The document provides a quality control checklist for plastering with descriptions of checks to perform before, during, and after plastering. It includes checks for substrate preparation, mortar mixing and application, and final finishes. The checklist contains over 10 items to check in each category.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
164 views
Plastering Work Checklist
The document provides a quality control checklist for plastering with descriptions of checks to perform before, during, and after plastering. It includes checks for substrate preparation, mortar mixing and application, and final finishes. The checklist contains over 10 items to check in each category.
A PRE-PLASTERING PREPARATION 1 Is Setting out done as per base reference line/drawing? Y N NA 2 Do Sufficient level pegs provided and wall alignment is acceptable? Y N NA 3 Do All first fixed joinery items are fixed accordingly? Y N NA 4 Do All concealed MEP services are complete and ready. (MEP Engineer Y N NA confirmed to proceed)? 5 Is Protection/Safety provided to installed components/ finishes? Y N NA 6 Is Wire mesh provided between RC structure and brickwork? Y N NA 7 Is Mortar spread on the walls yet to be plastered is cleaned? Y N NA 8 Does Architectural items such as corner beads, U-grooves, copings and Y N NA sides of jamb are completed prior to plastering work? 9 Do All finished works are well protected prior to plastering work? Y N NA 10 Check wall's moisture content, is it acceptable? Ensure wetting of substrate Y N NA before plastering. B CEMENT MORTAR MIXING & DURING PLASTERING 1 Is Corrected and clean sand material is used with plastering cement Y N NA mortar mix ratio as per specification? 2 Does Adequate lighting provided at work area? Y N NA 3 Does Verticality and minimum thickness for plastering is maintained? Y N NA 4 Is cement slurry or lime finish is done after all minor unevenness is covered Y N NA by rough finish in thin layers? (Where applicable) 5 Is Plastering is started from the top and gradually worked downwards to the Y N NA floor? 6 Is the Mortar is consumed within the initial setting time for cement of Y N NA not more than 30 minutes? 7 Do Plaster is roughened with stick broom/brush for area where second layer Y N NA of plaster is specified 8 Does Edges/corners of all doors/windows opening are completed along with Y N NA plastering? 9 Are the Grooves provided as per drawings otherwise at the junction of Y N NA two different materials with prior approval from OIC? (If applicable) 10 For joint to be left out, it is straightly chopped with chamfered edges? Y N NA 11 Does the Curing started 12 hours after plastering? Y N NA C FINAL PLASTERING FINISHES 1 Are there Visually acceptable smooth surface with no scratches? Y N NA 2 Check the evenness, line, plumb etc., using straight edge with Y N NA respect to button marks. Are they Inline? 3 Do All button marks are carefully removed and properly finished after all Y N NA checking? 4 Is there any surface damage or cracks and does surface is free Y N NA from major defects?
Name of Site Supervisor (SS): Name of officer in-charge (OIC):