General Construction Company WLL
ape dalall bel AS yo
M9, P- 112, Mussafah, PO Box 3338
‘Abu Dhabi, United Arab Emirates
Tel +971-2-5554025/6, email
[email protected]
wiww.gce-vae.net, TRN 100315062800003
OEM
National Contracting co
High
Customer
Priority
Project Name Civil work for Additional Three (3) Transformers at
‘Shamkha 400/132/33KV Grid Station
Sitio, | tam Code [Description
12044 Laboratory Testing
| 2 | 204a Laboratory Testing
Prepared by Reviewed by
shibin
05-Oct-23. 8:54:07AM
QUANTITY SURVEYOR
Stock
Type
swNs
MNS:
Required
PRODUCT REQUEST
PR No 6048
Date 05-Oct-2023
Project N-17734
Req Delivery 05-Oct-2023
peri NOM Romarks
21.00/NOS Laboratory Testing - Temperature
Monitoring
Daily visit for temperature
monitoring record (7 day x 3Nos
= 21Nes)
48.00, NOS | Laboratory Testing - Temperature
Loggers
‘Temperature monitoring for
concrete by sacrificial
“Temperature loggers (15Points x
3 Sensors = 45 Sensors (Add 3
“Ambient monitor sensor) Total =
‘4BNlos
For General Construction Company WLL
| Approves by
sae
| leGENERAL TEST REQUISITION rae
ace ioacaas am ioe Pe
el nas 05509524, Fx 025505307
ma ntamhOvanpeyancom [ ater
cine neeonce Jerr onanuaton company Sample enieaton i
constant [ractabel ning comeing sf
ese peat a es ata TS7SSEVIBBAVR wo aad H Waa Raabe TST aon a
[amt Oesnton amos cate Tne
Lectin of temmocougler [raver Pnth 456 sumo by |
rot Pon rout hs sping Mathes eal
lxmgla icon pra name ie
lta eeence samotne pont
‘sumgle rine of Same eS
‘sump taeatin lamoteie oc _|
Ho “Test Regul rd ‘antey eras
1 ays er tempter ed nos a Pare x3 2a
a | toetue monty cnc by se ae 15 Pits X Sensors = 45 sens (Ad 3 Amer mont sensc
Tegan rf Hott sos
ono
Wena ct aga:
+ Pe LABORATORIES eserves te gh cota any he bane meine atte an proved aibortatr sa hen deena acs and cn aceptanspeumed
“am io; WAACO8S uN OL Me 09 on 01-052020; us WIMPEY LABORATORIES y--O-29 Ht 0
To Mohamed Hussain From Frasat Mehmood Abbasi
Customer Name + General Construction Company WLL Company: Wimpey Laboratories(WA} - Abudhabi
Customer Address P.0.80%:3338, Abu Dhabi, Te: +971 2 Address: P.0.Box 115086, Musaffah M-34
5554025/6 Abudhabi, UAE
Email
[email protected] OurRef, = WA.QCGS-23-00348/R1
Tel 497125884025, pate 04/10/2023,
Subject Quotation For Testing
Project ‘Extension of Mahawi Substation , N-16678" Project in Mahawi, Muhammad bin Zayed
Dear Sir,
‘Thank you very much for your enquity forthe above mentioned project. We are pleased to quote our prices for the following testing serices,
hopefully you wil find it competitive and as per your requirements, At WIMPEY LAB we assure you of our best cooperation and an efficient
service to make your projects a success.
st eS 5 Unit Rate Total nate
No ree 2 = (ae) (aso)
Ll =f i 1
OTHERS
: ores Wea 15000] 0 pate Only
(ony vs or Tempereure Monitoring Recor
Pervays At 130) i
1.1 Field Engineer Mob/Demob Per Visit |
(Field Engineer for 7Day Monitoring. |
perooysaeD 150) |
Specialty
2 Determination of Temperature | uHP Nos 25000) 0 Rate Only
Monitoring for Concrete By Satria
‘Temperature Loggers (3 sensor each 1 |
| ambient monitoring) |
var @ 5% 080) 00
Standard Terms and Conditions:
1. Official confirmation leter/LPO required to commence work.
2, The Above rates are in AED and excluding VAT.
2. Payment: 100% Advance.
4, This quotation is valid for 1 month from the date of quotation,
5. Wimpey Laboratories quality management system has been assessed by technical experts for specific competence and awarded accreditation to
160 9001 and 1S0 IEC 17025. All works are not specificaly covered under accredited, but the competencies and quality will remain under the scope of
IS0 9001 and 1S0 IEC 17025. al the tests will be carried out in accordance with relevant international standards. Incase of any changes in the
standard, a standard operating procedure will be forward to you for an official approval.
6. Health and safety rules are strietly followed as per the local and international rule.
7. Hazardous materials wil be Identified and it will be returned to the customer after completing the test.
8. you accept the standard terms and condition ofthe quotation, please forward a signed copy oft tous followed by the LPO.
TeL: 4971 29503324 + Fako97a 2 5503387 *P.0.Box 118085, Musaffah M34, abudhabi, UAE Email: info auh@wiempeylah com
‘website: wimpy com Page 1016WA-Q-CGS-23-00348/R1.
Frasat Mehmood Abbasi
Designation : Business Development Manager
Phone : 971559199737
Emails evilmanager @lmpeyab.com
Ls 4971 25503324 + FaXW971 25503387 *P.0.80x 115086, Musaffah M34, Abudhabi, UAE E-mail nfo
[email protected]
‘website wun impeylab.com Page 2016\dditional Terms & Conditions
ity Agreement as per ISO/IEC 17025:2017
Both parties shall be responsible for the impartiality of laboratory activities and shall not allow
commercial, financial or other pressures to compromise impartiality. Wimpey Laboratories shall
inform the customer in advance, of the information it intends to place in the public domain. Also
Wimpey Laboratories shall ensure that personnel, including any committee members, contractors,
personnel of external bodies, or individuals acting on the laboratory's behalf, shall keep confidential
all information obtained or created during the performance of laboratory activities, except as
required by law. However, a customer may disclose the same to its affiliated companies, including its
parent company, if any (collectively, "Affiiates"), for the limited purpose of assisting customer in
satisfying any obligations it owes to the Disclosing Party.
“Decision Rule:
Wimpey Laboratories follows the decision rule in compliance with ILAC-G8:09/2019 while making
conformity reporting as per the customer requirements. All measurement uncertainties evaluated by
Laboratory with 95% confidence level will be considered while making a conformity statement. if the
customer is not looking for conformity statement we will provide measured results of testing
parameters.
Conformity reporting requirements with respect to legal/regulatory standards will be followed based
on regulatory standard guidance. In case of specific standard conformity reporting Wimpey
Laboratories will follow the conformity rule of respective standards for decision making.
Wimpey Laboratories use guard bands which can reduce the probability of making an incorrect
conformance decision. It is basically a safety factor built into the measurement decision process by
reducing the acceptance limit below that of the specification/tolerance limit. Wimpey Laboratories
refers to Guard Bands where the length of the Guard Band (w) is the Tolerance/specification Limit (TL)
minus the Acceptance Limit (AL) or w=TL~AL. This means that if the measurement result is below the
Acceptance Limit (AL), then the measurement is accepted as confarming to specification
With guard band terminology there are often upper and lower limits for a tolerance. For two-sided
tolerances, Wimpey Laboratories will include the lower limits as well.
‘A guard band which has a length equal to zero, w = 0, infers that acceptance is when a measurement
result is below a tolerance limit. This is called simple acceptance. Simple acceptance is also called
"shared risk" because the probability to be outside the tolerance limit may be as high as 50% in the
‘case when a measurement result is exactly on the tolerance limit.
Wimpey Laboratories fallows binary decision rule when the result is limited to two choices (pass or
fail). A non-binary decision rule exists when multiple terms may express the result (pass, conditional
pass, conditional fail, fal),
Wimpey Laboratories follows below options for Conformity statements reporting;
Case1
If the customer agrees that Pass/Fail decisions are based on acceptance limits Wimpey Laboratories
follows simple acceptance (w = 0, =7'L) procedure. The expanded measurement uncertainty calculated
per the GUM must be less than 1/3 of the tolerance limits based on the manufactures specifications
Statements of conformity are binary. The estimate of the measurand is assumed to have a normal
probability distribution and specific risk is used for the risk calculation. In this case,
TormNo WA OF O65 lusueNe 01 fev Nor00 tesved ens 02-05-2020 Approved By: General Manager
"TEL: #971 2'5503324 " FAK: 4971 28503387 * P.O, BOX: 115086 *ABLDHABI “UAE E-mail info auh@wimpeylab com
Website: www.wimpeylab.com
Poge 3 of6the risk that accepted items are outside the tolerance limit is up to 50%. The risk of false reject is up
to 50%! for measured results outside the tolerance.
Statements of conformity are reported as:
‘= Passed - The measured values were observed in tolerance at the points tested.
«= Failed - One or more measured values were observed out of tolerance at the points tested
case2
If the customer agrees that decisions are based on guard banded acceptance limits. (w = U,
Where Uis the expanded measurement uncertainty calculated per the GUM. Statements of conformity
are non-binary. The estimate of the measurand is assumed to have a normal probability distribution
‘and specific risk is used for the risk calculation. In this case the risk of accepted items to be outside the
tolerance limit is < 2.5%. For rejected items the risk to be inside the tolerance limit is < 2.5%. When
the measured result is close to the tolerance, the risk of false accept and false reject is up to 50%.
Measurement results are reported as:
* Pass - The measured values were observed in tolerance at the points tested. The specific false accept
risk is up to 2.5%.
« Conditional Pass - The measured values were observed in tolerance at the points tested. However,
a portion of the expanded measurement uncertainty intervals about one or more measured values
exceeded tolerance. When the measured result is close to the tolerance, the specific false accept risk
is up to 50%,
Conditional Fail- One or more measured values were observed out of tolerance at the points tested,
However, a portion of the expanded measurement uncertainty intervals about one or more measured
values were in tolerance. When the measured result is close to the tolerance, the specific false reject
risk is up to 50%.
«Fail -One or more measured values were observed out of tolerance at the points tested. The specific
false reject risk is up to 2.5%.
case 3
if the customer agrees that decisions are based on guard banded acceptance limits (AL) to result in
loss than 2% false accept [global] risk. For this case the acceptance limit is given by AL=VTL™-U? and U
is the expanded measurement uncertainty calculated per the GUM Statements of conformity is
binary. The estimate of the measurand is assumed to have a normal probability distribution. The risk
of accepted items to be outside the tolerance limit is $ 2.0%.
Statements of conformity are reported as:
+ Passed - The measured values were observed in tolerance at the points tested with a global false
accept risk of less than or equal to 2%.
+ Failed - One or more measured values were either observed out of tolerance at the points tested or
the global false accept risk for one or more measured values was greater than 2%.
Fou No: WA-GFOES bsweTNo 01 RavNos00 Tesued/onr02-01-2020 Approved By: General Manager
‘TEL: 49712 5503324 * FAX: 4971 2 5503387 * P.0, BOX: 115085 *ABUDHABI “U.AE E-mail: info,
[email protected]
Website: www.wimpeylab.com
Page 4 0f6Appendix
Wimpey Laboratories LLC (Abu Dhabi)
GENERAL TERMS AND CONDITIONS OF BUSINESS (2022)
2. the Company
2. The Peacoat
Th Cry 5 fr eal eit ines tM ce agus rvs
ani he trate dls eri oper y the Company of
442 The ipl aces att my aden. ee a of ie
415 They visits ofr st wt Xe eo of he Piel exit
an sna rvs gn ey omy
yb luce abe yw he seis eu Dearet cling oki
peal apciial niadaceigdeyaecaepes
# Fc Cenpny prov varios ers wich wilds spin he mana oft i
maaertntan Rost ct ny ids bia salons
Teri git rks piste uy ising
tafgrtcrenbenareststechonga smn
wyeie mine enna asin ch Nays ae
Orca ain tla ail meres schoo natty
ican Senda sanehcaEPEER
ists and rst
‘Sit tc nl gree nthe Pil a
‘uch rte is fing forte rc he Principal ane tears Tr ove
Te ecinmstanes hil go ben he sce a he maine ee
Th ots eis lr Cogan eyeing tte ite a pase
‘Meer andl fr sing stadt tne ths apt ee
‘Sryy i neyo he pau psn cer char
"erm hy acorn grt The i obs te spleen ee
‘Mons Ssh afer ne ch! viding predtrinel etalon ee
ata apoistineacmoth comely gay oth Bos
‘Rime natelrsprerspmement mat fe ule anc ie Cay ot
@
2. Obtgstins othe Pena
The acl indoor
Tap cy aonb mwah cry fam ik ay he
Comey nigicccometicace
18 Tomb te Conpuy naan ofa hs An andesite dns of whasr
‘Semestnror itn ni soe hu eno aan liso
1. Thr part oratory analysis an otberintrvenion
Si ictal mate seanabcest age by Hee ub ont pny rte
{Canny len the Pol tte says ut be en
SHAN fash et hing wet ie
rat incec a antuncing he eal crn or connie ok
Fen acne he Pg ace at he Copal! be esa
‘ultcios sor ane epson th hid yo eb ny the
9. Labi an ompenation
Copyright 2022 Wimpey Laboratories LLC (Abu Dhabi). All rights reserved.
1 The Sedan of (1) ne eso
sutra cota orm
‘The Hahly of the Compon’s subeontrctors ah agents faust)
Th Cuno mt ay ty fr cons or dt
‘han sorte he Conpy nro rarest a ipl as
‘cele tats sian or gears of res
‘Sauce and avegued ot an agers coca (npr wt Hott, nal
ny hay rian orka eprormanet ise ssopsodan! sta
i pamapl or epee cee td par ch hs
Price and nolo,
Te Pca wl oy at nat win hy (3 dys ln the at ee: he as
ie wonder any caper moe the Copa 8 oa eprom iss
‘he nati sult of pment
‘Rlsvestleeni mee anche il
‘Re Conpany stl as imate ing atom ofall pee Sac ander ren
Punto cle tvaon on
$e inal ol sa nny te Conny fr al he expenses ical yi in eins
arc ds Prise aps, tain yer as a eer el eset
iFetoresn psn Copy tc ey expen
these deConpny wine srg rl he mon sy Wo he
{hel epee gin the caste of rn oy on.
The Cpa arc he itso ea sen cece opi lw 1 ee
‘we HTK by te Ponca ns for pra acing Tom) nth. Sah
‘thve he ac om ent hate
|. Cain
2 walla, ite Prin ny nts Lea tn wp ean 1 lon at a3 ce)
SOS SaG ara necercane ert incor ep
elas fo any hb towands he Pina
Amendments and muifations
‘Noches mcm tn fh sat of hese GTC wine ts
Sangand sp ys psn hs sks he Comp
°° fe lay al pia the ter pnts wl ot bead By
Diane
‘tin iy sree en se i
‘Bingo hing meas a
nt ons rd 4h agin sea een
14. Apotcal jit and semen oF dspates
12 Fares my gt at eny pte ctor cm bu ws GUC 1 en. 9
‘rte icy age atin 5 to
Imtexpsey eno sel er the pare ati mea fa
15, Data Protection and Privsey
16, ton
11 Communes beste Piel lth Conga ll bedeneto ba
‘es ot excson tals comic nis. An ena
‘newogngapintion sl us be casi cal atest le
2 TRS i a an ue th Cay tc
Page 5 of 6Quotation Approval Letter
General Construction Company WLL
P.0,80x:3338
Abu Dhabi
Tel: +971 2 5554025/6
Date:
To:
Wimpey Laboratories
P.O. Box 115086
‘Abu Dhabi, UAE
Sub: Approval of Quotation, WA-Q-CGS-23-00348/R1 dated 04/10/2023 for undertaking “Extension
‘of Mahawi Substation , N-16678" Project in Mahawi, Muhammad bin Zayed
Dear Frasat Mehmood Abbasi,
Thank you for providing us your quotation. After review, we wish to inform you that your offer is
accepted. We are currently drafting a Purchase Order corresponding to your referenced quotation
and we will share it with you once completed.
In the meanwhile, you are requested to undertake the services based on this Approval letter and
proceed with submission of the report and invoices.
Yours Sincerely
Signature
Page 60! 6