HW Delivery Report - EMP - Storage Migration

A hardware delivery was completed on September 12th, 2019 from 13:30-16:00 at the Bakrie Tower server room on the 27th floor. A DellEMC Unity 300 and Dell switch were rack mounted. The activity was successfully executed and hardware installation was confirmed, with the exception of some short power cables on the Unity 300 that need replacement.

Uploaded by

Scarpy Ray
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views6 pages

HW Delivery Report - EMP - Storage Migration

A hardware delivery was completed on September 12th, 2019 from 13:30-16:00 at the Bakrie Tower server room on the 27th floor. A DellEMC Unity 300 and Dell switch were rack mounted. The activity was successfully executed and hardware installation was confirmed, with the exception of some short power cables on the Unity 300 that need replacement.

Uploaded by

Scarpy Ray
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Hardware Delivery Report

Date & Time: 12th September 2019 / 13.30 – 16.00


Site: Bakrie Tower floor 27th, server room
Equipment:
 DellEMC Unity 300
 Dell switch S4128F-ON
Summary:
Devices successfully delivered and rack mounted
Service Engineer:
 Aditya Dwi Dewanto
 Mohammad Anshor Amri
 Abdul Aziz Musthofa
 Olophon Damero Situmorang
Customer Cooperator:
 Priyono
 Sumarso
 Agus Suyanto
Result Confirmed by:
EMP
Result:
 Activity objective successfully executed
 Note: Half of Unity 300 - C13 to C14 Power cord cables (3x) is too short;
replacement already requested

Activity record: (Record the operation procedure and result)

 HW unboxed and verified: OK


 HW physically installed on Rack 02: OK
EMP – Storage Migration Project

Packing List:
Qty Material Number Description

1 SYSTEM UNITY 300

1 D3SL16F UNITY 2X4 PORT 16G FC IO

1 D3SL10IO4PT UNITY 2X4 PORT 10GB ISCSI/ETH OPT IO

26x2 D3FC-OM3-5M 5M MM FIBRE CABLE LC-LC

1 D31D24AF25 UNITY 300 2U DPE 25X2.5 DRIVE FLD RCK

1 D3SFP10I UNITY 4X10GB SFP ISCSI/ETH CONNECTION

62 D3-2S10-1200 UNITY 1.2TB 10K SAS 25X2.5 DRIVE

2 D3122F UNITY 2U 25X2.5 DRIVE DAE FLD RCK

1 D3SP-S4X600-10K UNITY SYSPACK 4X600GB 10K SAS 25X2.5

1 D31DEMCCK25KIT UNITY 25 DRIVE DPE FLD INSTALL KIT

1 M-PSM-HWE-004 PROSUPPORT W/MISSION CRITICAL-HARDWARE

1 458-002-524 UNITY HFA BASE SOFTWARE=IC

1 M-PSM-SWE-004 PROSUPPORT W/MISSION CRITICAL-SOFTWARE

1 SYSTEM RECOVERPOINT

1 458-001-374 RP BASIC FOR UNITY 300/300F =IC

1 M-PSM-SWE-004 PROSUPPORT W/MISSION CRITICAL-SOFTWARE

1 SYSTEM SRM

1 458-002-287 STORAGE M&R FOR UNITY=IC

1 456-113-338 STORAGE M&R FOR UNITY LIC=IC

1 M-PSM-SWE-005 PROSUPPORT W/MISSION CRITICAL-SOFTWARE

1 SYSTEM APPSYNC

1 458-001-425 APPSYNC BASIC FOR UNITY 300=IC

1 456-109-802 APPSYNC BASIC FOR UNITY 300=IC

1 M-PSM-SWE-004 PROSUPPORT W/MISSION CRITICAL-SOFTWARE

1 SYSTEM DELL S4100-ON SERIES SOLUTION

2 D-4128F-PHIN-EMP Dell EMC Switch S4128F-ON 1U, PHY-less, 28 x 10GbE SFP+, 2 x QSFP, PSU

Dell Networking, Transceiver, SFP+, 10GbE, SR, 850nm Wavelength, 300m Reach,
12-Pack
Jumper Cord, C13 to C14, 250V, 10A, 2m
Dell Networking, Cable, 100GbE QSFP28 to 2x50GbE QSFP+ Passive Breakout,1
Meter
3Yr ProSupport & Mission Critical:(7x24) 4-hour Onsite Service

2023-08-07 Page 2 of 6
EMP – Storage Migration Project
EMP – Storage Migration Project

Serial Numbers:
No Serial Number Description

1 CKM00193200246 UNITY 300 2U DPE 25X2.5 DRIVE

2 CF2CY191500327 UNITY 2U 25X2.5 DRIVE DAE A

3 CF2CY191700068 UNITY 2U 25X2.5 DRIVE DAE B

2023-08-07 Page 3 of 6
EMP – Storage Migration Project
EMP – Storage Migration Project

4 72MXNK2 DELL EMC S4128F-ON A

5 C2MXNK2 DELL EMC S4128F-ON B

Cabinet Layouts:

2023-08-07 Page 4 of 6
EMP – Storage Migration Project
EMP – Storage Migration Project

After Activity:

2023-08-07 Page 5 of 6
EMP – Storage Migration Project
EMP – Storage Migration Project

Annex 1:

N/A

Comments and Suggestions:

Report on September 12th, 2019

Report to: Pak Agus Suyanto


Cc to: Pak Sumarso, Pak Priyono

2023-08-07 Page 6 of 6