10/13/2023 | Page 1 of 6
Electro-Steam Generator Corp.
50 Indel Avenue
P.O. Box 438
Rancocas, NJ 08073-0438
Phone: 866-617-0764
Fax: 609-288-9078
Toll Free: 866-617-0764
Email:
[email protected]Item # S.S. DS-300 (H), 300 Kilowatt (kW) Double Stack High
Pressure 316L Stainless Steel Electric Steam Generator
Standard Features:
Built by an ASME Certificate holder in accordance with ASME BPVC Section
I - Rules for Construction of Power Boilers ("ASME BPVC Section I"). They also
comply with the requirements outlined in The National Board Synopsis of
Boiler and Pressure Vessel Laws, Rules and Regulations (NB-370) RULES FOR
CONSTRUCTION AND STAMPING section, which for many jurisdictions
include but are not limited to ASME BPVC Section I, ASME CSD-1, ASME B31.1,
and REGISTRATION WITH THE NATIONAL BOARD.
more
Specifications | Amperage | Dimensions | Minimum Clearance | Plumbing Connection Sizes | Included Options |
Options
Specifications
Brands Electro-Steam™
10/13/2023 | Page 2 of 6
Electrical Power Rating 300 kW (75 kW per Box) (4 Boxes)
208 V
230 V
Alternating Current (AC) 360 V
Voltage1 400 V
480 V
600 V
Phase 3
50 Hz
Frequency
60 Hz
Boiler Horse Power 30 bhp (15 bhp per Boiler)
1,035 lb/hr
Steam Capacity2
468.0 kg/hr
124.0 gal/hr
Average Water Consumption3
468.0 L/hr
Gross British Thermal Units
1,004,160 Btu/hr
(BTU) Output4
Maximum Boiler Pressure 100 psi
Operating Pressure 0 to 80 psi
Note for Operating Pressure Factory Set at 80 psi
Maximum Boiler Capacity 53 gal
Note for Maximum Boiler
26.5 Gallons per Boiler
Capacity
Boiler Fill Capacity 44 gal
Note for Boiler Fill Capacity 22.0 Gallons per Boiler
Boiler Material 5 316L Stainless Steel
Cabinet Material 316L Stainless Steel
Plumbing Material6 316L Stainless Steel
10/13/2023 | Page 3 of 6
American Society of Mechanical Engineers (ASME) - Boiler and
Pressure Vessel Code
Industry Standards American Society of Mechanical Engineers (ASME) - CSD-1
Canadian Underwriters Laboratories (cUL)
Underwriters Laboratories (UL)
Amperage
Amperage at 208 Volt (V)
Alternating Current (AC) Voltage 832.7 Amps (208.2 Amps per Box) (4 Boxes)
(3Ø Phase)
Amperage at 230 Volt (V)
Alternating Current (AC) Voltage 785.8 Amps (196.5 Amps per Box) (4 Boxes)
(3Ø Phase)
Amperage at 360 Volt (V)
Alternating Current (AC) Voltage 507.1 Amps (126.8 Amps per Box) (4 Boxes)
(3Ø Phase)
Amperage at 400 Volt (V)
Alternating Current (AC) Voltage 452.9 Amps (113.2 Amps per Box) (4 Boxes)
(3Ø Phase)
Amperage at 480 Volt (V)
Alternating Current (AC) Voltage 360.8 Amps (90.21 Amps per Box) (4 Boxes)
(3Ø Phase)
Amperage at 600 Volt (V)
Alternating Current (AC) Voltage 288.7 Amps (72.17 Amps per Box) (4 Boxes)
(3Ø Phase)
Dimensions
Length 64 in
Width 38 in
Height 63 in
Minimum Clearance
10/13/2023 | Page 4 of 6
Total Length 125 in
Total Width 60 in
Total Height 70 in
Plumbing Connection Sizes
Water Inlet (Shared) 1/2" NPT (Female) - Y-Strainer, Brass
Steam Outlet (Shared) 6" Flange (150 psi, 4-Hole) - 2-1/2" pipe connection
1-1/4" NPT (Male) (x2) - Two Black Pipes routed to the floor;
Safety Valves (x2)(Separate)
one from each Safety Valve.
Drain + MAFD Option (Shared) 1" NPT (Female) - Elbow, Brass
3/4" NPT (Female) - Threaded connection on the bottom of the
Steam Trap (Not Included)
2-1/2" shared Steam Outlet pipe.
Included Options
Two of these options are supplied standard in all double stack
steam generators; the motorized drain valve opens for three (3)
Motorized Automatic Flush and minutes during every start-up. As old water is drained out, fresh
Drain (MAFD) water is cycled in. This drain valve will not open if the pressure
in the steam generator exceeds 5 psi. The electric heaters are
locked out during flush cycle.
Two of these options are supplied standard in all double stack
steam generators; the Transformer steps down the primary
Single Service Transformer7 high voltage supplied for the heaters, in order to provide
120VAC 1Ø for the controls; with this option, only the two (2)
primary high voltage supplies are required.
Manual Low Water Reset trips if the electric heaters shut-off
Manual Low Water Reset8 because of a low water condition. Reset must be manually
pressed to resume steam production.
Two Water Feed Booster Pumps are supplied standard in all
high-pressure double stack steam generators. Each Water Feed
10/13/2023 | Page 5 of 6
Booster Pump increases the incoming water pressure to
Water Feed Booster Pump overcome the operating pressure of each steam generator. Each
Booster Pump requires a 5-150 psi water supply with a
minimum flow rate of 3 gpm (At least 6 gpm is required for
both)
Options
18-Month Warranty (12-Month Standard)
(2) Electric Heaters & (2) Heater Gaskets
Spare Parts Package Includes (2) Sight Glass Tubes & (4) Washers
(1) Pressure Control
(1) Contactor
2-stage, 5-micron water filter installed into incoming water line
5-Micron Water Filter to reduce sediment, dirt, rust, chlorine, and even odor from
incoming water supply.
1 Electro-Steam™ Double Stack electric steam generators are two (2) electric steam boilers stacked inside
one (1) cabinet. They are plumbed together, but not wired together. Double Stack steam generators require
two (2) or four (4) customer specific high voltage feeds, one (1) per Electrical Box - 150 kW models have two
(2) Electrical Boxes to feed and 200 to 480 kW models have four (4).
2 Calculated values are based off of a 212ºF boiler feed-water temperature. However, it must not exceed
140ºF. Temperatures that range between 60ºF and 140ºF, are approximately 80% to 90% of the calculated
values shown.
3 Calculated values are based off of a 212ºF boiler feed-water temperature. However, it must not exceed
140ºF. Temperatures that range between 60ºF and 140ºF, are approximately 80% to 90% of the calculated
values shown.
4 Calculated values are based off of a 212ºF boiler feed-water temperature. However, it must not exceed
140ºF. Temperatures that range between 60ºF and 140ºF, are approximately 80% to 90% of the calculated
values shown.
5 Wetted Surfaces.
6 Wetted Surfaces.
7 Two (2) Single Service Transformer options are included with each double stack electric steam generator.
These options provide 120 VAC 1Ø, 50/60 Hz for each boiler's controls.
8 A Manual Low Water Reset Button is supplied standard with every steam generator, but it is disabled. If this
Reset Button is required as per your local boiler codes, simply plug the two attached wires into the PC-Board
terminals labeled "Reset"
10/13/2023 | Page 6 of 6