The document identifies risks relating to quality, delivery, and cost for a project. It provides an evaluation table listing 8 risks to quality with details on severity, probability, prevention controls, and those responsible. It also lists 3 risks each to delivery and cost, again with relevant details.

Uploaded by

RS MANIKANDAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views2 pages

Risk Evalution

The document identifies risks relating to quality, delivery, and cost for a project. It provides an evaluation table listing 8 risks to quality with details on severity, probability, prevention controls, and those responsible. It also lists 3 risks each to delivery and cost, again with relevant details.

Uploaded by

RS MANIKANDAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Risk Identification and Prevention / Mitigation Plan

RISK EVALUATION TABLE.


Risk Policy: Meet quality, cost and delivery requirements 100% on time every time.

Sub Risk Mitigation plan,


Sl. Risk element Severity Probability Occurrence Prevention Control Prevention
Sl. Anticipated risk Evaluation should REN ≥ Responsibility
No. relating to: Ranking of Occurrence Ranking if any Ranking
No. No. (REN) 3X3X3=27
Effect

Customer Specific
Compound not meeting the Very low chance of requirements and Bhatachariyar /
1 Product Function failure 2 1 3 6
customer requirement. occurrence customer material Kumaraswamy
standards.

Poor Producibility of the product Project Not Completed Low Chance Of


2 4 2 Robust mould Design 3 24 Shinoj / Vignesh
meeting all quality targets on time occurrence

Poor Inspectability of the product Customer High Chance Of Training provided to


3 3 4 2 24 Raman
to confirm product acceptance. dissatisfication occurrence inspectors

01 Quality
Lack of clarity in customer Project Not Completed Low chance of
4 2 2 initial feasibility review 2 8 Vignesh
documentation on time occurrence

Marginal effect on the Low chance of


5 Excess Flash level 3 2 Robust mould Design 4 24 Shinoj / Vignesh
project occurrence

Difficulty to parts unloading due Customer Medium Chance Of


7 2 2 Robust mould Design 3 12 Shinoj / Vignesh
to critical part profile dissatisfaction occurrence
Time and cost
Medium Chance Of
8 Excess Rejections Overrunning of the 3 3 Process Validation 2 18 Vaibhav
occurrence
Project
Marginal effect on the High Chance Of
1 Project lead time is very short. 3 3 Firm APQP Timing plan 2 18 Shinoj / Vignesh
project Occurrence

Time and cost APQP Timing plan and


Excess Time for Mold Medium Chance Of
2 Overrunning of the 2 3 Tool Manufacturing 3 18 Shinoj / Vignesh
02 Delivery Fabrication. occurrence
Project facilities at In house

APQP Timing plan


Delay in tool delivery from tool Customer Low chance of
3 3 2 delivery through special 3 18 Shinoj / Vignesh
room dissatisfaction occurrence
mode of transports

Time and cost


Low chance of Costing including all the
1 Increase in Process cost Overrunning of the 3 2 3 18 Sagar / Monisha
occurrence process cost
Project

Time and cost


Medium Chance Of
2 Higher deflashing cost Overrunning of the 2 3 Robust mould Design 3 18 Manikanda raja
occurrence
Project
Time and cost Providing Fixtures and
03 Cost Low chance of
3 Higher Inspection Cost Overrunning of the 2 2 gauges during 2 8 Manikanda raja
occurrence
Project development stage
Time and cost Providing Automatic
Low chance of
4 Increase in Manpower Cost Overrunning of the 3 2 controls wherever 3 18 Manikanda raja
occurrence
Project applicable in process
Time and cost
Low chance of Costing including all the
5 Transport Cost Overrunning of the 3 2 3 18 Rajkumar
occurrence process cost
Project
Sub Risk Mitigation plan,
Sl. Risk element Severity Probability Occurrence Prevention Control Prevention
Sl. Anticipated risk Evaluation should REN ≥ Responsibility
No. relating to: Ranking of Occurrence Ranking if any Ranking
No. No. (REN) 3X3X3=27
Effect

Time and cost


Very Low chance Manpower availability as
1 Manpower high Absenteeism Overrunning of the 3 2 2 12 Punnia moorthy
of occurrence per Production schedules
Project

Marginal effect on the Very Low chance Capacity analysis during Navaneethan/
2 Lack of Power capacity 2 1 3 6
project of occurrence Initial feasibility study Management

04 Resource Customer Very Low chance Capacity analysis during


3 Lack of Moulding facility 4 1 3 12 Management
dissatisfaction of occurrence Initial feasibility study

Marginal effect on the Low chance of


4 Lack of skilled manpower 2 2 Proper Training provided 1 4 Punnia moorthy
project occurrence

Marginal effect on the Low chance of


5 Unplanned Machine Breakdown 3 2 Machine PM 4 24 Navaneethan
project occurrence

Time and cost


Fluctuation of Compound price in Low chance of Maintaining sufficient
1 Overrunning of the 3 2 4 24 Sagar / Monisha
International Market occurrence stocks at Inhouse
Economic Project
05
Scenario

Customer Very Low chance Adequate Inventory


2 Strikes and Political Issues 2 1 4 8 Manikanda raja
dissatisfaction of occurrence maintaining
06 Govt. Regulation
NA

Very Low chance Maintaining sufficient


1 Floods and Cyclones. No effect on the project 1 1 5 5 Manikanda raja
of occurrence stocks at Customer end

Natural
07
Calamities

Very Low chance Maintaining sufficient


2 Fire Accidents No effect on the project 1 1 5 5 Manikanda raja