This document provides a method statement and risk assessment for testing, pre-commissioning, and commissioning of pitch lighting at King Abdullah Sports City. It includes responsibilities of those involved, required instruments and tools, procedures to be followed, and attachments such as checklists and test reports. Abbreviations used are defined. The lighting system will be controlled independently for each pitch and allow selection of event scenes from match mode on the monitor.

Uploaded by

Avdija Hamzić
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
261 views193 pages

Kasc - Pitch Floodlights Stadium by All Details

This document provides a method statement and risk assessment for testing, pre-commissioning, and commissioning of pitch lighting at King Abdullah Sports City. It includes responsibilities of those involved, required instruments and tools, procedures to be followed, and attachments such as checklists and test reports. Abbreviations used are defined. The lighting system will be controlled independently for each pitch and allow selection of event scenes from match mode on the monitor.

Uploaded by

Avdija Hamzić
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 193

Ref No.

KASC-MS-TC-EL-THO-MST-XX-505041
TESTING, PRE-COMMISSIONING AND Rev. No. A
COMMISSIONING RISK ASSESSMENT Date 18.02.2014
METHOD STATEMENT OF
PITCH LIGHTING Page
Page 1 of 192
No:

This form is to be completed and attached to every risk assessment, method statement,
COSHH assessment and any other document requiring evidence that it has been read and
understood by Thermo employees, its subcontractors or agents

Contract name King Abdullah Sports City Project Contract no. 6600027562 (OOK)

Document type Method Statement

Document title Testing, Pre-commissioning Risk Assessment Method Statement of Pitch Lighting

Document ref. KASC-MS-TC-EL-THO-MST-XX-505041 Revision B Date 18.02.2014

The above referenced document shall be read and understood by all persons that are involved with
the works, procedures or policies. These persons shall enter their name, signature, date and employer
below as a record that they have read the document and agree with what is expected of them and will
abide by any conditions stipulated.

Any person who disagrees with any part of the document shall bring this to the attention of their
supervisor / manage

Print name Signature Date Employer

In the event anything changes in the Risk Assessment and Method Statement this should be
immediately brought to the attention of the Site Supervisor.
Contract No:66000275562(OOK)

King Abdullah Sports City (KASC) Ref. No:KASC-XX-TC-EL-THO-MST-XX-505041


Rev. No.: B

Testing, Pre-Commissioning and Commissioning Risk Assessment Date : 16-02-2014


and Method Statement of Pitch Lighting Page: 2 of 191

Table of Contents
Sl. No. Description A NA TBA
1 System Introduction Brief √
2 Pre-requisites Of The Commissioning Works √
3 Abbreviations √
4 Standards & Codes Reference √
5 Specific Performance Criteria’s Validation √
6 Reference Drawings Schedule √
7 Commissioning Responsibilities √
7.1 ARAMCO Engineers √
7.2 MSX Commissioning Manager √
7.3 Commissioning Manager/CxM √
7.4 Commissioning Engineer/CE √
7.5 Specialist Sub-Contractor Team √
7.6 Health & Safety Team √
8 Commissioning Instruments & Tools Required √
9 Commissioning Procedures √
9.1 Pre-Commissioning Inspection √
9.2 Pre-Commissioning Checklist √
9.3 Testing and Commissioning √
10 Attachments:
10.1 Pre-Commissioning Checklist √
10.2 Commissioning Checklist √
10.3 Commissioning Test Sheet Reports √
10.4 Pitch Lighting Schedule √
10.5 Catalogue √
10.6 Calculation Sheet for Aiming Point √
11 Risk Assessment Sheets √

Legend: A = Applicable NA = Not Applicable TBA = To Be Arranged

Main Contractor OR

AL MUHAIDIB SIX CONSTRUCT-MSX


MEP Contractor
THERMO SAUDI
Contract No:66000275562(OOK)

King Abdullah Sports City (KASC) Ref. No:KASC-XX-TC-EL-THO-MST-XX-505041


Rev. No.: B

Testing, Pre-Commissioning and Commissioning Risk Assessment Date : 16-02-2014


and Method Statement of Pitch Lighting Page: 3 of 191

1. System Description Brief

King Abdullah Sports City was provided by Pitch Floodlighting control. The pitch floodlights are controlled
independently. The operator will be able to select an event scene from the modes of lighting presented on the
monitor screen i.e. match mode. The graphical display on the monitor(s) will show Stadium outline at all levels
together with all Stadium pitch and stand lighting unit status. Failure of the Pitch Lighting communications bus will
switch all lighting units controlled by that part of the system ON. Within the lighting control panel for the Pitch /
Stand lighting a manual override for all Pitch and Stand lighting circuits will be provided.

2. Pre-requisites Of The Commissioning Works

• Completion of installation including termination of all cabling


• Operational permit to work system
• All the instruments used for the commissioning shall have a valid Calibration Test Certificates and
must be made available.
• All commissioning results shall be prepared, obtained and maintained by the commissioning engineer
as given in this procedure.
3. Abbreviations

AP : Aiming Point
BMS : Building Management System
C : Class (V, IV,III, II)
CE : Commissioning Engineer
CxM : Commissioning Manager
ES : Event Scene
DALI : Digital Addressable Lighting Interface
DB : Distribution Board
DDC : Direct Digital Control
HSE : Health, Safety and Environment
LCP : Lighting Control Panel
LCS : Lighting Control System
LV : Low Voltage
ML : Mode of Lighting
Main Contractor OR

AL MUHAIDIB SIX CONSTRUCT-MSX


MEP Contractor
THERMO SAUDI
Contract No:66000275562(OOK)

King Abdullah Sports City (KASC) Ref. No:KASC-XX-TC-EL-THO-MST-XX-505041


Rev. No.: B

Testing, Pre-Commissioning and Commissioning Risk Assessment Date : 16-02-2014


and Method Statement of Pitch Lighting Page: 4 of 191

MSX : Al Muhaidib Six Construct


PC : Personal Computer
PPE : Personal Protective Equipment
SL : Switching Level
V : Volt
W : Watts

4. Standard & Code Reference

Sl. No. System Standard & Code


AC-Supplied Electronic Ballast for Tubular Fluorescent Lamps
1 IEC 60929
Performance Requirements
Requirements for Electrical Installation, IEE Wiring Regulation,
2 BS 7671
Latest Edition

5. Specific Performance Criteria’s Validation

Functional Test:

Lamp Operation
Switching Mode Time Scheduled
Burning Time for Each Graphic Display
ON/OFF Operations
Pitch Floodlight

6. Reference Drawings Schedule


Sl.
Drawings No. Drawings Title
No.
Electrical Services Main Stadium Lighting and
1 KASC-MO-ME-EL-THO-DWG-10-630269-F
Emergency Lighting Layout Top Roof Sheet 1
Electrical Services Main Stadium Lighting and
2 KASC-MO-ME-EL-THO-DWG-10-630269-F
Emergency Lighting Layout Top Roof Sheet 2
Electrical Services Main Stadium Lighting and
3 KASC-MO-ME-EL-THO-DWG-10-630269-F
Emergency Lighting Layout Top Roof Sheet 3
Electrical Services Main Stadium Lighting and
4 KASC-MO-ME-EL-THO-DWG-10-630269-F
Emergency Lighting Layout Top Roof Sheet 4
Electrical Services Main Stadium Lighting and
5 KASC-MO-ME-EL-THO-DWG-10-630269-F
Emergency Lighting Layout Top Roof Sheet 6

Main Contractor OR

AL MUHAIDIB SIX CONSTRUCT-MSX


MEP Contractor
THERMO SAUDI
Contract No:66000275562(OOK)

King Abdullah Sports City (KASC) Ref. No:KASC-XX-TC-EL-THO-MST-XX-505041


Rev. No.: B

Testing, Pre-Commissioning and Commissioning Risk Assessment Date : 16-02-2014


and Method Statement of Pitch Lighting Page: 5 of 191

Electrical Services Main Stadium Lighting and


6 KASC-MO-ME-EL-THO-DWG-10-630269-F
Emergency Lighting Layout Top Roof Sheet 7
Electrical Services Main Stadium Lighting and
7 KASC-MO-ME-EL-THO-DWG-10-630269-F
Emergency Lighting Layout Top Roof Sheet 9
Electrical Services Main Stadium Lighting and
8 KASC-MO-ME-EL-THO-DWG-10-630269-F Emergency Lighting Layout Top Roof
Sheet 10
Electrical Services Main Stadium Lighting and
9 KASC-MO-ME-EL-THO-DWG-10-630269-F Emergency Lighting Layout Top Roof
Sheet 11
Electrical Services Main Stadium Lighting and
10 KASC-MO-ME-EL-THO-DWG-10-630269-F Emergency Lighting Layout Top Roof
Sheet 12

7. Responsibilities

7.1 Saudi ARAMCO Engineer


• Witnessing of the Pre-Commissioning and Commissioning activities.
• Approval of the Testing and Commissioning Method statement.
• Approved Testing and Commissioning Report.
7.2 MSX Commissioning Manager.
• Witnessing of the Commissioning activities.
• Approval of the Testing and Commissioning Method statement.
• Approved Testing and Commissioning Report.
7.3 Commissioning Manager / CxM
• CxM shall be responsible for entire Pre-commissioning and Commissioning of the Pitch Lighting. All
necessary manpower, apparatus and instruments which are required for Pre-commissioning and
commissioning activities shall be supplied by Commissioning engineer.
• CxM leads, plans, schedules and coordinates the Commissioning engineer to implement the
commissioning procedure to Pitch Lighting.
7.4 Commissioning Engineer.
• All Pre-Commissioning and Commissioning activities of Pitch Lighting are the responsibility of
Commissioning engineer.

Main Contractor OR

AL MUHAIDIB SIX CONSTRUCT-MSX


MEP Contractor
THERMO SAUDI
Contract No:66000275562(OOK)

King Abdullah Sports City (KASC) Ref. No:KASC-XX-TC-EL-THO-MST-XX-505041


Rev. No.: B

Testing, Pre-Commissioning and Commissioning Risk Assessment Date : 16-02-2014


and Method Statement of Pitch Lighting Page: 6 of 191

• Commissioning Engineer shall check the Commissioning works prior to submission for inspection
and approval.
• In case of failure in any test, the Commissioning engineer will rectify, and Commissioning Engineer
to re-offer the test for re-inspection and approval.
• All Original Test reports witnessed and approved will be retained by the Commissioning Engineer a
copy of the final testing & Commissioning Report for Pitch Lighting will be forwarded to the MSX.
• Notification of any witnessing of Pre-commissioning & Commissioning activities shall be forwarded
to all personnel prior to commencement of activity.
7.5 Specialist Sub-Contractor
• M/s OSRAM Middle East FZE. is the main supplier of Pitch Lighting. Thermo Commissioning shall
perform all testing and commissioning of Pitch Lighting under direct supervision of Thermo
Electrical Commissioning Engineer, complying with the procedure specified in the specification as a
requirement and in line with manufacturer’s recommendations and instruction.

7.6 Health & Safety Team


• All the safety requirements as per HSE Team rules shall be strictly followed by every individuals in
order to have a safe working environment and avoid hazards.

• Safety permits to be prepared in advance and obtained approval as per the site safety
requirements.

• Isolation of the area, and warning signs display if necessary, to be carried out for any testing and
energizing. Ensure all concerned personnel shall use PPE and all other safety items as required.

8. Commissioning Instruments & Tools Required


• Portable hand tools
• Tape Measurement
• Grid Markers
• Lux Level Meter
• Mobile Laptop
• Multi-meter
9. Commissioning Procedure
9.1 Pre Commissioning Inspection
9.1.1 Check list for readiness of the buildings

Main Contractor OR

AL MUHAIDIB SIX CONSTRUCT-MSX


MEP Contractor
THERMO SAUDI
Contract No:66000275562(OOK)

King Abdullah Sports City (KASC) Ref. No:KASC-XX-TC-EL-THO-MST-XX-505041


Rev. No.: B

Testing, Pre-Commissioning and Commissioning Risk Assessment Date : 16-02-2014


and Method Statement of Pitch Lighting Page: 7 of 191

a) Check whether system is installed as per approved drawing and design. Pre-commissioning
checks shall be carried out before the initial start-up.

9.1.2 Sub contractor shall perform all testing and commissioning of all Pitch Lighting. Equipment
complying with the procedure specified in the specification as a requirement and in line with
manufacturer recommendations and instructions.
9.1.3 Check and ensure the following items prior to pre-commissioning and commissioning.

b) Availability of access to all equipments and components required to testing and commissioning
and servicing.

c) Check the installation that should conform to the design drawings and specifications

d) The areas are free from dust and construction debris.

e) Check instruments, which are going to used for testing are calibrated and certified by the
laboratory.

9.2 Pre-Commissioning Checklist


a) Ensure that the Pitch Floodlights devices such as lamps, terminal box floodlight, switches are
installed in the proper location as per approved shop drawing.

b) Ensure that the Pitch floodlighting Control devices and panels installation are complete and the
electrical system readiness Form.

c) Ensure the Pitch floodlighting Control, interface modules and the panels are properly tagged
and identified.

d) Ensure that the wiring terminations to the Pitch Floodlighting control panels (LCP) are
completed in line with the latest updated schedule incorporating all changes.

e) Ensure that installation of light fittings fed from lighting control panels / modules are complete
including termination.

f) Ensure that the cable installation and termination is complete in all the LCP.

g) Ensure that ballast is installed in the light fixtures wherever controls are required.

Main Contractor OR

AL MUHAIDIB SIX CONSTRUCT-MSX


MEP Contractor
THERMO SAUDI
Contract No:66000275562(OOK)

King Abdullah Sports City (KASC) Ref. No:KASC-XX-TC-EL-THO-MST-XX-505041


Rev. No.: B

Testing, Pre-Commissioning and Commissioning Risk Assessment Date : 16-02-2014


and Method Statement of Pitch Lighting Page: 8 of 191

h) Ensure that the final wire connected to the light fixture is heat resistant wire with ceramic
connector.

i) Ensure the lighting system console (computer) is properly installed and the installation is
approved.

j) Ensure the Pitch Lighting is interfaced with Lighting Control System

k) Ensure the system software and the configuration parameters are available.

9.3 Testing and Commissioning


9.3.1 Commissioning Checklist
a) Ensure that all the pre-commissioning checks are carried out successfully and are approved.
b) Test the respective lighting circuits to be ON as per approved electrical load schedule.
c) Switch ON the power supply to the pitch floodlighting control panel (LCP) with system
devices for each.
d) Check for the communication of all devices i.e. control modules with the floodlighting control
panel (LCP) having the system devices i.e. power supply module.
e) Download the application software and verify the program is working as per sequence.
f) Switch ON and OFF the control switches installed (where applicable) and check that the
respective programmed circuits are switch ON and OFF accordingly.
g) Test the software as per the programmed parameters.
h) Check the lighting circuits / luminaries status (ON/OFF) in each floor plan graphics.
i) Check the lighting circuits switch ON/OFF timing schedule on the pitch lighting PC.
j) Check floor plans on the lighting graphics as per the as built drawings on the pitch lighting
PC located in the central control room.
k) Ensure availability of the approved timing schedule for Pitch Lighting.
l) Original software of the system and training shall be provided.
m) Check that the manual override each circuit using the override ON-OFF switch is properly
working.

Main Contractor OR

AL MUHAIDIB SIX CONSTRUCT-MSX


MEP Contractor
THERMO SAUDI
Contract No:66000275562(OOK)

King Abdullah Sports City (KASC) Ref. No:KASC-XX-TC-EL-THO-MST-XX-505041


Rev. No.: B

Testing, Pre-Commissioning and Commissioning Risk Assessment Date : 16-02-2014


and Method Statement of Pitch Lighting Page: 9 of 191

10. Attachments:

10.1 Pre Commissioning Checklist


10.2 Commissioning Checklist
10.3 Commissioning Test Sheet Reports
10.4 Pitch Lighting Schedule
10.5 Catalogue
10.6 Calculation Sheet for Aiming Point
11. Risk Assessment Sheet

Main Contractor OR

AL MUHAIDIB SIX CONSTRUCT-MSX


MEP Contractor
THERMO SAUDI
King Abdullah Sports City (KASC)  
Electrical System
Pre-Commissioning Checklist / Pitch Lighting
 
Project:                                                                                                     System: 
 
Equipment Name/Tag:  
  Level:  
 
Drawing No:   Location: 
 
Test Data √/X Notes
PRE COMMISSIONING INSPECTION    
1. Commissioning procedures reviewed  
2. O&M information (System Software)    
3. System Completeness (Wiring, Light Fittings &  
Panels)
4. Check Fixtures are level, aligned and parallel as    
per shop drawing
5. Check all luminaires/ reflector/ lamps are free    
from dust.
6. Confirm luminaires are identified as per shop  
drawing
7. Pitch lighting labeled/ Type as per shop drawing    
8. Confirm final distribution Equipment    
commissioning has been completed
9. Confirm all Luminaires and lamps are not  
damaged.
10. Confirm Earthing & Bonding commissioning has    
Been completed.
11. Confirm the pitch lighting interfaced with lighting `
control system.
12.Confirm the system software and the    
configuration parameters are available.
   
   
   
   
   
   
 
   
General Notes & Specialist Sub-Contractor    
Signature:
   
     
     
     
 

Pre‐Commissioning by:        Witness Date: _______________________
(THERMO SAUDI) 
 

Preliminary Checks by:             Witness Date: _______________________ 


(MSX)                                                          (Name)                                                                           (Signature) 

Pitch Lighting Checklist Sheet Reference Number: ELE-181 Page __of__


King Abdullah Sports City (KASC)  
Electrical System
Commissioning Test Sheet / Functional Testing of Pitch Lighting
 
Project:                                                                                                     System: 
 
Equipment Name/Tag:  
  Level:  
 
Drawing No:   Location: 
 
Test Data  √/X  Notes 
Commissioning Inspection
1. Commissioning procedures reviewed
2. Operation and maintenance information
3. Test the respective lighting circuits to be ON as
per approved electrical load schedule.
4. Switch ON the power supply to the pitch
floodlighting control panel (LCP) with system
devices for each.
5. Check for the communication of all devices i.e.
control modules with the floodlighting control
panel (LCP) having the system devices i.e. power
supply module.
6. Download the application software and verify the
program is working as per sequence.
7. Switch ON and OFF the control switches installed
(where applicable) and check that the respective
programmed circuits are switch ON and OFF
accordingly
8. Check the lighting circuits / luminaries status
(ON/OFF) in each floor plan graphics.
9. Check the lighting circuits switch ON/OFF timing
schedule on the pitch lighting PC.
10. Ensure availability of the approved timing
schedule for pitch lighting.
11. Original software of the system and training shall
be provided.
12. Check that the manual override each circuit using
the override ON-OFF switch is properly working.

INSTRUMENT: SERIAL NO.: CALIBRATION DATE: EXPIRY DATE:

General Notes:

Company: THERMO SAUDI MSX ARAMCO


Signature:

Name:

Date:
 

Pitch Lighting Checklist Sheet Reference Number: ELE-182 Page __of__


King Abdullah Sport City (KASC)
 
                                                                                             Electrical System 
                                                       Commissioning Test Sheet / Illumination Measurements 
Project:   System:
Equipment Name/Tag:  Level: 
Drawing No.:  Location:

Lux Reading
Height from
SN. Location Remarks
Floor
1st 2nd 3rd 4th Center Average

Pitch Lighting System Test sheet Reference Number ELE-183 Page ___ of ___
King Abdullah Sport City (KASC)
GENERAL NOTES:
1. All Illumination measurements are to be taken after 100 hours lamp 'burn in'.
2. A sketch detailing the location of measurement points is to be attached to this test report.
3. Type of lighting to be one of the following: Road / Flood / Fluorescent / Aviation Obstruction.
4. All luminaries will be locked into position when satisfactory illumination levels are achieved.
5. Anti-glare louvers should be fitted prior to illumination measurement.
6. Illumination measurements will be carried out at night.

INSTRUMENT:  SERIAL NO: CALIBRATION DATE: EXPIRY DATE:


 
 
 
General Notes:

Company  THERMO SAUDI Engineer  MSX Engineer  ARAMCO Engineer 


Signature       
Name       
Date       

Pitch Lighting System Test sheet Reference Number ELE-183 Page ___ of ___
King Abdullah Sport City (KASC)
 
                                                                                             Pitch Lighting Schedule 

Type of Light : LF01- LF04


No. of Flood
Grid No. Flood Lights Fed
SN System Description Position No. No. Floodlights Level Lights as per Manufacturer
Ref. from
circuits
1. Pitch Floodlighting Top Roof DB-STA-05-05-43P 4 Nos. SITECO-Germany
2. Pitch Floodlighting Top Roof DB-STA-05-05-45P 5 Nos. SITECO-Germany
Position-7 26 Floodlights Grid 12/13
3. Pitch Floodlighting Top Roof DB-STA-05-05-46P 10 Nos. SITECO-Germany
4. Pitch Floodlighting Top Roof DB-STA-05-05-47P 7 Nos. SITECO-Germany
5. Pitch Floodlighting Top Roof DB-STA-05-05-38P 5 Nos. SITECO-Germany
6. Pitch Floodlighting Top Roof DB-STA-05-05-49P 15 Nos. SITECO-Germany
Position 1 36 Floodlights Grid 22/23
7. Pitch Floodlighting Top Roof DB-STA-05-05-40P 7 Nos. SITECO-Germany
8. Pitch Floodlighting Top Roof DB-STA-05-05-41P 9 Nos. SITECO-Germany
9. Pitch Floodlighting Top Roof DB-STA-05-04-35P 7 Nos. SITECO-Germany
10. Pitch Floodlighting Top Roof DB-STA-05-04-36P 7 Nos. SITECO-Germany
Position 2 28 Floodlights Grid 28/29
11. Pitch Floodlighting Top Roof DB-STA-05-04-37P 8 Nos. SITECO-Germany
12. Pitch Floodlighting Top Roof DB-STA-05-04-27P 6 Nos. SITECO-Germany
13. Pitch Floodlighting Top Roof DB-STA-05-05-42P 9 Nos. SITECO-Germany
14. Pitch Floodlighting Position 6 26 Floodlights Grid 20/21 Top Roof DB-STA-05-05-43P 11 Nos. SITECO-Germany
15. Pitch Floodlighting Top Roof DB-STA-05-05-44P 8Nos. SITECO-Germany
16. Pitch Floodlighting Top Roof DB-STA-05-04-32P 10Nos. SITECO-Germany
17. Pitch Floodlighting Top Roof DB-STA-05-04-33P 6Nos. SITECO-Germany
Position 3 26 Floodlights Grid 36/37
18. Pitch Floodlighting Top Roof DB-STA-05-04-34P 6Nos. SITECO-Germany
19. Pitch Floodlighting Top Roof DB-STA-05-04-26P 4Nos. SITECO-Germany
20. Pitch Floodlighting Top Roof DB-STA-05-05-49P 6Nos. SITECO-Germany
Position 9 18 Floodlights Grid 04/05
21. Pitch Floodlighting Top Roof DB-STA-05-05-50P 12Nos. SITECO-Germany
22. Pitch Floodlighting Top Roof DB-STA-05-05-48P 12Nos. SITECO-Germany
Position 8 17 Floodlights Grid 08/09
23. Pitch Floodlighting Top Roof DB-STA-05-05-49P 5Nos. SITECO-Germany
24. Pitch Floodlighting Top Roof DB-STA-05-04-30P 8Nos. SITECO-Germany
Position 4 17 Floodlights Grid 40/41
25. Pitch Floodlighting Top Roof DB-STA-05-04-31P 9Nos. SITECO-Germany

Pitch Schedule Page 1


King Abdullah Sport City (KASC)
Type of Light : LF01- LF04
No. of Flood
Grid No. Flood Lights Fed
SN System Description Position No. No. Floodlights Level Lights as per Manufacturer
Ref. from
circuits
26. Pitch Floodlighting Top Roof DB-STA-05-04-29P 9 Nos. SITECO-Germany
Position-5 18 Floodlights Grid 44/45
27. Pitch Floodlighting Top Roof DB-STA-05-04-28P 9 Nos. SITECO-Germany
28. Pitch Floodlighting Top Roof DB-STA-05-01-03P 7 Nos. SITECO-Germany
Position 18 18 Floodlights Grid 92/93
29. Pitch Floodlighting Top Roof DB-STA-05-01-04P 11 Nos. SITECO-Germany
30. Pitch Floodlighting Top Roof DB-STA-05-01-05P 8 Nos. SITECO-Germany
Position 17 17 Floodlights Grid 89/90
31. Pitch Floodlighting Top Roof DB-STA-05-01-06P 9 Nos. SITECO-Germany
32. Pitch Floodlighting Top Roof DB-STA-05-02-24P 5 Nos. SITECO-Germany
Position 14 18 Floodlights Grid 53/52
33. Pitch Floodlighting Top Roof DB-STA-05-02-25P 13 Nos. SITECO-Germany
34. Pitch Floodlighting Top Roof DB-STA-05-02-23P 6 Nos. SITECO-Germany
Position 13 17 Floodlights Grid 56/57
35. Pitch Floodlighting Top Roof DB-STA-05-02-24P 5 Nos. SITECO-Germany
36. Pitch Floodlighting Top Roof DB-STA-05-01-07P 8 Nos. SITECO-Germany
37. Pitch Floodlighting Top Roof DB-STA-05-01-08P 7 Nos. SITECO-Germany
Position 16 26 Floodlights Grid 56/57
38. Pitch Floodlighting Top Roof DB-STA-05-01-09P 7 Nos. SITECO-Germany
39. Pitch Floodlighting Top Roof DB-STA-05-01-01P 4 Nos. SITECO-Germany
40. Pitch Floodlighting Top Roof DB-STA-05-01-10P 12 Nos. SITECO-Germany
41. Pitch Floodlighting Position 15 28 Floodlights Grid 76/77 Top Roof DB-STA-05-01-12P 9 Nos. SITECO-Germany
42. Pitch Floodlighting Top Roof DB-STA-05-01-02P 7 Nos. SITECO-Germany
43. Pitch Floodlighting Top Roof DB-STA-05-02-13P 10 Nos. SITECO-Germany
44. Pitch Floodlighting Top Roof DB-STA-05-02-14P 7 Nos. SITECO-Germany
45. Pitch Floodlighting Position 10 28 Floodlights Grid 7273 Top Roof DB-STA-05-02-15P 7 Nos. SITECO-Germany
46. Pitch Floodlighting Top Roof DB-STA-05-02-16P 7 Nos. SITECO-Germany
47. Pitch Floodlighting Top Roof DB-STA-05-02-17P 5 Nos. SITECO-Germany
48. Pitch Floodlighting Top Roof DB-STA-05-02-18P 6 Nos. SITECO-Germany
49. Pitch Floodlighting Position 11 28 Floodlights Grid 68/69 Top Roof DB-STA-05-02-19P 17 Nos. SITECO-Germany
50. Pitch Floodlighting Top Roof DB-STA-05-02-20P 5 Nos. SITECO-Germany
51. Pitch Floodlighting Top Roof DB-STA-05-02-21P 16 Nos. SITECO-Germany
Position 12 26 Floodlights Grid 60/61
52. Pitch Floodlighting Top Roof DB-STA-05-02-22P 10 Nos. SITECO-Germany

Pitch Schedule Page 2


King Abdullah
Sports City

Main Stadium

Calculation Sheet for


Aiming Point
KASC Main Stadium – Calculation Sheet for Aiming Point
Position 1: Axis 24-25
Number of floodlights: 36
Position 6: Axis 20-21 +Y Position 2: Axis 28-29
Number of floodlights: 28 1Y Number of floodlights: 28
6 2
80
Position 7: Axis 12-14 Position 3: Axis 35-37
Number of floodlights: 26 Number of floodlights: 26
7 3
60
Position 8: Axis 7-9 Position 4: Axis 40-42
Number of floodlights: 17 Number of floodlights: 17
8 4
40
Position 9: Axis 3-5 Position 5: Axis 44-46
Number of floodlights: 18 Number of floodlights: 18
9 5
20

-X +X
X
-80
80 -60
60 -40
40 -20
20 0 20 40 60 80

Position 18: Axis 92-94 -20


18 14 Position 14: Axis 51-53
Number of floodlights: 18 Number of floodlights: 18

-40
40
Position 17: Axis 88-90 17 13 Position 13: Axis 55-57
Number of floodlights: 17 Number of floodlights: 17

-60
Position 16: Axis 83-85 16 12 Position 12: Axis 60-62
Number of floodlights: 26 Number of floodlights: 26

-80
Position 15: Axis 76-77 15
10
-Y 11 Position 11: Axis 68-69
Number of floodlights: 28 Number of floodlights: 28
Position 10: Axis 72-73
Number of floodlights: 36

2 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

SiCompact R3 Maxi - 5NA 756


with Osram HQI
HQI-TS
TS 2000/D/S lamp

Number of the aiming point


Fl dli h type (LID N
Floodlight Nr.))
(Light distribution)
Coordinates of the
1.11 aiming point X / Y
3
Switching level
-37/+10
37/+10
1/1/0/0 Class V / class IV / class III / class II

3 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V Position 1: Axis 24-25
Number of floodlights: 36
Y

80

60

40
1.01 1.19
1.02 1.20
1.03 1.18 1.36 1.21

20

-60

-60 -45 -30 -15 0 15 30 45 60


-80

-20

1 09
1.09 1 27
1.27

-40

4 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV Position 1: Axis 24-25
Number of floodlights: 36
Y

80

60

40

1.01 1.19
1.02 1.20
1.18 1.36

20

-60
60 -45
45 -30
30 -15
15 0 15 30 45 60

-20

1 09
1.09 1 27
1.27

-40

5 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III Position 1: Axis 24-25
Number of floodlights: 36
Y

80

60

40

1.01 1.19
1.10 1.28

20

-60
60 -45
45 -30
30 -15
15 0 15 30 45 60

-20

-40

6 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class II Position 1: Axis 24-25
Number of floodlights: 36
Y

80

60

40

1.01 1.19

20

-60
60 -45
45 -30
30 -15
15 0 15 30 45 60

-20

-40

7 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


1.27 1.09
1 1
-50/-30

Position 1
+50/-30
1/1/0/0 1/1/0/0

A seen from
As f the
th bbackside:
k id
1.34 1.16
1 1
+40/-30 -40/-30
Class V – >2000 lux vertical 1/1/0/0 1/1/0/0
+
1.26 1.33 1.15 1.08
Class IV – 2000 lux vertical 1 1 1 1
+ +50/-15 +40/-15 -40/-15 -50/-15
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
Class III – 750 lux horizontal
+
1.22 1.25 1.32 1.14 1.07 1.04
4 2 2 2 2 4
Class II – 500 lux horizontal +50/+20 +50/0 +40/0 -40/0 -50/0 -50/+20
1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0

1.21 1.24 1.31 1.13 1.06 1.03


Floodlight types: 2 2 4 4 2 2
+50/+30 +50/+10 +40/+10 -40/+10 -50/+10 -50/+30
1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0

1 = WP11
2 = WP21 1.29 1.20 1.23 1.30 1.12 1.05 1.02 1.11
4 2 2 4 4 2 2 4
3 = WP31 +40/+30 +50/+30 +50/+20 +40/+20 -40/+20 -50/+20 -50/+30 -40/+30
1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0
4 = WP41
5 = WP51 1.19 1.28 1.35 1.36 1.18 1.17 1.10 1.01

6 = WP61 4
+50/+30
4
+40/+30
4
+20/+30
4
+10/+30
4
-10/+30
4
-20/+30
4
-40/+30
4
-50/+30
7 = WP71 1/1/1/1 1/1/1/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/1/0 1/1/1/1

8 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V
Position 2: Axis 28-29
Number of floodlights: 28
Y

80

60

40

2.01 2.13
2 28
2.28

20

-60 -45 -30 -15 0 15 30 45 60

-20
2.18
2.06 2.19

-40
9 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV
Position 2: Axis 28-29
Number of floodlights: 28
Y

80

60

40

2.01 2.13
2 28
2.28

20

-60 -45 -30 -15 0 15 30 45 60

-20
2.18
2.06 2.19

-40
10 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III
Position 2: Axis 28-29
Number of floodlights: 28
Y

80

60

40

2.13
2 28
2.28

20

-60 -45 -30 -15 0 15 30 45 60


2.16

-20

-40
11 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class II
Position 2: Axis 28-29
Number of floodlights: 28
Y

80

60

40

2.13
2 28
2.28

20

-60 -45 -30 -15 0 15 30 45 60


2.16

-20

-40
12 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming 2.06

Position 2
2.26
1 1
+15/-30 -30/-30
1/1/0/0 1/1/0/0

A seen from
As f the
th bbackside:
k id
2.19 2.12
Class V – >2000 lux vertical
1 1
+ +50/-30 -15/-30
1/1/0/0 1/1/0/0

Class IV – 2000 lux vertical


+ 2.18 2.27 2.24 2.05
2 1 2 2
Class III – 750 lux horizontal +50/-30 +30/-30 0/-30 -30/-15
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
+
Class II – 500 lux horizontal 2.17 2.23 2.11 2.03
2 10
2.10 2 04
2.04
2 2 2 2 2 4
+50/-15 0/-15 -15/-15 -15/0 -30/0 -30/+10
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0
Floodlight types:
2.15 2.16 2.22 2.21 2.08 2.02
4 4 4 4 4 4
1 = WP11 +50/+10
/ +50/0
/ /
0/0 0/+15 -15/+20
/ -30/+20
/
1/1/1/1 1/1/1/1 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
2 = WP21
3 = WP31 2.13 2.14 2.28 2.25 2.09 2.20 2.07 2.01
5 4 5 5 4 5 4 4
4 = WP41 +50/+30 +50/+20 +20/+30 +25/+30 -15/+10 0/+30 -15/+30 -30/+30

5 = WP51 1/1/1/1 1/1/1/1 1/1/1/1 1/0/0/0 1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0

6 = WP61
7 = WP71
13 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

Position 3: Axis 35-37


Number of floodlights: 26
Y

60

45

3.11 30
3.01

15

3.13
X

-60 -40 -20 0 20 40 60

-15

3.15 3.23
-30

14 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

Position 3: Axis 35-37


Number of floodlights: 26
Y

60

45

3.11 30
3.01

15

3.13
X

-60 -40 -20 0 20 40 60

-15

3.15 3.23
-30

15 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

Position 3: Axis 35-37


Number of floodlights: 26
Y

60

45

3.11 30
3.01

15
3.17

-60 -40 -20 0 20 40 60


3 08
3.08

-15

-30

16 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class II

Position 3: Axis 35-37


Number of floodlights: 26
Y

60

45

3.11 30
3.01

15
3.17

-60 -40 -20 0 20 40 60


3 08
3.08

-15

-30

17 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 3
3.24
2
+45/-30
1/0/0/0

A seen from
As f the
th bbackside:
k id 3.25 3.10 3.15
Class V – >2000 lux vertical 2 1 1
+ +20/-30 +10/-30 0/-30
1/1/0/0 1/1/0/0 1/1/0/0

Class IV – 2000 lux vertical


+ 3.20 3.05 3.09 3.14
2 1 2 2
Class III – 750 lux horizontal +40/-30 +30/-30 +10/-15 0/-15
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
+
Class II – 500 lux horizontal
3 23
3.23 3 04
3.04 3 26
3.26 3 12
3.12 3 13
3.13
2 2 4 4 2
+50/-30 +30/-15 +20/0 0/+15 0/0
1/1/0/0 1/1/0/0 1/0/0/0 1/1/1/1 1/1/0/0
Floodlight types:
3.22 3.19 3.03 3.08 3.07 3.11
4 4 4 4 4 4
1 = WP11 +50/-15
/ +40/-15
/ /
+30/0 +10/0 +10/+15
/ 0/+30
/
1/1/0/0 1/1/0/0 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1
2 = WP21
3 = WP31 3.21 3.18 3.17 3.02 3.16 3.01 3.06
4 4 5 5 6 5 4
4 = WP41 +50/0 +40/0 +40/+15 +30/+15 +40/+30 +30/+30 +10/+30

5 = WP51 1/0/0/0 1/1/0/0 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1

6 = WP61
7 = WP71
18 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

Position 4: Axis 40-42


Number of floodlights: 17
Y

40

4.01 30

20
4.17
10
4.07

-80 -60 -40 -20 0 20 40 60 80

-10

-20

4.05 4.16
-30
30

-40

19 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

Position 4: Axis 40-42


Number of floodlights: 17
Y

40

4.01 30

20

10
4.07

-80 -60 -40 -20 0 20 40 60 80

-10

-20

-30
30
4.10
-40

20 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

Position 4: Axis 40-42


Number of floodlights: 17
Y

40

4.01 30

20

10
4.07

-80 -60 -40 -20 0 20 40 60 80


4.08
-10

-20

-30
30

-40

21 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 4
4.05

A seen from
As f the
th bbackside:
k id 1
0/-30
Class V – >2000 lux vertical 1/0/0/0

+
4.04 4.17
2 2
Class IV – 2000 lux vertical 0/-20 -25/+15
+ 1/0/0/0 1/0/0/0

Class III – 750 lux horizontal


4.16 4.14 4.09 4.03
+
4 4 2 2
+45/-30 +30/-20 +15/-20 0/0
Class II – 500 lux horizontal 1/0/0/0 1/0/0/0 1/0/0/0 1/0/0/0

4.08 4.07 4.06 4.01


Floodlight types: 4 4 4 4
+15/0 +15/+15 +15/+30 0/+30
1/1/1/0 1/1/1/0 1/1/1/0 1/1/1/0

1 = WP11
4.15 4.10 4.13 4.12 4.02 4.11
2 = WP21 2 2 4 4 2 4
+30/-30 +15/-30 +30/0 0/+15 +30/+30
3 = WP31 1/1/0/0 1/1/0/0 1/1/0/0
+30/+15
1/1/0/0 1/1/0/0 1/1/0/0

4 = WP41
5 = WP51
6 = WP61
7 = WP71
22 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

40 Y
5.01
Position 5: Axis 44-46
5.13 30 Number of floodlights: 18

20
5.02
10
X

-80 -60 -40 -20 0 20 40 60 80

-10

-20

5.14
-30
5 05
5.05
-40

23 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

40 Y
5.01
Position 5: Axis 44-46
5.13 30 Number of floodlights: 18

20
5.02
10
X

-80 -60 -40 -20 0 20 40 60 80

-10

-20

-30
5.12
-40

24 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

40 Y

Position 5: Axis 44-46


30 Number of floodlights: 18

20
5.08
10
X

-80 -60 -40 -20 0 20 40 60 80

-10

-20

-30

-40

25 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 5
5.14

A seen from
As f the
th bbackside:
k id 1
0/-30
Class V – >2000 lux vertical 1/0/0/0

+
5.05 5.17
4 4
Class IV – 2000 lux vertical +35/-30 +10/+30
+ 1/0/0/0 1/0/0/0

Class III – 750 lux horizontal


5.11 5.04 5.09 5.16
+
5 4 6 5
+45/-15 +35/-15 +45/+10 +45/+30
Class II – 500 lux horizontal 1/0/0/0 1/0/0/0 1/0/0/0 1/0/0/0

5.12 5.03 5.08 5.07 5.13


Floodlight types: 4 5 6 6 2
+45/-30 +35/0 +45/+15 +45/+25 0/+30
1/1/0/0 1/1/0/0 1/1/1/0 1/0/0/0 1/1/0/0

1 = WP11
5.18 5.10 5.02 5.01 5.15 5.06
2 = WP21 5 5 5 5 5 6
+50/-5 +45/0 +35/+15 +45/+30 +45/+30
3 = WP31 1/1/0/0 1/1/0/0 1/1/0/0
+35/+30
1/1/0/0 1/1/0/0 1/1/0/0

4 = WP41
5 = WP51
6 = WP61
7 = WP71
26 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V
Position 6: Axis 20-21
Number of floodlights: 28
Y

80

60

40

6.13
6.01
6 28
6.28

20

-60 -45 -30 -15 0 15 30 45 60

-20
6.18
6.19 6.06

-40
27 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV
Position 6: Axis 20-21
Number of floodlights: 28
Y

80

60

40

6.13
6.01
6 28
6.28

20

-60 -45 -30 -15 0 15 30 45 60

-20
6.18
6.19 6.06

-40
28 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III
Position 6: Axis 20-21
Number of floodlights: 28
Y

80

60

40

6.13
6 28
6.28

20

-60 6.16 -45 -30 -15 0 15 30 45 60

-20

-40
29 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class II
Position 6: Axis 20-21
Number of floodlights: 28
Y

80

60

40

6.13
6 28
6.28

20

-60 6.16 -45 -30 -15 0 15 30 45 60

-20

-40
30 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming 6.06 6.26

Position 6 1
+30/-30
1
-15/-30
1/1/0/0 1/1/0/0

A seen from
As f the
th bbackside:
k id
Class V – >2000 lux vertical 6.12 6.19
1 1
+ +15/-30 -50/-30
1/1/0/0 1/1/0/0
Class IV – 2000 lux vertical
+ 6.05 6.24 6.27 6.18
2 2 1 2
Class III – 750 lux horizontal +30/-15 0/-30 -30/-30 -50/-30
+ 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0

Class II – 500 lux horizontal


6 03
6.03 6 04
6.04 6 10
6.10 6 11
6.11 6 23
6.23 6 17
6.17
4 2 2 2 2 2
+30/+10 +30/0 +15/0 +15/-15 0/-15 -50/-15
1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
Floodlight types:
6.02 6.08 6.21 6.22 6.16 6.15
4 4 4 4 4 4
1 = WP11 +30/+20 +15/+20 0/+15 0/0 -50/0 -50/+10
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/1/1 1/1/1/1
2 = WP21
3 = WP31 6.01 6.07 6.20 6.09 6.25 6.28 6.14 6.13

4 = WP41 4
+30/+30
4
+15/+30
5
0/+30
4
+15/+10
5
-25/+30
5
-20/+30
4
-50/+20
5
-50/+30
5 = WP51 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0 1/0/0/0 1/1/1/1 1/1/1/1 1/1/1/1

6 = WP61
7 = WP71
31 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

Position 7: Axis 12-14


Number of floodlights: 26
Y

60

45

30 7.11
7.01

15

7.13
X

-60 -40 -20 0 20 40 60

-15

7.23 7.15
-30

32 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

Position 7: Axis 12-14


Number of floodlights: 26
Y

60

45

30 7.11
7.01

15

7.13
X

-60 -40 -20 0 20 40 60

-15

7.23 7.15
-30

33 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

Position 7: Axis 12-14


Number of floodlights: 26
Y

60

45

30 7.11
7.01

15
7.17

-60 -40 -20 0 20 40 60


7 08
7.08

-15

-30

34 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class II

Position 7: Axis 12-14


Number of floodlights: 26
Y

60

45

30 7.11
7.01

15
7.17

-60 -40 -20 0 20 40 60


7 08
7.08

-15

-30

35 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 7
7.24
2
-45/-30
1/0/0/0

A seen from
As f the
th bbackside:
k id 7.10
Class V – >2000 lux vertical 7.15
1
7.25
1 2
+ 0/-30
-10/-30
-20/-30
1/1/0/0
1/1/0/0 1/1/0/0
Class IV – 2000 lux vertical
+ 7.09 7.05 7.14 7.20
2 1 2 2
Class III – 750 lux horizontal -10/-15 -30/-30 0/-15 -40/-30
1/1/0/0
+ 1/1/0/0 1/1/0/0 1/1/0/0

Class II – 500 lux horizontal


7 26
7.26
7.13 7.12 7.04 7.23
4
2 4 2 2
-20/0
0/0 0/+15 -30/-15 -50/-30
1/0/0/0
1/1/0/0 1/1/1/1 1/1/0/0 1/1/0/0
Floodlight types:
7.11 7.07 7.08 7.03 7.19 7.22
4 4 4 4 4 4
1 = WP11 0/+30 -10/+15 -10/0 -30/0 -40/-15 -50/-15
1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1 1/1/0/0 1/1/0/0
2 = WP21
3 = WP31 7.06 7.01 7.16 7.02 7.17 7.18 7.21
4 5 6 5 5 4 4
4 = WP41 -10/+30 -30/+30 -40/+30 -30/+15 -40/+15 -40/0 -50/0

5 = WP51 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1 1/1/0/0 1/0/0/0

6 = WP61
7 = WP71
36 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

Position 8: Axis 7-9


Number of floodlights:
g 17
Y

40

30 8.01

20
8.17
8.07 10

-80 -60 -40 -20 0 20 40 60 80

-10

-20

8.16 8.05
-30
30

-40

37 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

Position 8: Axis 7-9


Number of floodlights:
g 17
Y

40

30 8.01

20

8.07 10

-80 -60 -40 -20 0 20 40 60 80

-10

-20

-30
30
8.10
-40

38 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

Position 8: Axis 7-9


Number of floodlights:
g 17
Y

40

30 8.01

20

8.07 10

-80 -60 -40 -20 0 20 40 60 80


8 08
8.08
-10

-20

-30
30

-40

39 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 8
8.05

A seen from
As f the
th bbackside:
k id 1
0/-30
Class V – >2000 lux vertical 1/0/0/0

+
8.17 8.04
Class IV – 2000 lux vertical 2 2
+25/+15 0/-20
+ 1/0/0/0 1/0/0/0

Class III – 750 lux horizontal


+ 8.03 8.09 8.14 8.16
2 2 4 4
Class II – 500 lux horizontal 0/0 -15/-20 -30/-20 -45/-30
1/0/0/0 1/0/0/0 1/0/0/0 1/0/0/0

8.01 8.06 8.07 8.08


Floodlight types: 4 4 4 4
0/+30 -15/+30 -15/+15 -15/0
1/1/1/0 1/1/1/0 1/1/1/0 1/1/1/0

1 = WP11
8.11 8.02 8.12 8.13 8.10 8.15
2 = WP21 4 2 4 4 2 2
-30/+30 0/+15 -30/+15 -30/0 -15/-30 -30/-30
3 = WP31 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0

4 = WP41
5 = WP51
6 = WP61
7 = WP71
40 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

40 Y
9.01
Position 9: Axis 3-5
Number of floodlights: 18
30 9.13

20
9.02
10
X

-80 -60 -40 -20 0 20 40 60 80

-10

-20

9.14
-30
9.05
-40

41 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

40 Y
9.01
Position 9: Axis 3-5 9.13
30
Number of floodlights: 18

20
9.02
10
X

-80 -60 -40 -20 0 20 40 60 80

-10

-20

-30
9 12
9.12
-40

42 16.02.2014
KASC Main Stadium – Pitch Lghting Aiming Point
Class III

40 Y

Position 9: Axis 3-5


30
Number of floodlights: 18

20
9.08
10
X

-80 -60 -40 -20 0 20 40 60 80

-10

-20

-30

-40

43 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 9
9.14

A seen from
As f the
th bbackside:
k id 1
0/-30
Class V – >2000 lux vertical 1/0/0/0

+
9.17 9.05
Class IV – 2000 lux vertical 4 4
-10/+30 -35/-30
+ 1/0/0/0 1/0/0/0

Class III – 750 lux horizontal


+ 9.16 9.09 9.04 9.11
5 6 4 5
Class II – 500 lux horizontal -45/+30 -45/+10 -35/-15 -45/-15
1/0/0/0 1/0/0/0 1/0/0/0 1/0/0/0

9.13 9.07 9.08 9.03 9.12


Floodlight types: 2 6 6 5 4
0/+30 -45/+25 -45/+15 -35/0 -45/-30
1/1/0/0 1/0/0/0 1/1/1/0 1/1/0/0 1/1/0/0

1 = WP11
9.06 9.15 9.01 9.02 9.10 9.18
2 = WP21 6 5 5 5 5 5
-45/+30 -45/+30 -35/+30 -35/+15 -45/0 -50/-5
3 = WP31 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0

4 = WP41
5 = WP51
6 = WP61
7 = WP71
44 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V Y

40

10.09 10.27

20

-60 -45 -30 -15 0 15 30 45 60

-20
10.18 10.36
10.01
10 01 10.19
10 19
10.02 10.20
10.03 10.21
-40

-60

-80

Position 10: Axis 72-73


Number of floodlights: 36

45 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV Y

40

10.09 10.27

20

-60 -45 -30 -15 0 15 30 45 60

-20
10.18 10.36
10.01
10 01 10.19
10.02 10.20

-40

-60

-80

Position 10: Axis 72-73


Number of floodlights: 36

46 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III Y

40

20

-60 -45 -30 -15 0 15 30 45 60

-20
10 10
10.10 10 28
10.28
10.01 10.19

-40

-60

-80

Position 10: Axis 72-73


Number of floodlights: 36

47 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class II Y

40

20

-60 -45 -30 -15 0 15 30 45 60

-20

10.01 10.19

-40

-60

-80

Position 10: Axis 72-73


Number of floodlights: 36

48 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


10.09 10.27
1 1
-50/+30 +50/+30

Position 10 1/1/0/0 1/1/0/0

A seen from
As f the
th bbackside:
k id 10 16
10.16
1
10 34
10.34
1
Class V – >2000 lux vertical -40/+30 +40/+30
1/1/0/0 1/1/0/0
+

10.33 10.26
Class IV – 2000 lux vertical 10.08 10.15
1 1 1 1
+ -50/+15 -40/+15 +40/+15 +50/+15
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
Class III – 750 lux horizontal
+
10.04 10.07 10.14 10.32 10.25 10.22

Class II – 500 lux horizontal 4 2 2 2 2 4


-50/-20
50/ 20 -50/0
50/0 -40/0
40/0 +40/0 +50/0 +50/-20
1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0

Floodlight types: 10.03


2
10.06
2
10.13
4
10.31
4
10.24
2
10.21
2
-50/-30 -50/-10 -40/-10 +40/-10 +50/-10 +50/-30
1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0
1 = WP11
2 = WP21 10.11 10.02 10.05 10.12 10.30 10.23 10.20 10.29
4 2 2 4 4 2 2 4
3 = WP31 -40/-30 -50/-30 -50/-20 -40/-20 +40/-20 +50/-20 +50/-30 +40/-30

4 = WP41 1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0

5 = WP51 10.01 10.10 10.17 10.18 10.36 10.35 10.28 10.19


6 = WP61 4 4 4 4 4
+10/-30
4
+20/-30
4
+40/-30
4
-50/-30 -40/-30 -20/-30 -10/-30 +50/-30
7 = WP71 1/1/1/1 1/1/1/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/1/0 1/1/1/1

49 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
Class V 40

11.18
11.06 11.19

20

X
-60

-45 -30 -15 0 15 30 45 60

-20
11.28
11.01 11 13
11.13

-40

-60

-80
80
Position 11: Axis 68-69
Number of floodlights: 28

50 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
Class IV 40

11.18
11.06 11.19

20

-60 -45 -30 -15 0 15 30 45 60

-20
11.28
11.01 11 13
11.13

-40

-60

-80
80
Position 11: Axis 68-69
Number of floodlights: 28

51 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
Class III 40

20

11.16
X

-60 -45 -30 -15 0 15 30 45 60

-20
11.28
11.13

-40

-60

-80

Position 11: Axis 68-69


Number of floodlights: 28

52 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
Class II 40

20

11.16
X

-60 -45 -30 -15 0 15 30 45 60

-20
11.28
11.13

-40

-60

-80

Position 11: Axis 68-69


Number of floodlights: 28

53 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming 11.06 11.26

Position 11 1
-30/+30
1
+15/+30
1/1/0/0 1/1/0/0

A seen from
As f the
th bbackside:
k id
Class V – >2000 lux vertical 11.12 11.19
1 1
+ -15/+30 +50/+30
1/1/0/0 1/1/0/0
Class IV – 2000 lux vertical
+ 11.05 11.24 11.27 11.18
2 2 1 2
Class III – 750 lux horizontal -30/+15 0/+30 +30/+30 +50/+30
+ 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0

Class II – 500 lux horizontal


11 03
11.03 11 04
11.04 11 10
11.10 11 11
11.11 11 23
11.23 11 17
11.17
4 2 2 2 2 2
-30/-10 -30/0 -15/0 -15/+15 0/+15 +50/+15
1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
Floodlight types:
11.02 11.08 11.21 11.22 11.16 11.15
4 4 4 4 4 4
1 = WP11 -30/-20 -15/-20 0/-15 0/0 +50/0 +50/-10
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/1/1 1/1/1/1
2 = WP21
3 = WP31 11.01 11.07 11.20 11.09 11.25 11.28 11.14 11.13

4 = WP41 4
-30/-30
4
-15/-30
5
0/-30
4
-15/-10
5
+25/-30
5
+20/-30
4
+50/-20
5
+50/-30
5 = WP51 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0 1/0/0/0 1/1/1/1 1/1/1/1 1/1/1/1

6 = WP61
7 = WP71
54 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
45
Class V

12.15 30 12.23

15

12.13
X

-60 -40 -20 0 20 40 60

-15

12.01
12.11
-30

-45

-60

Position 12: Axis 60-62


Number of floodlights: 26

55 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
45
Class IV

12.15 30 12.23

15

12.13
X

-60 -40 -20 0 20 40 60

-15

12.01
12.11 -30

-45

-60

Position 12: Axis 60-62


Number of floodlights: 26

56 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
45
Class III

30

15

12.08
X

-60 -40 -20 0 20 40 60

12.17
-15

12.01
12.11
-30

-45

-60

Position 12: Axis 60-62


Number of floodlights: 26

57 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
45
Class II

30

15

12.08
X

-60 -40 -20 0 20 40 60

12.17
-15

12.01
12.11
-30

-45

-60

Position 12: Axis 60-62


Number of floodlights: 26

58 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 12
12.24
2
+45/+30
1/0/0/0

A seen from
As f the
th bbackside:
k id 12.10
Class V – >2000 lux vertical 12.15
1
12.25
1 2
+ 0/+30
+10/+30
+20/+30
1/1/0/0
1/1/0/0 1/1/0/0
Class IV – 2000 lux vertical
+ 12.09 12.05 12.14 12.20
2 1 2 2
Class III – 750 lux horizontal +10/+15 +30/+30 0/+15 +40/+30
1/1/0/0
+ 1/1/0/0 1/1/0/0 1/1/0/0

Class II – 500 lux horizontal


12 26
12.26
12.13 12.12 12.04 12.23
4
2 4 2 2
+20/0
0/0 0/-15 +30/+15 +50/+30
1/0/0/0
1/1/0/0 1/1/1/1 1/1/0/0 1/1/0/0
Floodlight types:
12.11 12.07 12.08 12.03 12.19 12.22
4 4 4 4 4 4
1 = WP11 0/-30 +10/-15 +10/0 +30/0 +40/+15 +50/+15
1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1 1/1/0/0 1/1/0/0
2 = WP21
3 = WP31 12.06 12.01 12.16 12.02 12.17 12.18 12.21
4 5 6 5 5 4 4
4 = WP41 +10/-30 +30/-30 +40/-30 +30/-15 +40/-15 +40/0 +50/0

5 = WP51 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1 1/1/0/0 1/0/0/0

6 = WP61
7 = WP71
59 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

40

13.05 30 13.16

20

10

-80 -60 -40 -20 0 20 40 60 80

13.07
-10
13.17
-20

13.01
-30
30

-40

Position 13: Axis 55-57


Number of floodlights: 17

60 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

40
13.10
30

20

10

-80 -60 -40 -20 0 20 40 60 80

13.07
-10

-20

13.01
-30
30

-40

Position 13: Axis 55-57


Number of floodlights: 17

61 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

40

30

20

10
13.08
X

-80 -60 -40 -20 0 20 40 60 80

13.07
-10

-20

13.01
-30
30

-40

Position 13: Axis 55-57


Number of floodlights: 17

62 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 13
13.05

A seen from
As f the
th bbackside:
k id 1
0/+30
Class V – >2000 lux vertical 1/0/0/0

+
13.17 13.04
Class IV – 2000 lux vertical 2 2
-25/-15 0/+20
+ 1/0/0/0 1/0/0/0

Class III – 750 lux horizontal


+ 13.03 13.09 13.14 13.16
2 2 4 4
Class II – 500 lux horizontal 0/0 +15/+20 +30/+20 +45/+30
1/0/0/0 1/0/0/0 1/0/0/0 1/0/0/0

13.01 13.06 13.07 13.08


Floodlight types: 4 4 4 4
0/-30 +15/-30 +15/-15 +15/0
1/1/1/0 1/1/1/0 1/1/1/0 1/1/1/0

1 = WP11
13.11 13.02 13.12 13.13 13.10 13.15
2 = WP21 4 2 4 4 2 2
+30/-30 0/-15 +30/-15 +30/0 +15/+30 +30/+30
3 = WP31 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0

4 = WP41
5 = WP51
6 = WP61
7 = WP71
63 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

40 Y
14.05
14.14 30

20

10
X

-80 -60 -40 -20 0 20 40 60 80

-10
14.02
-20
Position 14: Axis 51-53
14.13 Number of floodlights: 18
-30
14.01
-40

64 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

40 Y
14.12

30

20

10
X

-80 -60 -40 -20 0 20 40 60 80

-10
14.02
-20
Position 14: Axis 51-53
14.13 Number of floodlights: 18
-30
14 01
14.01
-40

65 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

40 Y

30

20

10
X

-80 -60 -40 -20 0 20 40 60 80

-10
14.08
-20
Position 14: Axis 51-53
-30 Number of floodlights: 18

-40

66 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 14
14.14

A seen from
As f the
th bbackside:
k id 1
0/+30
Class V – >2000 lux vertical 1/0/0/0

+
14.17 14.05
Class IV – 2000 lux vertical 4 4
+10/-30 +35/+30
+ 1/0/0/0 1/0/0/0

Class III – 750 lux horizontal


+ 14.16 14.09 14.04 14.11
5 6 4 5
Class II – 500 lux horizontal +45/-30 +45/-10 +35/+15 +45/+15
1/0/0/0 1/0/0/0 1/0/0/0 1/0/0/0

14.13 14.07 14.08 14.03 14.12


Floodlight types: 2 6 6 5 4
0/-30 +45/-25 +45/-15 +35/0 +45/+30
1/1/0/0 1/0/0/0 1/1/1/0 1/1/0/0 1/1/0/0

1 = WP11
14.06 14.15 14.01 14.02 14.10 14.18
2 = WP21 6 5 5 5 5 5
+45/-30 +45/-30 +35/-30 +35/-15 +45/0 +50/+5
3 = WP31 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0

4 = WP41
5 = WP51
6 = WP61
7 = WP71
67 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
Class V 40

15.18 15.06
15.19
20

-60 -45 -30 -15 0 15 30 45 60

-20
15.28
15.13 15.01

-40

-60

-80

Position 15: Axis 76-77


Number of floodlights: 28

68 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
Class IV 40

15.18 15.06
15.19
20

-60 -45 -30 -15 0 15 30 45 60

-20
15.28
15.13 15.01

-40

-60

-80

Position 15: Axis 76-77


Number of floodlights: 28

69 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
Class III 40

20

15.16 X

-60 -45 -30 -15 0 15 30 45 60

-20
15.28
15 13
15.13

-40

-60

-80
80
Position 15: Axis 76-77
Number of floodlights: 28

70 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
Class II 40

20

15.16 X

-60 -45 -30 -15 0 15 30 45 60

-20
15.28
15 13
15.13

-40

-60

-80
80
Position 15: Axis 76-77
Number of floodlights: 28

71 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming 15.06

Position 15
15.26
1 1
-15/+30 +30/+30
1/1/0/0 1/1/0/0

A seen from
As f the
th bbackside:
k id
15.19 15.12
Class V – >2000 lux vertical
1 1
+ -50/+30 +15/+30
1/1/0/0 1/1/0/0

Class IV – 2000 lux vertical


+ 15.18 15.27 15.24 15.05
2 1 2 2
Class III – 750 lux horizontal -50/+30 -30/+30 0/+30 +30/+15
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
+
Class II – 500 lux horizontal 15.17 15.23 15.11 15.03
15 10
15.10 15 04
15.04
2 2 2 2 2 4
-50/+15 0/+15 +15/+15 +15/0 +30/0 +30/-10
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0 1/0/0/0
Floodlight types:
15.15 15.16 15.22 15.21 15.08 15.02
4 4 4 4 4 4
1 = WP11 -50/-10
/ -50/0
/ /
0/0 0/-15 +15/-20
/ +30/-20
/
1/1/1/1 1/1/1/1 1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
2 = WP21
3 = WP31 15.13 15.14 15.28 15.25 15.09 15.20 15.07 15.01
5 4 5 5 4 5 4 4
4 = WP41 -50/-30 -50/-20 -20/-30 -25/-30 +15/-10 0/-30 +15/-30 +30/-30

5 = WP51 1/1/1/1 1/1/1/1 1/1/1/1 1/0/0/0 1/0/0/0 1/1/0/0 1/1/0/0 1/1/0/0

6 = WP61
7 = WP71
72 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
45
Class V

16.23 30 16.15

15

16.13
X

-60 -40 -20 0 20 40 60

-15

16.01
16.11
-30

-45

-60

Position 16: Axis 83-85


Number of floodlights: 26

73 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
45
Class IV

16.23 30 16.15

15

16.13
X

-60 -40 -20 0 20 40 60

-15

16.01
16.11
-30

-45

-60

Position 16: Axis 83-85


Number of floodlights: 26

74 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
45
Class III

30

15

16.08
X

-60 -40 -20 0 20 40 60

16.17
-15

16.01
16.11
-30

-45

-60

Position 16: Axis 83-85


Number of floodlights: 26

75 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Y
45
Class II

30

15

16.08
X

-60 -40 -20 0 20 40 60

16.17
-15

16.01
16.11
-30

-45

-60

Position 16: Axis 83-85


Number of floodlights: 26

76 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 16
16.24
2
-45/+30
1/0/0/0

A seen from
As f the
th bbackside:
k id 16.25 16.10 16.15
Class V – >2000 lux vertical 2 1 1
+ -20/+30 -10/+30 0/+30
1/1/0/0 1/1/0/0 1/1/0/0

Class IV – 2000 lux vertical


+ 16.20 16.05 16.09 16.14
2 1 2 2
Class III – 750 lux horizontal -40/+30 -30/+30 -10/+15 0/+15
1/1/0/0 1/1/0/0 1/1/0/0 1/1/0/0
+
Class II – 500 lux horizontal
16 23
16.23 16 04
16.04 16 26
16.26 16 12
16.12 16 13
16.13
2 2 4 4 2
-50/+30 -30/+15 -20/0 0/-15 0/0
1/1/0/0 1/1/0/0 1/0/0/0 1/1/1/1 1/1/0/0
Floodlight types:
16.22 16.19 16.03 16.08 16.07 16.11
4 4 4 4 4 4
1 = WP11 -50/+15
/ -40/+15
/ /
-30/0 -10/0 -10/-15
/ 0/-30
/
1/1/0/0 1/1/0/0 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1
2 = WP21
3 = WP31 16.21 16.18 16.17 16.02 16.16 16.01 16.06
4 4 5 5 6 5 4
4 = WP41 -50/0 -40/0 -40/-15 -30/-15 -40/-30 -30/-30 -10/-30

5 = WP51 1/0/0/0 1/1/0/0 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1 1/1/1/1

6 = WP61
7 = WP71
77 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

40

17.16 30 17.05

20

10

-80 -60 -40 -20 0 20 40 60 80

17.07 -10
17.17
-20

17.01
-30
30

-40

Position 17: Axis 88-90


Number of floodlights: 17

78 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

40
17.10
30

20

10

-80 -60 -40 -20 0 20 40 60 80

17.07 -10

-20

17.01
-30
30

-40

Position 17: Axis 88-90


Number of floodlights: 17

79 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

40

30

20

10
17.08
X

-80 -60 -40 -20 0 20 40 60 80

17.07
-10

-20

17.01
-30
30

-40

Position 17: Axis 88-90


Number of floodlights: 17

80 16.02.2014
KASC Main Stadium – Floodlight Layout

Gantry Floodlight Aiming


Position 17
17.05

A seen from
As f the
th bbackside:
k id 1
0/+30
Class V – >2000 lux vertical 1/0/0/0

+
17.04 17.17
2 2
Class IV – 2000 lux vertical 0/+20 +25/-15
+ 1/0/0/0 1/0/0/0

Class III – 750 lux horizontal


17.16 17.14 17.09 17.03
+
4 4 2 2
-45/+30 -30/+20 -15/+20 0/0
Class II – 500 lux horizontal 1/0/0/0 1/0/0/0 1/0/0/0 1/0/0/0

17.08 17.07 17.06 17.01


Floodlight types: 4 4 4 4
-15/0 -15/-15 -15/-30 0/-30
1/1/1/0 1/1/1/0 1/1/1/0 1/1/1/0

1 = WP11
17.15 17.10 17.13 17.12 17.02 17.11
2 = WP21 2 2 4 4 2 4
-30/+30 -15/+30 -30/0 0/-15 -30/-30
3 = WP31 1/1/0/0 1/1/0/0 1/1/0/0
-30/-15
1/1/0/0 1/1/0/0 1/1/0/0

4 = WP41
5 = WP51
6 = WP61
7 = WP71
81 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class V

40 Y
18.05

30 18.14

20

10
X

-80 -60 -40 -20 0 20 40 60 80

-10
18.02
-20
Position 18: Axis 92-94
Number of floodlights: 18
18.13
-30
18.01
-40

82 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class IV

40 Y
18.12

30

20

10
X

-80 -60 -40 -20 0 20 40 60 80

-10
18.02
-20
Position 18: Axis 92-94
Number of floodlights: 18
18.13
-30
18.01
-40

83 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point
Class III

40 Y

30

20

10
X

-80 -60 -40 -20 0 20 40 60 80

-10
18.08
-20
Position 18: Axis 92-94
Number of floodlights: 18 -30

-40

84 16.02.2014
KASC Main Stadium – Calculation Sheet for Aiming Point

Gantry Floodlight Aiming


Position 18
18.14

A seen from
As f the
th bbackside:
k id 1
0/+30
Class V – >2000 lux vertical 1/0/0/0

+
18.05 18.17
4 4
Class IV – 2000 lux vertical -35/+30 -10/-30
+ 1/0/0/0 1/0/0/0

Class III – 750 lux horizontal


18.11 18.04 18.09 18.16
+
5 4 6 5
-45/+15 -35/+15 -45/-10 -45/-30
Class II – 500 lux horizontal 1/0/0/0 1/0/0/0 1/0/0/0 1/0/0/0

18.12 18.03 18.08 18.07 18.13


Floodlight types: 4 5 6 6 2
-45/+30 -35/0 -45/-15 -45/-25 0/-30
1/1/0/0 1/1/0/0 1/1/1/0 1/0/0/0 1/1/0/0

1 = WP11
18.18 18.10 18.02 18.01 18.15 18.06
2 = WP21 5 5 5 5 5 6
-50/+5 -45/0 -35/-15 -45/-30 -45/-30
3 = WP31 1/1/0/0 1/1/0/0 1/1/0/0
-35/-30
1/1/0/0 1/1/0/0 1/1/0/0

4 = WP41
5 = WP51
6 = WP61
7 = WP71
85 16.02.2014
HEALTH AND SAFETY RISK ASSESSMENT RECORD
Risk Assessment No.: 1 Site: King Abdullah Sports City Activity: Electrical Test & Commissioning Location: All Thermo Electrical works Date
Persons Employees No. Other Workers Public Visitors Young Persons Total Persons at Risk Person Conducting Assessment: HSE Manager/CE
Exposed 5 10 15 Person Supervising Work: Commissioning Engineer
RISK = Likelihood x Severity Acceptable Risk Further Review Unacceptable Risk

5 A Likelihood Severity
Rating 1 = Very Unlikely Rating 1 = First Aid Injury or Illness
4 Rating 2 = Unlikely Rating 2 = Minor Injury or Illness
Likelihood Rating 3 = Likely Rating 3 = "3 day" Injury or Illness
3 B Rating 4 = Very Likely Rating 4 = Major Injury or Illness
Rating 5 = Almost Certain Rating 5 = Fatality, Disabling Injury etc.
2
Signature of Person Compiling Assessment:
1 C
Date of Assessment: 10/4/2010
1 2 3 4 5 Date of Assessment Review: 3 Months
Severity
1 2 3 4 5 6 7 8
HAZARD Factors of Harm Risk CONTROL MEASURES Likelihood Severity Residual Risk Control Measures
Multiple of As Applicable, Please Cross Reference with Separate EES Suite of Multiple of Implemented by
Likelihood Severity Columns 1x2 Generic / Specific Risk Assessments See Note 1 See Note 1 Columns 5 x 6 (Name)
Falls From Height Work at Height will be planned to ensure fall prevention. Accordingly provision of all Work at
3 5 15 Height Equipment will be subject to a Task Specific Risk Assessment. 1 2 2 All
Personal Injuries - Subject to a suitable PPE Risk Assessment Eye, Hand, Head & Face protection will be worn
Penetrative Eye Injuries; at all times when Electrical Testing.
Head / Facial Injuries Planning will include liaison with other Contractors and those in control of the workplace to
Fluid Entry to Body ensure that all are aware of the work to be carried out / risks.
2 6 12 1 2 2 All
Explosion / Slips, Trips A pre-start survey will be conducted to check electrical works and ensure loose materials /
and Falls connections / temporary Installations have been removed before work begins.Daily task
briefing will be conducted by trade formen.
Operatives will be trained in testing techniques and instructed in the precautions for safe
work, including use of correctly calibrated test equipment. Trip hazzard identified and marked.
Ensure adequate task and general lighting is being used.
Test area will be designated a restricted entry zone.
Good communications will be maintained at all times and warning notices posted.
An Authorised and Competent person is to ensure that all precautions and conditions of the
Permit to Work have been met before signing the clearance to work.Appropiate PPE to be
used and site safety team will monitor the activity.
3 5 15 1 3 3 All
Poor Working Posture / Testers will be trained / experienced in requirements of manual Handling and work in
Manual Handling / restricted areas. Damage tools to be discarded, foremen will supervise all operations and all
Restricted Access / hand tools should be tied in a firm point.
Egress A clear access and Egress Emergency Route will be established and maintained.
2 5 10 1 3 3 All
Electric Shock / Burns / Electrical supplies will be isolated in adjacent cables where and whenever possible.
Electrocution/Permit to An electrical will be on hand to isolate any circuit damaged.Only authorized persons should
work be involved in the testing commissioning activity. Ensure proper permit to work system in
place.
3 5 15 1 3 3 All