This report summarizes the results of a quarterly nationwide earthquake drill conducted at Holjogon Elementary School on September 7, 2023. The school was well prepared for the drill, having updated plans, equipment, and first aid kits. A total of 9 staff and 97 students participated in the "duck, cover, and hold" drill and evacuation drill. No issues were encountered during the actual drill. The report was prepared by the School DRRM Coordinator and noted by the School Head.

Uploaded by

JEROME
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views2 pages

NSED Monitoring Tool September

This report summarizes the results of a quarterly nationwide earthquake drill conducted at Holjogon Elementary School on September 7, 2023. The school was well prepared for the drill, having updated plans, equipment, and first aid kits. A total of 9 staff and 97 students participated in the "duck, cover, and hold" drill and evacuation drill. No issues were encountered during the actual drill. The report was prepared by the School DRRM Coordinator and noted by the School Head.

Uploaded by

JEROME
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Department of Education
REGION V
SCHOOLS DIVISON OF MASBATE PROVINCE

REPORT ON THE CONDUCT OF QUARTERLY NATIONWIDE


SIMULTANEOUS EARTHQUAKE DRILL

Date Conducted: SEPTEMBER 7, 2023


Time Started: ________________________________
Time Ended: _________________________________

Region V – BICOL
Division SDO MASBATE PROVINCE
District MOBO NORTH DISTRICT
School HOLJOGON ELEMENTARY SCHOOL

Pre-Drill Yes No
With available Go Bags? 
With updated preparedness, evacuation, and response plans? 
With updated Contingency Plan? 
With available early warning system? 
With available emergency and rescue equipment? 
With available First Aid Kits? 
With available communication equipment (Internet, cellphone, 
two-way radio, etc.)?
With sufficient space in school/classrooms to conduct 
the :Duck, Cover, and Hold”?
Conducted coordination/preparatory meeting with 
LDRRMO/BDRRMCs?
Conducted an orientation to learners and school personnel on 
earthquake preparedness measures and the conduct of
earthquake and fire drills?
Learners have accomplished the Family Earthquake 
Preparedness Homework?
Conducted alternative activities and/or Information, Education, 
and Communication (IEC) campaigns on earthquake
preparedness and fire prevention?
Additional Remarks
Republic of the Philippines
Department of Education
REGION V
SCHOOLS DIVISON OF MASBATE PROVINCE

REPORT ON THE CONDUCT OF QUARTERLY NATIONWIDE


SIMULTANEOUS EARTHQUAKE DRILL

Actual Drill Yes No


Conducted “DUCK, COVER, and HOLD”? 
Conducted evacuation drill? 
Additional Remarks

Number of Personnel Male Female Total


Teaching Personnel 1 6 7
Non-Teaching Personnel 1 1 2
GRAND TOTAL 2 7 9

Number of Learners Male Female Total


Learners 63 34 97
IP Learners
Muslim Learners
Learners with Disability
GRAND TOTAL 97

Post Drill Yes No


Conduct of post-activity exercises like tabletop and functional 
exercises
Additional Remarks

Common issues and concerns encountered during the actual conduct of drill
1. NONE
2. NONE
3. NONE
4. NONE
5. (add additional item/s when necessary)

Prepared by: Noted by:

REYNO B. LUPANGO GLORIA R. OCSING


School DRRM Coordinator School Head
Date: September 7, 2023 Date: September 7, 2023