PROCEEDINGS OF THE DAY
Day and Date
Monday tr 3rh Febru ary,2OZ3
Complaint No.
RERA-GRG -2645_2022
Complainant
HAREM, Gurugram
Nature of complaint
Suo Motu Cognizance
Represented through
Ar. Neeraj Gautam
Respondent
CZAR Buildwell pvr. Lrd.
Respondent Represented through
Sh. Sikander Singh
[DirecrorJ
Proceeding Recorded by
Ram Niwas
PROCEEDINGS
Singh (Director) is present
on beharf of mahira Homes 104
i}j:fi?ff: Buyers werrare
sh' Kamal Bhardwaj (President
of RwA) is present on beharf
of the Association.
He states that as per the
detailed order passed by the
directions were issued to the promoter Authority dated zz.*B,z,zzcertain
which have not been complied
as perescribed under the with. Notably, BBA
Act/rules is not being executed,
the amount illegaly withdrawn the promoter has faired to deposit
from the RERA accounts. Further,
demanded further instalments The promoter has
from the allottees and is threatening to cancer their
*ff['J:'.,:::*::TI#]#;::::::::i,:1i,.,iJoio,,o,u.
wi th th e o rd er
ated 22.0 B.z zzu i .u,i.u ,,.ai";Hffi
mav be direcred ro comp,y
':ili:', iH:[11
ililJ ffi
d 0 n
demanding further instalments
until proportionate construction
project in proportion to the has been done in the
amounts already deposited.
The counselfor the promoter
objects to the formation of the
that the time period of six months werfare association and states
accounts should be counted
for depositing ti.
,rounrs diverted from the RERA
from the date of a.r.l.ring of
accounts of the promoter. The
o'o'"'Tffi l*X#i:":utZrT.:#*ffg,$U,,:#r#t*i'$"ffiri,Trixr,',.*
rr-$q-o&ftqr{
qrra efl Tis{
Ho"#_,r.
=.{ff;Sl,1ffila=r"*.,
Errr o,fm zo,._,-urR
HARERI
ffiGURUGRAI
CIt No. RERA-GRG -2645-2022
demand is being raised in accordance with affordable housing policy as well as the o.aer o
the TCP Department.
After hearing both the parties it is directed'that the planning Executive concerned alonl
with Sh. J.S.Sindhu, Executive Engineer (Monitoring) shall visit the site within the next thre,
days and submit a report regarding construction activities with reference point of th
comprehensive report submitted in the suo moto proceedings. The report shall b,
submitted by Friday i.e. on 17.02.2023 with photographs and other evidence. The promote
is also directed to submit details of the amount deposited in the RERA account in complianc,
with the order dated 22.08.2022.
The matter may be fixed for 27.02.2023. Meanwhile, the promoter shall not cancel
M
6yzfetrKumg>Af,ora) (Ashok Sa ran) cvii]rfi,,d
./Member, HARERA, Member, H ERA, Member, HARERA,
Gurugram Gurugr Gurugram
An Authoritv constituted Development)Act,2016
"*i._:":i3ii3#;trS.?t?rtFi#i*l#d
+f-dq-o &ftqr{ efu fronrl otiqftqcc zor oe1 urr ,o$' o{'drrd rrFd srRro-isr
qrra allige fm qft6 6q1 qf{ftqs ri@iiD' o
261 r