Ceiling Works
Ceiling Works
Severit
Severit
Possible Accident / Ill Health & Persons-at-
Likeli-
Likeli-
Action Officer, Designation
hood
Level
hood
Level
No. Work Activity Hazard Existing Risk Control Additional Risk Control
Risk
Risk
y
y
Risk (Follow-up date)
1 Preparation of Tools laying in the Sprain and bruises Plan and arrange all equipments and tools in a 3 1 3 NA
tools and materials floor may cause slip orderly manner.
and fall. Remove unnecessary items in the work area and
ensure accessways are free from obstruction.
Tools and materials must be properly barricaded
and put up temporary storage area signage.
Ensure materials, tools and equipments are in
good condition. (physical condition and valid cert.)
Improper Lifting or handling Back ache and Maintain correct work posture. 3 1 3 NA
(Manual Handling) Back pain. Wear appropriate PPE ( Leather gloves,
goggles, safety helmet and safety shoes)
Buddy system if the load to lift is above 25 kg.
Falling object Head and Body Injury/ Always secure loose tools and materials during 4 1 4 NA
Due to unsecured tools Damage to properly. the activity and climbing up/down the ladder.
2a Provision of work platform Unsecured tools Head and Body Injury/ Always secure loose tools and materials during 4 1 4 NA
(Mobile Scaffold Erection and and scaffold materials. Damage to properly. the activity and when climb up/down the ladder.
Page 1 of 4 NEX-RA-19.5
Required PPE : (Safety Shoes/Helmet with Chin Strap/Safety Harness/Safety Glasses/Working Gloves/Ear Protection must put on).
Severit
Severit
Possible Accident / Ill Health & Persons-at-
Likeli-
Likeli-
Action Officer, Designation
hood
Level
hood
Level
No. Work Activity Hazard Existing Risk Control Additional Risk Control
Risk
Risk
y
y
Risk (Follow-up date)
Failure to secure fall protective Serious Physical Injury To wear safety harness when working above 2 5 1 5 NA
equipment. meters and to secure in the proper anchorage points.
(Use of A Frame Ladder) Defective Ladder/Improper Body Injury To check ladder condition before use. 3 1 3 NA
use of ladder Comply with ladder checklist.
Ladder must be placed on a firm ground.
Ensure one person must hold the ladder when in
use.
Proper PPE (Safety helmet, Safety Boots, Safety
goggles, Leather gloves, Ear protection and
cover all clothing.
Do not carry any tool when climbing up/down
a ladder.
Hand tool must be secured by holding firmly using
hand gloves during the work.
Do not stand on the last 2 rang of the ladder.
Do not lean the ladder at any equipment or piping
or at electrical panel.
Do not place the ladder or leave the ladder in a
obstruction manner at any passage way.
Bring the ladder back to its designated location.
4a Site Measurement Failure to secure fall protective Serious Physical Injury PTW must be verified and approved before 5 1 5 NA
and remove swayed equipment. the start of the procedure.
bracket support Brief the workers on the importance of wearing PPE
during the tool box meeting.
Provide full body harness to all workers.
Maintain 100% tie off all through out the procedure.
Page 2 of 4 NEX-RA-19.5
Required PPE : (Safety Shoes/Helmet with Chin Strap/Safety Harness/Safety Glasses/Working Gloves/Ear Protection must put on).
Severit
Severit
Possible Accident / Ill Health & Persons-at-
Likeli-
Likeli-
Action Officer, Designation
hood
Level
hood
Level
No. Work Activity Hazard Existing Risk Control Additional Risk Control
Risk
Risk
y
y
Risk (Follow-up date)
Pinch Point Hazards Hand Injury Be aware of areas with pinch points or impact points, 3 1 3 NA
this issue must be highlighted and discuss during
5 Install new Support Materials may sudden- Head Injury Ensure tools being used are properly tied with sling 3 1 3 NA
Bracket and new ly give way during drilling and rope to prevent from falling.
ceiling boards installation of new ceiling board, Do not leave loose tools or materials on the
it may drop off to the workers. mobile scaffold platform.
(Falling object) To barricade the area of operation and display
warning signages to prevent unauthorized entry.
Look out for workers or any passers by during the
removal of support bracket and installation
of new ceiling boards.
Clear bottom office area before start of work.
Ensure toeboard is installed at the platform before
work commence.
Failure to secure harness at Fractures and Bruises To put on safety harness when working 3 1 3 NA
proper anchorage points. above 2 meters and secure at proper anchorage
(Fall from heights) points.
Working to a more than 3 meter hieghts equires PTW
for WAH, apply and brief all workers on the hazards
and control measures for working at heights.
To maintain 3 point contact when climbing
up/down a ladder.
To ensure travel restraint system when
working at an unprotected edges or opening
including manhole openings.
Barricade and put up warning signage to prevent
unauthorized entry in the area.
To inspect harness, lifelines, connectors and
other safety devices before use.
Ensure mobile scaffold wheel is locked when in use.
6a Surface preparation Electrical hazard Serious Physical Injury Ensure there is no sign of exposure or damage on 5 1 5 NA
drilling and use other Contact with exposed live or the cables before use.
power tools. damaged cables, Defective Ensure that the safety guard provided is intact
equipments. before use.
Page 3 of 4 NEX-RA-19.5
Required PPE : (Safety Shoes/Helmet with Chin Strap/Safety Harness/Safety Glasses/Working Gloves/Ear Protection must put on).
Severit
Severit
Possible Accident / Ill Health & Persons-at-
Likeli-
Likeli-
Action Officer, Designation
hood
Level
hood
Level
No. Work Activity Hazard Existing Risk Control Additional Risk Control
Risk
Risk
y
y
Risk (Follow-up date)
certificates.
Wires and hose must be properly arrange and
secure with "S" hook.
Apply for hot work permit before work commence.
Struck by (Flying particles/Object) Eye Injury. Ensure to wear safety goggles / face shield to protect 3 1 3 NA
the eyes / face from flying particles.
Barricade the part of drilling and grinding area
with canvass to prevent dust from going into the
laboratory.
Pinch Points Cuts and Bruises Be cautious of correct work posture, hand 3 1 3 NA
during the installation of movements to prevent being caught in between.
bolts and nuts. Wear appropriate hand protective gloves.
Dusty atmosphere due to Respiratory Problem, Use dust mask ( N95 ) when dealing with dusty 2 1 2 NA
drilling works. Product contamination atmosphere.
at the laboratory. Use the improvised container attached in the
drilling machine to minimize dusty atmosphere due
to drilling works.
Ensure to wear safety goggles / face shield to protect
the eyes / face from flying particles.
Barricade the part of drilling and grinding area
with canvass to prevent dust from going into the
laboratory.
7 House keeping Poor house keeping. Fractures and Bruises Do not block access ways and ensure clearance 3 1 3 NA
Oil and toxic waste materials Water Pollution into drain / common drain.
Page 4 of 4 NEX-RA-19.5
Required PPE : (Safety Shoes/Helmet with Chin Strap/Safety Harness/Safety Glasses/Working Gloves/Ear Protection must put on).
Severit
Severit
Possible Accident / Ill Health & Persons-at-
Likeli-
Likeli-
Action Officer, Designation
hood
Level
hood
Level
No. Work Activity Hazard Existing Risk Control Additional Risk Control
Risk
Risk
y
y
Risk (Follow-up date)
Page 5 of 4 NEX-RA-19.5
Page 6 of 4 NEX-RA-19.5
NEX-SWP-19.5 REMOVAL AND INSTALLATION OF NEW SUPPORT BRACKET AND CEILING BOARD
1.0 - Purpose:
This Safe Work Procedure is developed to fulfil the requirement of the WSH Regulations.
2.0 - Scope: This instruction applies to all employee, contractors and representative of
company. This procedure shall be read in conjuntion with other Safe
Work Procedure and the WSH.
3.0 - Related NEX-RA-19.5
Document:
4.0 - Location Of CCR North Hall way
Task/equipment:
5.0 - Work Steps: a) Preparation works (Mobilization)
b) Provision of work platform (Mobile scaffold erection and dismantle, Use of
A Frame Ladder)
c) Site measurement and removed swayed bracket support.
d) Install new support bracket and new ceiling board.
e) Surface preparation, drilling and use other power tools.
f) Housekeeping.
9.0 - Records a) - Hard copy of SWP, RA and PTW shall be available on the premises at all times.
Prepared By:
Name & Signature: Position: WHSC
Date: 19.03.18
Approval,
Name & Signature: Position: Manager
Date: 19.03.18