MTH601-Midterm (June 7, 2014)
1. The first step in a problem solving exercises in OR is the ________that exist in the system.
Construction of the model of problem
Identification o f the problem
Solution of the problem
None of these
2 .A requirement for the definition of the problem in OR is that _________must be
clearly defined which helps to focus attention on what the problem is
Method
Objective
Solution
None of these
3 . In a network flow diagram, time follows from_________
Left to right
Right to left
Any direction
4. The dummy activities consume
No time,no resources
No time but some resources
Some resources in minimum time
All resources in a given time
5. In a national highway system interestion of two or more roads has the same analogy as
the ______in the network flow diagram.
Branch
Critical activity
Flow
Node
6. Best possible time estimate that a given activity would take under normal conditions
which often exist, is called
Most likely time estimate
Pessimistic time estimate
Smallest time estimate
Activity time estimate
7. In ______, activity time estimates are distributed according to beta distribution
PERT
CPM
Project Network
Float
8. If we have 2,4 and 12 hours as the optimistic(t0) most likely (tm) and pessimistic(tp)
then the expected time for the activity would be
7
6
5
4
9. If t0=2 tm=5 and tp=14 then SD=__________
2
4
6
8
10. IF t0=6,tm=12 and tp=18 then Vt=_______
12
2
4
144
11. The graphical method for solving a linear programming problem is applicable when
_____
Two variables are involved
Three variables are involved
Any number of variables are involved
None of these
12.
Which of the following is equivalent relation to the constraint x=2 of a linear
programming problem?
X≥2
x≤2
x<2 and x≥2
x<2 and X>2
13. While using simplex method for a LPP if there are 4 standard equations in 8 variables
then number of non basic variables will be _______
32
12
4
2
14.
X1
X2
R1
R2
15. In the purchasing model without any shortage(Wilsonsmodel) which of the following
quatitiy does not vary?
Supply
Demand
Inventory
Transportation cost
16. How many decision variables are involved in the inventory model with shortages?
One
Two
Three
Four
17. Which of the following rule is used in order to minimize the decision variables in any
inventory model?
Derivative test
Simplex method
PERT
Graphical method
18.
R→0
R=D
R>D or R<D
R→∞
19. ABC analysis depends on the
Quality of materials
Cost of materials
Annual consumption value of materials
Quantity of materials used
Question: (2 marks)
What is linear Programming?
Question: Forgot
Question: (3 marks)
If we increase the inventory, then what would be the proportionate effect on the
followings? Give proper reason in each case.
(i) Shortage Cost.
(ii) Ordering or Setup Cost per unit time.
(iii) Holding Cost.
Question: (3 marks)
Put the following program in standard form
Maximize. Z x y
Subject to :
x 5y 5
2x y 4
x, y 0
Question:
Find the initial basic feasible solution to the following linear programming problem,
Maximize Z = 4x + y
Subject to
3x + y = 3
2x + y ≥6
x + 2y ≤ 3
x, y ≥0
Question: (5 marks)
Classify the following material items into ABC categories.
Item Number 1 2 3 4 5 6 7
Annual Usage in Rs. 36000 14000 75000 37000 11000 16000 32000
Solved papr of Wet eye
Part 1
Question: (2 marks)
What is linear Programming?
Ans: Linear programming technique can be said to have a linear objective function
that is to be (either maximized or minimized) subject to linear equality or
unequality constraints and sign reactions on the variables.
Question: Forgot L
Question: (3 marks)
If we increase the inventory, then what would be the proportionate effect on the
followings? Give proper reason in each case.
(i) Shortage Cost.
(ii) Ordering or Setup Cost per unit time.
(iii) Holding Cost.
Ans: (i) Shortage Cost. When we increse the inventory the shortage cost will
decrease.
If we hav much inventory then we dont need to giv cost for overtim requirements
due to shortage nd also will not bear clerical nd adminitrator expenses.
(ii) Ordering or Setup Cost per unit time. When we incraese the inventory the ordering
cost C2 will also b increased.
If the items r inventory incrased then tsting nd training costs will also increased.
(iii) Holding Cost. will increase.
bcz with high inventory we need to giv tex n insurence also. we hav to mantian the
inventory record too.