WH-04 - Work at Height

This document outlines safety procedures for working at heights above 1.8 meters. It identifies potential hazards such as falling, dropped tools, damaged safety equipment, and adverse weather. The recommended safe procedures include: obtaining a permit for work, using fall protection equipment like harnesses and lanyards, inspecting equipment before use, avoiding working in high winds, maintaining three points of contact, and following standard operating procedures for working at heights. A buddy system is also recommended to provide supervision and act as a lookout.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

WH-04 - Work at Height

This document outlines safety procedures for working at heights above 1.8 meters. It identifies potential hazards such as falling, dropped tools, damaged safety equipment, and adverse weather. The recommended safe procedures include: obtaining a permit for work, using fall protection equipment like harnesses and lanyards, inspecting equipment before use, avoiding working in high winds, maintaining three points of contact, and following standard operating procedures for working at heights. A buddy system is also recommended to provide supervision and act as a lookout.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

‫شركة الحفر العراقية‬

JOB SAFETY ANALYSIS FORM IRAQI DRILLING COMPANY


‫نموذج التحليل اآلمن للعمل‬
‫رقم الوثيقة‬: IDCWI2-24F1 ‫نظام اإلدارة المتكامل‬
INTEGRATED MANAGEMENT SYSTEM

Work at Height (WH)

JOB: WORK AT HEIGHT (Above 1.8m) – WH-01

POTENTIAL HAZARDS
TOOLS /
Conditions or Actions Which RECOMMENDED SAFE PROCEDURES
KEY JOB PROCESS STEPS MATERIALS S/P RISK
Could Cause an Injury / Affect Personal Protective Devices Special Clothing Procedures
USED
Health

1. Prepare PTW & Safety systems Safety Systems  Non Authorized task, No 4B M  All work at height above 1.8m as per IDC HSEMS to
in place prior start work at risk assessment, be controlled under PTW.
height ( >1.8m as per IDC  Tools used at height not  Only authorized personnel to work at height.
HSEMS) logged  Review JSA and conduct PJSM to raise awareness
 Use of non-tethered tools while work at height
 Ensure using tools at height log sheet.

2. Prepare tools if applicable, Working Tools,  Non tethered tools used, 4B M  Assess situation and if tools are to be used, than only
Safety belt and necessary Safety belt. DROPs tethered type to avoid DROPS.
safety tools/equipment for the  Damaged safety belt used  Inspect safety belt and tools prior use, use hard hat
job or improper one. strap while at height.
 Adverse weather such  Assess Weather condition and avoid working in
strong & windy weather. adverse environment such strong windy weather.
 Ensure using tools at height log sheet if tools are taken
at height.

699081416.doc Jan 2003 Page 1 of 3


‫شركة الحفر العراقية‬
JOB SAFETY ANALYSIS FORM IRAQI DRILLING COMPANY
‫نموذج التحليل اآلمن للعمل‬
‫رقم الوثيقة‬: IDCWI2-24F1 ‫نظام اإلدارة المتكامل‬
INTEGRATED MANAGEMENT SYSTEM

3. Start working at height (such Working Tools,  Falling from height. 4B H  Review / Assess with Supervisor how the work will be
working in the derrick outside Safety belt.  DROPS performed prior to commencing
monkey board, working on Man basket  Stricken/Hit by falling tools  Work to be in accordance with SOP for working at
BOPs, working on top of or. Etc. height
houses/caravan, …etc)  Entangled or caught  Ensure buddy system / two workers available for the
between moving part or job
equipment.  Second person provides supervision and look-out role
 Work at heights training must be completed prior to
undertaking work at height
 Work at Heights Awareness training module available
for staff
 Wear full body safety harness and use SRL or lanyard
attached all times while climbing or working on stable
platform or surfaces
 Use hard hat straps all times, use tethered tools and
full PPE.
 DROPS/Red Zone is barricaded and controlled,
 Stand clear of moving parts,
 Use tools at height log sheet (In & Out)

4.  Unprotected edges  Guardrail systems are capable of withstanding,


 Unprotected Handrail without failure, a force of at least 200 pounds (890 N)
 Unprotected Openings applied in a downward or outward direction within 2
inches (5 cm) of the top edge, at any point along the
top rail.
 The top edge height of top rails, or equivalent
guardrail system members, are 42 inches (107 cm),
plus or minus 3 inches (8 cm), above the walking-
working surface
 Ensure all openings are secured,
699081416.doc Jan 2003 Page 2 of 3
‫شركة الحفر العراقية‬
JOB SAFETY ANALYSIS FORM IRAQI DRILLING COMPANY
‫نموذج التحليل اآلمن للعمل‬
‫رقم الوثيقة‬: IDCWI2-24F1 ‫نظام اإلدارة المتكامل‬
INTEGRATED MANAGEMENT SYSTEM

Leader ……………………… Supervisor ……………………… Date


Meeting
Names 1. ………………………….
2. ………………………….
3. ………………………….
4. ………………………….
5. ………………………….
6. ………………………….
7. ………………………….
8. ………………………….
9. ………………………….
10. ………………………….
11. ………………………….
12. ………………………….

Signage/Leader Meeting Signage/Supervisor

699081416.doc Jan 2003 Page 3 of 3