PT Pertamina Hulu Rokan Onshore Drilling Rig
2. EQUIPMENT SPECIFICATION.
No RIG # HP RIG NAME
1 1ST Min 750 …………….
MINIMUM REQUIREMENT
Equipment Categories:
SE1 : Major Equipment - Surface, i.e., sub structure, rigs unit, engines, pumps, genset, mud boat.
SE2 : Minor Equipment - Surface, i.e., toolbox, hand wrench, camp, etc.
DE1 : Major Equipment - Downhole Mechanical, i.e., drill pipes, drill collar, etc.
DE2 : Minor Equipment - Downhole Mechanical, i.e., bit sub, cross over, etc.
DE3 : Major Equipment - Downhole Motorized, i.e., motor, MWD, LWD, etc.
DE4 : Minor Equipment - Downhole Motorized, i.e., gyro, etc.
2.1 GENERAL
No General Requirement Company Specification
1 INDUSTRIAL All slings, pad eyes, climbing devices, fall prevention devices, escape devices, and any other lifting and rigging equipment shall comply with the
STANDARDS Industrial Lifting and Rigging Standard.
All operations shall comply with the Industrial Confined Space Standard.
2 WELLSITE All rig equipment (including all porta-camps working area for supporting services’ equipment such as but not limited cementing, wireline logging,
LOCATION directional drilling etc.) shall fit within a maximum 280’ x 240’ footprint for safe, reliable, and efficient operations. The rig packages shall fit Company
standard location while rig supporting equipment shall be arranged fitting existing location layout. Contractor shall provide detail Rig layout include
all supporting equipment fitting Company location. The layout shall indicate detail dimensions of each equipment (in detail scalable drawing) include
their positions toward access road and mud pits.
2.2 RIG EQUIPMENT
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
1 DRAWWORKS 1 SE1 Minimum 750 Input HP Double
Drum, Truck / Trailer Mounted,
capable of drilling to a maximum
depth of estimate 8,000 ft with hook
Contract No. SPHR00013A Page 19 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
load capacity minimum safe working
load (SWL) 400,000 Lbs. In
compliance with API 7K.
2 DRAWWORKS 1 SE1 At minimum, engine type shall be
PRIME MOVER equivalent to 4 series number CAT
engine 35xx, sufficient to supply
input min 750 HP at constant load.
Year made 1990 or onward. ARF
shall be located in Indonesia for
reliable support. A dyno test (to
verify engine capability) is
required. Technical Analysis Level
2 (TA-2) Inspection is not
acceptable.
Engine shall always produce 90% of
horsepower nameplate. All engines
shall be completed with hydro
mechanical and air intake shut off
device.
3 CATHEADS 1 SE1 Hydraulic Cat works with sufficient
torque capacity to generate 60,000
ft-lbs. of torque. Line pull shall have
a working torque gauge to measure
make up torque in ft-lbs. reading.
4 SUBTRUCTURE 1 SE1 Capable of handling 300,000 lbs.
rotary load and 250,000 lbs. setback
capacities.
Requirements:
1) Structure shall have integrated
hoist system (at minimum 20 tons)
sufficient to support class 3 BOP
stack handling while nipple up and
nipple down.
2) Substructure design shall
support BOP movement and
Contract No. SPHR00013A Page 20 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
installation (unobstructed ingress
egress).
3) Substructure shall be “in-line”
design with relation to rig carrier to
accommodate drilling new wells near
existing wells.
4) Contractor shall specify exact
height of this equipment from ground
level to rotary table and from ground
level to bottom of rotary beams when
responding.
5) Substructure design shall be
able to accommodate opening of
pipe ram bonnets whenever ram size
change out is required.
6) Structural engineering
calculations verifying the capacity
are required.
7) Substructure shall
accommodate Company standard
well pad dimensions with multiple
wells on one pad (see Company
standard layout).
8) In compliance with API 4F.
9) Contractor to provide a drip pan
system underneath the Rotary Table
to collect any fluid drip from the rig
floor and flow it to the waste handling
system to support zero discharge
system.
10) Substructure shall
accommodate Company standard
wellhead dimension combine with
BOP class 3 stack.
5 ROTARY TABLE 1 SE1 27.5 in minimum opening, 250 tons
minimum static load capacity with
bushings for 7”, 9-5/8”, 13-3/8”, and
18-5/8” casing.
Contract No. SPHR00013A Page 21 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
Rotary table shall be equipped with
working rotary torque gauge
measuring in ft–lbs. Rotary table
shall have positive lock to prevent
both clockwise and
counterclockwise rotation.
Rig floor shall be covered with non-
skid, traction pads to facilitate safe
working environment throughout
Drilling & Completion operation.
For example, please see
http://www.customsafetyproducts.co
m/
6 DOGHOUSE 1 SE1 Doghouse shall be equipped with set
up (rig up & rig down) mechanism
following Safety in Design (SID),
e.g., no rigger is position above
doghouse during set up (rig up & rig
down).
Contractor shall provide engineering
drawing for doghouse complete with
load rating.
7 LOADING RAM 1 SE1 Matched to rig carrier and
substructure.
The loading ramp / mud boat shall
have secure connection integrity
with the substructure to ensure
substructure and mast stability.
Contractor shall specify exact height
of this equipment when responding.
Structural engineering calculations
verifying capacity are required.
Contractor shall specify the point of
loading distribution (supported by
engineering calculation).
Contract No. SPHR00013A Page 22 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
8 DERRICK/MAST 1 SE Derrick / Mast minimum safe static
1 working load (SWL) rated to
400,000 lbs. Derrick Mast height
shall be able to accommodate Top
Drive system with double stands of
R2 Drill Pipe with connection
minimum 1.5 ft (18 inch) above
rotary table and 2 – 3 ft of clearance
between the travelling block the
Crown of the mast.
Requirements:
1. Contractor shall specify exact
height of this equipment complete
with top drive system installed
handling double pipes when
responding.
2. Contractor shall install crown
saver which shall automatically
disengage the drum clutch and
engage the brake if the block travels
too near the crown.
3. In compliance with API 4F.
4. If the derrick / mast is equipped
with guy line then guy line
termination to anchor shall use
following termination type.
9 BLOCK/HOOK 1 SE1 250 tons minimum dead strength
rating with minimum 5 sheaves and
complete with standard and extra-
long links for cementing. All elevator
links shall be rated for a minimum of
250 tons.
Contract No. SPHR00013A Page 23 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
Contractor shall specify exact
working length of this equipment
when responding.
10 TOP DRIVE 1 set SE1 Minimum 250 tons Top Drive System
capable for:
1. Drilling Speed Range: 0 –
minimum 180 RPM continuous
2. Drilling Torque: minimum
20,000 ft-lbs. continuous at 100
RPM (effective torque during
operation).
3. Hoisting Capacity: minimum
250 tons, API 8C, PSL-1.
4. Prime Mover: capable to
deliver minimum required HP for
maximum Top Drive capability. Year
made 1990 or onward. ARF shall be
located in Indonesia for reliable
support. A dyno test (to verify engine
capability) is required. Technical
Analysis Level 2 (TA-2) Inspection is
not acceptable.
5. Quill Connection: NC50 or 6-
5/8” Reg.
The unit shall be completed with Top
Drive and Swivel handling frame
used during R/U & R/D the top drive
system. Top Drive Unit dimension
shall fit with Rig Mast system
dimension.
PIPE HANDLER 1 set SE1 - Make up Torque Capacity:
ON TOP DRIVE minimum 29,000 ft-lbs.
SYSTEM - Break out Torque capacity:
minimum 32,000 ft-lbs.
- Grabber: Range 3-½” to 5 “OD
Pipe c/w drill pipe guide 6-¾” ID.
Contract No. SPHR00013A Page 24 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
- Upper IBOP: RH box rated for
minimum 10,000 psi. Remote
Operated.
- Lower IBOP: RH pin/Box rated for
minimum 10,000 psi.
- IBOP Connection shall be matched
with provided quill connection
- Elevator Links: 250 tons, Full Tilt
elevator links forward or backwards
for drilling down to rig floor.
- Rotary Table Stabilizer for 5” Drill
pipe.
SERVICE LOOP 1 set SE1 1. Power conductor cable / high
UNIT FOR TOP pressure hose, reel complete with
DRIVE SYSTEM clamps, attachments and hanging
cables.
2. Goose neck extension to attach
to 4” Kelly hose rated for 5,000 psi.
3. Control cable completed with
free standing spooling reel.
TORQUE 1 set SE1 Torque track complete with
ARREST accessories for installation flexibility.
SYSTEM
DRILLER 1 set SE1 Complete and compact control
CONTROL system with: Torque meter in ft-lbs.,
SYSTEM RPM meter, throttle control, torque
control, pipe handler control, IBOP
controls, Brake Controls, Mode
selection, Drill torque limit, Make Up
limit, Emergency Stop.
CAMERA AND 1 set SE2 Camera and Intercom installed at the
INTERCOM monkey board to allow driller to
monitor the TDS movement. Class 1
Division 1.
Contract No. SPHR00013A Page 25 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
MOVE ABILITY 1 set SE2 Top Drive equipment and
accessories shall be neatly packed &
containerizes for safe, ease, and
speed of moving between locations.
11 AIR PACKAGE 1 set SE2 Air cooled air compressor complete
with a minimum 20 HP motor,
minimum 500 gal receiving vessel
and all necessary piping and
controls. This system shall have
sufficient capacity to operate all air
actuated components on the rig and
shall have two sources of power
(diesel engine and explosion proof
electric motor).
12 HOIST 2 SE2 1 ea. 3 ton and 1 ea. 5 tons minimum
capacity Hydraulic or Pneumatic
hoist complete with brand new cable
and a guide to ensure that the cable
is properly spooled on the drum each
time the hoist is operated. If hoist is
pneumatic, a dedicated compressor
and suitable size air tank must be
provided to operate hoist only.
Contractor shall specify either
Hydraulic or Pneumatic and hoist
line size and manufacturer when
responding.
13 PIPE BOX/ PIPE As SE2 Standard oil field design (Pipe Rack
RACK Nee complete with Engineering
ded Calculation)
1. Pipe racks shall be designed and
built as per engineering calculations
to handle the loads required (drill
pipe, casing, etc.)
2. Pipe racks shall be inspected as
per Exhibit F.
Contract No. SPHR00013A Page 26 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
14 RIG MATS 2 SE2 Sectionalized rig matting for rig
Sets carrier, substructure. Rig Mats shall
be in safe and good condition during
lifetime of contract. Quick
replacement shall be made upon
damage.
1 SE2 For supporting Company tools and
Set equipment.
Rig Mats shall be in safe and good
condition during lifetime of contract.
Quick replacement shall be made
upon damage.
15 DEVIATION 1 DE2 0-8 degrees’ double recording type
SURVEY TOOL that can be dropped or run-on sand
line or run-on 0.092” slick line.
16 RIG 1set SE2 A sheltered Driller console with
INSTRUMENTATI drilling parameter indicators (weight
ON indicator, SPM for each pump, RPM
gauge, Rotary Torque gauge
complete with sensatory (real torque
in ft-lbs.), Rotary Tong Torque
Gauge, stroke counter and Pump
Pressure gauge.
2 SE2 Soft Scale pressure gauge 0 to 500
ea. psi full scale complete with valves
and fittings to mount it on the
standpipe when necessary to
ascertain drill pipe pressure in well
control situations. A permanent
fitting shall be present on the
standpipe to mount this gauge.
However, the gauge shall only be
mounted as needed.
Contract No. SPHR00013A Page 27 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
1 set SE2 Indicative acceptable brand or
equivalent: RigSense NOV. The IDS
(Integrated Drilling System) shall be
capable of taking real time
monitoring drilling parameter as
follow:
1. PVT Tanks shall be
equipped equivalent to
Ultrasonic/Radar sensors both
Active and Trip tanks with
continuous gain and loss volumetric
measurement. At minimum, shall be
able to detect 5 bbls of changes.
Flow sensor for returned mud at flow
line at least paddle type showing
total mud flow in bbl and % of total
flow.
PVT sensors and Flow sensors shall
be capable to detect any early kick
detection.
2. Provide proximity sensors
for stroke per minute (SPM) for each
mud pump and total pumps flow rate.
The system shall convert SPM to gal
per hour (GPM).
3. RPM and Torque
measurement for provided Top Drive
(either Electric or Hydraulic Top
Drive). Torque measurement shall
be in ft-lbs unit
4. Sensor to provide rotary
torque measurement using ft-lbs unit
(when needed).
5. Ability to provide Hookload,
Weight on Bit (WOB), and Block
Height by utilizing electronic encoder
sensors. It shall monitor bit depth
position and calculate instantaneous
and average ROP continuously.
Contract No. SPHR00013A Page 28 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
6. Shall provide pressure
transducer for standpipe manifold to
provide SPP monitoring.
7. Shall provide sensors to
accurately measure casing, annulus,
and internal pressure using
electronic transducer type (when
needed).
Shall have monitoring display at
Driller’s floor (preferable touch
screen) and DSR office.
Shall have ability to record and
backup all of drilling parameters data
in large storage (min 500 gb) to
cover drilling campaign during
contract period.
Shall be capable for taking
measurement, recording, and data
sampling rate at min every 0.5
seconds.
The data acquisition system shall be
either wired or wireless
communication between rig floor and
DSR office.
The system shall be equipped with
various alarms for all drilling
parameters and services.
The system shall be able to WITS in
and out any 3rd party data to be
transferred to any appointed Service
Company for centralized display of
various drilling parameters and
services.
The system shall be able to support
minimum of 50 channels of drilling
parameters and 3rd party services
with multiple protocol.
Contract No. SPHR00013A Page 29 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
The IDS shall be supported by
provider with local support to
maintain system during operations.
17 MANUAL 1 SE1 Manual Catwalk and V-Door.
CATWALK unit Capable to handle 3-1/2” to 5” DP, 3-
1/2” to 5” HWDP, 4-3/4” to 8” DC, 2-
3/8” to 4-1/2” tubing.
2.3 CIRCULATING EQUIPMENT
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Supporting Field
EQ.
NO EQUIPMENT QTY Last Until End of document Verification
CAT
Specification / Manufacture Location Operating Contract? provided (Yes/No)
Time (Yes/No)/
(Validity
date)
1 MUD PUMP 3 SE1 (3 units mud pumps shall be in SPIDER SLIP 1 set SE2 Pneumatic
Unit ready line installations match to Spider Slips
s mud tanks set up - 2 units are in for tubing,
operations, 1 unit as backup; minimum 80
however all 3 mud pumps can be tons rated
operated simultaneously capacity.
depending on operational needs / Tubing size:
well program). Triplex pumps are 2-7/8”, 3-
required. Each pump shall be rated 1/2", 4-1/2”.
for minimum 1000 HP input (3 mud
pumps shall have same rating) and
shall be able to deliver with all
pressures / volumes combinations.
Year made shall be at least 2010 or
onward. Brand new and OEM
recommended bearing shall be
Contract No. SPHR00013A Page 30 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
installed on Mud Pump power ends
and full NDT on Mud pumps fluid
ends for possible cracks shall be
provided.
Indicative acceptable brand or
equivalent: Gardner Denver,
National, Ideco, Lewco, Emsco,
Weatherford or Continental Emsco
(F-Series).
Requirements: 1- Each Mud Pump
shall be capable of delivering
minimum range of 600 GPM at
2,500 psi working pressure to 400
GPM at 3,500 psi working
pressure; 2- Each pump shall
have pulsation dampener on
output, flooded suctions provided
by independently driven electric
motor or belt driven centrifugal
pumps and vibration hose on
discharges.; 3- Vibration hoses
shall be rated to 5,000 psi working
pressure; 4- Contractor shall
specify either electric or belt driven
charging pumps when responding;
5- All piping on discharge lines
and standpipe shall be in welded
connection; 6- Pressure gauges
installation shall use flanged or
screw connection; 7- All relief lines
shall be rated at least equal to
maximum working pressure of the
pump (as per calculations in
ASME B31.3) and shall be
included in the high-pressure
piping inspection; 8- Manufacturer
shall be API certified; 9- All high-
pressure & relief lines shall have
safety restraint across every
connection and be properly
secured; 10- Mud pump shall be
equipped with close loop cooling
system; 11- Critical parts (not
limited to Liner, Fluid End Module,
Insert Valve, Seat Valve, Piston
Assembly) shall be OEM and
brand new.
Contract No. SPHR00013A Page 31 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
2 MUD PUMP 3 SE1 At minimum, type shall be
PRIME MOVER Unit equivalent to 4 series number CAT
s engine 35xx, sufficient to supply
input min 1000 HP at constant
load. Year made 1990 or onward.
ARF shall be located in Indonesia
for reliable support
Requirements:
1. Engines shall be large enough to
provide min 800 HP to input shaft
of mud pump. Contractor shall
provide engine / transmission
converter data to verify that 800 HP
is delivered to the pump
2. A dyno test (to verify engine
capability) is required. Technical
Analysis Level 2 (TA-2) Inspection
is not acceptable.
3. Engines shall be equipped with
hydro mechanical and air intake
shut off device.
3 MUD TANK 1 set SE2 Brand New. Minimum 800 bbl.
usable surface volume with
separate compartment for: 1. Sand
Trap; 2. Shale Shaker; 3.
Degasser; 4. Desander; 5. Desilter;
6. Slug Pit (min. 70 bbl. capacity);
7. Pre-mix Pit; 8. Active Pit.
Required additional tank: Trip
Tank, min. 50 bbl. with dedicated
centrifugal pump.
Requirements:
1. Tank layout and piping
arrangement shall be designed by
Solids Control Specialist Company.
Contractor to provide drawings and
mud lines schematic when
responding.
2. Mud tank shall have low / high
equalization and bottom clean out
gates. This equalization shall allow
100 % liquid processing efficiency
through Solids Control Equipment
(SCE).
3. Mud tank shall have Discharge
Ditch to direct the mud return from
shakers to each compartment as
Contract No. SPHR00013A Page 32 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
required.
4. Mud tank shall have Cutting
Discharge / Slide Chute to carry the
cuttings and drilling fluid waste
away from the mud tank area.
Discharging to ground next to mud
tanks is unacceptable.
5. Mud tank shall have Mud House
with shelter, exhaust, and lightings.
6. Mud tank and mixing area shall
be equipped with adequate lighting
for full visibility during night
operations. Lighting features on
tank and shaker area shall be
capable of being rotated and
aimed.
7. All electric plugs, outlets, motors,
lighting, and control boxes shall be
explosion proof.
8. Mud tank / mixing area shall be
equipped with eyewash station and
chemical safety shower.
9. Maximum each tank dimension
shall be 40 ft length x 10 ft wide.
10. Tank arrangement shall be
flexible using flexible hoses.
11. Mud tank shall have robust
system to drain mud from mud tank
to disposal pit to avoid any spill.
4 SHALE SHAKER 3 SE1 Brand New. Indicative acceptable
brand (Derrick, MI Swaco, Brandt)
or equivalent: Derrick FLC 503,
Linear motion, 3 panel model,
powered by vibrating motors to
operate at continues 7 G’s. Easily
and quickly raise or lower screen
panel from -1 degree to +5 degree
angle.
Requirements:
1. Each unit shall be capable to
process at minimum 500 gpm,
10.5 ppg water-based mud with
120 mesh screens.
2. The unit shall be equipped with
“jet sprayer” system for screen
cleaning.
Contract No. SPHR00013A Page 33 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
3. Contractor to provide screens
as per Company request ranging
API 80-200 per API RP 13C
designation. Company will
reimburse cost of all screens to the
Contractor. Any remaining
inventory at end of the contract is
Contractor’s responsibility.
4. Only OEM replacement parts
are accepted.
5. Company reserves the right to
provide screens directly from 3rd
party Company.
6. Provided shale shaker shall be
fit for purpose for Company's
operation need.
5 DESILTER 1 SE1 Brand New. Indicative acceptable
brand (Derrick, MI Swaco, Brandt)
or equivalent. Minimum 12
polyurethane cones with 4" hydro
cyclones equipped with pressure
gauge (in psi) and dedicated
Centrifugal Pump and Electric
Motor to supply 75 ft of head at 600
gpm.
Requirements:
1. Desilter cones shall be suitable
for high temperature application.
2. Desilter shall have independent
manifold.
3. All clamps shall be Victaulic
type.
4. All replacement parts (including
nozzle) shall be OEM parts.
5. Provided Desilter shall be fit for
purpose for Company's operation
need.
6 DESANDER 1 SE1 Brand New. Indicative acceptable
brand (Derrick, MI Swaco, Brandt)
or equivalent. Minimum 2
polyurethane cones with range 10”
- 12" hydro cyclones equipped with
pressure gauge (in psi) and
dedicated Centrifugal Pump and
Electric Motor to supply 75 ft of
head at 600 gpm.
Contract No. SPHR00013A Page 34 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
Requirements:
1. Desander cones shall be
suitable for high temperature
application.
2. Desander shall have
independent manifold.
3. All clamps shall be Victaulic
type.
4. All replacement parts (including
nozzle) shall be OEM parts.
5. Provided Desander shall be fit
for purpose for Company's
operation need.
7 DEGASSER 1 set SE1 Brand New. Indicative acceptable
brand (Derrick, MI Swaco, Brandt)
or equivalent. Vacuum Type
Degasser equipped with negative
pressure gauge and dedicated
Centrifugal Pump and Electric
Motor to supply minimum 800
gpm. Degasser shall have
independent manifold. Provided
Degasser shall be fit for purpose
for Company's operation need.
8 MUD HOPPERS 2 SE1 Brand New. Each Mud Hopper
AND MIXING shall be equipped with Fluid and
PUMP Polymer Shearing Devices using
impingement plates, piping, valves,
sack support with dedicated
minimum 100 HP Electric
Centrifugal Pump as Mixing Pump.
Requirements: 1- Hopper shall use
Nozzle or Ventury Jet type; 2-
Hopper shall have cutting table and
working area grating plate; 3-
Hopper shall have independent
manifold; 4- Hopper shall have
bypass manifold when not mixing
polymer; 5- Hopper shall be
equipped with a dust reduction
device to avoid dust inhalation by
crews while mixing chemicals; 6-
Hopper shall have ability to
discharge to active and slug pit
compartments; 7- Hopper shall be
equipped with shelter; 8-
Contract No. SPHR00013A Page 35 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
Contractor to provide details of
hopper, mixing pump, and shearing
device schematic / drawings.
9 MUD AGITATOR 1 SE Mud Agitator with ability to
Set 2 provide 65-85 second turnover
rate, shall be available minimum
one unit per compartment except
in sand trap. It shall be equipped
with minimum 10 HP explosion
proof electric motor. Control
boxes for motors shall be industry
recognized explosion proof.
Reference for TOR (turnover rate)
as per below table:
10 MUD GUN 1 SE2 Bottom type Mud Gun, shall be
Set available minimum one per
compartment except in sand trap
and equipped with Swivel and
Nozzles.
11 CHEMICAL 1 SE2 Chemical Barrel equipped with
BARREL stick steer valve at bottom outlet.
12 MUD MANIFOLDS 1 SE2 Unitized 4", 5,000 psi for
standpipe, kill line, and fill line
completed with sufficient valves to
direct mud flows as needed.
Requirements:
1. All hammer union connection
shall be grade 1502 rated for
15,000 psi.
2. All piping on standpipe shall
be in welded connection.
3. Pressure gauges installation
shall use flanged connection.
4. Mud manifold shall be
designed to accommodate option
to suck from all applicable
compartments including pre-mix
tank.
13 WATER TANK 1 SE2 500 bbl. minimum usable volume
capacity, shall be skid mounted,
Contract No. SPHR00013A Page 36 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
equipped with dedicated
Centrifugal Transfer Pump.
Tank shall be completed with fill /
discharge standpipe / manifold and
equipped with 3” union hammer
connection (matched with Vacuum
Truck hose connection type). Top
filling directly using VT hose over
tank is Filling with vacuum truck
hose over the side is
unacceptable.
14 TRANSFER PUMP 1 SE2 Skid Mounted and Portable
Centrifugal Pump with Electric
Motor to transfer fluids at location,
shall be capable to supply
minimum 75 ft head and 200 gpm
continuously, equipped with 2 x 75
ft of 2” hose.
15 SUPPLY WATER 1 SE2 Skid Mounted Duplex Pump with
PUMP Independent Engine capable of
providing a constant 200 gpm flow
to tanks from water source
complete with minimum 100 HP
diesel engine. Contractor shall
specify type of pump when
responding.
16 WATER SOURCE 1,000 SE2 3-1/2” Water Line completed with
LINE ft screwed connection or continuous
reel. Drill strings is not acceptable.
17 MUD BUCKET 1 SE Mud Bucket (Mud Saver)
2 completed with seals (shall be
light material and easy to be
handled by one personnel without
assisting tools). Indicative brand /
model or equivalent: Katch-Kan
type (see below).
18 2" AIR DRIVEN 1 SE1 Diaphragm Pump, Air Driven
DIAPHRAGM Type.
PUMPS
Contract No. SPHR00013A Page 37 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
- Connected to rig air supply line
with ¼”-1” connection and 30-120
psi air pressure
- Rate capacity up to 1-2 bpm
- Stainless steel material
- 1”-2” connection size for fluids
suction / discharge
Pump shall have additional
features, such as:
- Suction filter
- Limit switch – low voltage.
- Limit switch – stop / start pump.
Requirement: pump spare parts
shall be OEM and available onsite.
19 MUD GAS 1 set SE2 Mud Gas Separator (MGS) rated
SEPARATOR for minimum: 85 psi working
pressure, 250 gpm kill rate, 3
MMscf/day flow rate.
Shall be equipped with:
- Baffle plate inside MGS body.
- Dedicated inlet to transfer fresh
mud into MGS in case of
recovering gas blow thru.
- Gas vent stack that connects to
MGS gas outlet fulfilling safety
regulation.
- All connection lines of MGS inlet
to choke manifold, MGS gas outlet
to vent stack & MGS mud outlet to
solid control facility / tank.
20 KELLY/ROTARY 1 set SE2 4” Kelly / Rotary Hose, rated min
HOSE 5000 psi, with connection and
length matched to Top Drive /
Kelly operations.
2.4 DRILL STRING EQUIPMENT.
Contract No. SPHR00013A Page 38 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
1 DRILL PIPE (DP) 250 DE1 5", 19.5 ppf, R2, API grade G105 or
jts S135, with NC50 (4-1/2" IF)
connection, and minimum Premium
Class.
Requirements:
1. Hard banding on DP shall be
"smooth hard banding".
2. DP shall be equipped with
appropriate pipe boxes, thread
protectors, and lifting nubbins /
caps.
3. Pipe boxes shall be capable
to handle DP loads with appropriate
lifting system (pad eyes, slings,
etc.).
4. All DPs shall be inspected as
per Exhibit G (Drilling Eq.
Qualification Standard).
2 HEAVY WEIGHT 50 DE1 5", 49 ppf, R2, with NC 50 (4-1/2”
DRILL PIPE Jts IF) connection, and minimum
(HWDP) Premium Class.
Requirements:
1. Hard banding on HWDP shall
be "smooth hard banding".
2. HWDP shall be equipped with
appropriate pipe boxes, thread
protectors, and lifting nubbins /
caps.
3. Pipe boxes shall be capable
to handle HWDP loads with
appropriate lifting system (pad
eyes, slings, etc.).
4. All HWDPs shall be inspected
as per Exhibit G (Drilling Eq.
Qualification Standard).
3 DRILL PIPE PUP 1 set DE1 5", 19.5 PPF, API Grade G105 or
JOINTS S135, with NC 50 (4-1/2"IF)
Contract No. SPHR00013A Page 39 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
connection, and minimum Premium
Class. 2 jts - 5 ft. 1 jt (each) – 10 ft,
15 ft, 20 ft. DP pup shall be
equipped with appropriate thread
protector.
4 DRILL COLLAR 10 DE1 8" OD x 2-13/16" ID spiral, R2, with
(DC) jts 6-5/8" Reg. connection, and
minimum Premium Class.
Requirements:
1. DC shall be equipped with
appropriate pipe boxes, thread
protectors, and lifting subs.
2. Pipe boxes shall be capable
to handle DC loads with appropriate
lifting system (pad eyes, slings,
etc.).
3. All DCs shall be inspected as
per Exhibit G (Drilling Eq.
Qualification Standard).
15 DE1 6-1/2” or 6-3/4" OD x 2-13/16" ID
jts spiral, R2, with NC50 (4-1/2” IF)
connection, and minimum Premium
Class.
Requirements:
1. DC shall be equipped with
appropriate pipe boxes, thread
protectors, and lifting subs.
2. Pipe boxes shall be capable
to handle DC loads with appropriate
lifting system (pad eyes, slings,
etc.).
3. All DCs shall be inspected as
per Exhibit G (Drilling Eq.
Qualification Standard).
Contract No. SPHR00013A Page 40 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
2 jts DE1 8" OD Pony DC (10-20 ft), with 6-
5/8" Reg. connection, and minimum
Premium Class.
Requirements:
Requirements:
1. DC should be equipped with
appropriate pipe boxes, thread
protectors, and lifting subs.
2. Pipe boxes should be capable
to handle DC loads with appropriate
lifting system (pad eyes, slings,
etc.).
3. All DCs should be inspected
as per Exhibit G (Drilling Eq.
Qualification Standard).
2 jts DE1 6-1/2” or 6-3/4" OD Pony DC (10-20
ft), with NC50 (4-1/2” IF)
connection, and minimum Premium
Class.
Requirements:
1. DC should be equipped with
appropriate pipe boxes, thread
protectors, and lifting subs.
2. Pipe boxes should be capable
to handle DC loads with appropriate
lifting system (pad eyes, slings,
etc.).
3. All DCs should be inspected
as per Exhibit G (Drilling Eq.
Qualification Standard).
5 MISCELLENEOUS Requirements:
SUBS 1. All Miscellaneous Subs shall
complete with steel thread
protectors.
2. All Bit Subs listed shall be
bored for Float Valve.
3. Contractor shall specify exact
length of all Subs when responding.
Contract No. SPHR00013A Page 41 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
2 DE2 Crossover, 6-5/8” Reg. pin x NC50
box (4-1/2” IF).
2 DE2 Bit Sub, 6-5/8” Reg. box x 7-5/8”
Reg. box
2 DE2 Bit Sub, 6-5/8” Reg box x 6-5/8”
Reg box.
2 DE2 Bit Sub, NC50 (4-1/2” IF) box x 6-
5/8” Reg. box.
2 DE2 Bit Sub, NC50 (4-1/2” IF) box x 4-
1/2” Reg. box.
1 DE2 Lifting Sub, 2 ea. per each size:
Set For 8” DC (6-5/8” Reg. connection);
For 6-3/4” DC (NC50 connection).
2 DE Lifting Nubbin / Cap for 5” DP and
2 5” HWDP (NC50 connection); for
2-7/8” EUE TBG, 2-7/8” NUE TBG
3-1/2” NUE TBG, 3-1/2” EUE TBG,
4-1/2” NUE TBG.
1 DE2 Crossover - Circulating Sub, 13-3/8”
Casing BTC pin x NC50 box.
It shall or can be connected to Top
Drive, rotated by TDS, connected to
FOSV, shop fabricated and come
with pressure test certificates
indicating that has been pressure
tested to twice the burst value for
the appropriate casing size or at
minimum 3,000 psi working
pressure.
Contract No. SPHR00013A Page 42 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
1 DE2 Crossover - Circulating Sub, 9-5/8”
Casing BTC pin x NC50 box.
It shall or can be connected to Top
Drive, rotated by TDS, connected to
FOSV, shop fabricated and come
with pressure test certificates
indicating that has been pressure
tested to twice the burst value for
the appropriate casing size or at
minimum 3,000 psi working
pressure.
1 DE2 Crossover - Circulating Sub, 7”
Casing BTC pin x NC50 box.
It shall or can be connected to Top
Drive, rotated by TDS, connected to
FOSV, shop fabricated and come
with pressure test certificates
indicating that has been pressure
tested to twice the burst value for
the appropriate casing size or at
minimum 3,000 psi working
pressure
1 DE2 Crossover - Circulating Sub, 6-5/8”
Casing BTC pin x NC50 box.
It shall or can be connected to Top
Drive, rotated by TDS, connected to
FOSV, shop fabricated and come
with pressure test certificates
indicating that has been pressure
tested to twice the burst value for
the appropriate casing size or at
minimum 3,000 psi working
pressure.
1 for DE2 Crossover from Tubing to DP, 1 ea.
each for each size: 3-1/2” NUE pin x 3-
size 1/2” IF box, 3-1/2” EUE pin x 3-1/2”
Contract No. SPHR00013A Page 43 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
IF box, 2-7/8” EUE pin x 3-1/2” IF
box, 4-1/2” NUE pin x 4-1/2” IF box.
1 for DE2 Crossover from DP to DP, 1 ea. for
each each size: 3-1/2” IF pin x 4-1/2” IF
size box, 4-1/2” IF pin x 3-1/2” IF box.
1 for DE2 Crossover from Tubing to Tubing, 1
each ea. for each size: 3-1/2” EUE pin x
size 3-1/2” NUE box, 3-1/2” NUE pin x 3-
1/2” EUE box, 3-1/2” NUE pin x 2-
7/8” EUE box, 2-7/8” EUE pin x 3-
1/2” NUE box, 3-1/2” NUE pin x 4-
1/2” NUE box, 4-1/2” NUE pin x 3-
1/2” NUE box.
6 BLADE TYPE 2 DE2 8-1/2”, with 4-1/2” IF pin x 4-1/2” IF
STRING box
STABILIZER
2 DE2 12-1/4”, with 6-5/8” Reg pin x 6-5/8”
Reg box
1 DE2 17-1/2”, with 6-5/8” Reg pin x 6-5/8”
Reg box
7 FLOAT VALVE 2 DE2 For all Bit Sub sizes, 2 ea. for each
ea./s size. Shall be solid float valve (non-
ize ported flapper or plunger type is
acceptable).
8 FALSE ROTARY 1 set DE2 Shall match to rotary table and can
TABLE be used for running 3-1/2” and 4-
1/2” tubing. Able to withstand
minimum 95,000 lbs. load.
9 HANDLING Requirement: All provided powered
TOOLS handling tool (hydraulic or
pneumatic) shall use independent /
dedicated power unit.
Contract No. SPHR00013A Page 44 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
1 set SE2 Pipe Spinner: Hydraulic or
Pneumatic pipe Spinner c/w
variable jaws and rollers to handle
3-1/2” through 8” drill string
components.
1 set SE2 Hydraulic power tongs for casing -
5-1/2”, 6-5/8", 7", 9-5/8", 13-3/8".
Shall be equipped with working
torque gauge in ft-lbs., safety cut
out system when the jaws are
opened.
1 set SE2 Hydraulic power tongs for tubing –
3-1/2”, 4-1/2”. Shall be equipped
with backup tong system as integral
part, working torque gauge in ft-lbs,
safety cut out system when the jaws
are opened.
1 SE Manual Rotary Tong for Make-up
set 2 and Break-out on tubular – 3-1/2”
to 13-3/8”. Shall be capable to
apply at least 60,000 ft-lbs. of
torque. Shall be equipped with:
Tong line pull gauges installed on
each the make-up and break-out
snub lines, total 2 tong line pull
gauges, Counterbalances that
shall comply with Company Lifting
& Rigging Standard, Tong safety
handles (see below).
Contract No. SPHR00013A Page 45 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
1 set SE2 Split Bushings for running tubular -
13-3/8", 9-5/8", 7", 6-5/8", and 5-
1/2". Load rating shall be at least
same with the rotary table.
1 set SE2 Rotary Slips for running :
- Drill string : 5" DP - 250 tons, 6-
1/2" or 6-3/4" DC - 150 tons, 8" DC
- 150 tons.
- Casing : 4-1/2” – 150 tons, 5-1/2”
– 150 tons, 6-5/8” – 150 tons, 7" -
250 tons, 9-5/8" - 250 tons, 13-3/8"-
250 tons.
1 set SE2 Elevators for running:
- Drill string: 5" DP - 250 tons, 6-1/2"
or 6-3/4" DC - 150 tons, 8" DC - 150
tons.
- Casing: 4-1/2” – 150 tons, 5-1/2” –
150 tons, 6-5/8” – 150 tons, 7" - 250
tons, 9-5/8" - 250 tons, 13-3/8"- 250
tons.
- Tubing with minimum capacity
rating 80 tons: 2-7/8” EUE TBG, 2-
7/8” NUE TBG 3-1/2” NUE TBG, 3-
1/2” EUE TBG, 4-1/2” NUE TBG.
1 set SE2 Manual DC Safety clamp for all DC
sizes.
1 set Quick Disconnect Casing Protector
– for 5-1/2”, 6-5/8”, 7", 9-5/8", 13-
3/8". Quantity 6 ea. for each size.
10 INSIDE BOP 1 ea SE2 For 5" DP with NC 50 (4-1/2" IF)
Note: connection, 5,000 psi working
Pin connection pressure. IBOP shall be completed
shall align with with disabling mechanism. Pin
Contract No. SPHR00013A Page 46 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
FOSV connection connection shall be aligned with
type FOSV connection.
1 ea SE2 For 3-1/2" DP with 3-1/2" IF
connection, 5,000 psi working
pressure. IBOP shall be completed
with disabling mechanism. Pin
connection shall be aligned with
FOSV connection
11 FULL OPEN 2 ea SE2 For 5" DP with 4-1/2" IF connection,
SAFETY VALVE 5,000 psi working pressure. FOSV
Note: shall be equipped with necessary
BOX Connection crossovers to 6-1/2” or 6-3/4” DC
shall align with and 8" DC. FOSV shall be
IBOP connection completed with handling system.
type FOSV shall have suitable OD for
stripping through BOP equipment.
Box connection shall be aligned
with IBOP connection.
2 SE2 For 3-1/2” DP (3-1/2” IF)
ea. connection, 5,000 psi working
pressure. FOSV shall be completed
with handling system. FOSV shall
have suitable OD for stripping
through BOP equipment. Box
connection shall be aligned with
IBOP connection.
12 CIRCULATING 1 SE2 For 5" Drill Pipe – 5,000 psi
HEAD ea. working pressure. It shall be
completed with Fig 1502
connections. Shall have API Spec
7-1 licensed. Shall be forged, no
screw is allowed.
13 PUMP-IN SUB 1 SE2 For 5" Drill Pipe – 5,000 psi
ea. working pressure. It shall be
Contract No. SPHR00013A Page 47 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
completed with Fig 1502
connections. Shall have API Spec
7-1 licensed. Shall be forged, no
screw is allowed.
14 CIRCULATING 1 ea SE2 For running casing - 13-3/8" BTC, 9-
SWEDGE 5/8" BTC, 7" BTC. Quantity 1 ea.
each size. It shall be completed with
2" hammer union connection grade
1502 (15,000 psi), shop fabricated
with pressure test certificates
indicating that they have been
pressure tested to twice the burst
value for the appropriate casing size
or at minimum 3,000 psi working
pressure, "Orange peel" welded
type swedge is not acceptable, No
screw is allowed.
CIRCULATING 1 SE2 For running tubing - 4-1/2” NUE, 3-
SWEDGE ea. / 1/2” EUE, 3-1/2” NUE, 2-7/8” EUE.
(IC) size Quantity 1 ea. each size. It shall be
completed with 2" hammer union
connection grade 1502 (15,000 psi),
shop fabricated with pressure test
certificates indicating that they have
been pressure tested to twice the
burst value for the appropriate
casing size or at minimum 3,000 psi
working pressure, "Orange peel"
welded type swedge is not
acceptable, No screw is allowed.
15 SHOCK 1 EA SE2 For running ESP - 3” groove and 56”
ABSORBER diameter from Original Equipment
WHEEL Manufacturer.
16 QUICK ESP 1 EA SE2 Quick ESP cable cutter cutting tool.
CABLE CUTTER Capable to cut standard armored
Contract No. SPHR00013A Page 48 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandator Ready for
Validity Until y Field
EQ.
NO EQUIPMENT QTY Last End of Supportin Verification
CAT Specification /
Location Operating Contract? g (Yes/No)
Manufacture
Time (Yes/No)/ document
(Validity provided
date)
Electric Submersible Pump’s (ESP)
cable up to 2” diameter. Indicative
acceptable brand or equivalent:
Stanley.
17 STOVE PIPE 1 SE Stove Pipe to support assembling
EA 2 ESP unit on rig floor. Below picture
is an example of stove pipe. It shall
be able to withstand minimum
25,000 lbs weight of ESP
assembly.
18 SPIDER SLIP 1 SE Pneumatic Spider Slips for tubing,
set 2 minimum 80 tons rated capacity.
Tubing size: 2-7/8”, 3-1/2", 4-1/2”.
2.5 BLOW OUT PREVENTER EQUIPMENT (BOPE).
Contract No. SPHR00013A Page 49 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION
CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 ANNULAR BOPE 1 ea SE2 13-5/8" 5,000 psi. Indicative
acceptable brand or equivalent:
Hydril, Control Flow, Cameron,
Shaffer, T3 Energy Services. Shall
be manufactured by API certified
manufacturer or legislation certified
(Migas). Contractor shall always
maintain complete inventory of
OEM spare rubber parts and
elements for the equipment.
2 PIPE RAMS 1 set SE2 One 13-5/8" 5,000 psi Double Ram
Preventer or Two 13-5/8" 5,000 psi
Single Ram Preventers. ndicative
acceptable brand or equivalent:
Hydril, Control Flow, Cameron,
Shaffer, T3 Energy Services. Shall
be manufactured by API certified
manufacturer or legislation certified
(Migas). Contractor shall always
maintain complete inventory of
OEM spare rubber parts and
elements for the equipment.
3 RAM EQUIPMENT 1 set SE2 For 5" Drill Pipe.
1 set SE2 For 3-1/2” Tubular.
1 set SE2 Blind Shear Rams (BSR) for Ram
Preventer. BSR shall be able to
shear / cut quoted 5" DP (minimum
19.5 ppf, R2, API Grade G105).
BSR shall be equipped with spare
blocks, knives, and rubber.
Contractor shall provide Shear
Matrix table for BSR.
4 BOP HOIST 1 SE A hoist system for handling of BOP
SYSTEM Set 2 nipple up and nipple down. System
shall be integrated into the
Contract No. SPHR00013A Page 50 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION
CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
Substructure. BOP hoist system
shall follow below picture or
equivalent.
1 SE All BOP stacks shall be designed
Set 2 at minimum with railing method
from side of substructure to inside
well head completed with base
trolley. BOP stack to be installed
on well head with system to lift
whole stack.
Below lifting system (lifting flange
for BOP stack) or equivalent is
expected.
5 MUD CROSS/ 1 ea SE2 13-5/8" x 13-5/8" 5,000 psi c/w: 2
DRILLING SPOOL ea. 3-1/8” 5,000 psi side outlets, 2
ea. 3-1/8” 5,000 psi gate valves, 2
ea. 3-1/8” 5,000 psi blind flanges.
6 CHOKE & KILL 1 set SE2 Class III Choke Manifold refer to
MANIFOLD Exhibit C3, with minimum 5,000 psi
pressure rated, consists of: 3-1/8”
Co-flex Choke Line (c/w secondary
retention line), One 3-1/8” or 3-
1/16” HCR Valve, One 3-1/8” Gate
Valve, 3-1/8” Manifold with 2” Wing
Components c/w One Manual
Contract No. SPHR00013A Page 51 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION
CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
Adjustable Choke and One
Remotely Operated Choke (Super
Choke), Pressure gauges with
scale – 60 psi, 300 psi, 3,000 psi,
Additional components for line up to
Mud Tank and/or MGS with same
line size. Contractor shall provide
actual schematic / drawing of
Choke Manifold.
1 set SE2 Kill Line Manifold refer to Exhibit
C3, with minimum 5,000 psi
pressure rated, equipped with
pump-in assembly which consists
of: One 3-1/8” Gate Valve, one 3-
1/8” Check Valve, One Pump-in
Tee to allow pumping from Rig
Pump Manifold of Remote Pump
Unit. Contractor shall provide actual
schematic / drawing of Kill Manifold.
7 BOPE CLOSING 1 ea SE2 3,000 psi Accumulator System refer
UNIT to Industrial Standard. The system
shall be suitable for closing BOP
stack specified above per Company
guidelines. Contractor shall provide
calculations proofing adequate
Accumulator sizing. Accumulator
shall have Nitrogen Backup
System.
8 RISER SPOOL 1 set SE2 13-5/8" 5,000 psi rating. Height of
Riser Spool shall fit with Pitcher
Nipple, BOP Stack, and Wellhead
under rotary table.
9 ADAPTOR SPOOL Contractor shall be responsible to
AND DOUBLE provide All necessary Adaptors to
STUDDED match between Specified BOP
Contract No. SPHR00013A Page 52 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION
CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
ADAPTER Equipment to Wellheads and
FLANGE (DSAF) Pressure Control Equipment (PCE)
above BOP to BOP such as but not
limited to below listed items. Note:
Common Company Wellheads
connections are 13-5/8” 2M, 11”
2M, 7-1/16” 2M, 13-5/8” 3M, 11” 3M,
7-1/16” 3M.
1 set SE2 Adapter Flange – quantity 1 ea.
For each size: 3" 2M x 3" Line Pipe
(LP), 3" 5M x 3" Line Pipe (LP).
1 set SE2 DSAF - quantity 1 ea. for each
size: 13-5/8" 5M x 13-5/8" 2M, 13-
5/8" 5Mx 11" 3M, 13-5/8" 5M x 7-
1/16" 3M, 11" 2M x 13-5/8" 5M, 11"
3M x 7-1/16" 2M, 13-5/8" 5M x 7-
1/16" 2M.
1 set SE2 Adaptor Spool - quantity 1 ea. for
each size: 13-5/8" 5M x 11" 2M,
13-5/8" 5M x 7-1/16" 2M.
10 Lifting Cap for 1 SE Lifting Cap for lifting drilling spool /
Spool Adapter set 2 adapter. See below picture for
reference (example only). It shall
be available for all drilling spools /
adapters sizes operated onsite.
Quantity 1 ea. for each size.
Contract No. SPHR00013A Page 53 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION
CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
Reference:
http://www.woodcousa.com/catalo
gs/Lift_Plate%20Catalog.pdf
11 RING GASKET All SE2 New Wellbore Energized Type Ring
appli Gaskets shall be provided for every
cabl nipple-up on every well and shall be
e comply with API 6A. The ring
size gasket shall be provided for
s as following: Connection between
nee BOPE stack, Connection from
ded BOPE to Adaptor Spool,
Connection from BOPE to
Wellhead, Connection from Adaptor
Spool to Wellhead, Connection
from BOPE to Lubricator.
12 BOPE TEST 1 SE2 BOP Test Pump with 5,000 psi
PUMP working pressure and capable of
pumping 4 gpm at 5,000 psi. It shall
be equipped with: relief valve, low
pressure suction hose, 5,000 psi
piping to connect to BOP, chart
recorder to maximum pressure
5,000 psi, 0-96 minutes’ time clock
setting, One pressure gauge 0-500
psi and One pressure gauge 0-
5,000 psi, system to accommodate
volume tracking (provide pressure
vs volume chart) – manually
recorded, adequate paper charts to
record pressure testing.
Contract No. SPHR00013A Page 54 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
2.6 ELECTRICAL EQUIPMENT
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 ELECTRIC 2 SE1 Generator Set (Genset) consists of
POWER unit Generator and Engine, each unit
shall be capable to provide
minimum of 400 kW at 50/60 Hz.
At minimum, engine type shall be
equivalent to CAT engine C15 /
C18. Year made 1990 or onward.
ARF shall be located in Indonesia
for reliable support. A dyno test (to
verify engine capability) is required.
Technical Analysis Level 2 (TA-2)
Inspection is not acceptable.
Genset shall be able to supply
sufficient power for all rig
equipment. Contractor shall provide
calculations proofing it.
2 POWER AND 2 SE2 Generator Set (Genset) consists of
LIGHTING FOR unit Generator and Engine, each unit
MOVING (SILENT shall be capable to provide
TYPE) minimum of 100 kW. It shall be
dedicated for onsite camp power.
1 SE2 Generator Set (Genset) consists of
unit Generator and Engine, shall be
capable to provide minimum of 10
kW. It shall be utilized during rig
move.
2 SE2 Modularized, Trailer Mounted
unit Genset / Lighting Tower, capable to
provide minimum of 4 kW and at
least 4 ea. LED or Mercury Vapor
Lights. Requirements: Each Light to
Contract No. SPHR00013A Page 55 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
be rated minimum 1,000 watts,
Each Light shall be capable of
providing minimum 50,000 lumens
of light, The Lighting Tower shall be
capable of rotating 360 degrees
and being raised to 30'. The unit
shall be fully capable of being
erected and rigged down by one
man without using any supporting
equipment.
3 LIGHTING 1 SE2 Explosion-proof Lighting System to
unit supply sufficient lighting for rig
operations.
2.7 SAFETY EQUIPMENT.
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 LIFTING DEVICE 1 set SE2 Certified and shop-manufactured
Pallet Lifting System for use with
crane. All lifting devices shall
comply with Company Lifting and
Rigging Standard. All containers
shall be addressed as lifting
containers which to be applied with
whole lifting. Any containers which
identified more than 75% SWL shall
Contract No. SPHR00013A Page 56 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
be applied with half lifting method.
All lifting containers shall be
certified by 3rd inspector which
clearly identified by plate of
inspection, have proper pad eyes
design, and completed with
dedicated wire sling. All wire slings
type shall be appropriate and
adequate to the lifting container
design and lifting & rigging
application. 6-monthly inspection
on lifting gear appliances and yearly
load test on lifting container by
certified 3rdparty inspector, color
coded. All original certificates and
lifting equipment register are made
available on site.
2 AUTOMATED 1 SE2 Meets AAMI DF-80 Guidelines and
EXTERNAL unit AHA Recommendation for adult
DEFIBRILLATOR defibrillator. Minimum 300 or 12
hours of operating time (EN 60601-
2-4-2003). Single energy output,
150 J Nominal into 50 Ohm Load for
Adult. 50 J Nominal into 50 Ohm
Load for Pediatric.
3 FULL BODY 6 SE2 Full Body Harnesses complete
HARDNESS units with: Leg and Shaller Straps,
manufactured to an International
Standard, complete with Anti
Suspension Trauma Strap, shall
have 5 D-Ring lifting points.
1 unit for derrickman to climb up
derrick and working on monkey
board. It shall be equipped with tail
rope compatible with monkey board
working area.
Contract No. SPHR00013A Page 57 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 unit for rescuer as part of working
at height evacuation plan.
4 units for Rig personnel other than
derrickman when performing
working at height activities.
4 DERRICKMAN 1 SE2 To provide mean of attachment
ATTACHMENT ea. system for derrickman with
SYSTEM description as follow. Refer to API
RP 54 Recommended Practice for
Occupational Safety for Oil and Gas
Well Drilling and Servicing
Operations.
5 SELF- 3 SE2 Self-Retracting Line (SRL) Fall
RETRACTING units Prevention Device manufactured
LINE (SRL) to an international standard.
1 unit shall match to Derrick height
and installed on derrick.
1 unit shall match to and installed at
Derrickman attachment system.
1 unit shall match to Substructure
height and installed beneath the
substructure.
Counterweights are not acceptable;
inertia reel type is preferred. These
devices shall be tested and be
repaired or replaced as per
manufacturer recommendations.
Any time the device is used to arrest
the fall of a person, it shall be
immediately removed from the
Contract No. SPHR00013A Page 58 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
derrick and sent to the
manufacturer for
repair/recertification.
6 TOOL STORAGE 2 SE2 Rubber Pocket / Tool Storage Bag.
BAG ea. Dropped object prevention
accessories. One for Derrickman
and One for working at height.
7 WAH TOOLS 1 set SE2 Working at Height Tools. Tools for
working at derrick or any
categorized at height from
Company Work at Height (WAH),
industrial standard for working at
height (complete with strap band,
tether).
8 LEVITATOR / 1 set SE2 Levitator / Ladder Safe Climbing
LADDER SAFE Device complete with attachment
CLIMBING and sufficient wire rope. Shall
DEVICE match with derrick ladder height.
The wire shall be anchored properly
at the bottom of the ladder.
Contract No. SPHR00013A Page 59 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
9 LANYARD 2 ea SE2 Shock Absorber Type Double
Lanyard with appropriate length for
working at height other than Derrick
and Substructure.
10 DESCENT 2 set SE2 Slow Speed Descent Device
DEVICE complete with 3 point derrick type
full body harness for 300 lbs human
weight and ½” guide cable with
6000 lbs breaking strength &
attachment. Anchor point shall be
capable for 5,000 lbs pull. Anti-fall:
self-retracting lifeline match with
distance from monkey board to
ground.
11 ESCAPE LINE 1 set SE2 1/2" Escape Line matched to
escape device and derrick height
complete with escape pole as
necessary meets API RP 54 and
escape device specifications.
12 DRUM LIFTER 1 set SE2 Drum Lifter to lift the drum
vertically using crane. To use wire
sling installation which comply to
Industrial lifting & rigging standard.
13 MANUAL LIFT 2 SE2 Manual Lift Mate. To aid with the
MATE ea. safer manual handling of pipe
section, ironwork, and tubing
sections. This equipment is not
intended to be used for handling full
Contract No. SPHR00013A Page 60 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
tubulars; only mechanical lifting is
allowed.
14 FIRE 6 SE2 9 kg ABC Type Fire Extinguisher
EXTINGUISHER ea. complete with working pressure
gauges. All fire extinguishers shall
be monthly inspected internally and
annual inspected by 3rd party
1 SE2 150 lbs. Dry Powder Type Fire
ea. Extinguisher. All fire extinguishers
shall be monthly inspected
internally and annual inspected by
3rd party.
3 SE2 25 lbs. CO2 Fire Extinguisher. All
ea. fire extinguishers shall be monthly
inspected internally and annual
inspected by 3rd party.
1 SE2 90 lbs. Foam Fire Extinguisher.
ea. All fire extinguishers shall be
monthly inspected internally and
annual inspected by 3rd party.
15 GAS DETECTOR 1 SE2 Portable Multi-gas Detector c/w
unit suction pump and all standard
accessories (tube + calibration kit)
for detecting CO, LEL, O2 and H2S
digital sound alarm complete w/
charger & approved by authorized
agent. Contractor responsible to
perform calibration as per
manufacturer recommendation.
Basic user training & calibration
training shall be delivered by
Manufacturer or Authorized Agent.
16 FIRST AID KIT 2 set SE2 First Aid Kit refers to Permenaker
15/2008 c/w snake bite kit. Any
Contract No. SPHR00013A Page 61 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
additional medicine shall be as per
coordination with PHR doctor.
17 SPILL KIT 1 set SE2 Spill Kit comes in a yellow back
with ERSK logo for oil only.
Contents include: 1 PSP900-017
large yellow zippered spill kit bag,
emergency spill kit screen in black,
30 PSP100-032-s sorbent pad
white oil only 15x18", 2 PSP 100-
028-s sorbent sock white oil only
3"x48", 1 PSP 900-01 disposal
bags 21"x36" clear (125 box), 1
PSP 500-025 green nitrile gloves, 1
PSP 100-060 absorbent granular
2lb bag, 1 PSP 900-005 epoxy
putty, 7oz stick, 1 instruction sheet,
and 1 contents sheet.
2 box safety oil absorbents boom:
type SLI - SP-28080050; dimension
10feet x Dia.5 inch; content 3
booms/box; color white; material
melt blown polypropylene; weight
13 kg/box; box dimension 24.8” x
21” x 15”.
18 STRETCHER 1 SE2 Stretcher as per Company
unit standard: light weight, durable,
folded type, can be used to bring
the patient from high elevation, and
fit in the space at doghouse & rig
medical room. It shall be completed
with four body straps and bridle
slings (pole stretcher is not
acceptable).
19 SPINAL BOARD 1 set SE2 Spinal Board applicable for spinal
injury
Contract No. SPHR00013A Page 62 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
20 WINDSOCK 3 SE2 Windsock. Placement as follow:
units doghouse, rig office, and access
control.
21 BUG BLOWER 2 SE2 36”- 48” Bug Blower meet Class I
units Division I (explosion proof)
complete with electric cable
sufficient to place anywhere in
immediate rig area.
22 BREATHING 4 SE2 30 minutes Self Contained
APPARATUS units Breathing Apparatus complete
with 1 ea. refill tank approved by
authorized agent.
1 SE2 10 minutes minimum Escape
unit Pack /ELSA (Emergency Life
Saving Appliances) for each set
approved by authorized agent to be
used by Derrick Man when working
in a near CVC area or H2S potential
site.
23 BURN PACK 1 set SE2 Burn pack.
24 INSULATION 1 SE2 Earth Resistance & Insulation
METER unit Meter. To check grounding
resistance.
25 NOISE LEVEL 1 SE2 Noise Level Detector. To detect
DETECTOR unit noise level.
26 LUX METER 1 SE2 LUX Meter. Capable to measure
unit illumination level on rig site to
support safe operation especially at
nighttime.
Contract No. SPHR00013A Page 63 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
27 AIR QUALITY 1 SE2 Air Quality Meter. Capable to
METER unit measure PM1.0 / PM2.5 / PM10,
both indoor & outdoor in digital
format.
28 UNDERGROUND 1 SE2 Underground Cable Detector.
CABLE unit Complete with transmitter and
DETECTOR receiver assembly inductive coupler
(clamp, built in antenna, two 8” test
leads (2.4 m) with HD alligator clips
and durable polyethylene case. Hi
frequency transmitter provider
ranges up to 1.219 m and depth up
to 2 m. Receiver length 32” and
battery operated. The detector shall
have capability to detect
underground cable, current and
metal.
29 SAFETY 1 set SE2 PPE or Safety Equipment Station /
EQUIPMENT Box. Able to accommodate all
STATION safety equipment, including Safety
Harness & Lanyards, Eye & Ear
protection + Chemical Mixing PPE
& Welder / Firewatcher PPE.
30 SECONDARY 1 SE Secondary Containment. The
CONTAINMENT set 2 containment and storage area are
designed to contain 110% of the
content of the largest container or
20% of the total quantity of the
hazardous material stored,
whichever is greater. All containers
equal to or greater than 208L (55
gallons) are kept in secondary
containment. To minimize
potential environmental impacts
from unplanned spills or
discharges. Supported with
Contract No. SPHR00013A Page 64 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
integrity tested record, shall be
yearly integrity tested and
equipped with 2 ea drainage valve
whenever used to take out water
containment. Multiple Container.
This is applicable for single
container apart from drums, jerry
cans, and similar small storage.
Single container integrated with
equipment installation containers
equal to or greater than 208L (55
gallons) are need to be equipped
this design.
Contract No. SPHR00013A Page 65 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
31 EYEWASH 3 SE2 Portable Eyewash - one located in
units mud mixing area, one located in
mud storage area & one on Rig
Floor. Refer to standard (ANSI)
Standard for Emergency Eyewash
and Shower Equipment (ANSI
Z358.1-2004).
32 SAFETY SHOWER 1 SE2 Safety Shower / Eye Wash
unit Combo located at mud tank area
refer to standard (ANSI) Standard
for Emergency Eyewash and
Shower Equipment (ANSI Z358.1-
2004. Design shall be avoid
working at height activities to refill
the flushing fluids.
33 CHEMICAL 5 ea SE2 Chemical Retardant Coats. Refer
RETARDANT to Company PPE Standard.
COAT
34 FIRE AXE & 1 set SE2 Fire Axe & Fire Blanket.
BLANKET
35 CONNECTION 1 set SE2 Temporary Restraints for each
RESTRAINT Pressurized Connection. Whip
Contract No. SPHR00013A Page 66 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
sock, soft restraint, or clamp with
safety sling / chain with suitable
maximum operating pressure
rating. Each product shall be
completed with certificate of
manufacture and load test.
36 BRASS HAMMER 2 SE2 5 lbs Brass Hammer. Complete
units with wooden handle.
37 CHEMICAL 1 set SE2 Face Shield and Apron for mixing
MIXING PPE chemical refer to ANSI Z87.1 –
2003 - High Level Protection – High
Protection and Industrial PPE
Standard.
38 HIGH VOLTAGE 2 SE2 High Voltage Resistant Safety
SAFETY GLOVES pairs Gloves for electrician and one
assistance. Refer to ASTM D 120–
2006 Class 00 Specification for
Rubber Insulating Gloves
(electrical).
39 WELDER PPE 1 set SE2 Safety Apparatus for welder
(welding face shield with
attachment to Safety head Refer to
ANSI Z87.1 2003 - High Level
Protection and apron).
40 FIRE SUIT 5 SE2 Fire Suits.
sets
41 STIFFY 2 SE Non-Conductive Safety Hand
HANDLING TOOL ea. 2 Tool, corner or rounded edges, or
“V” shapes, and hooks, 600 lbs
push and 350 lbs pull capacity,50-
72” length.
Contract No. SPHR00013A Page 67 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
42 CARGO 1 SE Non-Conductive Cargo Handling
HANDLING TOOL ea. 2 Tools, corner or rounded edges, or
“V” shapes, and hooks, 600 lbs
push and 350 lbs pull capacity, 50-
72” length.
43 PIPE 1 SE Pipe Connection Guide for
CONNECTION ea. 2 connecting tubular on rig floor.
GUIDE Shall be available for tubular types
operated on site.
44 HAMMER 2 SE2 To aid holding the hammer wrench
HOLDING AID ea. or impact wrench when performing
hammering. 37.5 cm (1 ea.) and
85.1 cm (1 ea.).
45 LADDER 2 SE2 Working Portable Ladder class
units Type 1A-300 lbs., Shall be available
2 type for electrical (non-
conductive) and non-electrical job,
certified, and have inspection
system.
Contract No. SPHR00013A Page 68 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
46 WORKING 1 SE2 Working Platform fit and safe to
PLATFORM unit substructure leg completed with fall
prevention (standard toe board &
guardrail) refer to Safety in Design
(SID), API 54 and OSHA 1910.23.
47 LOTO SET 1 SE IHE / LOTO set as per Company
set 2 Isolation Hazardous Energy (IHE)
standard to isolate any energy
source available i.e., electric,
kinetic, chemical, pressure,
thermal and potential energy.
Contractor shall provide P&ID and
electrical drawing on related rig
system. IHE/LOTO set: Isolation
system (spectacle blind, blind
flange and double block and bleed)
fit to discharge line of mud pump
system, LOTO box, lockout device
( 4 colors for mechanic, operator,
electric and instrument), and tag.
Contract No. SPHR00013A Page 69 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
48 OXYGEN BOTTLE 2 SE2 Unit Oxygen Bottle 30 minutes
complete with all requirements for
breathing assistance during
emergency and medical evacuation
in accordance with Keputusan
Menteri Kesehatan Republik
Indonesia Nomor
1439/Menkes/SK/XI/2002.
49 PPE 1 set SE2 ANSI Z.89.1 Type I Class G & E,
approved safety hat, to protect
hazards of impact and penetration
from falling & flaying object, limited
electric sock & burn chain strap is
required for derrickman. Green
color for Short Service Employee
(SSE). Shall be within
manufacturer effective date.
Quantity – one per rig personnel.
1 set SE2 Ear Protection / Ear Plug refer to
standard ANSI S3.19 – 1974 and
ANSI S12.6 – 1997. Quantity –
one per rig personnel.
1 ea SE2 Earmuff for person who working on
high noise area refer to standard
ANSI S3.19 – 1974 and ANSI S12.6
– 1997.
Contract No. SPHR00013A Page 70 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 set SE2 Mask. Organic vapor respirator
dust for respirator refer to NIOSH
Title 42 CFR 84-1995.
1 set SE2 ANSI Leather Safety Shoes in
good condition use safety toe and
oil resistant. Refer to SNI Standard
or ASTM F 2413-2005 Impact
Resistance Class 75 (I/75) and
Compression Resistance Class
75 (C/75). With: Puncture
Resistance (PR) of 1200 N (270
lbs.), Slip, oil, water, and
chemical resistance. Chemical
Resistance Boot, ASTM F 2413-
2005 Impact Resistance Class 75
(I/75) and Compression
Resistance Class 75 (C/75).
Chemical Resistance, Sleep
Resistance and Waterproof.
Quantity – one per rig personnel.
1 set SE2 ANSI Rubber Safety Shoes for
Chemical hazard in good condition
use steel toe cap, heat resistant (up
to 1200), bump cap and oil, acid, slip
& nail resistant sole. Refer to
OSHA 29 CFR 1910.136 ANSI
Z41.1-1991, SII 0645, DIN 4843,
EN ISO 20345:2003, SNI Standard
or ASTM F 2413-2005 Impact
Resistance Class 75 (I/75) and
Compression Resistance Class
75 (C/75). With: Puncture
Resistance (PR) of 1200 N (270
lbs.), Slip, oil, water, and
chemical resistance. Chemical
Resistance Boot, ASTM F 2413-
2005 Impact Resistance Class 75
Contract No. SPHR00013A Page 71 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
(I/75) and Compression
Resistance Class 75 (C/75).
Chemical Resistance, Sleep
Resistance and Waterproof.
Quantity – one per rig personnel.
3 SE2 Fire Retardant Clothes (FRC)
sets Flammable Retardant Coverall:
Material Standard Certification: EN
531, EN 533. NFPA 2112. Material
Flame Resistance Coverall with soft
and comfort inside the fiber material
weight 7.5 oz/yard. COLOR: base
contractor color. Coverall Style:
Long Sleeve Coverall It Half
Elasticated at waist. Two front
chest pockets, 1 open rear
pocket, 1 rear pocket with flap
closures, pen pocket on left
sleeve, two swing pockets
allowing access to under, rule
pocket on upper right leg.
Reflective tave: Scotchlite-Silver
Flame Resistance 2-inch width:
Around arms, legs and at back
coverall. EMBROIDERY,
Contractor logo at front left chest
and back coverall, Employee
name and e-colour on front right
chest, Indonesian flag at upper
right sleeve. Quantity – three per
rig personnel.
5 SE2 Hand Gloves, Rubber type as
pairs require for handling chemical and
goods for oil industry activities – for
handling Chemical. Refer to
EN374–2003 for chemical
Contract No. SPHR00013A Page 72 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
degradation resistanceto
permeation by chemicals.
1 set SE2 Heavy Duty Gloves with Grip, full
hand and finger protection oil and
water resistance. Specification at
minimum: Shall protect the hand
against mechanical hazards
(Category 2), Meet or exceed the
standard EN-388, performance
rating 4342, Shall provide impact
resistant to finger, knuckle, and
metacarpal, Highly visible, made
of bright colors, Slip and oil
resistant (for workover/routine
service rigs), Meet or exceed the
standard EN-511(Slip and oil
resistant. Heavy duty gloves
shall be in good condition at any
time. Quantity – one per rig
personnel.
6 ea SE2 ANSI approved Safety Goggles,
non-ventilated type,185 mm
acetate or polycarbonate spectacle,
clear lenses, elastic/rubber head
band, Complete with lens cleaner,
for chemical handling refer to ANSI
Z87.1 – 2003.
2 ea SE2 Full Face Shield refers to ANSI
Z87.1 – 2003 - High Level
Protection for grinding activity can
be attached to safety hat.
2 set SE2 Safety Eyeglasses for eye
protection, general purpose plastic
lens. Safety eyeglasses must meet
ANSI Z87.1 – 2003 - High Level
Contract No. SPHR00013A Page 73 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
Protection. Quantity – two per rig
personnel. Prescription safety
glass shall be provided by
contractor for crew as per doctor
recommendation.
1 set SE2 Raincoat (shirt and paints).
Quantity – one per rig personnel.
2 set SE2 Safety Chemical Apron for mixing
Caustic and other chemicals. Refer
to Company PPE Standard.
1 set SE2 Flagman & Swamper Jacket.
Cotton minimum 65% use
reflector. Quantity – one per
personnel.
1 SE Half Face HEPA Mask for
set 2 hazardous air quality complete
with the cartridge. Cartridge is
replaceable within manufacturer
expiry condition. Respirator Refer
to NIOSH Title 42 CFR 84-1995.
Respirator cartridges refer to
NIOSH Title 42 CFR 84 – 1995 for
Approval of Respiratory Protective
Devices and ANSI Z88.7-2001 for
Color Coding of Air-Purifying
Respirator Canisters, Cartridges,
and Filters. (it is used if any smoke
period and mud boy while mixing
chemical). Quantity – one per rig
personnel.
Contract No. SPHR00013A Page 74 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 set SE2 2-layer cloth mask (at minimum) /
surgical Mask / N95 Mask to be
provided for all rig personnel
working in Covid-19 Pandemic
condition. Surgical mask shall be
provided for: Personnel that
conduct temperature
measurement, Personnel that work
under 2-meter distance > 15
minutes. N95 Mask shall be
provided to all rig personnel when
working under haze condition refer
to industrial standard practice.
Utilization of mask shall consider
personnel comfortability in term of
breathing. Contractor shall provide
enough mask required to fulfill that
purpose. Quantity – one per rig
personnel.
50 ACCESS 1 SE2 Small portable shack for security
CONTROL unit entrance gate & access control post
complete with electric lamp and
explosive proof. Refer to MSW
requirement and completed with
bulletin board uniform, flashlight,
plastic chain, yellow line, grounding
system, 5 pair cotton hand gloves,
5 ea. safety hat, 5 safety glasses, 5
ea. ear plug and 15 pcs visitor
badge. Electric accessories shall be
industrial standard.
Contract No. SPHR00013A Page 75 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 set SE2 T-Card system to identify
personnel in/out the wellsite,
identification of Short-Service
Employee.
SE T-card system shall consist of: T-
2 card board: 3 ea; 1 ea. for day shift
resident workforce, 1 ea night shift
resident workforce and 1 ea for
visitor. 1 board able to
accommodate 40 ea T-cards. Only
on board personnel based on work
schedule shall be displayed on T-
card board; T-card for each
personnel with red (off board) and
green colour (on board) in one
card (material water proof :
acrylic); 30 ea T-cards for visitor
with red (off board) and green
colour (on board) in one card; All
the resident and visitor name shall
be printed by printed label maker;
The visitor identification number
shall be refer to visitor book.
Contract No. SPHR00013A Page 76 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
2 set SE2 Physical barricade / marker which
are easily observed both during day
& night (glow in the dark) for
entrance road (shall be available in
both old location & new location
during moving activity). Refer to
Company Rig Safety Traffic
Management Plan Procedure.
1 SE Physical barricade is available
set 2 (nylon rope with minimum
diameter 0.5 inch can also be used
for horizontal structure material,
while other requirements are
remaining the same). Refer to
Company L&R – Exclusion Zone
and Physical Barricade
requirement. Acceptable
Barricade Criteria: Industrial
standard manufacture or
fabricated, Easy to assemble and
disassemble, Easy to mobilize
and light weight and able to
physically barricade the exclusion
Contract No. SPHR00013A Page 77 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
zone, Line height at the upper side:
minimum 70 cm, Vertical
Structure: safety cone, stick (steel,
wood, plastics), Horizontal
Structure: plastic chain, manila
rope, stick, Use high visibility color
(orange, green, yellow, or red).
1 set SE2 Safety warning sign in English &
Bahasa Indonesia. Refer to ANZI
Z535 and OSHA color standard
51 FITNESS FOR 1 set SE2 Automatic blood pressure
DUTY CHECK monitor. Hospital tested and
SYSTEM clinically accurate.
1 set SE2 Forehead body temperature non-
contact check tool. Hospital
tested and clinically accurate.
52 TRIPOD RESCUE 1 set SE2 7” Aluminum Tripod Winch with 60
SYSTEM ft of ¼” Galvanized cable (include
winch bag). UL classified 7”
aluminum tripod. Designed for
durability and light weight, the tripod
is easy to set up and transport.
Rated workload is 350 lbs. for work
support and 310 lbs. for fall arrest.
Contract No. SPHR00013A Page 78 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
Durable corrosion resistant
construction featuring anodized
aluminum size plates zinc plated
gears and shafts, stainless steel
springs and aluminum drum for
superior corrosion resistance.
Overload clutch reduces chances of
injury to entangled worker.
53 SAFETY CCTV 1 set SE2 2 ea. Weatherproof (2 ea. at Rig
SYSTEM Office) and 2 ea. gas proof Camera
(Rig Floor and mud tank).
Resolution: 1080P HD. Support
Color/BW mode converting. Built-in
6/8/12mm fixed focus lens is
optional. 48 infrared LED light, the
distance up to 50 meters. Support
AWB, natural color, clear image.
Build in 1 channel audio input and
audio output ports, and support
Realtime audio capture. Built-in SD
card slot and support SDHC card,
minimum 64GB. Water and Dust
Resistance: IP66. Electric
accessories shall be industrial
standard.
2.8 TRANSPORTATION FOR RIG OPERATIONS (Provided for each drilling unit)
Contract No. SPHR00013A Page 79 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
GPS (GLOBAL SE2 Required GPS install on vehicle shall
POSITIONING have capability to show location with
SYSTEM) accuracy as per I-JMS requirement.
Detail GPS specification as per
below.
TCP/UDP/SMS Transmission Mode:
TCP/UDP (pcs). Data automatic
upload: Time Interval/Distance
interval Mileage statistics:
GPS/Electronic, remotely listen-in
build in Geo-fence: 64 kinds, Alarm
kinds: GPRS/Email/SMS History
data storage (43200 pcs), GPS
antenna open/short detection
Domain name supporting, Blind area
data supplementary uploading,
Automatic self-
check/recovery/protection/build-in
backup battery. External Device:
Dispatch Screen (Message
exchange between driver and
center, Two-way Voice call). Fuel
Sensor (Analog ----Single
signal/Multi-signal), CCD Camera,
RFID Device, Password Keypad,
Bar- Code Scanner, Temperature
Sensor. Control Function I/O Port: 1)
5 Switch signal input., 2) 1 Analog
signal input(0-5v), 3) 1 Pulse signal
(<3.8V, 2k HZ trigger), 4) Switch
signal output(<500mA), 5) Serial port
(support more than 3 kinds of
different external device at the same
time), 6) Intelligent programmable
(I/O, A/D). Including Maintenance
Software, Firmware, Map license
and map updates, On-line technical
support, Maintenance at location,
Reporting service.
Contract No. SPHR00013A Page 80 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
Comprehensive SE2 Required Comprehensive Video
Video and Voice and Voice Recorder (CVVR) install
Record (CVVR) on vehicle shall have capability: At
minimum 2 channel camera with
1080P Full HD feature, one for front
vehicle view and one camera for
inside vehicle cabin to monitor
driving behavior, Clear audio
recording, To store at minimum 64
GB storage, For night video
recording (infra-red feature).
1 CREW BUS 1 SE2 Crew bus complete with seat belts
unit re-track lock type, enough to haul
1(one) shift crews, AC units,
backing up alarm and Fire
Extinguisher 10-20 lbs. (ABC). shall
be equipped with two-way radio
communication. Complete with
Driving Behavior Monitoring
System (DBMS), alarm and fog
light “BM Plate Number”.
Vulcanized tire not accepted.
Complete with Reverse Camera--
To help driver & operator to get a
clear picture of the condition when
moving in reverse. Reverse alarm
still has “blind spot” that are not
covered by the sensor. Year made
2020 or onward. Completed with
GPS integrated to Company I JMS.
Completed with CVVR System.
2 LIGHT VEHICLE 5 SE2 One unit, 4-WD, min. 2000cc,
unit Double cab (Diesel) for Rig Supt.
One unit, 4-WD, min. 2000cc,
Double cab (Diesel) for HES
Coordinator.
Contract No. SPHR00013A Page 81 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
One unit, 4-WD, min. 2000cc,
Double cab (Diesel) for Truck
Pusher.
One unit, 4-WD, min. 2000cc,
Double cab (Diesel) for Rig
Manager / Mechanic (Standby at
Rigsite).
One unit, 4-WD, min. 2000cc SUV
(Diesel) for Medical Evacuation
(Standby at Rigsite). shall be
equipped with basic Life support
equipment (Oxygen, Neck Collar,
capable for carrying stretcher).
Every vehicle has portable torch
lamp powered with car battery
supply to give adequate lighting to
assist worker working without
common rig lamp such as during
moving. shall have "BM" license
plate. shall be completed with seat
belts, reverse alarm, reverse
camera. Year made 2020 or
onward. Completed with GPS
integrated to Company I JMS.
Completed with CVVR System.
FOR ALL TRUCKS, CRANES,
AND DOZERS: Winches and lines
shall follow Company Lifting &
Rigging Standard, all binders for
securing loads must be ratchet
type. Provided transportation units
shall have capability to handle all
rig equipment safely.
3 CRANE 2 SE1 Crawler Crane minimum 50-ton
unit MIGAS certified. Minimum safety
devices: load indicator, load chart
(English), swing brake, high boom
Contract No. SPHR00013A Page 82 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
limiter with audible alarm, anti-toe
block with audible alarm & lock fall.
Automatic Moment Limiter (AML),
automatic shut off anti-toe block,
automatic shut off boom back stop.
Fire extinguisher (10 - 20 lbs. ABC).
Year made 2015 or onward.
4 DOZER 1 SE1 D-7 or equivalent type of wide track
unit bulldozer shall be equipped with
winch and appropriate puling
slings, terminations, and Seat belt.
Shall be equipped with prelate for
control sling movement when dozer
to conduct towing process. Fire
extinguisher (10 - 20 lbs. ABC).
Year made 2015 or onward.
5 FUEL TANK 1 SE2 Has sufficient capacity to operate
unit rig and equipment for 7 days of
normal operation. Tank shall be
completed with a drip pan or
containment device which shall
prevent any fuel from getting on the
ground. Minimum capacity 10,000
liter. Fuel tank shall be a closed
system and all transfer shall use
dead men nozzle. Fuel tank shall
be equipped with explosion proof
fuel pump.
6 VACUUM TRUCK 1 SE2 6X4 Drive, capacity 60 bbls, Tank
unit certified with operation pressure
minimum 40 psi and Vacuum Pump
Piston or rotary type complete with
retractable safety belts, AC,
powder fire extinguisher 10-20 lbs
(ABC), Spotlight 1 pcs, at the top
rear tank, backing up alarm, “BM”
Contract No. SPHR00013A Page 83 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
Plat Number. Year made 2015 or
onward. Vulcanized tires are not
accepted. Timber King type or
equal for rear tire. One way radio
communication (between
signalman to operator). Completed
with GPS integrated to Company I
JMS. Completed with CVVR
System.
2.9 TRANSPORTATION FOR MOVING OPERATIONS (provided for each drilling unit)
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 LOW BED C/W 2 SE1 Payload capacity and dimensions
PRIME MOVER unit shall be sufficient size to transport
(C/W WINCH IS all Contractor’s loads (including to
PREFEREABLE) haul crane and dozer) and follow
Gov transportation regulations.
Shall be capable of operating in all
weather conditions (muddy roads,
etc.) complete with reverse camera
and one way radio communication.
Maximum overhang for any load is
1.5 m. Tires shall be Hi-Miller type
on front and Timber King type on
back. Vulcanized tires are not
acceptable. Shall be equipped with
retractable safety belts, and fire
Contract No. SPHR00013A Page 84 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
extinguisher (10 - 20 lbs ABC).
Shall have “BM” plate number. Year
made 2015 or onward. Shall be
equipped with rubber wheel choker
to be used during parking. Shall be
equipped with GPS integrated to
Company I JMS. Shall be equipped
with CVVR System. Shall be
equipped with stopper to be able
handling tubular (including casing,
tubing). At least 1 unit shall be
equipped with ram to be able
hauling cranes & dozers.
2 TRAILER C/W 1 SE1 Payload capacity and dimensions
PRIME MOVER unit shall be sufficient size to transport
all Contractor’s loads and follow
Gov transportation regulations.
Shall be capable of operating in all
conditions (muddy roads, etc.).
Winch capacity shall be sufficient to
handle all Contractor’s loads.
Complete with reverse camera and
one way radio communication.
Maximum overhang for any load is
1.5 m. Tires shall be Hi-Miller type
on front and Timber King type on
back. Vulcanized tires are not
acceptable. Shall be equipped with
retractable safety belts, and fire
extinguisher (10 - 20 lbs. ABC).
Shall have “BM” plate number. Year
made 2015 or onward. Shall be
equipped with rubber wheel choker
to be used during parking. Shall be
equipped with GPS integrated to
Company I JMS. Shall be equipped
with CVVR System.
Contract No. SPHR00013A Page 85 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
3 TANDEM TRUCK 1 SE1 Payload capacity and dimensions
unit shall be sufficient size to transport
all Contractor’s loads and follow
Gov transportation regulations.
Shall be capable of operating in all
conditions (muddy roads, etc.).
Winch capacity shall be sufficient to
handle all Contractor’s loads.
Complete with reverse camera and
one way radio communication.
Maximum overhang for any load is
1.5 m. Tires shall be Hi-Miller type
on front and Timber King type on
back. Vulcanized tires are not
acceptable. Shall be equipped with
retractable safety belts, and fire
extinguisher (10 - 20 lbs ABC).
Shall have “BM” plate number. Year
made 2015 or onward. Shall be
equipped with rubber wheel choker
to be used during parking. Shall be
equipped with GPS integrated to
Company I JMS. Shall be equipped
with CVVR System.
4 CRANE 1 SE1 Crawler Crane minimum 35-ton
unit MIGAS certified. Minimum safety
devices: load indicator, load chart
(English), swing brake, high boom
limiter with audible alarm, anti-toe
block with audible alarm & lock fall.
Automatic Moment Limiter (AML),
automatic shut off anti-toe block,
automatic shut off boom back stop.
Fire extinguisher (10 - 20 lbs. ABC).
Year made 2015 or onward.
Crane shall have capability to lift all
Rig contractor equipment’s safely
and in accordance with the lifting
Contract No. SPHR00013A Page 86 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
COMPANY SPECIFICATION CONTRACTOR’s QUOTE
Certificate Mandatory Ready for
EQ. Validity Until Supporting Field
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
rigging standard. Contractors shall
submit Load Matrix in Submission
Document.
5 DOZER 1 SE1 D-7 or equivalent type of wide track
unit bulldozer shall be equipped with
winch and appropriate puling slings,
terminations, and Seat belt. Shall
be equipped with prelate for control
sling movement when dozer to
conduct towing process. Fire
extinguisher (10 - 20 lbs. ABC).
Year made 2015 or onward.
6 CARGO TRUCK 1 SE1 6x2 Drive folding wall shall be
unit equipped with retracts safety belt
(confirm to HES), AC, Fire
extinguisher (10 - 20 lbs ABC).
Spotlight at rear and backing up
alarm and tire chain. BM plate
number. Year made 2015 or
onward. Vulcanized tires are not
accepted. Timber King type or
equal for rear tire. One way radio
communication (between
signalman to operator). Completed
with GPS integrated to Company I
JMS. Completed with CVVR
System. Shall be equipped with
rubber wheel choker to be used
during parking.
2.10 MISCELLANEOUS.
Contract No. SPHR00013A Page 87 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
SPECIFICATION / CONTRACTOR’s QUOTE
MANUFACTURER
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
1 ON-SITE CAMP 1 set SE2 Sets of portacamp located within
wellpad which include daily
cleaning service, sufficient clean
water supply service, and laundry
service for personnel stay
overnight, consisting of:
- 1 portacamp unit for COMPANY
SITE SUPERVISOR; OFFICE -
furnished with split air conditioner
(AC), full view window, desk, chair
(ergonomic chair is preferable),
shelving, file cabinet, water
dispenser, refrigerator, microwave,
sink, bathroom facility with western
toilet/shower & water heater, and
running water, air purifier refers to
NIOSH Title 42 CFR 84-1995
- 1 portacamp unit for COMPANY
PERSONNEL; furnished with two
(2) Split air conditioned (AC)
bedrooms; each bedroom furnished
with desk, chair, two (2) beds with
mattress / pillows / sheets, locker,
air purifier refer to NIOSH Title 42
CFR 84-1995.
- 1 portacamp unit for
CONTRACTOR SITE
SUPERVISOR; OFFICE - furnished
with split air conditioner (AC), full
view window, desk, chair
(ergonomic chair is preferable),
shelving, file cabinet, water
dispenser, refrigerator, microwave,
sink, bathroom facility with western
toilet / shower & water heater,
running water. SLEEPER -
Contract No. SPHR00013A Page 88 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
SPECIFICATION / CONTRACTOR’s QUOTE
MANUFACTURER
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
furnished with air conditioner (AC),
one (1) bed with mattress / pillows /
sheets, night table, locker, air
purifier refers to NIOSH Title 42
CFR 84-1995.
- 1 portacamp unit for MEDICS
CLINICS & MUD ENGINEERS;
furnished with two (2) split air
conditioned (AC) rooms; For
Medics Clinics, furnished with
examination table / desk & chair,
medicine cabinets, basic medical
equipment, one (1) bed with
mattress / pillows / sheets; For Mud
Engineers, furnished with desk,
chair (ergonomic chair is
preferable), file cabinet, two (2)
beds with mattress / pillows /
sheets, locker, air purifier refer to
NIOSH Title 42 CFR 84-1995.
- 1 portacamp unit for SERCO
PERSONNEL; furnished with two
(2) split air conditioned (AC)
bedrooms; each bedroom furnished
with four (4) beds with mattress /
pillows / sheets, night table, locker,
air purifier refers to NIOSH Title 42
CFR 84-1995.
- 1 portacamp unit for HES
OFFICE / MEETING ROOM /
GREEN ROOM; furnished with split
air conditioner (AC), sufficient
space to hold meetings (TGM, pre-
spud, etc.) with rig crew, desks &
chairs, computers workspace /
power connections, white board,
Contract No. SPHR00013A Page 89 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
SPECIFICATION / CONTRACTOR’s QUOTE
MANUFACTURER
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
screen for projector or 42-inch TV,
air purifier refer to NIOSH Title 42
CFR 84-1995.
2 OFF-SITE CAMP 1 set SE2 Off-site camp shall accommodate
all rig and support personnel.
Off-site camp shall support
compartmentalization program
during COVID-19 pandemic which
involve following protocols: Shall be
equipped with all equipment related
to COVID-19 (non-contact
temperature gun, hand wash
facility, disinfectant, etc.), Provide
at minimum swab test antigen for all
rig and support personnel a day
before on duty, Installation of CCTV
(24 hours monitoring), Provide
security personnel (24 hours
monitoring), Rig contractor shall
provide meals to all personnel in
camp, Rig contractor to hire camp
boss to ensure all required items
related to COVID-19 are in
compliance.
At the minimum, offsite camp facility
shall consist of sleeping units,
shower units, kitchen / messhall
unit, recreation / entertainment unit,
laundry unit, prayer room, and
infirmary unit.
All rooms shall be equipped with:
Sufficient split air conditioner (AC).
Refer to AC specifications, Proper
air purifier (as needed).
For sleeping units, the allocation is
as follow:
- TOOL PUSHER & UP, 1 room
furnished with one (1) single bed
Contract No. SPHR00013A Page 90 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
SPECIFICATION / CONTRACTOR’s QUOTE
MANUFACTURER
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
c/w mattress / pillow / sheet, desk &
chair, locker.
- TRUCK PUSHER / DRILLER /
DERRICKMAN, 1 room furnished
with two (2) single beds c/w
mattress / pillow / sheet, desk &
chair, locker.
- OTHER RIG PERSONNEL AND
SUPPORT CREW, each room
furnished with max three (3) bunk
beds (6 beds total) c/w mattress /
pillow / sheet, locker.
Hot bed is not recommended.
3 LAPTOP 2 SE2 Minimum Intel Core i5 with 500
units Gigabyte hard drive and 8 GB of
DDR3 RAM loaded with original
Windows 10 or newer version, and
other application (minimum to
support office work application such
as but not limited to Microsoft office,
pdf reader, etc.). 1 for Rig
Manager/Clerk and 1 for HES
Officer.
4 PRINTER AND 2 SE2 Laser Jet printer-scanner for
SCANNER units Computer.
5 PORTABLE 2 SE2 Manufacture product with years
TOILET units guarantee and standard light
building material polyethylene
complete with exhaust blower &
light, hand wash/basin. Eastern
toilet & western seat type toilet,
proper flush system, and hose
spray. Toilet dimension as
manufacture standard or min. 1 W x
1.3 L x 3 H put on skid min.1.2 W x
3.6 L x 3.2 H (meter). 1 set of door
Contract No. SPHR00013A Page 91 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
SPECIFICATION / CONTRACTOR’s QUOTE
MANUFACTURER
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
rest room (single portable toilet)
set on the skid and have eye pad
for lifting which reliable to set on
such as muddy well pad condition
(can be pushed or towed). Skid total
weight not bigger than 2,5 ton (can
handled by Foco capacity 5 Tons).
WASTE HANDLING/CLEAN
WATER SUPPLY & DISPOSAL
PLACE (TPA): CONTRACTOR
shall be responsible to provide the
required portable toilet properly and
do toilet drainage system handling.
Has transportation such as truck
tank with min. capacity 5000 liters
and adequate accessories for each
clean water and black water truck
tank to supply clean water and such
black water. Complete with Roll
Toilet Paper, Liquid Soap, Room
Freshener, etc. Pit, w/ adequate
dimension min.10 M x 15M x 1M as
per standard and license/permit
from GOI and Environment
institution.
CHEMICAL FOR
DECOMPOSING: Chemical for
asunder the excrement for
decomposing and prevent it from
smells bad. With DENSOL or
deodorizer chemicals & running
water.
Skid of single doors and double
doors toiled shall be separated,
during moving 1 of them shall be set
at new location
6 HAND TOOLS 2 set SE2 Hand tools set complete with steel
box.
Contract No. SPHR00013A Page 92 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
SPECIFICATION / CONTRACTOR’s QUOTE
MANUFACTURER
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
2 set SE2 Pipe wrenches: 18"; 24"; 36"; 48".
Quantity – two ea. for each size.
1 ea SE2 100 feet Derrick tape.
1 set SE2 Caliper, standard for measurement
OD & ID.
1 set SE2 Mud balance; Marsh funnel;
Measuring cup; Stopwatch.
1 ea SE2 10 lbs. Sledgehammers.
1 ea SE2 10 lbs. Brass hammers.
7 WELDING SET 1 set SE2 300 amperes complete with supply
of rods, safety equipment, and
apparatus for welder.
8 CUTTING SET 1 set SE2 Oxygen-Acetylene complete with
heat tip (rosebud) and safety
equipment.
9 OTHER 1 set SE2 All necessary tubs & racks and
mousehole & rathole scabbards
1 set SE2 All slings mechanical splice (lifting
& pulling slings) shall meet industry
standard complete with certificate &
load rating and inspected
periodically at least 6 months by 3rd
party. No homemade splices sling
is allowed
1 set SE2 All Lifting gear (shackle, chain
block, snatch block, hook, pad eye,
sling etc.) shall be completed with
valid certificates, and inspected by
Contract No. SPHR00013A Page 93 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
SPECIFICATION / CONTRACTOR’s QUOTE
MANUFACTURER
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
3rd party every at least minimal 6
months
1 set SE2 Lead Free Pipe Dope for tubular
make up.
1 set SE2 Cotton rags and Hand Cleaners
2 SE2 Tarpaulin, waterproof nylon 24’ L X
sets 30’ W
10 INTERCOM 1 set SE2 Intercom station system (at least
SYSTEM located in: Driller console area, DD
area / doghouse, DSR room,
Contractor/TP office, access
control, MWD Eng room).
11 HANDHELD 5 SE2 Portable explosion proof handheld
RADIO units two-way radio can reach 2 km,
Indicative Acceptable brand or
equivalent: Motorola, Siemen.
12 MEGAPHONE 1 SE2 Megaphone completed with hand
unit mic, amplifier, and speaker. The
megaphone shall be loud enough to
be heard by all crew at rig site.
Indicative Acceptable brand or
equivalent: Toa.
13 CELLULAR 1 SE2 Brand new Smartphone; Android or
PHONE unit IOS; shall have calling, SMS,
Bluetooth, and WhatsApp features
at minimum; for COMPANY use.
Indicative Acceptable brand or
equivalent: Minimum Samsung
Galaxy M10.
Contract No. SPHR00013A Page 94 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
SPECIFICATION / CONTRACTOR’s QUOTE
MANUFACTURER
Certificate Mandatory Ready for
Validity Until Supporting Field
EQ.
NO EQUIPMENT QTY Last End of document Verification
CAT Specification /
Location Operating Contract? provided (Yes/No)
Manufacture
Time (Yes/No)/
(Validity
date)
14 INTERNET 1 set SE2 Rig site shall have internet / email
access in any Company locations.
15 FUEL & 1 set SE2 Fuel and Lubricants as required
LUBRICANT
16 PERISHABLE 1 set SE2 Perishable Supplies as required
SUPPLIES
END OF REFER TO EXHIBIT C2
AKHIR MERUJUK PADA DARI LAMPIRAN C2
Contract No. SPHR00013A Page 95 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
REFER TO EXHIBIT C4
MERUJUK LAMPIRAN C4
TO ONSHORE DRILLING CONTRACT
PADA KONTRAK PEMBORAN DI DARAT
NO. SPHR00013A
SPECIFICATION OF ADDITIONAL SERVICES ITEMS
SPESIFIKASI HAL-HAL PADA JASA-JASA TAMBAHAN
1. General Provision 1. Ketentuan Umum
1.1 Equipment or services listed under provision sum is equipment that may be 1.1 Perlengkapan atau jasa-jasa yang terdaftar dalam ketentuan tambahan
requested by COMPANY during the Contract period. adalah perlengkapan yang mungkin diminta oleh PERUSAHAAN dalam jangka waktu
Kontrak.
1.2 Provision to request such equipment or services is governed in the Article 12 of 1.2 Ketentuan untuk permintaan perlengkapan atau jasa-jasa diatur dalam Pasal
Exhibit A. 12 dari Lampiran A.
1.3 Items listed under the provision sum are not obligated to be delivered on the 1.3 Hal-hal yang terdaftar dalam ketentuan tambahan tidak harus diserahkan
Delivery Date. pada Tanggal Penyerahan.
Equipment Categories:
SE1 : Major Equipment - Surface, ie. sub structure, rigs unit, engines, pumps, genset, mud boat.
SE2 : Minor Equipment - Surface, ie. tool box, hand wrench, camp, etc.
DE1 : Major Equipment - Downhole Mechanical, ie. drill pipes, drill collar, etc.
DE2 : Minor Equipment - Downhole Mechanical, ie. bit sub, cross over, etc
DE3 : Major Equipment - Downhole Motorized, ie. motor, MWD, LWD, etc.
DE4 : Minor Equipment - Downhole Motorized, ie. gyro, etc.
EQUIPMENTS
Contract No. SPHR00013A Page 96 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
1 DRILL PIPE (DP) Open DE1 5", 19.5 PPF, R2, API Grade G105, NC 50 (4-1/2"IF)
connection, premium class with threads protectors.
Note:
Any combination of drill pipe in stand can be racked
back in derrick.
Hardbanding on Drillpipe "smooth hardbanding".
Completed with appropriate pipe boxes, steel thread
protectors,and lift nubbins/caps. Pipe boxe capable to
handle pipes load c/w appropriate lifting system (pad
eyes, slings, etc).
Open DE1 3-1/2", 13.3 PPF, R2, API Grade G105, NC 38 (3-1/2"IF)
connection, premium class with thread protectors.
Note:
Any combination of drill pipe in stand can be racked
back in derrick.
Hardbanding on Drillpipe "smooth hardbanding".
Completed with appropriate pipe boxes, steel thread
protectors,and lift nubbins/caps. Pipe boxes capable to
handle pipes load c/w appropriate lifting system (pad
eyes, slings, etc).
2 HEAVY WEIGHT Open DE1 5" OD x 49 ppf HWDP, R2, with NC 50 (4-1/2” IF)
DRILL PIPE connection, premium class with threads protector.
(HWDP) Note:
Any combination of drill pipe in stand can be racked
back in derrick.
Hardbanding on Drillpipe "smooth hardbanding".
Completed with appropriate pipe boxes, steel thread
protectors,and lift nubbins/caps. Pipe boxes capable to
handle pipes load c/w appropriate lifting system (pad
eyes, slings, etc).
Open DE1 3-1/2" OD x 25.3 ppf HWDP with NC 38 (3-1/2” IF)
connection, minimum premium class with threads
protector.
Note:
Any combination of drill pipe in stand can be racked
back in derrick.
Hardbanding on Drillpipe "smooth hardbanding".
Completed with appropriate pipe boxes, steel thread
Contract No. SPHR00013A Page 97 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
protectors,and lift nubbins/caps. Pipe boxes capable to
handle pipes load c/w appropriate lifting system (pad
eyes, slings, etc).
3 DRILL PIPE PUP Open DE1 3-1/2", 13.30 PPF, API Grade G105, NC 38 (3-1/2"IF)
JOINTS connection, premium class with steel threads protectors.
One each: 5 ft, 10 ft, 15 ft.
4 DRILL COLLARS Open DE1 4-3/4”OD, spiral, R-2 with NC 38 (3-1/2” IF) connections,
premium class with thread protectors.
Note:
Any combination of drill collar in stand can be racked
back in derrick.
All DC's come with steel thread protectors. completed
with lifting subs and appropriate pipe boxes which
capable to handle pipes load c/w appropriate lifting
system (pad eyes, slings, etc)
Open DE1 6-3/4” OD x 2-13/16” ID spiral, R-2 with NC 50 (4-1/2” IF)
connection, premium class with threads protector. All
DC’s come with steel thread protectors as well as
recesses for slips and elevators.
Completed with lifting subs and appropriate pipe boxes
capable to handle pipes load c/w appropriate lifting
system (pad eyes, slings, etc)
Open DE1 8" OD x 2-13/16" ID spiral, R-2 with 6-5/8" Regular
connection, premium class with threads protector. All
DC's be completed with steel thread protectors as well
as recesses for slips and elevators. Completed with
appropriate pipe boxes capable to handle pipes load c/w
appropriate lifting system (pad eyes, slings, etc)
5 BULL PLUG Open DE2 4-1/2” NUE 2M and 3-1/2” EUE 2M
6 MISCELLANEOU Open DE2 Left hand sub for 5-1/4” Kelly, match with swivel thread
S SUBS connection
Open DE2 Kelly saver sub for 5-1/4” Kelly, c/w rubber belt.
Open DE2 Bit sub: 3-1/2" IF box X 4-1/2" reg box
Contract No. SPHR00013A Page 98 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
Open DE2 Bit sub: 3-1/2" IF box X 3-1/2" reg box
Open DE2 Crossover NC38 (3-1/2” IF) pin x NC50 (4-1/2” IF) box
Open DE2 Lift subs for 4-3/4” DCs with NC38 (3-1/2” IF)
connection
7 11” 3M BLIND Open SE1 Single Blind – Shear Ram BOP, size 11”, 3000 Psi c/w
SHEAR RAM blind shear ram which able to cut 4-1/2”, 16.6 PPF Drill
BOPE Pipe, flanged connection, using RX ring gaskets.
All BOPE have exactly same pressure rating.
Alternative higher-pressure rating is not accepted.
All preventer have API certified manufacturers.
Contractor shall maintain a complete inventory of
spare rubber parts and elements for the above
equipment at all times.
Shop Test as per API spec 6A Standard Procedure.
BOP Weight still within Foco/crane lifting capacity
Complete with shear matrix by Manufacture
Contractor shall have maintenance and inspection
program refer to exhibit H1
Include skid
8 11” 3M Open SE1 Annular type BOPE with 11” x 3,000 psi WP, well bore
ANNULAR BOPE Pressure Assist System, using RX ring gaskets. API
certified manufacturer.
All preventer API certified manufacturers.
Contractor shall maintain a complete inventory of
spare rubber parts and elements for the above
equipment at all times.
Connection: Flange Type
Shop Test as per API spec 6A Standard Procedure.
BOP Weight still within Foco/crane lifting capacity
Contractor shall have maintenance and inspection
program refer to exhibit H1
Include skid
9 11” 3M RAM Open SE1 Double ram, size 11”, 3000 Psi c/w pipe rams (2-7/8”, 3-
BOPE 1/2" and 4-1/2") and blind rams. using RX ring gaskets
All BOPE exactly same pressure rating.
All preventer API certified manufacturers).
Contract No. SPHR00013A Page 99 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
Contractor shall maintain a complete inventory of
spare rubber parts and elements for the above
equipment at all times.
Shop Test as per API spec 6A Standard Procedure.
BOP Weight still within Foco/crane lifting capacity
Contractor shall have maintenance and inspection
program refer to exhibit H1
Include skid
Open SE1 Single ram, size 11”, 3000 Psi c/w pipe rams (2-7/8”, 3-
1/2" and 4-1/2") and blind rams. using RX ring gaskets
All BOPE exactly same pressure rating.
All preventer API certified manufacturers).
Contractor shall maintain a complete inventory of
spare rubber parts and elements for the above
equipment at all times.
Shop Test as per API spec 6A Standard Procedure.
BOP Weight still within Foco/crane lifting capacity
Contractor shall have maintenance and inspection
program refer to exhibit H1
Include skid
10 21” 2M ANNULAR Open SE2 One 21-1/4" 2,000 psi Annular BOP. Annular shall
BOP manufacture by API certified manufacturers.
RONGSHENG equal specification: Shaffer. maintain a
complete inventory of OEM spare rubber parts and
elements for the above equipment at all times.
11 RAM Open SE2 For 3-1/2" Tubular.
EQUIPMENT
Open SE2 For 7" Casing.
Open SE2 For 9-5/8" Casing.
Open SE2 Shear RAM
12 MUD Open SE2 11" -3M, w/ 3-1/16" side outlets c/w 3-1/16" blind
CROSS/DRILLIN flanges
G SPOOL
Open SE2 21-1/4” 2M w/ two 4-1/16” outlets flange type 2000 PSI
WP c/w R-37.
Contract No. SPHR00013A Page 100 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
13 RISER SPOOLS Open SE2 21-1/4" -2M with 2 ft and 4 ft length.
Open SE2 11" -3M with 2 ft and 4 ft length.
14 CREW BUS Open SE2 Crew bus complete with seat belts re-track lock type,
enough to haul 1(one) shift crews, AC units, backing up
alarm and Fire Extinguisher 10-20 lbs (ABC). shall be
equipped with two-way radio communication. Complete
with Driving Behavior Monitoring System (DBMS), alarm
and fog light “BM Plate Number”
Vulcanized tire not accepted.
Complete with Reverse Camera-- To help driver &
operator to get a clear picture of the condition when
moving in reverse
Reverse alarm still has “blind spot” that are not covered
by the sensor
Year made 2016 or onward
Completed with GPS integrated to Company I JMS.
Completed with CVVR System
15 CIRCULATING Open SE2 For 18-5/8” Casing, 4-1/2” NUE, 3-1/2” EUE, 3-1/2”
SWEDGE NUE, 2-7/8” EUE tubing.
Note:
These swedges c/w 2" hammer union connection grade
1502 (15,000 PSI) and shop fabricated and come with
pressure test certificates indicating that they pressure
tested to twice the burst value for the appropriate casing
size or at minimum 5000 PSI working pressure. "Orange
peel" welded type swedges are not acceptable.
16 ROTARY HOSE Open SE2 2-1/2” ID with 55 ft length, with 3,000 psi WP complete
with union connection and safety sling.
17 ROTARY SWIVEL Open SE2 Model SL-120, 100 Ton capacity with 3,000 psi WP and
match to block and Kelly complete with safety sling.
18 KELLY 3-1/2” Open SE2 3-1/2” Hexagonal type complete with Drive Bushing,
Lower Kelly Cock with 1,500 psi WP, Saver sub and
scabbard. 34 ft working space and maximum height
matched with mast specification and accessory
equipment (Kelly valve, hook, swivel, etc) and able to
make mouse hole for connection.
Contract No. SPHR00013A Page 101 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
19 KELLY COCK 3- Open SE2 Upper and lower valve for 3-1/2" kelly. Connections
1/2” match with kelly.
20 HANDLING Open SE2 Hydraulic power tongs c/w working torque gauge safety
TOOLS cut out system when the jaws are opened and line pull
sensor mounted on and dedicated to power tongs and a
dedicated power unit.
(for running16 ” – 18-5/8” casing)
Open SE2 Each of Make-up & Breakout manual rotary tongs for
16 and 18-5/8" casing. complete with tong line (torque)
pull gauges installed on each the make-up and
breakout snub lines. Total 2 tong line pull gauges.
Tongs completed with tong safety handles.
Open SE2 Each size rotary slips for 4-3/4” DC
Open SE2 Each size Elevators for 4-3/4” DC
Open SE2 Each size Elevators for 18-5/8” Casing
Open SE2 Hydraulic power tongs for tubing c/w working torque
gauge safety cut out system when the jaws are opened
and line pull sensor mounted on and dedicated to power
tongs and a dedicated power unit.
(complete with jaws for running 2-7/8”, 3-1/2”, 4-1/2”
tubulars)
Note:
Hydraulic Tubing Tong has a Tubing backup system for
each Tubing size as an integral part of the tong,
hydraulic.
Open SE2 Each of Make-up & Breakout manual rotary tongs for
tubular 3-1/2". Shall be complete with tong line
(torque) pull gauges installed on each the make-up and
breakout snub lines. Total 2 tong line pull gauges.
Tongs shall be capable of applying at least 55,000 ft-
lbs of torque.
Tongs completed with tong safety handles.
Note:
All counterbalances comply with IBU Lifting & Rigging
Standard.
Contract No. SPHR00013A Page 102 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
Open SE2 Each size split bushings for 18-5/8", 16”, 13-3/8", 10-
3/4”, 9-5/8" and 7" tubular. Same load rating to the
rotary table.
Open SE2 Each size rotary slips :
3-1/2” DP, 4-3/4” DC, 5" DP, 6-3/4" DC, 8" DC, 6 5/8" ,
7", 9-5/8", 10-3/4’’ , 13-3/8", 18-5/8”
Note
Capable to hold all operated string in this contract
Open SE2 Each size Elevators :
3-1/2” DP and 4-3/4” DC- 150 T.
Open SE2 Center latch type with 100 Ton capacity for handling:
2-3/8” NUE Tubing
2-3/8” EUE Tubing
2-7/8” EUE Tubing
2-7/8” NUE Tubing
3-1/2” EUE Tubing
3-1/2” NUE Tubing
4-1/2” EUE Tubing
4-1/2” NUE Tubing
C/W Standard Nut for cotter pin
Open SE2 Rod Elevator to handle 3/4”, 7/8”, 1” rod sizes.
with rating 25 T
Open SE2 Sucker Rod Hook Spring type with 35 tons capacity.
Open SE2 Power Sucker Rod Tong to handle ¾” to 1” Rod size with
rating 25 T
Open SE2 Sucker Rod Wrench for ¾” , 7/8” and 1” Rod size with
rating 25 T
Open SE2 For each size of Quick Disconnect casing protector for
4-1/2”, 5-1/2”, 6-5/8”, 7", 9-5/8", 10-3/4”, 13-3/8", 16”
and 18-5/8" casing.
Contract No. SPHR00013A Page 103 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
21 FALSE ROTARY Open DE2 Match to rotary table and can be used for running 3-1/2”
TABLE and 4-1/2” tubing. Able to withstand minimum 95,000 lbs
weight
22 TUBING SPIDER Open DE2 Pneumatic system for 3-1/2" and 4-1/2" tubing. Able to
AND SLIP ASSY withstand 95,000 lbs weight
23 MUD PUMP C/W Open SE1 Triplex pumps are required. Each pump shall be rated
MUD PUMP for 1000 horsepower input (3 mud pumps have same
PRIME MOVER rating) and are able to deliver at all pressure/volume
combinations. Each pump have pulsation dampeners on
output, flooded suctions provided by independently
driven electric motor or belt driven centrifugal pumps and
vibration hoses on discharges.
1000 HP, All engines completed with mechanical and air
intake shut off device.
IBrand: Caterpillar
Note :
1. Each Mud Pump is capable of delivering a range
602.3 GPM at 2,586 psi working pressure to 431.1 GPM
at 3,615 psi working pressure.
2. All pumps are capable of pumping simultaneously
down hole.
3. Vibration hoses are rated at 5,000 PSI WP.
4. Electric motor driven charging pumps.
5. Welded connections to all piping on discharge lines
and stand pipe, screw connection for pressure gauges
installation.
6. All relief lines are rated equal to maximum WP of the
pump (as per calculations in ASME B31.3), and are
included in the high pressure piping inspection.
7. Manufacturer is API certified.
8. All high pressure lines have safety restraint across
every connection.
9. All relief lines have safety restraint across every
connection and be properly secured.
10. Mud pump is equipped with close loop cooling
system.
11. Spare-part is provided from OEM
Contract No. SPHR00013A Page 104 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
12. Engines are large enough to provide 1000
horsepower to input shaft of mud pump. Provide
engine/transmission converter data to verify that 1,000
HP will be delivered to the pump.
13. A dynamometer test is provided to verify
engine/transmission capabilities.
14. All engines are completed with hydro mechanical
and air intake shut off device..
24 MUD PUMP C/W Open SE1 Triplex pumps are required. Each pump is rated for 1000
MUD PUMP horsepower input (all mud pumps shall have same
PRIME MOVER rating) and are able to deliver at all pressure/volume
combinations. Each pump have pulsation dampeners on
output, flooded suctions provided by independently
driven electric motor driven centrifugal pumps and
vibration hoses on discharges.
Electric motor driven charging pumps. 2005. Brand is
RONGSHENG, equal specification: Nationa.
1000 HP, All engines are completed with mechanical
and air intake shut off device.
Brand : Caterpillar.
Note:
1.Each Mud Pump is capable of delivering a range
602.3 GPM at 2,586 psi working pressure to 431.1 GPM
at 3,615 psi working pressure.
2.All pumps are capable of pumping simultaneously
down hole.
3.Vibration hoses are rated at 5,000 PSI WP.
4.Electric motor driven charging pumps.
5.Welded connections to all piping on discharge lines
and stand pipe, screw connection for pressure gauges
installation.
6.All relief lines are rated equal to maximum WP of the
pump (as per calculations in ASME B31.3), and are
included in the high pressure piping inspection.
7.Manufacturer is API certified.
8.All high pressure lines have safety restraint across
every connection.
9.All relief lines have safety restraint across every
Contract No. SPHR00013A Page 105 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
connection and be properly secured.
10.Mud pump is equipped with close loop cooling
system.
11. Spare-part is provided from OEM
12. Engines are large enough to provide 1000
horsepower to input shaft of mud pump. Provide
engine/transmission converter data to verify that 1,000
HP will be delivered to the pump.
1. A dynamometer test is provided to verify
engine/transmission capabilities.
2. All engines are completed with hydro
mechanical and air intake shut off device..
25 MUD PUMP C/W Open SE1 Triplex pumps are required. Each pump is rated for 500
MUD PUMP horsepower input (all mud pumps have same rating) and
PRIME MOVER is able to deliver at all pressure/volume combinations.
Each pump have pulsation dampeners on output,
flooded suctions provided by independently driven
electric motor driven centrifugal pumps and vibration
hoses on discharges.
Electric motor driven charging pumps. 2005. Brand is SJ
equal specification: Gardner Denver, National, Ideco,
Lewco, Emsco, Weatherford or Continental Emsco (F-
Series).
500 HP, All engines shall are completed with
mechanical and air intake shut off device.
Brand: Caterpillar.
Note:
1. Each individual Mud Pump is capable of delivering a
range from 450 GPM at 1,000 psi working pressure to
250 GPM at 2,500 psi working pressure.
2. All pumps are capable of pumping simultaneously
down hole.
3. Vibration hoses are rated at 5,000 PSI WP.
4. Electric or belt driven charging pumps when
responding.
5. Welded connections to all piping on discharge lines
and stand pipe, screw connection for pressure gauges
installation.
6. All relief lines are rated equal to maximum WP of the
Contract No. SPHR00013A Page 106 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
pump (as per calculations in ASME B31.3), and should
be included in the high pressure piping inspection.
7. Manufacturer is API certified.
8. All high pressure lines have safety restraint across
every connection.
9. All relief lines have safety restraint across every
connection and be properly secured.
10. Mud pump is equipped with close loop cooling
system
11. Spare-part is provided from OEM
12. Engines are large enough to provide 500
horsepower to input shaft of mud pump. Provide
engine/transmission converter data to verify that 500 HP
will be delivered to the pump.
13. A dynamometer test is done to verify
engine/transmission capabilities.
14. All engines are completed with hydro mechanical
and air intake shut off device.
26 ELECTRIC Open SE1 Each Generator and engine to provide 400 KW at 50Hz
POWER and each can supply sufficient power for all rig
equipment (additional shakers, camps, directional/MWD
unit, etc).
Note:
If one generator fails to provide sufficient power, Be
responsible to provide additional power supply at its own
cost.
27 LOW BED C/W Open SE1 Payload capacity and dimensions is sufficient size to
PRIME MOVER transport all BDSI’s loads (including to haul crane and
dozer) and be in compliance with Gov transportation
regulations. Be capable of operating in all weather
conditions (muddy roads, etc.) complete with reverse
camera and one way radio communication
Notes:
1. Maximum overhang for any load is 1.5 m.
2. Tires are Hi-Miller type on front and Timber King type
on back. Not be Vulcanized tires.
3. Equipped with retractable safety belts, and fire
extinguisher (10 - 20 lbs ABC).
4. Have “BM” plate number.
Contract No. SPHR00013A Page 107 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
5. Year made 2011.
6. Equipped with rubber wheel choker to be used during
parking.
7. Equipped with GPS integrated to Company I JMS.
8. Equipped with CVVR System
9. Equipped with stopper to be able handling tubular
(including casing, tubing.
10. At least 1 lowbed is equipped with ram to be able
hauling cranes & dozers
28 TRAILER C/W Open SE1 Payload capacity and dimensions shall be of sufficient
PRIME MOVER size to transport all BDSI’s loads and be in compliance
with Gov transportation regulations. Be capable of
operating in all conditions (muddy roads, etc.). Winch
capacity is sufficient to handle all BDSI’s loads.
Complete with reverse camera and one way radio
communication
Notes:
1. Maximum overhang for any load is 1.5 m.
2. Tires are Hi-Miller type on front and Timber
King type on back. Not be Vulcanized tires.
3. Equipped with retractable safety belts, and fire
extinguisher (10 - 20 lbs ABC).
4. Have “BM” plate number.
5. Year made 2011.
6. Equipped with rubber wheel choker to be used
during parking.
7. Equipped with GPS integrated to Company I JMS.
Equipped with CVVR System
29 TANDEM TRUCK Open SE1 Payload capacity and dimensions is of sufficient size to
transport all BDSI’s loads and be in compliance with Gov
transportation regulations. Be capable of operating in all
weather conditions (muddy roads, etc.). Winch capacity
is sufficient to handle all CONTRACTOR’s loads.
Complete with reverse camera and one way radio
communication
Notes:
1. Maximum overhang for any load is 1.5 m.
Contract No. SPHR00013A Page 108 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
2. Tires are Hi-Miller type on front and Timber King type
on back. Not be Vulcanized tires.
3. Equipped with retractable safety belts, and fire
extinguisher (10 - 20 lbs ABC).
4. Have “BM” plate number.
5. Year made 2011.
6. Equipped with rubber wheel choker to be used
during parking.
7. Equipped with GPS integrated to Company I JMS.
8. Equipped with CVVR System
30 CRANE Open SE1 Crawler Crane 35 ton MIGAS certified. Safety devices:
load indicator, load chart (English), swing brake, high
boom limiter with audible alarm, anti-toe block with
audible alarm & lock fall. Automatic Moment Limiter
(AML), automatic shut off anti-toe block, automatic shut
off boom back stop. Fire extinguisher (10 - 20 lbs ABC).
If using Crane 35 Ton, Submit Load Matrix in Submission
Document. And crane has ability to lift all equipment’s on
the rig safely and in accordance with the MSW lifting
rigging standard.
Year made 2011.
31 DOZER open SE1 D-7 or equivalent type of wide track bulldozer equipped
with winch and appropriate puling slings, terminations,
and Seat belt.
Equipped with prelate for control sling movement when
dozer to conduct towing process. Fire extinguisher (10 -
20 lbs ABC).
Year made 2011.
32 MGS Open SE2 • Rated for 350 psi Working pressure
• Kill rate 1400 gal/min
• 5.19 MMscf/d Min Flow Rate
• Dedicated inlet to transfer Fresh Mud into mud gas
separator in case of recovering gas blow thru
• Gas vent stack that connect to MGS gas outlet and
fulfill safety regulation
• Include all connection line of MGS inlet to choke
manifold, MGS gas outlet to vent stack & MGS mud
outlet to solid control facility/tank
• Baffle plate inside MGS body.
Contract No. SPHR00013A Page 109 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
33 LOW TORQUE Open SE2 Low torque valve shop fabricated and come with
VALVE FOR pressure test certificates indicating that they have
CIRCULATING pressure tested to twice the burst value for the
SWADGE appropriate casing size or at minimum 3,000 PSI
working pressure with 1502 union hammer. Have
bottom and above connection 2” union hammer
34 MISCELLEOUS Open DE2 Crossover 4-1/2” IF BOX to 6-5/8” LTC PIN, acceptable
SUBS range : 0,5 – 2 ft
Open DE2 Crossover 4-1/2” IF BOX to 6-5/8” BTC PIN, acceptable
range : 0,5 – 2 ft
Open DE2 Crossover 4-1/2” IF BOX to 5-1/2” LTC PIN, acceptable
range : 0,5 – 2 ft
Open DE2 Crossover 4-1/2” IF BOX to 5-1/2” BTC PIN, acceptable
range : 0,5 – 2 ft
Open DE2 Crossover 4-1/2” IF BOX to 7” BTC PIN, acceptable
range : 0,5 – 2 ft
Open DE2 Crossover 4-1/2” IF BOX to 9-5/8” BTC PIN, acceptable
range : 0,5 – 2 ft
Open DE2 Crossover 4-1/2” IF BOX to 13-3/8” BTC PIN,
acceptable range : 0,5 – 2 ft
35 KICK CONTROL Open SE2 For 6-5/8”, 5-1/2” and 4-1/2”. Each for BTC & LTC.
JOINT
36 PERSONNEL – Open - MinimumSHS. Have 10 years’ experience at
RIG location in supervising drilling and/or well service
SUPERINTENDE rigs (as Driller, Tour Pusher, Tool Pusher or
NT equivalent), min experience in Drilling 5 years
Have valid international well control certificate
Wellsharp IADC or IWCF.
Have Valid AP3 Certification
37 PERSONNEL – Open - Minimum SHS, have minimum 4 years experience as
ASSISTANT Driller for drilling and workover rigs. The last 2 years
DRILLER assignment as Driller at drilling rig (preferable) or
Contract No. SPHR00013A Page 110 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
cumulative has 3 years experience as driller in
drilling rig.
Have valid Migas JB certificate.
Have valid international well control certificate
Wellsharp IADC
Have Lifting & Rigging certificate
Has experience to execute CPI well minimum 12
months
38 LIGHT VEHICLE Open SE2 Three unit 4-WD, 2000cc double cab diesel
One unit, 4-WD, 2000cc SUV (Diesel)
Those units are intended to be shared for Rig Supt, HES
Coordinator, Rig Manager, mechanic and medical
evacuation vehicle (SUV)
For medical evacuation vehicle shall be equipped with
basic Life support equipment (Oxygen, Neck Collar,
capable for carrying stretcher
Every vehicle has portable torch lamp powered with car
battery supply to give adequate lighting to assist worker
working without common rig lamp such as during moving.
Note:
1) Have "BM" license plate.
2) Completed with seat belts, reverse alarm, reverse
camera,
3) Equipped with GPS integrated to Company I JMS.
4) Equipped with CVVR System.
5) Year made 2016.
39 VACUUM TRUCK Open SE2 6X4 Drive, capacity 60 bbls, Tank certified with operation
pressure 40 psi and Vacuum Pump Piston or rotary type
complete with retractable safety belts, AC, powder fire
extinguisher 10-20 lbs (ABC), Spot light 1 pcs, at the top
rear tank, backing up alarm, “BM” Plat Number complete
with GPS and CVVR system.
Year made 2011.
Completed with CVVR System
Vulcanized tires are not accepted. Timber King type or
equal for rear tire. One way radio communication
(between signalman to operator).
Contract No. SPHR00013A Page 111 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
40 TANK Open SE1 200 bbl capacity. skid mounted complete with transfer
pump. Tank be complete with fill/discharge stand
pipe/manifold completed with 3” union hammer
connection (aligned to VT hose connection type). Not be
filling with vacuum truck hose over the side.
41 TANK Open SE1 300 bbl capacity. skid mounted complete with transfer
pump. Tank complete with fill/discharge stand
pipe/manifold completed with 3” union hammer
connection (aligned to VT hose connection type). Not be
filling with vacuum truck hose over the side.
42 TANK Open SE1 500 bbl capacity. skid mounted complete with transfer
pump. Tank complete with fill/discharge stand
pipe/manifold completed with 3” union hammer
connection (aligned to VT hose connection type). Not be
filling with vacuum truck hose over the side.
43 MATTING Open SE2 Matting board to be utilized either for rig carrier,
BOARD substructure, tools, equipment, well pad area and
INCLUDING access road improvement. Mats shall be in safe and
INSTALLATION, good condition during lifetime of work order. Quick
TRANSPORTATI replacement shall be made upon damage. Matting board
ON, AND shall fulfill following specifications:
DISMANTLING Shall be a High-Density
Polyethylene/Polypropylene or equivalent
composite material. Plastic, fiberglass, wood, and
rubber materials are not allowed.
Shall have permanent Anti-Static Properties (static
dissipative) to ensure operational safety at the
drilling site.
Shall have permanent anti UV Protection properties.
Mats Shall have a minimum thickness to ensure
rigidity of the material under heavy track equipment
such as: dozers, cranes, excavators, and rig
equipment working in wet, muddy, or soft layers.
Shall follow the contours and be flexible to move in
the terrain according to the location but still be able
to maintain its rigidity and characteristics
Contract No. SPHR00013A Page 112 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
It is flexible for use in the drill rig area, especially soft
soil and mud and can follow the contours of the
terrain according to the location
Shall have a raised tread pattern with a minimum
thickness of 1 mm that provides traction and slip
resistance for the load above.
Stable locking mechanism of at least 2 locks per
side and concealed in mats to prevent tripping
hazards or interfering with track vehicles, dozer
blades, or slipping loads
The Overlapping Locking mechanism shall provide
sufficient lateral stability to withstand loads of up to
20 tons.
Using standard ASTM D790 or equivalent, test
parameters on 3-point loading equipment: 4 ft
unsupported/resisted mat/composite span shall not
bend/bend more than 4 inches under 10,000 lbs
load at 73 degrees F in center -center of the mat
with a nominal width of 94 inches.
44 ADDITIONAL Open SE2 Additional Porta camps for 4 personnel (c/w bed) include
PORTA CAMP toilet facilities, running water, air conditioning, water
heater.
45 PORTABLE Open SE2 Manufacture product with years guarantee and standard
TOILET light building material polyethylene c/w exhaust blower &
light, hand wash/basin. Eastern toilet & western seat
type toilet, proper flush system and hose spray. Toilet
dimension as manufacture standard or min. 1 W x 1.3 L
x 3 H put on skid min.1.2 W x 3.6 L x 3.2 H (meter). 1 set
of door rest room (single portable toilet) set on the skid
and have eye pad for lifting which reliable to set on such
as muddy well pad condition (can be pushed or towed).
Skid total weight not bigger than 2,5 ton (can handled by
Foco capacity 5 Tons).
WASTE HANDLING/CLEAN WATER SUPPLY &
DISPOSAL PLACE (TPA): CONTRACTOR shall
responsible to provide the required portable toilet
properly and do toilet drainage system handling. Has
transportation such as truck tank with min. capacity 5000
liters and adequate accessories for each clean water
Contract No. SPHR00013A Page 113 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
CONTRACTOR’s QUOTE
EQ.
NO EQUIPMENT QTY COMPANY SPECIFICATION
CAT
Specification Manufacture
and black water truck tank in order to supply clean water
and such black water. C/w Roll Toilet Paper, Liquid
Soap, Room Freshener, etc. Pit, w/ adequate dimension
min.10 M x 15M x 1M as per standard and licence/permit
from GOI and Environment institution.
CHEMICAL FOR DECOMPOSING: Chemical for
asunder the excrement for decomposing and prevent it
from smells bad. With DENSOL or deodorizer chemicals
& running water.
Note:
Skid of single doors and double doors toiled shall be
separated, during moving 1 of them will be set at new
location
46 PERSONNEL Open SE2 Half Face HEPA Mask for hazardous air quality complete
PROTECTION with the cartridge. Cartridge is replaceable within
EQUIPMENT manufacturer expiry condition.
(PER CREW Respirator Refer to NIOSH Title 42 CFR 84-1995
MEMBER) Respirator cartridge refer to NIOSH Title 42 CFR 84 –
1995 for Approval of Respiratory Protective Devices and
ANSI Z88.7-2001 for Color Coding of Air-Purifying
Respirator Canisters, Cartridges, and Filters.
END OF REFER TO EXHIBIT C4
AKHIR MERUJUK DARI LAMPIRAN C4
_________________________, Date: _________ 2021
PT. _______________________________________
Contract No. SPHR00013A Page 114 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig
PT Pertamina Hulu Rokan Onshore Drilling Rig
Duty stamp Rp 10,000
………………………………………………………
Director
Contract No. SPHR00013A Page 115 of 115 Ops Cont CCM
Technical Data Request – 750 HP – Drilling Rig