DAILY ASPHALT / PAVING REPORT
CLIENT JOB NO. MIX DESIGN No. ASPHALT SUPPLIER ASPHALT TYPE REFINERY LOCATION
PROJECT MIX TYPE NO. OF BLOWS DESIGN A.C CONTENT DESIGN DENSITY (kg/m3) AIR VOIDS %
CONTRACT NO.: PIT LOCATION: DATE PAVED MIXING TEMP. (ºC) COMPACTION TEMP. (ºC) AGG. ABSORP. AGG. SPEC. GRAV. BITUMEN SPEC. GRAV.
TARGETS FORMED MARSHALL SPECIMEN ASPHALT CONTENT % ROAD DENSITIES
DENSITY (kg/m3)
TARGET TOTAL
% BLEND SAND
MIX MOISTURE
TEST METHOD
MOISTURE (%)
SEGMENT NO.
THEORETICAL
AIR VOIDS (%)
COMPACTION
PAVER TEMP
% FINE SPLIT
EXTRACTION
CORRECTED
PLANT TEMP
AIR VOIDS %
CONTENT %
THICKNESS
% COARSE
LOCATION
R-RETEST
MAXIMUM
V.M.A. (%)
DENSITY
DENSITY
(kg/m3)
+ OR -
SPLIT
% RAP
LANE
(mm)
LIFT
(°C)
(°C)
A.C
(%)
CORE LOCATION
LOT
1
2
3
4
5
LOT AVERAGE
SAMPLE SOURCE CODE TEST METHOD
SIEVE ANALYSIS - % PASSING (mm)
SOURCE
CF Cold Feed FE Filterless Centrifuge
SAMPLE
CO Core NU Nuclear
HB Hot Bin RE Reflux
0.600
0.300
0.150
0.075
19.0
12.5
4.75
2.36
1.18
SP Stockpile FC Filter Centrifuge
9.5
TK Truck IG Ignition
PV Paver AV Average of FE & IG
TAR Target Gradation OR Other
LOT PAVING LIMITS (KMS) OR Other
FROM TO LANE MAT COMMENTS:
LOT TONNAGE
LOT AVERAGE
TESTED BY:
AVG
TAR