400kV LA Support Structure Plan

1. The document provides fabrication details for a 400 kV LA support structure for the Fatehgarh-III substation under a transmission system project in Rajasthan, India. 2. Key details include the indicative structure height adjusted for an 8000mm bus height, and mounting details according to equipment manufacturer drawings. 3. An additional 3% of nuts, bolts and washers shall be supplied for erection to allow for wastage.

Uploaded by

sarat mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

400kV LA Support Structure Plan

1. The document provides fabrication details for a 400 kV LA support structure for the Fatehgarh-III substation under a transmission system project in Rajasthan, India. 2. Key details include the indicative structure height adjusted for an 8000mm bus height, and mounting details according to equipment manufacturer drawings. 3. An additional 3% of nuts, bolts and washers shall be supplied for erection to allow for wastage.

Uploaded by

sarat mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8

F F

E E

13. 3% EXTRA NUTS, BOLTS AND WASHERS SHALL BE SUPPLIED FOR


ERECTION TO ALLOW FOR WASTAGE ETC.

D D

C C

B POWERGRID CORPORATION
B
OF INDIA LIMITED
(A GOVERNMENT OF INDIA ENTERPRISE)

PROJECT: SUBSTATION PACKAGE SS-86 FOR


FATEHGARH-III S/S UNDER TRANSMISSION SYSTEM FOR
EVACUATION OF POWER FROM REZ IN RAJASTHAN (20 GW)
GENERAL NOTES:
1. STRUCTURE HEIGHT SHOWN IS INDICATIVE. THE UNDER PHASE-III PART E1
SAME SHALL BE ADJUSTED FOR A BUS HEIGHT OF RELEASED FOR FABRICATION
8000 MM FROM PLINTH LEVEL. TITLE: FABRICATION DETAIL OF 400 kV LA SUPPORT
A 2. MOUNTING DETAILS ARE INDICATIVE AND SHALL BE A
AS PER THE EQUIPMENT MANUFACTURER DRAWING.
STRUCTURE FOR FATEHGARH-III S/S
R0
A3 DRAWING No. REV.
ELE. CIVIL MECH.
REV.No. DESCRIPTION DATE DRAWN REVIEW APPROVED
CHECKED C/ ENGG/ NR-1/ FATEHGARH-III/ EQP/ 400kV/ LA/ STR R0