Calculating OEE Worksheet
Zonex Air Overall Equipment
System Efficiency
Shearing Machine Date :- 07/11/23
Production Data
Shift Length 8 Hours = 480 Minutes
Short Breaks 2 Breaks @ 10 Minutes Each = 20 Minutes Total
Meal Break 1 Breaks @ 30 Minutes Each = 30 Minutes Total
Down Time 6 Minutes
Ideal Run Rate 0.75 PPM (Pieces Per Minute)
Total Pieces 126 Pieces
Reject Pieces 0 Pieces
Support Variable Calculation Result
Planned
Production Time Shift Length - Breaks 430 Minutes
Operating Time Planned Production Time - Down Time 424 Minutes
Good Pieces Total Pieces - Reject Pieces 126 Pieces
OEE Factor Calculation My OEE%
Availability Operating Time / Planned Production Time 98.60%
Performance (Total Pieces / Operation Time) / Ideal Run Rate 39.62%
Quality Good Pieces / Total Pieces 100.00%
Overall OEE Availability x Performance x Quality 39.07%
World My OEE
OEE Factor Class %
Availability 90.00% 98.60%
Performance 95.00% 39.62%
Quality 99.90% 100.00%
Overall OEE 85.00% 39.07%
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.
©2002-2005 Vorne Industries Inc., Itasca, IL USA ● (630) 875-3600 ● www.vorne.com ● www.oee.com
Calculating OEE Worksheet
Zonex Air Overall Equipment
System Efficiency
Shearing Machine Date :- 08/11/23
Production Data
Shift Length 8 Hours = 480 Minutes
Short Breaks 2 Breaks @ 10 Minutes Each = 20 Minutes Total
Meal Break 1 Breaks @ 30 Minutes Each = 30 Minutes Total
Down Time 6 Minutes
Ideal Run Rate 0.75 PPM (Pieces Per Minute)
Total Pieces 256 Pieces
Reject Pieces 0 Pieces
Support Variable Calculation Result
Planned
Production Time Shift Length - Breaks 430 Minutes
Operating Time Planned Production Time - Down Time 424 Minutes
Good Pieces Total Pieces - Reject Pieces 256 Pieces
OEE Factor Calculation My OEE%
Availability Operating Time / Planned Production Time 98.60%
Performance (Total Pieces / Operation Time) / Ideal Run Rate 80.50%
Quality Good Pieces / Total Pieces 100.00%
Overall OEE Availability x Performance x Quality 79.38%
World My OEE
OEE Factor Class %
Availability 90.00% 98.60%
Performance 95.00% 80.50%
Quality 99.90% 100.00%
Overall OEE 85.00% 79.38%
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.
©2002-2005 Vorne Industries Inc., Itasca, IL USA ● (630) 875-3600 ● www.vorne.com ● www.oee.com
Calculating OEE Worksheet
Zonex Air Overall Equipment
System Efficiency
Shearing Machine Date :- 09/11/23
Production Data
Shift Length 8 Hours = 480 Minutes
Short Breaks 2 Breaks @ 10 Minutes Each = 20 Minutes Total
Meal Break 1 Breaks @ 30 Minutes Each = 30 Minutes Total
Down Time 6 Minutes
Ideal Run Rate 0.75 PPM (Pieces Per Minute)
Total Pieces 246 Pieces
Reject Pieces 0 Pieces
Support Variable Calculation Result
Planned
Production Time Shift Length - Breaks 430 Minutes
Operating Time Planned Production Time - Down Time 424 Minutes
Good Pieces Total Pieces - Reject Pieces 246 Pieces
OEE Factor Calculation My OEE%
Availability Operating Time / Planned Production Time 98.60%
Performance (Total Pieces / Operation Time) / Ideal Run Rate 77.36%
Quality Good Pieces / Total Pieces 100.00%
Overall OEE Availability x Performance x Quality 76.28%
World My OEE
OEE Factor Class %
Availability 90.00% 98.60%
Performance 95.00% 77.36%
Quality 99.90% 100.00%
Overall OEE 85.00% 76.28%
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.
©2002-2005 Vorne Industries Inc., Itasca, IL USA ● (630) 875-3600 ● www.vorne.com ● www.oee.com
Calculating OEE Worksheet
Zonex Air Overall Equipment
System Efficiency
Shearing Machine Date :- 10/11/23
Production Data
Shift Length 8 Hours = 480 Minutes
Short Breaks 2 Breaks @ 10 Minutes Each = 20 Minutes Total
Meal Break 1 Breaks @ 30 Minutes Each = 30 Minutes Total
Down Time 6 Minutes
Ideal Run Rate 0.75 PPM (Pieces Per Minute)
Total Pieces 220 Pieces
Reject Pieces 0 Pieces
Support Variable Calculation Result
Planned
Production Time Shift Length - Breaks 430 Minutes
Operating Time Planned Production Time - Down Time 424 Minutes
Good Pieces Total Pieces - Reject Pieces 220 Pieces
OEE Factor Calculation My OEE%
Availability Operating Time / Planned Production Time 98.60%
Performance (Total Pieces / Operation Time) / Ideal Run Rate 69.18%
Quality Good Pieces / Total Pieces 100.00%
Overall OEE Availability x Performance x Quality 68.22%
World My OEE
OEE Factor Class %
Availability 90.00% 98.60%
Performance 95.00% 69.18%
Quality 99.90% 100.00%
Overall OEE 85.00% 68.22%
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.
©2002-2005 Vorne Industries Inc., Itasca, IL USA ● (630) 875-3600 ● www.vorne.com ● www.oee.com
Calculating OEE Worksheet
Zonex Air Overall Equipment
System Efficiency
Shearing Machine Date :- 15/11/23
Production Data
Shift Length 8 Hours = 480 Minutes
Short Breaks 2 Breaks @ 10 Minutes Each = 20 Minutes Total
Meal Break 1 Breaks @ 30 Minutes Each = 30 Minutes Total
Down Time 6 Minutes
Ideal Run Rate 0.75 PPM (Pieces Per Minute)
Total Pieces 280 Pieces
Reject Pieces 0 Pieces
Support Variable Calculation Result
Planned
Production Time Shift Length - Breaks 430 Minutes
Operating Time Planned Production Time - Down Time 424 Minutes
Good Pieces Total Pieces - Reject Pieces 280 Pieces
OEE Factor Calculation My OEE%
Availability Operating Time / Planned Production Time 98.60%
Performance (Total Pieces / Operation Time) / Ideal Run Rate 88.05%
Quality Good Pieces / Total Pieces 100.00%
Overall OEE Availability x Performance x Quality 86.82%
World My OEE
OEE Factor Class %
Availability 90.00% 98.60%
Performance 95.00% 88.05%
Quality 99.90% 100.00%
Overall OEE 85.00% 86.82%
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.
©2002-2005 Vorne Industries Inc., Itasca, IL USA ● (630) 875-3600 ● www.vorne.com ● www.oee.com
GRAPHICAL REPRESENTATION
SR NO DATE TOTAL PRODUCTION
1 11/7/2023 39.07%
2 11/8/2023 79.38%
3 11/9/2023 77.36%
4 11/10/2023 69.18%
5 15/10/2023 88.05%
TOTAL PRODUCTION FABRICATION
SHEARING MACHINE
100.00%
88.05%
90.00%
79.38% 77.36%
80.00%
69.18%
70.00%
60.00%
50.00%
39.07%
40.00%
30.00%
20.00%
10.00%
0.00%
11/7/2023 11/8/2023 11/9/2023 11/10/2023 15/10/2023
88.05%
5/10/2023