0% found this document useful (0 votes)
19 views2 pages

9R4 - ATR42 - Line Maintenance - 01-Jan-2023 - ATR-A-25-64-XX-00001-281A-A - Scheduled Inspection of The First-Aid Kit Condition

Uploaded by

joseaviador73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views2 pages

9R4 - ATR42 - Line Maintenance - 01-Jan-2023 - ATR-A-25-64-XX-00001-281A-A - Scheduled Inspection of The First-Aid Kit Condition

Uploaded by

joseaviador73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

23/2/23, 17:09 9R4 - ATR42 - Line Maintenance - 01-Jan-2023 - ATR-A-25-64-XX-00001-281A-A - Scheduled Inspection of the First-Aid Kit Condition

AIRCRAFT REVISION TAIL NUMBER -


CUSTOMIZATION DOCTYPES TITLE
TYPES DATE MSN
Line ATR-A-25-64-XX-00001-281A-A - Scheduled Inspection of
9R4 ATR42 01-Jan-2023
Maintenance the First-Aid Kit Condition

DM status information

DM Code : ATR-A-25-64-XX-00001-281A-A
Airline : 9R4
Issue Number : 002
Issue Date : Jan 01/23
Breakdown Title : FIRST AID EQUIPMENT
DM Title : Scheduled Inspection of the First-Aid Kit Condition
Applicability : ON A/C MSN ALL
Aircraft Type : ATR42
DM Producer : FB429
Language : Simplified English
Copyright : ATR-A-00-65-XX-10000-021A-D

ON A/C MSN ALL


TASK ATR-A-25-64-XX-00001-281A-A
Scheduled Inspection of the First-Aid Kit Condition
FIN: 5604MX
1. General
A. Reason for the Job
Self Explanatory

2. Job Set-Up Information

A. Work Zones.

ZONE ZONE DESCRIPTION


200 UPPER FUSELAGE BETWEEN FORWARD AND AFT PRESSURE BULKHEADS

B. Referenced Information.

REFERENCE DESIGNATION
ATR-A-25-64-XX-00ZZZ-520Z-A MP - Removal of the First Aid Kit
ATR-A-25-64-XX-00ZZZ-720Z-A MP - Installation of the First Aid Kit

3. Job Set-Up
SUBTASK 2564XX-10100010001
A. Remove the first aid kit Ref. MP ATR-A-25-64-XX-00ZZZ-520Z-A.

4. Procedure
SUBTASK 2564XX-60000010001
A. Check of the First-Aid Kit Condition
(1) Examine the general condition of the first aid kit.
(2) Do a check of the contents of the first aid kit:
(a) For sealed kit:
- Make sure that the seal is not broken.
- Make sure that the kit date is not expired.
- If the date is expired, the first aid kit must be replaced with a new one.

(b) For non-sealed kit:


- Make sure that the kit contains all the items that are recorded on the kit.
- Make sure that these items are in full quantity.

about:blank 1/2
23/2/23, 17:09 9R4 - ATR42 - Line Maintenance - 01-Jan-2023 - ATR-A-25-64-XX-00001-281A-A - Scheduled Inspection of the First-Aid Kit Condition
- Make sure that the date of each item is not expired.
- If the date is expired, the related item must be replaced with a new one or filled again, if possible.

5. Close-Up
SUBTASK 2564XX-10200010001
A. Close Up
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the first aid kit Ref. MP ATR-A-25-64-XX-00ZZZ-720Z-A.

© ATR ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

about:blank 2/2

You might also like