GABUNGAN BINAAN JURUTENAGA SDN BHD.
4 Sept 2020
Ir. Dr. Hj Abang Hatta Bin Abang Taha (MR)
Mr. Gabriel Anak Michael Tomi
En. Abang Asmadi Bin Abang Taha
Mr. Joe Mclaren Anak Tommy
Mr. Mark Anak Selat
En. Abang Lutfy Bin Abang Taha
En. Halek Bin Zainal Abidin
Ms. Susan Anak Ado
En. Saharrudin Bin Abdol Wahet
RE: MANAGEMENT REVIEW AGENDA
Please be informed that the Management Review meeting will be held on 18 Sept 2020 at 0900 at the
Office. The agenda for the meeting is as follows:
No Review Input Responsibility |
1_| the status of actions from previous management reviews, MR and HOD
> _ | changes in external and internal issues that are relevant to the HSE
management system, including
2:1 | the needs and expectations of interested parties; MR and HOD
2.2 | legal requirements and other requirements, MR and HOD
2.3 | fisks and opportunities; MR and HOD
3 _| the extent to which the HSE policy and the HSE objectives have been | HOD
met;
4 _| information on the HSE performance, Including trends in
41 | incidents, nonconformities, corrective actions and continual improvement; _| MR and HOD
[42 | monitoring and measurement results; MR and HOD
143 | T28ulls of evaluation of compliance with legal requirements and other MR and HOD |
requirements;
444 | audit results; UR
[45 | Consultation and participation of workers; MIR and HOD
46 | risks and opportunities; MR and HOD
5 | adequacy of resources for maintaining an effective HSE management | MR and HOD
system,
@ _| relevant communication(s) with interested parties, MIR and HOD
7__ | opportunities for continual improvement MR and HOD
Management Representative Approved by:
be ia
En. Saharudin Bin Abdol Wahet
ir Dr. Hy, Abang Hatta Bin Abang Taha
(Managing Director)GABUNGAN BINAAN JURUTENAGA SDN BHD
Minutes of The 14" HSE Management Review Meeting
Held at Conference Room on 18" Sept 2020 at 09.00am
Present : In. Dr. Hj Abang Hatta Bin Abang Taha (MR) - Managing Director
Mr. Gabriel Anak Michael Tomi — Project Manager
En, Abang Asmadi Bin Abang Taha Project Manager
Mr. Joe Mclaren Anak Tommy ~ Project Manager
Mr. Mark Anak Selat ~ Construction Manager
En. Abang Lutfy Bin Abang Taha - Supervisor
En, Halek Bin Zainal Abidin - Supervisor
Ms. Susan Anak Ado - Admin
En. Saharrudin Bin Abdol Wahet ~ Safety Officer
Minutes taken by
: En. Saharrudin Bin Abdol Wahet
Welcome Speech by MD
MD as chairman welcome all the staff present in this 14° HSE Info
Management Review meeting. He also highlighted that the
Management Review meeting is very important to review the
effectiveness and problems encountered during the implementation
of ISO 14001 & IS045001 Integration Management System in the
company.
He announces that the OHSAS18001:2007 OHSAS had been
upgraded to IS045001:2018 version and start implement from
01/08/2020,
1.0 | The status of actions from previous (13 ) HSE management
reviews
After discussion, all agreed that the previous (13) Management Info
Review Meeting Minutes is acceptable and no changes required
‘The Management decided to adopt and accept the previous
Management Review Meeting Minutes.
| The 13" minutes of meeting was proposed by Mr. Gabriel, And
seconded by Ms, Susan.
2 | Changes in external and internal issues that are relevant to the
HSE management system, including:
2.1 | The needs and expectations of interested parties, including
compliance obligations: MR/HOD
The needs and expectations / risk of interested parties was
determined and assessed in Risk Assessment Analysis,
2.2 | Legal requirements and other requirements; MR/HOD
MR / Committee has reviewed the register of applicable legal &
other requirements and confirmed changes was make to GBJ— LOI
Page 1 of 6GABUNGAN BINAAN JURUTENAGA SDN BHD.
Cont.
to GBJ — L04 (1/8/2020),
The MR reported that there is no significant change that could affect
the IMS.
23
Risks and opportunities;
The risks and opportunities of internal & external context were
| determined and assessed in Risk Assessment Analysis,
MR/HOD
24
External and internal issues that are relevant to the HSE
management system:
As the OHSMS was newly upgraded from OHSAS18001:2007
version to 1S045001:2015 version. The HSE external and intemal
issues were newly updated and monitored. The changes in external
and internal issues that are relevant to the HSE management system
will be discussed on the next management review meeting.
MR/HOD
‘The extent to which the HSE policy and the HSE objectives have
been met;
HSE Policy & Objectives have been amended on 1/8/2020 and
approved by MD.
‘The extent to which HSE objectives have been achieved;
1. Ensure all workers ineluding persons who work on our behalf
are trained on HSE awareness for next 12 months.
HSE Training was conducted for past 12 months (Appendix 1).
However, below items need to improve:
a) To ensure all GBJ & sub-contractor workers work at site to
have valid CIDB Green Card.
b) Management to ensure all supervisors is well trained in HSE
awareness, such as SSS, HIRARC, Work at height, Schedule
waste management, Accident Investigation.
©) To ensure all evidence of compliance are filed properly, such
as competency certificates, licenses, reports, CIDB green
cards,
2. Reduce of moderately serious & non serious incidents by 50%
over the next 12 months
According to Appendix 1, the objective was achieved. There is no
serious & non serious incidents happened on past 12 months (refer to
Incident & Accident Statistic Monitoring).
3. Achieve Zero valid HSE complaint from interested parties for
next 12 month:
According to Appendix 1, the objective was achieved. There was no
valid HSE complaint from interested parties for past 12 month. The
management programme has been updated monthly,
HOD/PM/CM.
ASAP
Page 2 of 6GABUNGAN BINAAN JURUTENAGA SDN BHD
(Cont. | 4. Achieve Zero fatality or serious injury (hos
than 3 days) over the next 12 months. MR/HOD
According to Appendix 1, the objective was achieved. There was no
fatality and serious injury happening for past 12 month. The
management programme has been updated monthly by Admin
Personnel.
5. Promote consultation and participation of workers through
HSE commit ting & training periodically.
According to Appendix 1, the objective was achieved. HSE
committee meeting & training was conducted.
4.0 _| Information on the HSE performance, including trend:
4.1 | Incidents, nonconformities, corrective actions and continual
improvement;
1. Status Of Incident Investigation MR/HOD
No Incident occurred.
2. Status of Corrective Actions
2.1 Process Non Conformance
There is no process, HSE issue and accident happening since
1/2020, hence, No NCR issued.
2.2 Interested Parties Comments / Complaint
There is no interested parties comments / complaint since 1/2020,
hence, No NCR issued.
2.3 HSE Internal Audit
20 Observation (13 + 7) was recorded during 11/9/2020 HSE
audit, and all were closed.
1. To source & participate to more new project tenders.
2. To do more housekeeping and cleaning in project area.
Admin
1. To improve the document filing system.
42 | Monitoring and measurement results; MR/HOD
There is no schedule waste are involved during the construction
43 | Results of evaluation of compliance with legal requirements and | MR/HOD
other requirements;
Page 3 of 6‘Cont.
GABUNGAN BINAAN JURUTENAGA SDN BHD
C Evaluations Of Compliance Legal Requirements &
Other Requirements
Legal committee has gone through all the applicable legal
requirements, EQA, FMA, Uniform Building by law and OHSAS
‘Act. The applicable legal has been summarized and updated in
GBIJ — LO1 to LO4. Other requirements shall include relevant codes
of practice and interested parties’ requirements like client, neighbor
requirements.
‘Those documents also include the activities that are related to
applicable legal as well as their compliance status. To date, GBI
need to improve on below
a) SDS —Need to file properly.
b) PMT/ PMA - Need to file properly.
©) Competency Certificate - Need to file properly (such as
SHO, SSS, Crane Operator, Scaffold Erector, Authorized
Entrant and Standby Person (AESP), Authorized Gas Tester
and Entry Supervisor (AGTES)).
4) HIRARC — Need to review and revise frequently.
€) First Aid Box — Need to check from time to time,
£) DOSH Site Registration — All project sites need to register
with DOSH.
MR/HOD
44
Internal & external audit results;
1 Internal Audit
‘The Internal HSE Audit conducted on 11 Sept 2020 at Kuching HQ
and SARES project site office. 20 observations have been issued and
closed.
INFO
a5
Mr. Saharrudin mentioned the internal HSE audit has been properly
conducted for the ISO14001 & IS045001 IMS. Hence, he plans to
give more briefing to staff so that they can implement the IMS more
effectively. MD instructed all outstanding NCRs and observations
must be verified by 25/9/2020.
2 Evaluation of Auditor
‘MD has gone through the audit note, observations and NCRs. He is
happy with the auditors’ performance. He is confident the auditors
can conduct the HSE audit more effective next time.
3 External Audit
The last 1* Surveillance audit will be conducted by GIC:
a) Audit Date : 29-30/8/2019
b) Standard : ISO 9001:2015 / ISO 14001:2015 / OHSAS
18001:2007
©) Scope : Construction Of Building And Civil Engineering
Works And Provision Of Mechanical And Electrical
Engineering Services.
MR/HOD
Page 4 of 6GABUNGAN BINAAN JURUTENAGA SDN BHD
(Cont. | The coming 2 Surveillance audit will be conducted by GIC:
a) Audit Date : 1-2" Oct 2020
b) Standard : ISO 9001:2015 / ISO 14001:2015 /
1S045001:2018
©) Scope : Construction Of Building And Civil Engineering MR/HOD
Works And Provision Of Mechanical And Electrical
Engineering Services.
4.5 | Consultation and participation of workers;
PMICM
1 Risk Assessment
assessment has been reviewed in 8/2020. This involved
participation of all the steering committee. The risk assessment
include the environmental impact & aspect assessments, hazard
k assessments and risk & opportunities that cover all
activities as mentioned in scope of registration.
2 Risk Control
After the risk assessments have been confirmed by MD. The
Steering Committee has reviewed and controlled/reduced the
moderate and high risks by considering the following hierarchy :
eliminate the hazard;
© substitute with less hazardous processes, operations,
materials or equipment;
‘use engineering controls and reorganization of work;
* use administrative controls, including training;
* use adequate personal protective equipment.
‘The review findings are recorded in Risk Control List.
3 Investigation of Incident
No Incident Occurred
4 Suggestion For Improvement or Actions Could Affect IMS
‘© Improve on the Enforcement & Monitoring
5.0 | Risks and opportunities; PMICM
L.The risks and opportunities of internal & external context were
determined and assessed in Risk Assessment Analysis.
2. All supervisors are to ensure that all safety control measurement
stated are closely implemented, enforced and monitored at
construction sites. This also include to have proper HSE training to
workers.
3. Management to ensure construction workers are to be supply with
relevant PPEs according to what been stated in the Risk Control
| Requirements (HIRARC /R & 0).
4, Management to ensure HSE budget to be control accordingly.
5. All evidence of compliance such as competency certificate,
licenses, reports must be kept & filed properly.
Page 5 of 6GABUNGAN BINAAN JURUTENAGA SDN BHD
6.0 | Adequacy of resources for maintaining an effective HSE
management system;
Resource Needs By HOD
1. Purchase more PPE
2. Conduct more trainings
7.0 | Relevant communication(s) with interested parties;
The external communication procedure has been implemented;
however, there is no evidence of External Communication Log being} PM/CM
used. Hence, MD instructed Admin personnel to record all the
related HSE correspondence with external parties as follows:
1. Promote the HSE policy
2. Obtain vendor's Safety Data Sheet (SDS)
3. Latest legal and other regulation through Publisher
4. HSE issue with local authorities (incoming & outgoing
correspondence) etc
There is no comment or complaint from interested parties related to
HSE issue since 1/2020.
MD expressed that as the company have three projects in hand all
meeting with Sarawak Energy, consultants and contractors had been
documented in the minutes of meeting. The constructions and
operations of all three projects had been carried out smoothly and
| safely. There is no major complaints from interested parties.
8.0 | Opportunities for continual improvement.
1 File Arrangement
Admin personnel suggested to keep all the relevant HSE records in
file for ease of reference and traceability.
2. Training
MR suggest to conduct more training to enhance staff knowledge on
HSE.
MR/HOD
9.0 | Other Issue
There is no other issue. Hence, meeting adjourned at 12:30pm. Next
meeting will be confirmed by MD.
Prepared by: Approved by:
A
En. Saharrudin Bin Abdol Wahet Ir. Dr. Hj. Abang Hatta Bin Abang Taha
Page 6 of 6: olololololololr Aueoipoued Bulutes)
'g Buljeow sen|wiwos gH YBNo.U) sJe>10M Jo UOHEdioILed pUe UONEYNsUD B}OWOd ¢
syuow ZL
° 0} 0}0]0]0)0/ 0] 0] you aug sono (skep ¢ ueY) aio UoHesi/eydsou) Aun{u) snouas 10 AyJe}e} 0187 AAaIYDY “P|
° ofolololofojolo ‘SuIUOW Z|, KOU 40 Seluied peyseLeqU! Woy jUle|dwIOD ASH pHleA 0187 exaiyoy °e|
o 0}0)o]o]o]o}o| o |syuow zp wou ay sero %0¢ Aq syueplou! snoues uoU g snolies AsyesepoUl 40 eonpeds °Z
1 olololololololr sujuow Z|, KOU 404 ssoueLeMe
ISH Uo peUutes, ase jJeyed sno Uo >JOM oY SUOsied BulpnioU! S19,IOM IIe sNSU “|
g|z ¢
g| Z| ol 8 als
2/8|8/2l ele >| 2] | §
sueway) 8] §] 3 | 3 a| 5) 5) 3/2) 8) 2/2 seanzelao
g| 8) 8) 8) *)2)2
Txpuoddy 0202 1024
GH NGS VOVNILNYNS NVVNIG NVONNEVDpos00 wna]
- oo o - 0
o ° = 0
- so a °
uyupy __ yo2foud MUN/NL —Io
—_— z
= +e
8
= _ oF
——— - - {ae
2
- ~ - or 8
- r zx
_ - — - om
id pny [eusaqu] ISH
0 o 0% TOL
o 0 Z uw
° o er | Balog
o 0 oa
pas019 wN_| PanssiwoN | $40 _[wounsedsg
CHER 5 VDVNILNUNE NVVNIG NVONNE >