Work Complete Report - SF1 Batch Plant

The document reports on work to rectify and refurbish corroded steel structures at a solvent fractionation plant. It provides an executive summary of the project including activities done and planned, as well as reasons for any delays. Detailed plans and diagrams are also included.

Uploaded by

hamidy81
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views10 pages

Work Complete Report - SF1 Batch Plant

The document reports on work to rectify and refurbish corroded steel structures at a solvent fractionation plant. It provides an executive summary of the project including activities done and planned, as well as reasons for any delays. Detailed plans and diagrams are also included.

Uploaded by

hamidy81
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Work Complete Report

Date : 23th Dec 2022


PROJECT SF1 BATCH PLANT Page 1 of 10

PROJECT : TO RECTIFY AND REFURBISH CORRODED STEEL STRUCTURE AT SOLVENT


FRACTIONATION PLANT (REV 1)

1.0 EXECUTIVE SUMMARY


1.1 Activities Done / In Progress
 Work starts at 13/10/2022
 Work ends at 5/12/2022

1.2 Activities Planning


 Touch up work and House keeping

1.3 Reason For Delay


 Detect gas acetone leak (18/10/2022 on 09.30 – 11.00 am)
1 2 3 4

B RCB RCB RCB


RCC RCC RCC RCC
UB3
UB3
UB3

UB3

UB3
4F2
4F4 4F1 4D3

UB3

UB3

UB3

UB3
UB3 UB3
UB3

UB1
UB3

4D2
RCB

RCB

RCB

RCB
UB2

UB2

UB2

UB2
UB3

UB3
4F3

UB3

UB3

UB3

UB3

UB3
UB3

UB3 UB3 UB3 UB3 UB3

4G1
UB3
UB3 UB3

UB3

UB3
UB3

A RCB RCB RCB


RCC RCC RCC RCC

LEVEL 1 (3.0 M)
SCALE 1 = 20

LEGEND A.K.K. ENGINEERING SDN BHD


PLO 774, KAW. PERINDUSTRIAN ZONE 12B,
KAMPUNG PASIR GUDANG BARU,
81700 PASIR GUDANG, JOHOR,
ID DISCRIPTION MALAYSIA.
engineering Tel: 607-254 3511 Fax: 607-254 2511
RCC 500 X 500 REINFORCE CONCRETE COLUMN
RCB 470 X 240 REINFORCE CONCRETE BEAM
UB1 350X 170 M.S. UNIVERSAL BEAM
PLAN VIEW
UB2 250 X 125 M.S. UNIVERSAL BEAM
UB3 203 X 133 M.S. UNIVERSAL BEAM
UC1 305X 305 M.S. UNIVERSAL COLUMN
1 2 3 4

UC1 UC1 UC1 UC1


B UB1 UB1 UB1

UB3
UB3
UB3
UB3 UB3 UB3 UB3 UB3 UB3 UB3 UB3 UB3 UB3

UB3

4D1
UB1

UB1

UB1

UB1
UB3

UB3

UB3

UB3

UB3

UB3

UB3

UB3

UB3

UB3
UB3

UB3 UB3 UB3 UB3 UB3 UB3 UB3 UB3 UB3 UB3
UB3

UB3

UB3
A UB1 UB1 UB1
UC1 UC1 UC1 UC1

LEVEL 2 (6.0 M)
SCALE 1 = 20

LEGEND A.K.K. ENGINEERING SDN BHD


PLO 774, KAW. PERINDUSTRIAN ZONE 12B,
KAMPUNG PASIR GUDANG BARU,
81700 PASIR GUDANG, JOHOR,
ID DISCRIPTION MALAYSIA.
engineering Tel: 607-254 3511 Fax: 607-254 2511
RCC 500 X 500 REINFORCE CONCRETE COLUMN
RCB 470 X 240 REINFORCE CONCRETE BEAM
UB1 350X 170 M.S. UNIVERSAL BEAM
PLAN VIEW
UB2 250 X 125 M.S. UNIVERSAL BEAM
UB3 203 X 133 M.S. UNIVERSAL BEAM
UC1 305X 305 M.S. UNIVERSAL COLUMN
1 2 3 4

UC1 UC1 UC1 UC1


B UB1 UB5 UB5

UB1 UB1 UB1

U U U
B1 B1 B1

B1

B1

B1
U

U
UB1

UB4

UB4

UB4

UB4

UB4

UB4
UB3

UB3

U
B1

B1

B1
B1

U
B1

B1
U

U
UB1 UB1 UB1

A UB1 UB5 UB5


UC1 UC1 UC1 UC1

LEVEL 3 (11.0 m)
SCALE 1 = 20

LEGEND

ID DISCRIPTION A.K.K. ENGINEERING SDN BHD


RCC 500 X 500 REINFORCE CONCRETE COLUMN PLO 774, KAW. PERINDUSTRIAN ZONE 12B,
KAMPUNG PASIR GUDANG BARU,
RCB 470 X 240 REINFORCE CONCRETE BEAM 81700 PASIR GUDANG, JOHOR,
UB1 350X 170 M.S. UNIVERSAL BEAM MALAYSIA.
engineering Tel: 607-254 3511 Fax: 607-254 2511
UB2 250 X 125 M.S. UNIVERSAL BEAM
UB3 203 X 133 M.S. UNIVERSAL BEAM
UB4 356 X 127 M.S. UNIVERSAL BEAM
PLAN VIEW
UB5 457 X 191 M.S. UNIVERSAL BEAM
UB6 305X 305 M.S. UNIVERSAL COLUMN
UC1 305X 305 M.S. UNIVERSAL COLUMN
Work Complete Report
Date : 23th Dec 2022
PROJECT E-PROJECT 2 (700 & 800) Page 5 of 10

2.0 SITE PICTURES

Level 0.00m

Support Column at Vessel 4D3

Level 3.00m

Support Column at 4F4 M.S. Tie beam connect at Concrete Beam


Work Complete Report
Date : 23th Dec 2022
PROJECT E-PROJECT 2 (700 & 800) Page 6 of 10

Level 3.00m

M.S. Tie beam connect at Concrete Beam M.S. Tie beam connect at Concrete Beam

M.S. Tie beam connect at Concrete Beam M.S. Tie beam connect at Concrete Beam

Support Beam for Vessel 4F4, 4F1 & 4D3 Cross Main Beam
Work Complete Report
Date : 23th Dec 2022
PROJECT E-PROJECT 2 (700 & 800) Page 7 of 10

Level 6.00m

New Cross and Tie Beam New Cross and Tie Beam

New Cross and Tie Beam New Cross and Tie Beam

New Cross and Tie Beam New Cross and Tie Beam
Work Complete Report
Date : 23th Dec 2022
PROJECT E-PROJECT 2 (700 & 800) Page 8 of 10

Level 9.00m

New Cross Beam New Cross Beam

Tank Support Beam( View for Bellow) Tank Support Beam( View for Bellow)

Tank Support Beam( View for above) Tank Support Beam( View for above)
Work Complete Report
Date : 23th Dec 2022
PROJECT E-PROJECT 2 (700 & 800) Page 9 of 10

Fabrication Work

Level 3.0m Beams Level 6.0 Beams

Level 9.0m Beams


Work Complete Report
Date : 23th Dec 2022
PROJECT E-PROJECT 2 (700 & 800) Page 10 of 10