Pembangunan Drainase Desa Papan Loe 1 Paket RAB
Pembangunan Drainase Desa Papan Loe 1 Paket RAB
1 2 3
A BAHAN DASAR
1 Batu kali
- Utuh M3 159,300.00 165,672.00 172,298.88
- Batu pecah 7 - 10 cm M3 171,900.00 178,776.00 185,927.04
- Batu pecah 5 - 7 cm M3 215,550.00 224,172.00 233,138.88
- Batu pecah 3 - 5 cm (Manual) M3 236,250.00 245,700.00 255,528.00
- Batu pecah 3 - 5 cm (Cruser) M3 299,250.00 311,220.00 323,668.80
- Batu pecah 2 - 3 cm (Manual) M3 413,100.00 429,624.00 446,808.96
- Batu pecah 2 - 3 cm (Cruser) M3 487,350.00 506,844.00 527,117.76
- Batu pecah 1 - 2 cm (Cruser) M3 521,100.00 541,944.00 563,621.76
2 Batu gunung M3 291,600.00 303,264.00 315,394.56
3 Tanah timbunan pilihan M3 192,600.00 200,304.00 208,316.16
4 Tanah timbunan biasa M3 147,600.00 153,504.00 159,644.16
5 Tanah timbunan humus M3 450,000.00 468,000.00 486,720.00
6 Pasir urug/timbunan M3 209,700.00 218,088.00 226,811.52
7 Pasir Pasangan M3 342,000.00 355,680.00 369,907.20
8 Kerikil sungai M3 278,100.00 289,224.00 300,792.96
9 Sirtu M3 235,350.00 244,764.00 254,554.56
10 Kapur pasangan Zak 76,050.00 79,092.00 82,255.68
11 Semen tonasa @ 50 kg Zak 72,000.00 74,880.00 77,875.20
12 Bosowa @ 40 Kg Zak 57,600.00 59,904.00 62,300.16
13 Batu merah Bh 855.00 889.20 924.77
14 Batu beton ringan Bh 9,900.00 10,296.00 10,707.84
15 Paveing blok t. 6 cm Bh 2,430.00 2,527.20 2,628.29
16 Paveing blok t. 8 cm Bh 2,695.50 2,803.32 2,915.45
17 Plastik bening alas beton M2 7,020.00 7,300.80 7,592.83
18 Gorong-gorong dia. 60 cm Bh 438,750.00 456,300.00 474,552.00
19 Gorong-gorong dia. 80 cm Bh 468,000.00 486,720.00 506,188.80
18 Gorong-gorong dia. 100 cm Bh 643,500.00 669,240.00 696,009.60
19 Kertas Milimeter Buah 335,700.00 349,128.00 363,093.12
20 Kertas Kalkir Rool 553,500.00 575,640.00 598,665.60
21 Kertas A4 Lbr 810.00 842.40 876.10
22 kertas A3 Lbr 900.00 936.00 973.44
23 Cat Kg 73,800.00 76,752.00 79,822.08
24 Meni Besi Kg 83,700.00 87,048.00 90,529.92
25 Kuas Buah 9,000.00 9,360.00 9,734.40
26 Tinta printer Botol 96,300.00 100,152.00 104,158.08
27 Foto Printing/Kertas Foto Lbr 3,600.00 3,744.00 3,893.76
28 Foto Copy A3 Lbr 1,800.00 1,872.00 1,946.88
29 Foto Copy A4 Lbr 900.00 936.00 973.44
30 Biaya Jilid Buah 9,900.00 10,296.00 10,707.84
31 Biaya Cetak Banner Lbr 73,800.00 76,752.00 79,822.08
32 Ijuk M3 28,800.00 29,952.00 31,150.08
33 Pohon Trambesi Buah 28,800.00 29,952.00 31,150.08
34 Sewa Laptop Buah Rp 59,200.00
35 Sewa Printer Buah Rp 450,000.00
36 Kamera Digital Buah 40,005.00
37 Air Ltr 500.00
B BAHAN KAYU
1 Kayu kls I
- Balok gergaji swalmil M3 12,507,300.00 13,007,592.00 13,527,895.68
- Papan gergaji swalmil M3 13,747,500.00 14,297,400.00 14,869,296.00
- Balok gergaji chansow M3 12,507,300.00 13,007,592.00 13,527,895.68
- Papan gergaji chansow M3 13,747,500.00 14,297,400.00 14,869,296.00
2 Kayu kls II
- Balok M3 5,382,000.00 5,597,280.00 5,821,171.20
- Papan M3 5,382,000.00 5,597,280.00 5,821,171.20
3 Kayu kls III
- Balok M3 3,474,000.00 3,612,960.00 3,757,478.40
Balok M' 9,150.00 9,516.00 9,896.64
- Papan M3 3,474,000.00 3,612,960.00 3,757,478.40
Papan M' 9,150.00 9,516.00 9,896.64
4 Bambu Btg 37,800.00 39,312.00 40,884.48
5 Kayu Kls IV M3 2,340,000.00 2,433,600.00 2,530,944.00
6 Plywood tebal 9 mm Lbr 301,500.00 313,560.00 326,102.40
7 Dolken kayu Ø 8-10/400 cm Btg 69,480.00 72,259.20 75,149.57
E BAHAN BESI DAN BAJA
1 Besi beton Kg 27,540.00 28,641.60 29,787.26
2 Besi beton ulir Kg 29,250.00 30,420.00 31,636.80
3 Paku biasa Kg 31,950.00 33,228.00 34,557.12
4 Paku asbes Kg 32,400.00 33,696.00 35,043.84
5 Paku Jembatan Kg 29,250.00 30,420.00 31,636.80
6 Besi Tempa M2 288,900.00 300,456.00 312,474.24
7 Rangka Atap Baja Ringan M2 282,600.00 293,904.00 305,660.16
8 Kawat beton M2 23,850.00 24,804.00 25,796.16
9 Palu Godom Baja Keras KG 3,240.00 3,369.60 3,504.38
10 Pahat Beton Baja Keras KG 5,684.00 5,911.36 6,147.81
11 Linggis Baja Keras KG 4,400.00 4,576.00 4,759.04
G BAHAN PLAFON DAN PARTISI
1 Eternit 100 x 100 x 0,2 lbr 22,500.00 25,250.00 26,260.00
2 Tripleks
- 122 x 244 x 0,2 cm lbr 54,000.00 60,600.00 63,024.00
- 122 x 244 x 0,3 cm lbr 102,150.00 114,635.00 119,220.40
- 122 x 244 x 0,6 cm lbr 148,500.00 166,650.00 173,316.00
- 122 x 244 x 0,9 cm lbr 225,000.00 252,500.00 262,600.00
- 122 x 244 x 1,8 cm lbr 324,000.00 363,600.00 378,144.00
M UPAH KERJA
1 Pekerja hari 76,500.00 85,850.00 89,284.00
2 Tukang
- Tukang kayu hari 99,000.00 111,100.00 115,544.00
- Tukang Batu hari 99,000.00 111,100.00 115,544.00
- Tukang Cat hari 99,000.00 111,100.00 115,544.00
- Tukang Listrik hari 139,500.00 156,550.00 162,812.00
- Tukang Pipa hari 117,000.00 131,300.00 136,552.00
- Tukang Besi hari 108,000.00 121,200.00 126,048.00
- Tukang Las hari 108,000.00 121,200.00 126,048.00
- Tukang Landscaping hari 117,000.00 131,300.00 136,552.00
- Tukang Profil hari 126,000.00 141,400.00 147,056.00
3 Kepala Tukang
- Kepala Tukang kayu hari 135,000.00 151,500.00 157,560.00
- KepalaTukang Batu hari 135,000.00 151,500.00 157,560.00
- KepalaTukang Cat hari 135,000.00 151,500.00 157,560.00
- KepalaTukang Listrik hari 198,000.00 222,200.00 231,088.00
- KepalaTukang Pipa hari 157,500.00 176,750.00 183,820.00
- KepalaTukang Besi hari 144,750.00 161,600.00 168,064.00
- KepalaTukang Las hari 144,000.00 161,600.00 168,064.00
- KepalaTukang Landscaping hari 157,500.00 176,750.00 183,820.00
- KepalaTukang Profil hari 157,500.00 176,750.00 183,820.00
4 Mandor hari 141,300.00 158,570.00 164,912.80
5 Masinis hari 108,000.00 121,200.00 126,048.00
6 Pembantu Masinis hari 76,500.00 85,850.00 89,284.00
7 Penjaga Gudang hari 103,500.00 116,150.00 120,796.00
8 Penjaga malam hari 103,500.00 116,150.00 120,796.00
9 Operator Alat Berat /Jam 16,200.00 18,200.00 18,928.00
10 Pembantu Operator Alat Berat /Jam 9,900.00 11,900.00 12,376.00
11 Operator Alat Ringan /Jam 13,500.00 15,500.00 16,120.00
12 Operator Alat Tripod/Crane Org/Hari 13,500.00 15,500.00 16,120.00
13 Pembantu Operator Alat Ringan /Jam 9,900.00 11,900.00 12,376.00
14 Mekanik /Jam 13,500.00 15,500.00 16,120.00
15 Pembantu Mekanik /Jam 9,900.00 11,900.00 12,376.00
16 Juru Ukur Org/Hari 251,370.00 253,370.00 263,504.80
17 Pembantu Juru Ukur Org/Hari 184,680.00 186,680.00 194,147.20
18 Engineer Org/Hari 308,520.00 310,520.00 322,940.80
19 Estimator Org/Hari 295,020.00 297,020.00 308,900.80
20 Pengawas Org/Hari 251,370.00 253,370.00 263,504.80
21 Koordintor Pengawas Org/Hari 308,520.00 310,520.00 322,940.80
22 Drafter Org/Hari 207,180.00 209,180.00 217,547.20
23 Tukang Foto Org/Hari 117,000.00 119,000.00 123,760.00
24 operator Printer Org/Hari 72,900.00 74,900.00 77,896.00
25 Sopir /Jam 14,877.00 16,877.00 17,552.08
26 Pembantu Sopir/Operator /Jam 12,312.00 14,312.00 14,884.48
27 Waterpass Buah 188,595.00 190,595.00 198,218.80
Bantaeng, 2017
Mengetahui,
Plt. Kepala Dinas PU dan Kimpraswil
Kabupaten Bantaeng
Jumlah Rp 447,300.00
Overhead + Profit (10%) Rp 44,730.00
Harga Satuan Pekerjaan Rp 492,030.00
A.4.4.2 PENGGANDAAN SHOP DRAWING
A.4.4.2.3 Foto Penggandaan Shop Drawing ( Set)
A Lain Lain
1 Foto Copy Kertas A4 Lembar 140.0000 Rp 900.00 Rp 126,000.00
2 Menjilid Buah 7.0000 Rp 9,900.00 Rp 69,300.00
Jumlah Rp 195,300.00
Overhead + Profit (10%) Rp 19,530.00
Harga Satuan Pekerjaan Rp 214,830.00
A.4.4.2 PEMBUATAN GAMBAR SHOP DRAWING
A.4.4.2.3 Pembuatan Gambar Shop Drawing ( Set)
A Tenaga Kerja
1 Drafter/Perencanaan Org/hari - Rp 207,180.00 Rp -
2 Desain Engineer/Perencanaan Org/hari 1.000 Rp 310,520.00 Rp 310,520.00
3 Estimator Engineer/Perencanaan Org/hari 1.000 Rp 297,020.00 Rp 297,020.00
4 Operator Printer Org/hari 1.000 Rp 74,900.00 Rp 74,900.00
Jumlah Harga Tenaga Kerja Rp 682,440.00
B Bahan
1 Kertas A4 Lbr 20.0000 Rp 842.40 Rp 16,848.00
2 Tinta Printer Botol 1.0000 Rp 100,152.00 Rp 100,152.00
3 Biaya Cetak/Jilid Set 1.0000 Rp 10,296.00 Rp 10,296.00
Jumlah Rp 195,300.00
Overhead + Profit (10%) Rp 19,530.00
Harga Satuan Pekerjaan Rp 214,830.00
A.4.4.2 PEMBUATAN GAMBAR AS BUILD DRAWING
A.4.4.2.3 Pembuatan Gambar As Build Drawing ( Set)
A Tenaga Kerja
1 Drafter Org/hari 1.0000 Rp 209,180.00 Rp 209,180.00
2 Pengawas Org/hari 1.0000 Rp 253,370.00 Rp 253,370.00
3 Koordintor Pengawas Org/hari 1.0000 Rp 310,520.00 Rp 310,520.00
4 Desain Engineer Org/hari - Rp 308,520.00
5 Operator Printer Org/hari 1.0000 Rp 74,900.00 Rp 74,900.00
Jumlah Harga Tenaga Kerja Rp 847,970.00
B Bahan
1 Kertas A4 Lbr 20.0000 Rp 842.40 Rp 16,848.00
2 Tinta Printer Botol 2.0000 Rp 100,152.00 Rp 200,304.00
3 Biaya Cetak/Jilid Set 1.0000 Rp 10,296.00 Rp 10,296.00
A Pekerjaan Persiapan
1 Pembersihan Lokasi & Pasangan Bowplank 120.00 M' Rp 38,542.03 Rp 4,625,043.72
2 Pembuatan Papan Nama Proyek 1.00 Set Rp 375,000.00 Rp 375,000.00
3 Pembuatan Shop Drawing & As Build Drawing 1.00 Set Rp 2,371,571.40 Rp 2,371,571.40
JUMLAH Rp 7,371,615.12
B Pekerjaan Drainase
1 Galian Tanah 73.44 M3 Rp 75,186.93 Rp 5,521,727.77
2 Urugan Tanah Kembali 24.48 M3 Rp 55,938.85 Rp 1,369,383.05
3 Pas. Batu Gunung 133.20 M3 Rp 1,131,167.90 Rp 150,671,563.61
4 Pek. Plesteran 300.00 M2 Rp 73,586.73 Rp 22,076,019.11
JUMLAH Rp 179,638,693.54
Page 14 of 36
NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH HARGA
Page 15 of 36
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
BANTAENG , 2017
Dibuat Oleh
KONSULTAN PERENCANA
CV. WAHIDAH ENGINEERING CONSULTAN
A. MUH. SALEH
DIREKTUR
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
A Pekerjaan Persiapan
1 Pembersihan Lokasi & Pasangan Bowplank 120.00 M' Rp 38,542.03 Rp 4,625,043.60
2 Pembuatan Papan Nama Proyek 1.00 Set Rp 375,000.00 Rp 375,000.00
3 Pembuatan Shop Drawing & As Build Drawing 1.00 Set Rp 2,371,571.40 Rp 2,371,571.40
JUMLAH Rp 7,371,615.00
B Pekerjaan Drainase
1 Galian Tanah 73.44 M3 Rp 75,186.92 Rp 5,521,727.40
2 Urugan Tanah Kembali 24.48 M3 Rp 55,938.85 Rp 1,369,383.05
3 Pas. Batu Gunung 133.20 M3 Rp 1,131,167.89 Rp 150,671,562.95
4 Pek. Plesteran 300.00 M2 Rp 73,586.73 Rp 22,076,019.00
JUMLAH Rp 179,638,692.40
Page 18 of 36
NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH HARGA
Page 19 of 36
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
SERATUS DELAPAN PULUH LIMA JUTA DELAPAN RATUS EMPAT BELAS RIBU RUPIAH
BANTAENG , 2017
Dibuat Oleh
PENAWAR
CV PUTRA LIBRA
DIREKTUR
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
1 2 3
A BAHAN DASAR
1 Batu kali
- Utuh M3 177,000.00 178,770.00
- Batu pecah 7 - 10 cm M3 191,000.00 192,910.00
- Batu pecah 5 - 7 cm M3 239,500.00 241,895.00
- Batu pecah 3 - 5 cm (Manual) M3 262,500.00 265,125.00
- Batu pecah 3 - 5 cm (Cruser) M3 332,500.00 335,825.00
- Batu pecah 2 - 3 cm (Manual) M3 459,000.00 463,590.00
- Batu pecah 2 - 3 cm (Cruser) M3 541,500.00 546,915.00
- Batu pecah 1 - 2 cm (Cruser) M3 579,000.00 584,790.00
2 Batu gunung M3 325,000.00 328,250.00
3 Tanah timbunan pilihan M3 214,000.00 216,140.00
4 Tanah timbunan biasa M3 164,000.00 165,640.00
5 Tanah timbunan humus M3 500,000.00 505,000.00
6 Pasir urug/timbunan M3 233,000.00 235,330.00
7 Pasir Pasangan M3 380,000.00 383,800.00
8 Kerikil sungai M3 309,000.00 312,090.00
9 Sirtu M3 261,500.00 264,115.00
10 Kapur pasangan Zak 84,500.00 85,345.00
11 Semen tonasa @ 50 kg Zak 80,000.00 80,800.00
12 Bosowa @ 40 Kg Zak 64,000.00 64,640.00
13 Batu merah Bh 950.00 959.50
14 Batu beton ringan Bh 11,000.00 11,110.00
15 Paveing blok t. 6 cm Bh 2,700.00 2,727.00
16 Paveing blok t. 8 cm Bh 2,995.00 3,024.95
17 Plastik bening alas beton M2 7,800.00 7,878.00
18 Gorong-gorong dia. 60 cm Bh 487,500.00 491,250.00
19 Gorong-gorong dia. 80 cm Bh 520,000.00 524,000.00
18 Gorong-gorong dia. 100 cm Bh 715,000.00 720,500.00
B BAHAN KAYU
1 Kayu kls I
- Balok gergaji swalmil M3 13,897,000.00 14,003,900.00
- Papan gergaji swalmil M3 15,275,000.00 15,392,500.00
- Balok gergaji chansow M3 13,897,000.00 14,003,900.00
- Papan gergaji chansow M3 15,275,000.00 15,392,500.00
2 Kayu kls II
- Balok M3 5,980,000.00 6,026,000.00
- Papan M3 5,980,000.00 6,026,000.00
3 Kayu kls III
- Balok M3 3,860,000.00 3,898,600.00
- Papan M3 3,860,000.00 3,898,600.00
4 Bambu Btg 42,000.00 42,420.00
5 Kayu Kls IV M3 2,600,000.00 2,620,000.00
M UPAH KERJA
1 Pekerja hari 85,000.00 85,850.00
2 Tukang
- Tukang kayu hari 110,000.00 111,100.00
- Tukang Batu hari 110,000.00 111,100.00
- Tukang Cat hari 110,000.00 111,100.00
- Tukang Listrik hari 155,000.00 156,550.00
- Tukang Pipa hari 130,000.00 131,300.00
- Tukang Besi hari 120,000.00 121,200.00
- Tukang Las hari 120,000.00 121,200.00
- Tukang Landscaping hari 130,000.00 131,300.00
- Tukang Profil hari 140,000.00 141,400.00
3 Kepala Tukang
- Kepala Tukang kayu hari 150,000.00 151,500.00
- KepalaTukang Batu hari 150,000.00 151,500.00
- KepalaTukang Cat hari 150,000.00 151,500.00
- KepalaTukang Listrik hari 220,000.00 222,200.00
- KepalaTukang Pipa hari 175,000.00 176,750.00
- KepalaTukang Besi hari 160,000.00 161,600.00
- KepalaTukang Las hari 160,000.00 161,600.00
- KepalaTukang Landscaping hari 175,000.00 176,750.00
- KepalaTukang Profil hari 175,000.00 176,750.00
4 Mandor hari 157,000.00 158,570.00
5 Masinis hari 120,000.00 121,200.00
6 Pembantu Masinis hari 85,000.00 85,850.00
7 Penjaga Gudang hari 115,000.00 116,150.00
8 Penjaga malam hari 115,000.00 116,150.00
Bantaeng, 2016
Mengetahui,
Plt. Kepala Dinas PU dan Kimpraswil
Kabupaten Bantaeng
S U D A R N I, SH.
Pangkat : Pembina Utama Muda
NIP. 19561231 198303 1 206
Keterangan :
Zona I :
- Kecamatan Bantaeng
Tappanjeng, Pallantikang, Malilingi, Letta, Lembang, Lamalaka, Karatuang.
- Kecamatan Bissappu
Bonto Sunggu, Bonto Atu, Bonto Rita, Bonto Lebang, Bonto Salluang, Bonto Manai, Bonto Jai, Bonto Langkasa.
- Kecamatan Eremerasa
Ulugalung, Mamampang
- Kecamatan Pa'jukukang
Rappoa, Biangloe, Lumpangan, Biangkeke, Nipa-nipa, Pa'jukukang, Borongloe, Batu Karaeng.
Zona II :
- Kecamatan Eremerasa
Mappilawing, Lonrong, Barua, Pa'bentengan.
- Kecamatan Gantarang Keke
Tanah Loe, Tombolo, Layoa, Baji Minasa, Kaloling, Gantarangkeke.
- Kecamatan Tompobulu
Lembang Gantarangkeke, Pattallassang, Banyorang.
- Kecamatan Sinoa
Bonto Mate'ne, Bonto Tiro, Bonto Majannang, Bonto Karaeng, Bonto Maccini, Bonto Bulaeng.
- Kecamatan Bissappu
Bonto Cinde, Bonto Loe.
- Kecamatan Uluere
Bonto Rannu, Bonto Tallasa.
- Kecamatan Pa'jukukang
Papanloe, Baruga.
Zona III :
- Kecamatan Bantaeng
Onto, Kayu Loe
- Kecamatan Eremerasa
Kampala, Parangloe, Pa'bumbungan.
- Kecamatan Bissappu
Bonto Jaya
- Kecamatan Tompobulu
Bonto-bontoa, Campaga, Ereng-ereng, Labbo, Bonto Tappalang, Balumbung, Pattaneteang.
- Kecamatan Uluere
Bonto Tangnga, Bonto Daeng, Bonto Marannu, Bonto Lojong.
HARGA SATUAN
ZONA 3
180,540.00
194,820.00
244,290.00
267,750.00
339,150.00
468,180.00
552,330.00
590,580.00
331,500.00
218,280.00
167,280.00
510,000.00
237,660.00
387,600.00
315,180.00
266,730.00
86,190.00
81,600.00 1,616.00
65,280.00
969.00
11,220.00
2,754.00
3,054.90
7,956.00
495,000.00
528,000.00
726,000.00
14,110,800.00
15,510,000.00
14,110,800.00
15,510,000.00
6,072,000.00
6,072,000.00
3,937,200.00
3,937,200.00
42,840.00
2,640,000.00
31,212.00
33,150.00
36,210.00
36,720.00
33,000.00
327,420.00
320,280.00
27,030.00
25,500.00
61,200.00
115,770.00
168,300.00
255,000.00
367,200.00
86,700.00
112,200.00
112,200.00
112,200.00
158,100.00
132,600.00
122,400.00
122,400.00
132,600.00
142,800.00
153,000.00
153,000.00
153,000.00
224,400.00
178,500.00
163,200.00
163,200.00
178,500.00
178,500.00
160,140.00
122,400.00
86,700.00
117,300.00
117,300.00
aeng, 2016
ngetahui,
as PU dan Kimpraswil
ten Bantaeng
A R N I, SH.
mbina Utama Muda
231 198303 1 206
Bonto Langkasa.
DAFTAR ANALISA HARGA SATUAN PEKERJAAN - ANALISA SNI
A.2.2.1.4 Pengukuran dan pemasangan 1 M' Bouwplank
A Tenaga Kerja
1 Pekerja Oh 0.100 Rp 85,000.00 Rp 8,500.00
2 Tukang Kayu Oh 0.100 Rp 110,000.00 Rp 11,000.00
3 Kepala Tukang Oh 0.010 Rp 150,000.00 Rp 1,500.00
4 Mandor Oh 0.005 Rp 157,000.00 Rp 785.00
Jumlah Harga Tenaga Kerja Rp 21,785.00
B Bahan
1 Kayu balok 5/7 M3 0.120 Rp 3,898,600.00 Rp 467,832.00
2 Paku 2" - 3" Kg 0.020 Rp 35,510.00 Rp 710.20
3 Kayu papan 3/20 M3 0.007 Rp 3,886,000.00 Rp 27,202.00
Jumlah Harga Bahan Rp 495,744.20
Jumlah Rp 517,529.20
Overhead + Profit (0 %) Rp 51,752.92
Harga Satuan Pekerjaan Rp 569,282.12
A.2.2.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 M3 Tanah biasa sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 0.750 Rp 85,000.00 Rp 63,750.00
2 Mandor Oh 0.025 Rp 157,000.00 Rp 3,925.00
Jumlah Harga Tenaga Kerja Rp 67,675.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 67,675.00
Overhead + Profit (10%) Rp 6,767.50
Harga Satuan Pekerjaan Rp 74,442.50
A.2.3.1.4 Menggali 1 M3 Tanah keras sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.000 Rp 85,000.00 Rp 85,000.00
2 Mandor Oh 0.032 Rp 157,000.00 Rp 5,024.00
Jumlah Harga Tenaga Kerja Rp 90,024.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 90,024.00
Overhead + Profit (10%) Rp 9,002.40
Harga Satuan Pekerjaan Rp 99,026.40
A.2.3.1.5 Menggali 1 M3 Tanah cadas sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.500 Rp 85,000.00 Rp 127,500.00
2 Mandor Oh 0.060 Rp 157,000.00 Rp 9,420.00
Jumlah Harga Tenaga Kerja Rp 136,920.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 136,920.00
Overhead + Profit (10%) Rp 13,692.00
Harga Satuan Pekerjaan Rp 150,612.00
A.2.3.1.6 Menggali 1 M3 Tanah lumpur sedalam 1 m
A Tenaga Kerja
1 Pekerja Oh 1.200 Rp 85,000.00 Rp 102,000.00
2 Mandor Oh 0.045 Rp 157,000.00 Rp 7,065.00
Jumlah Harga Tenaga Kerja Rp 109,065.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 109,065.00
Overhead + Profit (10%) Rp 10,906.50
Harga Satuan Pekerjaan Rp 119,971.50
A.2.3.1.9 Pengurugan kembali 1 M3 Galian tanah
A Tenaga Kerja
1 Pekerja Oh 0.500 Rp 85,000.00 Rp 42,500.00
2 Mandor Oh 0.050 Rp 157,000.00 Rp 7,850.00
Jumlah Harga Tenaga Kerja Rp 50,350.00
B Bahan
Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 50,350.00
Overhead + Profit (10%) Rp 5,035.00
Harga Satuan Pekerjaan Rp 55,385.00
A.2.3.1.10 Pemadatan tanah 1 M3 Tanah (per 20 cm)
A Tenaga Kerja
1 Pekerja Oh 0.500 Rp 85,000.00 Rp 42,500.00
2 Mandor Oh 0.050 Rp 157,000.00 Rp 7,850.00
Jumlah Harga Tenaga Kerja Rp 50,350.00
B Bahan
1 Bambu dia. 6 - 8/600 cm Btg 1.250 Rp - Rp -
2 Tali ijuk M3 0.186 Rp - Rp -
Jumlah Harga Bahan Rp -
Jumlah Rp 50,350.00
Overhead + Profit (10%) Rp 5,035.00
Harga Satuan Pekerjaan Rp 55,385.00
A.2.3.1.11 Pengurugan 1 M3 dengan pasir urug
A Tenaga Kerja
1 Pekerja Oh 0.300 Rp 85,000.00 Rp 25,500.00
2 Mandor Oh 0.010 Rp 157,000.00 Rp 1,570.00
Jumlah Harga Tenaga Kerja Rp 27,070.00
B Bahan
1 Pasir urug M3 1.200 Rp 233,000.00 Rp 279,600.00
Jumlah Harga Bahan Rp 279,600.00
Jumlah Rp 306,670.00
Overhead + Profit (10%) Rp 30,667.00
Harga Satuan Pekerjaan Rp 337,337.00
A.2.3.1.14 Pengurugan 1 M3 Sirtu padat
A Tenaga Kerja
1 Pekerja Oh 0.250 Rp 85,000.00 Rp 21,250.00
2 Mandor Oh 0.025 Rp 157,000.00 Rp 3,925.00
Jumlah Harga Tenaga Kerja Rp 25,175.00
B Bahan
1 Sirtu M3 1.200 Rp 261,500.00 Rp 313,800.00
Jumlah Harga Bahan Rp 313,800.00
Jumlah Rp 338,975.00
Overhead + Profit (10%) Rp 33,897.50
Harga Satuan Pekerjaan Rp 372,872.50
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.2 Pemasangan 1 M3 Pondasi batu belah / Gunung camp. 1SP : 4PP
A Tenaga Kerja
1 Pekerja Oh 1.300 Rp 85,000.00 Rp 110,500.00
2 Tukang Batu Oh 0.750 Rp 110,000.00 Rp 82,500.00
3 Kepala Tukang Oh 0.075 Rp 150,000.00 Rp 11,250.00
4 Mandor Oh 0.075 Rp 157,000.00 Rp 11,775.00
Jumlah Harga Tenaga Kerja Rp 216,025.00
B Bahan
1 Batu Gunug M3 1.200 Rp 250,000.00 Rp 300,000.00
2 Semen Portland Kg 163.000 Rp 1,600.00 Rp 260,800.00
3 Pasir Pasang M3 0.520 Rp 380,000.00 Rp 197,600.00
Jumlah Harga Bahan Rp 758,400.00
Jumlah Rp 974,425.00
Overhead + Profit (10%) Rp 97,442.50
Harga Satuan Pekerjaan Rp 1,071,867.50
A.3.2.1.9 Pemasangan 1 M3 Batu kosong (anstamping)
A Tenaga Kerja
1 Pekerja Oh 0.780 Rp 85,000.00 Rp 66,300.00
2 Tukang Batu Oh 0.390 Rp 110,000.00 Rp 42,900.00
3 Kepala Tukang Oh 0.039 Rp 150,000.00 Rp 5,850.00
4 Mandor Oh 0.039 Rp 157,000.00 Rp 6,123.00
Jumlah Harga Tenaga Kerja Rp 121,173.00
B Bahan
1 Batu Gunug M3 1.200 Rp 250,000.00 Rp 300,000.00
2 Pasir urug M3 0.432 Rp 233,000.00 Rp 100,656.00
Jumlah Harga Bahan Rp 400,656.00
Jumlah Rp 521,829.00
Overhead + Profit (10%) Rp 52,182.90
Harga Satuan Pekerjaan Rp 574,011.90
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.7 Membuat 1 M3 beton mutu f'0 = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
A Tenaga Kerja
1 Pekerja Oh 1.650 Rp 85,000.00 Rp 140,250.00
2 Tukang Batu Oh 0.275 Rp 110,000.00 Rp 30,250.00
3 Kepala Tukang Oh 0.028 Rp 150,000.00 Rp 4,200.00
4 Mandor Oh 0.083 Rp 157,000.00 Rp 13,031.00
Jumlah Harga Tenaga Kerja Rp 187,731.00
B Bahan
1 Semen Portland Kg 371.000 Rp 1,600.00 Rp 593,600.00
2 Pasir Beton M3 0.499 Rp 380,000.00 Rp 189,457.14
3 Kerikil (Maks 30mm) M3 0.776 Rp 579,000.00 Rp 449,046.67
4 Air Ltr 215.000 Rp - Rp -
Jumlah Harga Bahan Rp 1,232,103.81
Jumlah Rp 1,419,834.81
Overhead + Profit (10%) Rp 141,983.48
Harga Satuan Pekerjaan Rp 1,561,818.29
A.4.1.1.17 Pembesian 1 kg dengan besi polos atau besi ulir
A Tenaga Kerja
1 Pekerja Oh 0.0070 Rp 85,000.00 Rp 595.00
2 Tukang Besi Oh 0.0070 Rp 110,000.00 Rp 770.00
3 Kepala Tukang Oh 0.0007 Rp 150,000.00 Rp 105.00
4 Mandor Oh 0.0003 Rp 157,000.00 Rp 47.10
Jumlah Harga Tenaga Kerja Rp 1,517.10
B Bahan
1 Besi beton Kg 1.050 Rp 30,906.00 Rp 32,451.30
2 Kawat beton Kg 0.015 Rp 26,765.00 Rp 401.48
Jumlah Harga Bahan Rp 32,852.78
Jumlah Rp 34,369.88
Overhead + Profit (10%) Rp 3,436.99
Jumlah A+B Rp 35,886.98
A.4.1.1.24 Pemasangan 1 M2 bekisting untuk lantai
A Tenaga Kerja
1 Pekerja Oh 0.660 Rp 85,000.00 Rp 56,100.00
2 Tukang Kayu Oh 0.330 Rp 110,000.00 Rp 36,300.00
3 Kepala Tukang Oh 0.033 Rp 150,000.00 Rp 4,950.00
4 Mandor Oh 0.033 Rp 157,000.00 Rp 5,181.00
Jumlah Harga Tenaga Kerja Rp 102,531.00
B Bahan
1 Kayu klas III M3 0.040 Rp 3,898,600.00 Rp 155,944.00
2 Paku 5 - 12 cm Kg 0.400 Rp 35,855.00 Rp 14,342.00
3 Minyak bekisting Ltr 0.200 Rp - Rp -
4 Balok kayu klas II M3 0.018 Rp 6,026,000.00 Rp 108,468.00
5 Plywood tebal 9 mm Lbr 0.350 Rp 301,500.00 Rp 105,525.00
6 Dolken kayu Ø 8-10/400 cm Btg 2.000 Rp 77,972.00 Rp 155,944.00
Jumlah Harga Bahan Rp 540,223.00
Jumlah Rp 642,754.00
Overhead + Profit (10%) Rp 64,275.40
Harga Satuan Pekerjaan Rp 707,029.40
A.4.1.1.29 Membuat 1 M3 beton bertulang (K225)
A Tenaga Kerja
1 Pekerja Oh 1.650 Rp 85,000.00 Rp 140,250.00
2 Tukang Batu Oh 0.270 Rp 110,000.00 Rp 29,700.00
3 Kepala Tukang Oh 0.028 Rp 150,000.00 Rp 4,200.00
4 Mandor Oh 0.083 Rp 157,000.00 Rp 13,031.00
Jumlah Harga Tenaga Kerja Rp 187,181.00
B Bahan
1 Semen Portland Kg 371.000 Rp 1,600.00 Rp 593,600.00
2 Pasir Beton M3 0.499 Rp 380,000.00 Rp 189,620.00
3 Split 2-3 cm M3 0.722 Rp 579,000.00 Rp 418,038.00
Jumlah Harga Bahan Rp 1,201,258.00
Jumlah Rp 1,388,439.00
Overhead + Profit (10%) Rp 138,843.90
Harga Satuan Pekerjaan Rp 1,527,282.90
A.4.1.1.30 Membuat 1 M3 Plat Lantai beton
No Uraian Pekerjaan Sat. Volume Harga Satuan (Rp) Total Harga Satuan (Rp)
1 2 3 4 5 6
A Pekerjaan Jalan
1 Galian Tanah M3 25.000 Rp 74,442.50 Rp 1,861,062.50
2 Urugan Tanah Kembali M3 20.000 Rp 55,385.00 Rp 1,107,700.00
3 Pas. Batu Gunung M3 50.000 Rp 1,071,867.50 Rp 53,593,375.00
4 Urugan Sirtu M3 47.600 Rp 372,872.50 Rp 17,748,731.00
5 Pek. Rabat Jalan M3 88.400 Rp 1,561,818.29 Rp 138,064,736.88
8 Pek. Plesteran M2 60.000 Rp 74,565.26 Rp 4,473,915.60