Rdso LHB Modifications - BSB - 21.08.2023

This document provides a status update on modifications and instructions for zonal railways in the BSB Division as of August 21, 2023. It lists 6 modifications including modifications to air springs, hose pipes, dirt collectors, installation levers, CBC headlocks, and wheel shelling. For each modification, it provides the number of coaches that have been modified up to the previous month, those modified in the current month, the cumulative total, and the target remaining. It also includes the month-wise action plan to complete the remaining targets for each modification by their given deadlines.

Uploaded by

cnwcontrol bsb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

Rdso LHB Modifications - BSB - 21.08.2023

This document provides a status update on modifications and instructions for zonal railways in the BSB Division as of August 21, 2023. It lists 6 modifications including modifications to air springs, hose pipes, dirt collectors, installation levers, CBC headlocks, and wheel shelling. For each modification, it provides the number of coaches that have been modified up to the previous month, those modified in the current month, the cumulative total, and the target remaining. It also includes the month-wise action plan to complete the remaining targets for each modification by their given deadlines.

Uploaded by

cnwcontrol bsb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Status Sheet for Modifica ons/Instruc ons for Zonal Railways - BSB Division (Posi on of August upto 21.08.

2023)
(a) List of Modifica ons
No. of
No. of No. of
coaches Cumula ve Month wise ac on plan to achieve
coaches coaches Target for
S. modified No. of target (Details of tender finalized,
Modifica on Ref. Le er Depot where this modified this balance
No. upto previous coaches order placed etc should be
modifica on month coaches
month modified indicated)
is to be done (07/23)
(07/23)
Air Spring
RDSO Le er No. BSBS 186 97 3 100 86
FIBA modifica on as per RCF CAI No.
SV.AS.FIBA dated CPR 141 110 0 110 31
CAI/RCF/MECH/LHB/O24 Rev.O1 &
1 17.03.2021, It is being done by GKPS
CAI/RCF/MECH/LH8/034 Rev.00 & MAU 30 18 1 19 11
04.02.2022 & &
ICF CAI No B-2021/02 Rev-01.
16.08.2022. Total 357 225 4 229 128 Tender is available in BSB Division
BSBS 186 34 0 34 152 for 225 coaches. Work through this
SAE 100 R3 type hose pipes in place RDSO Le er No. tender is also in progress.
CPR 141 141 0 141 0
2 of SAE 100 Rl AT (less flexible) to be SV.AS.FIBA dated TDC - 31.10.2023
used. 16.08.2022. MAU 30 18 1 19 11
Total 357 193 1 194 163

BSBS 186 4 0 4 182


It is being done by GKPS
Provision of addi onal dirt collector &
RCF/KXH le er no. CPR 141 0 0 0 141
in BP pipe line before FIBA device in Revised es mate of tender for the
3 MD46131 Dated
all LHB coaches as per RCF CAI No. fitment of addi onal dirt collector in
04.10.2022 MAU 30 1 0 1 29
CAI/RCF/MECH/LHB/040 Rev-00. BSB division is under ve ng.
TDC - 31.10.2023
Total 357 5 0 5 352

RDSO le er No. BSBS 186 186 0 186 0


Modifica on of installa on lever SV.AS.FIBA CPR 141 141 0 141 0
4 All completed
assembly. Dated. 20.02.2023 MAU 30 30 0 30 0
or latest Total 357 357 0 357 0
CBC
BSBS 78 78 0 78 0
RDSO Le er No. CPR 95 95 0 95 0
Modifica on in AAR-H type head
5 MC/BLB/CBC All completed
ght lock CBC Escorts make MAU 21 21 0 21 0
dated 07.07.2021
Total 194 194 0 194 0

1
Wheel Shelling
Consolidated instruc ons regarding modifica ons for
6 addressing the problem of Wheel Shelling in LHB RDSO le er no. MC/LHB/Brake dated 15.04.2019
Coaches
KBIL- Replace exis ng BSBS 287 287 0 287 0
5mm choke with 9 mm CPR 170 170 0 170 0
Choke size of Dump valves of WSP
A choke FTIL- Replace All completed
system in LHB coaches exis ng 6mm choke MAU 56 56 0 56 0
with 9mm choke Total 513 513 0 513 0
BSBS 287 287 0 287 0
RDSO le er no. CPR 170 170 0 170 0
Modifica on in Air brake pipe line &
B MC/LHB/Brake All completed
associated fi ngs in LHB coaches. MAU 56 56 0 56 0
dated 24.06.2019
Total 513 513 0 513 0
IP67 grade junc on boxes as per RDSO Drawing
(CG-19005) alt 1 The Number of junc on boxes
BSBS 287 209 0 209 78
reduced to four from six, to therefore only one

Revised wiring scheme for WSP junc on box has all the connec ons (i.e Dump
CPR 170 137 0 137 33 It is being done by GKPS
C valve, speed sensors, power panel) Mil- Grade
type connectors Revised wiring layout for WSP
System of LHB Coaches system to be as per RDSO drawing no
(CG-18246 alt 0) the above layouts and
MAU 56 32 0 32 24 TDC - 31.10.2023
drawings are standardized across all types of
LHB Coaches.
Total 513 378 0 378 135
BSBS 287 287 0 287 0
Ensuring integrity of electrical RDSO le er no. CPR 170 170 0 170 0
D connec on of WSP system and free MC/LHB/Brake All completed
movement of callipers dated 27.09.2018 MAU 56 56 0 56 0
Total 513 513 0 513 0
BSBS 287 244 0 244 43
RDSO le er no. CPR 170 140 0 140 30
Self-lubrica ng Bushes for Brake To be done by GKPS
E MC/LHB/Brake
Calipers/Actuators MAU 56 35 0 35 21 TDC - 31.10.2023
dated 06.09.2018
Total 513 419 0 419 94
BSBS 287 287 0 287 0
RDSO le er no. CPR 170 170 0 170 0
F Brake Cylinder Pressure MC/LHB/Brake All completed
dated 20.04.2018 MAU 56 56 0 56 0
Total 513 513 0 513 0
Provision of Dog box
RB Le er No. BSBS 18 18 0 18 0
2007/M(C)/137/1 CPR 9 9 0 9 0
7 Provision of dog box in LWLRRM All completed
6 Power car-1, MAU 3 3 0 3 0
dated 25.01.2023.
Total 30 30 0 30 0

2
Fire Safety
RDSO le er no. BSBS 122 38 24 62 60 Work is being done on quota on at
Provision of Aspira on type smoke CPR 88 82 0 82 6
MC/ACF/Fire BSBS for 38 coaches. Rest is being
8 detectors in lavatory area in AC
Detec on/AC dtd MAU 26 9 0 9 17 done by GKPS.
Coaches.
22.07.2021 TDC - 30.09.2023
Total 236 129 24 153 83
02 Power Car remaining for fitment
& 06 Power Car is manual system.
BSBS 18 16 0 16 2
Both to be done by GKPS
TDC - 30.09.2023
03 Power Car is manual system
Provision of Fire detec on and CPR 9 9 0 9 0 which is to be done by GKPS
9
suppression system in Power Cars TDC - 30.09.2023
RDSO le er no.
MC/ACF/Fire 01 Power Car is manual system
Suppression/PC dtd MAU 3 3 0 3 0 which is to be done by GKPS
08.02.2023 TDC - 30.09.2023
Total 30 28 0 28 2 -
BSBS 0 0 0 0 0
Provision of Fire detec on and CPR 0 0 0 0 0 Pantry Car is not available in BSB
10
suppression system in Pantry Cars MAU 0 0 0 0 0 Division.
Total 0 0 0 0 0
RDSO spec No. BSBS 163 128 6 134 29
Provision of fire & smoke detec on RDSO/2008/CG-04( CPR 96 84 4 88 8 To be done by GKPS
11
system in AC Coaches Rev. 05) Dated Aug MAU 26 20 0 20 6 TDC - 31.08.2023
2019 or latest.
Total 285 232 10 242 43

Digitally signed by
OJAS OJAS SRIVASTAVA
SRIVASTAVA Date: 2023.08.22
17:37:36 +05'30'
ADME/C&W/BSB