TEST REPORT( Final test )
Order No. Customer name: Project Name :
No. of cubicles Type of panel Panel Name :
Rated Voltage V. Rated current Amps. Short circuit KA. KA.
Please state the date
Cubicles ED ED
art. Test description E CT EPT
1 2 3 4 5 6 7 8 9 10 R EJ ACC
Partial test after assembly of frame and busbars
1
اﻻﺧﺘﺒﺎر اﻟﻤﺮﺣﻠﻲ ﺑﻌﺪ ﺗﺠﻤﻴﻊ اﻟﺸﺎﺳﻴﻪ واﻟﻨﺤﺎس
Identity check / Visual check
1.1
اﻟﻔﺤﺺ اﻟﻈﺎهﺮي
Arrangement of cubicles acc. to requirement
1.1.1
ﺗﺮﺗﻴﺐ اﻟﺨﻼﻳﺎ ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Type & size of each cubicle acc. to requirement
1.1.2
ﻧﻮع وأﺑﻌﺎد آﻞ ﺧﻠﻴﺔ ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Transport packaging acc. to requirement
1.1.3
اﻟﻘﺎﻋﺪة اﻟﻤﻨﺎﺳﺒﺔ ﻟﻄﺒﻴﻌﺔ اﻟﻨﻘﻞ واﻟﺘﻐﻠﻴﻒ
Installation of devices acc. to requirement
1.1.4
ﺗﺮآﻴﺐ اﻷﺟﻬﺰة ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Technical data and current flow acc. to requirements
1.1.5
ﻣﺮاﺟﻌﺔ اﻟﺒﻴﺎﻧﺎت اﻟﻔﻨﻴﺔ وﻣﺴﺎرات اﻟﺘﻴﺎر ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Cross section of busbars acc. to requirement
1.1.6
ﻣﺮاﺟﻌﺔ أﺑﻌﺎد وﻣﻘﺎﺳﺎت اﻟﻨﺤﺎس ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Additional features of busbars acc. to requirement (e. g. silver-plated, painted,
1.1.7
insulated ) ( ﻣﻌﺰول ﺑﺎﻟﺮﻳﻘﻢ, ﻣﺪهﻮن, ﻣﺮاﺟﻌﺔ أﻧﻮاع اﻟﺤﻤﺎﻳﺎت اﻹﺿﺎﻓﻴﺔ ﻟﻠﻨﺤﺎس ) ﻣﻄﻠﻲ ﺑﺎﻟﻔﻀﺔ
Painting inspection for painted parts and sheet metal work
1.1.8
ﻣﺮاﺟﻌﺔ اﻟﺪهﺎن وﺗﻔﺘﻴﺤﺎت اﻷﺟﻬﺰة ﺑﺎﻟﺼﺎج
Mechanical test
1.2
اﻻﺧﺘﺒﺎر اﻟﻤﻴﻜﺎﻧﻴﻜﻲ
Tightening torque of screwed joints of contacts checked and marked
1.2.1
ﻣﺮاﺟﻌﺔ واﺧﺘﺒﺎر اﻟﻌﺰوم ﻟﻠﻤﺴﺎﻣﻴﺮ ووﺿﻊ اﻟﻌﻼﻣﺎت اﻟﻼزﻣﺔ
1.2.2
Check of remaining torques (sheet metal parts etc.; 5 samples per cubicle)
( اﻟﺦ....., ﻣﺮاﺟﻌﺔ اﻟﻌﺰوم ﻟﻤﺴﺎﻣﻴﺮ اﻟﺮﺑﻂ اﻟﻌﺎدﻳﺔ ) اﻷﺟﺰاء اﻟﺼﺎج
Screwed joint for interconnection of cubicles acc. to requirement
1.2.3
ﻣﺮاﺟﻌﺔ أﺟﺰاء اﻟﺮﺑﻂ اﻟﻼزﻣﺔ ﺑﻴﻦ اﻟﺨﻼﻳﺎ ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Partial test after completion
2
اﻻﺧﺘﺒﺎر اﻟﻨﻬﺎﺋﻲ ﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻣﻦ اﻟﺘﺠﻤﻴﻊ
Identity check / Visual check
2.1
اﻟﻔﺤﺺ اﻟﻈﺎهﺮي
Nameplate of switchboard/nameplates of functional units acc. to requirement
2.1.1
ﻣﺮاﺟﻌﺔ اﻟﻤﺴﻤﻴﺎت ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Devices and equipment identifiers acc. to part list ( review of components )
2.1.2
ﻣﺮاﺟﻌﺔ اﻷﺟﻬﺰة واﻟﻤﻜﻮﻧﺎت ﻃﺒﻘﺎ ﻟﻘﺎﺋﻤﺔ اﻷﺟﻬﺰة واﻟﻤﻜﻮﻧﺎت
Installation of devices acc. to requirement
2.1.3
ﺗﺮآﻴﺐ اﻷﺟﻬﺰة ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Marking of busbars and control power bus acc. to requirement
2.1.4
ﻣﺴﻤﻴﺎت اﻟﺒﺴﺒﺎر اﻟﻌﻤﻮﻣﻲ واﻟﺒﺴﺒﺎر اﻟﺨﺎص ﺑﺎﻟﻜﻨﺘﺮول ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Marking of connecting points acc. to requirement
2.1.5
ﺗﺴﻤﻴﺔ ﻧﻘﺎط اﻟﺮﺑﻂ ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Cubicle assembling and mimic system diagram acc. to requirement
2.1.6
ﻓﺤﺺ أﺟﺰاء اﻟﺨﻠﻴﺔ و ﻣﺮاﺟﻌﺔ ﺗﺠﻤﻴﻊ اﻟﺨﻼﻳﺎ و اﻟﺮﺳﻢ اﻟﺘﻮﺿﻴﺤﻲ ﻃﺒﻘﺎ ﻟﻠﺮﺳﻮﻣﺎت
Protection type acc. to requirement
2.1.7
ﻣﺮاﺟﻌﺔ درﺟﺔ اﻟﺤﻤﺎﻳﺔ ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Completeness of accessories
2.1.8
ﻣﺮاﺟﻌﺔ اﻻآﺴﺴﻮارات ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Wiring
2.2
اﺧﺘﺒــﺎر اﻻﺳﻼك
Insulated wires not laying at sharp edges or live parts
2.2.1
( اﻟﺦ.. ﺷﺮﻧﻚ، ﺣﻤﺎﻳﺔ اﻟﻜﺎﺑﻼت ﻣﻦ اﻻﺳﻄﺢ اﻟﺤﺎدة )ﺗﺮآﻴﺐ ﻣﻜﺮوﻧﺔ
Cross section Acc. To req.
2.2.2
. ﻣﻘﻄﻊ اﻟﺴﻠﻚ ﻣﻨﺎﺳﺐ
Numbering
2.2.3
اﻟﺘﺮﻗﻴﻢ
Terminals are fixed enough
2.2.4
ﺗﺜﺒﻴﺖ اﻟﺘﺮاﻣﻞ واﻟﺮوزﺗﺎت ﺑﺸﻜﻞ ﺟﻴﺪ
Wiring colors Acc. To Req. ( Colour code of wires
2.2.5
اﻟﺘﺎآﺪ ﻣﻦ اﻟﻮان اﻟﺴﻠﻚ ﻃﺒﻘﺎ ﻟﻠﻤﻄﻠﻮب
Mechanical test
2.3
اﻻﺧﺘﺒﺎر اﻟﻤﻴﻜﺎﻧﻴﻜﻲ
Mechanical interlock of C.B.
2.3.1
( وﺣﺪة اﻟﺮﺑﻂ اﻟﻤﻴﻜﺎﻧﻴﻜﻲ ﺑﻴﻦ اﻟﻘﻮاﻃﻊ او اﻟﻜﻮﻧﺘﺎآﺘﻮرات )ان وﺟﺪت
Fixing of devices ,C.B. ,contactors …etc.
2.3.2
. ﺗﺜﺒﻴﺖ اﻟﻤﻔﺎﺗﻴﺢ و اﻟﻜﻮﻧﺘﺎآﺘﻮرات و اﻟﻤﻜﻮﻧﺎت و ﺟﻤﻴﻊ اﻻﺟﺰاء
Door function ( hings & locks )
2.3.3
( آﻮاﻟﻴﻦ، ﻋﻤﻞ اﻻﺑﻮاب )ﻣﻔﺼﻼت
Electrical test
2.4
اﻻﺧﺘﺒﺎر اﻟﻜﻬﺮﺑﺎﺋﻲ
Open circuit & closed circuit contacts of all devices
2.4.1
. اﺧﺘﺒﺎر ﺟﻤﻴﻊ اﻷﺟﻬﺰة ﻓﻲ ﺣﺎﻟﺔ اﻟﺘﻮﺻﻴﻞ و اﻟﻔﺼﻞ
Operating , test and disconnected position of draw out circuit breakers
2.4.2
ﺗﺤﺮﻳﻚ اﻟﻘﻮاﻃﻊ ﻓﻲ أوﺿﺎع اﻟﺘﻮﺻﻴﻞ و اﻻﺧﺘﺒﺎر و اﻟﻔﺼﻞ
Relays test
2.4.3
اﺧﺘﺒﺎر اﻟﺮﻳﻠﻴﻬﺎت
Indicator lamps & push button
2.4.4
ﻟﻤﺒﺎت اﻟﺒﻴﺎن و اﻻزرار
Secondary injection test for metering devices ( Ammeter, Voltameter, …atc
2.4.5
ﻋﺪدات اﻟﻄﺎﻗﺔ.4 اﻟﻮاﺗﻤﻴﺘﺮ.3 اﻟﻔﻮﻟﺘﻤﻴﺘﺮات.2 اﻷﻣﻴﺘﺮات.1 اﺧﺘﺒﺎر اﻟﺤﻘﻦ اﻟﺜﺎﻧﻮي ل
Primary injection test for Current transformers ( C.T's )
2.4.6
اﺧﺘﺒﺎر اﻟﺤﻘﻦ اﻹﺑﺘﺪاﺋﻲ ﻟﻤﺤﻮﻻت اﻟﺘﻴﺎر
Function of control circuit acc. to customer specified circuit diagrams
2.4.7
اﺧﺘﺒﺎر داﺋﺮة اﻟﺘﺤﻜﻢ و اﻟﺘﺄآﺪ ﻣﻦ وﻇﻴﻔﺘﻬﺎ
Devices parameterized/programmed
2.4.8
ﺑﺮﻣﺠﺔ اﻷﺟﻬﺰة
Insulation Test
2.5
اﺧﺘﺒﺎر اﻟﻌﺰل
Main circuit between L1/L2/L3 and between phases &N(2500 v for 10 sec )
2.5.1
( ﺛﺎﻧﻴﻪ10 ﻓﻮﻟﺖ ﻟﻤﺪة2500) اﻟﻌﺰل ﺑﻴﻦ اﻟﻔﺎزات و اﻟﺘﻌﺎدل- اﻟﻌﺰل ﺑﻴﻦ اﻟﻔﺎزات: اﻟﺪاﺋﺮة اﻟﺮﺋﻴﺴﻴﺔ
Main circuit L1 &L2&L3 and N against PE . (2500 v for 10 sec )
2.5.2
( ﺛﺎﻧﻴﺔ10 ﻓﻮﻟﺖ ﻟﻤﺪة2500) . اﻟﻌﺰل ﻣﺎ ﺑﻴﻦ اﻟﻔﺎزات و اﻟﺘﻌﺎدل و ﺑﻴﻦ ﻧﻘﻄﺔ اﻻرﺿﻲ و ﺟﺴﻢ اﻟﻠﻮﺣﺔ