SAP Project Scenarios1
SAP Project Scenarios1
on
SAP Implementation Project
(ASAP Methodology)
-Ganesh
Agenda
• History and importance of ASAP methodology
• Detailed explanation of each phase in Implementation
• Roles of consultants in different phases of Implementation
• Explaining the documents used in Implementation with sample documents
History of ASAP Methodology
• By the mid 1990s, SAP procedures got a significant among of negative publicity
related to some high profile disasters. Though the companies know that the ends
were inevitable, SAP was criticized of being complicated, expensive and required
long delivery schedules
• This is when SAP came up with its ASAP roadmap to sort out the numerous SAP
projects that were over budget, over time and were at the risk of failure
• The ASAP (Accelerated SAP) methodology provides the roadmap for optimizing
and continuous implementation of SAP systems in business processes
• The ASAP roadmap also includes various ITIL (Information Technology
Infrastructure Library) elements and Value SAP techniques to make project
solutions more robust, cost effective, timely and successful
• The roadmap brings in a multiple number of tools, information and accelerators to
assist team members with the implementation of R/3
Benefits of ASAP Methodology
• The ASAP Methodology covers the entire project life cycle right from the initial
evaluation via delivery and till post project management
• Proven and transparent approach that facilitates the project team to collaborate
efficiently thus reducing implementation costs, time and risks
• Sensible risk management
• Better knowledge management wherein SAP solutions helps organize, implement
and meet business objectives
• Steering committee tools and better communications planning
• Better results because ASAP methodology is based on the experience of others –
the roadmap requires both soft skills and hard facts
• Project times are almost brought down to half
• Combination of all best practice tools including ITIL, PMI(Project Management
Institute), Internal SAP and others
Introduction – ASAP Roadmap
In the following the roles and responsibilities within each phase of the ASAP roadmap will be described.
The implementation roadmap has six phases:
1. Project Preparation The project is formally initiated, and planning is well under way.
2. Business Blueprint The project team gathers requirements and conducts the
conceptual design of the solution.
3. Realization The solution is built, and the integration tested; performance tests
are planned.
4. Final Preparation End users are trained; this is the final check before the cutover to
the new system solution.
5. Go Live and Support The solution receives confirmation, ongoing support is in place,
and the project is closing.
6. Run SAP The operability of the solution is ensured.
Phase 1 - Project Preparation
• After kick off meeting, discussions or Question & Answers sessions will be started
on As-Is process to understand the current business processes
Activities in BBP Phase
• To Be process documents are prepared as per As-Is discussions
• Level 0 Training
• Business walk through presentation (Level 1 training) will be given to all the
process owners and core team members
• As per the inputs and corrections from the client, Business Blue print documents
are changed and share the copies to the client
• BBP documents have to be signed off from the client
• Key Data Structures(KDS) document has to be prepared and signed off
• GAP list has to be identified and required solutions have to be proposed
• As per the new developments, ABAP consultants are nominated for the project
• All the templates and sample documents are given below
Document KDS_MM_Templa
As-Is process.xlsx GAP Analysis
te
Roles of Consultants in BBP/BPD Phase
Functional Consultant:
• Participating in Kick off meeting
• Participating in Business As-Is discussions
• Asking questions about process and prepare rough To Be processes
• Preparing Blueprint Walkthrough presentation and giving presentation to Process
Owners and Core Team Members
• Preparing Blueprint Documents
• Updating Blueprint Documents as per business review
• Discussion about Material Number range, Material types, PR document types, PO
Document types , number ranges
• Preparing KDS as per the discussions
• Preparing Gap List to find out required developments
Technical Consultant:
• No major involvement
Phase 3 - Realization
UT Template
SIT Template:
Same template is used to for testing like System Integration Testing and User
Acceptance Testing. UAT is also called as Final Acceptance Testing and Business
acceptance Testing
SIT Template
FS-Domestic
Purchase Order
Roles of Consultants in Realization
Functional Consultant:
• Configuration in Golden/Configuration client
• Doing Unit Testing in Testing Client under development landscape
• Preparing Functional Specifications and coordination with Technical consultants
• Testing of Developments
• Testing of Upload Programs
• Preparing Test Scripts
• Doing System Integration Testing (SIT) in Quality system
• Prepare Training Material and Provide Training to Core Team members
• Giving support to User Acceptance Testing (UAT or FAT)
Technical Consultant:
• Understand the list of developments as per the GAP list
• Understanding the FS and developing as per the requirement
• Coordinating with Functional consultant to meet the client’s requirement
• Preparing Technical Specification
Phase 4 - Final Preparation
• Final Master Data upload with Data Migration programs in Test System
• End User Training – Can be given by Key Users with the support of Consultants or
Consultants only give the Training
• Collecting Master data and Cutover data from business
• Migrating the Master data and Cutover data to SAP production system from non
legacy systems
• Creation of User IDs for End users
• Providing authorizations to the users as per the requirement
Open PO.xlsx.xlsx
Material Creation Template.xlsx
Cutover Data
MM Cutover Data:
• Open Purchase Orders
• Open Work Orders (Service Purchase Orders)
• Open Stock
FI Cutover Data:
• Open Payments
• Vendor Balances
• Customer Balances
• Vendor Advances
• Customer Advances
SD Cutover Data:
• Open Sales Orders
• Open Billing
• Open Contracts
Roles of Consultants in Final Preparation
Functional Consultant:
• Identifying the cutover data and testing the upload programs in Quality system
• Uploading Master data in Production System
• Uploading Cutover Data in Production System
• Working to complete the activities within cutover period as per the plan
• End User Training
• Documentation of all the phases
Technical Consultant:
• Completing the pending developments as per the plan
• Preparing Technical Specifications
• Creating the upload programs for cutover data
• Coordinating with functional consultant
Phase 5 - Go-Live and Support
Technical Consultant:
• Completing pending developments
• Modifications to existing developments as per the requirement
• Preparing Technical Specifications
Phase 6 – Run SAP
Technical Consultant:
• Working on new developments as per the requirement
• Working on existing changes in developments
• Working on any technical or coding related tickets
Thank You
28