BOQ For 3 Proposed Storide School Building at Shariatpur

The document provides a bill of quantities (BOQ) for the proposed construction of a 3-story school building in Shariatpur, Bangladesh. It includes estimates for civil works, finishing works, and a total project cost. The civil works involve multiple phases, including pile work, foundation work, short columns and beams for the ground floor, a septic tank, and structural work for the ground, 1st, 2nd and 3rd floors. The estimated total cost for civil works is over 10.25 crore Taka, while finishing works for all floors are estimated at over 8.76 crore Taka, bringing the total estimated project cost to over 18.96 crore Taka.

Uploaded by

Sandu Andrei
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
554 views13 pages

BOQ For 3 Proposed Storide School Building at Shariatpur

The document provides a bill of quantities (BOQ) for the proposed construction of a 3-story school building in Shariatpur, Bangladesh. It includes estimates for civil works, finishing works, and a total project cost. The civil works involve multiple phases, including pile work, foundation work, short columns and beams for the ground floor, a septic tank, and structural work for the ground, 1st, 2nd and 3rd floors. The estimated total cost for civil works is over 10.25 crore Taka, while finishing works for all floors are estimated at over 8.76 crore Taka, bringing the total estimated project cost to over 18.96 crore Taka.

Uploaded by

Sandu Andrei
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

BOQ for proposed 3 stories school building at Shariatpur

BOQ for 3 Proposed Storide School Building At Shariatpur, Bangladesh.

SI. ITEM AMOUNT (TK.) REMARKS


No.
A CIVIL WORK:
1 LAND COST 50,00,000
2 PHASE-I (CAST-IN-SITU PILE WORK): 98,42,371
3 PHASE-II (FOUNDATION WORK): 1,36,16,000
4 PHASE- III (SHORT COLUMN, GRADE 1,32,02,000
BEAM, FLOOR (UP TO GROUND
FLOOR):
5 PHASE-IV (SEPTIC TANK CIVIL 19,56,000
WORK):
6 PHASE-V (GROUND, 1ST, 2ND, 3RD 5,78,30,000
FLOOR):
7 PHASE-VI (ROOF TOP STRUCTURE 10,55,000
WITH O.H.W.R.)
SUB-TOTAL (A)= 10,25,01,371
B FINISHING WORK:
1 PHASE-VII (GROUND WORK): 1,15,30,844
2 PHASE-VIII (1ST, 2ND, 3RD FLOOR): 7,52,56,938
3 PHASE-IX (ROOF TOP WORK): 3,64,900
SUB TOTAL (B)= 8,76,45,802
TOTAL(A+B)= 18,96,54,053
A. CIVIL WORK
PHASE-I:
BOO FOR CAST-IN-SITU PILE WORK

SI. Description Unit Quantity Unit Price Amount Remarks


No. (Tk.) (Tk.)
01 Pouring Concrete:
Cast in Sim pile with Pouring Concrete works with
minimum cement content relates to mis. ratio
1:1.5:3, including Shingles, placing re-bar cage in
position, placing and removing tri-pod as per
requirement, pouring the concrete in bore-hole
with the help of a tremie pipe, maintaining the cft 11916 455 5421683
iremie pipe immersed in concrete by at least 1
meter throughout the period of concreting, mixing
the aggregates with standard mixer machine,
concrete etc. complete as per instruction of
Engineer-in-charge.
02 Re-bar Fabrication:
Re-bar cutting, bending, placing and binding as per
drawing and removal of loose rust (if necessary), kg 38461 110 4230688
supply of GI wire, cutting dish, spacer block
making & fixing, local carrying etc.complete as
per instruction of Engineer-in-charge.
03 Providing and making Point Welding:

at contact point of the spiral binders at reasonable


intervals writh the main reinforcements by electric
arc welding for construction of cast in situ bored point 3800 5 190000
pile carefully with highly oxidized electrodes
making the points prominent and accepted by The
Engineer.

Total
Amount:
98,42,371
HASE-II:
BOO FOR FOUNDATION CIVIL WORK
SI. Description Unit Quantity Unit Price Amount Remarks
No. (Tk.) (Tk.)
01 Earth work in excavation in all kinds of soil for
foundation Cft. 26,112 trenches including layout,
providing center lines, local bench-mark pillars,
leveling, ramming and preparing the base, staking, cft 42000 30 12,60,000
cleaning the excavated earth at a a safe distance
out of the area enclosed by the layout etc. all
complete as per instruction of Enginccr-in-charge.
02 One Layer of Brick Flat Soling in foundation or in
floor including preparation of bed and filing the
interstices with local sand, leveling etc. complete sft 6000 60 3,60,000
as per instruction of Engineer-in-charge.
03 Mass Concrete (CC): (1:2:4) in foundation or floor
with cement, sand (F.M. 1.2) and brick chips,
mixing, laying, compacting to levels and curing for cft 2000 290 5,80,000
at least 7 days etc. all complete as per instruction
of Engineer-in-charge.
04 Sand Filling in foundation trenches with sand
having min. F.M. 0.5 to 0.8 in 150mm layers
including leveling, watering and compaction by
ramming each layer up to finished level as per cft 25000 32 8,00,000
design etc, all complete as per instruction of
Engineer-in-charge.
05 RCC Casting (1:1.5:3) with Cement, Sand (F.M.
2.2), Stone Cft. Chips & Admixture as per given
ratio by manually mixing with mixture machine,
placing concrete in position, vibrating, compacting
& levelling, cleaning shutter of outer face with cft 11000 550 60,50,000
water during and after pouring concrete & curing
for 28 days, etc. all complete as per instruction of
Engineer- in-charge.
06 Fitting & fixing of Steel Shutter Work by cleaning
shutter properly & applying form oil, shoring & re-
shoring work with horizontal Support like props &
pipes, fixing joint foam along the periphery of the sft 3264 250 8,16,000
shutter, fixing paper tape at joint etc. complete as
per a instruction of Engineer-in-
07 Re- bar Work: Re-bar cutting, bending, placing
and binding as per drawing including supply of Gl
wire, welding (if required), with supply of welder,
welding rod, spacer block making & fixing, local kg 25000 150 37,50,000
carrying etc. all complete as per a instruction of
Engineer-in-charge.
Total 1,36,16,000
Amount:
PHASE-III:
BOO FOR CIVIL WORK OF SHORT COLUMN, GRADE BEAM, FLOOR (UP TO GROUND
FLOOR)

SI. Description Unit Quantity Unit Price Amount Remarks


No. (Tk.) (Tk.)
01 One Layer of Brick Flat Soling in foundation,
Grade Beam Bott. or in floor including preparation
of bed and filing the interstices with local sand, sft 4200 60 2,52,000
leveling etc. complete as per instruction of
Engineer-in-charge.
02 RCC Casting (1:1.5:3) with Cement, Sand (F.M.
2.2), Stone Cft. 2,350 Chips & Admixture as per
given ratio by manually mixing with mixture
machine, placing concrete in position, vibrating,
compacting & levelling, cleaning shutter of outer cft 15000 550 82,50,000
face with water during and after pouring concrete
& curing for 28 days, etc. all complete as per
instruction of Engineer- in-charge.
03 Fitting & fixing of Steel Shutter Work by
cleaning shutter Sft. 2,639 properly & applying
form oil, shoring & re-shoring work with
horizontal Support like props & pipes, fixing joint sft 5000 130 6,50,000
foam along the periphery of the shutter, fixing
paper tape at joint etc. complete as per a
instruction of Engineer-in-
04 Re-bar Work: Re-bar cutting, bending, placing and
binding as per drawing including supply of G1
wire, welding (if required), with supply of welder,
welding rod, spacer block making & fixing, local kg 12000 150 18,00,000
carrying etc. all complete as per a instruction of
Engineer-in-charge.
05 Sand Filling in floor with sand having min. F.M.
0.5 to 0.8 in 150mm layers including leveling,
watering and compaction by ramming each layer cft 50000 45 22,50,000
up to finished level as per design etc, all complete
as per instruction of Engineer-in-
Total 1,32,02,000
Amount:
PHASE-IV:
BOO FOR SEPTIC TANK CIVIL WORK
SI. Description Unit Quantity Unit Price Amount Remarks
No. (Tk.) (Tk.)
01 Construction of Septic Tank: (Up to Tank Top Slab) Earth
work in excavation in all kinds of soil for foundation
trenches including layout, providing center lines, local
bench-mark pillars, leveling, ramming and preparing the cft 8000 25 2,00,000
base, staking, cleaning the excavated earth at a a safe
distance out of the area enclosed by the layout etc. all
complete as per instruction of Engineer-in-charge.
02 One Layer of Brick Flat Soling in foundation or in floor
including preparation of bed and filing the interstices with
sft 500 50 25,000
local sand, leveling etc. complete as per instruction of
Engineer-in-charge.
03 Mass Concrete (CC): (1:2:4) in foundation or floorwith
cement, sand (F.M. 1.2) and brick chips, mixing, laying,
cft 200 290 70,000
compacting to levels and curing for at least 7 days etc. all
complete as per instruction of Engineer-in-charge.
04 RCC Casting (1:1.5:3) with Cement, Sand (F.M. 2.2),
Stone Chips & Admixture as per given ratio by manually
mixing with mixture machine, placing concrete in position,
vibrating, compacting & levelling, cleaning shutter of outer Cft 600 550 3,30,000
face with water during and after pouring concrete & curing
for 28 days, etc. all complete as per instruction of Engineer-
in-charge.
05 Fitting & fixing of Steel Shutter Work: by cleaning
shutter properly & applying form oil, shoring & re-shoring
work with horizontal Support like props & pipes. fixing sft 15000 150 2,25,000
joint foam along the periphery of the shutter, fixing paper
tape at joint etc. complete as per instruction of Engineer-in-
06 Re-bar Work: Re-bar cutting, bending, placing and binding
as per drawing including supply of Gl wire.welding (if
required), with supply of welder, welding rod, spacer block kg 5000 150 7,50,000
making & fixing, local carrying etc. allcomplete as per a
instruction of Engineer-in-charge.
07 125 mm Brick works with first class bricks in cement sand
Sft (F.M. of sand 1.2) mortar (1:4) with brick soaking in
sft 600 160 96,000
water min. 24hrs. etc. complete as per a instruction of
Engineer-in- charge.
08 250 mm Brick works with first Class bricks in cement sand
Cft (F.M. of sand 1.2) mortar (1:4) with brick soaking in
cft 700 450 3,15,000
water min. 24hrs. etc. complete as per a instruction of
Engineer-in- charge.
09 Minimum 12 mm thick. Cement Sand Plaster (1:4) with
fresh cement to wall both imier-and outer surface. finishing
the corner and edges including washing of sand cleaning the
sft 4000 60 2,40,000
surface, scaffolding and curing at least for & days, cost of
water, electricity and other charges etc. complete as per a
instruction of Engineer-in-charge.
Total Amount: 19,56,000
PHASE-V:
BOO FOR CIVIL WORK OF GROUND, 1ST, 2ND

SI. Description Unit Quantity Unit Price Amount Remarks


No. (Tk.) (Tk.)
01 RCC Casting (1:1.5:3) with Cement, Sand (F.M.
2.2), Stone Cft. 2,530 Chips & Admixture as per
given ratio by manually mixing with mixture
machine, placing concrete in position, vibrating,
compacting & levelling, cleaning shutter of outer cft 60000 550 3,30,00,000
face with water during and after pouring concrete
& curing for 28 days, etc. all complete as per
instruction of Engineer- in-charge.
02 Fitting & fixing of Steel Shutter Work by cleaning
shutter Sft. properly & applying form oil, shoring
& re-shoring work with horizontal Support like
props & pipes, fixing joint foam along the sft 10000 160 2,32,30,000
periphery of the shutter, fixing paper tape at joint
etc. complete as per a instruction of Engineer-in-
03 Re- bar Work: Re-bar cutting, bending, placing
and binding as per drawing including supply of G1
wire, welding (if required), with supply of welder,
welding rod, spacer block making & fixing, local kg 202575 115 2,32,30,000
carrying etc. all complete as per a instruction of
Engineer-in-charge.
Total 5,78,30,000
Amount:
Total Amount (Ground to 3rd Floor) 4th time of ground Floor:
PHASE-VI:
BOO FOR CIVIL WORK OF ROOF TOP STRUCTURE WITH O.H.W.R.

SI. Description Unit Quantity Unit Price Amount Remarks


No. (Tk.) (Tk.)
01 RCC Casting (1:1.5:3) with Cement, Sand (F.M.
2.2), Stone Cft. Chips & Admixture as per given
ratio by manually mixing with mixture machine,
placing concrete in position, vibrating, compacting
& levelling, cleaning shutter of outer face with cft 800 550 4,40,000
water during and after pouring concrete & curing
for 28 days, etc. all complete as per instruction of
Engineer- in-charge.
02 Fitting & fixing of Steel Shutter Work by cleaning
shutter Sft. properly & applying form oil, shoring
& re-shoring work with horizontal Support like
props & pipes, fixing joint foam along the sft 1240 125 1,55,000
periphery of the shutter, fixing paper tape at joint
etc. complete as per a instruction of Engineer-in-
03 Re-bar Work: Re-bar cutting, bending, placing and
binding as per drawing including supply of G1
wire, welding (if required), with supply of welder,
welding rod, spacer block making & fixing, local kg 4000 115 4,60,000
carrying etc. all complete as per a instruction of
Engineer-in-charge.
Total 10,55,000
Amount:
B. FINISHING WORK
PHASE-VII:
BOO FOR GROUND FLOOR WORK
SI. Description Unit Quantity Unit Price Amount Remarks
No. (Tk.) (Tk.)
01 RCC Casting Lintel & False Slab (1:2:4) with
Cement, Sand (F.M. 2.2), Stone Chips &
Admixture as per given ratio by manually mixing
with mixture machine, placing concrete in
position, vibrating, compacting & levelling, cft 15000 460 6,9,00,000
cleaning shutter of outer face with water during
and after pouring concrete & curing for 28 days,
etc. all complete as per instruction of Engineer-in-
charge.
02 Fitting & fixing of Steel Shutter Work: by cleaning
shutter properly & applying form oil, shoring & re-
shoring work with horizontal Support like props &
pipes. fixing joint foam along the periphery of the sft 2000 125 2,50,000
shutter, fixing paper tape at joint etc. complete as
per instruction of Engineer-in-
03 Re-bar Work: Re-bar cutting, bending, placing and
binding as per drawing including supply of Gl
wire.welding (if required), with supply of welder,
welding rod, spacer block making & fixing, local kg 350 110 38,500
carrying etc. allcomplete as per a instruction of
Engineer-in-charge.
04 125 mm Brick works with first class bricks in
cement sand Sft 3,364 (F.M. of sand 1.2) mortar
(1:4) with brick soaking in water min. 24hrs. etc. sft 3364 146 4,91,144
complete as per a instruction of Engineer-in-
charge.
05 Minimum 12 mm thick. Cement Sand Plaster (1:4)
with fresh cement to wall both imier-and outer
surface. finishing the corner and edges including
washing of sand cleaning the surface, scaffolding sft 25000 50 12,50,000
and curing at least for & days, cost of water,
electricity and other charges etc. complete as per a
instruction of Engineer-in-charge.
06 Exterior standard acrylic emulsion paint with
applying necessary exterior sealer & putty; finally
applying 2 coats of exterior emulsion paint
spreading by brush/roller/spray & necessary
scaffolding; applying to exterior surface with
surface preparation including cleaning, drying, sft 5000 50 2,50,000
making free from dirt, grease, wax, removing all
chalked and scaled materials, fungus, mending
good the surface defects using sand paper and
necessary scaffolding; etc. all complete accepted
by the Engineer-in-charge.
07 Interior standard acrylic emulsion paint (plastic or
matt finish) applying to interior wall and ceiling
with surface preparation including cleaning drying,
making free from dirt, grease, wax, removing all
chalked and scaled materials, fungus, mending
good the surface defects using sand paper and sft 20000 45 9,00,000
necessary scaffolding; applying necessary interior
sealer & putty, 2 coats of interior emulsion paint
spreading by brush/ roller/ spray& necessary
scaffolding etc. all complete in all floors and
accepted by the Engineer-in- charge.
08 Supplying, fitting and fixing country made mirror
polished homogeneous floor tiles complying BDS
on cement sand (F.M. 1.2) mortar (1:4) base and
raking out the joints with white cement including sft 2400 155 3,72,000
cutting and laying the tiles in proper way and
finishing with care etc. all complete and accepted
by the Engineer-in-charge.
09 Supplying, fitting and fixing country made rustic
or matt finished wall tiles on cement sand (F.M.
1.2) mortar (1:3) base and raking out the joints
with white cement including cutting, laying and
hire charge of machine and finishing with care etc. sft 540 190 1,02,600
including water,
electricity and other charges complete in all respect
and accepted by the Engineer-in-charge.
10 Supplying, fitting and fixing toilet accessories of
European Pcs type country made best quality
glazed porcelain combi closet, basin, miror, bib- pcs 4 55000 2,20,000
cock, tissue holder, all standard accessories.
11 Supplying, fitting and fixing 20 mm to 25 mm
thick machine Sft made cement pavement tiles
having minimum compressive strength of 27 MPa,
on cement sand (F.M. 1.2) mortar (1:4) base and
making the joints carefully in true straight line sft 160 115 18,400
including cutting, laying and hire charge of
machine and finishing with care etc. including
water,electricity and other charges complete in all
respect and accepted by the Engineer in-charge.
12 Supplying, fitting and fixing window grills of any
design made with 20 mm x 5 mm F.I. bar @ 100
mm c/c as inner and outer section; including
fabricating, welding, cost of electricity and tools
and plants, finished with anti- corrosive painting sft 520 240 1,24,800
(Red-Oxide), carriage, cutting grooves, mending
good the damages etc. complete for all floors
accepted by the Engineer-in-charge.
13 Supplying, fitting and fixing of aluminium sliding
window Sft having minimum 1.2 mm thick outer
frame including all accessories like sliding door sft 520 420 2,18,400
key lock, wheel, neoprene, bolts and nuts including
sealants, keeping provision for fitting 5 mm thick
glass including labour charge for fitting of
accessories, making grooves and mending good
damages, carriage, and electricity complete in all
respect as per drawing and accepted by the
Engineer-incharge.
14 Supplying, fitting and fixing 36 mm thick factory
made solid Pcs wooden door shutter with 6" x 2.5"
solid wooden frame, handle, hinged cleats and pcs 7 45000 3,15,000
buffer blocks, natural polish all complete in all
floors and accepted by the Engineer-in- charge
15 Supplying, Fitting, Fixing Jail pattern M.S grill
door made of 25 mm dia M.S Plain Rod @ 75 mm
c/c fitted and fixed with M.S Angle frame 65 mm x
65 mm x 6 mm size 7 Nos. placed Horizontally
and 2 Nos. Vertically providing 25 mm dia M.S
rod of 1200 mm long and 38 thick M.S plate up to
a size of 1'-6" x 1'-0" for locking arrangement, 38
mm dia G.I pipe of 1'-0" long for locking) sft 64 1250 80,000
including fabricating, welding, drilling, cutting and
riveting the F.I bar and M.S angle clamp 8 Nos.
including making holes in wall fixing the clamps
and mending good the damaged with C.C (1:1.5:3)
including anticorrosive paint etc. all complete as
per direction by the Engineer-in-Charge.
Total 1,15,30,844
Amount:
PHASE-VIII:
BOO FOR 1ST FLOOR WORK
SI. Description Unit Quantity Unit Price Amount Remarks
No. (Tk.) (Tk.)
01 RCC Casting Lintel & False Slab (1:2:4) with
Cement, Sand (F.M. 2.2), Stone Chips & Admixture
as per given ratio by manually mixing with mixture
machine, placing concrete in position, vibrating,
compacting & levelling, cleaning shutter of outer face cft 20000 800 1,60,00,000
with water during and after pouring concrete & curing
for 28 days, etc. all complete as per instruction of
Engineer-in-charge.

02 Fitting & fixing of Steel Shutter Work: by cleaning


shutter properly & applying form oil, shoring & re-
shoring work with horizontal Support like props &
pipes. fixing joint foam along the periphery of the sft 425 125 53,125
shutter, fixing paper tape at joint etc. complete as per
instruction of Engineer-in-

03 Re- bar Work: Re-bar cutting, bending, placing and


binding as per drawing including supply of Gl
wire.welding (if required), with supply of welder,
welding rod, spacer block making & fixing, local kg 365 110 40,150
carrying etc. allcomplete as per a instruction of
Engineer-in-charge.

04 125 mm Brick works with first class bricks in cement


sand (F.M. of sand 1.2) mortar (1:4) with brick
soaking in water min. 24hrs. etc. complete as per a sft 3489 146 5,09,394
instruction of Engineer-in- charge.

05 Minimum 12 mm thick. Cement Sand Plaster (1:4)


with fresh cement to wall both imier-and outer
surface. finishing the corner and edges including
washing of sand cleaning the surface, scaffolding and sft 9380 30 2,81,400
curing at least for & days, cost of water, electricity
and other charges etc. complete as per a instruction of
Engineer-in-charge.

06 Exterior standard acrylic emulsion paint with


applying necessary exterior sealer & putty; finally
applying 2 coats of exterior emulsion paint spreading
by brush/roller/spray & necessary scaffolding;
applying to exterior surface with surface preparation
including cleaning, drying, making free from dirt, sft 10000 50 5,00,000
grease, wax, removing all chalked and scaled
materials, fungus, mending good the surface defects
using sand paper and necessary scaffolding; etc. all
complete accepted by the Engineer-in-charge.

07 Interior standard acrylic emulsion paint (plastic or


matt finish) applying to interior wall and ceiling with
surface preparation including cleaning drying, making
free from dirt, grease, wax, removing all chalked and sft 350000 50 1,75,00,000
scaled materials, fungus, mending good the surface
defects using sand paper and necessary scaffolding;
applying necessary interior sealer & putty, 2 coats of
interior emulsion paint spreading by
brush/roller/spray& necessary scaffolding etc. all
complete in all floors and accepted by the Engineer-
in- charge.

08 Supplying, fitting and fixing country made mirror


polished homogeneous floor tiles complying BDS on
cement sand (F.M. 1.2) mortar (1:4) base and raking
out the joints with white cement including cutting and sft 2400 155 3,72,000
laying the tiles in proper way and finishing with care
etc. all complete and accepted by the Engineer-in-
charge.

09 Supplying, fitting and fixing country made rustic or


matt finished wall tiles on cement sand (F.M. 1.2)
mortar (1:3) base and raking out the joints with white
cement including cutting, laying and hire charge of sft 540 190 1,02,600
machine and finishing with care etc. including water,
electricity and other charges complete in all respect
and accepted by the Engineer-in-charge.
10 Supplying, fitting and fixing toilet accessories of
European Pcs type country made best quality glazed
porcelain combi closet, basin, miror, bib-cock, tissue pcs 4 55000 2,20,000
holder, all standard accessories.

11 Supplying, fitting and fixing window grills of any


design made with 20 mm x 5 mm F.I. bar @ 100 mm
c/c as inner and outer section; including fabricating,
welding, cost of electricity and tools and plants,
finished with anti- corrosive painting (Red-Oxide), sft 520 240 1,24,800
carriage, cutting grooves, mending good the damages
etc. complete for all floors accepted by the Engineer-
in-charge.

17 Supplying, fitting and fixing of aluminium sliding


window Sft having minimum 1.2 mm thick outer
frame including all accessories like sliding door key
lock, wheel, neoprene, bolts and nuts including
sealants, keeping provision for fitting 5 mm thick
glass including labour charge for fitting of sft 3500 550 19,25,000
accessories, making grooves and mending good
damages, carriage, and electricity complete in all
respect as per drawing and accepted by the Engineer-
incharge.

18 Supplying, fitting and fixing 36 mm thick factory


made solid Pcs wooden door shutter with 6" x 2.5"
solid wooden frame, handle, hinged cleats and buffer pcs 8 45000 3,60,000
blocks, natural polish all complete in all floors and
accepted by the Engineer-in- charge
Total 3,76,28,469
Amount:
Total Amount (1st to 2rd Floor) 2nd time of 1st Floor: 7,52,56,938
PHASE-IX:
BOO FOR ROOF TOP, PARAPET WALL, O.H.W.R & STAIR RAILING WORK

SI. Description Unit Quantity Unit Price Amount Remarks


No. (Tk.) (Tk.)
01 125 mm Brick works with first class bricks in cement
sand (F.M. of sand 1.2) mortar (1:4) with brick
soaking in water min. 24hrs. etc. complete as per a sft 1280 146 1,86,880
instruction of Engineer-in- charge.

02 Minimum 12 mm thick. Cement Sand Plaster (1:4)


with fresh cement to wall both imier-and outer
surface. finishing the corner and edges including
washing of sand cleaning the surface, scaffolding and sft 3950 30 1,18,500
curing at least for & days, cost of water, electricity
and other charges etc. complete as per a instruction of
Engineer-in-charge.

03 Exterior standard acrylic emulsion paint with


applying necessary exterior sealer & putty; finally
applying 2 coats of exterior emulsion paint spreading
by brush/roller/spray & necessary scaffolding;
applying to exterior surface with surface preparation
including cleaning, drying, making free from dirt, sft 2480 24 59,520
grease, wax, removing all chalked and scaled
materials, fungus, mending good the surface defects
using sand paper and necessary scaffolding; etc. all
complete accepted by the Engineer-in-charge.
Total 3,64,900
Amount:

Engr MD Uzzal SHAMIM SAMSUUDDIN


Director Architect DUET