Contents
1 GENERAL ......................................................................................................................................... 1
Scope ....................................................................................................................................... 1
References .............................................................................................................................. 1
Related Specification....................................................................................................... 1
Terminology ............................................................................................................................ 1
COMPANY ....................................................................................................................... 1
CONTRACTOR .................................................................................................................. 1
Vendor............................................................................................................................. 1
MIGAS ............................................................................................................................. 1
Third Party ....................................................................................................................... 1
Inspector ......................................................................................................................... 1
Conflicting Requirements........................................................................................................ 2
2 QUALITY ASSURANCE ...................................................................................................................... 2
Quality Assurance Requirements ............................................................................................ 2
Quality Records ....................................................................................................................... 2
Internal Quality Audit.............................................................................................................. 2
Training ................................................................................................................................... 3
3 QUALITY CONTROL REQUIREMENTS ............................................................................................... 3
Quality Control Requirements ................................................................................................ 3
4 ORGANIZATION AND FUNCTION..................................................................................................... 3
Policy ....................................................................................................................................... 3
Organization ............................................................................................................................ 4
QA Manager .................................................................................................................... 4
QA Coordinator ............................................................................................................... 4
Quality Control Administration ....................................................................................... 4
Discipline Inspector ......................................................................................................... 4
5 INSPECTION AND TESTING ITEMS ................................................................................................... 4
Application for Inspection ....................................................................................................... 4
Inspection Meeting ................................................................................................................. 5
Pre-Inspection Meeting................................................................................................... 5
Regular Inspection Meeting ............................................................................................ 5
Special Inspection Meeting ............................................................................................. 5
Inspection Test Report Record................................................................................................ 5
Inspection of Measuring and Test Equipment ........................................................................ 5
6 ATTACHMENT ................................................................................................................................. 6
1 GENERAL
Scope
This procedure to describe minimum requirements of Quality Control and Quality Assurance for all of
project activities in order to achieve COMPANY quality/requirement.
References
Related Specification
• PHR-PP-QC-GG-001 Project Quality Assurance Plan
• PHR-PP-QC-GG-003 Inspection and Test Plan at Shop
• PHR-PP-QC-GG-004 Inspection and Test Plan at Field
• PHR-PP-QC-GG-008 Fabrication Quality Control Plan
• PHR-PP-MN-GG-010 Quality Audit Procedure
Terminology
In this specification, the following words and terms shall have the meanings hereby assigned to them,
unless noted otherwise.
COMPANY
Refers to PERTAMINA HULU ROKAN, as the ultimate user and owner, the authorized representative
of COMPANY or COMPANY third party inspection.
CONTRACTOR
Refers to company selected by COMPANY, which may be responsible for the detailed engineering
design, material and equipment procurement, and construction as specified in Contract, Scope of
Work, or Work Order.
Note: EPCM Company shall also be responsible as CONTRACTOR
Vendor
Refers to the company selected by COMPANY or CONTRACTOR, which is responsible for the purchase
agreement or purchase order of the goods/services specified in this specification
Note:
• For EPC (Engineering, Procurement and Construction) project purposes: The terminology shall
have the meanings as above.
• For “Direct Procurement” by COMPANY purposes: Vendor shall also be responsible as
CONTRACTOR.
MIGAS
Indonesian Government body which is responsible for issuing approvals and licences for oil and gas
facilities.
Third Party
Inspection Company approved and appointed to act on behalf MIGAS, which is assigned as a
CONTRACTOR, Vendor subcontractor, or COMPANY Contract.
Inspector
COMPANY representative and/or person who has been assigned have a responsibilities for
inspection.
Conflicting Requirements
• In case of conflict between this Specification and its associated Specifications and the above
Codes and Standards, the Vendor shall bring the matter to the COMPANY’s attention for
resolution and approval in writing. However, the most stringent requirement shall apply.
• Should conflicts exist between this specification and other documents, the following order of
precedence shall govern:
• Scope of Work
• Data Sheets.
• This Specification
• Other COMPANY Specifications
• Other Referenced Publications
• Approved for Construction Drawings
• Vendor’s Code
2 QUALITY ASSURANCE
Quality Assurance Requirements
• Quality Assurance is a planned and systematic action by management that is necessary for
establishing requirements and ascertaining conformance to ensure that the design,
fabrication, construction (erection & installation), start up, and commissioning program will
be performed to a satisfactory quality standard as COMPANY required.
• Quality Assurance shall have a full commitment from CONTRACTOR’s/Vendor’s management
in the application of the required program. CONTRACTOR’s/Vendor’s project management
team shall be delegated with the responsibility to ensure that COMPANY’s quality assurance
requirements are met.
• CONTRACTOR/Vendor shall develop and implement the project quality assurance plan.
COMPANY will monitor and audit all aspects of quality assurance to ensure that the project
quality assurance plan is being correctly used and effectively implemented.
• CONTRACTOR’s/Vendor’s project quality assurance plan shall include about all phases of a
project activity from establishing functional capability to operation of the facilities.
• CONTRACTOR shall responsible for the quality of Vendor’s/Subcontractors works and
materials in accordance with COMPANY specification (Contract) and statutory requirements.
Quality Records
• CONTRACTOR shall describe the system of identification, collection, indexing, filing, storage,
maintenance, and disposition of various records. The records shall document the evidence of
compliance with the Contract requirements.
• The system shall be able to ensure all quality records are legible, identifiable, stored,
maintained, and retrievable.
• The audit results shall be documented, and COMPANY reserves the right to be represented
during these audits and have access to all pertinent documents.
• COMPANY shall have the right to conduct periodic audits on CONTRACTOR pertaining to
QA/QC activities related to the Works. COMPANY shall notify CONTRACTOR two weeks in
advance prior to the audits.
• All irregularities or non-conformances revealed by the audit and during on going QA/QC
review shall be corrected by CONTRACTOR in a timely manner so that the contractual
completion can be fulfilled.
Training
• CONTRACTOR shall describe the system for identifying the training needs and provision of
training to all personnel involved in the Work.
• The system shall be able to provide guidelines to all personnel to perform specific assignments
that conform to the Contract requirements.
Detail explanations of the project quality assurance plan will be described on the PP-QC- GG-001
Project Quality Assurance Plan.
• Construction Team are responsible for performance of work in compliance with the project
specification, drawings and installation instructions.
Organization
As required by COMPANY in Scope of Work or in Contract, Quality control organization chart is
attached (see Attachment-1). The following are the personnel in charge for quality control
organization and their function:
QA Manager
QA Manager shall give reports to the Project Manager about his/her responsibilities for supervision of
all quality control activities and coordinates project quality assurance / quality control efforts to
ensure the intended results. He/she has right to attend the pre-inspection meeting, inspection
meeting and inspection of testing and holding the inspection activity in coordination with the Project
Manager and COMPANY’s Quality Control Coordination, and/or MIGAS/Third Party. All release and/or
rejected work/inspection/testing is under ultimate judgment of QA Manager in accordance to the
COMPANY specification and statutory requirement.
QA Coordinator
He/she shall responsible to coordinate all of inspector work, scheduling and monitoring their
inspection result and reporting the result to the QA Manager. He/she has responsibility and right to
review, release and/or reject the Vendor’s/Subcontractor’s procedure documents, preparing any
necessary procedure documents under QA/QC deliverable list. QA Coordinator also permitted to
attend any pre-inspection meeting, inspection meeting and inspection of testing under QA Manager
permission.
Discipline Inspector
Discipline Inspector has responsibility to report the result of each attend the testing and inspection of
each discipline to the QA Coordinator. The Discipline Inspector has right to inspect at any time
according to their determined schedule and can give notification that the work is release or rejected.
Inspection Meeting
Pre-Inspection Meeting
CONTRACTOR/Vendor shall perform this meeting for any major equipment, before start fabrication.
The detail explanation of this meeting will describe in PHR-PP-QC-GG-008 Fabrication Quality Control
Plan.
• CONTRACTOR shall ensure the effective monitoring of the accuracy of the inspection
equipment with respect to the specified requirements and standards.
6 ATTACHMENT
Attachment-1 Quality Control Organization Chart
Attachment-2 Application for Inspection Form
Attachment-3 Non Conformance Report (NCR) Form
Attachment-4 Disposition Plan / Order Form
Attachment-5 Inspection Report Form
Attachment-6 Punch List Remaining Work Form
August 2021
QA/QC Procedures PHR-PP-QC-GG-002
CONTRACTOR:
APPLICATION FOR INSPECTION
To : Application No :
Message : Your presence is required for the below mentioned inspection activity
PIPING ELECT
Inspection Items :
Location :
Date :
Time : Approx Duration : day(s)
Contact Person :
Remarks :
Received by : Prepared by :
Date : Date :
CONTRACTOR :
NON-CONFORMANCE REPORT
(NCR)
NCR NO : JOB NO :
ORIGINAL REQUIREMENT :
REFERENCE
Action required by
Engineering Group
QC Group
Construction Group
Material Group
Nonconforming Item :
Cause of Nonconformance :
Rework
Rejection
Backcharge Claim Yes No
Further Inspection Yes No
Attachment Reference
Procedure Drawing (No. )
Material Requisition Specification (No. )
Additional Inspection Requisition (No. )
Procedure NCR (No. )
Report of Disposition Completion
Confirmed by :
CONTRACTOR :
INSPECTION REPORT
Type of Inspection :
Inspection Item :
Inspection Report :
Remarks :
CONTRACTOR :
PUNCH LIST REMAINING WORK
DISCIPLINE: Date :
CIVIL MECH. PIPING Job No. :
ELECT. INST. Doc. No. :
Vendor/SubCont :