On behalf of ABB, I am pleased to present this proposal to International Paper for capacitor
replacements for the Innovation drives on the pulp machine.
ABB has provided a detailed proposal for this effort in the sections that follow this cover letter.
If you have any questions concerning this proposal, please contact me at (843)-270-8243 or
[email protected].
Sincerely,
ABB Inc.
Daniel J. Osthoff
Sr. Account Manager
Proposal #: DFM-230428-1
Scope of Supply
The capacitor replacements are for the following Innovation AC drives currently in operation at the New
Bern, NC site.
Equipment List
Drives
• IPN Frame Size 92 Frame version A 11 drives; each qty. 2 Capacitor’s 4200 uf
• IPN Frame Size 620 Frame version A 2 drives; each qty. 12 Capacitor’s 4200 uf
• IPN Frame Size 250 Frame version A 2 drives; each qty. 8 Capacitor’s 4200 uf
• IPN Frame Size 65 Frame version A 1 drive; each qty. 2 Capacitor’s 4200 uf
Sources
• 1000 frame 1 drive; each qty. 24 Capacitor’s 4200 uf
• 375 frame 1 drive; each qty. 12 Capacitor’s 4200 uf
B. Field Engineering
Work scope detailed below will include technical direction to customer provided craft labor for the
capacitor replacement. The work scope is estimated as five (5) consecutive days, including travel,
during standard weekday hours.
Outage Services
• Perform capacitor replacements on all drive equipment listed above
• Perform motor/drive connection checks at the drive
ABB will provide one (1) field engineer for the outage tentatively scheduled for the last week of
September, 2023. The pricing is based on 5 days, 12 hours per day + travel time in and out and is based
on performing the services during normal weekdays.
IP-New Bern is to provide the craft labor for replacing the capacitors for the entire outage.
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 2 of 10
Proposal #: DFM-230428-1
Additional services can be provided per the ABB US Services Rate Sheet for 2023 at the end of this
quote.
Pricing Summary
Order Placement
If this proposal meets with your approval, please submit your purchase order referencing proposal
number DFM-230428-1 either VIA fax 440-585-5081 or e-mail it to [email protected] with
attention of:
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 3 of 10
Proposal #: DFM-230428-1
Additional Services
Should the Buyer desire to have ABB perform additional services beyond the scope of services
described in this proposal, a change order request will be submitted for the additional associated
costs. No additional services shall proceed without written authorization from the Buyer. Additional
services will be performed per our published rates for Service, applicable at the time that worked is
performed, including work that extends through the weekend / holiday. The current rates for Service
can be found in Attachment “A”.
Buyer’s Responsibilities
The Buyer’s responsibilities shall include, but are not limited to, the following:
• Issue switching orders, schedule outages, and de-energize the electrical apparatus, including
Lock-Out Tag-Out (LOTO) of all systems associated with ABB’s work scope involved in the
project. LOTO procedures shall meet or exceed Contractor or ABB’s requirements, whichever
are more stringent.
• Prior to the start of the on-site work, Buyer shall familiarize ABB personnel with their safety
practices, regulations in effect at jobsite, and any chemical and physical hazards, including
process safety issues associated with the work environment. ABB shall be under no obligation
to commence work unless safety practices are acceptable to ABB. As a safety precaution, prior
to the commencement of work, access to a nearby telephone with the ability to call outside the
facility will be provided by Buyer, as well as telephone numbers for local emergency services.
• Buyer will dispose of all wastes generated at the work site. Buyer will be responsible for
environmental conditions and will keep the equipment free of contaminants that would be
detrimental to the performance of the equipment.
• Buyer shall be responsible for the removal and replacement of any obstructions that may
interfere with access to or removal of the existing equipment
• Buyer will provide an experienced electrician or electrical supervisor familiar with the power
distribution system and trained in electrical safety and emergency response procedures
including CPR, AED, and first aid for purposes of:
- Directing ABB personnel in identifying and isolating the proper electrical equipment.
- Shutting down electrical equipment in an emergency and providing emergency response
during high risk operations including electrical work when a single ABB representative is
dispatched. This person must be visually present during all electrical work and high risk
operations. If not present then ABB will stop work and notify the Buyer.
- Complying with OSHA 1910.269(l)(1) and 1910.269(b)
• Buyer shall provide one (1) copy of existing system schematics, drawings and other information
regarding the equipment/site that is needed and be responsible for the accuracy of same and
verbal information concerning existing conditions and wiring.
• All communication between, including meetings, all documents, notes on drawings, and
submissions required under contract, shall be in the English language. Any language
translation, of required, will be the responsibility of the Buyer.
• Buyer must supply minimum power supply of 120V, 1-Phase, power source, if necessary.
• Buyer will provide/operate/maintain services for drinking water, sanitary facilities, parking,
trash containers, and lighting.
• Buyer to provide craft labor with tools and equipment to assist field engineer working on site, if
necessary.
• Buyer to supply, operate, and maintain all standard services to the site facility, such as electric
power, lighting, water, air, etc., if required. Backup for these systems is not included in this
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 4 of 10
Proposal #: DFM-230428-1
proposal. These services are to be made available to ABB, including a suitable source of 60Hz
120/240 volts AC, unless otherwise provided herein.
• Buyer to provide, and be responsible for, applicable codes, standard, laws, regulatory
requirements, etc. required for the development of functional specification and system design
and operation.
• Buyer shall be responsible for the review of the installation to assure compliance with
applicable codes. It is the intention of ABB to comply with the applicable codes, standards,
laws, regulatory requirements, etc.; however, by law it is the responsibility of the Buyer for
compliance of the total installation. ABB would be pleased to quote any additional features or
equipment that the Buyer deems necessary to meet these requirements
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 5 of 10
Proposal #: DFM-230428-1
• Should any unforeseen work delays beyond the control of ABB occur, including those as a result
of malfunctions or deficiencies encountered with the equipment (unless caused by ABB) or
should the Buyer desire to have ABB perform work beyond the scope of work described in this
proposal, that work will be billed at the published rates in effect at the time of performance of
that the work scope and will apply to all ABB project management, field engineers, field
engineering service technicians and/or craftsmen.
• ABB expressly objects to any requirements, methods or conditions contained in any Buyer
request that are not specifically addressed in this document, and such requirements, methods
and conditions, if any, are outside the scope of this proposal.
• Schedule: Unless otherwise stated in the scope, all work will be performed on a straight time
basis. All work is to be performed on a mutually agreeable schedule. The foregoing work as
described under work scope shall be performed during normal working hours Monday through
Friday, Holidays excepted. If work is performed on an overtime basis, the premium for the time
spent and other applicable cost will be billed in addition to the price quoted and will be billed at
our published rates in effect at the time work is performed. Time and expense of ABB
employees' travel from their headquarters to work site and return, shall be considered as time
worked. ABB requires a minimum two (2) weeks advance notice to ensure availability of
resources.
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 6 of 10
Proposal #: DFM-230428-1
Appendix A
Agreed liquidated damages, any actual damages, penalties or other fines, otherwise payable by ABB
shall not apply for delays directly or indirectly caused by the Excusable Event. Customer cannot invoke
such a delay as a cause for termination/cancellation of the Contract/Order, unless otherwise agreed
between the Parties.
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 7 of 10
Proposal #: DFM-230428-1
Delivery
The delivery of this upgrade will be determined at the project kick off meeting, which will be supported
via teleconference or e-mail. Typical lead time is sixteen to twenty weeks from acceptance of order.
ABB Service
All services are provided per the terms in ABB’s Standard Rate Sheet (attached). If International Paper ,
has a pricing agreement/service contract in place with ABB Inc., those terms/rates will be used.
Payment Terms
ABB’s proposal is based on the following payment terms, net 30. If International Paper , has a payment
term agreement in place with ABB Inc., those terms will be used.
Hardware
• 50% Upon receipt and acceptance of customers purchase order for hardware
• 50% Upon shipment of equipment
On-Site Service
• 100% Upon completion of on-site services
Shipping
The pricing for this proposal is based on shipment FOB Factory, Louisville, KY. Domestic Packing is
included; freight prepaid and add.
Proposal Validity
This Proposal is subject to acceptance within thirty (30) days from the date of proposal. All prices,
schedules, and technical descriptions are valid throughout this period.
Confidentiality
The information contained in this proposal is proprietary to ABB Inc. and may not be disclosed to any
third party or company without the written consent of ABB Inc. – Cleveland, Ohio USA.
NOTE: ABB is not licensed to resell/transfer software and/or license keys. Without this license, we are
legally unable to purchase on behalf of the end user and deliver Windows and VMWare physical media
and license keys. ABB’s licensing agreement only allows ABB to purchase and use these products as a
deployed solution to end user. ABB retains ownership of these licenses as part of the deployed
solution. End users whom want ownership of the Windows physical media/license keys will need to
purchase these items directly and supply to ABB for system installation.
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 8 of 10
Proposal #: DFM-230428-1
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 9 of 10
Proposal #: DFM-230428-1
23000 Harvard Road Tel: 1 800 HELP 365 (1 800 435 7365)
Cleveland, OH 44122 USA Fax: 440 585 5081
Page: 10 of 10