Jenis-jenis Pemeriksaan Amalan JKR:
PBC - Routine Maintenance INVENTORY
Works oleh konsesi
ROUTINE
CONDITION
CONFIRMATORY
DETAILED
Prepared and presented by : Tan Chee Kean 2
Prepared By : Tan Chee Kean 1/50
Mengapa Perlu Ada
Proses Penyenggaraan
Jambatan ?
Sebab ia merupakan
sebahagian daripada
Asset Life Cycle.
Prepared and presented by : Tan Chee Kean 3
ASSET LIFE CYCLE – Infrastructure Aset
Project &
3.
Construction Procurement 4.
Management 2. Asset Construction
Skill Design
Asset Planning &
Development Phase
5.
1. Asset Commissioning
Planning
10. Asset 6. Asset
Disposal Asset Operation & Acceptance
Maintenance Phase & Register
9. Upgrading
& 7. Operation & Facility &
Refurbishment Maintenance
8. Asset Maintenance
Assessment Management
Skill
Prepared and presented by : Tan Chee Kean 4
Prepared By : Tan Chee Kean 2/50
Dalam JKR apa jenis
Penyenggaraan Jambatan
biasa diamalkan?
Rutin.
Berkala.
Prepared and presented by : Tan Chee Kean 5
Amalan Penyenggaraan di JKR
Penyenggaraan Rutin
Dikontrakkan kepada konsesi.
Penyenggaraan Berkala.
Dirancang dan dilaksanakan
tahunan bergantung pada
peruntukan dengan merujukan
kepada laporan Pemeriksaan
Mandatori Tahunan Jambatan
(PMTJ).
Prepared and presented by : Tan Chee Kean 6
Prepared By : Tan Chee Kean 3/50
Penyenggaraan Rutin
Jambatan Dibawah
Kontrak Konsesi.
Prepared and presented by : Tan Chee Kean 7
Routine Maintenance Work
Berpandukan
MANUAL
For
Federal Road Maintenance
Contract Administration
Prepared and presented by : Tan Chee Kean 8
Prepared By : Tan Chee Kean 4/50
Breakdown Rates According to Activities
(Protocol / Primary / Secondary Roads)
Prepared and presented by : Tan Chee Kean 9
Routine Maintenance Work Activities
• RO1 – Pavement
• RO2 – Road Shoulder
• RO3 – Grass Cutting
• RO4 – Maintenance of Roads Furniture
• RO5 – Maintenance of Bridges and Culverts
• RO7 – Drainage (Cleaning & Desilting)
• B – Routine Inspection
Prepared and presented by : Tan Chee Kean 10
Prepared By : Tan Chee Kean 5/50
B – Routine Inspection
All asset data measured and captured
to be submitted to JKR
Bridge & Culvert
• Routine Condition Inspection
Form
Submit reports on work done as
per work programes.
Prepared and presented by : Tan Chee Kean 11
Pemeriksaan Rutin Oleh Konsesi
SCOPE OF WORKS
The Company shall provide all necessary
manpower, transport and equipment to
carry out daily routine inspection along all
Peninsular Federal Roads to identify defects
that require work Routine Maintenance
Works and to collect all road data as
required in the contract.
Prepared and presented by : Tan Chee Kean 12
Prepared By : Tan Chee Kean 6/50
Pemeriksaan Rutin Oleh Konsesi Penyenggaraan Jalan
WORKS PROCEDURES
The Company shall employ inspectors to carry out
daily routine inspection along the Federal Roads
within the area concerned.
The inspectors shall be equipped with a motorcycle
or other suitable vehicle, safety gears and
communication equipment to perform his daily
task/duty.
The inspectors shall also inspect and collect all road
Responsibility: data such as width and type of roads, shoulders,
Removal of minor drains, slopes, berms, structures and road furnitures.
obstruction which affect The inspectors shall also inspect, identify and note
the traffic upon down all defects and damages to road pevements,
detected by the shoulders, drains, road furniture and structures.
inspectors.
In the case of major defects or damages that require
The Company shall
urgent attention and/or which may affect the safety
submit daily report in
weekly basis in the form
and the comfort of the road user, the inspectors shall
of soft copy (CD or E- inform the Section Manager and JKR immediately via
mail) to JKR of all simple message services (SMS) or through the
defects identified for his communication equipment provided for necessary
necessary action. action.
Prepared and presented by : Tan Chee Kean 13
>25mm
RO1 - Pavement
>0.25m2
>0.25m2
>0.25m2
Prepared and presented by : Tan Chee Kean 14
Prepared By : Tan Chee Kean 7/50
RO2 – Road Shoulder
>1m 2
Prepared and presented by : Tan Chee Kean 15
RO5 – Maintenance of Bridges and Culverts
Prepared and presented by : Tan Chee Kean 18
Prepared By : Tan Chee Kean 8/50
Penyenggaraan
Berkala
Prepared and presented by : Tan Chee Kean 20
Contoh Penyenggaraan Berkala Jambatan
Pembaikan beam jambatan dengan
kaedah formwork repair.
Pembaikan pier column jambatan
Pembaikan pier jambatan dengan dengan kaedah jacketting.
aplikasi CFRP.
Prepared and presented by : Tan Chee Kean 21
Prepared By : Tan Chee Kean 9/50
Contoh Penyenggaraan Berkala Jambatan
Pembaikan pada epoxy nosing expansion joint. Pembaikan parapet konkrit dengan kaedah
formwork repair.
Aplikasi protective coating pada steel
Penggantian asphaltic plug
girder jambatan.
expansion joint.
Prepared and presented by : Tan Chee Kean 22
Contoh Penyenggaraan Berkala Pembetung
Pembaikan pada deck soffit pembetung Pembaikan pembetung CMP dengan
konkrit dengan kaedah guniting. kaedah shotcrete pada base.
Pembaikan pembetung kekotak konkrit Pembaikan pembetung CMP dengan
dengan kaedah reline dengan CMP. kaedah shotcrete pada base.
Prepared and presented by : Tan Chee Kean 23
Prepared By : Tan Chee Kean 10/50
PBC
Apakah itu PBC?
Performance Based Contract
Satu kontrak jangka panjang.
Satu kontrak penyenggaraan yang mempunyai takrifan paras
minima pencapaian (Service Levels) kualiti komponen aset jalan
termasuk aset jambatan dan pembetung yang perlu dicapai oleh
konsesi.
Ia merangkumi khidmat untuk memeriksa, mengumpul data dan
menyenggara aset tersebut termasuk juga kerja-kerja kecemasan
yang terjadi, penyelesaian terhadap isu aduan dan segala
maklumbalas status aset.
Satu bentuk kontrak dimana pembayaran kontrak perlaksanaan
kerja adalah berdasarkan kepada pencapaian kehidmat
penyenggaraan mengikut kehendak kontrak.
Pembayaran dibuat secara Lump Sum sekiranya mencapai
standard prestasi yang dipersetujui.
Penalti berbentuk denda akan dikenakan sekiranya tidak
mencapai prestasi yang dipersetujui.
Prepared and presented by : Tan Chee Kean 25
Prepared By : Tan Chee Kean 11/50
Komponen Utama Dalam PBC:
OPM – Operational Performance Measure
RDPM – Road Durability Performance Measure
MPM – Management Performance Measure
Prepared and presented by : Tan Chee Kean 26
Jenis-Jenis Penyenggaraan PBC:
Routine
Maintenance
Works
Periodic
Maintenance
Works
Emergency
Works
Additional
Works
Prepared and presented by : Tan Chee Kean 27
Prepared By : Tan Chee Kean 12/50
Kandungan
Kontrak PBC
Prepared and presented by : Tan Chee Kean 28
Penyenggaraan Rutin Dibawah PBC
Prepared and presented by : Tan Chee Kean 29
Prepared By : Tan Chee Kean 13/50
Penyenggaraan Berkala Dibawah PBC
Prepared and presented by : Tan Chee Kean 30
Skop Kerja Kecemasan Dibawah PBC
Prepared and presented by : Tan Chee Kean 31
Prepared By : Tan Chee Kean 14/50
Skop Kerja Kecemasan Dibawah PBC
Prepared and presented by : Tan Chee Kean 32
Skop Kerja Kecemasan Dibawah PBC
Prepared and presented by : Tan Chee Kean 33
Prepared By : Tan Chee Kean 15/50
Kerja Tambahan Dibawah PBC
Prepared and presented by : Tan Chee Kean 34
Kerja Tambahan Dibawah PBC
Prepared and presented by : Tan Chee Kean 35
Prepared By : Tan Chee Kean 16/50
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
• Appendix 3 - Routine Maintenance
Works (OPM)
• Appendix 2 - Specifications
• Appendix 11 - Performance Measures
*OPM – Operational Performance Measures
Prepared and presented by : Tan Chee Kean 36
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
Appendix 3 - Routine Maintenance
Works (OPM)
• Terkandung keperluan output dalam setiap
skop OPM.
• Discripsi setiap kecacatan dengan
berpandukan kepada keperluan output
dalam setiap OPM.
• Spesifikasi bahan dan kerja serta tatacara
perlaksanaan setiap OPM.
Appendix 11 - Performance Measures
Appendix 2 - Specifications • Service Level untuk setiap OPM.
• Merupakan spesifikasi tambahan yang • Tempoh maxima untuk melaksanakan
menjuruskan kepada kehendak sifat kerja-kerja pembaikan terhadap setiap
dan keberkesanan bahan pembinaan. OPM.
• Rujukan kepada pemeriksaan, ujian • Konsesi perlu mengwujudkan Conformance
dan penyediaan laporan untuk tujuan Management System.
semakan kualiti. • Perincian Service Level untuk setiap
• Rujukan Kod Amalan dalam isu kecacatan yang terkandung dalam OPM.
penyiasatan, ujian dan penyedian • Management Performance Measures untuk
laporan. pengoperasian syarikat konsesi mengikut
perjanjian kontrak.
Prepared and presented by : Tan Chee Kean 37
Prepared By : Tan Chee Kean 17/50
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
• Appendix 13 - Inspections and Reporting
• Appendix 4 - Periodic Maintenance Works
• Appendix 11 - Performance Measures
Prepared and presented by : Tan Chee Kean 38
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
Appendix 13 - Inspections and Reporting
• Perlu laksanakan pemeriksaan terhadap kesemua
aset yang berkedudukan di dalam ROW. (all road
surfaces, bridges, culverts, signs, vegetation,
guardrails, barriers, marker pegs, pavement
markings and footpaths)
• Jenis-jenis pemeriksaan adalah:-
Routine Patrols
Combined Day-time Inspections
Combined Night-time Inspections
Bridges and culverts – inspection
Emergency / Incident
Combined Inspection within Government‘s
Representative and Compony’s Representative
• Kesemua kecacatan yang ditemui harus dilaporkan
dalam masa 24jam bermula dari titik penemuan.
• Segala kecurian dan tindakan vandalism perlu
dilaporankan dalam masa 1 minggu bermula dari
tarikh penemuan.
• Pemeriksaan terperinci bersertakan laporan perlu
diserahkan kepada JKR dalam tempuh 1 minggu
bermula dari tarikh perlaksanaan.
Prepared and presented by : Tan Chee Kean 39
Prepared By : Tan Chee Kean 18/50
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
Jenis Pemeriksaan dan Kekerapan Perlaksanaan
Inspection Type Inspection Frequency
Protocol Roads and Primary Roads: Twice a week and during
periods of heavy rainfall
Routine Patrols Secondary, Federal Institutional, Industrial, FELDA Access and
Felda Internal Roads: Once a week and immediately after periods
of heavy rainfall.
Protocol and Primary Roads: Every two (2) months
Combined Day-
Secondary, Federal Institutional, Industrial, Felda Access and Felda
time Inspections
Internal Roads: Every six (6) months
Protocol and Primary Roads: Every six (6) months
Combined Night-
Secondary, Federal Institutional, Industrial, Felda Access and Felda
time Inspections
Internal Roads: Every Twelve (12) Months
Bridges and
(i) Every twelve (12) months
culverts –
(ii) Within two (2) days following the date of an agreed flood event
inspection
Emergency /
Immediately following notification.
Incident
* Combined Inspection: Carried out with Government‘s Representative (refer Paragraph
1.5 of this Appendix) unless agreed otherwise.
Prepared and presented by : Tan Chee Kean 40
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
Appendix 4 - Periodic Maintenance Works
• Planned yearly program.
• Planned Periodic Maintenance Scopes to restore
pavement strength and lifecycle :
Pavement overlay.
Pavement rehabilitation.
Pavement reconstruction works of the existing
pavement.
• Road marking, reflective raised pavement markers on
any newly rehabilitated pavement.
• Topping-up of unpaved road shoulders required for
newly rehabilitated pavement.
Prepared and presented by : Tan Chee Kean 41
Prepared By : Tan Chee Kean 19/50
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
Prepared and presented by : Tan Chee Kean 42
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
Maximum Time Maximum Time for
for Defect Repair Defect Repair
Scope
Service Level untuk setiap OPM. Names
Operational Performance Measures (OPM) (During the (For the remainder of
Phase-in Period) the Concession
Period)
Pavement Maintenance excluding
OPM-1 3 Months 1 Month
Potholes
OPM-1 Potholes 24 Hours 24 Hours
OPM-2 Unpaved Shoulder Maintenance 6 Months 3 Months
OPM-3 Drainage Maintenance 6 Months 3 Months
Routine Maintenance of Bridges
OPM-4 6 Months 3 Months
and Other Structures
Obstructions on the Pavement
OPM-5 Surface & Shoulders (non- 24 Hours 24 Hours
hazardous)
Incident Response & Emergency
OPM-6 Not Applicable Not Applicable
Works Response
OPM-7 Vegetation Control 1 Month 1 Month
OPM-8 Road Signs Maintenance 3 Months 1 Month
OPM-9 Raised Pavement Markers 3 Months 1 Month
OPM-10 Pavement Markings 6 Months 2 Months
Kerbing for Traffic Island, Turning
OPM-11 Bay, Footpath, Motorcycle Lane 6 Months 2 Months
and Access
Longitudinal Barrier Maintenance
OPM-12 3 Months 1 Week
(Guardrails)
Longitudinal Barrier Maintenance
OPM-12 3 Months 2 Weeks
(Wire ropes)
Longitudinal Barrier Maintenance
OPM-12 3 Months 3 Weeks
(Crash cushions)
Other Railing, Hand Rail, and
OPM-13 3 Months 1 Month
Pedestrian Barrier Maintenance
Displacement Marker Post
OPM-14 3 Months 1 Month
Maintenance
OPM-15 Footpath Maintenance 24 Hours 24 Hours
Prepared and presented by : Tan Chee Kean 43
Prepared By : Tan Chee Kean 20/50
Kandungan CONCESSION AGREEMENT
(Performance Based Contract for the Maintenance of Federal Roads
In the Southern Region of Peninsular Malaysia)
Appendix 18 - Form of Design Guarantee
Form of Performance Bond
Form of Design Guarantee
Bidder’s Declaration
Successful Bidder’s Declaration
Forms & Templates.
Road Asset Damage Reporting Form
Bridge & Other Structure Inspection Form
(JKR Routine Condition Inspection Form)
Routine Maintenance Works
Road Sign Reports
Emergency Works Or Additional Works Order
Accident Reporting Form
Prepared and presented by : Tan Chee Kean 44
Operational
Performance
Measures
(OPM)
Prepared and presented by : Tan Chee Kean 45
Prepared By : Tan Chee Kean 21/50
Apakah itu Operational Performance Measures?
Road user’s expectation about day to day
serviceability of the road under agreement.
Service Level specified for each OPM must be
comply by the company.
The company must develop and implement
monitoring system to ensure the Service Level are
being achieved within the required timeframe.
All OPM must be audited to check for compliance.
All defects under the OPM must be rectified
immediately or within the timeframe.
All road asset shall be maintained with reference
to Service Level specified for each OPM.
Prepared and presented by : Tan Chee Kean 46
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 1 - SURFACED PAVEMENT MAINTENANCE On Bridge Deck
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
1 Crack sealing.
2 Patching of potholes.
3 Repair heaves and shoves.
4 Repair asphalt surface with ravelling.
5 Repair block surfacing area.
6 Treatment for rutting.
7 Repair concrete transverse joints.
OPM – Operational Performance Measures
Prepared and presented by : Tan Chee Kean 47
Prepared By : Tan Chee Kean 22/50
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 1 - SURFACED PAVEMENT MAINTENANCE On Bridge Deck
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
8 Repair concrete pavement surface.
9 Repair deficient asphalt surface.
10 Repair loss of asphalt surface.
11 Reinstate pavement surface at utility covers.
12 Apply temporary and permanent pavement marking .
13 Reinstate of reflective raised pavement markers.
OPM – Operational Performance Measures
Prepared and presented by : Tan Chee Kean 48
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 3 - DRAINAGE MAINTENANCE
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
Level, reinstate, improve sealed surface cross fall to avoid water ponding on sealed
1
surface.
Cleaning and desilting works to clear ponding, blockage, debris and vegetation on the
2
sumps, manholes and catch-pit.
Cleaning and desilting works to clear ponding, blockage, debris and vegetation
3
on inlet, outlet and inside culvert (barrel).
Cleaning and desilting works to clear ponding, blockage, debris and vegetation
4
on kerb weep hole and side drain (covered and uncovered).
5 Reseat mis-seated covers.
Repainting all existing painted concrete or masonry structures on cross
6
drainage facilities .
Provides monthly report on any defects of a structural nature along with
7
photographs and supporting details.
OPM – Operational Performance Measures
Prepared and presented by : Tan Chee Kean 49
Prepared By : Tan Chee Kean 23/50
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 4 - ROUTINE MAINTENANCE OF BRIDGES AND OTHER
STRUCTURES
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
1 Clean or remove of any unauthorized advertisements/stickers or graffiti.
2 Repaint of flaking, peeling of painted surfaces.
3 Report all damage to structure when discovered. Harus ada rekod datas
4 Clear of debris. berikut:-
• No Struktur Jambatan.
5 Clearing of drainage facilities. • Jenis dan product property
cat asal yang digunakan.
6 Report and repair all damaged bridge joints. • Tarikh aplikasi cat.
• Warrenty.
7 Secure and repair damaged parapets and railings .
Prepared and presented by : Tan Chee Kean 50
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 5 - OBSTRUCTIONS ON THE PAVEMENT SURFACE AND
SHOULDERS (On Bridge Deck)
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
Remove all litter and waste materials from pavement surface and shoulders and
1
dispose from the ROW.
2 Removing all items on the sealed surface posing a safety or health hazard.
Prepared and presented by : Tan Chee Kean 51
Prepared By : Tan Chee Kean 24/50
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 6 - INCIDENT RESPONSE AND EMERGENCY EVENTS
(On Bridge Deck)
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
Notify Government and relevant authorities on the incidents
1
and emergency events.
Provide patrols in advance of and during any storm events or
2
other weather related phenomena.
3 Remove fallen trees, branches and debris to free traffic flow.
Provide traffic management and install all temporary warning
4 signage traffic control signage and barriers cones high
visibility netting etc, to make the road passable to traffic.
Prepared and presented by : Tan Chee Kean 52
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 8 - ROAD SIGNS MAINTENANCE (at Bridge Approach)
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
Cleaning, repair and replace damaged signs and supporting
1
structures.
2 Notify and report unauthorised signs.
3 Inspect and submit yearly report on frangible post.
4 Repair damaged frangible posts.
5 Inspect and submit yearly report on gantries.
Prepared and presented by : Tan Chee Kean 53
Prepared By : Tan Chee Kean 25/50
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 9 - REFLECTIVE RAISED PAVEMENT MARKERS (RRPM)
(On Bridge Deck)
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
1 Replace dysfunctional and missing RRPM .
2 Realign the RRPM .
3 Replace the RRPM .
Prepared and presented by : Tan Chee Kean 54
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 10 - PAVEMENT MARKING (On Bridge Deck)
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
1 Repaint non-compliant pavement markings .
2 Repaint all areas of wear or loss pavement markings.
Prepared and presented by : Tan Chee Kean 55
Prepared By : Tan Chee Kean 26/50
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 11 - KERBING FOR CARRIAGEWAY, TRAFFIC ISLAND, TURNING
BAY, FOOTPATH, MOTORCYCLE LANE AND ACCESS (On Bridge Deck)
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
1 Report all visible kerbs damage monthly.
2 Repair damaged kerbs.
3 Repaint all existing or new painted kerbing.
Prepared and presented by : Tan Chee Kean 56
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 12 - LONGITUDINAL BARRIER MAINTENANCE (On Bridge Deck)
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
1 Secure damaged longitudinal barrier.
Clean or remove any grafiti, unauthorized markings, sign, posters,
2
excessive build-up of dirt or soot.
Clean, repair or replace damaged longitudinal barrier and submit
3
monthly report on confirmation of repairs.
Prepared and presented by : Tan Chee Kean 57
Prepared By : Tan Chee Kean 27/50
Appendix 3 - Routine Maintenance Works
(Related to Bridge works)
ITEM NO. BRIEF DESCRIPTION OF WORKS
OPM 13 - RAILING, HAND RAIL, AND PEDESTRIAN BARRIER
MAINTENANCE (On Bridge Deck)
The Company shall provide all labour, equipment, tools, materials, transport
and whatever necessary for the execution of the works below:
1 Secure damaged barriers.
Clean or remove any graffiti, unauthorized markings, sign, posters
2
etc.
Clean, repair or replace damaged hand rail and pedestrian barrier
3
and submit monthly report on confirmation of repairs.
Prepared and presented by : Tan Chee Kean 58
Penyenggaraan
Pembentung
Prepared and presented by : Tan Chee Kean 59
Prepared By : Tan Chee Kean 28/50