This document is an attendance sheet for daily laborers working on the Moyale Water Supply Project by Iqra General Construction Company from August 1-15, 2015. It lists 8 daily laborers, their positions, the number of days worked, daily rate, and total amount earned. The laborers worked between 10-12 days each and earned between 3,000-3,600 birr for their work based on a daily rate of 300 birr.

Uploaded by

ARSE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views4 pages

August

This document is an attendance sheet for daily laborers working on the Moyale Water Supply Project by Iqra General Construction Company from August 1-15, 2015. It lists 8 daily laborers, their positions, the number of days worked, daily rate, and total amount earned. The laborers worked between 10-12 days each and earned between 3,000-3,600 birr for their work based on a daily rate of 300 birr.

Uploaded by

ARSE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Iqra General Construction Company

Moyale Water Supply Project


Month:-August 1-15, 2015 Attendance Sheet:- Daily Labor
Date Over
S.No Full Name Pos Total Rate Amount Sign
time

1 10
1 11

14

1 15
1 12
1 13
1

9
1 Gezehagn Getu DL 11 300 3,300

1
1
x
1
1
x

1
1
2 Temesgen Kuse DL 11 300 3,300

1
1
x
1
1
x

1
1
1
1
1
1

1
3 Yohannes Giro DL 11 300 3,300

x
1
1

1
1

1
1
1
1
1
1

1
4 Karsato Kashare DL 10 300 3,000

1
1
x
1
1
x

1
1
1
1
1
1

x
5 Kuzey Yatele DL 12 300 3,600

x
1
1

1
1
1

1
1
1
1
1
1

1
6 Birbirsa Kirchana DL 12 300 3,600

1
1
x
1
1
1

1
1
1
1
1
1

1
7 Iras Tona/Yoh DL 10 300 3,000

x
1
1

1
1

1
1
1
1
1
1
8 Kusheda Kirma DL 11 300 3,300
1
1
x
1
1
x

1
1
1
1
1
1

1
9 Iysa Yetawa DL 1 12 300 3,600
1
x
1
1
1

1
1
1
1
1
1

1
10 Kombre Koche DL 12 300 3,600
1
1
x
1
1
1

1
1
1
1
1
1

1
11 Kuse Orkaydo /Yoh DL 10 300 3,000
1
1
x
1
1
x

1
1
1
1
1
1

x
12 Sawgedhesko DL 11 300 3,300
1
1
x
1
1
x

1
1
1
1
1
1

1
13 Guyo Tafese DL 12 300 3,600
1
1
x
1
1
1

1
1
1
1
1
1

1
14 Melkamu DL 11 300 3,300
x

x
1
1

1
1

1
1
1
1
1
1

1
15 Abdulahi DL 11 300 3,300
1
1
x
1
1
x

1
1
1
1
1
1

1
Total 167 50,100
Prepared by. Checked By

Abiyot Demissie
Iqra General Construction Company
Moyale Water Supply Project
Month:-August 16-30, 2015 Attendance Sheet:- Daily Labor
Date
S.No Full Name Pos Total Over time Rate Amount Sign

1 16
1 17
1 18
1 19
1 20
1 21

x 23
1 24
1 25
1 26
1 27
x 28
1 29
1 30
x 22
1 Gezehagn Getu DL 12 300 3,600
2 Temesgen Kuse DL 12 300 3,600

1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
3 Yohannes Giro DL 12 300 3,600

1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
4 Kuzey Yatele DL 12 300 3,600

1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
5 Birbirsa Kirchana DL 12 300 3,600

1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
6 Kusheda Kirma DL 12 300 3,600
1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
7 Iysa Yetawa DL 1 12 300 3,600
1
1
1
1
1
x
x
1
1
1
1
x
1
1
8 Kombre Koche DL 12 300 3,600
1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
9 Guyo Tafese DL 12 300 3,600
1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
10 Melkamu DL 12 300 3,600
1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
11 Abdulahi DL 12 300 3,600
1
1
1
1
1
1
x
x
1
1
1
1
x
1
1
Total 132 39,600
Prepared by. Checked By
Abiyot Demissie
Iqra General Construction Company
Moyale Water Supply Project
Skilled Labor Attendance                                                                  Month: August 1-15, 2015
Date Over
No Full Name Pos Days Rate Amount Sign
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Time
1 Hayle Tekalign C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 1,000 15,000
2 Sintayehu Bedilu C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 800 12,000
3 Getachew Nesibu C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 800 12,000
5 Tekle Tegegn BB 1 1 1 1 1 1 1 1 1 1 1 1 12 800 9,600
6 Mekbib Mas 1 1 1 1 1 1 1 1 1 1 1 1 12 800 9,600
7 Dawit Mas 1 1 1 1 1 1 1 1 1 1 1 1 12 800 9,600
8 Memihir Meskele ass 1 1 1 1 1 1 1 1 1 1 1 1 12 6 600 10,800
9 Lemita Gebeyehu ass 1 1 1 1 1 1 1 1 1 1 1 1 12 450 5,400
Total 105 6 84,000
Prepared by Checked by
Abiyot Demissie
Iqra General Construction Company
Moyale Water Supply Project
Skilled Labor Attendance                                                                  Month: August 16-30, 2015
Date Over
No Full Name Pos Days Rate Amount Sign
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time
1 Hayle Tekalign C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 1,000 14,000
2 Sintayehu Bedilu C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 800 11,200
3 Getachew Nesibu C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 800 11,200
5 Tekle Tegegn BB 1 1 1 1 1 1 1 1 1 1 1 1 12 800 9,600
6 Mekbib Mas 1 1 1 1 1 1 1 1 1 1 1 1 12 800 9,600
7 Dawit Mas 1 1 1 1 1 1 1 1 1 1 1 1 12 800 9,600
8 Memihir Meskele ass 1 1 1 1 1 1 1 1 1 1 1 1 12 600 7,200
9 Lemita Gebeyehu ass 1 1 1 1 1 1 1 1 1 1 1 1 12 450 5,400
Total 102 0 77,800
Prepared by Checked by
Abiyot Demissie

You might also like