0% found this document useful (0 votes)
108 views36 pages

Pembangunan Drainase Desa Papan Loe 1 Paket RAB

This document provides a price list for construction materials and labor costs for three different zones in 2017. It includes prices for various types of stone, sand, wood, steel, ceiling and partition materials. Labor costs are also provided for different worker roles such as laborers, craftsmen, head craftsmen and foremen on a daily rate. The prices vary by zone and material type.

Uploaded by

marlina lina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views36 pages

Pembangunan Drainase Desa Papan Loe 1 Paket RAB

This document provides a price list for construction materials and labor costs for three different zones in 2017. It includes prices for various types of stone, sand, wood, steel, ceiling and partition materials. Labor costs are also provided for different worker roles such as laborers, craftsmen, head craftsmen and foremen on a daily rate. The prices vary by zone and material type.

Uploaded by

marlina lina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 36

DAFTAR HARGA SATUAN BAHAN BANGUNAN

DAN UPAH KERJA


TAHUN 2017

HARGA SATUAN HARGA SATUAN HARGA SATUAN


NO. URAIAN SATUAN
ZONA 1 ZONA 2 ZONA 3

1 2 3

A BAHAN DASAR
1 Batu kali
- Utuh M3 159,300.00 165,672.00 172,298.88
- Batu pecah 7 - 10 cm M3 171,900.00 178,776.00 185,927.04
- Batu pecah 5 - 7 cm M3 215,550.00 224,172.00 233,138.88
- Batu pecah 3 - 5 cm (Manual) M3 236,250.00 245,700.00 255,528.00
- Batu pecah 3 - 5 cm (Cruser) M3 299,250.00 311,220.00 323,668.80
- Batu pecah 2 - 3 cm (Manual) M3 413,100.00 429,624.00 446,808.96
- Batu pecah 2 - 3 cm (Cruser) M3 487,350.00 506,844.00 527,117.76
- Batu pecah 1 - 2 cm (Cruser) M3 521,100.00 541,944.00 563,621.76
2 Batu gunung M3 291,600.00 303,264.00 315,394.56
3 Tanah timbunan pilihan M3 192,600.00 200,304.00 208,316.16
4 Tanah timbunan biasa M3 147,600.00 153,504.00 159,644.16
5 Tanah timbunan humus M3 450,000.00 468,000.00 486,720.00
6 Pasir urug/timbunan M3 209,700.00 218,088.00 226,811.52
7 Pasir Pasangan M3 342,000.00 355,680.00 369,907.20
8 Kerikil sungai M3 278,100.00 289,224.00 300,792.96
9 Sirtu M3 235,350.00 244,764.00 254,554.56
10 Kapur pasangan Zak 76,050.00 79,092.00 82,255.68
11 Semen tonasa @ 50 kg Zak 72,000.00 74,880.00 77,875.20
12 Bosowa @ 40 Kg Zak 57,600.00 59,904.00 62,300.16
13 Batu merah Bh 855.00 889.20 924.77
14 Batu beton ringan Bh 9,900.00 10,296.00 10,707.84
15 Paveing blok t. 6 cm Bh 2,430.00 2,527.20 2,628.29
16 Paveing blok t. 8 cm Bh 2,695.50 2,803.32 2,915.45
17 Plastik bening alas beton M2 7,020.00 7,300.80 7,592.83
18 Gorong-gorong dia. 60 cm Bh 438,750.00 456,300.00 474,552.00
19 Gorong-gorong dia. 80 cm Bh 468,000.00 486,720.00 506,188.80
18 Gorong-gorong dia. 100 cm Bh 643,500.00 669,240.00 696,009.60
19 Kertas Milimeter Buah 335,700.00 349,128.00 363,093.12
20 Kertas Kalkir Rool 553,500.00 575,640.00 598,665.60
21 Kertas A4 Lbr 810.00 842.40 876.10
22 kertas A3 Lbr 900.00 936.00 973.44
23 Cat Kg 73,800.00 76,752.00 79,822.08
24 Meni Besi Kg 83,700.00 87,048.00 90,529.92
25 Kuas Buah 9,000.00 9,360.00 9,734.40
26 Tinta printer Botol 96,300.00 100,152.00 104,158.08
27 Foto Printing/Kertas Foto Lbr 3,600.00 3,744.00 3,893.76
28 Foto Copy A3 Lbr 1,800.00 1,872.00 1,946.88
29 Foto Copy A4 Lbr 900.00 936.00 973.44
30 Biaya Jilid Buah 9,900.00 10,296.00 10,707.84
31 Biaya Cetak Banner Lbr 73,800.00 76,752.00 79,822.08
32 Ijuk M3 28,800.00 29,952.00 31,150.08
33 Pohon Trambesi Buah 28,800.00 29,952.00 31,150.08
34 Sewa Laptop Buah Rp 59,200.00
35 Sewa Printer Buah Rp 450,000.00
36 Kamera Digital Buah 40,005.00
37 Air Ltr 500.00
B BAHAN KAYU
1 Kayu kls I
- Balok gergaji swalmil M3 12,507,300.00 13,007,592.00 13,527,895.68
- Papan gergaji swalmil M3 13,747,500.00 14,297,400.00 14,869,296.00
- Balok gergaji chansow M3 12,507,300.00 13,007,592.00 13,527,895.68
- Papan gergaji chansow M3 13,747,500.00 14,297,400.00 14,869,296.00
2 Kayu kls II
- Balok M3 5,382,000.00 5,597,280.00 5,821,171.20
- Papan M3 5,382,000.00 5,597,280.00 5,821,171.20
3 Kayu kls III
- Balok M3 3,474,000.00 3,612,960.00 3,757,478.40
Balok M' 9,150.00 9,516.00 9,896.64
- Papan M3 3,474,000.00 3,612,960.00 3,757,478.40
Papan M' 9,150.00 9,516.00 9,896.64
4 Bambu Btg 37,800.00 39,312.00 40,884.48
5 Kayu Kls IV M3 2,340,000.00 2,433,600.00 2,530,944.00
6 Plywood tebal 9 mm Lbr 301,500.00 313,560.00 326,102.40
7 Dolken kayu Ø 8-10/400 cm Btg 69,480.00 72,259.20 75,149.57
E BAHAN BESI DAN BAJA
1 Besi beton Kg 27,540.00 28,641.60 29,787.26
2 Besi beton ulir Kg 29,250.00 30,420.00 31,636.80
3 Paku biasa Kg 31,950.00 33,228.00 34,557.12
4 Paku asbes Kg 32,400.00 33,696.00 35,043.84
5 Paku Jembatan Kg 29,250.00 30,420.00 31,636.80
6 Besi Tempa M2 288,900.00 300,456.00 312,474.24
7 Rangka Atap Baja Ringan M2 282,600.00 293,904.00 305,660.16
8 Kawat beton M2 23,850.00 24,804.00 25,796.16
9 Palu Godom Baja Keras KG 3,240.00 3,369.60 3,504.38
10 Pahat Beton Baja Keras KG 5,684.00 5,911.36 6,147.81
11 Linggis Baja Keras KG 4,400.00 4,576.00 4,759.04
G BAHAN PLAFON DAN PARTISI
1 Eternit 100 x 100 x 0,2 lbr 22,500.00 25,250.00 26,260.00
2 Tripleks
- 122 x 244 x 0,2 cm lbr 54,000.00 60,600.00 63,024.00
- 122 x 244 x 0,3 cm lbr 102,150.00 114,635.00 119,220.40
- 122 x 244 x 0,6 cm lbr 148,500.00 166,650.00 173,316.00
- 122 x 244 x 0,9 cm lbr 225,000.00 252,500.00 262,600.00
- 122 x 244 x 1,8 cm lbr 324,000.00 363,600.00 378,144.00

M UPAH KERJA
1 Pekerja hari 76,500.00 85,850.00 89,284.00
2 Tukang
- Tukang kayu hari 99,000.00 111,100.00 115,544.00
- Tukang Batu hari 99,000.00 111,100.00 115,544.00
- Tukang Cat hari 99,000.00 111,100.00 115,544.00
- Tukang Listrik hari 139,500.00 156,550.00 162,812.00
- Tukang Pipa hari 117,000.00 131,300.00 136,552.00
- Tukang Besi hari 108,000.00 121,200.00 126,048.00
- Tukang Las hari 108,000.00 121,200.00 126,048.00
- Tukang Landscaping hari 117,000.00 131,300.00 136,552.00
- Tukang Profil hari 126,000.00 141,400.00 147,056.00
3 Kepala Tukang
- Kepala Tukang kayu hari 135,000.00 151,500.00 157,560.00
- KepalaTukang Batu hari 135,000.00 151,500.00 157,560.00
- KepalaTukang Cat hari 135,000.00 151,500.00 157,560.00
- KepalaTukang Listrik hari 198,000.00 222,200.00 231,088.00
- KepalaTukang Pipa hari 157,500.00 176,750.00 183,820.00
- KepalaTukang Besi hari 144,750.00 161,600.00 168,064.00
- KepalaTukang Las hari 144,000.00 161,600.00 168,064.00
- KepalaTukang Landscaping hari 157,500.00 176,750.00 183,820.00
- KepalaTukang Profil hari 157,500.00 176,750.00 183,820.00
4 Mandor hari 141,300.00 158,570.00 164,912.80
5 Masinis hari 108,000.00 121,200.00 126,048.00
6 Pembantu Masinis hari 76,500.00 85,850.00 89,284.00
7 Penjaga Gudang hari 103,500.00 116,150.00 120,796.00
8 Penjaga malam hari 103,500.00 116,150.00 120,796.00
9 Operator Alat Berat /Jam 16,200.00 18,200.00 18,928.00
10 Pembantu Operator Alat Berat /Jam 9,900.00 11,900.00 12,376.00
11 Operator Alat Ringan /Jam 13,500.00 15,500.00 16,120.00
12 Operator Alat Tripod/Crane Org/Hari 13,500.00 15,500.00 16,120.00
13 Pembantu Operator Alat Ringan /Jam 9,900.00 11,900.00 12,376.00
14 Mekanik /Jam 13,500.00 15,500.00 16,120.00
15 Pembantu Mekanik /Jam 9,900.00 11,900.00 12,376.00
16 Juru Ukur Org/Hari 251,370.00 253,370.00 263,504.80
17 Pembantu Juru Ukur Org/Hari 184,680.00 186,680.00 194,147.20
18 Engineer Org/Hari 308,520.00 310,520.00 322,940.80
19 Estimator Org/Hari 295,020.00 297,020.00 308,900.80
20 Pengawas Org/Hari 251,370.00 253,370.00 263,504.80
21 Koordintor Pengawas Org/Hari 308,520.00 310,520.00 322,940.80
22 Drafter Org/Hari 207,180.00 209,180.00 217,547.20
23 Tukang Foto Org/Hari 117,000.00 119,000.00 123,760.00
24 operator Printer Org/Hari 72,900.00 74,900.00 77,896.00
25 Sopir /Jam 14,877.00 16,877.00 17,552.08
26 Pembantu Sopir/Operator /Jam 12,312.00 14,312.00 14,884.48
27 Waterpass Buah 188,595.00 190,595.00 198,218.80

Bantaeng, 2017
Mengetahui,
Plt. Kepala Dinas PU dan Kimpraswil
Kabupaten Bantaeng

Ir. ABD. RASYID, S


Pangkat : Pembina Utama Muda
NIP. 19561231 198303 1 206
DAFTAR ANALISA HARGA SATUAN PEKERJAAN - ANALISA SNI
A.2.2.1.4 Pengukuran dan pemasangan 1 M' Bouwplank
A Tenaga Kerja
1 Pekerja Oh 0.100 Rp 85,850.00 Rp 8,585.00
2 Tukang Kayu Oh 0.100 Rp 111,100.00 Rp 11,110.00
3 Kepala Tukang Oh 0.010 Rp 151,500.00 Rp 1,515.00
4 Mandor Oh 0.005 Rp 158,570.00 Rp 792.85
Jumlah Harga Tenaga Kerja Rp 22,002.85
B Bahan
1 Kayu balok 5/7 M' 0.300 Rp 9,516.00 Rp 2,854.80
2 Paku 2" - 3" Kg 0.020 Rp 33,228.00 Rp 664.56
3 Kayu papan 3/20 M3 1.000 Rp 9,516.00 Rp 9,516.00
Jumlah Harga Bahan Rp 13,035.36
Jumlah Rp 35,038.21
Overhead + Profit (0 %) Rp 3,503.82
Harga Satuan Pekerjaan Rp 38,542.03
A.2.2.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 M3 Tanah biasa sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 0.750 Rp 85,850.00 Rp 64,387.50
2 Mandor Oh 0.025 Rp 158,570.00 Rp 3,964.25
Jumlah Harga Tenaga Kerja Rp 68,351.75
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 68,351.75
Overhead + Profit (10%) Rp 6,835.18
Harga Satuan Pekerjaan Rp 75,186.93
A.2.3.1.4 Menggali 1 M3 Tanah keras sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.000 Rp 85,850.00 Rp 85,850.00
2 Mandor Oh 0.032 Rp 158,570.00 Rp 5,074.24
Jumlah Harga Tenaga Kerja Rp 90,924.24
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 90,924.24
Overhead + Profit (10%) Rp 9,092.42
Harga Satuan Pekerjaan Rp 100,016.66
A.2.3.1.5 Menggali 1 M3 Tanah cadas sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.500 Rp 85,850.00 Rp 128,775.00
2 Mandor Oh 0.060 Rp 158,570.00 Rp 9,514.20
Jumlah Harga Tenaga Kerja Rp 138,289.20
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 138,289.20
Overhead + Profit (10%) Rp 13,828.92
Harga Satuan Pekerjaan Rp 152,118.12
A.2.3.1.6 Menggali 1 M3 Tanah lumpur sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.200 Rp 85,850.00 Rp 103,020.00
2 Mandor Oh 0.045 Rp 158,570.00 Rp 7,135.65
Jumlah Harga Tenaga Kerja Rp 110,155.65
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 110,155.65
Overhead + Profit (10%) Rp 11,015.57
Harga Satuan Pekerjaan Rp 121,171.22
A.2.3.1.9 Pengurugan kembali 1 M3 Galian tanah
A Tenaga Kerja
1 Pekerja Oh 0.500 Rp 85,850.00 Rp 42,925.00
2 Mandor Oh 0.050 Rp 158,570.00 Rp 7,928.50
Jumlah Harga Tenaga Kerja Rp 50,853.50
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 50,853.50
Overhead + Profit (10%) Rp 5,085.35
Harga Satuan Pekerjaan Rp 55,938.85
A.2.3.1.10 Pemadatan tanah 1 M3 Tanah (per 20 cm)
A Tenaga Kerja
1 Pekerja Oh 0.500 Rp 85,850.00 Rp 42,925.00
2 Mandor Oh 0.050 Rp 158,570.00 Rp 7,928.50
Jumlah Harga Tenaga Kerja Rp 50,853.50
B Bahan
1 Bambu dia. 6 - 8/600 cm Btg 1.250 Rp - Rp -
2 Tali ijuk M3 0.186 Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 50,853.50
Overhead + Profit (10%) Rp 5,085.35
Harga Satuan Pekerjaan Rp 55,938.85
A.2.3.1.11 Pengurugan 1 M3 dengan pasir urug
A Tenaga Kerja
1 Pekerja Oh 0.300 Rp 85,850.00 Rp 25,755.00
2 Mandor Oh 0.010 Rp 158,570.00 Rp 1,585.70
Jumlah Harga Tenaga Kerja Rp 27,340.70
B Bahan
1 Pasir urug M3 1.200 Rp 209,700.00 Rp 251,640.00
Jumlah Harga Bahan Rp 251,640.00
Jumlah Rp 278,980.70
Overhead + Profit (10%) Rp 27,898.07
Harga Satuan Pekerjaan Rp 306,878.77
A.2.3.1.14 Pengurugan 1 M3 Sirtu padat
A Tenaga Kerja
1 Pekerja Oh 0.250 Rp 85,850.00 Rp 21,462.50
2 Mandor Oh 0.025 Rp 158,570.00 Rp 3,964.25
Jumlah Harga Tenaga Kerja Rp 25,426.75
B Bahan
1 Sirtu M3 1.200 Rp 235,350.00 Rp 282,420.00
Jumlah Harga Bahan Rp 282,420.00
Jumlah Rp 307,846.75
Overhead + Profit (10%) Rp 30,784.68
Harga Satuan Pekerjaan Rp 338,631.43

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.2 Pemasangan 1 M3 Pondasi batu belah / Gunung camp. 1SP : 4PP
A Tenaga Kerja
1 Pekerja Oh 1.500 Rp 85,850.00 Rp 128,775.00
2 Tukang Batu Oh 0.750 Rp 111,100.00 Rp 83,325.00
3 Kepala Tukang Oh 0.075 Rp 151,500.00 Rp 11,362.50
4 Mandor Oh 0.075 Rp 158,570.00 Rp 11,892.75
Jumlah Harga Tenaga Kerja Rp 235,355.25
B Bahan
1 Batu Gunug M3 1.200 Rp 303,264.00 Rp 363,916.80
2 Semen Portland Kg 163.000 Rp 1,497.60 Rp 244,108.80
3 Pasir Pasang M3 0.520 Rp 355,680.00 Rp 184,953.60
Jumlah Harga Bahan Rp 792,979.20
Jumlah Rp 1,028,334.45
Overhead + Profit (10%) Rp 102,833.45
Harga Satuan Pekerjaan Rp 1,131,167.90
A.3.2.1.9 Pemasangan 1 M3 Batu kosong (anstamping)
A Tenaga Kerja
1 Pekerja Oh 0.780 Rp 85,850.00 Rp 66,963.00
2 Tukang Batu Oh 0.390 Rp 111,100.00 Rp 43,329.00
3 Kepala Tukang Oh 0.039 Rp 151,500.00 Rp 5,908.50
4 Mandor Oh 0.039 Rp 158,570.00 Rp 6,184.23
Jumlah Harga Tenaga Kerja Rp 122,384.73
B Bahan
1 Batu Gunug M3 1.200 Rp 303,264.00 Rp 363,916.80
2 Pasir urug M3 0.432 Rp 218,088.00 Rp 94,214.02
Jumlah Harga Bahan Rp 458,130.82
Jumlah Rp 580,515.55
Overhead + Profit (10%) Rp 58,051.55
Harga Satuan Pekerjaan Rp 638,567.10
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.7 Membuat 1 M3 beton mutu f'0 = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
A Tenaga Kerja
1 Pekerja Oh 1.650 Rp 85,850.00 Rp 141,652.50
2 Tukang Batu Oh 0.275 Rp 111,100.00 Rp 30,552.50
3 Kepala Tukang Oh 0.028 Rp 151,500.00 Rp 4,242.00
4 Mandor Oh 0.083 Rp 158,570.00 Rp 13,161.31
Jumlah Harga Tenaga Kerja Rp 189,608.31
B Bahan
1 Semen Portland Kg 371.000 Rp 1,497.60 Rp 555,609.60
2 Pasir Beton M3 0.499 Rp 355,680.00 Rp 177,331.89
3 Kerikil (Maks 30mm) M3 0.776 Rp 541,944.00 Rp 420,307.68
4 Air Ltr 215.000 Rp 500.00 Rp 107,500.00
Jumlah Harga Bahan Rp 1,260,749.17
Jumlah Rp 1,450,357.48
Overhead + Profit (10%) Rp 145,035.75
Harga Satuan Pekerjaan Rp 1,595,393.22
A.4.1.1.17 Pembesian 1 kg dengan besi polos atau besi ulir
A Tenaga Kerja
1 Pekerja Oh 0.0070 Rp 85,850.00 Rp 600.95
2 Tukang Besi Oh 0.0070 Rp 111,100.00 Rp 777.70
3 Kepala Tukang Oh 0.0007 Rp 151,500.00 Rp 106.05
4 Mandor Oh 0.0003 Rp 158,570.00 Rp 47.57
Jumlah Harga Tenaga Kerja Rp 1,532.27
B Bahan
1 Besi beton Kg 1.050 Rp 27,540.00 Rp 28,917.00
2 Kawat beton Kg 0.015 Rp 23,850.00 Rp 357.75
Jumlah Harga Bahan Rp 29,274.75
Jumlah Rp 30,807.02
Overhead + Profit (10%) Rp 3,080.70
Jumlah A+B Rp 32,339.29
A.4.1.1.24 Pemasangan 1 M2 bekisting untuk lantai
A Tenaga Kerja
1 Pekerja Oh 0.660 Rp 85,850.00 Rp 56,661.00
2 Tukang Kayu Oh 0.330 Rp 111,100.00 Rp 36,663.00
3 Kepala Tukang Oh 0.033 Rp 151,500.00 Rp 4,999.50
4 Mandor Oh 0.033 Rp 158,570.00 Rp 5,232.81
Jumlah Harga Tenaga Kerja Rp 103,556.31
B Bahan
1 Kayu klas III M3 0.040 Rp 3,474,000.00 Rp 138,960.00
2 Paku 5 - 12 cm Kg 0.400 Rp 31,950.00 Rp 12,780.00
3 Minyak bekisting Ltr 0.200 Rp - Rp -
4 Balok kayu klas II M3 0.018 Rp 5,382,000.00 Rp 96,876.00
5 Plywood tebal 9 mm Lbr 0.350 Rp 301,500.00 Rp 105,525.00
6 Dolken kayu Ø 8-10/400 cm Btg 2.000 Rp 69,480.00 Rp 138,960.00
Jumlah Harga Bahan Rp 493,101.00
Jumlah Rp 596,657.31
Overhead + Profit (10%) Rp 59,665.73
Harga Satuan Pekerjaan Rp 656,323.04
A.4.1.1.29 Membuat 1 M3 beton bertulang (K225)
A Tenaga Kerja
1 Pekerja Oh 1.650 Rp 85,850.00 Rp 141,652.50
2 Tukang Batu Oh 0.270 Rp 111,100.00 Rp 29,997.00
3 Kepala Tukang Oh 0.028 Rp 151,500.00 Rp 4,242.00
4 Mandor Oh 0.083 Rp 158,570.00 Rp 13,161.31
Jumlah Harga Tenaga Kerja Rp 189,052.81
B Bahan
1 Semen Portland Kg 371.000 Rp 1,497.60 Rp 555,609.60
2 Pasir Beton M3 0.499 Rp 355,680.00 Rp 177,484.32
3 Split 2-3 cm M3 0.722 Rp 521,100.00 Rp 376,234.20
Jumlah Harga Bahan Rp 1,109,328.12
Jumlah Rp 1,298,380.93
Overhead + Profit (10%) Rp 129,838.09
Harga Satuan Pekerjaan Rp 1,428,219.02
A.4.1.1.30 Membuat 1 M3 Plat Lantai beton

1 Pek.Pembesian Kg 125.000 Rp 32,339.29 Rp 4,042,411.50


2 Pek.Bekesting M3 4.000 Rp 656,323.04 Rp 2,625,292.16
3 Pek.Beton K225 M3 1.000 Rp 1,428,219.02 Rp 1,428,219.02

Jumlah Harga Bahan Rp 8,095,922.69


Jumlah
Overhead + Profit (10%)
Harga Satuan Pekerjaan Rp 8,095,922.69

A.4.4.2 HARGA SATUAN PEKERJAAN PASANGAN PLESTERAN


A.4.4.2.3 Pemasangan 1 M2 plesteran 1SP : 3PP, tebal 15 mm
A Tenaga Kerja
1 Pekerja Oh 0.300 Rp 85,850.00 Rp 25,755.00
2 Tukang Batu Oh 0.150 Rp 111,100.00 Rp 16,665.00
3 Kepala Tukang Oh 0.015 Rp 151,500.00 Rp 2,272.50
4 Mandor Oh 0.015 Rp 158,570.00 Rp 2,378.55
Jumlah Harga Tenaga Kerja Rp 47,071.05
B Bahan
1 Semen Portland Kg 7.776 Rp 1,497.60 Rp 11,645.34
2 Pasir Pasang M3 0.023 Rp 355,680.00 Rp 8,180.64
Jumlah Harga Bahan Rp 19,825.98
Jumlah Rp 66,897.03
Overhead + Profit (10%) Rp 6,689.70
Harga Satuan Pekerjaan Rp 73,586.73
A.4.1.1.31 Membuat 1 M3 Plat Duicker beton

1 Pek.Pembesian Kg 185.000 Rp 32,339.29 Rp 5,982,769.02


2 Pek.Bekesting M3 4.000 Rp 656,323.04 Rp 2,625,292.16
3 Pek.Beton K225 M3 1.000 Rp 1,428,219.02 Rp 1,428,219.02

Jumlah Harga Bahan Rp 10,036,280.21


Jumlah
Overhead + Profit (10%) Rp -
Harga Satuan Pekerjaan Rp 10,036,280.21
A.4.4.2 HARGA SATUAN PEKERJAAN PASANGAN SIARAN
A.4.4.2.3 Pemasangan 1 M2 Siaran 1SP : 2PP, tebal 15 mm
A Tenaga Kerja
1 Pekerja Oh 0.300 Rp 85,850.00 Rp 25,755.00
2 Tukang Batu Oh 0.150 Rp 111,100.00 Rp 16,665.00
3 Kepala Tukang Oh 0.015 Rp 151,500.00 Rp 2,272.50
4 Mandor Oh 0.015 Rp 158,570.00 Rp 2,378.55
Jumlah Harga Tenaga Kerja Rp 47,071.05
B Bahan
1 Semen Portland Kg 6.340 Rp 1,497.60 Rp 9,494.78
2 Pasir Pasang M3 0.012 Rp 355,680.00 Rp 4,268.16
Jumlah Harga Bahan Rp 13,762.94
Jumlah Rp 60,833.99
Overhead + Profit (10%) Rp 6,083.40
Harga Satuan Pekerjaan Rp 66,917.39
A.4.4.2 HARGA SATUAN PEKERJAAN BONGKARAN PAS LAMA
A.4.4.2.3 Pemasangan 1 Bongkaran Pasangan lama m3
A Tenaga Kerja
1 Pekerja Oh 1.600 Rp 85,850.00 Rp 137,360.00
2 Mandor Oh 0.180 Rp 158,570.00 Rp 28,542.60

Jumlah Harga Tenaga Kerja Rp 165,902.60


B Bahan
1 Rp - Rp -
2 Rp -
Jumlah Harga Bahan Rp -
C Peralatan
1 Palu Godom Baja Keras Kg 0.006 Rp 3,240.00 Rp 19.44
2 Pahat Beton Baja Keras Kg 0.009 Rp 5,680.00 Rp 51.12
3 Linggis Baja Keras M3 0.020 Rp 4,400.00 Rp 88.00
Jumlah Harga Bahan Rp 158.56
Jumlah Rp 166,061.16
Overhead + Profit (10%) Rp 16,606.12
Harga Satuan Pekerjaan Rp 182,667.28
A.4.4.2 HARGA SATUAN PEKERJAAN PEMBERSIHAN PERMUKAAN TANAH
A.4.4.2.3 Mengangkut Hasil Galian Dengan Jarak angkut > 5000 m ( m3)
A Tenaga Kerja
1 Pekerja Oh - Rp - Rp -
2 Mandor Oh - Rp - Rp -

Jumlah Harga Tenaga Kerja Rp -


B Bahan
1 Rp - Rp -
2 Rp -
Jumlah Harga Bahan Rp -
C Peralatan
1 Operasional Damp Truck /Jam 0.240 Rp 266,700.00 Rp 64,008.00
2
3
Jumlah Harga Bahan Rp 64,008.00
Jumlah Rp 64,008.00
Overhead + Profit (10%) Rp 6,400.80
Harga Satuan Pekerjaan Rp 70,408.80
A.4.4.2 HARGA SATUAN PEKERJAAN PEMBERSIHAN TIMBUNAN TANAH DIPADATKAN
A.4.4.2.3 Timbunan Tanah Didatangkan ( m3)
A Tenaga Kerja
1 Pekerja Org/hari 0.133 Rp 85,850.00 Rp 11,443.81
2 Mandor Org/hari 0.013 Rp 158,570.00 Rp 2,108.98

Jumlah Harga Tenaga Kerja Rp 13,552.79


B Bahan
1 Tanah Timbunan m3 1.200 Rp 159,644.16 Rp 191,572.99
2 Rp -
Jumlah Harga Bahan Rp 191,572.99
C Peralatan
1 Damp Truck /Jam 0.027 Rp 915,357.91 Rp 24,531.59
2 Excavator /Jam 0.082 Rp 266,700.00 Rp 21,949.41
3
Jumlah Harga Bahan Rp 46,481.00
Jumlah Rp 251,606.78
Overhead + Profit (10%) Rp 25,160.68
Harga Satuan Pekerjaan Rp 276,767.46
A.4.4.2 FOTO DOKUMENTASI & PELAPORAN
A.4.4.2.3 Foto Dokumentasi & Pelaporan ( Set)
A Tenaga Kerja
1 Engineer Org/hari - Rp 308,520.00 Rp -
2 Juru ukur Org/hari 1.000 Rp 251,370.00 Rp 251,370.00
3 Pembantu Juru Ukur Org/hari 2.000 Rp 184,680.00 Rp 369,360.00
4 Tukang Foto Org/hari 1.000 Rp 117,000.00 Rp 117,000.00
Jumlah Harga Tenaga Kerja Rp 737,730.00
B Bahan
1 Foto Printing/Kertas Foto Lbr 18.0000 Rp 3,600.00 Rp 64,800.00
2 Kertas A4 Lbr 60.0000 Rp 810.00 Rp 48,600.00
3 Tinta Printer Botol 1.0000 Rp 96,300.00 Rp 96,300.00
4 Menjilid Set 1.0000 Rp 9,900.00 Rp 9,900.00
Jumlah Harga Bahan Rp 219,600.00
C Peralatan
1 Sewa Laptop Sewa-Bulan 0.2500 Rp 59,200.00 Rp 14,800.00
2 Sewa Printer Sewa-Bulan 0.1500 Rp 450,000.00 Rp 67,500.00
3 Kamera Digital Sewa/Hari 0.25000 Rp 40,005.00 Rp 10,001.25
Jumlah Harga Bahan Rp 92,301.25
Jumlah Rp 1,049,631.25
Overhead + Profit (10%) Rp 104,963.13
Harga Satuan Pekerjaan Rp 1,154,594.38
A.4.4.2 PENGGANDAAN LAPORAN
A.4.4.2.3 Foto Penggandaan Laporan ( Set)
A Lain Lain
1 Foto Copy Kertas A4 Lembar 420.0000 Rp 900.00 Rp 378,000.00
2 Menjilid Buah 7.0000 Rp 9,900.00 Rp 69,300.00

Jumlah Rp 447,300.00
Overhead + Profit (10%) Rp 44,730.00
Harga Satuan Pekerjaan Rp 492,030.00
A.4.4.2 PENGGANDAAN SHOP DRAWING
A.4.4.2.3 Foto Penggandaan Shop Drawing ( Set)
A Lain Lain
1 Foto Copy Kertas A4 Lembar 140.0000 Rp 900.00 Rp 126,000.00
2 Menjilid Buah 7.0000 Rp 9,900.00 Rp 69,300.00

Jumlah Rp 195,300.00
Overhead + Profit (10%) Rp 19,530.00
Harga Satuan Pekerjaan Rp 214,830.00
A.4.4.2 PEMBUATAN GAMBAR SHOP DRAWING
A.4.4.2.3 Pembuatan Gambar Shop Drawing ( Set)
A Tenaga Kerja
1 Drafter/Perencanaan Org/hari - Rp 207,180.00 Rp -
2 Desain Engineer/Perencanaan Org/hari 1.000 Rp 310,520.00 Rp 310,520.00
3 Estimator Engineer/Perencanaan Org/hari 1.000 Rp 297,020.00 Rp 297,020.00
4 Operator Printer Org/hari 1.000 Rp 74,900.00 Rp 74,900.00
Jumlah Harga Tenaga Kerja Rp 682,440.00
B Bahan
1 Kertas A4 Lbr 20.0000 Rp 842.40 Rp 16,848.00
2 Tinta Printer Botol 1.0000 Rp 100,152.00 Rp 100,152.00
3 Biaya Cetak/Jilid Set 1.0000 Rp 10,296.00 Rp 10,296.00

Jumlah Harga Bahan Rp 127,296.00


C Peralatan
1 Sewa Laptop Sewa-Bulan 0.3500 Rp 59,200.00 Rp 20,720.00
2 Sewa Printer Sewa-Bulan 0.2500 Rp 450,000.00 Rp 112,500.00

Jumlah Harga Bahan Rp 133,220.00


Jumlah Rp 942,956.00
Overhead + Profit (10%) Rp 94,295.60
Harga Satuan Pekerjaan Rp 1,037,251.60
A.4.4.2 PENGGANDAAN AS BUILD DRAWING
A.4.4.2.3 Penggandaan As Build Drawing ( Set)
A Lain Lain
1 Foto Copy Kertas A4 Lembar 140.0000 Rp 900.00 Rp 126,000.00
2 Menjilid Buah 7.0000 Rp 9,900.00 Rp 69,300.00

Jumlah Rp 195,300.00
Overhead + Profit (10%) Rp 19,530.00
Harga Satuan Pekerjaan Rp 214,830.00
A.4.4.2 PEMBUATAN GAMBAR AS BUILD DRAWING
A.4.4.2.3 Pembuatan Gambar As Build Drawing ( Set)
A Tenaga Kerja
1 Drafter Org/hari 1.0000 Rp 209,180.00 Rp 209,180.00
2 Pengawas Org/hari 1.0000 Rp 253,370.00 Rp 253,370.00
3 Koordintor Pengawas Org/hari 1.0000 Rp 310,520.00 Rp 310,520.00
4 Desain Engineer Org/hari - Rp 308,520.00
5 Operator Printer Org/hari 1.0000 Rp 74,900.00 Rp 74,900.00
Jumlah Harga Tenaga Kerja Rp 847,970.00
B Bahan
1 Kertas A4 Lbr 20.0000 Rp 842.40 Rp 16,848.00
2 Tinta Printer Botol 2.0000 Rp 100,152.00 Rp 200,304.00
3 Biaya Cetak/Jilid Set 1.0000 Rp 10,296.00 Rp 10,296.00

Jumlah Harga Bahan Rp 227,448.00


C Peralatan
1 Sewa Laptop Sewa-Bulan 0.5000 Rp 59,200.00 Rp 29,600.00
2 Sewa Printer Sewa-Bulan 0.2400 Rp 450,000.00 Rp 108,000.00

Jumlah Harga Bahan Rp 137,600.00


Jumlah Rp 1,213,018.00
Overhead + Profit (10%) Rp 121,301.80
Harga Satuan Pekerjaan Rp 1,334,319.80
A.4.4.2 PEMBUATAN PAPAN NAMA PROYEK
A.4.4.2.3 Pembuatan Papan Nama Proyek ( Set)
A Tenaga Kerja
1 Pekerja Org/hari 1.0000 Rp 85,850.00 Rp 85,850.00
2 Tukang Kayu Org/hari 0.5000 Rp 111,100.00 Rp 55,550.00
3 Mandor Org/hari 0.1000 Rp 158,570.00 Rp 15,857.00
Jumlah Harga Tenaga Kerja Rp 157,257.00
B Bahan
1 kayu Balok Kelas II m3 0.0150 Rp 4,843,800.00 Rp 72,657.00
2 Paku kg 1.2000 Rp 28,755.00 Rp 34,506.00
3 Cetak Banner lbr 1.0000 Rp 66,420.00 Rp 66,420.00

Jumlah Harga Bahan Rp 173,583.00


C Peralatan
1 ls 1.0000 Rp 10,069.09 Rp 10,069.09

Jumlah Harga Bahan Rp 10,069.09


Jumlah Rp 340,909.09
Overhead + Profit (10%) Rp 34,090.91
Harga Satuan Pekerjaan Rp 375,000.00
DAFTAR KUANTITAS DAN HARGA

SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KAB.BANTAENG


KEGIATAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG-GORONG
PAKET PEKERJAAN : PEMBANGUNAN DRAINASE DESA CAMPAGALOE 1 PAKET
TAHUN ANGGARAN : 2017

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH HARGA

A Pekerjaan Persiapan
1 Pembersihan Lokasi & Pasangan Bowplank 120.00 M' Rp 38,542.03 Rp 4,625,043.72
2 Pembuatan Papan Nama Proyek 1.00 Set Rp 375,000.00 Rp 375,000.00
3 Pembuatan Shop Drawing & As Build Drawing 1.00 Set Rp 2,371,571.40 Rp 2,371,571.40
JUMLAH Rp 7,371,615.12
B Pekerjaan Drainase
1 Galian Tanah 73.44 M3 Rp 75,186.93 Rp 5,521,727.77
2 Urugan Tanah Kembali 24.48 M3 Rp 55,938.85 Rp 1,369,383.05
3 Pas. Batu Gunung 133.20 M3 Rp 1,131,167.90 Rp 150,671,563.61
4 Pek. Plesteran 300.00 M2 Rp 73,586.73 Rp 22,076,019.11

JUMLAH Rp 179,638,693.54

REAL COST : Rp 187,010,308.66

Page 14 of 36
NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH HARGA

Page 15 of 36
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KAB.BANTAENG


KEGIATAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG-GORONG
PAKET PEKERJAAN : PEMBANGUNAN DRAINASE DESA CAMPAGALOE 1 PAKET
TAHUN ANGGARAN : 2017

NO URAIAN PEKERJAAN JUMLAH HARGA BOBOT

A Pekerjaan Persiapan Rp 7,371,615.12 3.94%


B Pekerjaan Drainase Rp 179,638,693.54 96.06%

Real-Cost = Rp 187,010,308.66 100.00%


DIBULATKAN = Rp 187,010,000.00
TERBILANG :

SERATUS DELAPAN PULUH TUJUH JUTA SEPULUH RIBU RUPIAH,-

BANTAENG , 2017
Dibuat Oleh
KONSULTAN PERENCANA
CV. WAHIDAH ENGINEERING CONSULTAN

A. MUH. SALEH
DIREKTUR
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KAB.BANTAENG


KEGIATAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG-GORONG
PAKET PEKERJAAN : PEMBANGUNAN DRAINASE DESA CAMPAGALOE 1 PAKET
TAHUN ANGGARAN : 2017

NO URAIAN PEKERJAAN JUMLAH HARGA BOBOT


DAFTAR KUANTITAS DAN HARGA

SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KAB.BANTAENG


KEGIATAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG-GORONG
PAKET PEKERJAAN : PEMBANGUNAN DRAINASE DESA CAMPAGALOE 1 PAKET
TAHUN ANGGARAN : 2017

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH HARGA

A Pekerjaan Persiapan
1 Pembersihan Lokasi & Pasangan Bowplank 120.00 M' Rp 38,542.03 Rp 4,625,043.60
2 Pembuatan Papan Nama Proyek 1.00 Set Rp 375,000.00 Rp 375,000.00
3 Pembuatan Shop Drawing & As Build Drawing 1.00 Set Rp 2,371,571.40 Rp 2,371,571.40
JUMLAH Rp 7,371,615.00
B Pekerjaan Drainase
1 Galian Tanah 73.44 M3 Rp 75,186.92 Rp 5,521,727.40
2 Urugan Tanah Kembali 24.48 M3 Rp 55,938.85 Rp 1,369,383.05
3 Pas. Batu Gunung 133.20 M3 Rp 1,131,167.89 Rp 150,671,562.95
4 Pek. Plesteran 300.00 M2 Rp 73,586.73 Rp 22,076,019.00

JUMLAH Rp 179,638,692.40

REAL COST : Rp 187,010,307.40

Page 18 of 36
NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH HARGA

Page 19 of 36
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KAB.BANTAENG


KEGIATAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG-GORONG
PAKET PEKERJAAN : PEMBANGUNAN DRAINASE DESA CAMPAGALOE 1 PAKET
TAHUN ANGGARAN : 2017

NO URAIAN PEKERJAAN JUMLAH HARGA BOBOT

A Pekerjaan Persiapan Rp 7,371,615.00 3.94%


B Pekerjaan Drainase Rp 179,638,692.40 96.06%

Real-Cost = Rp 187,010,307.40 100.00%


DIBULATKAN = Rp 187,010,000.00
TERBILANG :

SERATUS DELAPAN PULUH LIMA JUTA DELAPAN RATUS EMPAT BELAS RIBU RUPIAH

BANTAENG , 2017
Dibuat Oleh
PENAWAR
CV PUTRA LIBRA

DIREKTUR
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

SKPD : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KAB.BANTAENG


KEGIATAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG-GORONG
PAKET PEKERJAAN : PEMBANGUNAN DRAINASE DESA CAMPAGALOE 1 PAKET
TAHUN ANGGARAN : 2017

NO URAIAN PEKERJAAN JUMLAH HARGA BOBOT


DAFTAR HARGA SATUAN BAHAN BANGUNAN
DAN UPAH KERJA
TAHUN 2016

HARGA SATUAN HARGA SATUAN


NO. URAIAN SATUAN
ZONA 1 ZONA 2

1 2 3

A BAHAN DASAR
1 Batu kali
- Utuh M3 177,000.00 178,770.00
- Batu pecah 7 - 10 cm M3 191,000.00 192,910.00
- Batu pecah 5 - 7 cm M3 239,500.00 241,895.00
- Batu pecah 3 - 5 cm (Manual) M3 262,500.00 265,125.00
- Batu pecah 3 - 5 cm (Cruser) M3 332,500.00 335,825.00
- Batu pecah 2 - 3 cm (Manual) M3 459,000.00 463,590.00
- Batu pecah 2 - 3 cm (Cruser) M3 541,500.00 546,915.00
- Batu pecah 1 - 2 cm (Cruser) M3 579,000.00 584,790.00
2 Batu gunung M3 325,000.00 328,250.00
3 Tanah timbunan pilihan M3 214,000.00 216,140.00
4 Tanah timbunan biasa M3 164,000.00 165,640.00
5 Tanah timbunan humus M3 500,000.00 505,000.00
6 Pasir urug/timbunan M3 233,000.00 235,330.00
7 Pasir Pasangan M3 380,000.00 383,800.00
8 Kerikil sungai M3 309,000.00 312,090.00
9 Sirtu M3 261,500.00 264,115.00
10 Kapur pasangan Zak 84,500.00 85,345.00
11 Semen tonasa @ 50 kg Zak 80,000.00 80,800.00
12 Bosowa @ 40 Kg Zak 64,000.00 64,640.00
13 Batu merah Bh 950.00 959.50
14 Batu beton ringan Bh 11,000.00 11,110.00
15 Paveing blok t. 6 cm Bh 2,700.00 2,727.00
16 Paveing blok t. 8 cm Bh 2,995.00 3,024.95
17 Plastik bening alas beton M2 7,800.00 7,878.00
18 Gorong-gorong dia. 60 cm Bh 487,500.00 491,250.00
19 Gorong-gorong dia. 80 cm Bh 520,000.00 524,000.00
18 Gorong-gorong dia. 100 cm Bh 715,000.00 720,500.00

B BAHAN KAYU
1 Kayu kls I
- Balok gergaji swalmil M3 13,897,000.00 14,003,900.00
- Papan gergaji swalmil M3 15,275,000.00 15,392,500.00
- Balok gergaji chansow M3 13,897,000.00 14,003,900.00
- Papan gergaji chansow M3 15,275,000.00 15,392,500.00
2 Kayu kls II
- Balok M3 5,980,000.00 6,026,000.00
- Papan M3 5,980,000.00 6,026,000.00
3 Kayu kls III
- Balok M3 3,860,000.00 3,898,600.00
- Papan M3 3,860,000.00 3,898,600.00
4 Bambu Btg 42,000.00 42,420.00
5 Kayu Kls IV M3 2,600,000.00 2,620,000.00

E BAHAN BESI DAN BAJA


1 Besi beton Kg 30,600.00 30,906.00
2 Besi beton ulir Kg 32,500.00 32,825.00
3 Paku biasa Kg 35,500.00 35,855.00
4 Paku asbes Kg 36,000.00 36,360.00
5 Paku Jembatan Kg 32,500.00 32,750.00
6 Besi Tempa M2 321,000.00 324,210.00
7 Rangka Atap Baja Ringan M2 314,000.00 317,140.00
8 Kawat beton M2 26,500.00 26,765.00

G BAHAN PLAFON DAN PARTISI


1 Eternit 100 x 100 x 0,2 lbr 25,000.00 25,250.00
2 Tripleks
- 122 x 244 x 0,2 cm lbr 60,000.00 60,600.00
- 122 x 244 x 0,3 cm lbr 113,500.00 114,635.00
- 122 x 244 x 0,6 cm lbr 165,000.00 166,650.00
- 122 x 244 x 0,9 cm lbr 250,000.00 252,500.00
- 122 x 244 x 1,8 cm lbr 360,000.00 363,600.00

M UPAH KERJA
1 Pekerja hari 85,000.00 85,850.00
2 Tukang
- Tukang kayu hari 110,000.00 111,100.00
- Tukang Batu hari 110,000.00 111,100.00
- Tukang Cat hari 110,000.00 111,100.00
- Tukang Listrik hari 155,000.00 156,550.00
- Tukang Pipa hari 130,000.00 131,300.00
- Tukang Besi hari 120,000.00 121,200.00
- Tukang Las hari 120,000.00 121,200.00
- Tukang Landscaping hari 130,000.00 131,300.00
- Tukang Profil hari 140,000.00 141,400.00
3 Kepala Tukang
- Kepala Tukang kayu hari 150,000.00 151,500.00
- KepalaTukang Batu hari 150,000.00 151,500.00
- KepalaTukang Cat hari 150,000.00 151,500.00
- KepalaTukang Listrik hari 220,000.00 222,200.00
- KepalaTukang Pipa hari 175,000.00 176,750.00
- KepalaTukang Besi hari 160,000.00 161,600.00
- KepalaTukang Las hari 160,000.00 161,600.00
- KepalaTukang Landscaping hari 175,000.00 176,750.00
- KepalaTukang Profil hari 175,000.00 176,750.00
4 Mandor hari 157,000.00 158,570.00
5 Masinis hari 120,000.00 121,200.00
6 Pembantu Masinis hari 85,000.00 85,850.00
7 Penjaga Gudang hari 115,000.00 116,150.00
8 Penjaga malam hari 115,000.00 116,150.00

Bantaeng, 2016
Mengetahui,
Plt. Kepala Dinas PU dan Kimpraswil
Kabupaten Bantaeng

S U D A R N I, SH.
Pangkat : Pembina Utama Muda
NIP. 19561231 198303 1 206
Keterangan :
Zona I :
- Kecamatan Bantaeng
Tappanjeng, Pallantikang, Malilingi, Letta, Lembang, Lamalaka, Karatuang.
- Kecamatan Bissappu
Bonto Sunggu, Bonto Atu, Bonto Rita, Bonto Lebang, Bonto Salluang, Bonto Manai, Bonto Jai, Bonto Langkasa.
- Kecamatan Eremerasa
Ulugalung, Mamampang
- Kecamatan Pa'jukukang
Rappoa, Biangloe, Lumpangan, Biangkeke, Nipa-nipa, Pa'jukukang, Borongloe, Batu Karaeng.

Zona II :
- Kecamatan Eremerasa
Mappilawing, Lonrong, Barua, Pa'bentengan.
- Kecamatan Gantarang Keke
Tanah Loe, Tombolo, Layoa, Baji Minasa, Kaloling, Gantarangkeke.
- Kecamatan Tompobulu
Lembang Gantarangkeke, Pattallassang, Banyorang.
- Kecamatan Sinoa
Bonto Mate'ne, Bonto Tiro, Bonto Majannang, Bonto Karaeng, Bonto Maccini, Bonto Bulaeng.
- Kecamatan Bissappu
Bonto Cinde, Bonto Loe.
- Kecamatan Uluere
Bonto Rannu, Bonto Tallasa.
- Kecamatan Pa'jukukang
Papanloe, Baruga.

Zona III :
- Kecamatan Bantaeng
Onto, Kayu Loe
- Kecamatan Eremerasa
Kampala, Parangloe, Pa'bumbungan.
- Kecamatan Bissappu
Bonto Jaya
- Kecamatan Tompobulu
Bonto-bontoa, Campaga, Ereng-ereng, Labbo, Bonto Tappalang, Balumbung, Pattaneteang.
- Kecamatan Uluere
Bonto Tangnga, Bonto Daeng, Bonto Marannu, Bonto Lojong.
HARGA SATUAN
ZONA 3

180,540.00
194,820.00
244,290.00
267,750.00
339,150.00
468,180.00
552,330.00
590,580.00
331,500.00
218,280.00
167,280.00
510,000.00
237,660.00
387,600.00
315,180.00
266,730.00
86,190.00
81,600.00 1,616.00
65,280.00
969.00
11,220.00
2,754.00
3,054.90
7,956.00
495,000.00
528,000.00
726,000.00

14,110,800.00
15,510,000.00
14,110,800.00
15,510,000.00

6,072,000.00
6,072,000.00

3,937,200.00
3,937,200.00
42,840.00
2,640,000.00

31,212.00
33,150.00
36,210.00
36,720.00
33,000.00
327,420.00
320,280.00
27,030.00

25,500.00

61,200.00
115,770.00
168,300.00
255,000.00
367,200.00

86,700.00

112,200.00
112,200.00
112,200.00
158,100.00
132,600.00
122,400.00
122,400.00
132,600.00
142,800.00

153,000.00
153,000.00
153,000.00
224,400.00
178,500.00
163,200.00
163,200.00
178,500.00
178,500.00
160,140.00
122,400.00
86,700.00
117,300.00
117,300.00

aeng, 2016
ngetahui,
as PU dan Kimpraswil
ten Bantaeng

A R N I, SH.
mbina Utama Muda
231 198303 1 206

Bonto Langkasa.
DAFTAR ANALISA HARGA SATUAN PEKERJAAN - ANALISA SNI
A.2.2.1.4 Pengukuran dan pemasangan 1 M' Bouwplank
A Tenaga Kerja
1 Pekerja Oh 0.100 Rp 85,000.00 Rp 8,500.00
2 Tukang Kayu Oh 0.100 Rp 110,000.00 Rp 11,000.00
3 Kepala Tukang Oh 0.010 Rp 150,000.00 Rp 1,500.00
4 Mandor Oh 0.005 Rp 157,000.00 Rp 785.00
Jumlah Harga Tenaga Kerja Rp 21,785.00
B Bahan
1 Kayu balok 5/7 M3 0.120 Rp 3,898,600.00 Rp 467,832.00
2 Paku 2" - 3" Kg 0.020 Rp 35,510.00 Rp 710.20
3 Kayu papan 3/20 M3 0.007 Rp 3,886,000.00 Rp 27,202.00
Jumlah Harga Bahan Rp 495,744.20
Jumlah Rp 517,529.20
Overhead + Profit (0 %) Rp 51,752.92
Harga Satuan Pekerjaan Rp 569,282.12
A.2.2.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 M3 Tanah biasa sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 0.750 Rp 85,000.00 Rp 63,750.00
2 Mandor Oh 0.025 Rp 157,000.00 Rp 3,925.00
Jumlah Harga Tenaga Kerja Rp 67,675.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 67,675.00
Overhead + Profit (10%) Rp 6,767.50
Harga Satuan Pekerjaan Rp 74,442.50
A.2.3.1.4 Menggali 1 M3 Tanah keras sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.000 Rp 85,000.00 Rp 85,000.00
2 Mandor Oh 0.032 Rp 157,000.00 Rp 5,024.00
Jumlah Harga Tenaga Kerja Rp 90,024.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 90,024.00
Overhead + Profit (10%) Rp 9,002.40
Harga Satuan Pekerjaan Rp 99,026.40
A.2.3.1.5 Menggali 1 M3 Tanah cadas sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.500 Rp 85,000.00 Rp 127,500.00
2 Mandor Oh 0.060 Rp 157,000.00 Rp 9,420.00
Jumlah Harga Tenaga Kerja Rp 136,920.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 136,920.00
Overhead + Profit (10%) Rp 13,692.00
Harga Satuan Pekerjaan Rp 150,612.00
A.2.3.1.6 Menggali 1 M3 Tanah lumpur sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.200 Rp 85,000.00 Rp 102,000.00
2 Mandor Oh 0.045 Rp 157,000.00 Rp 7,065.00
Jumlah Harga Tenaga Kerja Rp 109,065.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 109,065.00
Overhead + Profit (10%) Rp 10,906.50
Harga Satuan Pekerjaan Rp 119,971.50
A.2.3.1.9 Pengurugan kembali 1 M3 Galian tanah
A Tenaga Kerja
1 Pekerja Oh 0.500 Rp 85,000.00 Rp 42,500.00
2 Mandor Oh 0.050 Rp 157,000.00 Rp 7,850.00
Jumlah Harga Tenaga Kerja Rp 50,350.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 50,350.00
Overhead + Profit (10%) Rp 5,035.00
Harga Satuan Pekerjaan Rp 55,385.00
A.2.3.1.10 Pemadatan tanah 1 M3 Tanah (per 20 cm)
A Tenaga Kerja
1 Pekerja Oh 0.500 Rp 85,000.00 Rp 42,500.00
2 Mandor Oh 0.050 Rp 157,000.00 Rp 7,850.00
Jumlah Harga Tenaga Kerja Rp 50,350.00
B Bahan
1 Bambu dia. 6 - 8/600 cm Btg 1.250 Rp - Rp -
2 Tali ijuk M3 0.186 Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 50,350.00
Overhead + Profit (10%) Rp 5,035.00
Harga Satuan Pekerjaan Rp 55,385.00
A.2.3.1.11 Pengurugan 1 M3 dengan pasir urug
A Tenaga Kerja
1 Pekerja Oh 0.300 Rp 85,000.00 Rp 25,500.00
2 Mandor Oh 0.010 Rp 157,000.00 Rp 1,570.00
Jumlah Harga Tenaga Kerja Rp 27,070.00
B Bahan
1 Pasir urug M3 1.200 Rp 233,000.00 Rp 279,600.00
Jumlah Harga Bahan Rp 279,600.00
Jumlah Rp 306,670.00
Overhead + Profit (10%) Rp 30,667.00
Harga Satuan Pekerjaan Rp 337,337.00
A.2.3.1.14 Pengurugan 1 M3 Sirtu padat
A Tenaga Kerja
1 Pekerja Oh 0.250 Rp 85,000.00 Rp 21,250.00
2 Mandor Oh 0.025 Rp 157,000.00 Rp 3,925.00
Jumlah Harga Tenaga Kerja Rp 25,175.00
B Bahan
1 Sirtu M3 1.200 Rp 261,500.00 Rp 313,800.00
Jumlah Harga Bahan Rp 313,800.00
Jumlah Rp 338,975.00
Overhead + Profit (10%) Rp 33,897.50
Harga Satuan Pekerjaan Rp 372,872.50
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.2 Pemasangan 1 M3 Pondasi batu belah / Gunung camp. 1SP : 4PP
A Tenaga Kerja
1 Pekerja Oh 1.300 Rp 85,000.00 Rp 110,500.00
2 Tukang Batu Oh 0.750 Rp 110,000.00 Rp 82,500.00
3 Kepala Tukang Oh 0.075 Rp 150,000.00 Rp 11,250.00
4 Mandor Oh 0.075 Rp 157,000.00 Rp 11,775.00
Jumlah Harga Tenaga Kerja Rp 216,025.00
B Bahan
1 Batu Gunug M3 1.200 Rp 250,000.00 Rp 300,000.00
2 Semen Portland Kg 163.000 Rp 1,600.00 Rp 260,800.00
3 Pasir Pasang M3 0.520 Rp 380,000.00 Rp 197,600.00
Jumlah Harga Bahan Rp 758,400.00
Jumlah Rp 974,425.00
Overhead + Profit (10%) Rp 97,442.50
Harga Satuan Pekerjaan Rp 1,071,867.50
A.3.2.1.9 Pemasangan 1 M3 Batu kosong (anstamping)
A Tenaga Kerja
1 Pekerja Oh 0.780 Rp 85,000.00 Rp 66,300.00
2 Tukang Batu Oh 0.390 Rp 110,000.00 Rp 42,900.00
3 Kepala Tukang Oh 0.039 Rp 150,000.00 Rp 5,850.00
4 Mandor Oh 0.039 Rp 157,000.00 Rp 6,123.00
Jumlah Harga Tenaga Kerja Rp 121,173.00
B Bahan
1 Batu Gunug M3 1.200 Rp 250,000.00 Rp 300,000.00
2 Pasir urug M3 0.432 Rp 233,000.00 Rp 100,656.00
Jumlah Harga Bahan Rp 400,656.00
Jumlah Rp 521,829.00
Overhead + Profit (10%) Rp 52,182.90
Harga Satuan Pekerjaan Rp 574,011.90
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.7 Membuat 1 M3 beton mutu f'0 = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
A Tenaga Kerja
1 Pekerja Oh 1.650 Rp 85,000.00 Rp 140,250.00
2 Tukang Batu Oh 0.275 Rp 110,000.00 Rp 30,250.00
3 Kepala Tukang Oh 0.028 Rp 150,000.00 Rp 4,200.00
4 Mandor Oh 0.083 Rp 157,000.00 Rp 13,031.00
Jumlah Harga Tenaga Kerja Rp 187,731.00
B Bahan
1 Semen Portland Kg 371.000 Rp 1,600.00 Rp 593,600.00
2 Pasir Beton M3 0.499 Rp 380,000.00 Rp 189,457.14
3 Kerikil (Maks 30mm) M3 0.776 Rp 579,000.00 Rp 449,046.67
4 Air Ltr 215.000 Rp - Rp -
Jumlah Harga Bahan Rp 1,232,103.81
Jumlah Rp 1,419,834.81
Overhead + Profit (10%) Rp 141,983.48
Harga Satuan Pekerjaan Rp 1,561,818.29
A.4.1.1.17 Pembesian 1 kg dengan besi polos atau besi ulir
A Tenaga Kerja
1 Pekerja Oh 0.0070 Rp 85,000.00 Rp 595.00
2 Tukang Besi Oh 0.0070 Rp 110,000.00 Rp 770.00
3 Kepala Tukang Oh 0.0007 Rp 150,000.00 Rp 105.00
4 Mandor Oh 0.0003 Rp 157,000.00 Rp 47.10
Jumlah Harga Tenaga Kerja Rp 1,517.10
B Bahan
1 Besi beton Kg 1.050 Rp 30,906.00 Rp 32,451.30
2 Kawat beton Kg 0.015 Rp 26,765.00 Rp 401.48
Jumlah Harga Bahan Rp 32,852.78
Jumlah Rp 34,369.88
Overhead + Profit (10%) Rp 3,436.99
Jumlah A+B Rp 35,886.98
A.4.1.1.24 Pemasangan 1 M2 bekisting untuk lantai
A Tenaga Kerja
1 Pekerja Oh 0.660 Rp 85,000.00 Rp 56,100.00
2 Tukang Kayu Oh 0.330 Rp 110,000.00 Rp 36,300.00
3 Kepala Tukang Oh 0.033 Rp 150,000.00 Rp 4,950.00
4 Mandor Oh 0.033 Rp 157,000.00 Rp 5,181.00
Jumlah Harga Tenaga Kerja Rp 102,531.00
B Bahan
1 Kayu klas III M3 0.040 Rp 3,898,600.00 Rp 155,944.00
2 Paku 5 - 12 cm Kg 0.400 Rp 35,855.00 Rp 14,342.00
3 Minyak bekisting Ltr 0.200 Rp - Rp -
4 Balok kayu klas II M3 0.018 Rp 6,026,000.00 Rp 108,468.00
5 Plywood tebal 9 mm Lbr 0.350 Rp 301,500.00 Rp 105,525.00
6 Dolken kayu Ø 8-10/400 cm Btg 2.000 Rp 77,972.00 Rp 155,944.00
Jumlah Harga Bahan Rp 540,223.00
Jumlah Rp 642,754.00
Overhead + Profit (10%) Rp 64,275.40
Harga Satuan Pekerjaan Rp 707,029.40
A.4.1.1.29 Membuat 1 M3 beton bertulang (K225)
A Tenaga Kerja
1 Pekerja Oh 1.650 Rp 85,000.00 Rp 140,250.00
2 Tukang Batu Oh 0.270 Rp 110,000.00 Rp 29,700.00
3 Kepala Tukang Oh 0.028 Rp 150,000.00 Rp 4,200.00
4 Mandor Oh 0.083 Rp 157,000.00 Rp 13,031.00
Jumlah Harga Tenaga Kerja Rp 187,181.00
B Bahan
1 Semen Portland Kg 371.000 Rp 1,600.00 Rp 593,600.00
2 Pasir Beton M3 0.499 Rp 380,000.00 Rp 189,620.00
3 Split 2-3 cm M3 0.722 Rp 579,000.00 Rp 418,038.00
Jumlah Harga Bahan Rp 1,201,258.00
Jumlah Rp 1,388,439.00
Overhead + Profit (10%) Rp 138,843.90
Harga Satuan Pekerjaan Rp 1,527,282.90
A.4.1.1.30 Membuat 1 M3 Plat Lantai beton

1 Pek.Pembesian Kg 125.000 Rp 36,072.86 Rp 4,509,107.13


2 Pek.Bekesting M3 4.000 Rp 707,029.40 Rp 2,828,117.60
3 Pek.Beton K225 M3 1.000 Rp 1,527,282.90 Rp 1,527,282.90
Jumlah Harga Bahan Rp 8,864,507.63
Jumlah
Overhead + Profit (10%)
Harga Satuan Pekerjaan Rp 8,864,507.63

A.4.4.2 HARGA SATUAN PEKERJAAN PASANGAN PLESTERAN


A.4.4.2.3 Pemasangan 1 M2 plesteran 1SP : 3PP, tebal 15 mm
A Tenaga Kerja
1 Pekerja Oh 0.300 Rp 85,000.00 Rp 25,500.00
2 Tukang Batu Oh 0.150 Rp 110,000.00 Rp 16,500.00
3 Kepala Tukang Oh 0.015 Rp 150,000.00 Rp 2,250.00
4 Mandor Oh 0.015 Rp 157,000.00 Rp 2,355.00
Jumlah Harga Tenaga Kerja Rp 46,605.00
B Bahan
1 Semen Portland Kg 7.776 Rp 1,600.00 Rp 12,441.60
2 Pasir Pasang M3 0.023 Rp 380,000.00 Rp 8,740.00
Jumlah Harga Bahan Rp 21,181.60
Jumlah Rp 67,786.60
Overhead + Profit (10%) Rp 6,778.66
Harga Satuan Pekerjaan Rp 74,565.26
A.4.1.1.31 Membuat 1 M3 Plat Duicker beton

1 Pek.Pembesian Kg 185.000 Rp 36,072.86 Rp 6,673,478.55


2 Pek.Bekesting M3 4.000 Rp 707,029.40 Rp 2,828,117.60
3 Pek.Beton K225 M3 1.000 Rp 1,527,282.90 Rp 1,527,282.90

Jumlah Harga Bahan Rp 11,028,879.05


Jumlah
Overhead + Profit (10%) Rp -
Harga Satuan Pekerjaan Rp 11,028,879.05
A.4.4.2 HARGA SATUAN PEKERJAAN PASANGAN SIARAN
A.4.4.2.3 Pemasangan 1 M2 Siaran 1SP : 2PP, tebal 15 mm
A Tenaga Kerja
1 Pekerja Oh 0.300 Rp 85,000.00 Rp 25,500.00
2 Tukang Batu Oh 0.150 Rp 110,000.00 Rp 16,500.00
3 Kepala Tukang Oh 0.015 Rp 150,000.00 Rp 2,250.00
4 Mandor Oh 0.015 Rp 157,000.00 Rp 2,355.00
Jumlah Harga Tenaga Kerja Rp 46,605.00
B Bahan
1 Semen Portland Kg 6.340 Rp 1,600.00 Rp 10,144.00
2 Pasir Pasang M3 0.012 Rp 380,000.00 Rp 4,560.00
Jumlah Harga Bahan Rp 14,704.00
Jumlah Rp 61,309.00
Overhead + Profit (10%) Rp 6,130.90
Harga Satuan Pekerjaan Rp 67,439.90
A.4.4.2 HARGA SATUAN PEKERJAAN BONGKARAN PAS LAMA
A.4.4.2.3 Pemasangan 1 Bongkaran Pasangan lama m3
A Tenaga Kerja
1 Pekerja Oh 1.600 Rp 85,000.00 Rp 136,000.00
2 Mandor Oh 0.180 Rp 157,000.00 Rp 28,260.00

Jumlah Harga Tenaga Kerja Rp 164,260.00


B Bahan
1 Rp - Rp -
2 Rp -
Jumlah Harga Bahan Rp -
C Peralatan
1 Palu Godom Baja Keras Kg 0.006 Rp 3,240.00 Rp 19.44
2 Pahat Beton Baja Keras Kg 0.009 Rp 5,680.00 Rp 51.12
3 Linggis Baja Keras M3 0.020 Rp 4,400.00 Rp 88.00
Jumlah Harga Bahan Rp 158.56
Jumlah Rp 164,418.56
Overhead + Profit (10%) Rp 16,441.86
Harga Satuan Pekerjaan Rp 180,860.42
A.4.4.2 HARGA SATUAN PEKERJAAN PEMBERSIHAN PERMUKAAN TANAH
A.4.4.2.3 Mengangkut Hasil Galian Dengan Jarak angkut > 5000 m ( m3)
A Tenaga Kerja
1 Pekerja Oh - Rp - Rp -
2 Mandor Oh - Rp - Rp -

Jumlah Harga Tenaga Kerja Rp -


B Bahan
1 Rp - Rp -
2 Rp -
Jumlah Harga Bahan Rp -
C Peralatan
1 Operasional Damp Truck /Jam 0.240 Rp 266,700.00 Rp 64,008.00
2
3
Jumlah Harga Bahan Rp 64,008.00
Jumlah Rp 64,008.00
Overhead + Profit (10%) Rp 6,400.80
Harga Satuan Pekerjaan Rp 70,408.80
A.4.4.2 HARGA SATUAN PEKERJAAN PEMBERSIHAN TIMBUNAN TANAH DIPADATKAN
A.4.4.2.3 Timbunan Tanah Didatangkan ( m3)
A Tenaga Kerja
1 Pekerja Org/hari 0.133 Rp 85,000.00 Rp 11,330.50
2 Mandor Org/hari 0.013 Rp 157,000.00 Rp 2,088.10

Jumlah Harga Tenaga Kerja Rp 13,418.60


B Bahan
1 Tanah Timbunan m3 1.200 Rp 167,280.00 Rp 200,736.00
2 Rp -
Jumlah Harga Bahan Rp 200,736.00
C Peralatan
1 Damp Truck /Jam 0.027 Rp 915,357.91 Rp 24,531.59
2 Excavator /Jam 0.082 Rp 266,700.00 Rp 21,949.41
3
Jumlah Harga Bahan Rp 46,481.00
Jumlah Rp 260,635.60
Overhead + Profit (10%) Rp 26,063.56
Harga Satuan Pekerjaan Rp 286,699.16
DAFTAR KUANTITAS DAN HARGA
SKPD : DINAS PU DAN KIMPRASWIL KAB.BANTAENG
KEGIATAN : PENATAAN LINGKUNGAN PEMUKIMAN PENDUDUK PEDESAAN
PAKET PEKERJAAN : JALAN SETAPAK BONTO TAPPALANG
TAHUN ANGGARAN : 2017

No Uraian Pekerjaan Sat. Volume Harga Satuan (Rp) Total Harga Satuan (Rp)
1 2 3 4 5 6

A Pekerjaan Jalan
1 Galian Tanah M3 25.000 Rp 74,442.50 Rp 1,861,062.50
2 Urugan Tanah Kembali M3 20.000 Rp 55,385.00 Rp 1,107,700.00
3 Pas. Batu Gunung M3 50.000 Rp 1,071,867.50 Rp 53,593,375.00
4 Urugan Sirtu M3 47.600 Rp 372,872.50 Rp 17,748,731.00
5 Pek. Rabat Jalan M3 88.400 Rp 1,561,818.29 Rp 138,064,736.88
8 Pek. Plesteran M2 60.000 Rp 74,565.26 Rp 4,473,915.60

Total Harga Rp 216,849,520.98


Dibulatkan Rp 216,849,000.00
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
SKPD : DINAS PU DAN KIMPRASWIL KAB.BANTAENG

KEGIATAN : PENATAAN LINGKUNGAN PEMUKIMAN PENDUDUK PEDESAAN

PAKET PEKERJAAN : JALAN SETAPAK BONTO TAPPALANG

TAHUN ANGGARAN : 2017

NO. REKAPITULASI PEKERJAAN JUMLAH HARGA

I Pekerjaan Jalan Rp 216,849,520.98

JUMLAH HARGA I + II + III Rp 216,849,520.98


PPN 10 % Rp 21,684,952.10
TOTAL Rp 238,534,473.08
DIBULATKAN Rp 238,534,000.00

( TIGA RATUS DELAPAN BELAS JUTA ENAM RATUS DELAPAN


TERBILANG : PULUH SEMBILAN RIBU RUPIAH,- )