0% found this document useful (0 votes)
124 views29 pages

Statnett Digital Substation

Uploaded by

Abib Leye
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views29 pages

Statnett Digital Substation

Uploaded by

Abib Leye
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

Digital Substation

The Nordic Workshop in Power System Protection and Control

Eivind Norum
Trondheim, 23.5.2017
Topics

• Todays computerbased solution

• Digital substation
What is it?
Key Aspects

• R&D project
The project team
Why digital substation in Statnett?
Challenges in new technology

Fremtiden er elektrisk
Eivind Norum
• M.Sc from NTNU Electric power
systems (Energi og miljø)
• Trainee in Statnett since august
2016
• Focus areas: Fault analysis,
power system protection and
control
• Currently working in the Digital
Substation (DSAS) R&D project

Fremtiden er elektrisk
The R&D unit in Statnett
• Strategic tool to find a way for future corporate strategies
• Focus on improving safety, cost and time efficiency
• Estimated 861 million Euro in potential saving last 10 years
• Working with all parts of Statnett’s organization. Involving 130
people (2016) to ensure right focus and easy implementation of new
solutions and technology

Some of our projects and focus areas:

Voltage Probabilistic Full digital Environment Next generation Machine learning Composite Pre-fabricated
upgrading security of supply substation & Society control center for system towers steel foundation
unbalances

The future is electric www.statnett.no/en/Sustainability/RandD/


Colleagues in the digital substation project

+ other internal resources from


Drift og marked, IKT og
Teknologi og utvikling

Rannveig Løken – Nargis Hurzuk –


Project manager Project engineer

We are Building important competence


for the future digital grid
The future is electric
Projects partners

The future is electric


Why digital substaion?
• HSE
• Cost
• Time
• Functionality

Fremtiden er elektrisk
Project progress

September 2017

Installation of pilot

January 2018

Business case

2019

Input to new substation design

The future is electric


Some of the project objectives
• Gain experience from operation of digital substation pilot
• Develop next generation control system
• Develop collaboration between disciplines such as ICT and power engineering
• Develop competence
• Verify maturity of technology

The future is electric


Today's computer based solution in Statnett

Dispatch center
Remote Access

GPS

Control room
HMI Gateway

Timesync.
Stationbus IEC 61850-8-1

Switch
Fiberoptic ring

IED

Primary
component

The future is electric


Major Leap in communication design

Conventional design:

App. 800 power & signal


conductors
- from bay to control room

Prosess bus: Maximum footprint


reduction potential (Ring structure):

7 powercables & fibers

- from bay to control room

Fremtiden er elektrisk
What is the essential of a digital substaion?
• All measuring is digitized in or close to
the primary equipment in the bay – Sampled measured values (SMV)
• All breaker control commands and signals to/from the bay is digitized with
process bus based on IEC 61850-9-2 - GOOSE

The future is electric


Digital substaion with process bus
Dispatch center
Remote acess

GPS

Control room
Timesync. 1 Gateway Timesync. 2
HMI

Switch Stationbus
IEC 61850-8-1 Fiberoptic ring

IED

Processbus
IEC 61850-9-2

Bay cabinet

Switch-gear
control unit
(SCU)

Primary
components

The future is electric


Simplified section of conventional and digital station

Conventional
Substation

Possiblity for more


compact controlsystem
Reduction in usage
of oil/Compact

Reduction in substation
Digital substation Reduction in usage of copper footprint

Fremtiden er elektrisk
Digital Substaion pilot

The future is electric


Digital Substaion pilot – some key aspects
• Protection and Control IEDs without Input transformers, low-pass filter, converter and binary
I/O-compact
• Elimination of CT secondary circuits with NCIT
• Protection and control for more than line in one IED/protection relay

The future is electric


Process bus in digital substaion pilot
• Critical signals are digital
• GOOSE and sampled meassured (SMV) using IEC protocol 61850
• VLAN
• Time synchronization – PTP
• Redundancy - PRP
• IT security

The future is electric


Optical current transformer-NCIT

HSE:
Elimination of secondary
HV-part current circuit

Optical sensor – faraday


Sensorhead effect

Free of magnetic
Fibre saturations effects

Lower weight -transport


Insulator Reduction in in usage of oil
and gas- 80%

Reduced substation
Fundament footprints

Fremtiden er elektrisk
Merging Unit(MU)

From Optical/Analog to IEC 61850-9-2 (process bus)

Stand Alone Merging Unit(SAMU)

From Analog to IEC 61850-9-2 (process bus)

Fremtiden er elektrisk
IEDs in the pilot (PCU1)
• Protection and control unit
• Distance protection for 2 lines
• Bay control unit (Objektmaskin) for 2 lines
• Autoreclosure (IKA) for 2 lines
• Fault and disturbance recorder for 2 lines
• All functions in one IED
• Based on 7SA87 -Siemens

The future is electric


IEDs in the pilot (PCU2)
• Based on SPRECON supplied by
Jacobsen Electro/Sprecher Automation
• Industry based LINUX computer hardware
instead of supplier IED
• Distance protection for 2 lines
• Bay control unit (Objektmaskin) for 2 lines
• Autoreclosure (IKA) for 2 lines
• Fault and disturbance recorder for 2 lines
• All functions in one IED

The future is electric


IEDs in the pilot (PCU3)
• Protection and control unit (PCU)
• Distance protection for 2 lines
• Fault and disturbance recorder for 2 lines
• Phasor measurement unit (PMU)
• Based on REL670 from ABB
• All functions in one IED

The future is electric


Pdiff. -DANEO 400
• Continuous comparison of currents
from conventional and optical power
measurement
• Fault and disturbance recorder

SCU- Switchgear Control Unit


• I/O for converting analog values to IEC 61850 telegrams
• I/O for converting IEC 61850 telegrams to analog values
• Fault and disturbance recorder

Fremtiden er elektrisk
Publications
• NEF teknisk møte (may 2017)
• PAC world (june 2017)
• Cigre (august 2018)

The future is electric


Expected benifits
• Improved personal safety
• Reduction in cost connected to copper cables
• Reduction in cost for IEDs through omission of analog measuring inputs and binary I / O
• Takes less space both indoors and outdoors
• Reduced time required to build and test facility
• Greater degree of self-monitoring that provide better quality of utility
• Easier data retrieval from the primary facility for maintenance purposes
• Improved ability to perform remote access / remote diagnostics providing reduced operating
costs
• Reduced electromagnetic interference due to transition to the fiber optic connectors

The future is electric


Some challanges
• Regulatory Compliance – Accredited measurement circuit control, EMP protection and
demands for redundancy/duplication
• Climatic conditions / life of IEDs in the field, working out in the field
• Commercial availability of components (NCVT)
• Properties in protective function entrusted to NCIT?
• Interoperability between components of different vendors
• ICT security and control of accesses
• Competence building - Organization change
• Time synchonisation for SMV is crucial

The future is electric


Control system in digital substation – step 1 and 2
• Substation control system today

• Digital substation Step 1 – Greater degree of integration –This R&D project

• Digital substation Step 2 –Greater degree of integration –Future?

Fremtiden er elektrisk
Questions?