Gac 12 VX RMH Lah 008 - Rev 1 - Ipbd & GCB

This document provides a commissioning procedure for an Isolated Phase Bus Duct (IPBD) and Generator Circuit Breaker (GCB) at the Gardabani Thermal Power Plant in Georgia. It outlines the objective, methodology, and acceptance criteria for commissioning the IPBD and GCB. The methodology includes checks of equipment erection and pre-commissioning checks using attached checklists. Commissioning checks are also to be completed using the checklists to ensure the IPBD and GCB are commissioned per the outlined tests and measurements. Seven attachments with detailed test procedures are referenced.

Uploaded by

Dipayan Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views3 pages

Gac 12 VX RMH Lah 008 - Rev 1 - Ipbd & GCB

This document provides a commissioning procedure for an Isolated Phase Bus Duct (IPBD) and Generator Circuit Breaker (GCB) at the Gardabani Thermal Power Plant in Georgia. It outlines the objective, methodology, and acceptance criteria for commissioning the IPBD and GCB. The methodology includes checks of equipment erection and pre-commissioning checks using attached checklists. Commissioning checks are also to be completed using the checklists to ensure the IPBD and GCB are commissioned per the outlined tests and measurements. Seven attachments with detailed test procedures are referenced.

Uploaded by

Dipayan Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

ÇALIK ENERJİ SAN.TİC.


POWER SYSTEMS E.P.C. GROUP

GARDABANI TPP
GEORGIA

GARDABANI C.C.P.P
230 MW

Revision History

1 30.01.201 FOR COMMISSIONING LDI SKN SSV


0 08.01.201 FOR COMMISSIONING LDI SKN SSV
B 23.12.201 FOR APPROVAL LDI SKN SSV
A 03.12.201 FOR APPROVAL VBA SKN SSV
4
REV DATE DESCRIPTION PREPARED CHECKED APPROVED

DOCUMENT TITLE/SUBJECT:

TESTING AND COMMISSIONING PROCEDURE:- IPBD &GCB

PROJECT DOCUMENT NO:


Size A-4
Detailed Information

Proje Syste Serial


Type
Doc.
Disc

Unit Orig. Lang. Eng.


ct m No

No. of
GAC 12 VX RMH LAH 008 04
Sheet

Rev.
1
No:
Doc. No. : GAC-12-VX-RMH-LAH-008
COMMISSIOING PROCEDURE
Page : 2 OF 3
FOR IPBD & GCB Revision :1

TABLE OF CONTENTS

1.0 Objective : 03

2.0 Methodology : 03

3.0 Acceptance Criteria : 03

4.0 Attachments : 03

This document is the property of ÇALIK Enerji Sanayi ve Ticaret A.Ş and may not be copied, used, reprinted or distributed by others
Doc. No. : GAC-12-VX-RMH-LAH-008
COMMISSIOING PROCEDURE
Page : 3 OF 3
FOR IPBD & GCB Revision :1

1.0 Objective:

Objective of this document is to have a written down procedure for the commissioning
related activities of Isolated Phase Bus Duct (IPBD) and Generator Circuit Breaker.

2.0 Methodology

Broadly the methodology of the commissioning is as below:


 Checking the completeness of the erection of the equipment and accessories.
 Conducting the pre-commissioning checks of the IPBD with GCB and associated
equipment filling & sign off the checklists (attached) accordingly
 Conducting the commissioning checks of the IPBD with GCB and associated
equipment filling & sign off the checklists (attached) accordingly
 Ensuring upstream & downstream equipments are already commissioned or ready
for commissioning

3.0 Acceptance Criteria

 IPBD & GCB have been commissioned in compliance with checks and tests
mentioned in the attachments

4.0 Attachments:

Following attachments, attached with this document, may be referred for conducting the
pre-commissioning and commissioning activities for IPBD &GCB:

Attachment 1: Pre-commissioning Checks: IPBD & GCB

Attachment 2: Pre Commissioning Test: Insulation Resistance Measurement

Attachment 3: Pre Commissioning Test: High Voltage Test

Attachment 4: Pre Commissioning Test: Contact Resistance Test

Attachment 5: Pre-commissioning Test: Voltage Transformer Test

Attachment 6: Pre-commissioning Test: Current Transformer Test

Attachment 7: Commissioning Checks: IPBD & GCB


---XXX---

This document is the property of ÇALIK Enerji Sanayi ve Ticaret A.Ş and may not be copied, used, reprinted or distributed by others