0% found this document useful (0 votes)
37 views

Inspection Report - Electrical Work

electrical
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

Inspection Report - Electrical Work

electrical
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Electrical Work

Site Information

Sap Id I-KA-BGLR-ENB-1084 (5G Upgradation)

Candidate Id C6

Form No R5G-70-CQM-FMT-PR-013

Site Name Kundalahalli Gate

SAI TOWERS, HYDRABAD BIRIYANI,OPP. SAKARA EYE HOSPITAL,


Site Location
KUNDANAHALLI G,,

City --

Latitude 12.954794

Longitude 77.711805

R4G State Karnataka

Contractor NA

Date 05 May 2022

Reliance Jio Infocomm Limited Page 1


Inspection Report- Electrical Work

Sr.No. Description Specifications Observations Remarks

Preliminary Checks

50070-ESK-XX-XXXX-
1.0 Drawing No XXXX-ENB-0000-001

Availability of SLD / Equipment


1.1 layout with contactor Latest Drawing Yes

Availability of all equipments/


1.2 All tools & Tackles Yes
Material on site

Any physical damages to the


1.3 No damage No
equipments

1.4.1 Check for Make LT

1.4.2 Model 1 BAY 42U

1.4.3 Sr. no. E22-6552

Rating of the equipments and


1.4.4 NA
cable

Power Cable ( KWH Meter to


1.4.1.1 NA
SMPS ) Make

Power Cable ( KWH Meter to


1.4.1.2 NA
SMPS ) Size

SMPS with ACDB and DCDB-


1.4.2.1 Make NA
Make

Reliance Jio Infocomm Limited Page 2


SMPS with ACDB and DCDB-
1.4.2.2 Model NA
Model

SMPS with ACDB and DCDB-


1.4.2.3 Rating NA
Rating

SMPS with ACDB and DCDB-Sr.


1.4.2.4 Sr. No NA
No

1.4.3.1 Battery Bank-Make Make NA

1.4.3.2 Battery Bank-Model Model NA

1.4.3.3 Battery Bank-Rating Rating NA

Battery Bank-Sr No for Module 1


1.4.3.4 Sr. No. Module 1 NA

Battery Bank-Sr No for Module 2


1.4.3.5 Sr. No. Module 2 NA

1.4.4.1 Energy Meter-Make Make NA

1.4.4.2 Energy Meter-Model Model NA

ODC / Equipment Rack (2 Bay)


1.4.5.1 2 Bay Make NA

ODC / Equipment Rack (3 Bay)


1.4.5.2 Make 3 Bay NA

1.4.6.1 Fiber Distribution Panel (96 F) 96 F- Make & Nos NA

Fiber Distribution Panel (288 F) 288 F- Make & Nos


1.4.6.2 NA

Cable Connection and Routing

Reliance Jio Infocomm Limited Page 3


Check all equipments are installed
2.1 at proper location as per layout As per Drawing Ok NA
drawing

Check for connection of


2.2 As per Drawing Ok NA
equipments as per SLD

Check for power cable termination


2.3 at MCB with proper rating As per Drawing Ok

Check Lugs fixed properly, by


2.4 Ok NA
crimping tool

2.5 Check MCB rating As per Drawing Ok

Check cable cuts, damages,


Routed properly and
2.6 routing. (Cable should not be Ok
no damages
routed on sharp edges)

Check for proper mounting of


2.7 Mounted properly Ok
Meter Box and KWH Meter

AC power cable routed properly


2.8.1 Routed properly Ok

Trenching is done properly per


2.8.2 no damages Ok
site design layout & spec

Check proper earthing of ODC /


2.9 As per drawing Ok
Equipment Rack

Check proper earthing of all the


2.10 As per drawing Ok
equipments

Check for cable entry points for


2.11 proper sealing, conduit and gland Properly Sealed Ok

2.12 No intermittent cable joint Ok

Check for labeling (Feruling) of all


2.13 Labeling Done Yes
the cable

Reliance Jio Infocomm Limited Page 4


Check connectors are properly
2.14 Yes
fixed

Check the continuity & tightness


2.15 Ok
of cabling

Check the positions of all switches All in OFF condition


2.16 Yes
and MCB

Battery Bank ( As per Battery Statement)

Setting & Installation as per OEM As per vendor user


3.1 Yes
specifications manual

3.2 Battery Voltage V NA

No leakages,
3.3 Condition of Battery Bank Ok
Bulging

Batteries are interconnected and


Parallel Connections
3.4 connected to SMPS with correct Ok
polarity

Battery terminals are properly No Loose


3.5 Yes
tightened Connection

Grounding of battery bank done


3.6 Yes
properly

Battery commissioned Properly


3.7 Yes

All Software’s are uploaded


Latest Software
3.8 as per HOTO Document Yes
Version
guidelines

SMPS with ACDB and DCDB

Check for SMPS Rated Capacity


4.1 12 KW, 16 KW 0

No. of modules installed and 2,3 and 4 KW / 3


4.2 NA
rating in SMPS KW

Reliance Jio Infocomm Limited Page 5


Check for Battery low voltage
4.3 41 V 0
disconnect setting

Check for proper & Firm No Loose


4.4 Ok
connection of all cables Connection

4.5 Check for Earthing of SMPS As per drawing Ok

Check for functioning of all


4.6 indication lamps and Meters on All functioning Yes
SMPS

4.7 SMPS commissioned Properly Yes

All Software’s are uploaded


Latest Software
4.8 as per HOTO Document Yes
Version
guidelines
Check for connection and
Alarms connected &
4.9 Integration of all External alarms. Yes
Simulated

Cable Tray

Check for routing and saddling of Proper Saddle/ Clits


5.1 Yes
cable tray used

Check for fixing of cable tray


5.2 As per Drawing Ok
cover with the cable tray

Check for proper arrangement of


5.3 vertical supports for cable tray As per Drawing Ok

ODC

Check for ODC accessories Available and no


6.1 Yes
availability as per BOM parts are missing

Check for the foundation


6.2 dimensions as per drawing and As per drawing Yes
foundation level

Check for Anchoring Type (R4G-


6.3.1 Chemical Anchor Yes
70-TWC-GEN-PR-002)

Reliance Jio Infocomm Limited Page 6


Check for Anchor make and Size HILTI / FIECHER-
6.3.2 Check for Anchor Adhesive M10 HILTI / Fiecher
FIECHER

Check for Torque on random


6.3.3 30 N /m ok
basis

No abnormal sign of:


Surface paint quality & scratches /
scratches / paint
6.4 Dents / transit / corrosion No Scratches
peel off / dent /
damages
corrosion

Cabinet installation as per As per drawing and


6.5 Yes
approved drawing specification

PG glands and Roxtec cable entry Present and No


6.6 ok
modules damages

Protection from Moisture / Water


Availability of Gasket
6.7 ingression through EPDM rubber yes
gasket is proper
Check for no gap between EDPM
rubber gasket and roof panels to
6.8 No Gap No Gap
minimize the entry of driven water

Cabinet door provided with


Hinged type , proper alignment
6.9 Proper Alignment Yes
and locking arrangement

Check for the proper mounting of


Noise Free
6.10 Fan Trays and functioning Ok
Operation

Rain hood installed above cable


6.11 entry modules / PG Glands Available Yes

Cable entry between racks


6.12 Provided Yes
through rubber Grommets

ODC enclosure is properly


6.13 Proper Earthing Yes
earthed

Other Equipments

Check for Proper Installation of


7.1 Yes
Lightening Arrestor

Reliance Jio Infocomm Limited Page 7


7.2 Aviation Lamp( If Applicable) Installed NA

Check for installation of MCT (


7.3 Roxtec Module) on GBM and Installed & 2 Yes
Numbers

Check for pole/delta and ODC


7.4 As per drawing Yes
earthling

Are all necessary cables routed


7.5 As per drawing Yes
up to the antenna?

Observations and Comments:

Found ok

Reliance Jio Infocomm Limited Page 8


CFQ details

Contractor’s representative Field Engineer QC Engineer

Signature

Name Kali Ranjithkumar

Date 07 May 2022 07 May 2022 --