current and the polarizing voltage off.
13. Reset the BLOCK digital input.
1. Inject the polarizing voltage 3U0, which is 5% of UBase (EF4PTOC) where the current is
lagging the voltage by 65°.
2. Inject current (65° lagging the voltage) into one phase at about 110% of the set operating
current, and switch the current off with the switch.
3. Switch the fault current on, (110% of the set operating current) and wait longer than the
set value tCoord.
189
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
9. Switch the fault current on (110% of the set operating current) and wait for a period
longer than the set value tCoord.
10. Switch the fault current and the polarizing voltage off.
11. Reset the CR binary input and the BLOCK digital input.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Values of the logical signals for ECRWPSCH are available on the Local HMI under Main menu/
Tests/Function status/Scheme communication/ECRWPSCH(85)/ECRWPSCH:1.
The Signal Monitoring in PCM600 shows service values that are available on the Local HMI as
well.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
First, test the four step residual overcurrent protection function EF4PTOC and then the
current reversal and weak-end infeed logic according to the corresponding instructions. Then
continue with the instructions below.
1. Inject the polarizing voltage 3U0 to 5% of UBase and the phase angle between voltage
and current to 155°, the current leads the voltage.
2. Inject current (180° — AngleRCA) in one phase to about 110% of the set operating current
of the four step residual overcurrent protection (IN>Dir).
3. Check that the IRVL output is activated in the disturbance recorder after the set time
tPickUpRev.
4. Abruptly reverse the current to AngleRCA setting lagging the voltage, to operate the
forward directional element.
5. Check that the IRVL output still is activated after the reversal with a time delay that
complies with the setting tDelayRev.
6. Switch off the polarizing voltage and the current.
190
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
1. Inject the polarizing voltage 3U0 to (180° — AngleRCA) of UBase and the phase angle
between voltage and current to 155°, the current leads the voltage.
2. Inject current (180° — AngleRCA) in one phase to about 110% of the setting operating
current (IN>Dir).
3. Activate the CRL binary input.
4. Abruptly reverse the current to the setting of AngleRCA setup lagging the voltage, to
operate the forward directional element.
5. Switch off the current and check that the ECHO and CS appear on the corresponding
binary output during 200ms after resetting the directional element.
6. Switch off the CRL binary input.
7. Activate the BLOCK binary input.
8. Activate the CRL binary input.
9. Switch off the polarizing voltage and reset the BLOCK and CRL binary input.
1. Inject the polarizing voltage 3U0 to about 90% of the setting (3U0>) operating voltage.
2. Activate the CRL binary input.
3. Increase the injected voltage to about 110% of the setting (3U0) operating voltage.
4. Activate the CRL binary input.
5. Check that the ECHO, CS and TRWEI appear on the corresponding binary output or on the
local HMI.
6. Reset the CRL binary input.
7. Activate the BLOCK binary input.
8. Activate the CRL binary input.
191
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
13. Abruptly reverse the current to 65° lagging the voltage to operate the forward directional
element.
14. Switch the current off and check that the ECHO, CS and TRWEI appear on the
corresponding binary output during 200ms after resetting the directional element. If
EF4PTOC also operates in forward direction, CS should be obtained.
15. Switch the polarizing voltage off and reset the CRL binary input.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
10.11.7.1 Low active power and power factor local criteria LAPPGAPC GUID-5F73C74C-3BA1-4DF0-8D04-CE1416AF727D v1
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
1. Connect the test set for three-phase current injection and three-phase voltage to the
appropriate IED terminals.
2. Inject symmetrical phase voltages equal to the rated voltage.
3. Decrease the injected current in phase L1 and note the operated value (start value) of the
studied step of the function. This current shall have the same phase angle as the injected
P =U ×I
phase voltage. The active power for operation is calculated as: ph ph
(single-
phase active power).
4. Increase the current slowly and note the reset value.
5. Connect a trip output contact to a timer.
6. Set the injected current to 50% of the operate level in the tested stage. Switch on the
current and check the time delay.
7. Check that all trip and start contacts operate according to the configuration (signal
matrices).
8. Finally check that start and trip information is stored in the event memory. Repeat steps
3 – 6 for phases L2 and L3.
9. Inject symmetrical phase voltages and phase currents in all three phases, equal to SBase
(rated voltage and current).
10. Increase the phase angle between the injected phase voltages and phase current, and
note the operate value φ. The corresponding power factor is equal to pf = cos j .
11. Decrease the phase angle and note the reset value.
192
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
12. Set the phase angle of the injected current slightly higher than the operate value. Switch
on the current and check the time delay.
13. Check that all trip and start contacts operate according to the configuration (signal
matrices).
14. Finally check that start and trip information is stored in the event memory.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
æ U injected U injected ö
U = U injected - ç I injected - j + j ÷ × ( RL + jX L )
equal to: è xy
X cp
X ø
14. Repeat step 13 for phases L2 and L3.
15. Set OperationOV to On.
16. Connect the test set for three-phase current injection and three-phase voltage to the
appropriate IED terminals.
17. Inject symmetrical phase voltages equal to the rated voltage.
18. Increase the injected voltage in phase L1 and note the operated value (start value) of the
function.
19. Decrease the voltage slowly and note the reset value.
20. Connect a trip output contact to a timer.
21. Increase stepwise the injected voltage to 110% of the operate level, and check the time
delay.
22. Check that all trip and start contacts operate according to the configuration (signal
matrices).
23. Finally check that start and trip information is stored in the event memory. Repeat steps
17 – 22 for phases L2 and L3.
If voltage compensation will be used do the following steps:
24. Set EnShuntReactorto On and activate input signal SWIPOS.
193
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
25. Check that the line impedance (R1 and X1) and reactor impedance (Xc) are set to the
correct values.
26. Inject symmetrical phase voltages equal to 120% of the rated voltage.
27. Increase the injected current (same phase angle as the injected voltage) in phase L1 from
zero and note the operated value (start value) of the function. Check that this value is
æ U injected U injected ö
U = U injected - ç I injected - j + j ÷ × ( RL + jX L )
equal to: è X xy X cp ø
Completing the test
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
194
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
INPut
LOCTR X X X
LOCTRL1 X
LOCTRL2 X
LOCTRL3 X
195
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
UL1 UL1
UL2 UL2
UL3 UL3
IED
IED TEST SET
IEC10000014-1-en.vsd
IEC10000014 V1 EN-US
1. Connect the test set for three-phase voltage injection to the appropriate IED terminals as
shown in Figure 45
2. Increase the injected voltage and note the operated value (start value) of the studied
step of the function.
3. Decrease the voltage slowly and note the reset value.
4. Connect a trip output contact to a timer.
5. Set the injected voltage to 110% of the operate level of the tested stage. Switch on the
current and check the time delay.
6. Check that all trip and start contacts operate according to the configuration (signal
matrices).
7. Finally check that start and trip information is stored in the event memory.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
1. Connect the test set for three-phase voltage injection (L1, L2, L3) or residual voltage
injection (N) to the appropriate IED terminals. This depends on how the IED is fed from
the VT.
2. Increase the injected zero sequence voltage and note the operated value (start value) of
the studied step of the function.
3. Decrease the voltage slowly and note the reset value.
4. Connect a trip output contact to a timer.
196
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
5. Set the injected voltage to 110% of the operate level in the tested stage, switch on the
current and check the time delay.
6. Check that all trip and start contacts operate according to the configuration (signal
matrices).
7. Finally check that start and trip information is stored in the event memory.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
IL 1 IL 1
IL 2
IL 2
IL 3
IL 3
IED
IED TEST SET
IEC10000013-1-en.vsd
IEC10000013 V1 EN-US
1. Connect the test set for three-phase current injection to the appropriate IED terminals as
shown in Figure 46
2. Increase the injected current and note the operated value (start value) of the studied step
of the function.
3. Decrease the current slowly and note the reset value.
4. Connect a trip output contact to a timer.
5. Set the injected current to 200% of the operate level of the tested stage. Switch on the
current and check the time delay.
6. Check that all trip and start contacts operate according to the configuration (signal
matrices).
7. Finally check that start and trip information is stored in the event memory.
197
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
1. Connect the test set for three-phase voltage injection (L1, L2, L3or residual voltage
injection (N) to the appropriate IED terminals. This is dependent on how the IED is fed
from the CT.
2. Increase the injected zero-sequence current and note the operated value (start value) of
the studied step of the function.
3. Decrease the current slowly and note the reset value.
4. Connect a trip output contact to a timer.
5. Set the injected current to 200% of the operate level of the tested stage. Switch on the
current and check the time delay.
6. Check that all trip and start contacts operate according to the configuration (signal
matrices).
7. Finally check that start and trip information is stored in the event memory.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
1. Connect the test set for three-phase current injection to the appropriate IED terminals.
2. Increase the injected current in phase L1 and note the operated value (start value) of the
studied step of the function.
3. Decrease the current slowly and note the reset value.
4. Connect a trip output contact to a timer.
5. Set the injected current to 200% of the operate level of the tested stage. Switch on the
current and check the time delay.
6. Check that all trip and start contacts operate according to the configuration (signal
matrices).
7. Finally check that start and trip information is stored in the event memory.
8. Repeat steps 2 – 7 for phases L2 and L3.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
1. Connect the test set for three-phase current injection to the appropriate IED terminals.
2. Inject a symmetrical three-phase current larger than the set value I<.
3. Decrease the injected current in phase L1 and note the operated value (start value) of the
studied step of the function.
4. Increase the current slowly and note the reset value.
5. Connect a trip output contact to a timer.
198
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
6. Decrease the injected current step-wise to 50% of the operate level and check the time
delay.
7. Check that all trip and start contacts operate according to the configuration (signal
matrices).
8. Finally check that start and trip information is stored in the event memory.
9. Repeat steps 2 – 7 for phases L2 and L3.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
This function is functionality tested together with other protection functions (line differential
protection,earth-fault overcurrent protection, and so on) within the IED. It is recommended
that the function is tested together with the autorecloser function, when built into the IED or
when a separate external unit is used for reclosing purposes. The instances of SMPPTRC are
identical except for the name of the function block SMPPTRC. The testing is preferably done in
conjunction with the protection system and autoreclosing function.
In addition to various other tests, the following tests should be performed. They depend on
the complete configuration of an IED:
Procedure
1. Make sure that TripLockout and AutoLock are both set to Off.
2. Initiate different single-phase-to-earth faults one at a time.
Single-phase tripping will only be allowed when an autoreclose attempt will follow. The
autorecloser function SMBRREC has the functionality such as the long trip time, CB ready
and so on, which can prevent a proper single-phase tripping and autoreclose. To by-pass
this problem the fault initiation should be with a test set and with the autoreclose in full
service with a test set connected to the distance protection function. Consider using an
adequate time interval between faults, to overcome a reclaim time of which is activated
by SMBRREC. Only a single-phase trip should occur for each separate fault and only one
199
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
of the trip outputs (TRLn) should be activated at a time. Functional outputs TRIP and
TR1P should be active during each fault. No other outputs should be active.
3. Initiate different phase-to-phase and three-phase faults.
Consider using an adequate time interval between faults, to overcome a reclaim time,
which is activated by SMBRREC. A three-phase trip should occur for each separate fault
and all of the trips. Functional outputs TRIP, all TRLn and TR3P should be active at each
fault.
4. Initiate a single phase-to-earth fault and switch it off immediately when the trip signal is
issued for the corresponding phase. Initiate the same fault once again within the reclaim
time of the used SMBRREC.
A single-phase fault shall be given at the first fault. A three-phase trip must be initiated
for the second fault. Check that the corresponding trip signals appear after both faults.
Functional outputs TRIP, TRLn and TR1P should be active during first fault. No other
outputs should be active. Functional outputs TRIP, all TRLn and TR3P should be active
during second fault.
5. Initiate a single phase-to-earth fault and switch it off immediately when the trip signal is
issued for the corresponding phase. Initiate the second single phase-to-earth fault in one
of the remaining phases within the time interval, shorter than tEvolvingFault (default
setting 2.0s) and shorter than the dead-time of SMBRREC, when included in the
protection scheme.
Check that the second trip is a three-phase trip and that a three-phase autoreclosing
attempt is given after the three-phase dead time. Functional outputs TRIP, TRLn and
TR1P should be active during the first fault. No other outputs should be active. Functional
outputs TRIP, all TRLn and TR3P should be active during second fault.
In addition to other tests, the following tests, which depend on the complete configuration of
an IED, should be carried out.
Procedure
1. Make sure that AutoLock and TripLockout are both set to Off.
2. Initiate different single-phase-to-earth faults one at a time.
Take an adequate time interval between faults into consideration, to overcome a reclaim
time, which is activated by the autorecloser function SMBRREC. Only a single-phase trip
should occur for each separate fault and only one of the trip outputs (TRLn) should be
activated at a time. Functional outputs TRIP and TR1P should be active at each fault. No
other outputs should be active.
3. Initiate different phase-to-phase faults one at a time.
Take an adequate time interval between faults into consideration, to overcome a reclaim
time which is activated by SMBRREC. Only a two-phase trip should occur for each
separate fault and only corresponding two trip outputs (TRLn) should be activated at a
time. Functional outputs TRIP and TR2P should be active at each fault. No other outputs
should be active.
4. Initiate a three-phase fault.
Take an adequate time interval between faults into consideration, to overcome a reclaim
time, which may be activated by SMBRREC. Only a three-phase trip should occur for the
fault and all trip outputs (TRLn) should be activated at the same time. Functional outputs
TRIP and TR3P should be active at each fault. No other outputs should be active.
5. Initiate a single phase-to-earth fault and switch it off immediately when the trip signal is
issued for the corresponding phase. Initiate the same fault once again within the reclaim
time of the used SMBRREC.
200
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
A single-phase fault shall be given at the first fault. A three-phase trip must be initiated
for the second fault. Check that the corresponding trip signals appear after both faults.
Functional outputs TRIP, TRLn and TR1P should be active during first fault. No other
outputs should be active. Functional outputs TRIP, all TRLn and TR3P should be active
during second fault.
6. Initiate a single phase-to-earth fault and switch it off immediately when the trip signal is
generated for the corresponding phase. Initiate the second single-phase-to-earth fault in
one of the remaining phases within the time interval, shorter than tEvolvingFault (default
setting 2.0s) and shorter than the dead-time of SMBRREC, when included in the
protection scheme.
Check that the second trip is a three-phase trip and that a three-phase autoreclosing
attempt is given after the three-phase dead time. Functional outputs TRIP, TRLn and
TR1P should be active during first fault. No other outputs should be active. Functional
outputs TRIP, all TRLn and TR3P should be active during second fault.
7. Initiate a phase-to-phase fault and switch it off immediately when the trip signal is
issued for the corresponding two phases. Initiate a second phase-to-phase fault between
two other phases within the time interval, shorter thantEvolvingFault (default setting
2.0s).
Check, that the output signals, issued for the first fault, correspond to a two- trip for
included phases. The output signals generated by the second fault must correspond to
the three-phase tripping action.
The following tests should be carried out when the built-in lockout function is used in addition
to possible other tests, which depends on the complete configuration of an IED.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
201
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Prepare the IED for verification of settings as outlined in section "Testing the liquid medium
supervision for alarm and lock out conditions" and section "Completing the test" in this
chapter.
Check that the input logical signal BLOCK is logical zero and that on the local HMI, the logical
signals PRES_ALM, PRES_LO, TEMP_ALM and TEMP_LO are equal to logical zero.
10.13.1.1 Testing the liquid medium supervision for alarm and lock out conditions GUID-768DAAC8-F89D-4401-B86D-9B26FD7224F6 v1
1. Connect binary inputs to consider gas pressure and gas density to initiate the alarms.
2. Consider the analogue pressure input PRESSURE to initiate the alarms.
3. Gas pressure lock out input can be used to set PRES_LO signal, check the signal status in
local HMI under Main menu/Test/Function status/Monitoring/Gas medium supervision
SSIMG/PRES_LO
4. Reduce the pressure level input below PresAlmLimit, check for PRES_ALM signal status in
local HMI under Main menu/Test/Function status/Monitoring/Gas medium supervision
SSIMG/PRES_ALM
5. Activate BLOCK binary input, the signals PRES_ALM, PRES_LO should disappear.
6. Reset the BLOCK binary input.
7. Check for reset lock out input RESET_LO to reset PRES_LO lock out signal.
8. Conduct these steps for temperature input as well to detect and reset TEMP_ALM and
TEMP_LO signals.
9. Continue to test another function or end the test by changing the TestMode setting to
off.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Liquid medium supervision
SSIML" and section "Completing the test" in this chapter.
Check that the input logical signal BLOCK is logical zero and that on the local HMI, the logical
signals LVL_ALM, LVL_LO, TEMP_ALM and TEMP_LO are equal to logical zero.
10.13.2.1 Testing the liquid medium supervision for alarm and lock out conditions GUID-C1F1E6CA-9512-4358-A4E7-84CC3698D156 v1
1. Connect the binary inputs to consider liquid level to initiate the alarms.
2. Consider the analogue level input LEVEL to initiate the alarms.
3. Liquid level lock out input can be used to set LVL_LO signal, check the signal status in
local HMI under Main menu/Test/Function status/Monitoring/Liquid medium
supervision SSIML/LVL_LO
4. Reduce the liquid level input below LevelAlmLimit, check for LVL_ALM signal status in
local HMI under Main menu/Test/Function status/Monitoring/Liquid medium
supervision SSIML/LVL_ALM
202
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
5. Activate BLOCK binary input, the signals LVL_ALM, LVL_LO should disappear.
6. Reset the BLOCK binary input.
7. Check for reset lock out input RESET_LO to reset the LVL_LO lock out signal.
8. Conduct these steps for temperature input as well to detect and reset TEMP_ALM and
TEMP_LO signals.
9. Continue to test another function or end the test by changing the TestMode setting to
Off.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Prepare the IED for verification of settings outlined in section “Testing the IED operation”.
The Signal Monitoring tool in PCM600 shows the service values that are available on the Local
HMI as well.
Values of the logical signals belong to the breaker monitoring are available on the local HMI
under: Main menu/Test/Function status/Monitoring/BreakerMonitoring/SSCBR:x
1. Connect the test set for the injection of a three-phase current to the appropriate current
terminals of the IED.
2. If current need to be injected for a particular test, it should be done in the phase selected
by the PhSel parameter.
3. Follow the sequence for positioning the auxiliary contacts before testing:
POSCLOSE 0 1 0
POSOPEN 0 0 1
4. Test of CB contact travel time
4.1. Test the set timing defined by OpenTimeCorr, CloseTimeCorr, tTrOpenAlm and
tTrCloseAlm.
4.2. Change the status of the auxiliary contacts such that travel time to open TTRVOP
and travel time to close TTRVCL exceed the respective set values (tTrOpenAlm and
tTrCloseAlm). The measured travel time for opening and closing is shown on TTRVOP
and TTRVCL respectively.
4.3. Check that TRVTOPAL and TRVTCLAL are activated.
5. Test of CB status
5.1. Test the set current level defined by AccStopCurr.
5.2. Check the CLOSEPOS output by changing the POSOPEN to 0 and POSCLOSE to 1.
5.3. Check the OPENPOS output by changing the POSOPEN to 1 and POSCLOSE to 0 and
also inject the current in the selected phase slightly lower and higher than
AccStopCurr set value. Only for a current lower than set AccStopCurr should activate
the output POSOPEN.
5.4. Check the circuit breaker is in INVDPOS if auxiliary contacts read same value or CB is
open and inject the current in selected phase more than AccStopCurr set value.
6. Test of remaining life of CB
203
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
1. Continue to test another function or end the test by changing the Test mode setting to
Off.
2. Restore connections and settings to their original values if they were changed for testing
purposes.
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
204
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
During testing, the IED can be set when in test mode from PST. The functionality of the event
reporting during test mode is set in the Parameter Setting tool in PCM600.
Prepare the IED for verification of settings as outlined in section "Requirements" and
section "Preparing for test" in this chapter.
The Fault locator function LMBRFLO depends on other functions to work properly, that is,
phase selection information from distance protection function and analog information
supplied by the trip value recorder function. Check that proper binary start and phase
selection signals are connected and voltage and current signals are configured (parameter
settings).
The result is displayed on the local HMI or via PCM600. Distances to faults for the last 100
recorded disturbances can be found on the local HMI under Main menu/Disturbance Records/
Disturbance #n(n = 1–100)/General Information
If PCM600 is used, the result is displayed on the recording list after upload, including loop
selection information.
1. Set the test point (|Z| fault impedance and ZF impedance phase angle ) for a condition
that meets the requirements in table 39.
2. Subject the IED to healthy normal load conditions for at least two seconds.
3. Apply a fault condition.
Check that the distance-to-fault value displayed on the HMI complies with equations 110,
111 and 112
205
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Z
p = ------x- × 100
X1
EQUATION123 V1 EN-US (Equation 110)
3 × Zx
p= × 100
X0 + 2 × X1
EQUATION124 V1 EN-US (Equation 111)
3 × Zx
p = --------------------------------------------- × 100
X0 + 2 × X1 ± XM
EQUATION125 V1 EN-US (Equation 112)
Where:
p = the expected value of a distance to fault in percent
Zx = set test point on the test set
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
The Limit counter function L4UFCNT can be tested by connecting a binary input to the counter
and applying pulses to the counter. The speed of the pulses must not exceed the cycle time of
the function. Normally the counter will be tested when testing the function that the counter is
connected to, such as the trip function. When the function is configured, test it together with
the function that operates it. Trig the function and check that the counter result corresponds
to the number of operations.
Continue to test another function or end the test by changing the Test mode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
206
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
The test of the Pulse-counter logic function PCFCNT requires the Parameter Setting tool in
PCM600 or an appropriate connection to the local HMI with the necessary functionality. A
known number of pulses with different frequencies are connected to the pulse counter input.
The test should be performed with settings Operation = On or Operation = Off and the
function blocked or unblocked. The pulse counter value is then checked in PCM600 or on the
local HMI.
Prepare the IED for verification of settings as outlined in section ”Overview “ and
section ”Preparing for test“ in this chapter.
Common test equipment can be used to determine the injection of current and voltage and
time measurement.
1. Connect the test set for injection of three-phase currents and three phase voltage to the
appropriate current and voltage terminals of the IED.
2. Ensure the instantaneous values of active and reactive power from CVMMXN function
block are connected to ETPMMTR function block active and reactive power inputs.
3. Enable the EnaAcc setting and set tEnergy as 1 minute.
4. Activate the STARTACC input and supply the IED with three phase currents and voltages at
their rated value.
5. Check that the ACCINPRG signal appears continuously.
6. Note the EAFACC and ERFACCvalue after 1 minute and compare it with calculated energy
value.
7. Similarly check after each 1 minute whether the calculated integrated energy value and
EAFACC and ERFACC outputs are matching.
8. After some time (multiple of minute) remove the current and voltage input from CVMMXN
function block.
9. Check the EAFACC and ERFACC output in the next 1 minute cycle for the retaining the same
value.
10. Activate STOPACC input after some time and supply the IED with same current and
voltage.
11. Check that the ACCINPRG signal disappears immediately and EAFACC and ERFACC outputs
also stop updating.
12. Similarly the testing can be done for EAFACC and ERFACC outputs by changing the power
inputs directions through direction settings.
207
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
5. After 1 minute check the MAXPAFD and MAXPRFD whether it is showing the last 1 minute
average power value as maximum.
6. Next 1 minute cycle reduce the current or voltage below previous value.
7. Check after 1 minute whether the MAXPAFD and MAXPRFD outputs are retaining the old
maximum value.
8. Similarly the testing can be done for MAXPAFD and MAXPRFD outputs by changing the
power inputs directions through direction settings.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
Test of the multiple command function block and multiple transmit is recommended to be
performed in a system, that is, either in a complete delivery system as an acceptance test
(FAT/SAT) or as parts of that system, because the command function blocks are connected in
a delivery-specific way between bays and the station level and transmit.
Command and transmit function blocks included in the operation of different built-in
functions must be tested at the same time as their corresponding functions.
Prepare the IED for verification of settings as outlined in section "Preparing the IED to verify
settings".
208
Commissioning manual
1MRK 505 345-UEN B Section 10
Testing functionality by secondary injection
• The I/O-circuit board is supervised as an I/O module. For example it generates FAIL if the
board is not inserted. I/O-modules not configured are not supervised.
• The communication is supervised and the signal COMFAIL is generated if a
communication error is detected.
Status for inputs and outputs as well as self-supervision status are available from the local
HMI under
Test the correct functionality by simulating different kind of faults. Also check that sent and
received data is correctly transmitted and read.
A test connection is shown in figure 47. A binary input signal (BI) at End1 is configured to be
transferred through the communication link to End2. At End2 the received signal is configured
to control a binary output (BO). Check at End2 that the BI signal is received and the BO
operates.
Repeat the test for all the signals configured to be transmitted over the communication link.
IEC07000188 V1 EN-US
209
Commissioning manual
Section 10 1MRK 505 345-UEN B
Testing functionality by secondary injection
Prepare the IED for verification of settings as outlined in section "Requirements" and section
"Preparing for test" in this chapter.
1. Check the configuration of binary inputs that control the selection of the active setting
group.
2. Browse to the ActiveGroup menu to achieve information about the active setting group.
The ActiveGroup menu is located on the local HMI underMain menu/Test/Function
status/Setting groups/ActiveGroup
3. Connect the appropriate dc voltage to the corresponding binary input of the IED and
observe the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4. Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting groups
are described in the corresponding PCM600 documents and instructions for the
operators within the SCS are included in the SCS documentation.
Continue to test another function or end the test by changing the TestMode setting to Off.
Restore connections and settings to their original values, if they were changed for testing
purposes.
After exiting the IED test mode, make sure that the MU is returned to normal
mode.
210
Commissioning manual
1MRK 505 345-UEN B Section 11
Checking the directionality
Before starting this process, all individual devices that are involved in the fault clearance
process of the protected object must have been individually tested and must be set in
operation. The circuit breaker must be ready for an open-close-open cycle.
The directional test is performed when the protected object is energized and a certain amount
of load current is available. It is also necessary to know the flow of the load current (import or
export, i.e. forward or reverse) by help of the indication from an external instrument (energy-
meter, or SCADA information).
The design of the test procedure depends on the type of protection function to be tested.
Some items that can be used as guidelines are the following.
The test is performed by looking at the information given by the High speed distance
protection ZMFPDIS, ZMFCPDIS or the directional function ZDRDIR or ZDMRDIR whichever is
used.
Procedure:
1. Make sure that all control and protection functions that belong to the object that are
going to be energized have been tested and are set to be in operation
2. Make sure that the primary load current fulfills the following conditions (by using an
external equipment):
• The magnitude of the primary load current must be higher than the minimum
operating current set for the directional elements in the IED. In case of default
settings this means:
• load current > 5% of base current
• Otherwise the settings IMinOpPE and IMinOpPP for ZDRDIR or ZDMRDIR are
available under the HMI menu: Main menu/Settings/IED Settings/
Impedance protection/DirectionalImpedance
The primary load impedance must have an angle (PHI) between the setting angles for the
directional lines. In case of default settings this means:
• for forward (exported) load: -15 deg < PHI < 115 deg
• for reverse (imported) load: 165 deg < PHI < 295 deg
The settings for forward load: - ArgDir < PHI < ArgNegRes and the settings for reverse
load: 180 deg - ArgDir < PHI < 180 deg + ArgNegRes included in the directional functions
ZDRDIR or ZDMRDIR are available under the HMI menu:
• Main menu/Settings/IED Settings/Impedance protection/DirectionalImpedance
3. The directionality of the load current is shown by the High speed distance protection
ZMFPDIS or ZMFCPDIS under the HMI menu: Main menu/Test/Function status/
Impedance protection/HighSpeedDistance or by the directional function ZDRDIR or
ZDMRDIR and it is available under the HMI menu: Main menu/Test/Function status/
Impedance protection/DirectionalImpedance
The following will be shown if the load current flows in forward (exporting) direction:
211
Commissioning manual
Section 11 1MRK 505 345-UEN B
Checking the directionality
• L1Dir = Forward
• L2Dir = Forward
• L3Dir = Forward
The following will be shown if the load current flows in the reverse direction (importing):
• L1Dir = Reverse
• L2Dir = Reverse
• L3Dir = Reverse
Compare this result with the information given by the external equipment, it must be the
same. If the direction of the three phases is not the same, this is a sign of incorrect
connection of the voltage or current transformers serving the distance protection
function. It is also possible that there is a wrong setting for the earthing point for one or
more of the CTs serving distance protection (the setting name is: CTStarPoint available
under the HMI menu:Main menu/Configuration/Analog modules).
If the directional function shows forward when it should show reverse (or vice-versa) for
all the three phases, this probably means a wrong connection of CTs and/or VTs serving
the distance protection, or it can mean a wrong setting of earthing point (the setting
name is : CTStarPoint) for all the three CTs, or it could mean a wrong setting for the pre-
processing blocks (3PhaseAnalogGroup under the HMI menu: Main menu/Configuration/
Analog modules) connected to the CTs/VTs and serving the distance protection (verify
that no wrong negation has been set; the setting name is: Negation).
If the directional function shows “No direction” for all the three phases it can mean that
the load current is below the minimum operating current or that the load impedance has
an angle which is outside the above given valid angles for determining forward or reverse
direction.
If the directional function shows “No direction” for only some of the three phases, this
probably means a wrong CTs/VTs connection.
4. The measured impedance information is available under the same menu. These values are
not affected by the minimum operating current setting of ZDRDIR or ZDMRDIR and the
measured values are shown any time the load current is higher than 3% of the base
current:
• L1R
• L1X
• L2R
• L2X
• L3R
• L3X
The measured impedance information can still be used to determine the direction of the
load. A positive resistance measured in all phases indicates a forward (exporting) resistive
load (active power), while a negative sign indicates a reverse (importing) resistive load
(active power). Usually it is enough to look at the resistive values to get information of the
load direction, that must anyway be compared with the indication given by external
equipment measuring the same power flow.
212
Commissioning manual
1MRK 505 345-UEN B Section 12
Commissioning and maintenance of the fault clearing system
During commissioning all protection functions shall be verified with the setting values used at
each plant. The commissioning tests must include verification of all circuits by green-lining the
circuit diagrams and the configuration diagrams for the used functions.
Further, the settings for protection functions are tested and recorded carefully as outlined for
the future periodic maintenance tests.
The final testing includes primary verification of all directional functions where load currents is
checked on the local HMI and in PCM600. The amplitudes and angles of all currents and
voltages should be checked and the symmetry verified.
Directional functions have information about the measured direction and, for example,
measured impedance. These values must be checked and verified as correct with the export or
import of power available.
Finally, final trip tests must be performed. This involves activation of protection functions or
tripping outputs with the circuit breaker closed and the tripping of the breaker verified. When
several breakers are involved, each breaker must be checked individually and it must be
verified that the other involved breakers are not tripped at the same time.
SEMOD56520-5 v4
The periodicity of all tests depends on several factors, for example the importance of the
installation, environmental conditions, simple or complex equipment, static or
electromechanical IEDs, and so on.
The normal maintenance praxis of the user should be followed. However, ABB's
recommendation is as follows:
• Periodic maintenance test for protection IEDs of objects with redundant protection
system.
First maintenance test should always be carried out after the first half year of
service.
213
Commissioning manual
Section 12 1MRK 505 345-UEN B
Commissioning and maintenance of the fault clearing system
When protection IEDs are combined with built-in control, the test interval can
be increased drastically, up to for instance 15 years, because the IED
continuously reads service values, operates the breakers, and so on.
Prior to testing, the protection IEDs should be inspected to detect any visible damage that
may have occurred (for example, dirt or moisture deposits, overheating).
SEMOD56528-5 v5
To be made after the first half year of service, then with the cycle as proposed above and after
any suspected maloperation or change of the IED setting.
Testing of protection IEDs shall preferably be made with the primary circuit de-energized. The
IED cannot protect the circuit during testing. Trained personnel may test one IED at a time on
live circuits where redundant protection is installed and de-energization of the primary circuit
is not allowed.
ABB protection IEDs are preferably tested by aid of components from the COMBITEST testing
system described in information B03-9510 E. Main components are RTXP 8/18/24 test switch
usually located to the left in each protection IED and RTXH 8/18/24 test handle, which is
inserted in test switch at secondary testing. All necessary operations such as opening of trip
circuits, short-circuiting of current circuits and opening of voltage circuits are automatically
performed in the right order to allow for simple and safe secondary testing even with the
object in service.
Before starting maintenance testing, the test engineers should scrutinize applicable circuit
diagrams and have the following documentation available:
It is of utmost importance to carefully record the test results. Special test sheets covering the
frequency of test, date of test and achieved test values should be used. IED setting list and
protocols from previous tests should be available and all results should be compared for
differences. At component failures, spare equipment is used and set to the requested value. A
note of the exchange is made and the new measured values are recorded. Test records for
several years of testing should be stored in a common file for a station, or a part of a station,
to give a simple overview of the period of testing and achieved test values. These test records
are valuable when analysis of service disturbances shall be done.
The periodic maintenance test is done by secondary injection from a portable test set. Each
protection shall be tested according to the secondary injection test information for the
214
Commissioning manual
1MRK 505 345-UEN B Section 12
Commissioning and maintenance of the fault clearing system
specific protection IED. Only the setting values adopted shall be checked for each protection
function. If the discrepancy between obtained value and requested set value is too big the
setting should be adjusted, the new value recorded and a note should be made in the test
record.
When inserting the test handle the alarm and event signalling is normally blocked. This is done
in the IED by setting the event reporting to Off during the test. This can be done when the test
handle is inserted or the IED is set to test mode from the local HMI. At the end of the
secondary injection test it should be checked that the event and alarm signalling is correct by
activating the events and performing some selected tests.
Once secondary testing has been completed, it should be checked that no self-supervision
signals are activated continuously or sporadically. Especially check the time synchronization
system, GPS or other, and communication signals, both station communication and remote
communication.
When the protection IED undergoes an operational check, a tripping pulse is normally obtained
on one or more of the output contacts and preferably on the test switch. The healthy circuit is
of utmost importance for the protection operation. If the circuit is not provided with a
continuous trip-circuit supervision, it is possible to check that circuit is really closed when the
test-plug handle has been removed by using a high-ohmic voltmeter and measuring between
the plus and the trip output on the panel. The measurement is then done through the trip coil
of the circuit breaker and therefore the complete trip circuit is checked.
Please observe that the test system does not provide built-in security during
this test. If the instrument should be set on Amp instead of Volts, the circuit
breaker naturally is tripped, therefore, great care is necessary.
Trip circuit from trip IEDs to circuit breaker is often supervised by trip-circuit supervision. It
can then be checked that a circuit is healthy by opening tripping output terminals in the
cubicle. When the terminal is opened, an alarm shall be achieved on the signal system after a
delay of some seconds.
Remember to close the circuit directly after the test and tighten the terminal
carefully.
After a maintenance test it is recommended to measure the service currents and service
voltages recorded by the protection IED. The service values are checked on the local HMI or in
PCM600. Ensure that the correct values and angles between voltages and currents are
215
Commissioning manual
Section 12 1MRK 505 345-UEN B
Commissioning and maintenance of the fault clearing system
recorded. Also check the direction of directional functions such as Distance and directional
overcurrent functions.
For transformer differential protection, the achieved differential current value is dependent on
the tap changer position and can vary between less than 1% up to perhaps 10% of rated
current. For line differential functions, the capacitive charging currents can normally be
recorded as a differential current.
The zero-sequence current to earth-fault protection IEDs should be measured. The current
amounts normally very small but normally it is possible to see if the current circuit is "alive".
The neutral-point voltage to an earth-fault protection IED is checked. The voltage is normally
0.1 to 1V secondary. However, voltage can be considerably higher due to harmonics. Normally a
CVT secondary can have around 2.5 - 3% third-harmonic voltage.
Thus a list should be prepared of all items disturbed during test so that all can be put back into
service quickly and without overlooking something. It should be put back into service item by
item and signed by the responsible engineer.
216
Commissioning manual
1MRK 505 345-UEN B Section 13
Troubleshooting
Section 13 Troubleshooting
This procedure describes how to navigate the menus in order to find the cause of an internal
failure when indicated by the flashing green LED on the HMI module.
Procedure
Table 40: Signals from the General menu in the diagnostics tree.
Indicated result Possible reason Proposed action
Internal fail Off No problem detected. None.
Internal fail On A failure has occurred. Check the rest of the indicated results to find the fault.
Internal warning Off No problem detected. None.
Internal warning On A warning has been Check the rest of the indicated results to find the fault.
issued.
Time synch Ready No problem detected. None.
Time synch Fail No time Check the synchronization source for problems.
synchronization. If the problem persists, contact your ABB representative
for service.
Real time clock Ready No problem detected. None.
Real time clock Fail The real time clock has Set the clock.
been reset.
ADC-module OK No problem detected. None.
ADC-module Fail The AD conversion Contact your ABB representative for service.
module has failed.
(Protocol name) Ready No problem detected. None.
Table continues on next page
217
Commissioning manual
Section 13 1MRK 505 345-UEN B
Troubleshooting
If an internal fault has occurred, the local HMI displays information under Main menu/
Diagnostics/IED status/General
Under the Diagnostics menus, indications of a possible internal failure (serious fault) or
internal warning (minor problem) are listed.
218
Commissioning manual
1MRK 505 345-UEN B Section 13
Troubleshooting
Also the internal signals, such as INT--FAIL and INT--WARNING can be connected to binary
output contacts for signalling to a control room.
In the IED Status - Information, the present information from the self-supervision function can
be viewed. Indications of failure or warnings for each hardware module are provided, as well as
information about the external time synchronization and the internal clock. All according to
table 41. Loss of time synchronization can be considered as a warning only. The IED has full
functionality without time synchronization.
When settings are changed in the IED, the protection and control applications restart in order
to take effect of the changes. During restart, internal events get generated and Runtime App
error will be displayed. These events are only indications and will be for short duration during
the restart.
When an internal fault has occurred, extensive information about the fault can be retrieved
from the list of internal events available in the SMS part:
The list of internal events provides valuable information, which can be used during
commissioning and fault tracing.
The internal events are time tagged with a resolution of 1ms and stored in a list. The list can
store up to 40 events. The list is based on the FIFO principle, when it is full, the oldest event is
overwritten. The list cannot be cleared and its content cannot be erased.
219
Commissioning manual
Section 13 1MRK 505 345-UEN B
Troubleshooting
The internal events in this list not only refer to faults in the IED, but also to other activities,
such as change of settings, clearing of disturbance reports, and loss of external time
synchronization.
The information can only be retrieved from the Parameter Setting software package. The PC
can be connected either to the port at the front or at the rear of the IED.
Table 42: Events available for the internal event list in the IED
Event message: Description Generating signal:
INT--FAIL Off Internal fail status INT--FAIL (reset event)
INT--FAIL INT--FAIL (set event)
INT--WARNING Off Internal warning status lNT--WARNING (reset event)
INT--WARNING lNT--WARNING (set event)
IOn--Error Off In/Out module No. n status IOn--Error (reset event)
IOn--Error IOn--Error (set event)
ADMn-Error Off Analog/Digital module No. n ADMn-Error (reset event)
status
ADMn-Error ADMn-Error (set event)
MIM1-Error Off mA-input module status MIM1-Error (reset event)
MIM1-Error MIM1-Error (set event)
INT--RTC Off Real Time Clock (RTC) status INT--RTC (reset event)
INT--RTC INT--RTC (set event)
INT--TSYNC Off External time synchronization INT--TSYNC (reset event)
status
INT--TSYNC INT--TSYNC (set event)
INT--SETCHGD Any settings in IED changed
DRPC-CLEARED All disturbances in
Disturbance report cleared
The events in the internal event list are time tagged with a resolution of 1ms.
This means that, when using the PC for fault tracing, it provides information on the:
13.2.3 Diagnosing the IED status via the LHMI hint menu GUID-7E8503E9-441B-487A-9CD7-B43463D1CAE5 v3
In order to help the user, there is an LHMI page labeled ‘Hints’. This page is located under Main
menu/Diagnostics/IED status/Hints. For each activated hint there is a headline. From the
headline view, an explanation page can be entered, giving the user more information and hints
about the particular topic.
For example, if there is a configuration to use IEC 61850 9–2 analog data, but no data arrives
on the access point, then the IED will use substituted data and most protection functions will
be blocked. This condition will be indicated with a sub-menu under Hints, where details about
this condition are shown. The Hint menu is a way to assist the user in troubleshooting.
220
Commissioning manual
1MRK 505 345-UEN B Section 13
Troubleshooting
The Hint menu is currently only available in English. All the entries are in English,
regardless of which language is selected.
221
Commissioning manual
Section 13 1MRK 505 345-UEN B
Troubleshooting
Headline Explanation
LDCM not running the application image <slot number> is running the factory image instead
of the application image. The factory image is older
and does not contain the latest updates and fixes.
Please reboot the IED. If the problem persists update
the LDCM firmware or replace the board.
LDCM version is not accepted <device name> firmware version <version string> is
not accepted. The minimum accepted version is
<version string>.
Please update the LDCM firmware or replace the
board.
OEM not running the application image OEM in slot <slot number> is running the factory
image instead of the application image. The factory
image is older and does not contain the latest
updates and fixes.
Please reboot the IED. If the problem persists, update
the OEM firmware or replace the board.
SFP unplugged from the slot SFP has been unplugged from the slot
Please check the connection.
Corresponding hardware(s) is set to fail.
SFP replaced with other type Configured and the detected SFP(s) are different.
Corresponding hardware(s) is set to fail.
Please restart IED and consider Reconfigure HW
modules to get updated hardware list.
Non ABB vendor SFP detected Non ABB vendor SFP detected.
Corresponding hardware(s) is set to fail. Please use
ABB approved SFP’s.
When adding, removing or moving a hardware modules in an IED ( for example, I/O modules,
communication modules or time synchronization modules) a set of procedures must be
followed.
Procedure:
Procedure:
1. Remove all existing configuration for the module in PCM, and write that configuration to
the IED.
2. Switch the IED off and remove the HW module.
3. Switch the IED on, wait for it to start, and then perform a HW reconfig.
4. Perform a license update in PCM 600.
222
Commissioning manual
1MRK 505 345-UEN B Section 13
Troubleshooting
If any configuration that makes the module needed remains, then the HW
reconfig will not remove the module.
The module will still be needed. An error indication for the module will appear, if
the module is physically removed from the IED and the IED is restarted with
some part of the configuration still requiring the module.
Procedure:
1. Remove all existing configuration for the module in PCM, and write that configuration to
the IED.
2. Switch the IED off and move the HW module.
3. Switch the IED on, wait for it to start, and then perform a HW reconfig.
4. Perform a license update in PCM600.
The new module is now available in PCM600 at the new position and is ready to be configured.
M11764-2 v2
M11764-10 v1
An alternative is to open the IED and send only the faulty circuit board to ABB for repair. When
a printed circuit board is sent to ABB, it must always be placed in a metallic, ESD-proof,
protection bag. The user can also purchase separate replacement modules.
M11766-4 v2
Most electronic components are sensitive to electrostatic discharge and latent damage may
occur. Please observe usual procedures for handling electronics and also use an ESD wrist
strap. A semi-conducting layer must be placed on the workbench and connected to earth.
223
Commissioning manual
Section 13 1MRK 505 345-UEN B
Troubleshooting
If the IED has been calibrated with the system inputs, the calibration procedure must be
performed again to maintain the total system accuracy.
If an IED needs to be repaired, the whole IED must be removed and sent to an ABB Logistic
Center. Before returning the material, an inquiry must be sent to the ABB Logistic Center.
e-mail: [email protected]
Instructions from the power network company and other maintenance directives valid for
maintenance of the power system must be followed.
224
Commissioning manual
1MRK 505 345-UEN B Section 14
Glossary
AC Alternating current
ACC Actual channel
ACT Application configuration tool within PCM600
A/D converter Analog-to-digital converter
ADBS Amplitude deadband supervision
ADM Analog digital conversion module, with time synchronization
AI Analog input
ANSI American National Standards Institute
AR Autoreclosing
ASCT Auxiliary summation current transformer
ASD Adaptive signal detection
ASDU Application service data unit
AWG American Wire Gauge standard
BBP Busbar protection
BFOC/2,5 Bayonet fiber optic connector
BFP Breaker failure protection
BI Binary input
BIM Binary input module
BOM Binary output module
BOS Binary outputs status
BR External bistable relay
BS British Standards
BSR Binary signal transfer function, receiver blocks
BST Binary signal transfer function, transmit blocks
C37.94 IEEE/ANSI protocol used when sending binary signals between IEDs
CAN Controller Area Network. ISO standard (ISO 11898) for serial
communication
CB Circuit breaker
CBM Combined backplane module
CCITT Consultative Committee for International Telegraph and Telephony. A
United Nations-sponsored standards body within the International
Telecommunications Union.
CCM CAN carrier module
CCVT Capacitive Coupled Voltage Transformer
Class C Protection Current Transformer class as per IEEE/ ANSI
CMPPS Combined megapulses per second
CMT Communication Management tool in PCM600
225
Commissioning manual
Section 14 1MRK 505 345-UEN B
Glossary
226
Commissioning manual
1MRK 505 345-UEN B Section 14
Glossary
227
Commissioning manual
Section 14 1MRK 505 345-UEN B
Glossary
228
Commissioning manual
1MRK 505 345-UEN B Section 14
Glossary
229
Commissioning manual
Section 14 1MRK 505 345-UEN B
Glossary
230
Commissioning manual
1MRK 505 345-UEN B Section 14
Glossary
231
Commissioning manual
232
233
ABB AB
Substation Automation Products