Foundation To Stitch Level: Reinforcement Detail of Column and Shear Wall

This document provides reinforcement details for a column and shear wall (SW 1) that is part of a project located in Gurugram, India. The contractor is T I Engineering Services and the client is Smart World Developers. The summary includes specifications for rebar sizes, shapes, quantities, and placement in the column and shear wall. Bar sizes range from T8 to T20. Placement details include lengths, spacing, lap lengths, and cut lengths. Reinforcement is specified for the foundation, main bars, main rings, rectangular strips, and link zones. Bar quantities and weights are provided for estimating purposes.

Uploaded by

krishan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views5 pages

Foundation To Stitch Level: Reinforcement Detail of Column and Shear Wall

This document provides reinforcement details for a column and shear wall (SW 1) that is part of a project located in Gurugram, India. The contractor is T I Engineering Services and the client is Smart World Developers. The summary includes specifications for rebar sizes, shapes, quantities, and placement in the column and shear wall. Bar sizes range from T8 to T20. Placement details include lengths, spacing, lap lengths, and cut lengths. Reinforcement is specified for the foundation, main bars, main rings, rectangular strips, and link zones. Bar quantities and weights are provided for estimating purposes.

Uploaded by

krishan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

PROJECT :- DDJAY Sec 61 Gurugram

CONTRACTOR :- T I ENGINEERING SERVICES BBS Ref. No.

CLIENT :- SMART WORLD DEVELOPERS Ref. Drgs:


Reinforcement Detail Of Column and Shear Wall

A B a C D E F d G H I J

Sr.No a a c b b f a e
b d a a c a c e b d a
a b b
c b b d c
No. of Bars Per
Bar Shape No of Member Length of Shape Deduction (d Cut Total Dia wise Weight (in Mtr)
Member
Description of Item Grid / Location Des' Bars Spacing Span Nos ø of Bars Lap No. of bend for Each 45
Mark IDs a b c d e f g degree) Length Length 8 10 12 16 20 25 28 32

Foundation to Stitch Level


Cluster-9 Type- C with P7
1 SW 1 (325*800*200) Main bar B 1 1 4 T20 300 2681 800 1 -80 3.70 14.81 14.810
B 1 1 8 T16 300 2681 640 1 -64 3.56 28.46 28.460
B 1 1 6 T12 300 2681 480 1 -48 3.41 20.48 20.480
Main Ring upto footing C 1 1 3 T10 740 740 265 265 75 75 5 -50 2.12 6.35 6.350
Main Ring upto footing C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 466 1 1 7 T10 740 740 265 265 75 75 5 -50 2.12 14.81 14.810
Main Ring C 100 932 1 1 8 T8 740 740 265 265 75 75 5 -40 2.13 17.00 17.000
Main Ring L0 C 75 466 1 1 7 T10 740 740 265 265 75 75 5 -50 2.12 14.81 14.810
Main Ring L0 C 75 466 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 932 1 1 8 T8 265 265 140 140 75 75 5 -40 0.93 7.40 7.400
Main Ring L0 C 75 466 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 466 1 2 7 T8 106 106 140 140 75 75 5 -40 0.61 8.50 8.500
Rectangular striup C 100 932 1 2 8 T8 106 106 140 140 75 75 5 -40 0.61 9.72 9.720
Rectangular striup L0 C 75 466 1 2 7 T8 106 106 140 140 75 75 5 -40 0.61 8.50 8.500
Link Zone L0 C 75 466 1 1 7 T8 265 265 75 75 2 -16 0.67 4.66 4.660
Link Zone C 100 932 1 1 8 T8 265 265 75 75 2 -16 0.67 5.33 5.330
Link Zone L0 C 75 466 1 1 7 T8 265 265 75 75 2 -16 0.67 4.66 4.660
Tie Beam Junction Main Ring L0 C 1 1 3 T10 740 740 265 265 75 75 5 -50 2.12 6.35 6.350
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

2 SW 2 (200*600) Main bar B 1 1 8 T20 300 2689 800 1 -80 3.71 29.68 29.680
B 1 1 4 T16 300 2689 640 1 -64 3.57 14.26 14.260
Main Ring upto footing C 1 1 3 T10 540 140 540 140 75 75 5 -50 1.47 4.40 4.400
Main Ring L0 C 75 466 1 1 7 T10 540 140 540 140 75 75 5 -50 1.47 10.26 10.260
Main Ring C 100 931 1 1 8 T8 540 140 540 140 75 75 5 -40 1.48 11.80 11.800
Main Ring L0 C 75 466 1 1 7 T10 540 140 540 140 75 75 5 -50 1.47 10.26 10.260
Rectangular striup L0 C 75 466 1 2 7 T8 108 140 108 140 75 75 5 -40 0.61 8.56 8.560
Rectangular striup C 100 931 1 2 8 T8 108 140 108 140 75 75 5 -40 0.61 9.78 9.780
Rectangular striup L0 C 75 466 1 2 7 T8 108 140 108 140 75 75 5 -40 0.61 8.56 8.560
Tie Beam Junction Main Ring L0 C 1 1 3 T10 540 140 540 140 75 75 5 -50 1.47 4.40 4.400

3 SW 3 (325*800*200) Main bar B 1 1 12 T20 300 2681 800 1 -80 3.70 44.42 44.420
B 1 1 6 T16 300 2681 640 1 -64 3.56 21.35 21.350
Main Ring upto footing C 1 1 3 T10 740 740 265 265 75 75 5 -50 2.12 6.35 6.350
Main Ring upto footing C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 466 1 1 7 T10 740 740 265 265 75 75 5 -50 2.12 14.81 14.810
Main Ring C 100 932 1 1 8 T8 740 740 265 265 75 75 5 -40 2.13 17.00 17.000
Main Ring L0 C 75 466 1 1 7 T10 740 740 265 265 75 75 5 -50 2.12 14.81 14.810
Main Ring L0 C 75 466 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 932 1 1 8 T8 265 265 140 140 75 75 5 -40 0.93 7.40 7.400
Main Ring L0 C 75 466 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 466 1 2 7 T8 105 105 140 140 75 75 5 -40 0.61 8.48 8.480
Rectangular striup C 100 932 1 2 8 T8 105 105 140 140 75 75 5 -40 0.61 9.68 9.680
Rectangular striup L0 C 75 466 1 2 7 T8 105 105 140 140 75 75 5 -40 0.61 8.48 8.480
Link Zone L0 C 75 466 1 1 7 T8 265 75 75 2 -16 0.40 2.81 2.810
Link Zone C 100 932 1 1 8 T8 265 75 75 2 -16 0.40 3.21 3.210
Link Zone L0 C 75 466 1 1 7 T8 265 75 75 2 -16 0.40 2.81 2.810
Tie Beam Junction Main Ring L0 C 1 1 3 T10 740 740 265 265 75 75 5 -50 2.12 6.35 6.350
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

4 SW 4 (200*900) Main bar B 1 1 8 T16 300 2681 640 1 -64 3.56 28.46 28.460
B 1 1 10 T12 300 2681 480 1 -48 3.41 34.14 34.140
Main Ring upto footing C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200
Main Ring upto footing C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200
Main Ring L0 C 75 466 1 1 7 T10 840 840 140 140 75 75 5 -50 2.07 14.46 14.460
Main Ring C 100 932 1 1 8 T8 840 840 140 140 75 75 5 -40 2.08 16.60 16.600
Main Ring L0 C 75 466 1 1 7 T10 840 840 140 140 75 75 5 -50 2.07 14.46 14.460
Rectangular striup L0 C 75 466 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Rectangular striup C 100 932 1 3 8 T8 105 105 140 140 75 75 5 -40 0.61 14.52 14.520
Rectangular striup L0 C 75 466 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Link Zone L0 C 75 466 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone C 100 932 1 1 8 T8 140 75 75 2 -16 0.28 2.21 2.210
Link Zone L0 C 75 466 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200

5 SW 5 (200*900) Main bar B 1 1 8 T16 300 2634 640 1 -64 3.51 28.09 28.090
B 1 1 10 T12 300 2634 480 1 -48 3.37 33.67 33.670
Main Ring upto footing C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200
Main Ring upto footing C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200
Main Ring L0 C 75 454 1 1 7 T10 840 840 140 140 75 75 5 -50 2.07 14.46 14.460
Main Ring C 100 908 1 1 8 T8 840 840 140 140 75 75 5 -40 2.08 16.60 16.600
Main Ring L0 C 75 454 1 1 7 T10 840 840 140 140 75 75 5 -50 2.07 14.46 14.460
Rectangular striup L0 C 75 454 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Rectangular striup C 100 908 1 3 8 T8 105 105 140 140 75 75 5 -40 0.61 14.52 14.520
Rectangular striup L0 C 75 454 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Link Zone L0 C 75 454 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone C 100 908 1 1 8 T8 140 75 75 2 -16 0.28 2.21 2.210
Link Zone L0 C 75 454 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200

6 SW 6 (325*800*200) Main bar B 1 1 12 T20 300 2634 800 1 -80 3.66 43.86 43.860
B 1 1 6 T16 300 2634 640 1 -64 3.51 21.07 21.070
Main Ring upto footing C 1 1 3 T10 740 740 265 265 75 75 5 -50 2.12 6.35 6.350
Main Ring upto footing C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 454 1 1 7 T10 740 740 265 265 75 75 5 -50 2.12 14.81 14.810
Main Ring C 100 908 1 1 8 T8 740 740 265 265 75 75 5 -40 2.13 17.00 17.000
Main Ring L0 C 75 454 1 1 7 T10 740 740 265 265 75 75 5 -50 2.12 14.81 14.810
Main Ring L0 C 75 454 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 908 1 1 8 T8 265 265 140 140 75 75 5 -40 0.93 7.40 7.400
Main Ring L0 C 75 454 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 454 1 2 7 T8 105 105 140 140 75 75 5 -40 0.61 8.48 8.480
Rectangular striup C 100 908 1 2 8 T8 105 105 140 140 75 75 5 -40 0.61 9.68 9.680
Rectangular striup L0 C 75 454 1 2 7 T8 105 105 140 140 75 75 5 -40 0.61 8.48 8.480
Link Zone L0 C 75 454 1 1 7 T8 265 75 75 2 -16 0.40 2.81 2.810
Link Zone C 100 908 1 1 8 T8 265 75 75 2 -16 0.40 3.21 3.210
Link Zone L0 C 75 454 1 1 7 T8 265 75 75 2 -16 0.40 2.81 2.810
Tie Beam Junction Main Ring L0 C 1 1 3 T10 740 740 265 265 75 75 5 -50 2.12 6.35 6.350
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

7 SW 7 (200*900) Main bar B 1 1 8 T16 300 2634 640 1 -64 3.51 28.09 28.090
B 1 1 10 T12 300 2634 480 1 -48 3.37 33.67 33.670
Main Ring upto footing C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200
Main Ring upto footing C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200
Main Ring L0 C 75 454 1 1 7 T10 840 840 140 140 75 75 5 -50 2.07 14.46 14.460
Main Ring C 100 908 1 1 8 T8 840 840 140 140 75 75 5 -40 2.08 16.60 16.600
Main Ring L0 C 75 454 1 1 7 T10 840 840 140 140 75 75 5 -50 2.07 14.46 14.460
Rectangular striup L0 C 75 454 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Rectangular striup C 100 908 1 3 8 T8 105 105 140 140 75 75 5 -40 0.61 14.52 14.520
Rectangular striup L0 C 75 454 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
a b c b b d c
No. of Bars Per
Bar Shape No of Member Length of Shape Deduction (d Cut Total Dia wise Weight (in Mtr)
Member
Description of Item Grid / Location Des' Bars Spacing Span Nos ø of Bars Lap No. of bend for Each 45
Mark IDs a b c d e f g degree) Length Length 8 10 12 16 20 25 28 32

Link Zone L0 C 75 454 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930


Link Zone C 100 908 1 1 8 T8 140 75 75 2 -16 0.28 2.21 2.210
Link Zone L0 C 75 454 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 840 840 140 140 75 75 5 -50 2.07 6.20 6.200

8 SW 8 (200*600) Main bar B 1 1 8 T20 300 2596 800 1 -80 3.62 28.94 28.940
B 1 1 4 T16 300 2596 640 1 -64 3.47 13.89 13.890
Main Ring upto footing C 1 1 3 T10 540 140 540 140 75 75 5 -50 1.47 4.40 4.400
Main Ring L0 C 75 443 1 1 7 T10 540 140 540 140 75 75 5 -50 1.47 10.26 10.260
Main Ring C 100 885 1 1 8 T8 540 140 540 140 75 75 5 -40 1.48 11.80 11.800
Main Ring L0 C 75 443 1 1 7 T10 540 140 540 140 75 75 5 -50 1.47 10.26 10.260
Rectangular striup L0 C 75 443 1 2 7 T8 108 140 108 140 75 75 5 -40 0.61 8.56 8.560
Rectangular striup C 100 885 1 2 8 T8 108 140 108 140 75 75 5 -40 0.61 9.78 9.780
Rectangular striup L0 C 75 443 1 2 7 T8 108 140 108 140 75 75 5 -40 0.61 8.56 8.560
Tie Beam Junction Main Ring L0 C 1 1 3 T10 540 140 540 140 75 75 5 -50 1.47 4.40 4.400

9 SW 9 (1300*325*200) Main bar B 1 1 6 T25 300 2588 1000 1 -100 3.79 22.73 22.730
B 1 1 30 T20 300 2588 800 1 -80 3.61 108.27 108.270
Main Ring upto footing C 1 1 3 T10 1240 1240 140 140 75 75 5 -50 2.87 8.60 8.600
Main Ring upto footing C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 443 1 1 7 T10 1240 1240 140 140 75 75 5 -50 2.87 20.06 20.060
Main Ring C 100 885 1 1 8 T8 1240 1240 140 140 75 75 5 -40 2.88 23.00 23.000
Main Ring L0 C 75 443 1 1 7 T10 1240 1240 140 140 75 75 5 -50 2.87 20.06 20.060
Main Ring L1 C 75 443 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 885 1 1 8 T8 265 265 140 140 75 75 5 -40 0.93 7.40 7.400
Main Ring L1 C 75 443 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Ring L0 C 75 443 1 7 7 T8 106 106 140 140 75 75 5 -40 0.61 29.75 29.750
Ring C 100 885 1 7 8 T8 106 106 140 140 75 75 5 -40 0.61 34.02 34.020
Ring L0 C 75 443 1 7 7 T8 106 106 140 140 75 75 5 -40 0.61 29.75 29.750
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Tie Beam Junction Main Ring L1 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

10 SW 10 (600*200*265) Main bar B 1 1 8 T20 300 2681 800 1 -80 3.70 29.62 29.620
B 1 1 6 T16 300 2681 640 1 -64 3.56 21.35 21.350
Main Ring upto footing C 1 1 3 T10 540 540 140 140 75 75 5 -50 1.47 4.40 4.400
Main Ring L0 C 75 466 1 1 7 T10 540 540 140 140 75 75 5 -50 1.47 10.26 10.260
Main Ring C 100 932 1 1 8 T8 540 540 140 140 75 75 5 -40 1.48 11.80 11.800
Main Ring L0 C 75 466 1 1 7 T10 540 540 140 140 75 75 5 -50 1.47 10.26 10.260
Main Ring L0 C 75 466 1 1 7 T10 205 205 140 140 75 75 5 -50 0.80 5.57 5.570
Main Ring C 100 932 1 1 8 T8 205 205 140 140 75 75 5 -40 0.81 6.44 6.440
Main Ring L0 C 75 466 1 1 7 T10 205 205 140 140 75 75 5 -50 0.80 5.57 5.570
Rectangular striup L0 C 75 466 1 1 7 T8 108 108 140 140 75 75 5 -40 0.61 4.28 4.280
Rectangular striup C 100 932 1 1 8 T8 108 108 140 140 75 75 5 -40 0.61 4.89 4.890
Rectangular striup L0 C 75 466 1 1 7 T8 108 108 140 140 75 75 5 -40 0.61 4.28 4.280
Link Zone L0 C 75 466 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone C 100 932 1 1 8 T8 140 75 75 2 -16 0.28 2.21 2.210
Link Zone L0 C 75 466 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 540 540 140 140 75 75 5 -50 1.47 4.40 4.400
Tie Beam Junction Main Ring L0 C 1 1 3 T10 205 205 140 140 75 75 5 -50 0.80 2.39 2.390
-
11 SW 11 (600*200*265) Main bar B 1 1 16 T20 300 2681 800 1 -80 3.70 59.23 59.230
Main Ring upto footing C 1 1 3 T10 540 540 140 140 75 75 5 -50 1.47 4.40 4.400
Main Ring L0 C 75 466 1 1 7 T10 540 540 140 140 75 75 5 -50 1.47 10.26 10.260
Main Ring C 100 932 1 1 8 T8 540 540 140 140 75 75 5 -40 1.48 11.80 11.800
Main Ring L0 C 75 466 1 1 7 T10 540 540 140 140 75 75 5 -50 1.47 10.26 10.260
Main Ring L0 C 75 466 1 1 7 T10 205 205 140 140 75 75 5 -50 0.80 5.57 5.570
Main Ring C 100 932 1 1 8 T8 205 205 140 140 75 75 5 -40 0.81 6.44 6.440
Main Ring L0 C 75 466 1 1 7 T10 205 205 140 140 75 75 5 -50 0.80 5.57 5.570
Rectangular striup L0 C 75 466 1 2 7 T8 90 90 140 140 75 75 5 -40 0.58 8.06 8.060
Rectangular striup C 100 932 1 2 8 T8 90 90 140 140 75 75 5 -40 0.58 9.20 9.200
Rectangular striup L0 C 75 466 1 2 7 T8 90 90 140 140 75 75 5 -40 0.58 8.06 8.060
Tie Beam Junction Main Ring L0 C 1 1 3 T10 540 540 140 140 75 75 5 -50 1.47 4.40 4.400
Tie Beam Junction Main Ring L0 C 1 1 3 T10 205 205 140 140 75 75 5 -50 0.80 2.39 2.390

12 SW 12 (200*2350*700) Main bar B 1 1 30 T20 300 2681 800 1 -80 3.70 111.06 111.060
1 1 4 T16 300 2681 640 1 -64 3.56 14.23 14.230
1 1 22 T12 300 2681 480 1 -48 3.41 75.11 75.110
Main Ring upto footing C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
1 2 3 T8 417 417 140 140 75 75 5 -40 1.23 7.38 7.380
1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030
Main Ring(W) C 175 1763 1 2 11 T8 2074 4 -32 2.05 45.02 45.020
Rectangular striup(X) C 100 1763 1 2 19 T8 416 416 140 140 75 75 5 -40 1.23 46.62 46.620
Rectangular striup(Y) C 100 1763 1 2 19 T8 104 104 140 140 75 75 5 -40 0.60 22.92 22.920
Rectangular striup (Z) C 100 1763 1 1 19 T8 640 640 140 140 75 75 5 -40 1.68 31.83 31.830
link Zone (X1) C 250 1763 1 4 8 T8 140 75 75 2 -16 0.28 8.84 8.840
link Zone (Y1) C 100 1763 1 1 19 T8 140 75 75 2 -16 0.28 5.24 5.240
Rectangular striup (Z1) C 100 1763 1 2 19 T8 107 107 140 140 75 75 5 -40 0.61 23.14 23.140
Tie Beam Junction Main Ring(W) C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
Tie Beam Junction Rectangular striup (Z) C 1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030

13 SW 13 (200*800) Main bar B 1 1 4 T20 300 2689 800 1 -80 3.71 14.84 14.840
B 1 1 12 T16 300 2689 640 1 -64 3.57 42.79 42.790
Main Ring upto footing C 1 1 3 T10 740 740 140 140 75 75 5 -50 1.87 5.60 5.600
Main Ring L0 C 75 468 1 1 7 T10 740 740 140 140 75 75 5 -50 1.87 13.06 13.060
Main Ring C 100 935 1 1 8 T8 740 740 140 140 75 75 5 -40 1.88 15.00 15.000
Main Ring L0 C 75 468 1 1 7 T10 740 740 140 140 75 75 5 -50 1.87 13.06 13.060
Rectangular striup L0 C 75 468 1 3 7 T8 106 106 140 140 75 75 5 -40 0.61 12.75 12.750
Rectangular striup C 100 935 1 3 8 T8 106 106 140 140 75 75 5 -40 0.61 14.58 14.580
Rectangular striup L0 C 75 468 1 3 7 T8 106 106 140 140 75 75 5 -40 0.61 12.75 12.750
Tie Beam Junction Main Ring L0 C 1 1 3 T10 740 740 140 140 75 75 5 -50 1.87 5.60 5.600

14 SW 14 (200*2350*700) Main bar B 1 1 30 T20 300 2681 800 1 -80 3.70 111.06 111.060
1 1 4 T16 300 2681 640 1 -64 3.56 14.23 14.230
1 1 22 T12 300 2681 480 1 -48 3.41 75.11 75.110
Main Ring upto footing C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
1 2 3 T8 417 417 140 140 75 75 5 -40 1.23 7.38 7.380
1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030
Main Ring(W) C 175 1763 1 2 11 T8 2074 4 -32 2.05 45.02 45.020
Rectangular striup(X) C 100 1763 1 2 19 T8 416 416 140 140 75 75 5 -40 1.23 46.62 46.620
Rectangular striup(Y) C 100 1763 1 2 19 T8 104 104 140 140 75 75 5 -40 0.60 22.92 22.920
Rectangular striup (Z) C 100 1763 1 1 19 T8 640 640 140 140 75 75 5 -40 1.68 31.83 31.830
link Zone (X1) C 250 1763 1 4 8 T8 140 75 75 2 -16 0.28 8.84 8.840
link Zone (Y1) C 100 1763 1 1 19 T8 140 75 75 2 -16 0.28 5.24 5.240
Rectangular striup (Z1) C 100 1763 1 2 19 T8 107 107 140 140 75 75 5 -40 0.61 23.14 23.140
Tie Beam Junction Main Ring(W) C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
Tie Beam Junction Rectangular striup (Z) C 1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030

15 SW 15 (200*1900*325) Main bar B 1 1 28 T20 300 2677 800 1 -80 3.70 103.54 103.540
1 1 18 T12 300 2677 480 1 -48 3.41 61.38 61.380
Main Ring upto footing C 1 2 3 T8 1618 4 -32 1.59 9.54 9.540
1 2 3 T8 412 412 140 140 75 75 5 -40 1.22 7.32 7.320
1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030
Main Ring(W) C 175 1713 1 2 11 T8 1618 4 -32 1.59 34.98 34.980
Rectangular striup(X) C 100 1713 1 2 18 T8 515 515 140 140 75 75 5 -40 1.43 51.30 51.300
Rectangular striup(Y) C 100 1713 1 2 18 T8 265 265 140 140 75 75 5 -40 0.93 33.30 33.300
Rectangular striup (Z) C 100 1713 1 4 18 T8 103 103 140 140 75 75 5 -40 0.60 43.28 43.280
link Zone (X1) C 250 1713 1 3 8 T8 140 75 75 2 -16 0.28 6.63 6.630
Tie Beam Junction Main Ring(W) C 1 2 3 T8 1618 4 -32 1.59 9.54 9.540
Tie Beam Junction Rectangular striup(X) C 1 2 3 T8 515 515 140 140 75 75 5 -40 1.43 8.56 8.560
Tie Beam Junction Rectangular striup(Y) C 1 2 3 T8 265 265 140 140 75 75 5 -40 0.93 5.56 5.560

16 SW 16 (200*2350*700) Main bar B 1 1 30 T20 300 2681 800 1 -80 3.70 111.06 111.060
1 1 4 T16 300 2681 640 1 -64 3.56 14.23 14.230
a b c b b d c
No. of Bars Per
Bar Shape No of Member Length of Shape Deduction (d Cut Total Dia wise Weight (in Mtr)
Member
Description of Item Grid / Location Des' Bars Spacing Span Nos ø of Bars Lap No. of bend for Each 45
Mark IDs a b c d e f g degree) Length Length 8 10 12 16 20 25 28 32

1 1 22 T12 300 2681 480 1 -48 3.41 75.11 75.110


Main Ring upto footing C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
1 2 3 T8 417 417 140 140 75 75 5 -40 1.23 7.38 7.380
1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030
Main Ring(W) C 175 1763 1 2 11 T8 2074 4 -32 2.05 45.02 45.020
Rectangular striup(X) C 100 1763 1 2 19 T8 416 416 140 140 75 75 5 -40 1.23 46.62 46.620
Rectangular striup(Y) C 100 1763 1 2 19 T8 104 104 140 140 75 75 5 -40 0.60 22.92 22.920
Rectangular striup (Z) C 100 1763 1 1 19 T8 640 640 140 140 75 75 5 -40 1.68 31.83 31.830
link Zone (X1) C 250 1763 1 4 8 T8 140 75 75 2 -16 0.28 8.84 8.840
link Zone (Y1) C 100 1763 1 1 19 T8 140 75 75 2 -16 0.28 5.24 5.240
Rectangular striup (Z1) C 100 1763 1 2 19 T8 107 107 140 140 75 75 5 -40 0.61 23.14 23.140
Tie Beam Junction Main Ring(W) C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
Tie Beam Junction Rectangular striup (Z) C 1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030

17 SW 17 (200*800) Main bar B 1 1 4 T20 300 2642 800 1 -80 3.66 14.65 14.650
B 1 1 12 T16 300 2642 640 1 -64 3.52 42.23 42.230
Main Ring upto footing C 1 1 3 T10 740 740 140 140 75 75 5 -50 1.87 5.60 5.600
Main Ring L0 C 75 416 1 1 7 T10 740 740 140 140 75 75 5 -50 1.87 13.06 13.060
Main Ring C 100 833 1 1 7 T8 740 740 140 140 75 75 5 -40 1.88 13.13 13.130
Main Ring L0 C 75 416 1 1 7 T10 740 740 140 140 75 75 5 -50 1.87 13.06 13.060
Rectangular striup L0 C 75 416 1 3 7 T8 106 106 140 140 75 75 5 -40 0.61 12.75 12.750
Rectangular striup C 100 833 1 3 7 T8 106 106 140 140 75 75 5 -40 0.61 12.75 12.750
Rectangular striup L0 C 75 416 1 3 7 T8 106 106 140 140 75 75 5 -40 0.61 12.75 12.750
Tie Beam Junction Main Ring L0 C 1 1 3 T10 740 740 140 140 75 75 5 -50 1.87 5.60 5.600

18 SW 18 (200*2350*700) Main bar B 1 1 30 T20 300 2681 800 1 -80 3.70 111.06 111.060
1 1 4 T16 300 2681 640 1 -64 3.56 14.23 14.230
1 1 22 T12 300 2681 480 1 -48 3.41 75.11 75.110
Main Ring upto footing C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
1 2 3 T8 417 417 140 140 75 75 5 -40 1.23 7.38 7.380
1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030
Main Ring(W) C 175 1763 1 2 11 T8 2074 4 -32 2.05 45.02 45.020
Rectangular striup(X) C 100 1763 1 2 19 T8 416 416 140 140 75 75 5 -40 1.23 46.62 46.620
Rectangular striup(Y) C 100 1763 1 2 19 T8 104 104 140 140 75 75 5 -40 0.60 22.92 22.920
Rectangular striup (Z) C 100 1763 1 1 19 T8 640 640 140 140 75 75 5 -40 1.68 31.83 31.830
link Zone (X1) C 250 1763 1 4 8 T8 140 75 75 2 -16 0.28 8.84 8.840
link Zone (Y1) C 100 1763 1 1 19 T8 140 75 75 2 -16 0.28 5.24 5.240
Rectangular striup (Z1) C 100 1763 1 2 19 T8 107 107 140 140 75 75 5 -40 0.61 23.14 23.140
Tie Beam Junction Main Ring(W) C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
Tie Beam Junction Rectangular striup (Z) C 1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030

19 SW 19 (200*1900*325) Main bar B 1 1 28 T20 300 2677 800 1 -80 3.70 103.54 103.540
1 1 18 T12 300 2677 480 1 -48 3.41 61.38 61.380
Main Ring upto footing C 1 2 3 T8 1618 4 -32 1.59 9.54 9.540
1 2 3 T8 412 412 140 140 75 75 5 -40 1.22 7.32 7.320
1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030
Main Ring(W) C 175 1713 1 2 11 T8 1618 4 -32 1.59 34.98 34.980
Rectangular striup(X) C 100 1713 1 2 18 T8 515 515 140 140 75 75 5 -40 1.43 51.30 51.300
Rectangular striup(Y) C 100 1713 1 2 18 T8 265 265 140 140 75 75 5 -40 0.93 33.30 33.300
Rectangular striup (Z) C 100 1713 1 4 18 T8 103 103 140 140 75 75 5 -40 0.60 43.28 43.280
link Zone (X1) C 250 1713 1 3 8 T8 140 75 75 2 -16 0.28 6.63 6.630
Tie Beam Junction Main Ring(W) C 1 2 3 T8 1618 4 -32 1.59 9.54 9.540
Tie Beam Junction Rectangular striup(X) C 1 2 3 T8 515 515 140 140 75 75 5 -40 1.43 8.56 8.560
Tie Beam Junction Rectangular striup(Y) C 1 2 3 T8 265 265 140 140 75 75 5 -40 0.93 5.56 5.560

20 SW 20 (200*2350*700) Main bar B 1 1 30 T20 300 2681 800 1 -80 3.70 111.06 111.060
1 1 4 T16 300 2681 640 1 -64 3.56 14.23 14.230
1 1 22 T12 300 2681 480 1 -48 3.41 75.11 75.110
Main Ring upto footing C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
1 2 3 T8 417 417 140 140 75 75 5 -40 1.23 7.38 7.380
1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030
Main Ring(W) C 175 1763 1 2 11 T8 2074 4 -32 2.05 45.02 45.020
Rectangular striup(X) C 100 1763 1 2 19 T8 416 416 140 140 75 75 5 -40 1.23 46.62 46.620
Rectangular striup(Y) C 100 1763 1 2 19 T8 104 104 140 140 75 75 5 -40 0.60 22.92 22.920
Rectangular striup (Z) C 100 1763 1 1 19 T8 640 640 140 140 75 75 5 -40 1.68 31.83 31.830
link Zone (X1) C 250 1763 1 4 8 T8 140 75 75 2 -16 0.28 8.84 8.840
link Zone (Y1) C 100 1763 1 1 19 T8 140 75 75 2 -16 0.28 5.24 5.240
Rectangular striup (Z1) C 100 1763 1 2 19 T8 107 107 140 140 75 75 5 -40 0.61 23.14 23.140
Link Zone C 250 441 1 6 3 T8 140 75 75 2 -16 0.28 4.98 4.980
Tie Beam Junction Main Ring(W) C 1 2 3 T8 2074 4 -32 2.05 12.28 12.280
Tie Beam Junction Rectangular striup (Z) C 1 1 3 T8 640 640 140 140 75 75 5 -40 1.68 5.03 5.030

21 SW 21 (200*600) Main bar B 1 1 12 T16 300 2588 640 1 -64 3.47 41.58 41.580
Main Ring upto footing C 1 1 3 T10 540 540 140 140 75 75 5 -50 1.47 4.40 4.400
Main Ring L0 C 75 443 1 1 7 T10 740 740 140 140 75 75 5 -50 1.87 13.06 13.060
Main Ring C 100 885 1 1 8 T8 740 740 140 140 75 75 5 -40 1.88 15.00 15.000
Main Ring L0 C 75 443 1 1 7 T10 740 740 140 140 75 75 5 -50 1.87 13.06 13.060
Rectangular striup L0 C 75 443 1 2 7 T8 108 108 140 140 75 75 5 -40 0.61 8.56 8.560
Rectangular striup C 100 885 1 2 8 T8 108 108 140 140 75 75 5 -40 0.61 9.78 9.780
Rectangular striup L0 C 75 443 1 2 7 T8 108 108 140 140 75 75 5 -40 0.61 8.56 8.560
Tie Beam Junction Main Ring L0 C 1 1 3 T10 740 740 140 140 75 75 5 -50 1.87 5.60 5.600

22 SW 22 (200*1500) Main bar B 1 1 34 T20 300 2588 800 1 3.69 125.43 125.430
Main Ring upto footing C 1 1 3 T10 1440 1440 140 140 75 75 5 -50 3.27 9.80 9.800
Main Ring L0 C 75 443 1 1 7 T10 1440 1440 140 140 75 75 5 -50 3.27 22.86 22.860
Main Ring C 100 885 1 1 8 T8 1440 1440 140 140 75 75 5 -40 3.28 26.20 26.200
Main Ring L0 C 75 443 1 1 7 T10 1440 1440 140 140 75 75 5 -50 3.27 22.86 22.860
Rectangular striup L0 C 75 443 1 6 7 T8 90 90 140 140 75 75 5 -40 0.58 24.18 24.180
Rectangular striup C 100 885 1 6 8 T8 90 90 140 140 75 75 5 -40 0.58 27.60 27.600
Rectangular striup L0 C 75 443 1 6 7 T8 90 90 140 140 75 75 5 -40 0.58 24.18 24.180
Rectangular striup L0 C 75 443 1 1 7 T8 180 180 140 140 75 75 5 -40 0.76 5.29 5.290
Rectangular striup C 100 885 1 1 8 T8 180 180 140 140 75 75 5 -40 0.76 6.04 6.040
Rectangular striup L0 C 75 443 1 1 7 T8 180 180 140 140 75 75 5 -40 0.76 5.29 5.290
Link Zone L0 C 75 443 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone C 100 885 1 1 8 T8 140 75 75 2 -16 0.28 2.21 2.210
Link Zone L0 C 75 443 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 1440 1440 140 140 75 75 5 -50 3.27 9.80 9.800

23 SW 23 (200*1700*325) Main bar B 1 1 12 T20 300 2681 800 1 3.78 45.38 45.380
B 1 1 24 T16 300 2681 2.98 71.54 71.540
Main Ring upto footing C 1 1 3 T10 1640 1640 140 140 75 75 5 -50 3.67 11.00 11.000
1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 441 1 1 7 T10 1640 1640 140 140 75 75 0.000
Main Ring C 100 882 1 1 8 T8 1640 1640 140 140 75 75 5 -40 3.68 29.40 29.400
Main Ring L0 C 75 441 1 1 7 T10 1640 1640 140 140 75 75 5 -50 3.67 25.66 25.660
Main Ring L0 C 75 441 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 882 1 1 8 T8 265 265 140 140 75 75 5 -40 0.93 7.40 7.400
Main Ring L0 C 75 441 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 441 1 7 7 T10 103 103 140 140 75 75 5 -50 0.59 28.98 28.980
Rectangular striup C 100 882 1 7 8 T8 103 103 140 140 75 75 5 -40 0.60 33.67 33.670
Rectangular striup L0 C 75 441 1 7 7 T10 103 103 140 140 75 75 5 -50 0.59 28.98 28.980
Tie Beam Junction Main Ring L0 C 75 441 1 1 3 T10 1640 1640 140 140 75 75 5 -50 3.67 11.00 11.000
Tie Beam Junction Main Ring L0 C 75 441 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

24 SW 24 (200*1000*325) Main bar B 1 1 28 T20 300 2689 800 1 3.79 106.12 106.120
Main Ring upto footing C 1 1 3 T10 940 940 140 140 75 75 5 -50 2.27 6.80 6.800
1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 428 1 1 7 T10 940 940 140 140 75 75 5 -50 2.27 15.86 15.860
Main Ring C 100 856 1 1 8 T8 940 940 140 140 75 75 5 -40 2.28 18.20 18.200
Main Ring L0 C 75 428 1 1 7 T10 940 940 140 140 75 75 5 -50 2.27 15.86 15.860
Main Ring L0 C 75 428 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 856 1 1 8 T8 265 265 140 140 75 75 5 -40 0.93 7.40 7.400
Main Ring L0 C 75 428 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 428 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
a b c b b d c
No. of Bars Per
Bar Shape No of Member Length of Shape Deduction (d Cut Total Dia wise Weight (in Mtr)
Member
Description of Item Grid / Location Des' Bars Spacing Span Nos ø of Bars Lap No. of bend for Each 45
Mark IDs a b c d e f g degree) Length Length 8 10 12 16 20 25 28 32

Rectangular striup C 100 856 1 3 8 T8 105 105 140 140 75 75 5 -40 0.61 14.52 14.520
Rectangular striup L0 C 75 428 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Link Zone L0 C 75 428 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone C 100 856 1 1 8 T8 140 75 75 2 -16 0.28 2.21 2.210
Link Zone L0 C 75 428 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 940 940 140 140 75 75 5 -50 2.27 6.80 6.800
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

25 SW 25 (200*1050*325) Main bar B 1 1 24 T20 300 2677 800 1 -80 3.70 88.75 88.750
Main Ring upto footing C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 428 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring C 100 856 1 1 8 T8 990 990 140 140 75 75 5 -40 2.38 19.00 19.000
Main Ring L0 C 75 428 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring L0 C 75 428 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 856 1 1 8 T8 265 265 140 140 75 75 5 -40 0.93 7.40 7.400
Main Ring L0 C 75 428 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 428 1 4 7 T8 99 99 140 140 75 75 5 -40 0.59 16.60 16.600
Rectangular striup C 100 856 1 4 8 T8 99 99 140 140 75 75 5 -40 0.59 18.96 18.960
Rectangular striup L0 C 75 428 1 4 7 T8 99 99 140 140 75 75 5 -40 0.59 16.60 16.600
Tie Beam Junction Main Ring L0 C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

26 SW 26 (200*1050*325) Main bar B 1 1 24 T20 300 2630 800 1 -64 3.67 88.01 88.010
Main Ring upto footing C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 416 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring C 100 833 1 1 7 T8 990 990 140 140 75 75 5 -40 2.38 16.63 16.630
Main Ring L0 C 75 416 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring L0 C 75 416 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 833 1 1 7 T8 265 265 140 140 75 75 5 -40 0.93 6.48 6.480
Main Ring L0 C 75 416 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 416 1 4 7 T8 99 99 140 140 75 75 5 -40 0.59 16.60 16.600
Rectangular striup C 100 833 1 4 7 T8 99 99 140 140 75 75 5 -40 0.59 16.60 16.600
Rectangular striup L0 C 75 416 1 4 7 T8 99 99 140 140 75 75 5 -40 0.59 16.60 16.600
Tie Beam Junction Main Ring L0 C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

27 SW 27 (200*1000*325) Main bar B 1 1 28 T20 300 2642 800 1 3.74 104.80 104.800
Main Ring upto footing C 1 1 3 T10 940 940 140 140 75 75 5 -50 2.27 6.80 6.800
1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 416 1 1 7 T10 940 940 140 140 75 75 5 -50 2.27 15.86 15.860
Main Ring C 100 833 1 1 7 T8 940 940 140 140 75 75 5 -40 2.28 15.93 15.930
Main Ring L0 C 75 416 1 1 7 T10 940 940 140 140 75 75 5 -50 2.27 15.86 15.860
Main Ring L0 C 75 416 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 833 1 1 7 T8 265 265 140 140 75 75 5 -40 0.93 6.48 6.480
Main Ring L0 C 75 416 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 416 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Rectangular striup C 100 833 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Rectangular striup L0 C 75 416 1 3 7 T8 105 105 140 140 75 75 5 -40 0.61 12.72 12.720
Link Zone L0 C 75 416 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone C 100 833 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone L0 C 75 416 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 940 940 140 140 75 75 5 -50 2.27 6.80 6.800
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

28 SW 28 (200*1050*325) Main bar B 1 1 22 T20 300 2630 800 1 3.73 82.08 82.080
Main Ring upto footing C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 416 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring C 100 833 1 1 7 T8 990 990 140 140 75 75 5 -40 2.38 16.63 16.630
Main Ring L0 C 75 416 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring L0 C 75 416 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 833 1 1 7 T8 265 265 140 140 75 75 5 -40 0.93 6.48 6.480
Main Ring L0 C 75 416 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 416 1 3 7 T8 110 110 140 140 75 75 5 -40 0.62 12.93 12.930
Rectangular striup C 100 833 1 3 7 T8 110 110 140 140 75 75 5 -40 0.62 12.93 12.930
Rectangular striup L0 C 75 416 1 3 7 T8 110 110 140 140 75 75 5 -40 0.62 12.93 12.930
Link Zone L0 C 75 416 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone C 100 833 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone L0 C 75 416 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

29 SW 29 (200*1050*325) Main bar B 1 1 22 T20 300 2630 800 1 -160 3.57 78.56 78.560
Main Ring upto footing C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750
Main Ring L0 C 75 416 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring C 100 833 1 1 7 T8 990 990 140 140 75 75 5 -40 2.38 16.63 16.630
Main Ring L0 C 75 416 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring L0 C 75 416 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Main Ring C 100 833 1 1 7 T8 265 265 140 140 75 75 5 -40 0.93 6.48 6.480
Main Ring L0 C 75 416 1 1 7 T10 265 265 140 140 75 75 5 -50 0.92 6.41 6.410
Rectangular striup L0 C 75 416 1 3 7 T8 110 110 140 140 75 75 5 -40 0.62 12.93 12.930
Rectangular striup C 100 833 1 3 7 T8 110 110 140 140 75 75 5 -40 0.62 12.93 12.930
Rectangular striup L0 C 75 416 1 3 7 T8 110 110 140 140 75 75 5 -40 0.62 12.93 12.930
Link Zone L0 C 75 416 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone C 100 833 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Link Zone L0 C 75 416 1 1 7 T8 140 75 75 2 -16 0.28 1.93 1.930
Tie Beam Junction Main Ring L0 C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
Tie Beam Junction Main Ring L0 C 1 1 3 T10 265 265 140 140 75 75 5 -50 0.92 2.75 2.750

30 SW 30 (200*1050*435) Main bar B 1 1 28 T20 300 2588 800 1 -64 3.63 101.50 101.500
Main Ring upto footing C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
1 1 3 T10 375 375 140 140 75 75 5 -50 1.14 3.41 3.410
Main Ring L0 C 75 444 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring C 100 887 1 1 8 T8 990 990 140 140 75 75 5 -40 2.38 19.00 19.000
Main Ring L0 C 75 444 1 1 7 T10 990 990 140 140 75 75 5 -50 2.37 16.56 16.560
Main Ring L0 C 75 444 1 1 7 T10 375 375 140 140 75 75 5 -50 1.14 7.95 7.950
Main Ring C 100 887 1 1 8 T8 375 375 140 140 75 75 5 -40 1.15 9.16 9.160
Main Ring L0 C 75 444 1 1 7 T10 375 375 140 140 75 75 5 -50 1.14 7.95 7.950
Rectangular striup L0 C 75 444 1 4 7 T8 90 90 140 140 75 75 5 -40 0.58 16.12 16.120
Rectangular striup C 100 887 1 4 8 T8 90 90 140 140 75 75 5 -40 0.58 18.40 18.400
Rectangular striup L0 C 75 444 1 4 7 T8 90 90 140 140 75 75 5 -40 0.58 16.12 16.120
Link Zone L0 C 75 444 1 2 7 T8 140 75 75 2 -16 0.28 3.86 3.860
Link Zone C 100 887 1 2 8 T8 140 75 75 2 -16 0.28 4.42 4.420
Link Zone L0 C 75 444 1 2 7 T8 140 75 75 2 -16 0.28 3.86 3.860
Tie Beam Junction Main Ring L0 C 1 1 3 T10 990 990 140 140 75 75 5 -50 2.37 7.10 7.100
Tie Beam Junction Main Ring L0 C 1 1 3 T10 375 375 140 140 75 75 5 -50 1.14 3.41 3.410

31 SW 31 (200*600) Main bar B 1 1 12 T16 300 2588 640 1 -80 3.45 41.39 41.390
Main Ring upto footing C 1 1 3 T10 540 540 140 140 75 75 5 -50 1.47 4.40 4.400
Main Ring L0 C 75 443 1 1 7 T10 740 740 140 140 75 75 5 -50 1.87 13.06 13.060
Main Ring C 100 885 1 1 8 T8 740 740 140 140 75 75 5 -40 1.88 15.00 15.000
Main Ring L0 C 75 443 1 1 7 T10 740 740 140 140 75 75 5 -50 1.87 13.06 13.060
Rectangular striup L0 C 75 443 1 2 7 T8 108 108 140 140 75 75 5 -40 0.61 8.56 8.560
Rectangular striup C 100 885 1 2 8 T8 108 108 140 140 75 75 5 -40 0.61 9.78 9.780
Rectangular striup L0 C 75 443 1 2 7 T8 108 108 140 140 75 75 5 -40 0.61 8.56 8.560
Tie Beam Junction Main Ring L0 C 1 1 3 T10 740 740 140 140 75 75 5 -50 1.87 5.60 5.600

3120.510 1334.630 620.270 515.700 1971.330 22.730 0.000 0.000


@ @ @ @ @ @ @ @
Unit Weight in KG 0.395 0.617 0.889 1.580 2.469 3.858 4.840 6.321
a b c b b d c
No. of Bars Per
Bar Shape No of Member Length of Shape Deduction (d Cut Total Dia wise Weight (in Mtr)
Member
Description of Item Grid / Location Des' Bars Spacing Span Nos ø of Bars Lap No. of bend for Each 45
Mark IDs a b c d e f g degree) Length Length 8 10 12 16 20 25 28 32

Total Weight in KG 1232.794 823.846 551.351 814.933 4867.481 87.693 0.000 0.000 8378.099
Total (MT) 8.378