0% found this document useful (0 votes)
78 views1 page

T Des2 Sa2 0055

This document transmittal form is from Mr. Chaudhry Zafar Iqbal, Project Manager of DESCON, to Mr. Raimondi Giampiero, Project Manager of SAIPEM regarding the Shah Gas Development Project. It includes three method statements for laying pipes, concrete repair works, and filling tie rod holes for approval with a status of initial contractor review. The transmittal is intended for approval and comments by SAIPEM and requests acknowledgement of receipt and return of the transmittal copy.

Uploaded by

Farzand Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views1 page

T Des2 Sa2 0055

This document transmittal form is from Mr. Chaudhry Zafar Iqbal, Project Manager of DESCON, to Mr. Raimondi Giampiero, Project Manager of SAIPEM regarding the Shah Gas Development Project. It includes three method statements for laying pipes, concrete repair works, and filling tie rod holes for approval with a status of initial contractor review. The transmittal is intended for approval and comments by SAIPEM and requests acknowledgement of receipt and return of the transmittal copy.

Uploaded by

Farzand Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

COMPANY: CONTRACTOR: SUBCONTRACTOR:

Job No.: 032090 Agreement No..: 13524209 Contract No.: 567595


Project Title:
Shah Gas Development Project

TRN. No. T-DES2-SA2-0055


Drawing/Document Transmittal Form Date: 27 Jun 2011
FROM: Mr.Chaudhry Zafar Iqbal TO: Mr.Raimondi Giampiero
Project Manager - DESCON Project Manager - SAIPEM
Address: P.O.BOX.46821 Address: P.O.BOX 47117
Abu Dhabi UAE Abu Dhabi UAE

Telephone: +971 2 555 5807 Telephone: +971 2 698 9898


Mobile: +971 50167 6917 Mobile: +971
Fax: +971 2 555 5784 Fax: +971 2 698 9893/4/5/6
E-mail: [email protected] E-mail: [email protected]
NADIM NASSER NADIM NASGER

First Submission Further Submission

Previous TRN Ref: T-DES2-SA2-0022 Date: 27-Apr-2011


Sr. Approval
Document No. Description Rev. Status Copies Category
No.
A MP02-0200-14-MES-2D0005 Method Statement for Laying Pipes in
1 B 200-CA-E-2D0005 Duct Banks, Conduits in Concrete and B2 ICR 10 5
C AUH/1341/QA&QC/C/MS-05 Buried Conduits
A MP02-0200-17-MES-2D0007
Method Statement for Concrete Repair
2 B 200-CA-E-2D0007
Works B2 ICR 09 5
C AUH/1341/QA&QC/C/MS-07
A MP02-0200-17-MES-2D0010
Method Statement for Filling of Tie
3 B 200-CA-E-2D0010
Rod Holes in the Concrete B2 ICR 08 5
C AUH/1341/QA&QC/C/MS-10

THIS SUBMITTAL IS INTENDED FOR ( Tick as applicable)


APPROVAL / COMMENTS YOUR INFORMATION / RECORDS

AS PER YOUR REQUEST YOUR NECESSARY ACTION

Kindly acknowledge receipt and return transmittal copy.


SUBCONTRACTOR CONTRACTOR
Name: Mr.Chaudhry Zafar Iqbal Name:

Signature: Signature:

Position: Project Manager Position:


Date: 27 Jun 2011 Date:

Legend: A: Company Document No., B: Saipem Document No., C: Construction Contractor Document No.

You might also like