Building Condition Assessment A Comprehensive Approach in Energy and Facility Management
Building Condition Assessment A Comprehensive Approach in Energy and Facility Management
A Comprehensive Approach in
Energy and Facility Management
Poor . . .
ri
Go
Fa
Total Deficiencies
FCI=(1 - ) X 100
Replacement Costs
od
ri
Poor . . .
Fa
Go
100 95 90
- Meet the current acceptable standards of construction, and comply with regulatory
requirements.
- CRV is not the Insurance Replacement Value, Book Value, or the Market Value
Why FCI?
FCI BCA
Analysis Strategy
Operations
Nadine International Inc. 9
BUILDING CONDITION ASSESSMENT
Validation &
Summary
Why BCA?
BCA
Radio Frequency Identification Device (RFID)
RFID tagging will help reduce the FCI in the following ways:
- Improve the quality of the strategic decision making, due to the accurate and
current data
• Detailed Audit:
- Visual Inspection of the entire building
• Intrusive Assessment:
a) Review existing documentation
b) Conduct Inspection as per Checklists
c) Open the equipment panels
d) Conduct performance tests
e) Record actual condition of the equipment
f) Take digital picture of the deficiencies
g) Identify opportunities for improvements (Energy
Efficiency, accessibility, Codes, etc.)
• Intrusive Audit:
BCA Reports
• Uniformat Code
• Component Name
• Description
• Observations
• Recommendations
• Uniformat Categories
• Cost Allowance
• Service/Actual and
Remaining Life
• Scope of Work
• Quantities/Units
• Rates
• Photos/Attachments
• Percentage of
quantity scheduled
• Estimated future cost
• Uniformat Code
• Budget Cycles
• Annual Projections
• Equipment Naming
Convention
• Equipment Name
• Manufacturer’s Name
• Service Life
• Equipment Location
• Installation Date
• Model/Serial #
• Capacity
• Power Supply
BCA
How BCA Provides Quality and Accuracy
BCA
How BCA Provides Quality and Accuracy
Validation &
Summary
Validation &
Summary
- Includes Contingencies
Validation &
Summary
Validation &
Summary
- Has the quality of the original construction been assessed against life
cycle and the gap identified?
Validation &
Summary
Validation &
Summary
Validation &
Summary
Validation &
Summary
Validation &
Summary
ANALYSIS
Prioritizing Repairs/Replacement/Upgrades
• Priority 1 Immediate Safety, Building Code, Accreditation
Immediate/Critical:
Validation &
Summary
Building Type: Long Term Care Centre with Face Brick & Concrete Block Back-up / Bearing Walls
Cost Per Square Meter: $3,767.90 Cost Per Square Foot: $350.05
Building Cost: $42,773,491.20
Architectural, Engineering, Project Management, and Building Permit Fees - 15% $392.49 $4,455,572.00
A -Substructure $ 117,400.00
B - Shell $ 340,520.00
C -Interiors $ 445,366.00
D- Services $ 522,000.00
FCI poor
10%
ABC LTC fair
5% FCI = 5.53%
good
0% YEAR
A -Substructure $ 117,400.00 $ - $ - $ - $ -
Annual Estimated
Expenditures $ 2,363,486.00 $ 239,992.00 $ 605,152.00 $ 338,281.00 $ 546,992.00
A -Substructure $ - $ - $ - $ - $ -
B - Shell $ - $ - $ - $ - $ -
Annual Estimated
Expenditures $ 1,769,382.00 $ 155,692.00 $ 119,992.00 $ 489,992.00 $ 215,692.00
$2,000,000
$1,769,382.00
$1,500,000
Ser i es1
Ser i es2
$1,000,000
$605,152.00
$546,992.00
$489,992.00
$500,000
$338,281.00
$155,692.00 $215,692.00
$239,992.00
$119,992.00
$0
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 0
ESTIMATED
YEAR FUNDING FCI
EXPENDITURE
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$0
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 0
Estimated
YEAR Funding FCI
Expenditure
2011 $ 2,363,486.00 $ - 5.53 % Fair
2012 $ 239,992.00 $ - 6.09 % Fair
2013 $ 605,152.00 $ - 7.50 % Fair
2014 $ 338,281.00 $ - 8.29 % Fair
2015 $ 546,992.00 $ - 9.57 % Fair
2016 $ 1,769,382.00 $ - 13.71 % Poor
2017 $ 155,692.00 $ 6,018,977.00 14.07 % Poor
2018 $ 119,992.00 $ 119,992.00 0.28 % Good
2019 $ 489,992.00 $ - 1.15 % Good
2020 $ 215,692.00 $ - 1.65 % Good