ÇALIK ENERJİ SAN.TİC.
AŞ
POWER SYSTEMS E.P.C. GROUP
GARDABANI TPP
GEORGIA
GARDABANI C.C.P.P
230 MW
Revision History
1 30.01.201 FOR COMMISSIONING LDI SKN SSV
0 08.01.201 FOR COMMISSIONING LDI SKN SSV
B 23.12.201 FOR APPROVAL LDI SKN SSV
A 03.12.201 FOR APPROVAL VBA SKN SSV
4
REV DATE DESCRIPTION PREPARED CHECKED APPROVED
DOCUMENT TITLE/SUBJECT:
TESTING AND COMMISSIONING PROCEDURE:- IPBD &GCB
PROJECT DOCUMENT NO:
Size A-4
Detailed Information
Proje Syste Serial
Type
Doc.
Disc
Unit Orig. Lang. Eng.
ct m No
No. of
GAC 12 VX RMH LAH 008 04
Sheet
Rev.
1
No:
Doc. No. : GAC-12-VX-RMH-LAH-008
COMMISSIOING PROCEDURE
Page : 2 OF 3
FOR IPBD & GCB Revision :1
TABLE OF CONTENTS
1.0 Objective : 03
2.0 Methodology : 03
3.0 Acceptance Criteria : 03
4.0 Attachments : 03
This document is the property of ÇALIK Enerji Sanayi ve Ticaret A.Ş and may not be copied, used, reprinted or distributed by others
Doc. No. : GAC-12-VX-RMH-LAH-008
COMMISSIOING PROCEDURE
Page : 3 OF 3
FOR IPBD & GCB Revision :1
1.0 Objective:
Objective of this document is to have a written down procedure for the commissioning
related activities of Isolated Phase Bus Duct (IPBD) and Generator Circuit Breaker.
2.0 Methodology
Broadly the methodology of the commissioning is as below:
Checking the completeness of the erection of the equipment and accessories.
Conducting the pre-commissioning checks of the IPBD with GCB and associated
equipment filling & sign off the checklists (attached) accordingly
Conducting the commissioning checks of the IPBD with GCB and associated
equipment filling & sign off the checklists (attached) accordingly
Ensuring upstream & downstream equipments are already commissioned or ready
for commissioning
3.0 Acceptance Criteria
IPBD & GCB have been commissioned in compliance with checks and tests
mentioned in the attachments
4.0 Attachments:
Following attachments, attached with this document, may be referred for conducting the
pre-commissioning and commissioning activities for IPBD &GCB:
Attachment 1: Pre-commissioning Checks: IPBD & GCB
Attachment 2: Pre Commissioning Test: Insulation Resistance Measurement
Attachment 3: Pre Commissioning Test: High Voltage Test
Attachment 4: Pre Commissioning Test: Contact Resistance Test
Attachment 5: Pre-commissioning Test: Voltage Transformer Test
Attachment 6: Pre-commissioning Test: Current Transformer Test
Attachment 7: Commissioning Checks: IPBD & GCB