0% found this document useful (0 votes)
98 views8 pages

MR 6048 1

Material request

Uploaded by

Muhammad hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
98 views8 pages

MR 6048 1

Material request

Uploaded by

Muhammad hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 8
General Construction Company WLL ape dalall bel AS yo M9, P- 112, Mussafah, PO Box 3338 ‘Abu Dhabi, United Arab Emirates Tel +971-2-5554025/6, email [email protected] wiww.gce-vae.net, TRN 100315062800003 OEM National Contracting co High Customer Priority Project Name Civil work for Additional Three (3) Transformers at ‘Shamkha 400/132/33KV Grid Station Sitio, | tam Code [Description 12044 Laboratory Testing | 2 | 204a Laboratory Testing Prepared by Reviewed by shibin 05-Oct-23. 8:54:07AM QUANTITY SURVEYOR Stock Type swNs MNS: Required PRODUCT REQUEST PR No 6048 Date 05-Oct-2023 Project N-17734 Req Delivery 05-Oct-2023 peri NOM Romarks 21.00/NOS Laboratory Testing - Temperature Monitoring Daily visit for temperature monitoring record (7 day x 3Nos = 21Nes) 48.00, NOS | Laboratory Testing - Temperature Loggers ‘Temperature monitoring for concrete by sacrificial “Temperature loggers (15Points x 3 Sensors = 45 Sensors (Add 3 “Ambient monitor sensor) Total = ‘4BNlos For General Construction Company WLL | Approves by sae | le GENERAL TEST REQUISITION rae ace ioacaas am ioe Pe el nas 05509524, Fx 025505307 ma ntamhOvanpeyancom [ ater cine neeonce Jerr onanuaton company Sample enieaton i constant [ractabel ning comeing sf ese peat a es ata TS7SSEVIBBAVR wo aad H Waa Raabe TST aon a [amt Oesnton amos cate Tne Lectin of temmocougler [raver Pnth 456 sumo by | rot Pon rout hs sping Mathes eal lxmgla icon pra name ie lta eeence samotne pont ‘sumgle rine of Same eS ‘sump taeatin lamoteie oc _| Ho “Test Regul rd ‘antey eras 1 ays er tempter ed nos a Pare x3 2a a | toetue monty cnc by se ae 15 Pits X Sensors = 45 sens (Ad 3 Amer mont sensc Tegan rf Hott sos ono Wena ct aga: + Pe LABORATORIES eserves te gh cota any he bane meine atte an proved aibortatr sa hen deena acs and cn aceptanspeumed “am io; WAACO8S uN OL Me 09 on 01-052020 ; us WIMPEY LABORATORIES y--O-29 Ht 0 To Mohamed Hussain From Frasat Mehmood Abbasi Customer Name + General Construction Company WLL Company: Wimpey Laboratories(WA} - Abudhabi Customer Address P.0.80%:3338, Abu Dhabi, Te: +971 2 Address: P.0.Box 115086, Musaffah M-34 5554025/6 Abudhabi, UAE Email [email protected] OurRef, = WA.QCGS-23-00348/R1 Tel 497125884025, pate 04/10/2023, Subject Quotation For Testing Project ‘Extension of Mahawi Substation , N-16678" Project in Mahawi, Muhammad bin Zayed Dear Sir, ‘Thank you very much for your enquity forthe above mentioned project. We are pleased to quote our prices for the following testing serices, hopefully you wil find it competitive and as per your requirements, At WIMPEY LAB we assure you of our best cooperation and an efficient service to make your projects a success. st eS 5 Unit Rate Total nate No ree 2 = (ae) (aso) Ll =f i 1 OTHERS : ores Wea 15000] 0 pate Only (ony vs or Tempereure Monitoring Recor Pervays At 130) i 1.1 Field Engineer Mob/Demob Per Visit | (Field Engineer for 7Day Monitoring. | perooysaeD 150) | Specialty 2 Determination of Temperature | uHP Nos 25000) 0 Rate Only Monitoring for Concrete By Satria ‘Temperature Loggers (3 sensor each 1 | | ambient monitoring) | var @ 5% 080) 00 Standard Terms and Conditions: 1. Official confirmation leter/LPO required to commence work. 2, The Above rates are in AED and excluding VAT. 2. Payment: 100% Advance. 4, This quotation is valid for 1 month from the date of quotation, 5. Wimpey Laboratories quality management system has been assessed by technical experts for specific competence and awarded accreditation to 160 9001 and 1S0 IEC 17025. All works are not specificaly covered under accredited, but the competencies and quality will remain under the scope of IS0 9001 and 1S0 IEC 17025. al the tests will be carried out in accordance with relevant international standards. Incase of any changes in the standard, a standard operating procedure will be forward to you for an official approval. 6. Health and safety rules are strietly followed as per the local and international rule. 7. Hazardous materials wil be Identified and it will be returned to the customer after completing the test. 8. you accept the standard terms and condition ofthe quotation, please forward a signed copy oft tous followed by the LPO. TeL: 4971 29503324 + Fako97a 2 5503387 *P.0.Box 118085, Musaffah M34, abudhabi, UAE Email: info auh@wiempeylah com ‘website: wimpy com Page 1016 WA-Q-CGS-23-00348/R1. Frasat Mehmood Abbasi Designation : Business Development Manager Phone : 971559199737 Emails evilmanager @lmpeyab.com Ls 4971 25503324 + FaXW971 25503387 *P.0.80x 115086, Musaffah M34, Abudhabi, UAE E-mail nfo [email protected] ‘website wun impeylab.com Page 2016 \dditional Terms & Conditions ity Agreement as per ISO/IEC 17025:2017 Both parties shall be responsible for the impartiality of laboratory activities and shall not allow commercial, financial or other pressures to compromise impartiality. Wimpey Laboratories shall inform the customer in advance, of the information it intends to place in the public domain. Also Wimpey Laboratories shall ensure that personnel, including any committee members, contractors, personnel of external bodies, or individuals acting on the laboratory's behalf, shall keep confidential all information obtained or created during the performance of laboratory activities, except as required by law. However, a customer may disclose the same to its affiliated companies, including its parent company, if any (collectively, "Affiiates"), for the limited purpose of assisting customer in satisfying any obligations it owes to the Disclosing Party. “Decision Rule: Wimpey Laboratories follows the decision rule in compliance with ILAC-G8:09/2019 while making conformity reporting as per the customer requirements. All measurement uncertainties evaluated by Laboratory with 95% confidence level will be considered while making a conformity statement. if the customer is not looking for conformity statement we will provide measured results of testing parameters. Conformity reporting requirements with respect to legal/regulatory standards will be followed based on regulatory standard guidance. In case of specific standard conformity reporting Wimpey Laboratories will follow the conformity rule of respective standards for decision making. Wimpey Laboratories use guard bands which can reduce the probability of making an incorrect conformance decision. It is basically a safety factor built into the measurement decision process by reducing the acceptance limit below that of the specification/tolerance limit. Wimpey Laboratories refers to Guard Bands where the length of the Guard Band (w) is the Tolerance/specification Limit (TL) minus the Acceptance Limit (AL) or w=TL~AL. This means that if the measurement result is below the Acceptance Limit (AL), then the measurement is accepted as confarming to specification With guard band terminology there are often upper and lower limits for a tolerance. For two-sided tolerances, Wimpey Laboratories will include the lower limits as well. ‘A guard band which has a length equal to zero, w = 0, infers that acceptance is when a measurement result is below a tolerance limit. This is called simple acceptance. Simple acceptance is also called "shared risk" because the probability to be outside the tolerance limit may be as high as 50% in the ‘case when a measurement result is exactly on the tolerance limit. Wimpey Laboratories fallows binary decision rule when the result is limited to two choices (pass or fail). A non-binary decision rule exists when multiple terms may express the result (pass, conditional pass, conditional fail, fal), Wimpey Laboratories follows below options for Conformity statements reporting; Case1 If the customer agrees that Pass/Fail decisions are based on acceptance limits Wimpey Laboratories follows simple acceptance (w = 0, =7'L) procedure. The expanded measurement uncertainty calculated per the GUM must be less than 1/3 of the tolerance limits based on the manufactures specifications Statements of conformity are binary. The estimate of the measurand is assumed to have a normal probability distribution and specific risk is used for the risk calculation. In this case, TormNo WA OF O65 lusueNe 01 fev Nor00 tesved ens 02-05-2020 Approved By: General Manager "TEL: #971 2'5503324 " FAK: 4971 28503387 * P.O, BOX: 115086 *ABLDHABI “UAE E-mail info auh@wimpeylab com Website: www.wimpeylab.com Poge 3 of6 the risk that accepted items are outside the tolerance limit is up to 50%. The risk of false reject is up to 50%! for measured results outside the tolerance. Statements of conformity are reported as: ‘= Passed - The measured values were observed in tolerance at the points tested. «= Failed - One or more measured values were observed out of tolerance at the points tested case2 If the customer agrees that decisions are based on guard banded acceptance limits. (w = U, Where Uis the expanded measurement uncertainty calculated per the GUM. Statements of conformity are non-binary. The estimate of the measurand is assumed to have a normal probability distribution ‘and specific risk is used for the risk calculation. In this case the risk of accepted items to be outside the tolerance limit is < 2.5%. For rejected items the risk to be inside the tolerance limit is < 2.5%. When the measured result is close to the tolerance, the risk of false accept and false reject is up to 50%. Measurement results are reported as: * Pass - The measured values were observed in tolerance at the points tested. The specific false accept risk is up to 2.5%. « Conditional Pass - The measured values were observed in tolerance at the points tested. However, a portion of the expanded measurement uncertainty intervals about one or more measured values exceeded tolerance. When the measured result is close to the tolerance, the specific false accept risk is up to 50%, Conditional Fail- One or more measured values were observed out of tolerance at the points tested, However, a portion of the expanded measurement uncertainty intervals about one or more measured values were in tolerance. When the measured result is close to the tolerance, the specific false reject risk is up to 50%. «Fail -One or more measured values were observed out of tolerance at the points tested. The specific false reject risk is up to 2.5%. case 3 if the customer agrees that decisions are based on guard banded acceptance limits (AL) to result in loss than 2% false accept [global] risk. For this case the acceptance limit is given by AL=VTL™-U? and U is the expanded measurement uncertainty calculated per the GUM Statements of conformity is binary. The estimate of the measurand is assumed to have a normal probability distribution. The risk of accepted items to be outside the tolerance limit is $ 2.0%. Statements of conformity are reported as: + Passed - The measured values were observed in tolerance at the points tested with a global false accept risk of less than or equal to 2%. + Failed - One or more measured values were either observed out of tolerance at the points tested or the global false accept risk for one or more measured values was greater than 2%. Fou No: WA-GFOES bsweTNo 01 RavNos00 Tesued/onr02-01-2020 Approved By: General Manager ‘TEL: 49712 5503324 * FAX: 4971 2 5503387 * P.0, BOX: 115085 *ABUDHABI “U.AE E-mail: info,[email protected] Website: www.wimpeylab.com Page 4 0f6 Appendix Wimpey Laboratories LLC (Abu Dhabi) GENERAL TERMS AND CONDITIONS OF BUSINESS (2022) 2. the Company 2. The Peacoat Th Cry 5 fr eal eit ines tM ce agus rvs ani he trate dls eri oper y the Company of 442 The ipl aces att my aden. ee a of ie 415 They visits ofr st wt Xe eo of he Piel exit an sna rvs gn ey omy yb luce abe yw he seis eu Dearet cling oki peal apciial niadaceigdeyaecaepes # Fc Cenpny prov varios ers wich wilds spin he mana oft i maaertntan Rost ct ny ids bia salons Teri git rks piste uy ising tafgrtcrenbenareststechonga smn wyeie mine enna asin ch Nays ae Orca ain tla ail meres schoo natty ican Senda sanehcaEPEER ists and rst ‘Sit tc nl gree nthe Pil a ‘uch rte is fing forte rc he Principal ane tears Tr ove Te ecinmstanes hil go ben he sce a he maine ee Th ots eis lr Cogan eyeing tte ite a pase ‘Meer andl fr sing stadt tne ths apt ee ‘Sryy i neyo he pau psn cer char "erm hy acorn grt The i obs te spleen ee ‘Mons Ssh afer ne ch! viding predtrinel etalon ee ata apoistineacmoth comely gay oth Bos ‘Rime natelrsprerspmement mat fe ule anc ie Cay ot @ 2. Obtgstins othe Pena The acl indoor Tap cy aonb mwah cry fam ik ay he Comey nigicccometicace 18 Tomb te Conpuy naan ofa hs An andesite dns of whasr ‘Semestnror itn ni soe hu eno aan liso 1. Thr part oratory analysis an otberintrvenion Si ictal mate seanabcest age by Hee ub ont pny rte {Canny len the Pol tte says ut be en SHAN fash et hing wet ie rat incec a antuncing he eal crn or connie ok Fen acne he Pg ace at he Copal! be esa ‘ultcios sor ane epson th hid yo eb ny the 9. Labi an ompenation Copyright 2022 Wimpey Laboratories LLC (Abu Dhabi). All rights reserved. 1 The Sedan of (1) ne eso sutra cota orm ‘The Hahly of the Compon’s subeontrctors ah agents faust) Th Cuno mt ay ty fr cons or dt ‘han sorte he Conpy nro rarest a ipl as ‘cele tats sian or gears of res ‘Sauce and avegued ot an agers coca (npr wt Hott, nal ny hay rian orka eprormanet ise ssopsodan! sta i pamapl or epee cee td par ch hs Price and nolo, Te Pca wl oy at nat win hy (3 dys ln the at ee: he as ie wonder any caper moe the Copa 8 oa eprom iss ‘he nati sult of pment ‘Rlsvestleeni mee anche il ‘Re Conpany stl as imate ing atom ofall pee Sac ander ren Punto cle tvaon on $e inal ol sa nny te Conny fr al he expenses ical yi in eins arc ds Prise aps, tain yer as a eer el eset iFetoresn psn Copy tc ey expen these deConpny wine srg rl he mon sy Wo he {hel epee gin the caste of rn oy on. The Cpa arc he itso ea sen cece opi lw 1 ee ‘we HTK by te Ponca ns for pra acing Tom) nth. Sah ‘thve he ac om ent hate |. Cain 2 walla, ite Prin ny nts Lea tn wp ean 1 lon at a3 ce) SOS SaG ara necercane ert incor ep elas fo any hb towands he Pina Amendments and muifations ‘Noches mcm tn fh sat of hese GTC wine ts Sangand sp ys psn hs sks he Comp °° fe lay al pia the ter pnts wl ot bead By Diane ‘tin iy sree en se i ‘Bingo hing meas a nt ons rd 4h agin sea een 14. Apotcal jit and semen oF dspates 12 Fares my gt at eny pte ctor cm bu ws GUC 1 en. 9 ‘rte icy age atin 5 to Imtexpsey eno sel er the pare ati mea fa 15, Data Protection and Privsey 16, ton 11 Communes beste Piel lth Conga ll bedeneto ba ‘es ot excson tals comic nis. An ena ‘newogngapintion sl us be casi cal atest le 2 TRS i a an ue th Cay tc Page 5 of 6 Quotation Approval Letter General Construction Company WLL P.0,80x:3338 Abu Dhabi Tel: +971 2 5554025/6 Date: To: Wimpey Laboratories P.O. Box 115086 ‘Abu Dhabi, UAE Sub: Approval of Quotation, WA-Q-CGS-23-00348/R1 dated 04/10/2023 for undertaking “Extension ‘of Mahawi Substation , N-16678" Project in Mahawi, Muhammad bin Zayed Dear Frasat Mehmood Abbasi, Thank you for providing us your quotation. After review, we wish to inform you that your offer is accepted. We are currently drafting a Purchase Order corresponding to your referenced quotation and we will share it with you once completed. In the meanwhile, you are requested to undertake the services based on this Approval letter and proceed with submission of the report and invoices. Yours Sincerely Signature Page 60! 6

You might also like