wll
‘ CENTRAL GOVERNMENT EMPLOYEES
brill ene ORG ae
CHENNAI (PHASE Iilll)
HOUSING SCHEME:
CGEWHO RULES
eof.¢.saa.va-sit. ferasnach
data wert oafardt scam snare daca
bi Dees EMPLOYEES WELFARE HOUSING ORGANISATION
FA Wi ipath Bhawan, Janpath, New Delhi-110001
Ph.: 011-23717249, 20730722, "23986408 a 01 23717260 » Webste www.cgewho.in » E-mail :
[email protected]
»
miiia
|
Completed and Handed over
Projects of CGEWHO
MOHALI (Ph-1) - 603 DUs BHUBANESWAR (Ph-l) - 256 DUs HYDERABAD (Ph-lll) - 380 DUs
‘Completion Year : 2013 Completion Year : 2013 Completion Year : 2013
il cae
LUCKNOW - 130 DUs AIMT (Pht) NOIDA (Ph-V) - 576 DUs
‘Completion Year : 2008 ‘Completion Year : 2007
NERUL (Ph-1) - 384 DUs AHMEDABAD - 310 DUs
Completion Year : 1996 Completion Year : 2005
KOCHI - 43 DUs HYDERABAD Ph - 344 DUS
Completion Year : 2001 Completion Year : 2001
GURGAON (Ph-1) - 1088 DUs KHARGARH - 1230 DUs NOIDA (Ph-l) - 508 DUS
‘Completion Year : 1999 Completion Year : 1998, Completion Year : 1998.CGEWHO
INDEX TO CONTENTS
PART-A: CHENNAI (PHASE III) HOUSING SCHEME [> TwangrawaifromaScheme Ls
1 [Introduction [oz 26 [Cancellation Charges 15,
2 [Location 02 27 [Possession 16
3__| Salient Features 02 28 [Delay in Taking Over 16
[5 frevatte DeairoronemgUmEyaE [or] [2 [Hanng er is
a ee 30_[Mutual Exchange of Dwelling Unit 16
S| Basle Specihentionn 3 31 [Co-operative Society Apartment 16
7 [Payment Schedule 05 \Gismens-Ansnciailon’
| Construction Schedule 06) linet ae
[Loan Arrangements 06] [3 Jownersmip Ta
10_[ Sale of Applications 06 34 [Succession 18
11 _| Receipt of Applications 07 35 [Transfer is]
12 [Allotment 07] — [36 [Liability of the COEWHTO 18
13 | Refund o7 37 [Amendments to the Rules 18
14 [important Points 07, of the Organisation
38 [Acceptance of Application 18
PART-B : CGEWHO RULES [ef aretirato
‘40 [Misrepresentation or Suppression of Facts _[19
1 [Preamble 09
2 | Definitions 09
3 | eligibilcy [oo] PART-C: ANNEXURE(s) & APPLICATION FORM
4_[ Special Eligibility Criteria 10] [1A Block Floor Plan Typical Units Annexure | 20
I ebiinte RoC 10 2_| B- Block Floor Plan Typical Unit: Annexure 21
e {11 | 3_| € Block Floor Plan Typical Unit: Annexure | 22
_ {12 | [4 [D-Block Floor Plan Typical Units AnnemarelV | 23
Ea ee ene 5_| Proforma for Payment Deposit: Annexure-V | 24
Technical Brochure p12) 6_| Proforma for Change of Address: Annexure-Vi] 25
10 | Stations: 12
Ti | Hesees Pan {2} | 7_[ Format of Pre-Receipt: Annexure-VIl 26
12 [How to Apply 12] [8 [Format of affidavit: Annexure-Vitt 27
13 | Registration of Applications 13 ‘9_| Format of Release Deed: Annexure-IX 28,
14 | Reservation for SC/ST/ 13 10 | Format of Special Power of Attorney: Annexure-X | 29
Physically Handicapped Applicants 1 | Format of Tripartive Agreement: Annexure-X! | 30
15 | Confirmation of Booking 13 12 | Undertaking about Loan detail: Annexure-I [33 |
16 [Cost of Dwelling Units/Flats 13| [75 [applications for Membership Annexure [34
a pepmene Schade <4} [Tia [Acceptance And Undertaking: Anexurel [35
[a9 TGhangesinPaymentssehedule [4] | ** | Avotcatontorn Amouenv |”
20 | Mode of Payment 14 —
21 | Payment of Interest 14 Part-D: Application Kit (Application | (i)
22 | Rebate: [74] | form with one copy of CGEWHO be to
23 | Loan Arrangements 15 Rules: to submitted duly signed and_| (xviii)
24 [Allotment of Specific Unit 15] | completed for allottment to CGEWHO
wmfe 4 CGEWHO
PART A: CHENNAI (PHASE III) HOUSING SCHEME
1, INTRODUCTION/BACKGROUND
1) Central Government Employees Welfare
Housing Organisation (CGEWHO), an
autonomous body of Ministry of Housing &
Urban Poverty Alleviation, Govt. of India and
registered under the Societies Registration Act
1860, specifically created for execution of
housing projects for Central Government
Employees, on No Profit No Loss, self financing
basis throughout country. It has at present, to its,
credit, on-going housing schemes at Mohali
(Phase II-615 DUs), Mohali, Sector-79 (SAS
Nagar-316 DUs) and Greater Noida (2130 DUs)
and further, 3061 dwelling units under various
stages of planning, Thirty Projects at following
locations have been completed.
No. [Project completed at No of DUs
1,2 | Chennai (Phase-1 & 1) 1096
3 Nerul, Ne lumbai 384
4,5 _[ Panchkula (Phase-1 & 1) 338
6,7 _ | Kolkata (Phase-I & II) 1158
8,9 _| Noida, Sector-51 (Phase 1& 11) 1200
10 | Kharghar, Navi Mumbai 1230
uurgaon, Sector-56 (Phasel&I)| 1940
13__ | Chandigarh 305
14 Banglore (Phase I) 603
15, 16| Hyderabad (Phase, I & III) ‘902
17
18 Kochi 43
19, 20| Pune (Phase 1 & II) ‘307
21, 22] Noida, Sector-82 2276
23 | (Phase lll, IV&V)
24 [Ahmedabad 310
25, 26| Jaipur (Phase 1 & II) 756
27 [Lucknow 130
28 Mohali (Phase 1) 603
29 _ | Bhubneshwar (Phase I) 256
30 | Meerut (Phase I) 00
ii) After successful completion of housing
projects as mentioned above, CGEWHO is now
launching its next housing scheme at Chennai,
‘Tamil Nadu. Besides the present scheme at
Chennai, CGEWHO's forth-coming schemes
may include Vishakhapatnam (Phase-I) and
Meerut (Phase-II).
iii) This brochure, outlines details and ‘Rules and
Regulations’ governing the Chennai (Phase III)
Housing Scheme.
;. LOCATION
‘The plot admeasuring undivided share of approximately
12 acres out of total approx. 23.92 acres located on
Poonamallee-Avadi Main Road, Parthipattu village.
Distances ofimportant place(s) by road are:
Avadi Railway Station 3.0 Kms,
ISBT 3.0 Kms.
Chennai Airport 9.2 Kms,
Please see location place of Plot in the back side of cover
page.
It isa part of the contiguous land where Chennai (Phase
Ul) project of CGEWHO isalready completed.
1) All DUsare provided with balcony(ies).
ii) Located in developed area of Poonamallee Avadi
Main Road.
{ii) Fully functional project with bituminous road,
paved walk ways, electrification, water supply,
sewage disposal system, area drainage system,
community facilities, horticulture/ plantations,
parks, boundary wall, security gates & postetc.
iv) Allthe blocks are provided with lift facility.
v) All approvals have been obtained from the
Statutory Authorities
@Rainwater harvesting for augmenting water
resources Efficient Plans.
Super Built-up Area calculated as peractual.
Construction as per approved plans by the
MDA.
ELIGIBLE CATEGORIES
PRIORITYI
i) Central Government Employees: Serving or
retired Central Govt. Employees, who are
covered by the definition as given at Para 2(vil) of
PartB ofthis Brochure, will be eligible.
ii) Spouses of deceased employees: Spouses of
the deceased Central Govt. Employees or
deceased retired employees would be eligible, if
the deceased employee would have qualified by
criteria (i) above.
iii) Employees of CGEWHO, with a minimum of one
year of service, will be eligible.
PRIORITY IL
i) Employees in service of Central PSUs, State
Govts., Union Territory Administration,
Autonomus Bodies, Corporations, Nationalised
Banks ete.
fi) Serving uniformed employees of the Ministry of
Defence and serving employees of Ministry of
Railways.
Note:
1) Allotments shall be made in the order of priority,
depending upon the number of applications
received, as mentioned above. However, in case the
number of applications received from Priority I
applicants outnumber the number of dwelling
units proposed to be built; a Draw of lots will be
held at CGEWHO's Head Office, New Delhi.
ii) An eligible Central Government Employee can
make only one application for one DU/Flat only.
Where both husband and wife are eligible, only
one can apply.
iti) Before submission of application, applicants must
ensure their eligibility regarding their Central
Govt, employment and other conditions given
under Para 4 of Part B of these Rules. In case, an
allotment is still made in contravention of the
CGEWHO Rules due to any oversight, it will be the
responsibility of the applicant to inform this
Organisation, once itcomes to his/her knowledge.
PRIORITY - UI
General Public, including retired/spouses of
deceased employees of Priority-II
Note:
Allotments shall be made in the order of priority,
depending upon the number of applications
received, as mentioned above. However, in case the
number of applications received from Priority 1
applicants outnumber the number of dwelling units
proposed to be built, a Draw of lots will be held. The
unsuccessful applicants, if any, will be considered
alongwith the Priority II applicants, in the same
manneras for Priority | applicants, so on.
@)‘Theprojectis planned with appox.4.220 dwvallingunioe with connected central amenities The base tentative
details of the dwelling units (subjectto change without any notice) areas under:
Type |] Accommodation [Configuration] Tentative Area [Non-Refundable [Earnest [Tentative cost]
With lift |in Sq. ft / Approx| Application Fee |Money | of DU/Flat
q. p pp!
No.ofDU/Flats(s} (inRs) — |Deposit| (figure in
to be built lakhs)
: Drawing-cum-Dining,
(1BHK) Miche oad Bath, Stilt+ | 562 sqft. / 400 nos. 500 50,000] 14.05
one WCand Balcony | 10 Storey
Drawing-cum-dining,
é two bedrooms,
fapnky |litchen,two toilets, | tte — |intaseft/240nes} 500 50000] 27.95
Balconies 40 storey
Drawing-cum-dining,
three bedrooms,
fo Kitchen three tailets, | Stite — |is27sqit./340n0s} 1000 —‘|100,000] 38.18
Balconies Th stoiey,
Drawing-cum-dining
i three bedrooms,
(4BHK | Saree tollets, Stilt+ —[1742sqft./240n0s} 1000 -—‘|1,00,000} 43.55
one servant room with| 10 storey
WC, Kitchen, balconies
Note:
1) Types, Areas, No. of DUs and Cost, as indicated above are tentative and subject to revision. However,
further details will be communicated through "Technical Brochure’,
ii) Application Fee is Non-Refundable. A combined Bank Draft for Earnest Money Deposit (EMD) and
Application Fee may be submitted alongwith application,
iii) Earnest Money Deposit (EMD) will be considered as partpaymentof the installment(s), onallotment.
iv) Planning permission hasalready been obtained from the Avadi Muncipality /CMDA.
v)__Asingle block of Community center shall be provided at the complex which shall be partially meant for
the Chennai (Phase I!) beneficiaries and partially for Chennai (Phase Ill) beneficiaries,
vi) Escalation and additional statutory levies shall be charged extra
vii) ‘There are limited car parkings under stilts available and will be charged separately @ Rs. 2.5 lakhs. In
case demandis higher, allotment shall be made through draw of lots.CGEWHO fe
SI Particulars TypeA Type B Type Type D
a) Internal wall/
ceiling Oil Bound | Oil Bound Distemper | Same as for Type A | Same as for Type A | Same as for Type A
Distemper
b) External wall | Weatherproof Paint| Same as for Type A | Same as for Type A | Same as for Type A
©} i) General floor | Vitrified tiles Same as for Type A | Same as for Type A | Same as for Type A
ii) Kitchen Ceramic Tiles Same as for Type A | Same as for Type A | Same as for Type A
Ceramic Tiles
d) Bath flooring Glazed tiles| Same as for’Type A | Same as for Type A | Same as for Type A
dado 7 ft. height
Polished Granite
) Kitchen Platform 600 mm | Same as for'Type A | Same as for Type A | Same as for Type A
high Glazed tiles | Sameas for Type A | Same as for Type A | Same as for Type A
dado 2' high
f) Window Aluminum ‘Same as for Type A | Same as for Type A | Same as for Type A
8) Door Frame/Shutter| Wooden/Flush doors | Same as for Type A | Same as for Type A | Same as for Type A
Copper wiring in
1h) Electrical Wiring | concealed PVC _—_| Sameas for Type A | Same as for Type A | Same as for Type A
Conduits
INSTALMENT| PARTICULARS
STAGE WHEN TO BE CALLED
On applying | Earnest Money Deposit (EMD)
‘Along with application by the last date of receiving
application(s), or extension thereof.
Ast 30% of cost of DU/Flat less EMD | On issue of letter of allotment
2nd 15% of cost of DU/Flat After commencement of work.
3rd 20% of cost DU/Flat After attaining 45% progress of the work.
4th 15% of cost DU/Flat After attaining 65% progress of work
©nl CGEWHO
sth | 20% of cost DU/Flat
After attaining 80% progress of work.
6th & final Actual cost towards escalations,
interest towards equalization
charges, Apartment Owners’
Association Charges, and other
statutory levies/charges, if any
with cost of parking if applicable
On completion of the project.
Notes :
i) Separate call-up or Demand notice for each installment shall be sent giving 30 days, for effecting the
payment.
ii) All payments are to be made by Bank Drafts only drawn in favor of CGEWHO A/C No 0267101523034
CANARA BANK, NEW DELHL.'
w
Ale No. 02671015 23034
iii) Asmentioned in the payment schedule above, escalation component, ifany, Apartment Owners‘ Association
charges @ 1.5% of the final cost of dwelling unit, reserve fund @ 1.5% of the final cast of the dwelling unit,
stamp duties and other levies, interest towards equalization charges and statutory payments, ifany shall be
computed and charged along with the final installment, at the time of offering physical possession of the
dwelling unit. However, the organization reserves its right to call any amount towards escalation even
during the tenancy ofthe project.
iv) Beneficiaries are advised to remain in contact with CGEWHO and keep visiting our website www.cgewho.in
regarding issue of call-up notice(s) etc.
CONSTRUCTION SCHEDULE
Project work will be tentatively completed within
48 months; from the last date of 2nd installment
which would be called on the commencement of
construction.
House Building Advance is admissible to Central
Government Employees for acquiring houses from
the CGEWHO, as per OM No. I/17015/1/91-H.IlL
dated 04.09.1991, issued by the then Ministry of
Urban Development against mortgage of the
property, in favor of the President of India.
Additional funds, if required, can be borrowed from
other Financial Institutions like HUDCO, HDFC,
GICHFL, LICHFL, and Housing subsidiaries of the
Nationalized Banks etc. on the basis of secon
mortgage of property allotted by CGEWHO,
Explanations: Applicants are to apply for loan
directly to their respective Departments/ Financial
Institutions. All possible assistance will, however, be
provided by the CGEWHO, including the documents,
as required by the concerned Institution(s).
10.SALE OF APPLICATIONS —
Intending applicants may obtain the CGEWHO Rules
Brochure at a cost of Rs. 100/- in cash or through
Bank Draft in favour of 'CGEWHO A/C No
oMe No. 02670523034
0267101523034 CANARA BANK, NEW DELHI’
payable at New Delhi from following points:
CGEWHO's Head Office | Hard copy of 'CGEWHO
at 6th Floor, ‘A Wing, | Rules Brochure’
JANPATH BHAWAN,
Janpath, Available from
New Delhi-110001 30.05.2016
CGEWHO Project office | Hard copy 'CGEWHO
at Poonamallee Avadi,
Main Road Rule Brochure’
Contact
Qs». Srinivasan Available from
(M) 0444464154 30.05.2016
Alternatively Rs.100/- towards the
Downloading cost of brochure to be
from CGEWHO's added along with EMD &
wabsiter. Application Fees while
applying in case of
eee Downloaded Form.
11.RECEIPTOF APPLICATIONS
Duly completed applications will be received only at
the Head Office at New Delhi, either by post or by
hand. Applications by hand can be deposited in the
«office onall the working days,
30.05.2016
30.06.2016
‘Scheme open from:
Scheme Closeson
12.ALLOTMENT
After the receipt of application forms, complete in
all respects, from all the eligible applicants, a ‘draw
oflots' will be conducted at the Head Office in case of
over subscription, within four months of the formal
closure of the scheme or extension therefore, in the
presence of an officer nominated by Ministry of
Housing & Urban Poverty Alleviation,
CGEWHO ol
The date of the ‘draw’ will be intimated to all the
applicants, either individually or web-published at:
www.cgewho.in
The result of the ‘draw’ will be communicated to all
the applicants individually or will be published in the
official website of CGEWHO {www.cgewho.in}
Otherwise, allotments shall be made to all the
eligible applicants in case, the scheme is subscribed
by more than 50% of no(s) DU(s) to be built.
13.REFUNDS =
In case of over-subscription, refund to unsuccessful
allottees will be made within two months from the date
of draw which will be held within four months from the
date ofclosure ofthe scheme orextension, ifany.
As per rules of the organization, interest @ 5% per
annum is payable, if the Earnest Money is not
refunded to unsuccessful allottees within two
months from the date of draw of ots.
In case of under-subscription and if applications are
received less than 50% of DU/Flat(s) the refund will
be made within six months from the closure of the
scheme or extension thereof without interest;
beyond six months interest @ 5% payable from the
date of closure ofthe scheme or extension, thereof.
14. IMPORTAN
CLARIFICATION —
1) Change of Address : All correspondence will be
made with the applicants/beneficiaries on the
address mentioned at SI No. 13 of the Application
Form, Any change of address should be notified to
the CGEWHO, New Delhi, in the format given at
Annexure-ViofPart'C’
ii) In order to provide prompt and efficient service to
the beneficiaries visiting our office, for deposit of
applications, payment and with scheme enquiries,
it will be entertained in our office on all working
days between 0930 and 1300 Hours
iii) Beneficiaries are advised to ensure that their
ceainl CGEWHO
Registration number and Name is mentioned
correctly, while remitting payments and
corresponiting with thisoffice.
iv) Beneficiaries are requested to send their
payments under a separate covering letter and
notto club their queries like Change of Address, in
the same letter.
Call-up notices for instalments, for all the
schemes, are sent to all the confirmed
beneficiaries and published in our website ie.
www.egewho.in, mentioning therein the last date
of payment. For payments received beyond the
stipulated date, interest towards equalisation
charges becomes chargeable, as per Para 18 of
the "CGEWHO Rules’ Waiver of interest is not
possible and hence beneficiaries are advised NOT
to enter into avoidable correspondence
requesting for waiver of interest towards
equalisation charges.
vi) Beneficiaries forwarding the Tripartite
Agreement for availing HBA/ loan from
HUDCO/HDFC/LICHFL/GICHFL etc. are
requested to forward one extra copy of the
agreement. All copies should be signed by the
beneficiaries and duly witnessed. One copy will be
retained and the remaining copies, duly signed by
the authorised signatory, will be sent back to the
beneficiary.
vii) Interest @ 15% per annum is charged for late
payment of instalment (for exact no. of days).
Interest is also charged to late joiners on all the
instalments called for at the time ofjoining (from
the respective dates of instalments) as stated
above, In case of change from lower category to
higher category, interest on differential amount
ischarged oneach instalment.
1. No interest is paid to member beneficiaries to
whom confirmed allotment has been made.
No interest is paid when a_ beneficiary
withdraws from a scheme. Interest is paid to
waiting list members @ 5% per annum, provided
they are on the waiting list fora minimum period
ofoneyear.
3. Waiting list members will not be entitled to
interest if allotment made to them is not
accepted. However, they will not be charged any
cancellation charges til thirty days from date of
issue ofallotmentlletter.
No interest is paid in case the beneficiaries
change from higher to lower category.
No interest is paid for early payment of
instalment.
No interest is paid if the project is delayed due to
any circumstances whatsoever.
Interest on EMD to non-allottees in the case of
draw is paid only in circumstances explained in
Para (21) of Part B of CGEWHO brochures,
Computation of interest (Debit/Credit) is doneat _
the time ofcalling up of the final instalment.
7. CGEWHO is providing a service to the
beneficiaries within its minimum means and
resources, So the organisation's liability towards
the allotment of DUs shall be limited to refund of
the amount deposited by the beneficiaries, in
case the beneficiary is not satisfied with the
quality of dwelling units being offered to him/er
at the time of handing over possession of the
dwelling unit/as well as for any delay in the
project due to unavoidable circumstances.
No compensation shall be admissible on any
‘account or reason which may be noted by the
applicants while applying for any of the
CGEWHO's Housing Scheme.
viii) Beneficiaries who are promoted from the
waiting list will be charged interest @ 15% per
annum from the respective date of instalments
towards equalization charges. The rate of
interests subject tochange.
@CGEWHO onl
PART B : CGEWHO RULES
i) The Central Government Employees Welfare
Housing Organization is a ‘Society’ established
topromote, control and coordinate the
development of housing schemes at selected
places, all over India, on no profit-no loss and
self financing basis as a welfare measure, The
Society is a registered body under the Societies
Registration Act of 1860.
li) Its aim is to provide welfare housing service of
quality to the Central Governmentemployees,
iii) The rules have been drawn up to give the Central
Government employees, serving and retired, a
perception of the task and an understanding of
the Organisation's commitment to them and
their own obligations in this matter: Such a
brochure cannot be all comprehensive,
Applicants may, therefore, contact the
organisation's Head Office in New Delhi for
clarifications.
‘General Body’ means the list of Members given
under Para 6 of the Memorandum of
Association,
ii) ‘Governing Council’ means the list of members
given under Para 5 of the Memorandum of
Association.
iii)'CGEWHO' means the Central Government
Employees Welfare Housing Organisation.
iv)'Scheme’ means the ‘self-financed housing
project’ announced by the CGEWHO.
v) ‘Dwelling Unit of DU’ means a single
storey/duplex type/flat type of housing unit
constructed in independent group housing or
multistoreyed construction or marked plots.
i)
0
vi) Beneficiary’ means an eligible applicant
whose booking for a dwelling unit has been
confirmed by the CGEWHO.
vii)For the purpose of CGEWHO, a Central
Government Employee is an individual who is
appointed by or on behalf of the President of
India and whose pension both charged and
voted. is debitable to the Consolidated Funds of
India, or is under old/new Pension Scheme
includingthe All India Services officials.
However, employees of ‘State’ and Union
Territory Administration are not included.
Further such Central Govt. employees as are
eligible under similar Orgaisation like
AWHO, AFNHB, IRWOare also NOT included.
3.ELIGIBILTIY
ELIGIBLE CATEGORIES
PRIORITY!
1) Central Government Employees : Serving or
retired Central Govt. employees, who are
covered by the definition as given at Para 2 (vii)
ofPartB ofthis Brochure, will be eligible.
ii) Spouses of the deceased employees : Spouses
ofthe deceased Central Government Employees
or deceased retired employees would be
eligible, if the deceased employee would have
qualified by criteria (i) above.
)) Employees of the CGEWHO, with a minimum of
oneyear of service, will be eligible,
PRIORITY II
i) Serving employees of Central PSUs, State Govts,,
Union Territory Administration, Autonomous
Bodies, Corporations, Nationalised Banks ete.
ii) Serving uniformed employees of the Ministry of
Defence and serving employees of Ministry oful CGEWHO
Railways and covered under Priority-I like Lok
Sabha and Rajya Sabha Secretariate etc.
Note
i) Allotments shall be made in the order of priority,
depending upon the number of applications
received, as mentioned above. However, in case
the number of applications received from Priority
J applicants outnumber the number of dwelling
units proposed to be built, a Draw of lots will be
held at CGEWHO's Head Office, New Delhi.
ti) An eligible Central Government employee can
make only one application for one DU/Flat only.
Where both husband and wife are eligible, only
one can apply.
lif) Before submission of application, applicants must
ensure their eligibility regarding their Central
Govt. employment and other conditions given
under para 4 of Part 'B' of these Rules, In case, an
allotment is still made in contravention of the
CGEWHO Rules due to any oversight, it will be the
responsibility of the applicant to inform this
Organisation, once it comes to his/her
knowledge.
PRIORITY - III
General Public, including retired/spouses of
deceased employees of Priority-II
Note:
Allotments shall be made in the order of priority,
depending upon the number of applications
received, as mentioned above. However, in case the
number of applications received from Priority I
applicants outnumber the number of dwelling
units proposed to be built, a Draw of lots will be
held. The unsuccessful applicants, if any, will be
considered alongwith the Priority Il applicants, in
thesamemanner as for Priority !applicants, soon.
1) Where both husband and wife are eligible, only
one ofthem can apply.
(0)
ii) Employees, serving or retired, owning
residential property, in his/her, or in the name
of his/her spouse in the city/town, where the
CGEWHO is planning a Scheme, will not be
eligible for that Scheme. For this purpose, urban
agglomerates contiguous to the city of the
scheme (e.g. Delhi, Noida, Greater Noida,
Gurgaon, Faridabad) will be considered as one
city / town / location.
iii) Individual will be generally entitled to only one
dwelling unit under CGEWHO Schemes
anywhere in the country. However, when the
scheme is undersubscribed even after three
advertisements and opened for General Public
any individual can apply for the second dwelling
unit if s/he is not owning any house/flat from
CGEWHO in that Municipal Limit of the
city/town. Priority for this second dwelling unit
shall be given in the order of preference in
Eligibility Criteria ie. Priority 1 shall be
considered first.
iv) An employee who has been dismissed from the
service, would cease to be a beneficiary of the
Scheme and will not be eligible to apply.
v) Eligibility and other conditions attached to the
allotment of land by the Municipal and Local
Development Authorities, as applicable to such
Scheme, would prevail.
vi) The terms and conditions, as imposed by the
Land Allotting Agency/Plans Approving
Authority, in respect of cost, FAR, Bye-laws
eligibility etc, shall prevail and be binding on the
beneficiary ofthe CGEWHO.
5. HOUSING CONCEPT
Subject to availability of land, dwelling units and
garages in single units, multiple units, row
housing, multi-storeyed building, group-
housing or marked plots may be planned,
subject to the approval of the local civic
authorities, These plans will be announced as
Scheme,as applicable.6. TYPE OF HOUSES
‘The CGEWHO may build houses or flats of the
following types : One bed-room units - Type
A/L; Two bed-rooms units - Type B/M; Three
bed-rooms units - Type C/N and Four bedroom
units in Type D. These may be built with or
without scooter/car garages/stilts. The design,
the layout and the built-up area in each type may
vary from place to place. More types may be
added with consequent changein Rule 7.
7. OPTION TOAPPLY FORTYPEOFUNIT
The applicant may apply for any one of theabove
types of units linked with the Group of which
he/she belongs,asunder:
a ee
AorL(1BHK) |, B&A ae ae
BorM (BHI) |CB&A | sbove| onwards
CorN(3BHK) |paa — [RS4200 |PB2
Denn) — [A [andabove| awards
Note
1) Change of dwelling unit from one type to another
type, provided otherwise eligible as per this para,
can be entertained subject to payment of
additional Application Fee and Earnest Money, as
applicable, and availability of vacancies in that
articular type ofdwelling unit. However, change
to a lower type of category will not entitle the
applicant for refund of differential Application
Fee but will entitle him for refund/appropriate
adjustment of the differential Earnest Money
paid.
qa)
ccomo if
ii) Change from one scheme to another scheme is not
permitted. For doing so, an applicant should first
withdraw /undertake to withdraw his allotment
{from the existing scheme and apply afresh in the
new scheme, if he so desires (subject to payment
ofcancellation charges, asper rules).
iii) Request for change of DU from one type to
another, within the same scheme, or change from
one scheme to another, after physical possession
of the originally allotted DU has been taken, are
liable to be rejected, Further, incase the changeas
‘mentioned at sub-para (i) & (ii) above have been
agreed to and implemented, it will be construed
that the applicant had joined the revised type of
DU/scheme from the very inception and all the
Payments received/yet to be received will be
treated, accordingly. CGEWHO's decision in this
regard shall be final and the beneficiary will not
have any claim whatsoever.
iv) In case an existing beneficiary of the CGEWHO
under any scheme, wishes to apply for the
announced Housing Scheme, he may do so by
paying the Application Fee only and clearly
stating in the Affidavit' the facts regarding his
earlier registration with the CGEWHO. In the
event of confirmed allotment under any Housing
Scheme, the concerned beneficiary will have to
surrender any one of the two registrations, In
case of surrender of original allotment,
withdrawal charges shall be deducted, if
applicable, as per the rules and remaining
amount will be transferred to his/er retained
registration account of Housing Scheme. Failure
to state the facts in the application may invite
cancellation ofboth the applications/ allotments.fal CGEWHO
Plans and specifications will be drawn up for each
type of dwelling unit to meet the basic needs of the
group and conforming to the bye-laws of the civic
authorities. Different specifications may be
considered for each type of dwelling unit,
After approval of the plans by the local statutory
authorities, the plans of dwelling units and layout
and the major specifications will be published in a
Technical Brochure and circulated/distributed to
all the beneficiaries. These, however, are subject to
change prior to or during execution, at the
discretion of the CEO, CGEWHO. CGEWHO
undertakes construction of the housing projects as,
per approved plans and beneficiaries shall have no
right to claim any changes or challenge the methods
or procedures adopted during the construction.
Major building efforts of the CGEWHO will be
concentrated in areas where there is concentration
of Central Government employees. Other places
may be added depending on availability ofland and
years ata time will be promulgated for the benefit of
all Central Government employees. Revised
Schedule will be announced as and when the Master
Plan is rolled through CGEWHO's newsletter.
1). The CGEWHO will announce the Scheme, giving
location, station, types, covered areas and
approximate cost of each unit for inviting
applications,
(2)
ii) An employee who is eligible to become
beneficiary, may obtain the CGEWHO
Rules/Scheme Brochure along with Application
Form the nominated office/Head Office, on
payment of Rs.100/- in cash or through bank draft
drawn in favour of ‘CEO, CGEWHO payable at New
Delhi.
iii) On receipt of the Application Form and the
‘CGEWHO Rules’, the applicant should fill the
Form and return the same to the CGEWHO by
the specified time, alongwith:
a) Bankdraft, asunder:
Type [Non-Refundable [Refundable] Total
of [Application Fees} EMD |Amount
flat (in Rs.) (inks) | (inks)
aan 500 50,000 | 50,500
asim) 500 50,000 | 50,500
(BH) 1000 1,00,000 |1,01,000
tenn] 1000 1,00,000 |1,01,000
Note:
Rs, 100/- to be added towards cost of (CGEWHO Rules
Brochure' with above amount, in case, applicant is
using downloaded application form.
b) Affidavit as per the format prescribed in the
CGEWHO Application Form.
¢)_ Pay slip or copy of PPO duly attested. No interest
will be payable on Earnest Money deposited
alongwith the application for the first Six months
calculated from the day following the closing date
of scheme, including extension, if any. Thereafter
beyond three months a simple interest @ 5% per
annum will be payable to unsuccessful allottess til
the date of refund. On allotment, the Earnest
Money paid (along with the application) shall bedeemed to be a part of the instalment(s) and the
beneficiary will be treated as if he had made part
payment ofthe first instalment.
13. REGISTRATION OF APPLICATIONS
On scrutiny of the Application Form, the
applicants will be registered for a dwelling unit
inthe Scheme.
15%.75% & 1% of the DUs/Flats¢ ofall hatypad in
all the housing schemes of CGEWHO will be
reserved for SC/ST/Physically Handicapped (who
are appointed in the Central Government on
Physically Handicapped quota as per Govt of India
Rules or become handicapped during
employment with more 75% disability) applicants
respectively, with a stipulation that there will be a
minimum of one DU of each type in the reserved
category and fractions, ifany, will be rounded offto
the nearest full number: The procedure adopted in
suchallotmentsshallbeasunder:
() Im case of more number of applicants
belonging to SC/ST/Physically Handicapped
categories, after first conducting the draw
for the reserved categories alone,
unsuccessful applicants shall be considered
in the draw for general category of
applicants. Those who will succeed in the
general draw will geta confirmed allotment,
and the remaining applicants, if any, shall be
placed on the general waiting list as well as
the one created especially for the reserved
category of applicants. However, in case of
less number of applications than the number
of DUs reserved, the balance DUs (after
giving confirmed allotment to the applicants
belonging to the reserved category) shall
automatically stand de-reserved, and will be
considered in the general draw.
(3)
Gi)
(ii)
wy)
15.CONFIRMATION OF BOOKING
CGEWHO of
‘The applicants desirous of being considered
in the ‘Reserved’ category, will be required to
submit an attested photocopy of the
‘Caste'/'Disability’ Certificate from the
appropriate competent authority.
These ‘Reservations’ for SC/ST will be
applicable to ‘Priority I' applicants only. The
reservation for Physically Handicapped will
beapplicable to all category of applicants.
The spill over and unsubscribed dwelling
units, if any, under SC/ST/Physically
Handicapped quota shall be allotted (after
exhausting of SC/ST/PH waiting list) to
eligible applicants under Priority I belonging
to general category of CGEWHO Rules in
order of seniority established from the date of
receipt of application in CGEWHO. In case of
two applications are received on same date
than allotment shall be made in order of date
of demand draft of EMD, submitted with the
application,
If the registered applicants for a given project
exceed the number of dwelling units, a draw of lots
will be held at the Head Office separately for each
type. Successful applicants will be given
‘confirmation of booking’ by an Allotmentletter.
The cost of dwelling units, with or without garages,
for each Scheme will be worked out by the CGEWHO
and intimated at the time of announcing the
Scheme. The cost will, inter alia, include interest on
investment in land purchased for a scheme,
common amenities, cost of reserve funds, charges
towards registration of land etc. The costs will be
reviewed at different stages of construction and will
be subject to escalation, on account of market
prices, labour wages, Cooperative Society/nfl CGEWHO
Apartments Owners’ Association's charges,
essential alterations, additions etc. All revisions of
cost will be charged to the beneficiaries and they
willbe liable to pay the same.
17.PAYMENT SCHEDULES
Beneficiaries will be required to pay instalments on
the self-financing basis. The payments will be on
call. Please also see para-7 of Part ‘A’ of this
Brochure.
18, LATE PAYMENTS
Beneficiaries who join a Scheme, late or are
promoted from the waiting list, after the initial
enrollment or are late in paying their instalments,
will be charged interest from the respective dates of
instalments towards equalisation charges. The rate
of interest on these payments will be 15% per
annum. This rate of interest is subject to change.
‘The CGEWHO reserves its right to terminate the
registration and cancel the allotment without
giving any further notice, in case of default in
making the scheduled payment beyond 120 days
from the lastdate of payment.
NOTE:
Once an allotment has been cancelled, for any
reason whatsoever, it cannot be revived under any
circumstances. However, in extreme cases, the
Competent Authority may agree to re-activate the
allotment provided the request is accompanied by
requisite outstanding payments.
19. CHANGESIN PAYMENT SCHEDULES
‘The CGEWHO will make every effort to indicate the
prices of the dwelling units as accurately as possible
but the costs may vary. Adjustments in payments
and schedules may become necessary,
commensurate with the progress of construction,
Beneficiaries will be intimated of the changes as
they occur.
ay)
20.MODE OF PAYMENT ~
All payments will be made by Demand Draft / Pay
Order only on any Scheduled Bank payable at New
Delhi, drawn in favour of the CGEWHO A/c
0267101523034 Canara Bank duly endorsed
‘payee A/c only’. Payments in cash or cheque will
notbe accepted.
21. PAYMENT OF INTEREST
i) No interest will be payable by the CGEWHO to
the beneficiaries on any instalment paid after the
confirmation of booking. Beneficiaries, to whom.
confirmed allotment has been made, shall also not’
be entitled to any interest on installments paid, in
the event of cancellation/ withdrawal.
ii) No interest will be payable by the CGEWHO on
the Application Fee, which isnon-refundable.
iii) No interest will be payable on Earnest Money
deposited alongwith the application for the first
four months calculated from the day following the
closing date of scheme, including extension, if any.
Thereafter, beyond two months a simple interest @
5% per annum will be payable to unsuccessful
allottes till the date of refund. On allotment, the
Earnest Money paid (alongwith the application)
shall be deemed to be a part of the instalment(s}ige
and the beneficiary will be treated as ifhe had made
partpayment of the first instalment.
Ifa beneficiary pays the total cost of dwelling unit
within 45 days of the confirmation of booking, a
rebate of 2.5% will be given. However, this or any
other rebate is not applicable for making any
advance payment of the tentative cost of the
dwelling unit. Further, this rebate is available to the
applicants receiving allotment, on announcement
ofthescheme,Applicants joining the scheme, during its operation,
subject to availability and offering to make early
payments will not be entitled to this rebate.
23.LOAN ARRANGEMENTS:
1) Beneficiaries who are still in Central
Government employment may be entitled to House
Building Advance as admissible to Central
Government employees in accordance with the
rules of the Government of India.
ii) The CGEWHO will assist the beneficiary for
taking housing loan from Nationalized Banks,
HUDCO and other financial institutions subject to
execute necessary documents by the beneficiary.
Loan on second mortgage may also be possible,
however, the receipt of loan cannot be guaranteed.
‘The quantum of loan will, inter-alia, depend on the
repaying capacity of the beneficiary.
The allotment of block, floor, specific dwelling unit
will be conducted by a draw of lots at the Head
Office towards the end of the projectand the results
be intimated to each beneficiary. Allotments of a
specific flat/ floor, as a result of the draw, shall be
final and no requests for change shall be
entertained,
RESERVATIONS:
i) Reservation will be made upto 3% of
ground/lowest floor flats in each scheme for
handicapped personnel in the CGEWHO's
Housing Schemes.
ii) Personnel with the following disabilities will be
eligible for such reservations:
a) Orthopaedically handicapped - severe (75%
andabove)
b) Visually handicapped - severe (75% and
above)
(15)
CGEWHO afl
c) Mentalillness- severe (75% and above)
iii) Availability of the above facility is restricted only
totheallottee, his/her spouse and children only.
iv) Percentage of disability would be certified by
the Head ofPeptt. ofa GovernmentHospital.
25. WITHDRAWAL FROM A SCHEME
Ifa beneficiary wishes to withdraw from a scheme,
he should submit a written request to the CGEWHO,
alongwith the following documents.
a) Letter ofallotmentin original (ifissued)
b) Original receipt(s) issued by this office against
the payment(s) madeby the beneficiary
c) Pre-receipt as per proforma placed at
Annexure VII.
Allottees withdrawing from a scheme will not be
refunded their application fee, nor will they be
entitled to any interest payment. No interests paid
to confirmed allottees. Allottees withdrawing after
the date of commencement of construction, will be
required to pay withdrawal charges @ 15% of the
first instalment. Allottees withdrawing after
allotment of specific floor/flats will be required to
pay withdrawal charges @ 20% of the first
instalment, Such refund will be made within 45
days of the receipt of the request for withdrawal
alongwithall required documents.
26. CANCELLATIO! =
Inaddition to the Application Fee, 15% /20% of the
first instalment will be levied as cancellation
charges in case cancellation or withdrawal is sought
after the commencement of construction/
allotment of specific unit respectively. These
charges will also be levied on beneficiaries whose
booking has been cancelled by the CGEWHO for
want of timely payment or any other reason
whatsoever.fa 4 CGEWHO
The beneficiary will be given a notice of two months
to take the allotted unit, provided he/she has
completed all formalities, paid all the dues,
executed all the Deeds (Format at annexure and
Rule 32) and obtained a Clearance Certificate from
the CGEWHO.
28,.DELAYINTAKINGOVER
The allotment of an individual who fails to take
possession of the dwelling unit for three months
after expiry of the notice period (inspite of making
payment of following overhead charges per month
orpartthereof), shall be liable to be cancelled by the
CEO, CGEWHO. Under special circumstances, such
an allottee may approach the Chief Executive
Officer, CGEWHO for an extension of this period
which may be granted by the CEO asa special case
for another maximum period of three months only,
‘Type of dwelling Overhead Charges
unit/flat (in Rs.) /per Month
Aor L (1 BAK) 500
Bor M (2 BHK) 1500
Cor N(3 BHK) 2000
D (4 BAK) 3000
In the event of a beneficiary failing to take physical
possession of the flat within 12 months of issue of
the final call up letter, in spite of having paid the
maintenance charges as above, the possession shall
be given from the CGEWHO's Head Office only, and
not from the site office, on ‘as is-where is’ basis.
Further, in such a case any request for repairs,
defect rectification etc will not be entertained. The
beneficiary, who takes possession late will,
however, be obliged to pay to the concerned
Apartment Owners Association/ Society, the
monthly up-keep & maintenance charges, as
leviedby it weef. the date made applicable by the
a6)
AOA or the date of allotment, whichever is earlier.
-29.HANDINGOVER =
The dwelling units will be offered on ‘as-is-where-
is’ basis after the Contractor and Architect have
certified their completion. However, defects and
deficiencies observed by the beneficiaries at the
time of handing over/taking over, may be recorded
in the documents, These will be examined and
rectified, wherever applicable, in the defectliability
period.
30.MUTUAL EXCHANGE OF
Mutual exchange of type of DUs, during the
currency of the scheme, or specific floor flat, after
the draw has been conducted, may be permitted
within the same scheme, or schemes managed by
the same AQA/ Society subject to the two
beneficiaries giving an undertaking to effect all the
future payments, as called, and not to seek
withdrawal from the scheme. However, in extreme
situations, the Chief Executive Officer, may agree to
accept withdrawal from the scheme, subject to
paymentof double the normal ‘withdrawal charges!
i.e, 30% / 40% of the 1st instalment (para 25 of the
CGEWHO Rulerefers).
Beneficiaries of each Scheme would form a
Cooperative Society/Apartment Ownership
Association under local laws governing such
bodies. Every beneficiary will pay the Membership
Fee for the Society /Association. In addition, a sum
equal to 1.5% of the final cost of the dwelling unit
will be charged from each beneficiary and credited
to the account of his Society/Association, for its
running expenses. The Society/Association, willadminister the colony, look after its maintenance,
attend to common property and provide guidelines
for civic standards. The Society /Association will be
governed by its byelaws.
“PROCEDURE & OBLIGATIONS”
(a) Coinciding with or after issue of the final call up
notice, the CGEWHO will hold a General Body
meeting ofall the beneficiaries to electthe office
bearers of the proposed Apartment Owners’
Association.
(b) Such elected adhoc Committee, of the proposed
Apartment Owners Association, will aim at
formally constituting the Association, including
framing of its by-laws under the local laws
governing such bodies, and register the same
with the appropriate competent authorities.
(On completing the formalities regarding
registration of the Association, the ad-hoc
Committee would be required to convene a
General Body meeting of all the beneficiaries to
elect and constitute a regular Executive
Committee.
(4) The duly elected adhoc Committee will take over
all the common areas/services/facilities of the
project within 6 months of its constitution - a
period during which CGEWHO will maintain the
residential complex and debit the actual
maintenance expenses so incurred to the
Apartment Owners’ Association account.
(e)In case the adhoc/regular Committee fails to
take over the common services/facilities/areas
within a further period of 4 months, the
CGEWHO shall be at liberty to wind up its
operations at site, including demobilising its
man power, leaving the complex in ‘as is-where
is’ condition, at the discretion of the Chief
Executive Officer, CGEWHO. However, during
these 4 months period, though the CGEWHO
shall maintain the complex at the cost of
an
CGEWHO oa
Apartment Owners’ Association, it will charge
an additional amount of Rs. 150/- per
beneficiary per month for the services so
provided which-will be over and above the
actual cost of maintenance and debitthe same to
the Apartment Owners’ Association account,
before handing over the balance ofamounttoiit.
(8 While some amounts will be transferred to the
ad-hoc Committee by the CGEWHO, for meeting
day to day expenses, bulk of the AOA charges
collected will be transferred to the regular
Executive Committee only, on a formal request
bythe President/Secretary, butafter taking over
all the common areas/services/facilities of the
project. However, no interest would be paid by
the CGEWHO to the AOA, on the amounts
collected from the beneficiaries towards AOA
32.
‘An undertaking covering the followi
be given byall the beneficiaries:
ng aspects will
i) Abide by the laws, bye-laws, rules and
regulations of the Central or State Governments, the
Civic bodies, the CGEWHO and the Cooperative
Society/ Apartment Ownership Association.
ii) Shall not sub-divide, extend, amalgamate, or
carry out structural design or layout changes to the
dwelling unit and garages without the prior
permission in writing ofthe Civic Authority.
iii) The dwelling units and garages/stilts would be
used for the sole purpose of living and car/ scooter
parking. Any commercial exploitation of these
would be deemed to be a violation of terms and
conditions.
vi)Facilities like stair-cases, passages, terraces,
parks, lifts etc and common spaces and services,
will be utilized by the beneficiary, along with other
beneficiaries of the Scheme and no one will haveofl CGEWHO
exclusive right to their usage, nor make any
alterations thereto.
At the time of execution of Transfer Deed in favour
of a beneficiary, he/she will have the option to
register the dwelling unit in his/her own name, or
jointly register it with one or tworelations outof the
undermentioned:
a) Wife/Husband
b) Son/sons, daughter/ daughters, including
legally adopted children
c) Parents (in case of unmarried & widows without
children)
4) Brother/Sister (in case of unmarried & widows
without children)
In the event of the death of the beneficiary before
the dwelling unit is taken over, his/her spouse or
dependent children, whoever has been shown as
the nominee in the Application, will be eligible to
continue in the Scheme and to avail of the benefits
under the Scheme. In case of unmarried members,
these privileges will be extended to the dependent
parents only. However, such changes in CGEWHO's
records shall be made subject to the nominee
fulfilling certain criteria and submitting requisite
setof documents.
‘The beneficiaries will not be permitted to dispose
off the dwelling unit by way of Sale/Transfer/
Assignment/ Long Lease/ by execution of Power of
Attorney, under any circumstances, before transfer
ofthe legal title of the dwelling unit by the CGEWHO
in favour of the beneficiary. Any such transfer shall
result in cancellation of allotment of the dwelling
unit, in which case the allottee will pay penalty, as
(as)
prescribed under the heading ‘Cancellation
Charges‘After transfer of the legal title of the
dwellng unit in favour of the beneficiary, he/she
may dispose off his/her dwelling unit, with prior
permission of the concerned 'Kendriya Vihar
Apartment Owners Association/ Society’,as per its
bye-laws.
In extreme situations beyond the control of
CGEWHO, CGEWHO may be obliged to abandon
a Scheme. In such a case, its liability would be to
refund the deposits in full, with interest, in
accordance with the Rules, less handling
charges of 1% and Application Fee.
ii) The CGEWHO is only providing a service. It can
in no way be held responsible for any claims of
damages which may arise due to any reason
whatsoever, including any commission or
omission, by the CGEWHO or its employees.
‘The General Body is empowered to amend, alter or
delete any of the Rules, as well as the Memorandum
of Association,
‘The Chief Executive Officer, CGEWHO has the right
of final acceptance of an application, its
registration, booking and allotment of the dwelling
unitand garages/stilts.
4) All matters of disputes relating to CGEWHO
Rules, which are likely to affect the rights of the
beneficiaries, vis-a-vis, the CGEWHO, may be
referred to the President of the Governing
Council. The President shall appoint Arbitrator
to adjudicate in the matter, whose decision shallbe final and binding on the beneficiary and the
CGEWHO. Request for arbitration of a dispute
will be entertained only if it is made within two
months of the cause of the action and prior to
taking possession of the house. Possession will
not be given till the arbitration proceedings are
complete,
Appointment of an Arbitrator will not be
objected to on the ground that he/she is a
person subordinate to the President, is a
member of the Governing Council or the
Executive Committee, is associated with the
functioning ofthe CGEWHO, orisa beneficiary of
aScheme.
iii) President of the Governing Council shall have
the privilege and authority to appoint a new
successor to the Arbitrator after his demitting
the office of Arbitrator on account of the transfer,
resignation, retirement, death or any such
eventuality, whereby the adjudicating
Arbitrator is incapacitated to adjudicate the
dispute between the parties,
iv) All suits and legal proceedings of any kind
against CGEWHO shall be instituted only in the
appropriate courts in Delhi, notwithstanding
the location of the property, which may be
subject matter of the dispute. All the arbitration
proceedings/hearings shall be held in
Delhionly.
(a9)
Ifitis found, at any time that an applicant has given
false information or suppressed certain material
facts, or has transferred the rights of the dwelling
unitin any manner whatsoever, his/her application
will be rejected, and the registration/booking of
dwelling unit will be cancelled without making any
reference to the applicant. He/ she will also be
debarred from participating in future schemes. In
such cases, allottees will pay penalty as prescribed
underthe heading “Cancellation Charges”.
OTHER SALIENT FEATURES REGARDING LOANS
FROMFINANCIALINSTITUTIONS
i) The period of loan varies from 5 to 20 years.
Repayment will, generally not extend beyond
retirement.
ii) Co-borrowers: Earning members of a family like
wife, son, daughter, father and mother can join
as co- borrowers for increasing the amount of
Joan
iii) The admissibility of loan is dependent on the
repaying capacity of the borrowers and the co-
borrowers opted by the beneficiary.
iv) Loan is generally disbursed only after applicant
has invested his own share in full,il CGEWHO
Annexure-1
BED ROOM
3.00X3,28
DINING
2.48X2.03
DRAWING/LIVING
2.93X3.15,
A-BLOCK
FLOOR PLAN TYPICAL UNITCGEWHO ao
Annexure-II
00M
3.80X4.10
seDROoW |
30¢420
|e ait
a = = ef : ee cu
= E
Dining
280x3.10
ect |
B-BLOCK
FLOOR PLAN TYPICAL UNIT
(ay4d cocme
Annexure-III
BED ROOM
3.80X3.50,
UVING
9.30X3.60
N.BED ROOM
4:30X4,20
DINING
4.30X2.60
ig :
J eg is i = BED ROOM
a ne a =4 GRAN INA
fgg Re ise 3.30X3.10
is =
$.60X4.00
C-BLOCK(TYPE-1 & II)
FLOOR PLAN TYPICAL UNIT
(22)BVING
3:50%290,
ONIN
4,703.20
CRAWING:
3.800420
SERVANTROOM
240%3.30
D-BLOCK
FLOOR PLAN TYPICAL UNIT
(23)
CGEWHO i.
Annexure-IV
| ae ROOM
| S.80x.80
}) BED ROOM
3.304410,& 4 CGEWHO
PART C: CHENNAI (PHASE III) HOUSING SCHEME
PROFORMA FOR PAYMENT DEPOSIT
Annexure-V
(Photocopy may be used :: to be used for payment thr. DD/pay order/cheques of HBA/F')
To, From
The E.O Name of the Scheme:
Central Govt. Employees Registration No. :
Welfare Housing Organisation ‘Address:
6th floor, ‘A’ Wing,
Janpath Bhawan,
Janpath,
New Dethi- 110001
Subject : Deposit of Instalment/Part Payment against Registration No.
Sir,
Enclosed herewith please find the following Demand Draft/Banker's Cheque against___
instalment for the Housing
Scheme. This amount has been drawn from my H.B.A./Housing Loan from HDFC, GICHFL, LICHFL,
Bank/other financial institutions (name)__/Personal Resources.
sL| Demand Draft / Banker's | Date of DD/BC ‘Amount Drawn on,
Cheque No. (in Rs) (BANK's NAME)
al TOTAL
‘Thanking you,
Yours faithfully,
Date (Signature)
(24)cccmo fl
Annexure-VI
PROFORMA FOR CHANGE OF ADDRESS
(Photocopy may be used)
To, From:
The CEO Name of the Scheme
Central Govt. Employees Registration No, :
Welfare Housing Organisation ‘Address:
6th floor, ‘A’ Wing,
Janpath Bhawan,
Janpath, 7
New Delhi - 110001 [>
Subject : Change of correspondence address in CGEWHO's Record :: Registration No.
Sir,
With reference to above, my correspondence address may please be changed to
Old Address : New Changed Address :
po +
Yours faithfully,
Date (Signature)
Thanking you,
(25)CGEWHO
Annexure-VII
PRE-RECEIPT
(Photocopy may be used)
Received a sum of Rs. (Rupees) vide
D.D./Pay Order No___dated. drawn on Canara Bank from Central
Government Employees Welfare Housing Organisation towards full and final payment of amount due to me
oncancellation of my Registration No. for. Housing Scheme.
2. further certify that! have notavailed anyloan or
a) I have been sanctioned HBA of Rs,
which have availed Rs.. or
b) _Thavebeen sanctioned an amount of Rs. By.
‘Name of the Financial Institution) of which Ihave availed Rs.
Sign over Rs. 1/-
Revenue Stamp
Regn.No.:
Name
Address:
Note: Please give full details ofall the loans availed by you. (Signature of applicant)
(This form should be submitted duly filled while a beneficiary withdraws from any scheme including wait listed
applicants)
(26)f
Annexure-VIII
CGEWHO
AFFIDAVIT
(To be use incase of death of any beneficiary)
Lo. widow/son/daughter/brother/sister/ of Late Shri/Smt
aged years residing at...
on oath and state as follows:
(@ That Late Shri / Smt.
sister /brother who expired on..
(i) That Late Shri / Smt...
Central Government Employees Welfare Housing Organisation (CGEWHO) at
vide registration ni
(iii) That my husband/wife/son/daughter/sister/brother died on
behind the following legal heirs:
Name Age
a)
b)
3
(iv) That Late Shri / mt
dated .
do hereby affirm
‘as my husband/wife/son /daughter/
date) at. (place).
was a registrant of a housing schemepromoted by
(Station)
(date) leaving
died interstate/executed registered will
bequesthing his/her interest in the aforesaid registration for a dwelling unit at
(project) . ..(station) in my favour. A
_-has been/ is being furnished to CGEWHO.
alsonominated me/.
photocopy of registered will date
(v) ThatLateShri/smt.
unit) at project.
‘dwelling
(v) That no other heirs have any objection in case the dwelling unit mentioned above is transferred in
favour of,
(vi) That! indemnify harmless CGEWHO in respect of any claim which may be made hereinafter by any of
the legal heirs or any third party in respect of the aforesaid dwelling unit.
(viii) That | am eligible to be registered for being allotted the aforesaid mentioned dwelling unit as per the
rules ofallotment of CGEWHO.
(ix) lownthe following properties:
Particularsof the Station Area Property
a) b) c) d)
DEPONENT
(ote: This affidavit is to be executed on a non-judicial stamp paper of Rs. 10/- or as may be applicable in
the State where this Affidavit is executed. The Affidavit be attested by a First-Class Magistrate or a Notary
Public. To be executed by the nominee to whom the property is to be transferred.)
@7fl coem
Annexure-IX
RELEASE DEED
idow/ son/daughter/brother/sister of Late Shri/Smt.
aged
years residing
do hereby state as follows:
i) ThatLate Shri/sm .wasaregistrant of Central Government
Employees Welfare Housing Organisation (CGEWHO) in respect ofa type dwelling unitat
station) promoted by CGEWHO vide registration no
ii) That Shri /Smt
Late Shri/Smt
lied on.
lied inter of.
iii) That release and relinquish my rightin the aforesaid type.
atproject.
husband.
..dwelling unit,
in favour of my father mother / mother / brother / sister / wife /
further state that I shall have no claim whatsoever in respect ofthe aforesaid flat in case the same is
transferred in favour of
iv) | hereby indeminify CGEWHO harmless in case of any body makes a claim in respect of aforesaid flat
for and on my behalf i respect of my right which I have released a Release Deed in favour
of.
IN WITNESS whereof] have signed this document/deed at
his day of. 2
WITNESS: EXECUTED
1 DEPONENT
2
(Note: This Affidavit is to be executed on a non judicial stamp paper of Rs. 10/- or as may be applicable in the
State where this Affidavit is executed. The Affidavit be attested by a First-Class Magistrate or Notary Public to be
executed by other legal heir(s} except in whose favour the property is to be transferred separately or jointly.
(29)C0 CC EC0C0 CE.,_ QL LL I=
CGEWHO inl
Annexure-X
SPECIAL POWER OF ATTORNEY
. son/daughter/wife of Shri
residentof.. amanallottee
of FlatNo
on.
space No. - and scooter parking space No.
CGEWHO's housing scheme at.
Thereby constitute and appoint Shri/Smt
Shri... as my lawful attorney for performing the following:
i) Totake physical possession of the DU from CGEWHO.
ii) To enter into correspondence and receive documents/receipts from the CGEWHO,
iil) To apply for electricity/water connections.
My attorney's signatures are attested here under:
Signature of Attorney
Signature of Attorney attested by the beneficing
Date :
Place: DEPONENT
(Note: This affidavit isto be executed on a non-judgicial stamp paper of 10/- or as may be applicable in the
Peon mere this affidavit is executed The Affidavit be attested by a first class class Magistrate ora Notary
Public, may used for taking over peaceful physical possession.)
ee)fe 4 CGEWHO
(TO BE EXECUTED ON A NON-JUDICIAL STAMP PAPER)
RTITE.
thdayof_.. 20 between
Annexure-XI
‘This agreement made on this
1. Mr/Mrs $/o(D/o)Shri
R/o (Name and Address)
(Hereinafter learned as 'Borrower' which term shall unless repugnant in the context shall include his/her
heirs, executors, administrator and assigns) of the First Part.
2. Central Govt Employees Welfare Housing Organisation (hereinafter referred to as Organisation) The
Organisation registered in July 1990 under the Society's Registration Act XI of 1860 vide Registration
No.S.21181 dated 17.7.90 having its registered office at CGEWHO Janpath Bhavan, 6th Floor, 'A’ Wing,
Janpath, New Delhi- 110 001 (hereinafter termed as Organisation) which term unless repugnant of the
context shall include its successors, administrators and assigns of the second part.
3 (Name of Banik) a body corporate constituted under the
Bank Act___ represented by one of its branches situated at
(hereinafter termed as Bank) which expression shall unless repugnant to the context shall include its
assigns, administrations and successors of the third part.
4. AND whereas the Borrower has been allotted a house/flat (Regn. No. )
situatedat____to be constructed by the Organisation as per agreement dated
wherein the borrower is required to make payment(s) to the Organisation in lump
sum/instalments as provided under the terms of allotment. WHEREAS the Borrower has under the
provisions framed by the bank for a housing loan for the purpose of purchase of house/flat from
Organisation. The Bank therefore has agreed to sanction a loan ofRs.___——___(Rupees
only) to the Borrower (hereinafter referred to bas
Housing Loan for Purchase of House/Flat) subject to the terms and conditions, the Borrower is also
required to furnish to the Bank interalia other securities, the mortgage of the above said house/flat and
the Organisation has agreed to render all assistance to Borrower/Bank to comply with this condition and
in particular agreed to obtain permission to mortgage from the lessor and or such other
person/authorities as may be required.
5. AND WHEREAS the Borrower and the Bank has entered/agreed to enter into the loan Agreement
incorporating therein the terms and conditions regarding Housing Loan for purchase of House/Flat.
6. AND WHEREAS the Borrower has represented that the would not be able to mortgage the above said
house/flat until such time the full payment is made towards its cost and the said house/flat has been
conveyed to the Borrower by the Organisation towards consideration of the said loan sanctioned to the
Borrower.
(30)CGEWHO inf
AND WHEREAS the Borrower has requested the Bank to disburse the said loan to the Borrower
notwithstanding the borrowers inability to create mortgage at this stage on the strength of this agreement.
It is hereby agreed to and by between the parties hereto on the terms and conditions set forth hereinbelow.
1. That the Borrower hereby authorise the Bank to made disbursement(s) of the sanctioned loan to the
Organisation directly on behalf of borrower and any such payment made to the CGEWHO shall be deemed
to be the payment(s) made to borrower shall in each case the liable for the payments of loan disbursed on
his behalf to the Organisation as though the same has been disbursed directly to borrower. If there is any
delay in payments to the Organisation, it will be treated as default on the part of borrower and the
borrower shall be liable to pay the Organisation the penalty/interest on such delayed payment, if any,
according to the terms of allotment and policy of the Organis:
2.That the Organisation shall maintain a separate account of the borrower and adjust the payment
received by it from the Bank towards the cost of above said house/flat allotted in favour of the Borrower,
3. That the Organisation hereby consents that the Bank shall have a lien on the house/flat and Borrower
may furnish the house/flat as security for the housing loan to be obtained from the Bank and also to
create mortgage in favour of the Bank in respect of the said house/flat.
4. That the Borrower undertakes that on execution of the sale deed/lease deed after delivery of
possession, The Borrower shall deposit the said deed directly to the Bank.
5. That the house/flat shall form part of the security for the housing loan sanctioned by the bank and as.
soon as the sale deed/lease deed as executed by the Organisation, the borrower shall create mortgage in
favour of the Bank, as security for the housing loan for the purchase of house/flat in the form and manner
as desired by the Bank.
6. That if for any reason there is an increase/escalation in the cost of dwelling unit by Organisation, the same
shall be paid and borne by the borrower as the case may be as per the agreement between them without any
reference to the bank and until such payment(s) is/are made, the bank shall have right to suspend further
disbursement of the sanctioned loan remaining loan instalments in favour of the Borrower.
7. That during the currency of the loan Organisation shall not transfer the house/flat to any other person
without the previous written consent of the Bank,
8.That in the even of the cancellation of allotment of the Borrower by the Authority, for reason
whatsoever, the Organisation shall refund to the Bank forthwith, the entire amount received from it as
per CGEWHO Rules.
9. That the Organisation shall not issue duplicate allotment letter and possession letter tdhe borrower
without obtaining the prior written consent of the Bank.
10, That is the event of default by the borrower, the Bank may at its discretion enforce the security by sale to a
.. Contd..
G1)af CGEWHO
person in consultation with the Organisation and Organisation shall accept the purchase of house/flat in
place of borrower who shall be eligible to acquire the flat/dwelling unit as per rules of the Organisation,
after the purchaser's complying with the necessary requirements of the Organisation in this respect.
IN WITNESS WHEREOF THE parties hereto have signed this Agreement on the day, month and Year
above first written.
Regn. No.
Address of the Borrower
(Signature of the Borrower)
WITHNESSES
(Signature with full names & addresses)
Signature on behalf of the Organisation
WITNESSES
(Signature with full names & addresses)
Signature on behalf of the Bank
WITNESSES
(Signature with full names & addresses)
G2CGEWHO ool
Annexure-I
NAME
REGISTRATION NO.
DESIGNATION
PRESENT OFFICE ADDRESS
MOBILE NO.
Chief Executive Officer,
Central Government Emplyees
Welfare Housing Organisation,
Janpath Bhavan, 6th Floor, ‘A’ Wing.,
Janpath, New Delhi-110001
Sub: coimati
Dear Sir,
1 understand that the cost as intimated by CGEWHO is tentative and final cost will be worked out after
settlement of the final bills of contractors. | undertake to pay or receive the difference, if any, on
completion of the final costing by CGEWHO.
Talso inform you that I have raised the following loans to finance the said dwelling unit :
House Building Advance (from Central Govt) Amount Loan A/c No.
Loan from HD FC
Loan from LIC Housing Finance
Loan from GIC Housing Finance
Loan from Banks (name of the Bank)
Loan from other institutions
(State the name of the institution) ——
I request that the original title deeds of the property may please be sent to
(Head of the financial institution) at the following address under intimation to me:
Thanking you, Yours faithfully,
Name
Correspondence Address
(To be signed and submitted before taking over physical possession of DU.)
(33)ol CGEWHO
Annexure-II
APPLICATION FOR MEMBERSHIP
(T0 BE SUBMITTED IN DUPLICATE)
NAME
REGN. NO.
ADDRESS
To
The Secretary,
Kendriya Vihar Apartment
Ownership Association,
Sub : Application for Membership and Declaration,
Sir,
1 wife / son / daughter of
+ wish to become a member of your Apartment
Ownership Association. My particulars are as undel
a) Myageis years.
b) Ihave been allotted type ""Flat No. on floor in Block No. and parking
no & in Kendriya Vihar, vide Registration No. and possession in likely to be
given soon/has been given on
©) Neither I nor my spouse nor my dependent children have any other residential flat within the
complex covered by your Association,
d) I shallabide by the current bye laws of the Association and any alterations(s)/amendment(s) or
revision(s) that may be made during my membership. | further declare that I shall abide by the
rules framed in accordance with the bye-laws.
e) I shall not sell/transfer/mortage or dispose off the flat in any manner without the prior
permission of the CGEWHO and Association, nor shall | use it for any commercial purpose.
Signature of the Applicant
(To be signed and submitted before taking over physical possession of unit)
G4)CGEWHO aol
Annexure-IIT
ACCEPTANCE AND UNDERTAKING
(TO BE EXECUTED ON A NON JUDICIAL STAMP PAPER OF RS.50/- DULY ATTESTED BY NOTARY PUBLIC
OR FIRST CLASS MAGISTRATE : To be submitted before taking over peaceful possession of Unit)
WHEREAS,[__ sn wife daughter of
resident of
as a result of an application made to
the Central Government Employees Welfare Housing Organisation (CGEWHO), have been allotted a type "
", Flat No,___ in Block No. on Floor and Stilt No. situated in "KENDRIYA
VIHAR" (hereinafter called the flat/dwelling unit).
2. hereby convey my acceptance to the allotment of flat/parking space as per terms and conditions
of allotment and I further undertake as follows :
(a) I fully accept, agree and shall abide by all the Rules and Regulations, and the terms and conditions
that are set forth in the ‘CGEWHO Rules’ brochure, as amended from time to time, and the terms
and conditions given inthe CGEWHO allotment letter on the subject.
(’) Iwill abide by all the terms and conditions and laid down in the allotment letter issued by the
CGEWHO.
(Q_Lundertake to declare that as per the CGEWHO Allotment Rules there is no change in status of my
property since my registration under "Kendriya Vihar‘, promoted by the CGEWHO, in
so far as I/my spouse do not own any residential plot or house at ‘
(4) I will not make any additions and /or alterations in the flat, without prior permission in writing
from the CGEWHO and the local municipal/civic authority. | will not amalgamate the flat with any
other dwelling unit and will not subdivide it.
fe) | will not use the flat for any purpose other than residential. | will not allow any commercial activity in
the flat.() | will utilise and maintain, alongwith other allottees, the staircasse, passage, terrace, roads
and other common areas/conveniences/facilities and { understand fully that | have no exclusive right
to their use. I will use these without causing any inconvenience to other allottees and users.
(g) | will become member of the "Apartment Owners Association : formed by all the allottees for
managing, administering and maintaining the complex and shall abide by all the bye laws of the
Association.
(a) 1 will pay my share of subscription towards maintenance and upkeep of the flat, staircase and the
surrounding common areas and water and sewerage treatment plants, as determined from time to
time by the concerned Association.
(1 am aware that portions of the land not allotted to me in the residential scheme have either been
allotted to someone else or kept reserved for common use and services, which shall be managed by the
registered Apartment Ownership Association, of which I will be a constituent part. I shall in no
(G5)