This document transmittal form is from Mr. Chaudhry Zafar Iqbal, Project Manager of DESCON, to Mr. Raimondi Giampiero, Project Manager of SAIPEM regarding the Shah Gas Development Project. It includes three method statements for laying pipes, concrete repair works, and filling tie rod holes for approval with a status of initial contractor review. The transmittal is intended for approval and comments by SAIPEM and requests acknowledgement of receipt and return of the transmittal copy.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
78 views1 page
T Des2 Sa2 0055
This document transmittal form is from Mr. Chaudhry Zafar Iqbal, Project Manager of DESCON, to Mr. Raimondi Giampiero, Project Manager of SAIPEM regarding the Shah Gas Development Project. It includes three method statements for laying pipes, concrete repair works, and filling tie rod holes for approval with a status of initial contractor review. The transmittal is intended for approval and comments by SAIPEM and requests acknowledgement of receipt and return of the transmittal copy.
Sr. Approval Document No. Description Rev. Status Copies Category No. A MP02-0200-14-MES-2D0005 Method Statement for Laying Pipes in 1 B 200-CA-E-2D0005 Duct Banks, Conduits in Concrete and B2 ICR 10 5 C AUH/1341/QA&QC/C/MS-05 Buried Conduits A MP02-0200-17-MES-2D0007 Method Statement for Concrete Repair 2 B 200-CA-E-2D0007 Works B2 ICR 09 5 C AUH/1341/QA&QC/C/MS-07 A MP02-0200-17-MES-2D0010 Method Statement for Filling of Tie 3 B 200-CA-E-2D0010 Rod Holes in the Concrete B2 ICR 08 5 C AUH/1341/QA&QC/C/MS-10
THIS SUBMITTAL IS INTENDED FOR ( Tick as applicable)
APPROVAL / COMMENTS YOUR INFORMATION / RECORDS
AS PER YOUR REQUEST YOUR NECESSARY ACTION
Kindly acknowledge receipt and return transmittal copy.