0% found this document useful (0 votes)
114 views4 pages

Ensoniq Esq1 Service Manual Part1

Uploaded by

georgeorwell
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
114 views4 pages

Ensoniq Esq1 Service Manual Part1

Uploaded by

georgeorwell
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
NO ° ARI NO.| 9312000501 INTRODUCTION ‘As with every ENSONIQ product, all ESQ-1 service will be handled through the ENSONIQ._. Module Exchange Program, Rather than diagnose and exchange individual components, you will: replace complete modules. We feel this is the most time and cost effective method of repair, both for you and your customers. The ESQ-1 Service manual is divided into four different sections and includes service information on both the ESQ-1 Digital Wave Synthesizer and the ESQ-M Digital Wave Synthesizer Module. In April of 1987, ENSONIQ replaced the Metal Case of the ESQ-1 with a Plastic Case. You can use the following criteria to determine which case is which: STYLE SERIAL#RANGE MAINBOARD ASSY # DISTINGUISHING FEATURE METAL 10000 - 24999 40900004001 NO HEAT SINK ON BACK PLASTIC 25000 - HIGHER 40900007001 HEAT SINK ON BACK There are no interchangeable parts between the metal and plastic ESQ-1. There is service information, however, that applies to both types of cases. It is for this reason that you find sections of the manual dedicated to: both the metal and plastic ESQ-1 (Section 1), the metal ESQ-1 only (Section 2), the plastic ESQ-1 only (Section 3) and the ESQ-M (Section 4). TABLE OF CONTENTS Figure! — ESQ-1 Front Panel Controls METAL AND PLASTIC ESQ-1 (Section 1) Internal ihemory ESQ-1 Test Procedure ‘Memory Protect Test Memory Backup Test Analog Input Test Sustain Jack Test Sequencer Jack Test 3. Cartridge Test Keypad Test Stereo Test . Tape Output Test 10. Tape Input Test 11, Filter Tune 12, Sound Test 13. MIDI Test, 14, Re-initialization Of ESQ-1 15. Hard Reset Using Self-Test Mode to Diagnose Display Assemblies Software Notes. 0.8. 1.7 thru O.S. 3.5 Hardware Notes Battery Low Message System Error Message : Flowchart - Troubleshooting an ESQ-1 with a Blank Display SRA ABRE NE MOV ONAUNANUNS RABUN NND Ss ah Metal ESQ-1 (Section 2) Figure2 ESQ-I Metal Exploded View Checking the Power Supply B Figure3 AC Line Voltage Check Points B Power Supply Measurements 2 14 Figure 4 — Power Supply Voltage Check Poirts 14 ‘Testing the Power Supply Unloaded 15 Harware Notes (specific to the Metal ESQ-1) 16 FigureS Intermittent Start-up Problem Modification 17 Section A Replacing the Main Board 18 Metal ESQ-1 (Continued) SectionB Replacing the Display Board Section Replacing the Keypad Board Section D Replacing the Keyboard SectionE Replacing the Power Supply Section F Replacing the Transormer SectionG Replacing the Pitch/Mod Wheel Assembly Section H Replacing the Line Filter Section! Replacing the Operating Systern EPROMs Plastic ESQ-1 (Section 3) Figure 6 ESQ-1 Plastic Exploded View Checking the Power Supply Figure 7 AC Line Voltage Check Points Power Supply Measurements Figure 8 — Power Supply Voltage Check Points Testing the Power Supply Unloaded Hardware Notes (specific to the Plastic ESQ-1) Figure 9 Intermittant Start-up Problem Modification Section A Replacing the Main Board SectionB Replacing the Display Board Section C Replacing the Keypad Board SectionD Replacing the Keyboard Figure 10 Bottom of ESQ-I Plastic Case SectionE Replacing the Power Supply Section Replacing the Transformer SectionG Replacing the Pitch/Mod Wheel Assembly Section H Replacing the Line Filter Section Replacing the Operating System EPROMs Section] Installing Ferrite Bead Figure 10A Ferrite Bead Installation ESQ-M (Section 4) Figure 11 ESQ- iy Exploded View Intemal Memory Checking the Power Supply ‘Transformer and Power Supply Voltage Points Power Supply Measurements ‘Testing the Power Supply Unloaded ESQ. eM Test Procedure + Getting to the Hidden Functions Page . Thitial Setup Keypad Test Re-initialization OTESQ-M Filter Tune ‘Analog Test Load from Cartridge Test . Write to Cartridge Test . Memory Protect Test 0. Stereo Test 11. Sound Test 12, Re-initialization OFESQ-M_ 13, Burn-in Routine Software Notes and Hardware Notes Section A Replacing the Main Board Section B- Replacing the Keypad/Display Board Section C Replacing the Power Supply Section D Replacing the Transformer Section E Replacing the Line Filter Section F Replacing the Operating System EPROM. Dawn meen wsonanoas STOYLNOS TANVd LNOYS Figure 1 — ESQ-1 Front Panel Controls

You might also like