0% found this document useful (0 votes)
82 views226 pages

AFC-4320 MPR-28 Apr-2023

This monthly progress report provides an overview of the project including: 1) Financial status with payment details received up to April 2023 totaling INR 11,38,46,85,648.28. 2) Physical progress with construction advancing at the tunnels, stations, and other infrastructure elements. 3) Updates on design, programming, planning and coordination activities including correspondence, submissions, interfaces and procurement. 4) Safety and quality reporting on activities and compliance during the reporting period.

Uploaded by

sandesh negi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views226 pages

AFC-4320 MPR-28 Apr-2023

This monthly progress report provides an overview of the project including: 1) Financial status with payment details received up to April 2023 totaling INR 11,38,46,85,648.28. 2) Physical progress with construction advancing at the tunnels, stations, and other infrastructure elements. 3) Updates on design, programming, planning and coordination activities including correspondence, submissions, interfaces and procurement. 4) Safety and quality reporting on activities and compliance during the reporting period.

Uploaded by

sandesh negi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 226

MONTHLY PROGRESS

REPORT

DOCUMENT No.
April-2023 PAGE 1 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

1. GENERAL................................................................................................................................................. 3
PROJECT OVERVIEW ........................................................................................................................................ 3
ALIGNMENT OF THE PROJECT .......................................................................................................................... 4
2. FINANCIAL STATUS ................................................................................................................................. 5
STATUS OF PAYMENT ...................................................................................................................................... 5
IPC CLAIM DETAILS .......................................................................................................................................... 6
CLAIMS AND VARIATIONS ................................................................................................................................ 7
PRICE ESCALATION ........................................................................................................................................... 7
S - CURVE UP TO APRIL 23 ................................................................................................................................ 8
3. PHYSCIAL PROGRESS............................................................................................................................. 10
CONSTRUCTION PROGRESS ........................................................................................................................... 10
DESIGN PROGRESS ......................................................................................................................................... 12
4. DPR SUMMARY FROM 26.03.2023 TO 25.04.2023 ................................................................................ 12
5. PROGRAMME UPDATE ......................................................................................................................... 12
6. KEY DATES STATUS ............................................................................................................................... 12
7. THREE MONTH ROLLING PROGRAMME ................................................................................................ 15
8. PLANNING AND CO-ORDINATION ......................................................................................................... 15
A). CORRESPONDENCES: ................................................................................................................................ 15
B). DESIGN SUBMISSION ................................................................................................................................ 31
C). INTERFACE ................................................................................................................................................ 38
D). KEY STAFF ................................................................................................................................................. 47
E). MANPOWER (SUB-CONTRACTOR) ............................................................................................................. 47
F). PLANT AND MACHINERY ........................................................................................................................... 48
G). STATUS OF LAND HANDOVER ................................................................................................................... 53
9. PROCUREMENT REPORT ....................................................................................................................... 55
10. PHOTOGRAPHS ..................................................................................................................................... 60
11. SAFETY .................................................................................................................................................. 61
12. QUALITY ............................................................................................................................................... 71
13. INSTRUMENTATION .............................................................................................................................. 90
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 2 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

Annexures
1. DPR Summary

2. Organization Chart

3. Photographs

4. Environmental Monitoring Test Results

5. Traffic Marshal Attendance

6. Manpower Summary Details.

7. Key Person CV Submission Status

8. Drawing Register

9. Master list of documents

10. Three month rolling programme


MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 3 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
1. GENERAL

Project Overview
1 Project Name Design and Construction of Tunnels by TBM from near Brahmpuri DN
Ramp to Begumpul UP Ramp and 3 Under Ground Station at Meerut
Central, Bhaisali & Begumpul by Cut & Cover Method Including
Architectural Finishing and Design, supply, installation, testing and
commissioning of Electrical and Mechanical Systems including Fire
detection & suppression Systems and Hydraulic systems on Delhi —
Ghaziabad — Meerut RRTS Corridor.
2 Package 08
3 Employer National Capital Region Transport Corporation (NCRTC) Ltd
4 Client Design M/s AIAI- GC, M/S Ayesa India Pvt. Ltd., M/S Italferr
Consultant
5 Contractor’s Design M/S Tandon Consultants Pvt. LTD, Geo Consultant JV
Consultant
6 Contractor M/S Afcons Infrastructure Ltd.
7 Letter of Acceptance 26th November 2020
8 Date of 06th January 2021
Commencement of
work
9 Contract Period 1310 days (43 Months from Date of Commencement)
10 Contract Amount Rs. 1529.10 Cr.

Salient features and major scope


Sl. No Description Unit Qty
1 Tunneling by TBM (Twin Tube Length) Kms 3.56
2 Stations (Cut & Cover)- (Meerut Central, Bhaisali & Nos 3
Begumpul)

3 Launching Shafts Nos 3


4 Retrieval Shafts Nos 3
5 Cut & Cover Tunnel Rm 458
6 Ramp Rm 873
7 Ventilation Shaft Nos 1

3 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 4 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Alignment of the project

4 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 5 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

2. FINANCIAL STATUS

Status of Payment

Following are the Payment details paid up to April-2023.

Amount in INR USD Amount


Sl. No. Head
Amount Receipt Date Amount Receipt Date

1 Net Payment upto RA Bill 26 $1,95,01,876.68


₹ 11,38,46,85,648.28
2 Mar-23 Bill in INR 80% ₹ 30,88,74,644.00 30 March 2023 $5,45,255.95 03 April 2023

3 C&D Plant processing charges ₹ 4,32,552.00 31 March 2023

4 Mar-23 Bill in INR 20% ₹ 9,55,34,918.00 10 April 2023 $1,68,786.08 12 April 2023

5 Mar-23 Escalation Bill in INR ₹ 14,14,31,850.00 21 April 2023 $2,33,568.73 26 April 2023

5 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 6 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

IPC Claim Details


IPC- 27 Submitted in the month of April 23

Amount Claimed
Sl. No Description
INR USD

1 IPC - 27 (Mar-23) 85,25,23,975.00 15,28,998.61

2 GST

2.1 CGST @ 9% 7,67,27,157.75 1,37,609.87

2.2 SGST @ 9% 7,67,27,157.75 1,37,609.87

3 Gross Amount 1,00,59,78,290.50 18,04,218.36

4 Deductions

4.1 IT TDS (0.7%) 59,67,667.83 10,702.99

4.2 GST TDS (2%) 1,70,50,479.50 30,579.97

4.3 Labour Cess (1%) 85,25,239.75 15,289.99

4.5 Total Deductions 3,15,43,387.08 56,572.95

5 Payable Amount 97,44,34,903.43 17,47,645.41

6 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 7 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Claims and Variations
No claims or variations have been submitted.

Price Escalation
Amount Claimed Amount Certified
Sl. No Description
INR USD INR USD

1 PV - 24 12,36,29,241.00 2,04,168.46

7 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 8 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
S - Curve up to April 23

S Curve
100.00%

90.00%

80.00%

70.00%

60.00%
Percentage (%)

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%
Jan-21 May-21 Oct-21 Mar-22 Aug-22 Jan-23 Jun-23 Nov-23 Apr-24 Sep-24
Months
Planned S Curve
Actual S Curve Till April '23

8 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 9 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

Months Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21

Planned % 0.18% 0.48% 0.70% 1.01% 2.00% 3.89% 5.97% 8.52% 11.22% 13.92% 16.85% 19.72%

Actual % 0.15% 0.38% 0.80% 1.06% 3.06% 3.37% 3.57% 3.94% 4.75% 5.92% 7.86% 9.49%

Months Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

Planned % 22.93% 26.53% 29.91% 33.50% 36.93% 40.43% 44.22% 48.23% 52.25% 55.77% 58.95% 62.36%

Actual % 11.56% 14.76% 17.23% 19.18% 22.82% 24.32% 25.46% 28.80% 32.67% 36.23% 39.82% 43.97%

Months Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23

Planned % 66.04% 69.61% 73.01% 76.59%

Actual % 47.06% 50.45% 52.98% 56.62%

9 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 10 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
3. PHYSCIAL PROGRESS

Construction Progress
▪ Bhaisali Station.
o Guide wall – Completed.
o D-wall – Completed.
o Plunge Column – Completed.
o Roof Slab Excavation – Completed.
o Roof Slab casting - Total 6766 Sqm complete.
o Concourse Slab Excavation – Completed.
o Concourse Slab Casting – Total 6443 Sqm Complete.
o Base Slab Excavation – Completed.
o Base Slab Casting – Completed.
o Ancillary Building Slab– 914 Sqm done (Total 2512 Sqm Complete).
o Ancillary Building Column –1No done (Total 82 No Complete).
o UPE wall – 143 Rm done (Total 591 Rm Complete).
o OTE duct Slab – 64 Rm done (Total 157 Rm Complete).
o Blockwork – 66 Cum (Total 542 Cum Complete).
o Internal RCC walls Concourse – Total 156 Rm Complete.
o Permanent Column Base to Concourse - 2 No done (Total 34 No Complete.
o Permanent Column Concourse to roof - Total 19 No Complete.
o First stage concrete – Total 852 Sqm Complete.
o Platform Slab Casting – Total 468 Sqm Complete.
o Earth mat - Total 3 No Complete.
o Entry Exit - Total 35 No Soldier Pile

▪ Meerut Central Station.


o Guide wall – Completed.
o D-wall – Completed.
o Plunge Column – Completed.
o Roof Slab Excavation - Completed.
o Roof Slab Casting – Total 7850 Sqm complete.
o Concourse Slab Excavation – Completed.
o Concourse Slab Casting – Total 7888 Sqm Complete.
o Base Slab Excavation – Completed.
o Base Slab Casting – 865 Sqm done (Total 6845 Sqm Complete).
o Permanent Column Base to Concourse – 9 No done (Total 19 No Complete).
o Permanent Column Concourse to roof -3 No done (Total 12 No Complete).
o UPE wall –66 Rm done (Total 303 Rm Complete).
o Platform Slab Casting – 294 Sqm done.(Total 939 Sqm Complete).
o RCC walls Concourse(Final lift) – Total 215 Rm Complete.
o Blockwork –51 Cum done(Total 226 Cum Complete).
o Earth mat - Total 3 No Complete.

▪ Begumpul Station.
o Guide wall – Completed.
o D-wall – Completed.
o Plunge Column – Completed.
10 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 11 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
o Roof Slab Excavation – Completed.
o Roof Slab Casting – Total 6061 Sqm complete.
o Mezzanine Slab Excavation – Completed.
o Mezzanine Slab Casting – Total 6050 Sqm complete.
o Concourse Slab Excavation –Completed.
o Concourse Slab Casting - Total 6049 Sqm complete.
o Base Slab Excavation –Completed.
o Base Slab Casting – 1502 Sqm done (Total 3879 Sqm complete).
o Earth mat – 1 No done (Total 3 No Complete).
o Permanent Column Base to Concourse - Total 6 No Complete.
o Permanent Column Concourse to Mezzanine - Total 3 No Complete.
o Permanent Column Mezzanine to Roof- Total 3 No Complete.
o Blockwork – 133 Cum done (Total 400 Cum Complete).
o UPE wall –80 Rm done (Total 202 Rm Complete).

▪ North Launching Shaft and Cut & Cover.


o Kingpost – Completed.
o Excavation – Completed.
o Soldier Pile – Completed.
o Ramp Excavation – Completed
o Base Slab Casting CnC– Total 2635 Sqm complete.
o Base Slab casting (Elevated Slab) – Total 660 Sqm complete.
o Base slab casting UG Ramp –Total 2830 Sqm complete.
o Base Slab casting Elevated Ramp –Total 1669 Sqm complete.
o Roof Slab casting – 202 Sqm done (Total 1682 Sqm complete).
o RCC Wall (C/C, U G & Above ground Ramp) – 223 Rm done (Total 1010 Rm Complete).

▪ South Cut & Cover.


o Soldier Pile –32 Nos. Done (Total 814 Nos. done).
o Excavation – 8128 cum complete (Total 46590 Cum complete).
o Kingpost – Total Cum 57 Nos Complete.
o Base Slab Casting CnC – Total 4115 Sqm Complete.
o Base Slab (Box structure) – Total 946 Sqm Complete
o RCC Wall –166 Rm done (Total 469 Rm Complete).
o Elevated Slab Casting –Total 330 Sqm complete.

• Casting Yard.
o Segment ring casting –Total 4807 rings casted.

• TBM Tunnelling.
o BHAI - MEEC DOWN LINE Main drive completed.
o BHAI - MEEC UP LINE Main drive completed.
o NCC BEGU DOWNLINE Main drive completed.
o NCC BEGU UPLINE Main drive completed.
o TBM 1 BHAI - BEGU UP LINE-195 rings done (Total 410 Completed).
o TBM 2 BHAI - BEGU DOWN LINE-96 rings done (Total 96 Completed).

• Cross passage.
o CP 1 UL- Forepoling-36 no done , 1 Lintel Beam Fixed

11 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 12 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
o CP 1 DL- Forepoling-07 no done , 0 Lintel Beam Fixed
o CP 2 UL- Forepoling-36 no done , 0 Lintel Beam Fixed
o CP 4 DL- Forepoling-10 no done , 0 Lintel Beam Fixed
o CP 9 UL- Forepoling-36 no done , 2 Lintel Beam Fixed

Design progress
A summary of the submissions and subsequent approvals has been shown in Clause 7.2 of this monthly
progress report.

4. DPR Summary from 26.03.2023 to 25.04.2023


The DPR Summary is as attached in Annexure 1.

5. PROGRAMME UPDATE
In line with requirement of NCRTC, the Programme Update will be submitted separately vide letter along with
updated programme.

6. KEY DATES STATUS

Number of Days
Key from the
Description Date Remarks
Dates Commencement
Date “D”
Submission Proof of placement of Achieved
KD0 D+15 21-Jan-21
Purchase Order for TBMs (25-Jan-21)
Achieved
KD1 Submission of E&M Preliminary Design D+90 06-Apr-21
(05-Apr-21)
Submission of Tunnel and Station Achieved
KD2 D+90 06-Apr-21
Layout drawings and Preliminary Design (15-Feb-21)
Submission detailed designs for Civil Achieved
KD3 D+135 21-May-21
Works (26-Mar-21)
Start of Construction of station-1 by cut Achieved
KD4a D+165 20-Jun-21
& cover method. (27-May-21)
Start of Construction of station-2 and Achieved
KD4b D+225 19-Aug-21
station-3 by cut & cover method. (8-Jul-21)
Achieved
KD5 Submission of E&M Detail Design D+195 20-Jul-21
(17-Jul-21)
Achieved
KD6 Start of Initial drive for TBM-1 D+365 06-Jan-22
(09 Apr 22)
KD7 Start of Initial drive for TBM-2 D+395 05-Feb-22 Achieved.
12 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 13 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Number of Days
Key from the
Description Date Remarks
Dates Commencement
Date “D”
(28 May 22)
Achieved
KD8 Start of Initial drive for TBM-3 D+425 07-Mar-22
(10 Jun 22)
KD9 Start of Initial drive for TBM-4 D+455 06-Apr-22
The start of Major activities of E&M
Work’s at all three stations: Start of
Achieved
KD10 E&M work at ASS and Under croft. D+730 06-Jan-23
(06 Jan 23)
Firefighting piping work. The start of
Major activities of E&M Works.
Completion of Ancillary buildings
including its service galleries connecting
KD11 to stations, Under croft, Cable duct, D+760 05-Feb-23
cable, and other service gallery at all
stations.
Achieve substantial completion of the
following station rooms/areas at
platform, concourse & mezzanine levels:
¢ To provide access to Lift & Escalator
Contractor and structure finished to
Degree 2 completion at all stations ¢ To
Provide access to all Interfacing
KD12a Contractors of Group 1 station rooms at D+780 25-Feb-23
all stations, except the rooms mentioned
in KD12b, finished to Degree 3
completion.
Achieve substantial completion of all
TVS Rooms inside all stations, except
the rooms mentioned in KD12b, to
handover the TVS contractor
Achieve substantial completion of the
following station rooms/areas at
platform, concourse & mezzanine levels
at last one station:
KD12b • To Provide access to all Interfacing D+880 05-Jun-23
Contractors to the following rooms
finished to Degree 3 completion: -
o One Tunnel Ventilation
Machine Room

13 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 14 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Number of Days
Key from the
Description Date Remarks
Dates Commencement
Date “D”
o One Ventilation and Air
Conditioning Mechanical Room
Achieve substantial completion of
one TVS Room inside one last station
to handover the TVS contractor.
Achieve substantial completion of all
tunnel ventilation shafts in tunnel area
and mid-shafts, in any, to handover the
TVS & other interfacing Contractor
KD13 D+910 05-Jul-23
finished to Degree 1. Achieve substantial
completion of all tunnel ventilation
shafts in tunnel area, in any, to handover
the TVS Contractor finished to Degree 1.
Achieve substantial completion of all
KD14 E&M works to permit permanent power D+1100 11-Jan-24
on to all stations and tunnels
Achieve substantial completion of
station track areas at all Stations finished
to Degree 1 completion and provide
KD15 D+910 05-Jul-23
access to Track work (including in turn-
out areas, if applicable) and other
Interfacing Contractors
Achieve substantial completion of all cut
and cover tunnels/boxes and bored
tunnels, including cross passages,
ventilations shaft, and temporary TBM
KD16 shaft in tunnel areas, if any, finished to D+910 05-Jul-23
Degree 1 completion and provide access
to Track work and other Interfacing
Contractors on entire bored tunnels and
all cut and cover tunnel lengths.

14 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 15 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Number of Days
Key from the
Description Date Remarks
Dates Commencement
Date “D”
1. Achieve completion of the station
areas at all Stations to provide access to
all PSD Contractor and Platform screen
door work zones to finished Degree 2
KD17 completion. D+1100 11-Jan-24
2. Achieve completion of Groups 2
station rooms and public Concourse
Level finished to Degree 3 at all Stations
and provide access to AFC Contractor.
Complete all E&M works, architectural
finishing and signage works in Meerut
KD18a D+1160 11-Mar-24
Central Station to permit testing and
commissioning
Complete all E&M works, architectural
finishing and signage works in
KD18b D+1160 11-Mar-24
Begumpul Station to permit testing and
commissioning
Complete all E&M works, architectural
finishing and signage works in Bhaisali
KD18c D+1190 10-Apr-24
Station to permit testing and
commissioning
Complete all E&M works, architectural
finishing and signage works in tunnels
KD18d D+1250 09-Jun-24
and ventilation shafts in all respects to
permit testing and commissioning:
Achieve issuance of Taking Over
KD19 Certificate (all completed to degree 4 D+1310 08-Aug-24
completion)

7. THREE MONTH ROLLING PROGRAMME


In line with requirement of NCRTC, the Three-Month Rolling Programme shall be submitted separately
through letter with updated programme.

8. PLANNING AND CO-ORDINATION

a). Correspondences:
Summary of incoming correspondence from NCRTC
15 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 16 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

Sl.No. Letter No. Date Description

1 NCRTC-DM-CPM-MRT- 28.03.2023 Public complaint regarding repair of building falling on the


PKG8-011-5858 alignment of BHAI to MEEC Tunnel.
2 NCRTC-DM-CPM-MRT- 29.03.2023 NONO on the Good For Construction (GFC) Submission of
PKG8-011A-5862 Dimension & Reinforcement of Maintenance Staircase O-24.1
at Grid 8 & O-24.2 at Grid 14 Bhaisali Station (BHAI) (Rev-
B)
3 NCRTC-DM-CPM-MRT- 29.03.2023 Reg. Submission of Colour Shade of Fire Check Door sourced
PKG8-057-5864 from M/s GMP Technical Solutions for selection and approval
4 NCRTC-DM-CPM-MRT- 30.03.2023 NONO with comments on Revised Good For Construction
PKG8-011B-5873 (GFC) Submission of Meerut Central Station Platform Level
Framing Plan & Sections along with WIP BIM Model (Rev-
D)
5 NCRTC-DM-CPM-MRT- 09.01.2023 Minutes of Weekly Progress Review Meeting No. 73 held on
PKG8-029-5886 09.01.2023
6 NCRTC-DM-CPM-MRT- 31.03.2023 NONO on Route Accessibility Plan (RAP)
PKG8-024-5887
7 NCRTC-DM-CPM-MRT- 01.04.2023 NONO with Comments on the Revised Construction
PKG8-011A-5888 Reference Drawing (CRD) Submission of Bhaisali Station
Reinforcement details of Platform Level Slab (Grid 1-16)
(Rev-B)
8 NCRTC-DM-CPM-MRT- 01.04.2023 NONO with Comments on the Revised Construction
PKG8-011A-5889 Reference Drawings (CRD) Submission of Entry-ES2 & Vent
Shaft Framing Plan for Bhaisali Station along with BIM
Model (Rev-B)
9 NCRTC-DM-CPM-MRT- 01.04.2023 Comments on Method Statement for Finishing Work (Rev-0)
PKG8-017-5893
10 NCRTC-DM-CPM-MRT- 01.04.2023 Signed Tracing Sheets of Good For Construction (GFC)
PKG8-011C-5894 Drawings Begumpul Station Typical reinforcement details of
Concourse level, Typical reinforcement details &
Strengthening around cut outs for RCC Plenum wall at
Mezzanine level, Reinforcement details of Base Slab (Grid 06
to 12) and Design & Drawings of Public Staircase (ST-03, 04
& 05)
11 NCRTC-DM-CPM-MRT- 16.01.2023 Minutes of Weekly Progress Review Meeting No. 74 held on
PKG8-029-5901 16.01.2023
12 NCRTC-DM-CPM-MRT- 05.04.2023 Signed Tracing Sheets of Good For Construction (GFC)
PKG8-011C-5906 Drawings Begumpul Station Reinforcement details of Base
Slab (Grid 1 to 6), Design and Details of Public Staircase ST-
2 and Public Staircase ST-13, layout plan of UPAS duct &
Cutout, D-wall reinforcement details of Entry-Exit ES-1,
ECS-TVS Equipment Foundation Plinth Details, Double slab
between Mezzanine Slab & Roof Slab
13 NCRTC-DM-CPM-MRT- 05.04.2023 Signed Tracing Sheets of Good For Construction (GFC)
PKG8-011A-5907 Drawings Bhaisali Station reinforcement details of Base Slab
(Grid 05 to 16), Typical reinforcement details &
Strengthening around cut out for Plenum Wall at Concourse
level, Plenum Wall reinforcement at concourse level (Grid 01
to 07) Rev-B

16 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 17 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
14 NCRTC-DM-CPM-MRT- 05.04.2023 Comments on the Construction Reference Drawing (CRD)
PKG8-011A-5908 Submission of Bhaisali Station Platform to Concourse Level
Lift Details on Grid-"E" (Rev-A)
15 NCRTC-DM-CPM-MRT- 05.04.2023 NONO on the Revised Good for Construction (GFC)
PKG8-011A-5909 Submission of Undercroft Level Framing Plan and Sections at
Bhaisali (BHAI) Station (Grid-1 to 13) along with WIP BIM
Model (Rev-F)
16 NCRTC-DM-CPM-MRT- 05.04.2023 NONO with comments on the Revised Good for Construction
PKG8-011A-5910 (GFC) Submission of Undercroft Level Part Framing Plan
(Grid-13 to 22) and Section for UG Station at Bhaisali Station
(Rev-D) With WIP BIM Model
17 NCRTC-DM-CPM-MRT- 05.04.2023 NONO on Submission of Design Modification Report (DMR-
PKG8-011F-5911 65) for providing missing details of catch Pit in Upline &
Down Line Box Structure as per Plumbing Drawing.
18 NCRTC-DM-CPM-MRT- 05.04.2023 NONO on Submission of Design Modification Report (DMR-
PKG8-011F-5912 64) for missing Connection Details of SCC & MEEC Station
at South End
19 NCRTC-DM-CPM-MRT- 05.04.2023 NONO on Method Statement for Repairing Steps and Lips at
PKG8-017-5916 Segment Joints Inside Tunnel (Rev-1)
20 NCRTC-DM-CPM-MRT- 05.04.2023 Reg. Submission of Monthly Progress Report
PKG8-031-5917
21 NCRTC-DM-CPM-MRT- 13.02.2023 Minutes of Weekly Progress Review Meeting No. 76 held on
PKG8-029-5944 13.02.2023
22 NCRTC-DM-CPM-MRT- 27.02.2023 Minutes of Weekly Progress Review Meeting No. 78 held on
PKG8-029-5949 27.02.2023
23 NCRTC-DM-CPM-MRT- 10.04.2023 Comments on the Construction Reference Drawings (CRD)
PKG8-047B-5955 Submission of Architectural (Volume-3A) Above Ground
Structure Finishes of Bhaisali (BHAI) Station (Rev-B) with
WIP BIM Model
24 NCRTC-DM-CPM-MRT- 10.04.2023 Comments on the Definitive Design (DD) Submission of
PKG8-011A-5956 Bhaisali Station Platform Level Wall Opening (WOD)
Drawings (Rev-A)
25 NCRTC-DM-CPM-MRT- 11.04.2023 Comments on Design Mix for Foam Concrete (FC-03)/ Light
PKG8-056-5962 Weight Concrete
26 NCRTC-DM-CPM-MRT- 11.04.2023 NONO on Trial Mix for Tunnel Primary Grout (TG-36))
PKG8-056-5963
27 NCRTC-DM-CPM-MRT- 11.04.2023 NONO on Submission of Proposal 4th Internal Audit Report
PKG8-015A-5964 of QMS ISO 9001-2015 conducted between 17.05.2022 to
19.05.2022.
28 NCRTC-DM-CPM-MRT- 11.04.2023 NONO on Method Statement for Segment Repair Inside
PKG8-017-5965 Tunnel (Rev-2)
29 NCRTC-DM-CPM-MRT- 11.04.2023 Comments on Monthly Quality Report for the month of
PKG8-016-5966 February, 2023 (MQR-25)
30 NCRTC-DM-CPM-MRT- 11.04.2023 Comments on Monthly Quality Report for the month of
PKG8-016-5967 October, 2021
31 NCRTC-DM-CPM-MRT- 11.04.2023 Comments on Monthly Quality Report for the month of
PKG8-016-5968 September, 2021
32 NCRTC-DM-CPM-MRT- 11.04.2023 Comments on CV for the Post of Tunnel Construction
PKG8-033-5969 Engineer (NATM) (Mr. Biltu Das)

17 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 18 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
33 NCRTC-DM-CPM-MRT- 11.04.2023 Comments on CV of BIM Manager (Mr. Himanshu
PKG8-033-5970 Aggarwal)
34 NCRTC-DM-CPM-MRT- 11.04.2023 NONO on CV of Mr. Rajiv Ranjan Singh for the Post of
PKG8-033-5971 Station Manager
35 NCRTC-DM-CPM-MRT- 13.04.2023 Delay in construction of Cross Passages (CP)
PKG8-002-5974
36 NCRTC-DM-CPM-MRT- 13.04.2023 Comments on the Definitive Design (DD) Submission of
PKG8-011C-5977 Begumpul Ancillary Building Wall Opening Drawings
(WOD) (Rev-A)
37 NCRTC-DM-CPM-MRT- 13.04.2023 Comments on the Construction Reference Drawing (CRD)
PKG8-011C-5978 Submission of Begumpul Station Platform to Concourse Level
Lift Details on Grid-"E" (Rev-A)
38 NCRTC-DM-CPM-MRT- 13.04.2023 Comments on the Definitive Design (DD) Submission of
PKG8-011C-5981 Begumpul Station Platform Level Wall Opening (WOD)
Drawings (Rev-A)
39 NCRTC-DM-CPM-MRT- 13.04.2023 Comments on the Good For Construction (GFC) Submission
PKG8-011C-5982 of Begumpul Station Platform Level SEM Floor Opening
Drawings along with WIP BIM Model (Rev-D)
40 NCRTC-DM-CPM-MRT- 13.04.2023 NONO on the Revised Good for Construction (GFC)
PKG8-011C-5983 Submission of Undercroft Level Part Framing Plan and
Section for UG Station at Begumpul Station (Rev-G) Along
With BIM Model
41 NCRTC-DM-CPM-MRT- 13.04.2023 NONO on Good For Construction (GFC) Submission of
PKG8-011B-5984 Meerut Central Station Design & Reinforcement Details of
Platform Slab (Grid 1-9) (Rev-B)
42 NCRTC-DM-CPM-MRT- 13.04.2023 NONO with Comments on Construction Reference Drawing
PKG8-011B-5985 (CRD) Submission of Design & details of Fireman Staircase
(F-02.1) for Meerut Central Station (Rev-A)
43 NCRTC-DM-CPM-MRT- 13.04.2023 NONO with Comments on Good for Construction (GFC)
PKG8-011B-5986 Submission of Meerut Central Station Undercroft Level Floor
Opening Layout Drawing along with BIM Model (Rev-C)
44 NCRTC-DM-CPM-MRT- 13.04.2023 NONO on Construction Reference Drawing (CRD)
PKG8-011B-5987 Submission of Meerut Central Station Platform Level Floor
Opening Layout Drawing along with BIM Model (Rev C)
45 NCRTC-DM-CPM-MRT- 15.04.2023 NONO on Compliance Report of 3rd Internal Audit ISO
PKG8-015A-5993 9001-2015 conducted on 14.03.2022 to 16.03.2022
46 NCRTC-DM-CPM-MRT- 15.04.2023 Regarding non-submission of Three-Month Rolling
PKG8-031-5994 Programme (Mar-23 to May-23 & April-23 to June-23) and
MPR for March 2023
47 NCRTC-DM-CPM-MRT- 06.03.2023 Minutes of Weekly Progress Review Meeting No. 79 held on
PKG8-029-5997 06.03.2023
48 NCRTC-DM-CPM-MRT- 13.03.2023 Minutes of Weekly Progress Review Meeting No. 80 held on
PKG8-029-5998 13.03.2023
49 NCRTC-DM-CPM-MRT- 17.04.2023 Regarding Break-up of BoQ Schedules in sub-stages
PKG8-021-5999
50 NCRTC-DM-CPM-MRT- 19.04.2023 Comments on Submission of reports of Pre-conditional
PKG8-009-6030 Survey of Existing Building Condition for Tunnel from
Bhaisali Station to Meerut Central Station and Bhaisali to
Begumpul Station

18 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 19 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
51 NCRTC-DM-CPM-MRT- 19.04.2023 Signed Tracing Sheets of Good for Construction (GFC)
PKG8-011A-6032 Drawings Bhaisali Station reinforcement details of Platform
Slab (Rev-B), Plenum Slab framing between Concourse &
Roof level (Rev-C), Layout plan of Stub Column starting from
Undercroft slab (Rev-B), Ancillary building design & details
of maintenance Staircase O-23 (Rev-C), Public Staircase ST-
01 & ST-02, D-Wall reinforcement for panel DW2 to DW4 &
DW107 to DW112, Construction sequence for north end
launching shaft, ECS-TVS Equipment foundation at
Concourse & Platform level Slab.
52 NCRTC-DM-CPM-MRT- 19.04.2023 Signed Tracing Sheets of Good For Construction (GFC)
PKG8-011B-6033 Drawings Meerut Central Station Reinforcement details of
Base Slab (Grid 05 to 17) (Rev-C) & Reinforcement details of
Platform Slab (Grid 09 to 22) (Rev-C)
53 NCRTC-DM-CPM-MRT- 19.04.2023 Signed Tracing Sheets of Good For Construction (GFC)
PKG8-011B-6034 Drawings Meerut Central Station Typical Reinforcement
Details of Plenum walls between Roof & Concourse Level
(Rev-B), Typical Reinforcement details of Double Slab
between Roof and Concourse level, Reinforcement details of
Base slab (Grid 01 to 05), Design & Details of Public
Staircase ST-01, Concourse level Framing Plan and sections
& D-Wall Panel DW26 to DW35 and DW82 to DW96
54 NCRTC-DM-CPM-MRT- 20.04.2023 Comments on the Construction Reference Drawing (CRD)
PKG8-011C-6044 Submission of Begumpul Station Entry Exit – 3 Design &
Details of D-Wall Panels E3W02 to E3W06, E3W08, E3W11
to E3W13, E3W15 to E3W22, E3W27 to E3W28, E3W30,
E3W32 to E3W34, E3W36 to E3W39, E3W41 to E343 along
with D - Wall Layout & Construction Sequence (Rev A)
55 NCRTC-DM-CPM-MRT- 20.04.2023 Comments on the Good For Construction (GFC) Submission
PKG8-011C-6045 of Construction Sequence of Entry Exit ES-01 Begumpul
Station (Rev-E) along with WIP BIM Model
56 NCRTC-DM-CPM-MRT- 20.04.2023 Comments on the Good For Construction (GFC) Submission
PKG8-011C-6046 of Platform Level Framing Plan and Section of Begumpul
(BEGU) Station (Rev-C) with WIP BIM Model
57 Engineer/Package-08/01/6050 21.04.2023 Delay in start of Finishing Works at Stations
58 NCRTC-DM-CPM-MRT- 21.04.2023 Regarding provision of Advance Probe Drilling at specified
PKG8-011-6053 locations in TBM drive from Bhaisali to Begumpul Station
59 NCRTC-DM-CPM-MRT- 21.04.2023 Comments on the Construction Reference Drawing (CRD)
PKG8-011C-6058 Submission of Design & Reinforcement Details of Begumpul
Station Maintenance Staircase (O-23.6) between Grid 13 to 14
(Rev-A)
60 NCRTC-DM-CPM-MRT- 21.04.2023 Comments on the Construction Reference Drawing (CRD)
PKG8-011C-6059 Submission of Design & Reinforcement Details of Begumpul
Station Fireman Staircase (F-02.1) & (F-02.2) (Rev-A)
61 NCRTC-DM-CPM-MRT- 21.04.2023 NONO on the Good For Construction (GFC) Submission of
PKG8-011C-6060 Reinforcement Details of Sump Cover Slab at Grid 2, 10 & 15
Begumpul Station (Rev-B)
62 NCRTC-DM-CPM-MRT- 21.04.2023 NONO with comments on Construction Reference Drawing
PKG8-011B-6061 (CRD) Submission of SOUTH Cut & Cover RCC Parapet
Wall GAD & Reinforcement Details (Rev-A)

19 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 20 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
63 NCRTC-DM-CPM-MRT- 21.04.2023 NONO with comments on Revised Good for Construction
PKG8-011B-6062 (GFC) Submission of General Arrangement Drawing (GAD)
and Section details for South Cut & Cover box & Elevated
Ramp (Rev-K)
64 NCRTC-DM-CPM-MRT- 21.04.2023 NONO on Revised Good For Construction (GFC) Submission
PKG8-011B-6063 of South Cut and Cover Reinforcement Details of U Trough
(Chainage 66010m to Chainage 66254m) (Rev-E)
65 NCRTC-DM-CPM-MRT- 21.04.2023 Regarding damaged segments at Invert of Tunnel between
PKG8-041-6066 Bhaisali to Meerut Central DN Line
66 NCRTC-DM-CPM-MRT- 24.04.2023 Comments on the Shutter Design for Closing of Temporary
PKG8-011C-6068 Cut-outs at Begumpul Station
67 NCRTC-DM-CPM-MRT- 24.04.2023 Comments on the Good for Construction (GFC) Submission
PKG8-011A-6069 of Bhaisali Station Design & Details of Soldier Pile Wall for
Entry Exit ES-2 (Rev-B)
68 NCRTC-DM-CPM-MRT- 24.04.2023 NONO on the Good for Construction (GFC) Submission of
PKG8-011A-6070 Bhaisali Station Reinforcement details of Platform Level Slab
(Grid 1-16) Rev-C
69 NCRTC-DM-CPM-MRT- 25.04.2023 Public complaint regarding crack.occur in building of 35/15
PKG8-051-6077 near Delhi Chungi Road due to excavation work in South Cut
& Cover
70 NCRTC-DM-CPM-MRT- 25.04.2023 Comments on Monthly Health & Safety Report for the month
PKG8-018-6078 of March 2023
71 NCRTC-DM-CPM-MRT- 25.04.2023 NONO on Monthly Health and Safety Report for the month of
PKG8-018-6079 January 2023
72 NCRTC-DM-CPM-MRT- 25.04.2023 NONO on Submission of Compliance Report of 5th Internal
PKG8-015A-6080 Audit ISO 9001-2015
73 NCRTC-DM-CPM-MRT- 25.04.2023 Comments on Monthly Quality Report for the month of
PKG8-016-6081 March 2023 (MQR-26)
74 NCRTC-DM-CPM-MRT- 25.04.2023 NONO on Monthly Environment Report for the month of
PKG8-067-6082 February 2023

Summary of outgoing correspondence from NCRTC

Sl.No. Letter No. Date Description


AFC-4559-NCRTC-Pkg8- Submission of MEEC, BHAI & BEGU Fire Rated Door Shop
1 27.03.2023
2023-3940 Drawings (Rev-0)

Submission of Tracing Sheets, A1 Copy 06 sets & a CD for


AFC-4559-NCRTC-Pkg8- Closure-Good For Construction of Settlement Analysis &
2 27.03.2023
2023-3941 Construction Impact Assessment (Bored Tunnel-2 Bhaisali to
Begumpul) Instrumentation and Monitoring Drawings Rev-C

AFC-4559-NCRTC-Pkg8- Submission of Design Modification Report (DMR-64) for missing


3 27.03.2023
2023-3942 Connection Details of SCC & MEEC Station at South End

Construction Reference Drawing (CRD) Submission of Begumpul


AFC-4559-NCRTC-Pkg8-
4 27.03.2023 Station Design & Reinforcement Details of Ancillary Building
2023-3943
Columns (Rev A)

20 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 21 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
AFC-4559-NCRTC-Pkg8- Submission of Technical Proposal of Cables (Make-KEI Industries
5 28.03.2023
2023-3944 Ltd) (Rev-1)

AFC-4559-NCRTC-Pkg8- Revised Good For Construction (GFC) Submission of Construction


6 28.03.2023
2023-3945 Sequence of Entry Exit ES-01 Begumpul Station (Rev-E)

AFC-4559-NCRTC-Pkg8- Difference in GST TDS deducted and GST TDS deposited/


7 28.03.2023
2023-3946 uploaded on GST portal for the month of Feb-2023
AFC-4559-NCRTC-Pkg8-
8 28.03.2023 Submission of Renewed Insurance Policies for TBM
2023-3947
AFC-4559-NCRTC-Pkg8- Submission of Records against processing charges reimbursement
9 28.03.2023
2023-3948 of C&D Plant
AFC-4559-NCRTC-Pkg8- Submission of Compliance Report of 3rd Internal Audit ISO 9001-
10 28.03.2023
2023-3949 2015
Revised Good For Construction (GFC) for Tracing Submission of
AFC-4559-NCRTC-Pkg8-
11 28.03.2023 Begumpul Station Intermediate Level (Except Entry/Exit Area)
2023-3950
Wall Opening Drawings (Rev-D)
AFC-4559-NCRTC-Pkg8- Weekly SHE Walkthrough Report Conducted at Bhaisali Station
12 29.03.2023
2023-3951 dated 28.02.2023
AFC-4559-NCRTC-Pkg8- Weekly SHE Walkthrough Report Conducted at Begumpul Station
13 29.03.2023
2023-3952 dated 14.02.2023
AFC-4559-NCRTC-Pkg8- Compliance Report of 4th Quarter External Environment Audit
14 29.03.2023
2023-3953 conducted on 14th January 2023 at Package-8
AFC-4559-NCRTC-Pkg8- Submission of Minutes of SHE Committee Meeting held on
15 29.03.2023
2023-3954 24.03.2023
AFC-4559-NCRTC-Pkg8- Request for approval of CV for the post of “Tunnel Construction
16 29.03.2023
2023-3955 Engineer (NATM Tunnel)” (Mr. Biltu Das)
AFC-4559-NCRTC-Pkg8- Submission of Method Statement for Repairing Steps and Lips at
17 29.03.2023
2023-3956 Segment Joints Inside Tunnel (Rev-1)
AFC-4559-NCRTC-Pkg8- Compliance Report of Non-Conformities (NCR) No.
18 29.03.2023
2023-3957 AFC/QC/NCR/ 32 & 54 of Begumpul UG Station

Submission of Design Modification Report (DMR-63) for providing


AFC-4559-NCRTC-Pkg8-
19 30.03.2023 steel frame encased with concrete at the Junctions with running
2023-3958
bored tunnels, complying with the clause 8 (7) Chapter 5 of ODS.

AFC-4559-NCRTC-Pkg8- Submission of Three-Month Rolling Programme (January-2023 to


20 30.03.2023
2023-3959 March-2023)
Construction Reference Drawing (CRD) Submission of Design &
AFC-4559-NCRTC-Pkg8-
21 30.03.2023 Details of Plinth Slab & Plunge Column of Begumpul Station
2023-3960
Ancillary Building (Rev-A)
AFC-4559-NCRTC-Pkg8- Definitive Design (DD) Submission of Architectural Volume 2B -
22 30.03.2023
2023-3961 Typical Detail Drawings (Part-2) (Rev-A)
Submission of Tax Invoice for C&D Plant processing charges
AFC-4559-NCRTC-Pkg8-
23 30.03.2023 reimbursement for the month of Feb-2023 & Mar-2023 of Package
2023-3962
08.
Submission of Design Modification Report (DMR-65) for providing
AFC-4559-NCRTC-Pkg8-
24 30.03.2023 missing details of catch Pit in Upline & Down Line Box Structure
2023-3963
as per Plumbing Drawing.
AFC-4559-NCRTC-Pkg8- Submission of Monthly SHE Training Report for the month of
25 30.03.2023
2023-3964 January 2023
21 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 22 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
AFC-4559-NCRTC-Pkg8- Submission of Monthly SHE Training Report for the month of
26 30.03.2023
2023-3965 February 2023
AFC-4559-NCRTC-Pkg8- Submission of Method Statement for Segment Repair Inside Tunnel
27 31.03.2023
2023-3966 (Rev-2)
AFC-4559-NCRTC-Pkg8- Submission of Design Mix for Foam Concrete (FC-03) / Light
28 31.03.2023
2023-3967 Weight Concrete
AFC-4559-NCRTC-Pkg8- Compliance of Comments on Trial Mix of Tunnel Primary Grout
29 31.03.2023
2023-3968 (TG-36)
AFC-4559-NCRTC-Pkg8- Submission of Compliance of Monthly Quality Report for the
30 31.03.2023
2023-3969 Month of September 2021
AFC-4559-NCRTC-Pkg8- Submission of Technical Proposal for Pipe Fittings (Grooved and
31 31.03.2023
2023-3970 Threaded) (Rev-0)
AFC-4559-NCRTC-Pkg8- Submission of Tax Invoice for Balance 20% amount against IPC-27
32 31.03.2023
2023-3971 for the month of March-2023
AFC-4559-NCRTC-Pkg8- Regarding reduction of BG towards recovered component of Plant
33 01.04.2023
2023-3972 & Machinery Advance
AFC-4559-NCRTC-Pkg8- Submission of Compliance Report of 5th Audit ISO 9001-2015
34 01.04.2023
2023-3973 (Surveillance Audit by M/s Bureau Veritas)
AFC-4559-NCRTC-Pkg8- Submission of Compliance Report of 4th Internal Audit ISO 9001-
35 01.04.2023
2023-3974 2015
AFC-4559-NCRTC-Pkg8- Regarding reduction of BG towards recovered component of
36 01.04.2023
2023-3975 Mobilisation Advance
AFC-4559-NCRTC-Pkg8- Request for approval of CV for the post of “BIM Manager” (Mr.
37 03.04.2023
2023-3976 Himanshu Aggarwal)
Good For Construction (GFC) Submission of Meerut Central
AFC-4559-NCRTC-Pkg8-
38 04.04.2023 Station Design & Reinforcement Details of Platform Slab (Grid 1-
2023-3977
9) (Rev-B)
Construction Reference Drawing (CRD) Submission of Begumpul
AFC-4559-NCRTC-Pkg8-
39 04.04.2023 Station Ancillary Building SEM Layout Floor Opening Drawings
2023-3978
(Rev-B) along with WIP BIM Model
Revised Good For Construction (GFC) Submission of Tracing
AFC-4559-NCRTC-Pkg8-
40 04.04.2023 Drawings of Floor SEM Drawings of Intermediate Level of
2023-3979
Begumpul (BEGU) Station (Rev-G)
Revised Good For Construction (GFC) Submission of Tracing
AFC-4559-NCRTC-Pkg8-
41 04.04.2023 Drawings of Floor SEM Drawings of Concourse Level (Grid-01 to
2023-3980
16) of Begumpul (BEGU) Station (Rev-H)

Good For Construction (GFC) Submission of Meerut Central


AFC-4559-NCRTC-Pkg8-
42 04.04.2023 Station Concourse Level Wall Opening Layout Drawing for BOH
2023-3981
Area from (Grid 1-5 & 15-22) along with BIM Model (Rev-D)

AFC-4559-NCRTC-Pkg8- Definitive Design Submission of Designs and Drawings of Bhaisali


43 04.04.2023
2023-3982 Earthing and Lightning Protection Layout (Rev-A)
AFC-4559-NCRTC-Pkg8- Compliance to comments on Monthly Health and Safety report for
44 04.04.2023
2023-3983 the month of January 2023
AFC-4559-NCRTC-Pkg8- Compliance Report of Weekly SHE Walkthrough Report conducted
45 04.04.2023
2023-3984 at South Cut & Cover on 08.02.2023
AFC-4559-NCRTC-Pkg8- Compliance Report of Weekly SHE Walkthrough Report conducted
46 03.04.2023
2023-3985 at North Cut & Cover on 14.02.2023

22 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 23 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
AFC-4559-NCRTC-Pkg8- Compliance Report of Weekly SHE Walkthrough Report conducted
47 03.04.2023
2023-3986 at North Cut & Cover on 21.02.2023
AFC-4559-NCRTC-Pkg8- Compliance Report of Weekly SHE Walkthrough Report conducted
48 03.04.2023
2023-3987 at Begumpul Station on 14.03.2023
AFC-4559-NCRTC-Pkg8- Weekly SHE Walkthrough Report conducted at Meerut Central
49 04.04.2023
2023-3988 dated 21.03.2023
AFC-4559-NCRTC-Pkg8- Weekly SHE Walkthrough Report conducted at South Cut & Cover
50 04.04.2023
2023-3989 dated 28.03.2023
AFC-4559-NCRTC-Pkg8-
51 04.04.2023 British Safety Council: International Safety Awards 2023 Results
2023-3990

AFC-4559-NCRTC-Pkg8- Submission of Revised As-built General Alignment Drawings from


52 05.04.2023
2023-3991 Meerut Central to Bhaisali Station (Downline) (Rev-L)

AFC-4559-NCRTC-Pkg8- Request for approval of CV for the post of “Station Manager” (Mr.
53 06.04.2023
2023-3992 Rajiv Ranjan Singh)
Submission of Tracing Sheets,A1 Copy 06 sets for Closure Good
AFC-4559-NCRTC-Pkg8-
54 06.04.2023 For Construction of RCC Plenum Walls Reinforcement details at
2023-3993
Concourse Level Begumpul Station (Rev-B)
Submission of Tracing Sheets,A1 Copy 06 sets for Closure Good
AFC-4559-NCRTC-Pkg8-
55 06.04.2023 For Construction Drawings of Public Staircase (ST-03,04&05) For
2023-3994
Begumpul Station (Rev-B)
Submission of Tracing Sheets,A1 Copy 06 sets for Closure Good
AFC-4559-NCRTC-Pkg8-
56 06.04.2023 For Construction Reinforcement Details of Base Slab (Grid-06 to
2023-3995
12) at Begumpul Station (Rev-B)
Submission of Tracing Sheets,A1 Copy 06 sets for Closure Good
AFC-4559-NCRTC-Pkg8- For Construction Typical Reinforcement details & Strengthening
57 06.04.2023
2023-3996 around cut outs for RCC Plenum Walls Mezzanine Level at
Begumpul Station Rev-D)
AFC-4559-NCRTC-Pkg8- Submission of Monthly Instrumentation & Monitoring Report
58 06.04.2023
2023-3997 (Mar-2023) of Package-8
AFC-4559-NCRTC-Pkg8- Submission of Monthly Instrumentation & Monitoring Report
59 06.04.2023
2023-3998 Tunnel (BHAI to MEEC) (Mar-2023) of Package-8
AFC-4559-NCRTC-Pkg8- Submission of Monthly Instrumentation & Monitoring Report
60 06.04.2023
2023-3999 Tunnel (NCC to BEGU) (Mar-2023) of Package-8
AFC-4559-NCRTC-Pkg8- Submission of Monthly Instrumentation & Monitoring Report
61 06.04.2023
2023-4000 Tunnel (BHAI to BEGU) (Mar-2023) of Package-8
Good for Construction (GFC) Submission of Begumpul Station
AFC-4559-NCRTC-Pkg8-
62 06.04.2023 Platform Level Framing Plan & Section along With BIM Model
2023-4001
(Rev-C)
Revised Good for Construction Drawings (GFC) Submission of
AFC-4559-NCRTC-Pkg8- Begumpul Station- Vol-1A Architectural General Arrangement
63 06.04.2023
2023-4002 Drawings of Entry Exit ES-1 ES-3 & Ancillary Building (Rev-H)
Along With BIM Model
Definitive Design (DD) Submission of Meerut Central Station
AFC-4559-NCRTC-Pkg8-
64 07.04.2023 (MEEC) Architectural Finishes Vol.2A for Public Area (Rev-A)
2023-4003
Along With WIP BIM Model

23 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 24 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Revised Good for Construction Drawings (GFC) Submission of
AFC-4559-NCRTC-Pkg8- North Cut & Cover Box Tunnel & Ramp General Arrangement
65 07.04.2023
2023-4004 Drawing & Section Details For Elevated Ramp & Sump Area (Rev-
K)
Revised Good for Construction Drawings (GFC) Submission of
AFC-4559-NCRTC-Pkg8-
66 07.04.2023 North End Launching Shaft Reinforcement Details of U-Trough
2023-4005
Ramp (Chainage 71100 to71310) Rev-F
AFC-4559-NCRTC-Pkg8- Compliance report of Non- Conformities (NCR) No.
67 07.04.2023
2023-4006 AFC/QC/NCR/35, 36, 62, 66, 67 & 68.

AFC-4559-NCRTC-Pkg8- Good for Construction (GFC) Submission of Bhaisali Station


68 07.04.2023
2023-4007 Reinforcement details of Platform Level Slab (Grid 1-16) Rev-C

AFC-4559-NCRTC-Pkg8- Good for Construction (GFC) Submission of Bhaisali Station


69 07.04.2023
2023-4008 Design & Details of Soldier Pile Wall for Entry Exit ES-2 (Rev-B)

AFC-4559-NCRTC-Pkg8- Construction Reference Drawing (CRD) Submission of North Cut


70 07.04.2023
2023-4009 & Cover Box Tunnel & Ramp Railing & Fencing Details (Rev-A)

Construction Reference Drawing (CRD) Submission of SOUTH


AFC-4559-NCRTC-Pkg8-
71 07.04.2023 Cut & Cover RCC Parapet Wall GAD & Reinforcement Details
2023-4010
(Rev-A)
Revised Good for Construction (GFC) Submission of General
AFC-4559-NCRTC-Pkg8-
72 07.04.2023 Arrangement Drawing (GAD) and Section details for South Cut &
2023-4011
Cover box & Elevated Ramp (Rev-K)
Revised Good For Construction (GFC) Submission of South Cut
AFC-4559-NCRTC-Pkg8-
73 08.04.2023 and Cover Reinforcement Details of U Trough (Chainage 66010m
2023-4012
to Chainage 66254m) (Rev-E)
Revised Good For Construction (GFC) Submission of North Cut
AFC-4559-NCRTC-Pkg8- and Cover & South End Design & Details of Box with Ramp
74 08.04.2023
2023-4013 Structure (Chainage 65860M to Chainage 66010M & Chainage
71310 to Chainage 71520) (Rev-E)

AFC-4559-NCRTC-Pkg8- Revised Good For Construction (GFC) Submission of South Cut &
75 08.04.2023
2023-4014 Cover GAD & Reinforcement Details of Sump Area (Rev-D)

AFC-4559-NCRTC-Pkg8- Submission of Three-Month Rolling Programme (February-2023 to


76 08.04.2023
2023-4015 April-2023)
AFC-4559-NCRTC-Pkg8- Submission of Method Statement for Diversion of 200mm DI water
77 08.04.2023
2023-4016 line (Rev-1)
AFC-4559-NCRTC-Pkg8- CRD Submission of SLD & Electrical Design calculation of
78 10.04.2023
2023-4017 Bhaisali station (Rev-H)
AFC-4559-NCRTC-Pkg8-
79 10.04.2023 Monthly Health & Safety Report for the month of March 2023
2023-4018
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8-
80 11.04.2023 - Good For Construction Begumpul Station Reinforcement Details
2023-4019
of Base Slab (Grid-1 to 6) (Rev-B)
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8-
81 11.04.2023 - Good For Construction Begumpul Station Design & Details of
2023-4020
Public Staircase ST-02 (Rev-C)

24 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 25 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8-
82 11.04.2023 - Good For Construction Layout Plan of UPAS Duct & Cut out at
2023-4021
Undercroft Level of Begumpul Station (Rev-C)

Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure


AFC-4559-NCRTC-Pkg8-
83 11.04.2023 - Good For Construction Public Staircase (ST-13) for Begumpul
2023-4022
Station (Rev-B)
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8-
84 11.04.2023 - Good For Construction Begumpul Station Entry-Exit ES-1 D-wall
2023-4023
Reinforcement Details (Rev-B)
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8-
85 11.04.2023 - Good For Construction Begumpul Station ECS-TVS Equipment
2023-4024
Foundation Plinth Details (Rev-B)
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8-
86 11.04.2023 -Good For Construction Begumpul Station Double Slab between
2023-4025
Mezzanine Slab & Roof Slab (Rev-D)
Good For Construction (GFC) Submission of Reinforcement
AFC-4559-NCRTC-Pkg8-
87 11.04.2023 Details of Sump Cover Slab at Grid 2, 10 & 15 Begumpul Station
2023-4026
(Rev-B)
AFC-4559-NCRTC-Pkg8- Regarding approval of MEP SITC Works Subcontractor – EFKON
88 11.04.2023
2023-4027 India Pvt. Ltd.

Construction Reference Drawing (CRD) Submission of Design &


AFC-4559-NCRTC-Pkg8-
89 11.04.2023 Reinforcement Details of Begumpul Station Maintenance Staircase
2023-4028
(O-23.6) between Grid 13 to 14 (Rev-A)

Construction Reference Drawing (CRD) Submission of Design &


AFC-4559-NCRTC-Pkg8-
90 11.04.2023 Reinforcement Details of Begumpul Station Fireman Staircase (F-
2023-4029
02.1) & (F-02.2) (Rev-A)
AFC-4559-NCRTC-Pkg8- Submission of Method Statement for Installation of GI Conduits
91 11.04.2023
2023-4030 and Accessories (Rev-0)
AFC-4559-NCRTC-Pkg8-
92 10.04.2023 Monthly Environment Report for the month of March-2023
2023-4031
AFC-4559-NCRTC-Pkg8- Weekly SHE Walkthrough Report Conducted at North Cut & Cover
93 11.04.2023
2023-4032 dated 04.04.2023
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8-
94 12.04.2023 - Good for Construction Bhaisali Base Slab Reinforcement details
2023-4033
(Grid-05 to 16) (Rev-B)
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8- - Good For Construction Bhaisali Station Typical Reinforcement
95 12.04.2023
2023-4034 details & strengthening around cut outs for Plenum wall at
Concourse Level (Rev-C)
Submission of Tracing sheets, A1 Copy-06sets & a CD for Closure
AFC-4559-NCRTC-Pkg8-
96 12.04.2023 - Good For Construction Bhaisali Station Plenum Wall
2023-4035
Reinforcement at Concourse Level (Grid-1 to 7) (Rev-B)
Tracing Sheet for Signature Good For Construction (GFC)
AFC-4559-NCRTC-Pkg8-
97 12.04.2023 Submission of Meerut Central Station ECS-TVS Equipment
2023-4036
Foundation at Concourse & Platform Level Slab (Rev-B)

25 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 26 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Tracing Sheets for Signature Good For Construction (GFC)
AFC-4559-NCRTC-Pkg8- Submission of Meerut Central Station Dimensional &
98 12.04.2023
2023-4037 Reinforcement details of Maintenance Staircase O-23.5 (Grid-22-G)
(Rev-B)
Construction Reference Drawing (CRD) Submission of Meerut
AFC-4559-NCRTC-Pkg8-
99 12.04.2023 Central (MEEC) Station Vol-2A Architectural Finishes Drawings
2023-4038
for BOH Area (Rev-B)
AFC-4559-NCRTC-Pkg8- Compliance of Comments on Design Mix Grade M-40 (TM-168)
100 13.04.2023
2023-4039 Shotcrete with 10 mm down Coarse Aggregate
AFC-4559-NCRTC-Pkg8- Compliance for approval of CV for the post of “Tunnel
101 13.04.2023
2023-4040 Construction Engineer (NATM Tunnel)”
AFC-4559-NCRTC-Pkg8- Submission of Design Modification Report (DMR)-66 for North
102 13.04.2023
2023-4041 Cut & Cover Walkway Slab
AFC-4559-NCRTC-Pkg8- Submission of Price Variation Bill-25 for the month of March-2023
103 13.04.2023
2023-4042 along with Tax Invoices
AFC-4559-NCRTC-Pkg8- Shutter Design for Closing of Temporary Cut-outs at Begumpul
104 13.04.2023
2023-4043 Station (Rev-0)
AFC-4559-NCRTC-Pkg8- Submission of Revised MEEC, BHAI & BEGU Fire Rated Door
105 13.04.2023
2023-4044 Shop Drawings (Rev-1)
AFC-4559-NCRTC-Pkg8- Submission of Method Statement for Installation of Cable Tray and
106 13.04.2023
2023-4045 Raceway (Rev-0)
AFC-4559-NCRTC-Pkg8- Submission of Three-Month Rolling Programme (March-2023 to
107 14.04.2023
2023-4046 May-2023)

Submission of Design Modification Report (DMR-63) for providing


AFC-4559-NCRTC-Pkg8-
108 14.04.2023 steel frame encased with concrete at the Junctions with running
2023-4047
bored tunnels, complying with the clause 8 (7) Chapter 5 of ODS.

AFC-4559-NCRTC-Pkg8- Submission of Monthly Quality Report for the month of March-


109 14.04.2023
2023-4048 2023 (MQR-26)
AFC-4559-NCRTC-Pkg8- Submission of Technical Proposal for Tunnel Bracket sourced from
110 14.04.2023
2023-4049 M/s Axxiom Venture (Rev-0)
Revised Good for Construction (GFC) Submission of Begumpul
AFC-4559-NCRTC-Pkg8-
111 14.04.2023 Station Concourse Level BOH Area Wall Opening Drawings (Rev-
2023-4050
D) along with WIP BIM Model
Revised Good For Construction Drawings (GFC) Submission of
AFC-4559-NCRTC-Pkg8-
112 14.04.2023 Begumpul Station- Vol-1A Platform Level Architectural General
2023-4051
Arrangement Drawings (Rev-K)
AFC-4559-NCRTC-Pkg8- CRD Submission of Designs and Drawings of Begumpul Station
113 14.04.2023
2023-4052 Lighting (Rev-B)
AFC-4559-NCRTC-Pkg8- Submission of Monthly SHE Training Report for the month of
114 14.04.2023
2023-4053 March-2023 (with 01 CD)
AFC-4559-NCRTC-Pkg8- Compliance Report of GC Environment Audit conducted at Casting
115 14.04.2023
2023-4054 Yard on 31.03.2023
AFC-4559-NCRTC-Pkg8- Weekly SHE Walkthrough Report conducted at Begumpul Station
116 14.04.2023
2023-4055 dated 11.04.2023
AFC-4559-NCRTC-Pkg8- Submission of Quarterly SHE Training Report for the 1st Quarter
117 14.04.2023
2023-4056 (from January to March 2023)

26 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 27 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Good For Construction (GFC) Submission of Entry-ES2 & Vent
AFC-4559-NCRTC-Pkg8-
118 15.04.2023 Shaft Framing Plan for Bhaisali Station along with BIM Model
2023-4057
(Rev-C)
AFC-4559-NCRTC-Pkg8- Submission of Checking of Final Traverse Report from BHAI to
119 17.04.2023
2023-4058 MEEC UP Line
AFC-4559-NCRTC-Pkg8- Submission of Checking of Control Points AFGPS-7, AFGPS-8 to
120 17.04.2023
2023-4059 TBM S88 UP Line BHAI to BEGU
AFC-4559-NCRTC-Pkg8- Compliance of Comments on Design Mix of Foam Concrete TM-
121 18.04.2023
2023-4060 FC03
Compliance report of Non-conformities (NCR No.)
AFC-4559-NCRTC-Pkg8- AFC/QC/NCR/04 & 06 of Begumpul Station and
122 18.04.2023
2023-4061 AFC/QC/NCR/11, 52, 54, 59 & 64 of Begumpul, Bhaisali &
Meerut Central Station
AFC-4559-NCRTC-Pkg8- Submission of Technical Proposal of FS & NON-FS Wires make-
123 18.04.2023
2023-4062 KEI Industries Ltd. (Rev-0)
AFC-4559-NCRTC-Pkg8- Submission of Technical Submittal for Fire Hydrant Valve - New
124 18.04.2023
2023-4063 Age Fire Protection Industries Pvt. Ltd. (Rev-0)
AFC-4559-NCRTC-Pkg8- Submission of Checking of Control Points AFGPS-7, AFGPS-8 to
125 18.04.2023
2023-4064 TBM S88 UP Line BHAI to BEGU
AFC-4559-NCRTC-Pkg8- Submission of Checking of Geometrical Definition at Collar
126 18.04.2023
2023-4065 Section Lattice Girder
AFC-4559-NCRTC-Pkg8- Submission of Proposal to Divert Uncharted 200 mm Water line DI
127 18.04.2023
2023-4066 pipe at Begumpul Station
AFC-4559-NCRTC-Pkg8- Submission of Compliance Report of 6th Internal Audit ISO 9001-
128 18.04.2023
2023-4067 2015
AFC-4559-NCRTC-Pkg8- Intimation for absence of Mr. Alok Tiwari – Contractor’s
129 18.04.2023
2023-4068 Representative
Construction Reference Drawing (CRD) Submission of Begumpul
AFC-4559-NCRTC-Pkg8-
130 19.04.2023 Station Platform Level Slab Design & Reinforcement details (Rev-
2023-4069
A)
Revised Good For Construction (GFC) Submission of Begumpul
AFC-4559-NCRTC-Pkg8-
131 19.04.2023 Station Platform Level Framing Plan & Section along with WIP
2023-4070
BIM Model (Rev-C)
AFC-4559-NCRTC-Pkg8- Submission of Checking of Final Control Points with levels from
132 19.04.2023
2023-4071 NCC to BEGU UP Line
AFC-4559-NCRTC-Pkg8- Submission of Three-Month Rolling Programme (April-2023 to
133 20.04.2023
2023-4072 June-2023)
AFC-4559-NCRTC-Pkg8-
134 20.04.2023 Submission of Technical Submittal of FF Pumps (Rev-1)
2023-4073
AFC-4559-NCRTC-Pkg8- Submission of Checking of Final Wriggle Survey Report BHAI to
135 21.04.2023
2023-4074 MEEC UP Line
AFC-4559-NCRTC-Pkg8- Submission of Checking of TBM Manual Survey Report TBM S88
136 21.04.2023
2023-4075 UP Line BHAI to BEGU
AFC-4559-NCRTC-Pkg8- Compliance to NCRTC Comments on Bhaisali Station Platform
137 24.04.2023
2023-4076 Level Slab Shutter Design (Grid 19-22)
AFC-4559-NCRTC-Pkg8- Confirmation of Debit / Credit Balances for Package-08 as on
138 24.04.2023
2023-4077 31.03.2023

27 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 28 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Revised Construction Reference Drawing (CRD) Submission of
AFC-4559-NCRTC-Pkg8-
139 24.04.2023 Entry-ES1 & Ancillary Building Framing Plan for Begumpul
2023-4078
Station Alongwith WIP BIM Model (Rev-B)
AFC-4559-NCRTC-Pkg8- Compliance Report of Weekly SHE Walkthrough conducted at
140 24.04.2023
2023-4079 Bhaisali Station on 28.02.2023
AFC-4559-NCRTC-Pkg8- Compliance Report of Weekly SHE Walkthrough conducted at
141 24.04.2023
2023-4080 Meerut Central on 21.03.2023
AFC-4559-NCRTC-Pkg8- Compliance Report of Weekly SHE Walkthrough conducted at
142 24.04.2023
2023-4081 South Cut & Cover on 28.03.2023
AFC-4559-NCRTC-Pkg8- Compliance report of Weekly SHE Walkthrough Report conducted
143 24.04.2023
2023-4082 at North Cut & Cover on 04.04.2023
AFC-4559-NCRTC-Pkg8-
144 24.04.2023 Invitation for SHE Committee Meeting
2023-4083
Submission of Evidence Photographs of 52nd National Safety
AFC-4559-NCRTC-Pkg8-
145 24.04.2023 Week/Day 2023 program held at NCRTC Package-8 from 04th to
2023-4084
10th March 2023
Good For Construction (GFC) Submission of Begumpul Station
Entry Exit – 3 Design & Details of D-Wall Panels E3W02 to
AFC-4559-NCRTC-Pkg8- E3W06, E3W08, E3W11 to E3W13, E3W15 to E3W22, E3W27 to
146 24.04.2023
2023-4085 E3W28, E3W30, E3W32 to E3W34, E3W36 to E3W39, E3W41 to
E343 along with D - Wall Layout & Construction Sequence (Rev
B)
AFC-4559-NCRTC-Pkg8- Leave Intimation of Mr. Alok Tiwari – Contractor’s Representative
147 24.04.2023
2023-4086 (25th Apr to 02May)
AFC-4559-NCRTC-Pkg8- GFC submission of Bhaisali station Fire Fighting Drawings &
148 24.04.2023
2023-4087 Calculation Report (Rev-F)
AFC-4559-NCRTC-Pkg8- GFC Submission of Bhaisali Station Plumbing Drawings & Water
149 24.04.2023
2023-4088 supply system (Rev-E)
Construction Reference Drawing (CRD) Submission of Design &
AFC-4559-NCRTC-Pkg8-
150 24.04.2023 Details of Plinth Slab & Plunge Column of Begumpul Station
2023-4089
Ancillary Building (Rev-A)
Construction Reference Drawing (CRD) Submission of Begumpul
AFC-4559-NCRTC-Pkg8-
151 24.04.2023 Station Design & Reinforcement Details of Ancillary Building
2023-4090
Columns (Rev A)
AFC-4559-NCRTC-Pkg8-
152 25.04.2023 Submission of GST documents for Mar-2023
2023-4091
AFC-4559-NCRTC-Pkg8- Submission of Cross Passage Shutter General Arrangement
153 25.04.2023
2023-4092 Drawings & Fabrication Details
AFC-4559-NCRTC-Pkg8- Submission of North & South Cut & Cover above Ground Wall
154 25.04.2023
2023-4093 Shutter Bracket Details
Revised Construction Reference Drawing (CRD) Submission of
AFC-4559-NCRTC-Pkg8-
155 24.04.2023 Bhaisali Station Platform to Concourse Level Lift Details on Grid-
2023-4094
"E" (Rev-B)
Construction Reference Drawing (CRD) Submission of Bhaisali
AFC-4559-NCRTC-Pkg8-
156 24.04.2023 Station Ancillary Building SEM Layout - Wall Opening Drawings
2023-4095
along with BIM Model (Rev-C)

28 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 29 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-
AFC-4559-NCRTC-Pkg8-
157 24.04.2023 Good For Construction Bhaisali Station Reinforcement Details of
2023-4096
Platform Slab (Grid-16 to 22) (Rev-B)

Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-


AFC-4559-NCRTC-Pkg8-
158 25.04.2023 Good For Construction Bhaisali Ancillary Building details of
2023-4097
Maintenance Staircase O-23 (Rev-C)
Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-
AFC-4559-NCRTC-Pkg8-
159 25.04.2023 Good For Construction Bhaisali Plenum Slab Framing between
2023-4098
Concourse & Roof Level (Rev-C)
Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-
AFC-4559-NCRTC-Pkg8-
160 25.04.2023 Good For Construction Bhaisali Station Layout Plan of Stub
2023-4099
Columns starting from Undercroft Slab (Rev-B)
Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-
AFC-4559-NCRTC-Pkg8-
161 25.04.2023 Good For Construction Bhaisali Station Public Staircase ST-01 &
2023-4100
ST-02 (Rev-C)

Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-


AFC-4559-NCRTC-Pkg8-
162 25.04.2023 Good For Construction Bhaisali Station ECS-TVS Equipment
2023-4101
Foundation at Concourse & Platform Level Slab (Rev-B)

Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-


AFC-4559-NCRTC-Pkg8-
163 25.04.2023 Good For Construction Bhaisali Station Sequence for North End
2023-4102
Launching Shaft (Rev-C)

Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-


AFC-4559-NCRTC-Pkg8-
164 25.04.2023 Good For Construction Bhaisali Station D-Wall Reinforcement for
2023-4103
Panel DW2 to DW4 & DW107 to DW112 (Rev-D)

Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-


AFC-4559-NCRTC-Pkg8-
165 25.04.2023 Good For Construction Reinforcement details of Base Slab (Grid-6
2023-4104
to 17) for Meerut Central Station (Rev-C)

Submission of Tracing Sheet, A1 Copy-06-sets & a CD for Closure-


AFC-4559-NCRTC-Pkg8-
166 25.04.2023 Good For Construction Meerut Central Station Design &
2023-4105
Reinforcement Details of Platform Slab (Grid-9 to 22) (Rev-C)

Other Correspondences:

Sl.No. Letter No. Date Sent to Description

1 AFC/4559/NCRTC- 31.03.2023 The Nodal Officer, Request for NOC/Permission to


Pkg8/Misc/141 Ground Water Act drill Borewells at different
2019, locations of RRTS-Underground
B-371, Ganganagar – Metro Project of NCRTC-Pkg-8
Meerut.
District- Meerut-UP

29 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 30 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
2 AFC/4559/NCRTC- 31.03.2023 The Secretary, Request permission to Install
Pkg8/Misc/142 Idgah, Near Rani Mill – and Monitor equipment in your
Delhi Meerut Road, premises
Meerut-UP

3 AFC/4559/NCRTC- 15.04.2023 Project Manager Regarding Handing over/Taking


Pkg8/Misc/143 Package-17, over of the Land at Casting Yard
L&T Ltd.

30 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 31 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
b). Design Submission
Target Date
S. Date of Revision NCRTC
Description Letter No. of
No. Submission No. Reply
Resubmission
Permanent Works
Definitive Design Stage Submission
AFC-4559-
Definitive Design (DD) Submission of Architectural
1 NCRTC-Pkg8- 30.03.2023 Rev-A COMMENTS 15.05.2023
Volume 2B - Typical Detail Drawings (Part-2) (Rev-A)
2023-3961
Definitive Design Submission of Designs and Drawings AFC-4559-
Awaiting
2 of Bhaisali Earthing and Lightning Protection Layout NCRTC-Pkg8- 04.04.2023 Rev-A
Reply
(Rev-A) 2023-3982
Definitive Design (DD) Submission of Meerut Central AFC-4559-
Awaiting
3 Station (MEEC) Architectural Finishes Vol.2A for NCRTC-Pkg8- 07.04.2023 Rev-A
Reply
Public Area (Rev-A) Along with WIP BIM Model 2023-4003
Construction Reference Drawings
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
1 Begumpul Station Design & Reinforcement Details of NCRTC-Pkg8- 27.03.2023 Rev-A
Reply
Ancillary Building Columns (Rev A) 2023-3943
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
2 Design & Details of Plinth Slab & Plunge Column of NCRTC-Pkg8- 30.03.2023 Rev-A
Reply
Begumpul Station Ancillary Building (Rev-A) 2023-3960

31 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 32 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
3 Begumpul Station Ancillary Building SEM Layout Floor NCRTC-Pkg8- 04.04.2023 Rev-B
Reply
Opening Drawings (Rev-B) along with WIP BIM Model 2023-3978
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
4 North Cut & Cover Box Tunnel & Ramp Railing & NCRTC-Pkg8- 07.04.2023 Rev-A
Reply
Fencing Details (Rev-A) 2023-4009
Construction Reference Drawing (CRD) Submission of AFC-4559-
NONO WITH
5 SOUTH Cut & Cover RCC Parapet Wall GAD & NCRTC-Pkg8- 07.04.2023 Rev-A 01.05.2023
COMMENTS
Reinforcement Details (Rev-A) 2023-4010
AFC-4559-
CRD Submission of SLD & Electrical Design calculation NONO WITH
6 NCRTC-Pkg8- 10.04.2023 Rev-H
of Bhaisali station (Rev-H) COMMENTS
2023-4017
Construction Reference Drawing (CRD) Submission of
AFC-4559-
Design & Reinforcement Details of Begumpul Station
7 NCRTC-Pkg8- 11.04.2023 Rev-A COMMENTS 05.05.2023
Maintenance Staircase (O-23.6) between Grid 13 to 14
2023-4028
(Rev-A)
Construction Reference Drawing (CRD) Submission of AFC-4559-
8 Design & Reinforcement Details of Begumpul Station NCRTC-Pkg8- 11.04.2023 Rev-A COMMENTS 15.05.2023
Fireman Staircase (F-02.1) & (F-02.2) (Rev-A) 2023-4029
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
9 Meerut Central (MEEC) Station Vol-2A Architectural NCRTC-Pkg8- 12.04.2023 Rev-B
Reply
Finishes Drawings for BOH Area (Rev-B) 2023-4038
AFC-4559-
CRD Submission of Designs and Drawings of Begumpul Awaiting
10 NCRTC-Pkg8- 14.04.2023 Rev-B
Station Lighting (Rev-B) Reply
2023-4052

32 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 33 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
11 Begumpul Station Platform Level Slab Design & NCRTC-Pkg8- 19.04.2023 Rev-A
Reply
Reinforcement details (Rev-A) 2023-4069
Revised Construction Reference Drawing (CRD)
AFC-4559-
Submission of Entry-ES1 & Ancillary Building Framing Awaiting
12 NCRTC-Pkg8- 24.04.2023 Rev-B
Plan for Begumpul Station Alongwith WIP BIM Model Reply
2023-4078
(Rev-B)
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
13 Design & Details of Plinth Slab & Plunge Column of NCRTC-Pkg8- 24.04.2023 Rev-A
Reply
Begumpul Station Ancillary Building (Rev-A) 2023-4089
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
14 Begumpul Station Design & Reinforcement Details of NCRTC-Pkg8- 24.04.2023 Rev-A
Reply
Ancillary Building Columns (Rev A) 2023-4090
Revised Construction Reference Drawing (CRD) AFC-4559-
Awaiting
15 Submission of Bhaisali Station Platform to Concourse NCRTC-Pkg8- 24.04.2023 Rev-B
Reply
Level Lift Details on Grid-"E" (Rev-B) 2023-4094
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
16 Bhaisali Station Ancillary Building SEM Layout - Wall NCRTC-Pkg8- 24.04.2023 Rev-C
Reply
Opening Drawings along with BIM Model (Rev-C) 2023-4095
Construction Reference Drawing (CRD) Submission of AFC-4559-
Awaiting
17 Bhaisali Station Design & Details of Strut & Waler for NCRTC-Pkg8- 25.04.2023 Rev-A
Reply
Entry Exit ES-02 (Rev-A) 2023-4111
Construction Reference Drawing (CRD) Submission of
AFC-4559-
Begumpul Station Design & Reinforcement Details of Awaiting
18 NCRTC-Pkg8- 25.04.2023 Rev-A
Entry Exit ES-01 Ancillary Building Mezzanine Slab Reply
2023-4112
(Rev A)

33 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 34 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Good for Construction (GFC)
Revised Good For Construction (GFC) Submission of AFC-4559-
1 Construction Sequence of Entry Exit ES-01 Begumpul NCRTC-Pkg8- 28.03.2023 Rev-E COMMENTS 10.05.2023
Station (Rev-E) 2023-3945
Revised Good For Construction (GFC) for Tracing
AFC-4559-
Submission of Begumpul Station Intermediate Level
2 NCRTC-Pkg8- 28.03.2023 Rev-D
(Except Entry/Exit Area) Wall Opening Drawings (Rev-
2023-3950
D)
Good For Construction (GFC) Submission of Meerut AFC-4559-
3 Central Station Design & Reinforcement Details of NCRTC-Pkg8- 04.04.2023 Rev-B NONO
Platform Slab (Grid 1-9) (Rev-B) 2023-3977
Revised Good For Construction (GFC) Submission of
AFC-4559-
Tracing Drawings of Floor SEM Drawings of Awaiting
4 NCRTC-Pkg8- 04.04.2023 Rev-G
Intermediate Level of Begumpul (BEGU) Station (Rev- Reply
2023-3979
G)
Revised Good For Construction (GFC) Submission of
AFC-4559-
Tracing Drawings of Floor SEM Drawings of Concourse Awaiting
5 NCRTC-Pkg8- 04.04.2023 Rev-H
Level (Grid-01 to 16) of Begumpul (BEGU) Station Reply
2023-3980
(Rev-H)
Good For Construction (GFC) Submission of Meerut
AFC-4559-
Central Station Concourse Level Wall Opening Layout Awaiting
6 NCRTC-Pkg8- 04.04.2023 Rev-D
Drawing for BOH Area from (Grid 1-5 & 15-22) along Reply
2023-3981
with BIM Model (Rev-D)
Good for Construction (GFC) Submission of Begumpul AFC-4559-
7 Station Platform Level Framing Plan & Section along NCRTC-Pkg8- 06.04.2023 Rev-C COMMENTS 11.05.2023
With BIM Model (Rev-C) 2023-4001

34 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 35 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Revised Good for Construction Drawings (GFC)
AFC-4559-
Submission of Begumpul Station- Vol-1A Architectural Awaiting
8 NCRTC-Pkg8- 06.04.2023 Rev-H
General Arrangement Drawings of Entry Exit ES-1 ES-3 Reply
2023-4002
& Ancillary Building (Rev-H) Along With BIM Model
Revised Good for Construction Drawings (GFC)
AFC-4559-
Submission of North Cut & Cover Box Tunnel & Ramp Awaiting
9 NCRTC-Pkg8- 07.04.2023 Rev-K
General Arrangement Drawing & Section Details For Reply
2023-4004
Elevated Ramp & Sump Area (Rev-K)
Revised Good for Construction Drawings (GFC)
AFC-4559-
Submission of North End Launching Shaft Awaiting
10 NCRTC-Pkg8- 07.04.2023 Rev-F
Reinforcement Details of U-Trough Ramp (Chainage Reply
2023-4005
71100 to71310) Rev-F
Good for Construction (GFC) Submission of Bhaisali AFC-4559-
11 Station Reinforcement details of Platform Level Slab NCRTC-Pkg8- 07.04.2023 Rev-C NONO
(Grid 1-16) Rev-C 2023-4007
Good for Construction (GFC) Submission of Bhaisali AFC-4559-
12 Station Design & Details of Soldier Pile Wall for Entry NCRTC-Pkg8- 07.04.2023 Rev-B COMMENTS 12.05.2023
Exit ES-2 (Rev-B) 2023-4008
Revised Good for Construction (GFC) Submission of
AFC-4559-
General Arrangement Drawing (GAD) and Section NONO WITH
13 NCRTC-Pkg8- 07.04.2023 Rev-K 30.04.2023
details for South Cut & Cover box & Elevated Ramp COMMENTS
2023-4011
(Rev-K)
Revised Good For Construction (GFC) Submission of AFC-4559-
14 South Cut and Cover Reinforcement Details of U Trough NCRTC-Pkg8- 08.04.2023 Rev-E NONO
(Chainage 66010m to Chainage 66254m) (Rev-E) 2023-4012

35 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 36 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Revised Good For Construction (GFC) Submission of
North Cut and Cover & South End Design & Details of AFC-4559-
Awaiting
15 Box with Ramp Structure (Chainage 65860M to NCRTC-Pkg8- 08.04.2023 Rev-E
Reply
Chainage 66010M & Chainage 71310 to Chainage 2023-4013
71520) (Rev-E)
Revised Good For Construction (GFC) Submission of AFC-4559-
NONO WITH
16 South Cut & Cover GAD & Reinforcement Details of NCRTC-Pkg8- 08.04.2023 Rev-D 03.05.2023
COMMENTS
Sump Area (Rev-D) 2023-4014
Good For Construction (GFC) Submission of AFC-4559-
17 Reinforcement Details of Sump Cover Slab at Grid 2, 10 NCRTC-Pkg8- 11.04.2023 Rev-B NONO
& 15 Begumpul Station (Rev-B) 2023-4026
Tracing Sheet for Signature Good For Construction
AFC-4559-
(GFC) Submission of Meerut Central Station ECS-TVS Awaiting
18 NCRTC-Pkg8- 12.04.2023 Rev-B
Equipment Foundation at Concourse & Platform Level Reply
2023-4036
Slab (Rev-B)
Tracing Sheets for Signature Good For Construction
AFC-4559-
(GFC) Submission of Meerut Central Station Awaiting
19 NCRTC-Pkg8- 12.04.2023 Rev-B
Dimensional & Reinforcement details of Maintenance Reply
2023-4037
Staircase O-23.5 (Grid-22-G) (Rev-B)
Revised Good for Construction (GFC) Submission of AFC-4559-
Awaiting
20 Begumpul Station Concourse Level BOH Area Wall NCRTC-Pkg8- 14.04.2023 Rev-D
Reply
Opening Drawings (Rev-D) along with WIP BIM Model 2023-4050
Revised Good For Construction Drawings (GFC)
AFC-4559-
Submission of Begumpul Station- Vol-1A Platform Awaiting
21 NCRTC-Pkg8- 14.04.2023 Rev-K
Level Architectural General Arrangement Drawings Reply
2023-4051
(Rev-K)

36 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 37 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Good For Construction (GFC) Submission of Entry-ES2 AFC-4559-
22 & Vent Shaft Framing Plan for Bhaisali Station along NCRTC-Pkg8- 15.04.2023 Rev-C COMMENTS 16.05.2023
with BIM Model (Rev-C) 2023-4057
Revised Good For Construction (GFC) Submission of AFC-4559-
Awaiting
23 Begumpul Station Platform Level Framing Plan & NCRTC-Pkg8- 19.04.2023 Rev-C
Reply
Section along with WIP BIM Model (Rev-C) 2023-4070
Good For Construction (GFC) Submission of Begumpul
Station Entry Exit – 3 Design & Details of D-Wall
AFC-4559-
Panels E3W02 to E3W06, E3W08, E3W11 to E3W13, Awaiting
24 NCRTC-Pkg8- 24.04.2023 Rev-B
E3W15 to E3W22, E3W27 to E3W28, E3W30, E3W32 Reply
2023-4085
to E3W34, E3W36 to E3W39, E3W41 to E343 along
with D - Wall Layout & Construction Sequence (Rev B)
AFC-4559-
GFC submission of Bhaisali station Fire Fighting Awaiting
25 NCRTC-Pkg8- 24.04.2023 (Rev-F)
Drawings & Calculation Report (Rev-F) Reply
2023-4087
AFC-4559-
GFC Submission of Bhaisali Station Plumbing Drawings Awaiting
26 NCRTC-Pkg8- 24.04.2023 (Rev-E)
& Water supply system (Rev-E) Reply
2023-4088

37 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 38 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
c). Interface
The following Interface Activities in the month of, April 2023 had taken place:
• Response on request for Clearance for Down Line Retaining Wall Casting of North Cut & Cover between Chainage 71130 to 71160 above
2.4 m from Top of Base Slab upto Ground level (2nd Lift) has been received from Track Works and S&T/PSD contractor on dated
27.03.2023 through email.
• 31. Signed copy of ISF No.: ISF-UGC02-TVS-00131-R00 with comments has been received from TVS/ECS contractor (M/s Strabag) on
dated 27.03.2023 through email. M/s Afcons has been hereby requested to TVS/ECS contractor for providing the Air pressure details on
False ceiling at Platform level of MEEC and BEGU Station. The same has been forwarded to all the concerns of M/s Afcons and DDC on
30.03.2023 for information and needful action.
• 32. Response on request for Concrete Pour Clearance for Base Slab of MEEC between Grid No.: 8(+14 m) to 10(+4 m)/(B-L) has been
received from PST/OHE contractor (M/s Ircon) on dated 28.03.2023 through email.
• 33. Signed copy of ISF No.: ISF-UGC02-TVS-00136-R00 with comments has been received from TVS/ECS contractor (M/s Strabag) on
dated 29.03.2023 through email. M/s Afcons has been hereby shared the PDF & CAD files of DD Stage (WOD) Wall Opening drawings of
Ancillary Building of MEEC Station (Rev- A) along with Architectural and Structural BIM Model to TVS/ECS
• contractor for review and be ready for its jointly sign off. The same has been forwarded to the concerns DDC on 30.03.2023 for information
and needful action.
• 34. ISF No.: ISF-UGC02-EAG C05 (Pkg 7)-00009-R00 has been shared to EAG C05 (Pkg 7) contractor (M/s L&T Ltd.) on dated 30.03.2023
through email. M/s Afcons has been hereby shared the PDF & CAD files of SCC & NCC Drainage System discharge from Sump pits to Rain
water Harvesting tanks to Package- 7 contractor (M/s L&T Ltd.) for their review and confirmation.
• 35. Response on request for Clearance for 17th Concrete Pour of Base Slab at South Cut & Cover between Chainage.: 66556 to 66580 (UP
Line) has been received from PST/OHE contractor (M/s Ircon) on dated 31.03.2023 through email.
• Response on request for Clearance for UPAS (UP Line- Undercroft Side) Wall Casting of BHAI Station between Grid No.: 10 to 13/(C-D)
till height of 2.4 M from TOC-Undercroft has been received AFC contractor (M/s Datamatics Global Services Ltd.) on 01.04.2023 through
email.

38 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 39 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• Signed copies of Escalators GADs of MEEC, BHAI & BEGU Stations and Escalators Schedule has been received from Escalator contractor
(M/s Schindler) on dated 01.04.2023 through email. The same has been forwarded to the concerns of M/s Afcons on same day for
information and needful action.
• M/s Afcons has been received the CRD Stage Clash free CSD BIM Model and drawings (E-transmit & NWD, AutoCAD and PDF) from
MEP- DDC on 01.04.2023 for reference and circulation to SWCs for their review and confirmation.
• M/s Afcons has been shared the PDF & CADD Files of Structural Drawings of C-P Lift of MEEC Station to Site team on dated 01.04.2023
for information and references.
• Request for Concrete Pour Clearance for Casting of Sump Pit Cover Slab between Grid No.: 15 to 16/(F-G) at Undercroft level of MEEC
Station has been shared to MEP team on dated 01.04.2023 for providing their clearance after inspection of Sump Pit Cover Slab Cut-outs and
its dimensions.
• Minutes of Meeting related to Status of RAMS Documents and Hazard Log held on 28.03.2023 has been received from Mr. Sourav De of GC
on dated 01.04.2023 through email and Wrench correspondence. The same has been shared to MEP contractor (M/s Efkon) on dated
04.03.2023 for information and needful action.
• Signed copy of ISF No.: ISF-UGC02-S&T and PSD-00068-R02 with comments has been resend by S&T and PSD Contractor on 03.04.2023
through email. M/s Afcons (Civil contractor for Package 8) has been hereby shared the CRD Stage Clash free CSD BIM Model and
Drawings (E-transmit, NWD, CAD & PDF) of South Ramp Cut & Cover Tunnel to S&T and PSD contractor (M/s Alstom Group.) for review
and be ready for jointly sign-off and requested to provide Updated S&T BIM Model for further Working and proceeding with submission.
• Signed copy of ISF No.: ISF-UGC02-TVS-00104-R02 with comments has been received from TVS/ECS Contractor on 03.04.2023 through
email. M/s Afcons (Civil contractor for Package 8) has been hereby shared the CRD Stage Clash free CSD BIM Model and Drawings (E-
transmit, NWD, CAD & PDF) of South Ramp Cut & Cover Tunnel to TVS/ECS contractor (M/s Strabag) for review and be ready for jointly
sign-off and requested to provide Updated TVS/ECS BIM Model for further Working and proceeding with submission. The same has been
forwarded to the concerned DDC on same day for information and needful action.
• Signed copy of ISF No.: ISF-UGC02-TVS-00111-R02 with comments has been received from TVS/ECS Contractor on 03.04.2023 through
email. M/s Afcons (Civil contractor for Package 8) has been hereby shared the CRD Stage Clash free CSD BIM Model and Drawings (E-
transmit, NWD, CAD & PDF) of North Ramp Cut & Cover Tunnel to TVS/ECS contractor (M/s Strabag) for review and be ready for jointly

39 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 40 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
sign-off and requested to provide Updated TVS/ECS BIM Model for further Working and proceeding with submission. The same has been
forwarded to the concerned DDC on same day for information and needful action.
• Signed copy of ISF No.: ISF-UGC02-TVS-00103-R02 with comments has been resend by TVS/ECS Contractor on 03.04.2023 through
email. M/s Afcons (Civil contractor for Package 8) has been hereby shared the DD Stage (Rev- A1) CSD BIM Model of LS- 19 Tunnel
(CAD, PDF, E-transmit & NWD) to TVS/ECS contractor (M/s Strabag) for review and requested to providing revised TVS BIM Model.
• Signed copy of ISF No.: ISF-UGC02-TVS-00105-R03 with comments has been received from TVS/ECS Contractor on 03.04.2023 through
email. M/s Afcons (Civil contractor for Package 8) has been hereby shared the CRD Stage Clash free CSD BIM Model & CSD drawings of
Tunnel Section LS- 17 (E-transmit, NWD, CAD & PDF) to TVS/ECS contractor (M/s Strabag) for review and requested to providing revised
TVS BIM Model for further working & proceeding with submission.
• M/s Afcons has been received the GFC Stage Floor Openings drawings of Concourse level of BEGU Station from DDC on dated 03.04.2023
for onwards Submission to GC/NCRTC.
• M/s Afcons has been received the GFC Stage Floor Openings drawings of Intermediate level of BEGU Station from DDC on dated
03.04.2023 for onwards Submission to GC/NCRTC.
• M/s Afcons has been received the CRD Stage Floor Openings drawings of Ancillary Building of BEGU Station along with CRS reply &
Work in Progress BIM Model (E-transmit, IFC, NWD) on dated 03.04.2023 for onwards Submission to GC/NCRTC.
• The link related to GFC Stage Wall Openings drawings of Concourse level of Meerut Central Station along with CRS reply & Work in
Progress BIM Model (E-transmit, IFC, NWD) has been received from DDC on dated 03.04.2023 for onwards Submission to GC/NCRTC.
• Response on request for Concrete Pour Clearance for Casting of Temporary Cut-out between Grid No.: 21 to 22 /(C-F) at Concourse level of
BHAI Station has been received from PST/OHE contractor (M/s Strabag) on 03.04.2023 through email.
• Response on request for Concrete Pour Clearance for Casting of Temporary Cut-out between Grid No.: 21 to 22 /(C-F) at Concourse level of
BHAI Station has been received from S&T and PSD contractor (M/s Alstom Group.) on 04.04.2023 through email.
• M/s Afcons has been shared the CRD Stage Updated Clash Free CSD BIM Model of BEGU Station (E-transmit & NWD) and CSD Drawings
(CADD and PDF) to all SWCs on dated 03.04.2023 through email for review and be ready for Jointly sign off on the drawings.
• Signed copy of ISF No.: ISF-UGC02-S&T and PSD-00069-R04 with comments has been received from S&T and PSD Contractor on
04.04.2023 through email. M/s Afcons (Civil contractor for Package 8) has been hereby shared the CRD Stage updated Clash free CSD BIM

40 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 41 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Model & CSD drawings of Tunnel Section LS- 17 (E-transmit, NWD, CAD & PDF) to S&T and PSD contractor (M/s Alstom Group.) for
review and confirmation. The same has been forwarded to the concerned DDC on same day for information and needful action.
• Signed copy of ISF No.: ISF-UGC02-S&T and PSD-00065-R04 with comments has been received from S&T and PSD contractor (M/s
Alstom Group.) on 04.04.2023 through email. M/s Afcons (Civil contractor for Package- 8) has been hereby shared the CRD stage updated
Clash free CSD BIM Model & CSD drawings (E-transmit, NWD, CAD & PDF) of LS- 18 Tunnel along with supporting drawings to S&T
and PSD contractor for review and confirmation for further working and proceeding with submission. The same has been forwarded to MEP-
DDC on same day for information and needful action.
• Signed copy of ISF No.: ISF-UGC02-S&T and PSD-00067-R04 with comments has been received from S&T and PSD contractor (M/s
Alstom Group.) on 04.04.2023 through email. M/s Afcons (Civil contractor for Package- 8) has been hereby shared the CRD stage updated
Clash free CSD BIM Model & CSD drawings (E-transmit, NWD, CAD & PDF) of LS- 19 Tunnel section along with supporting documents
to S&T and PSD contractor for review and confirmation. The same has been forwarded to MEP- DDC on same day for information and
needful action.
• Request for Clearance for UPAS (UP line- Track side) Wall Casting of BEGU Station between Grid No.: 7(+2.5 M) to 8(+6 M)/(C-D) till
height of 2.4 M from TOC-Under croft has been shared to MEP & TVS/ECS contractor on dated 04.04.2023 for providing their clearance
after inspection of cut-outs/sleeves in the concerned wall.
• M/s Afcons has been shared the updated CRD Stage Clash free CSD BIM Model and CSD drawings of Begumpul Station (E-transmit, NWD,
CAD & PDF) to Track Works, Rolling Stock, Lift, TVS/ECS, AFC, Escalator, DDC- Track Works and S&T/PSD contractor through
following individual ISF on 04.04.2023 for review and be ready for its Joint Sign-off.
o ISF No.: ISF-UGC02-TKW-00014-R11
o ISF No.: ISF-UGC02-RS-00010-R11
o ISF No.: ISF-UGC02-PST-OHE-00022-R12
o ISF No.: ISF-UGC02-LIF-00018-R13
o ISF No.: ISF-UGC02-TVS-00029-R16
o ISF No.: ISF-UGC02-AFC-00013-R08
o ISF No.: ISF-UGC02-ESC-00018-R13
o ISF No.: ISF-UGC02-DDC-TKW-00003-R09

41 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 42 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
o ISF No.: ISF-UGC02-S&T and PSD-00021-R13
• Handing Over notes of MEEC TVF Room (M-10.3 & M- 10.4) and ECS Plant Room (M- 09.4) have been shared to MEP team (M/s Efkon)
on dated 04.04.2023 through email for information.
• Handing Over notes of MEEC ECS Plant Room (M- 09.4) has been shared to TVS/ECS contractor (M/s Strabag) on dated 04.04.2023
through email for information and records.
• Signed copy of ISF No.: ISF-UGC02-S&T and PSD-00038-R07 with comments has been received from S&T and PSD contractor on
05.04.2023 through email. M/s Afcons has been hereby shared the revised Access dates (CIP) for MEEC, BHAI and BEGU Station to S&T
and PSD contractor (M/s Alstom Group.) for providing their start and finish Dates in respective rooms/areas.
• Response on request for Concrete Pour Clearance for 5th Base Slab of BEGU between Grid No.: 9(+6 m) to 10(+12 m)/(A-J) has been
received from Track Works contractor (M/s L&T Ltd.) on 05.04.2023 through email.
• M/s Afcons has been received the link related to Latest BIM Model of LS- 17 from DDC- Track Works (M/s Prime Rail) on dated
05.04.2023 through email for review.
• M/s Afcons has been received the DD Stage Architectural finishes drawings of public area of MEEC Station (Vol.- 2A) along with Work in
Progress BIM Model (E-transmit, NWD) & LDC certificate on dated 05.04.2023 for onwards submission to GC/NCRTC. The IFC files for
the same has been received on dated 06.04.2023.
• ISF No.: ISF-UGC02-DDC-TKW-00031-R01 has been shared to DDC for Track Works (M/s Prime Rail) on dated 05.04.2023 through email.
M/s Afcons has been hereby shared the PDF & CAD files of As Built Alignment drawings of Down Line Tunnel from MEEC to BHAI
Station to DDC- Track Works for review and confirmation to further proceed for 1st stage concrete.
• ISF No.: ISF-UGC02-TKW-00076-R01 has been shared to Track Works contractor (M/s L&T Ltd) on dated 05.04.2023 through email. M/s
Afcons has been hereby shared the PDF & CAD files of As Built Alignment drawings of Down Line Tunnel from MEEC to BHAI Station to
Track Works contractor for review and confirmation to further proceed for 1st stage concrete.
• ISF No.: ISF-UGC02-DDC-TKW-00031-R02 has been shared to DDC for Track Works (M/s Prime Rail) on dated 05.04.2023 through email.
M/s Afcons has been hereby shared the PDF & CAD files of As Built Alignment drawings of Down Line Tunnel from MEEC to BHAI
Station to DDC- Track Works for review and confirmation to further proceed for 1st stage concrete.

42 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 43 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• ISF No.: ISF-UGC02-TKW-00076-R02 has been shared to Track Works contractor (M/s L&T Ltd) on dated 05.04.2023 through email. M/s
Afcons has been hereby shared the PDF & CAD files of As Built Alignment drawings of Down Line Tunnel from MEEC to BHAI Station to
Track Works contractor for review and confirmation to further proceed for 1st stage concrete.
• Comments on Floor Opening drawings of Platform level of BEGU Station has been received from NCRTC on dated 06.04.2023 for reference
& further resubmission/tracing submission.
• Signed copy of ISF No.: ISF-UGC02-RS-00010-R11 with comments has been received from Rolling Stock contractor on 06.04.2023 through
email. M/s Afcons has been hereby shared the updated CRD Stage Clash free CSD BIM Model and CSD drawings of Begumpul Station (E-
transmit, NWD, CAD & PDF) to Rolling Stock contractor (M/s Bombardier) for review and be ready for its Joint Sign-off.
• Response on request for Clearance for Concrete Pour of UP Line Roof Slab at North Cut & Cover between Chainage.: 71022 to 71050 has
been received from PST/OHE (M/s Ircon) and TVS/ECS contractor (M/s Strabag) on 06.04.2023 through email.
• Signed copy of ISF No.: ISF-UGC02-S&T and PSD-00038-R08 with comments has been received from S&T and PSD contractor on
06.04.2023 through email. M/s Afcons has been hereby shared the revised Access dates (CIP) for Tunnel Sections to S&T and PSD
contractor (M/s Alstom Group.) for providing their start and finish Dates along with number of days.
• Signed copy of ISF No.: ISF-UGC02-TKW-00027-R07 with response has been received from Track Works contractor on 07.04.2023 through
email. M/s Afcons has been hereby shared the revised Access dates (CIP) for Tunnel Sections to Track Works contractor (M/s L&T Ltd.) for
providing their start and finish Dates along with number of days.
• ECS BIM model of MEEC station revised as per GC & UGC comments on PD area converted into public area has been received from
TVS/ECS contractor (M/s Strabag) on dated 07.04.2023 through email.
• Updated ECS BIM model of BHAI station revised as PD area merged into public area has been received from TVS/ECS contractor (M/s
Strabag) on dated 07.04.2023 through email. The same has been forwarded to the concerned DDC on 08.04.2023 for providing the updated
CSD BIM Model and CSD drawings accordingly.
• Response on request for clearance of RCC Wall Casting of Concourse level of BHAI Station between Grid No.: 16 to 17/(A-E) above 2.4 m
from TOC to full height (2nd Lift) has been received from Escalator contractor (M/s Schindler) on dated 08.04.2023 through email.
• Response on request for Clearance for Plaster Works of Ticket Issuing Room (A- 03.2) & Station Control Room (A- 01) of Concourse level
of BHAI Station has been received from PST/OHE contractor on dated 09.04.2023 through email.

43 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 44 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• Response on request for Clearance for UPAS (Down Line- Undercroft Side) Wall Casting of BHAI Station between Grid No.: 13 to 14/(F-G)
till height of 2.4 M from TOC-Undercroft has been received from PST/OHE contractor on dated 09.04.2023 through email.
• M/s Afcons has been received the link related to PDF & CAD files of CSD layout of Platform level of BEGU Station from MEP-DDC on
dated 10.04.2023 through email for reference and circulation to SWCs for their review and confirmation.
• Comments on RCP Drawings of BEGU Station has been received from DDC on dated 10.04.2023 through email for information.
• Request for Clearance for Casting of Lift Shaft Wall between Grid No.: 8 to 9/(D-F) from Base to Platform slab at BEGU Station has been
shared to Lift contractor (M/s Otis) on 10.04.2023 through email for providing their clearance after inspection of provided drainage sleeves in
Lift pit.
• Response on request for Clearance for Screeding of Rooms/Corridor {O- 25.5, O- 15, M- 09.4, M- 10.4, M- 11.2, OTE & UPAS Plenum}
between Grid No.: 16 to 21/(B-J) of Concourse level of BHAI Station has been received from Escalator contractor (M/s Schindler) on dated
11.04.2023 through email.
• Response on request for Clearance for Plaster Works of Ticket Issuing Room (A- 03.2) & Station Control Room (A- 01) of Concourse level
of BHAI Station has been received from Escalator contractor (M/s Schindler) on dated 11.04.2023 through email.
• M/s Afcons has been received the revised Wall Opening drawings of RHS BOH area of Concourse level of MEEC Station from DDC on
dated 11.04.2023 through email. The same is minor modification in position of TE-178 cutout as per discussion with TVS team.
• Request for Inspection for UPAS (UP Line- Undercroft Side) Wall Openings of BHAI Station between Grid No.: 5 to 9/(D-E) till height of
2.4 M from TOC-Undercroft has been sent to GC- MEP on dated 11.04.2023 through email.
• Inspection request for Wall Openings of Lift Shaft Wall between Grid No.: 8 to 9/(D-F) from Base to Platform slab at BEGU Station has
been sent to GC-MEP on dated 11.04.2023 through email.
• M/s Afcons has been received the link related to CRD Stage Architectural finishes drawings (CAD & PDF) of BOH area of MEEC Station
(Vol.2A) along with LDC certificate & GC CRS reply from DDC on 11.04.2023 through email for onward circulation GC/NCRTC. The BIM
Model for the same (E- transmit, NWD & IFC) has been received on dated 12.04.2023.
• Revised Punch Holes Drawings of PSD for MEEC Station (CAD & PDF) has been received from DDC on dated 11.04.2023 through email
for circulation to S&T and PSD contractor (M/s Alstom Group.) for their review and confirmation.
• Method Statement for Installation of GI Conduits and Accessories has been received from MEP team on 12.04.2023 through email for
information.

44 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 45 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• Response on request for Clearance for UPAS (UP Line- Undercroft Side) Wall Casting of BHAI Station between Grid No.: 5 to 9/(D-E) till
height of 2.4 M from TOC-Undercroft has been received from S&T and PSD contractor (M/s Alstom Group.) on dated 12.04.2023 through
email.
• ISF No.: ISF-UGC02-TVS-00142-R00 has been shared to TVS/ECS contractor on dated 12.04.2023 through email. M/s Afcons has been
hereby shared the Commented drawings of RCP of BEGU Station to TVS/ECS contractor (M/s Strabag) for adjusting the ECS services to get
the required clear height from FFC to different services.
• Response on request for Clearance for UPAS (UP Line- Undercroft Side) Wall Casting of BHAI Station between Grid No.: 13 to 14(+5
m)/(C-D) till height of 2.4 M from TOC-Undercroft has been received from Lift and Escalator contractor on dated 12.04.2023 through email.
• Response on request for Clearance for Down Line OTE Duct Casting between Grid No.: 5(+5.6 m) to 8/(F-H) at Concourse Level of BHAI
Station has been received from Lift, Track Works, Escalator, S&T/PSD and Rolling Stock contractor on dated 12.04.2023 through email.
• M/s Afcons has been received the GFC Stage Architectural finishes drawings of Platform level of BEGU Station (Vol.-1A) along with Work
in Progress BIM Model (E-transmit, NWD, IFC) from DDC on dated 12.04.2023 for onward submission to GC/NCRTC.
• M/s Afcons has been received the GFC Stage (WOD) Wall Opening drawings of BOH area of Concourse level of BEGU Station along with
WIP BIM Model (E-transmit, NWD, IFC) and CRS reply from DDC on dated 12.04.2023 through email for onward submission to
GC/NCRTC.
• Excel file related to list of Rooms/areas at BHAI Station which were supposed to handed over for MEP Works has been shared to Bhaisali
Station execution team on dated 12.04.2023 for expedite the remaining the works and to inform for complete the handing over/Taking over
activities.
• ISF No.: ISF-UGC02-S&T and PSD-00098-R01 has been shared to S&T and PSD contractor on dated 12.04.2023 through email. M/s Afcons
has been hereby shared the PDF & CAD files of PSD Holes revised details of MEEC Station (Platform level) to S&T and PSD contractor
(M/s Alstom Group.) for their review and confirmation.
• ISF No.: ISF- SIPL/PKG-21/AFCON/PKG-8/CW&FW/001 has been received from Escalator contractor (M/s Schindler) on dated
13.04.2023 through email. This is related to Civil and Finishing work requirements from Escalator supply at handover stage for Meerut
Central, Bhaisali and Begumpul station. The same has been forwarded to the concerns of DDC on same day for information and needful
action.

45 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 46 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• M/s Afcons has been received the revised Shear Connector layout from DDC for Track Works (M/s Prime Rail) on dated 14.04.2023 for
review and confirmation. The same has been forwarded to the concerned DDCs and M/s Afcons for information and needful action.
• Response on request for Clearance for 17th Concrete Pour of Base Slab at South Cut & Cover between Chainage.: 66556 to 66580 (UP Line)
has been received from PST/OHE contractor (M/s Ircon) on dated 15.04.2023 through email.
• ISF No.: ISF-AFC-UGC-P08-010-R00 has been received from AFC contractor (M/s Datamatics Global Services Ltd.) on dated 17.04.2023
through email. With this ISF, AFC contractor has been shared the typical design inputs regarding AFC Rooms (TOM & EFO) to M/s. Afcons
for review and confirmation.
• Response on request for Clearance for Concrete Pour of Base Slab & Sump Pit Cover Slab at South Cut & Cover between Chainage.: 66237
to 66254 has been received from PST/OHE contractor (M/s Ircon) on dated 18.04.2023 through email.
• Response on request for Concrete Pour Clearance for Base Slab of MEEC Station {1st Stage Concrete} between Grid No.:19 (+6 m) to 21
(+8.5 m)/(G-L) has been received from TVS/ECS contractor (M/s Strabag) on dated 19.04.2023 through email.
• The link related to Jointly signed copies of the CRD stage CSD Drawings of BEGU Station has been shared to the concerned DDC on dated
20.04.2023 for information and revise the drawings as per SWCs comments.
• M/s Afcons has been shared the Alignment drawings of Pkg- 08 along with following related ISFs to DDC on dated 20.04.2023 for
information and needful action.
o ISF No.: ISF-UGC02-TKW-00005-R06
o ISF No.: ISF-UGC02-S&T and PSD-00009-R06
o ISF No.: ISF-UGC02-RS-00006-R06
o ISF No.: ISF-UGC02-PST-OHE-00010-R06
o ISF No.: ISF-UGC02-DDC-TKW-00006-R02
o ISF No.: ISF-UGC02-TVS-00010-R07
• Jointly signed copy of Handing over Notes for DN Line Cut & Cover from North LS (Chainage No.: 70913.804 to 71340.000) has been
shared to Track Works contractor (M/s L&T Ltd.) on 21.04.2023 for information and records & also hereby requested to Track Team for
provide the work completion date for this span so that plan for remaining civil works can be done.

46 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 47 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• Minutes of Meeting for Weekly Interface Coordination Meeting (75th) With Package- 8 and Interfacing contractors held on 18.04.2023 at
Pkg- 8 Site Office at BHAI Station received from Mr. Sourav De of GC on 21.04.2023 through email and Wrench correspondence has been
forwarded to all the concerns of M/s Afcons and DDC on 22.04.2023 for information and needful action.
• ISF No.: ISF/PKG-23/PKG08/0098/R0 received from TVS/ECS contractor (M/s Strabag) related to details of Colour Shade for Air
Distribution Products has been shared to DDC on 22.04.2023 for information and needful action.
• ISF No.: ISF-S&T-UG-P8-0026-1 has been received from S&T and PSD contractor (M/s Alstom Group.) on 24.042023 through Wrench
correspondence. With this ISF, S&T and PSD contractor has been shared the PAS- Acoustic Simulation Study for BEGU Station to M/s
Afcons for review and confirmation. The same has been forwarded to the concerned DDC on same day for information and needful action.
• Signed copy of ISF No.: ISF/PKG-23/PKG08/0095/R0 with Package- 8 response has been shared to TVS/ECS contractor (M/s Strabag) on
dated 25.04.2023 through email. With this ISF, TVS/ECS contractor has been shared the Foundation Layout of Pkg- 8 section to M/s Afcons
for review and confirmation.

d). Key Staff


Detailed summary has been attached as Annexure 7.

e). Manpower (Sub-Contractor)


Manpower detailed summary is attached as Annexure 6.

47 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 48 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
f). Plant and Machinery
Equipment Deployed at site

ALL South
Bhaisal Casting Meerut North Cut
Row Labels STATION Begumpul Cut & TBM Grand Total
i Yard Central & Cover
S Cover
Chassis - Trailor 40 Fit 1 1
Chassis Trailer- 20 T 1 1
Chassis Trailer- 20 T 2 2
Air Compressor 300 CFM
1 1 2 1 5
(Diesel)
Air Compressor 598 CFM
1 4 5
(Electrical)
Anti-Fogging Machine 1 1
Baby Roller 1 1
Backhoe Loader 1 1 1 1 4
Backhoe Loader with Breaker 1 1
Batching Plant 60 CUM/HR 2 2
Bobcat 1 1
Chassis Diesel Bowser 2.4 KL 1 1
Chassis Trailer- 20 T 1 1
Concrete Pump 72 CUM/HR
1 1
(Diesel)
Concrete Pump 74 CUM/HR
1 1 1 3
(Diesel)
Crawler Crane 100 T 1 2 1 4

48 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 49 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Crawler Crane 150 T 1 1 2
Crawler Crane 75/80T 1 2 3
Cube Testing Machine 3000
2 2
KN
Diaphragm Wall Conversion
1 1
Kit 2.5 MTR.
Diesel Bowser 2.4 KL 1 1
Digital Level 1 MM 2 2
Distribution Transformer 3000
1 1
KVA
Distribution Transformer 3500
2 2
KVA
Distribution Transformer 800
1 1 2
KVA
Eicher 2 2
EOT Crane 10T X 30 M span 2 2
EOT Crane
1 1
10Tx30MSpanx9MHt.
Excavator Breaker E140 1 1 2
Excavator Ex 140 1 1
Excavator Ex 210 1 1
Flat Car 10 TON 4 4
Flat Car 25 TON 6 6
Forklift 5 TON 1 1
Front end loader 2 2

49 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 50 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Gantry Crane 200T X22-25M
1 1
Span X38 M HUH
Gantry Crane 200TX22-25M
1 1
Spa X38 M(W H)
Gantry Crane
2 2
20Tx30MSpanx13MHt.
Gantry Crane
2 2
40Tx11MSpanx38MHt.
Gantry Crane
1 1
40Tx9.5MSpanx38MHt.
Generator 1010 KVA 8 1 2 11
Generator 125 KVA 1 1 2
Generator 160 KVA 1 1
Generator 20 KVA 1 1 1 3
Generator 250 KVA 1 1 2
Generator 40 KVA 1 1
Generator 500 KVA 1 1 2
Generator 82.5 KVA 1 1
Grout Car 6 CUM 3 3
Grouting plant 30 CUM/HR 1 1 2
Grouting Pump 2 CUM/HR 2 2 4
Lighting Mast 6 KVA 1 1
Locomotive 27 TON 2 2
Locomotive 40 TON 5 5
Long Boom Excavetor 1 1

50 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 51 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Low Bed Trailer 1 1
Man Rider 12-SEATER 3 3
Man lifter 1 1
Muck Car 12 CUM 2 2
Muck Car 17 CUM 35 35
Pick and Carry Crane 1 1 1 1 1 1 6
Piling Rig 2.5 MTR Dia. 1 1
Placer Boom 1 1
Segment Car 15 TON 4 4
Segment Car 20 TON 6 6
TELESCOPIC CRANE 50 Ton 1 1 2
TELESCOPIC CRANE 60 Ton 1 1 2
TELESCOPIC CRANE RT 250
1 1
Ton
Tipper 25T 1 1 2
Total Station 1 SEC 1 1
Total Station 1 SEC With ATR
2 2 2 6
System
Tractor with Boomer 1 1 1 3
Transit Mixer 20 20
Transit Mixer( 4 CUM) 1 1
Truck Mounted Crane 3T 1 1
Truck Mounted Crane 6T 1 2 3
Tunnel Boring M/c 7.51 MTR
2 1 3
Dia. EPB

51 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 52 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Ultrasonic Drilling Monitor 100
2 2
MTR Dept
Utility vehicle 2 2
Ventilation System 2 x 45 KW 1 1
Ventilation System 2 x 55 KW 2 2
Vibratory Compactor 1 1
Vibro Hammer 1 1
Walk Behind Roller 1 TON
1 1
(Local Purchase
Water Chilling Plant 50 TR 1 2 3
Water Chilling Plant 50 TR- 1 1
Water Chilling Plant 54 TR 1 1
Water tanker 12 KL 1 1 2
Weigh Bridge 100 TON 1 1
Grand Total 1 14 44 59 15 20 5 85 243

52 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 53 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
g). Status of Land Handover
Contractual
Sl. Handed Over
Location Area (In CORRESPONDENCE/REFERENCE Date Remarks Land Parcel Type
No (In Sqm)
Sqm)
1 Casting Yard 70000 70000 NCRTC/DM/CPM-MRT/PKG8/002/622 03-Feb-21 Temporary
NCRTC-DM-CPM-MRT-PKG8-002/730 18-Feb-21 Launching shaft South Permanent
NCRTC-DM-CPM-MRT-PKG8-002/787 26-Feb-21 Launching shaft South Permanent
NCRTC-DM-CPM-MRT-PKG8-
10-Apr-21 Station Box Area Permanent
007/1107
NCRTC-DM-CPM-MRT-PKG8-002- UPSRTC Local
26-Nov-21 Temporary
2651 Workshop
NCRTC-DM-CPM-MRT-PKG8-002-
04-Dec-21 Taxi Stand Permanent
BHAISALI 2748
2 23976 23533.22 NCRTC-DM-CPM-MRT-PKG8-007- Permanent &
STATION 01-Jan-22 UPSRTC Bus stand
2960 Temporary
NCRTC-DM-CPM-MRT-PKG8-007- Diesel Pump/Shed
18-Jan-22 Permanent
3072 Area

NCRTC-DM-CPM-MRT-PKG8-007- Entry/Exit Bhaisali


31-Jul-22
4513 Station

NCRTC-DM-CPM-MRT-PKG8-007- Amar Head and Gear


3 12670 9388.564 13-Dec-21 Permanent
2810 Mfg Co/ & Tech Fitnes

53 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 54 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
NCRTC-DM-CPM-MRT-PKG8-007- Permanent &
MEERUT 15-Feb-22 Wizard Travels Shop
3230 Temporary
CENTRAL
NCRTC-DM-CPM-MRT-PKG8-007- North East retrival
STATION 13-Mar-22
3602 shaft
NCRTC-DM-CPM-MRT-PKG8-007- Bungalow No/ 80 (T4) Permanent &
24-Dec-21
2891 and 83 (T2) Temporary
NCRTC-DM-CPM-MRT-PKG8-007-
29-Dec-21 Pocket A Permanent
2932
NCRTC-DM-CPM-MRT-PKG8-007-
29-Dec-21 Station Box Permanent
2932
BEGUMPUL NCRTC-DM-CPM-MRT-PKG8-007- National Inter College
4 19265 16229 22-Jul-22 Permanent
STATION 4338 Land Survey No. 271/8

NCRTC-DM-CPM-MRT-PKG8-007-
Pocket E
4392 28.07.2022

NCRTC-DM-CPM-MRT-PKG8-007-
Pocket A
4392 28.07.2022
NCRTC-DM-CPM-MRT-PKG8-007-
06-Jul-21 NCC Building Permanent
1623
5 NORTH CNC 20183 20183
NCRTC-DM-CPM-MRT-PKG8-007- Permanent &
19-Jul-21
1696 Temporary

6 SOUTH CNC 13779.59 13779.59

54 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 55 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
9. PROCUREMENT REPORT
Still to be
Order Order
Sr no Vendor/supplying plant PO Date Item Description delivered
Qty Unit
(qty)
1 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 750X1950MM 3HRS 3 NOS 3
2 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 750X1950MM 3HRS 30 NOS 30
3 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 750X1950MM 3HRS 4 NOS 4
4 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 900X2100MM 3HRS 11 NOS 11
5 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 900X2100MM 3HRS 1 NOS 1
6 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 4 NOS 4
7 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 2 NOS 2
8 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 6 NOS 6
9 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 1 NOS 1
10 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 2 NOS 2
11 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 1 NOS 1
12 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 23 NOS 23
13 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 4 NOS 4
14 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 15 NOS 15
15 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 1 NOS 1
16 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 7 NOS 7
17 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X24000MM 3HRS 5 NOS 5
18 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1800X2100MM 3HRS 4 NOS 4
19 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1800X2100MM 3HRS 2 NOS 2
20 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1800X2400MM 3HRS 2 NOS 2
21 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2000X2400MM 3HRS 2 NOS 2
22 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2400X2400MM 3HRS 2 NOS 2
23 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2400X2400MM 3HRS 2 NOS 2

55 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 56 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
24 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 750X1950MM 3HRS 2 NOS 2
25 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 750X1950MM 3HRS 46 NOS 46
26 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 900X2100MM 3HRS 17 NOS 17
27 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 5 NOS 5
28 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 2 NOS 2
29 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 12 NOS 12
30 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 1 NOS 1
31 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 3 NOS 3
32 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 2 NOS 2
33 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 8 NOS 8
34 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 5 NOS 5
35 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 22 NOS 22
36 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 1 NOS 1
37 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 2 NOS 2
38 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 1 NOS 1
39 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X24000MM 3HRS 2 NOS 2
40 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1800X2100MM 3HRS 4 NOS 4
41 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1800X2400MM 3HRS 3 NOS 3
42 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1800X2400MM 3HRS 5 NOS 5
43 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2000X2400MM 3HRS 2 NOS 2
44 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2000X2400MM 3HRS 8 NOS 8
45 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2400X2400MM 3HRS 2 NOS 2
46 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2400X2400MM 3HRS 5 NOS 5
47 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 750X1950MM 3HRS 1 NOS 1
48 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 750X1950MM 3HRS 41 NOS 41
49 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 900X2100MM 3HRS 9 NOS 9
50 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 900X2100MM 3HRS 2 NOS 2
51 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 4 NOS 4

56 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 57 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
52 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 2 NOS 2
53 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 5 NOS 5
54 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1000X2100MM 3HRS 4 NOS 4
55 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 32 NOS 32
56 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 3 NOS 3
57 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 4 NOS 4
58 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 3 NOS 3
59 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 16 NOS 16
60 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 1 NOS 1
61 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 1 NOS 1
62 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 1 NOS 1
63 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X24000MM 3HRS 2 NOS 2
64 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1800X2100MM 3HRS 2 NOS 2
65 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1800X2400MM 3HRS 2 NOS 2
66 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1800X2400MM 3HRS 2 NOS 2
67 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2000X2100MM 3HRS 2 NOS 2
68 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2000X2400MM 3HRS 3 NOS 3
69 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2400X2400MM 3HRS 1 NOS 1
70 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 2400X2400MM 3HRS 1 NOS 1
71 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME1500X2100MM 3HRS 8 NOS 8
72 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2
73 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2
74 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2
75 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2
76 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2
77 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2
78 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2
79 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2

57 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 58 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
80 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1150X2400MM 3HRS 1 NOS 1
81 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1150X2400MM 3HRS 1 NOS 1
82 GMP TECHNICAL SOLUTIONS PVT LTD. 31-03-2023 FIRE RATED DOOR & FRAME 1200X2100MM 3HRS 2 NOS 2
83 Steel Authority of India Ltd. 10-04-2023 Tmt Bar FE 500D 10MM 50 TO 2.25
84 Steel Authority of India Ltd. 10-04-2023 Tmt Bar FE 500D 12MM 50 TO 50
85 Steel Authority of India Ltd. 10-04-2023 Tmt Bar FE 500D 16MM 50 TO 0
86 Steel Authority of India Ltd. 10-04-2023 Tmt Bar FE 500D 20MM 50 TO 1.89
87 Govind Service Agencies 12-04-2023 MS Plate 40MM Thk Gr E 350 BR IS2062 40.500 TO 3.485
88 Govind Service Agencies 12-04-2023 MS Plate 50MM Thk Gr E 350 BR IS2062 1.300 TO 1.3
89 Govind Service Agencies 12-04-2023 PLATE 20MM THK MS GR E350 B0 IS2062 2.350 TO 2.35
90 CHANDER BHAN YOGESH KUMAR 12-04-2023 MS ANGLE 40X40X5MM 1.600 TO 1.6
91 CHANDER BHAN YOGESH KUMAR 12-04-2023 MS ANGLE 35X35X4MM 1.400 TO 1.4
92 CHANDER BHAN YOGESH KUMAR 12-04-2023 CHANNEL(ISMC) 100 X 50MM MS E250 IS2062 20 TO 0
93 CHANDER BHAN YOGESH KUMAR 12-04-2023 MS ANGLE 50X50X5 MM 1.200 TO 1.2
94 CHANDER BHAN YOGESH KUMAR 12-04-2023 MS Angle 75x75x6MM 25.500 TO 20.92
95 CHANDER BHAN YOGESH KUMAR 12-04-2023 MS Plate 10Mm 0.600 TO 0.6
96 CHANDER BHAN YOGESH KUMAR 12-04-2023 CHANNEL(ISMC) 75 X 40MM E250 IS 2062 0.200 TO 0.2
97 CHANDER BHAN YOGESH KUMAR 12-04-2023 CHEQUERED PLATE 3 MM 1.500 TO 1.5
98 CHANDER BHAN YOGESH KUMAR 12-04-2023 I BEAM 150X75MM 0.650 TO 0.65
99 CHANDER BHAN YOGESH KUMAR 12-04-2023 MS Plate 12Mm 1 TO 1
100 ULTRA TECH CEMENT LIMITED 12-04-2023 OPC Cement 53 Grade (BULKER) 2,000 TO 2000
101 ULTRA TECH CEMENT LIMITED 12-04-2023 OPC Cement 53 Grade (BAGS) 125 TO 50
102 ULTRA TECH CEMENT LIMITED 12-04-2023 OPC Cement 53 Grade (BULKER) 5,247.540 TO 3318.2
103 APAAR INFRATECH P LTD 19-04-2023 Crystalline Powder[WaterProofingMaterial 5,000 KG 5000
104 VISHWANATH INDUSTRIES.. 21-04-2023 Cup Lock Standard 1000 long Acrow 1,146 NOS 1146
105 VISHWANATH INDUSTRIES.. 21-04-2023 Cup Lock Standard 1500 long Acrow 1,116 NOS 1116
106 VISHWANATH INDUSTRIES.. 21-04-2023 Cup Lock Standard 2000 long Acrow 2,430 NOS 2430
107 VISHWANATH INDUSTRIES.. 21-04-2023 Cup Lock Standard 3000 long Acrow 3,829 NOS 3829

58 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 59 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
108 VISHWANATH INDUSTRIES.. 21-04-2023 Cup Lock Ledger 1500 long Acrow 1,908 NOS 1908
109 VISHWANATH INDUSTRIES.. 21-04-2023 Cup Lock Ledger 1250 long Acrow 37,998 NOS 37998
110 VISHWANATH INDUSTRIES.. 21-04-2023 Cup Lock Ledger 1000 long Acrow 4,000 NOS 4000
111 VISHWANATH INDUSTRIES.. 21-04-2023 Adj Stirrup Head 36 x 450MM & 350MM Thre 5,498 NOS 5498
112 VISHWANATH INDUSTRIES.. 21-04-2023 Adj Base Jack 36 x 450MM & 350MM Thread 5,128 NOS 5128
113 VISHWANATH INDUSTRIES.. 21-04-2023 Steel Waler 100 depth 2400 long L&T Doka 396 NOS 396
114 DELHI CALIBRATIONS LABORATORY 28-03-2023 calibration of Earth Pressure Sensors 1 AU 0
PRIVA
115 DELHI CALIBRATIONS LABORATORY 28-03-2023 calibration of Earth Pressure Sensors 1 AU 0
PRIVA
116 RAJDHANI ENGINEERING WORKS 28-03-2023 Repair Charges of Gear Pinion for EOT 1 AU 0
117 ALEXIS ENGINEERING & MARKETING 01-04-2023 Calibration Honeywell Multi Gas Detecor 1 AU 0
PVT.
118 ALEXIS ENGINEERING & MARKETING 01-04-2023 Calibration Honeywell Multi Gas Detecor 1 AU 0
PVT.
119 UPPAL LOGISTICS 28-03-2023 transportation charge 1 AU 0
120 FLORIDA ELECTRICAL ENGINEERING 08-04-2023 Repairing chrges of Eractor Cylinder for 1 AU 0
CORP
121 S A INDUSTRIES 08-04-2023 Segment Feeder wheel Coating for S-90TBM 1 AU 0
122 S A INDUSTRIES 08-04-2023 Bridge Gantry Wheel Coting for S-90 TBM 1 AU 0
123 HILTI INDIA PVT. LTD. 12-04-2023 Breaker TE 800 230V case 1 AU 0
124 RAJDHANI ENGINEERING WORKS 12-04-2023 Repairing /Lathe work for Bottam Pully 1 AU 0
125 RAJDHANI ENGINEERING WORKS 12-04-2023 Repairing /Lathe work for Flange Plate 1 AU 0
126 B.K ELECTRICALS 12-04-2023 10HP Pump Spares Repair 1 AU 0
127 B.K ELECTRICALS 12-04-2023 2 HP Modi pump repairing 1 AU 0
128 B.K ELECTRICALS 12-04-2023 7Hp Mody pump Repairing 1 AU 0
129 B.K ELECTRICALS 12-04-2023 3 HP Pump Repairing 1 AU 0
130 MAMTA ELECTRICALS WORKS 12-04-2023 5HP Pump Rewinding & Spares Repair 1 AU 0

59 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 60 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
131 MAMTA ELECTRICALS WORKS 12-04-2023 10HP Pump Rewinding & Spares Repair 1 AU 0
132 MAMTA ELECTRICALS WORKS 12-04-2023 10HP submersible Rewinding 1 AU 0
133 GAINWELL COMMOSALES PVT. LTD 13-04-2023 Repairing charges of Charging Alternater 1 AU 0
134 TERRATEC INDIA PRIVATE LIMITED 31-03-2023 Consignment Stock Management Fee Spares 1 AU 0
135 BENZ HYDRAULICS 24-04-2023 Hydraulics HSN:73079210-2"Fitting of TBM 1 AU 0
136 BENZ HYDRAULICS 24-04-2023 Hydraulics HSN:73079210-2""Fitting of TB 1 AU 0
137 AMP CONTROL EQUIPMENT PVT LTD 27-03-2023 NEUTRAL GROUNDING RESISTOR NGR 11KV 183A 2 NOS 2
138 ELTECH INDIA 27-03-2023 Automatic Voltage Regulator (AVR) SX440 1 NOS 0
139 TERRATEC INDIA PRIVATE LIMITED 05-04-2023 THRUST CYLINDER SEAL KIT 2 NOS 0
140 TERRATEC INDIA PRIVATE LIMITED 05-04-2023 ELEMENT FOR SUIT SUCTION FILTER 1 NOS 0
141 TERRATEC INDIA PRIVATE LIMITED 05-04-2023 FILTER ELEMENT FOR LINE FILTER 1 NOS 0

10. PHOTOGRAPHS

Attached as Annexure 3.

60 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 61 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
11. SAFETY
SHE Monthly report for the month of April 2023

Planning:

Comments on Tunnel SHE plan has been complied and submitted for review and approval and
OH&S Plan and Environment Management Plan has been approved. OH&S plan and
Environmental Management Plan is based on overall objective of continually improving SHE
performance. The guiding principles are:
• Prevention of safety risks and environmental impact through sound design practices.
• Establishing and maintaining system for "Injury free work environment” & "Resource
construction and waste minimization" in construction activities.
• Monitoring of SHE parameters for timely and preventive actions

The approach takes into account the following:

Statutory / regulatory, legal and other requirements


Significant environmental aspects, potential hazards and risk assessment
Client's requirements

Project OH&S plan, Environment Management Plan Parameters, Site Safety Rules for workers
and visitors, Fire Fighting guidelines, Emergency Preparedness and Response Plans are laid
down
SHE Personnel are engaged to monitor the Safety practices. They are identified by Green
Helmet.
Details of Emergency Contact persons and their phone numbers are listed out and issued in case
of any emergency.

Implementation:
Safety
Plant and • Job specific training is being conducted on different job for the workers and
Equipment staff competency
• Third party training has been conducted for scaffolding erector and inspector
• Third party training has been conducted for safe use of lifting operation
• Third party inspection of all the engaged equipment is being done.
• Safe and Unsafe tag system is being implemented on site for equipment.
• Competency training is being provided operator
• Competency training is being provided to riggers.
• Defensive driving training is being provided by third party agency.
• Competency certificate is being provided to operators and divers
• Emission stack monitoring has been done for crawler equipment.
Preventive • Safety induction training is being done for new joining staffs and workers.
measure • Basic 16 hrs SHE training is being provided to all the new joining before
resuming on duty.
• 100% compliance of Personal Protective Equipment is being done at site.

61 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 62 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• Informatory, waring, danger and mandatory signages boards are being
installed at site.
• Daily TBT is being conducted at site.
• On job training is being conducted at site.
• Safety alerts are being done at site.
• All the site observation is being recorded and reported.
Safety Audit • Second quarter external OH&S audit has been conducted and its compliance
has been submitted
• Internal MARS audit is being conducted at all the sites every month.
• Internal electrical audit is being conducted at all the sites every month.
• GC Safety Inspection has conducted on site, Begumpul Station, Begumpul
labor camp, Meerut Central Station and Casting Yard.
• GC Safety Inspection observation has been complied and submitted.
• ISO certification for ISO 45001: 2018 & 14001: 2015 Certification: has
conducted and certificate has been received.
Site practices • All exercise as per employer requirement on SHE is being implemented at
site.
• South Cut and Cover barricading work has been done.
• Rope light, solar blinker and chevron light are being used at site.
• Three-layer diversion protection is being provided for traffic diversion.
• Basic 16 Hrs. SHE Training Basic training is being conducted on site.
• Lifting engineer and lifting supervisor training has been provided to
engineer and supervisor
Housekeeping • All the station area, North cut & Cover, casting yard and Tunnel
housekeeping is being done regularly.
• Barricading boards are being cleaned and washed at regular basis.
• Road cleaning is being done on regular basis.
• Adequate illumination system is provided at site.
• Water sprinkling is being done.
• Wheel washing facility has been provided on site for washing of vehicle
before leaving the site.
Administrative • Work permit system is being followed on site.
control • Hazard identification and risk assessment implemented for all new activity.
• Method statement is being prepared for all the new activity.
• Job specific emergency response plan is being prepared.
• Unauthorized entry is prohibited at the working area.
• Traffic control is monitored.
• On site security has been deployed.
• Traffic marshal has been deployed on site for the traffic control.
• Informatory/Warning and dangerous signage boards are being installed on
site for workers awareness.
• Mobile toilet has been installed at the entire site.
• Drinking water has been provided at every work location.
• Job specific training is being held on site.
Health
First Aid box • First Aid box has been provided at each site.

62 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 63 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• Oximeter has been provided at each location for workers oxygen level
checkup prior entry on site.
• Temperature gun has been provided at each location for workers temperature
checkup prior entry on site.
• Emergency medical tie-up has been made with nearest hospital KMC
Hospital and Sirohi Hospital for any emergency response.
• Oxygen concentrator has been purchased for the any emergency response.
• First aider has been deployed on site for any emergency response.
Environment
Environmental • Environmental Aspect and impacts of activities are being submitted with
Impact Aspect Method Statement.
Environmental • Cutting of trees and plantation has been completed at Bhaisali
work
SHE Objective • Zero reportable incidents
and Target
• Zero non-conformances in respect of compliance of statutory laws
related to SHE as well as welfare facilities
• 100% compliance in incident reporting and documented information
• Executing construction activities with least inconvenience to the road
users/public, traffic movement as well as environment.
• Minimize waste generated at sites and maximize reuse of materials
• To achieve construction site as zero discharge site as far as is possible.
• Zero reportable environmental incidents.
• All personnel shall be inducted in accordance with the approved
contractor’s SHE plans.
• Total compliance of conducting inspections and audits as per approved
SHE plan
• 100 % adherence of usage of appropriate PPEs at work
• Disposal of all types of wastes.
• Precautionary measure of Pandemic like Covid-19 etc.
Environment • Environment monitoring is being conducted on site by M/s- Global
Monitoring Enviro Laboratories.
Waste materials • Building demolition waste has been used at casting yard for internal road
under GSB.
• Building demolished waste is being reused at casting yard for the
construction work.
• Dust bin has been provided at each site for waste collection.
Noise pollution • Silencer and mufflers use at site
• Regular servicing and maintenance of equipment are being done.
Air pollution • Excavated material is being covered with green net until it is leveled or
removed.

63 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 64 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
• Water sprinkling through mist spray gun and truck mounted tanker is
being done
• Road cleaning is being done
• All the engaged equipment maintenance is being done regularly
• All the vehicle has valid PUC certificate
• Anti-smog has been deployed at casting yard for the dust suppression
Water pollution • Bio-toilet has been provided at site.

S. No INCIDENT STATISTICS SUMMARY MONTH CUMULATIVE


1. Number of Man-hours Worked 781165 12032801
2. Number of Man-days Worked 71015 1093891
3. Number of Reportable Fatal Incident 0 0

4. Number of Reportable Major Incident 0 0

5. Number of Minor incident (<48hrs) 0 0

6. Number of Dangerous Occurrence 0 1

7. Number of Near Miss case 02 128

8. Number of Man-hours Lost 0 0

9.1 Number of Man-days Lost 0 0

9.2 Number of Man-days Lost for <48hrs 0 0


10.1 Lost Time Incident Frequency Rate:
No. of Reportable Lost Time Injury (3+4) x 106 0 0
Total Man-hours Worked
10.2 Incident Frequency Rate: (for sl.no.5 only) 0 0
11.1 Incident Severity Rate:
Man-days lost due to Reportable lost time
injury (9.1) x 106 0 0
Total Man-hours Worked
11.2 Incident Severity Rate: (for Sl.no.5 only) 0 0

12. Incidence Rate:


No. of Reportable Lost Time Injury (3+4) x
1000 0 0
Average No. of Persons employed

64 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 65 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
13. Average Number of Personnel:
i. Staff 675 9296
ii. Worker includes sub-contractor: 2284 32529
14. Peak workmen of the month 2723 nos -
01.04.2023

Internal NRC status:


S. Site NCR Total Closed Open
N nos

1 Casting yard NCR 34 34 0

2 Bhaisali Station NCR 42 42 0


3 Bhaisali Tunnel NCR 20 20 0
3 Meerut Central NCR
33 32 1
Station & SCC
4 Begumpul NCR
39 38 1
Station
5 North cut and NCR
33 33 0
Cover

NCN Details
S. Site NCN Total Closed Open
N nos

1 Casting yard NCN 03 03 00

2 Bhaisali NCN 08 08 00
Station
3 Meerut Central NCN 03 03 00
Station

4 South cut and NCN 01 01 00


cover

5 North cut and NCN 05 05 00


Cover
6 Begumpul NCN 01 01 00
Station

65 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 66 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Training Photographs

Training on Chemical Handling

66 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 67 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

Training on Sources of Waste and its management at Construction site & its management

Training on different type of Pollution

67 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 68 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

Use of Anti-Smog gun at Site

68 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 69 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

Anti-mosquito fumigation on site

69 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 70 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

Regular Toe Dust Cleaning

70 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 71 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

12. QUALITY

1.EXTERNAL NCN:

NCN STATUS
SUBMITTED
S.NO SITE LOCATION TOTAL CLOSED OPEN
FOR CLOSING
1 BEGUMPUL STATION 05 00 01 04

2 MEERUT CENTRAL STATION 02 02 00 00

3 BHAISALI STATION 09 00 08 01
4 TUNNEL 15 00 00 15

5 NORTH LAUNCHING SHAFT 09 00 07 02

6 CASTING YARD 00 00 00 00
TOTAL 40 03 15 22

71 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 72 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

EXTERNAL NCR STATUS (NCN)


TOTAL SUBMITTED FOR CLOSING CLOSED OPEN

22

15

15
40
1 2
0
8 7
4 0 0
15
0
1
0 9 9
5 2
2 0 0
BEGUMPUL MEERUT BHAISALI TUNNEL NORTH SOUTH CUT CASTING YARD TOTAL
STATION CENTRAL STATION LAUNCHING AND COVER
SHAFT
72 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 73 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

2.INTERNAL NCR:

INTERNAL NCR STATUS

S.NO SITE LOCATION TOTAL CLOSED OPEN

1 BEGUMPUL STATION 17 16 01

2 MEERUT CENTRAL STATION 13 09 04

3 BHAISALI STATION 34 28 06

4 TUNNEL 03 03 00

5 NORTH LAUNCHING SHAFT 03 00 03

6 SOUTH LAUNCHING SHAFT 02 01 01

7 CASTING YARD 02 02 00

TOTAL 74 59 15

73 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 74 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

INTERNAL NCR STATUS


TOTAL CLOSED OPEN

15

59

28

74
1
16 4
9 34
17 13 0
3 3
0 1 0
2
3 3 2 2

BEGUMPUL MEERUT BHAISALI TUNNEL NORTH SOUTH CUT CASTING TOTAL


CENTRAL LAUNCHING AND COVER YARD
SHAFT

74 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 75 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

3.CONCRETE MIX DESIGN:

TOTAL CONCRETE MIX


NONO UNDER REVIEW REPLY PENDING REJECTED
DESIGN

51 39 02 09 01

75 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 76 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

CONCRETE MIX DESIGN STATUS

9% 1%

2%

TOTAL CONCRETE MIX DESIGN


NONO
50% UNDER REVIEW
REPLY PENDING

38% REJECTED

76 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 77 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

4.0 METHOD STATEMENT STATUS:

Total MS NONO UNDER REVIEW REPLY PENDING DISCARDED

65 50 07 06 02

77 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 78 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

METHOD STATEMENT STATUS

5% 2%
5%

Total MS
NONO
50% UNDER REVIEW
REPLY PENDING
38% DISCARDED

78 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 79 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

5. MATERIAL/VENDOR STATUS:

MATERIAL/VENDOR APPROVAL STATUS


Sl.
N Description Source Afcons Submitted letter Reference Dated Status Remarks
o
Reinforcemen AFC/4559/NCRTC-Pkg8/2021/243 05-03-2021 NONO with
Dextra C
t Couplers NCRTC/DM/CPMMRT/PKG8/016/1005 27-03-2021 comment

AFC/4559/NCRTC-Pkg8/2021/1145 22.09.2021
1 NCRTC-2199 01.10.2021 B
Halfen
(Re- Under
Moment AFC/4559/NCRTC-Pkg8/2021/1286 16.10.2021
Submission Review
India Pvt NCRTC-2693 30.11.2021 done)
AFC/4559/NCRTC-Pkg8/2021/1568 8.12.2021

AFC/4559/NCRTC-Pkg8/2021/242
05-03-2021
27-
Crystalline NCRTC/DM/CPM-MRT/PKG8/016/1006 NONO with
2 Xypex 03.2021 C
Admixture comment
AFC/4559/NCRTC-Pkg8/2021/1507 30.11.2021

NCRTC/DM/CPM-MRT/PKG8/016/3037 13.01.2022

79 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 80 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
AFC/4559/NCRTC-Pkg8/2022/1793 17.01.2022

AFC/4559/NCRTC-Pkg8/2022/1810 22.01.2022

AFC/4559/NCRTC-Pkg8/2021/573 26-05-2021
Penetron NONO Approved
NCRTC/DM/CPM-MRT/PKG8/016/1402 29-05-2021

AFC/4559/NCRTC-Pkg8/2021/283 15-03-2021
ROSA -
M/s NCRTC/DM/CPMMRT/PKG8/057/1007 27-03-2021
Ashtech NONO Approved
(India) AFC/4559/NCRTC-Pkg8/2021/370 03.04.2021
Pvt. Ltd.
Flyash - NCRTC/DM/CPM-
3 04.05.2021
second party MRT/PKG8/057/1245
NTPC
Dadri AFC/4559/NCRTC-Pkg8/2021/1150 21.09.2021
supplier
(Ashtech
NONO Approved
NCRTC/DM/CPM-
Industries 01.10.2021
MRT/PKG8/057/2201
Pvt. Ltd.

AFC/4559/NCRTC-Pkg8/2021/233 03-03-2021
Duron
(Rejected)
Water Polyvinyls
4 NCRTC/DM/CPM-MRT/PKG8/016/1066 06-04-2021
Stopper
NONO with
AFC/4559/NCRTC-Pkg8/2021/233 10.03.2021 C
comment

80 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 81 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
KANTA AFC/4559/NCRTC-Pkg8/2021/504 08.05.2021
POLYME
RS NCRTC/DM/CPM/MRT/PKG8/057/1306 12.05.2021

AFC/4559/NCRTC-Pkg8/2021/878 31.07.2021
Maruti
NONO Approved
Rubber
NCRTC/DM/CPMMRT/PKG8/057/3934 17.05.2022

GEO AFC/4559/NCRTC-Pkg8/2021/342
Ground NCRTC/DM/CPMMRT/PKG8/016/1066
Engineerin
g 26-03-2021 NONO NONO
Operation
s India NCRTC-DM-CPM-MRT-PKG8-057/1186
Pvt. Ltd.

5 Geo Polymer
AFC/4559/NCRTC-Pkg8/2021/308 22.03.2021

Eco AFC/4559/NCRTC-Pkg8/2021/371 03.04.2021


Drilling NONO
Fluids NCRTC/DM/CPMMRT/PKG8/057/1286 08.05.2021

AFC/4559/NCRTC-Pkg8/2021/551 20.05.2021

81 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 82 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

NCRTC/DM/CPM-MRT/PKG8/057/1419 02.06.2021

AFC/4559/NCRTC-Pkg8/2021/475 27.04.2021

NCRTC/DM/CPM-MRT/PKG8/016/1259 05.05.2021

Wall Grip NCRTC/DM/CPM-MRT/PKG8/016/1418 02.06.2021 Rejected


AFC/4559/NCRTC-Pkg8/2021/1403 05.11.2021

AFC/4559/NCRTC-Pkg8/2021/1501 26.11.2021

NCRTC/DM/CPMMRT/PKG8/016/2598 22.11.2021

AFC/4559/NCRTC-Pkg8/2021/1385 01.11.2021

KB NCRTC/DM/CPMMRT/PKG8/016/2868 22.11.2021
Internation
NONO Approved
al LLC
Polymer AFC/4559/NCRTC-Pkg8/2022/1855 02.02.2022

NCRTC/DM/CPMMRT/PKG8/016/3218 11.02.202

Conbextra
6 AFC/4559/NCRTC-Pkg8/2021/230 02-03-2021 NONO Approved
GP2

82 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 83 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Fosroc
Chemicals NCRTC/DM/CPMMRT/PKG8/016/1138 16-04-2021
Pvt. Ltd.

Shutter AFC/4559/NCRTC-Pkg8/2021/229 02-03-2021


Fosroc
Release
7 Chemicals NONO Approved
Agent -
Pvt. Ltd. NCRTC/DM/CPMMRT/PKG8/016/1138 16-04-2021
Reebol

Cement,
Flyash, AFC/4559/NCRTC-Pkg8/2021/343 26.03.2021
20mm, All Test
10mm, Rsand As per NCRTC/DM/CPMMRT/PKG8/057/1325 report
18.05.2021
8 & Admixture source submitted
for Third party visit letter and awaited
test at AFC/4559/NCRTC-Pkg8/2021/581 31-05-2021 for Approval
Gaziabad
Test lab

Coarse NTPC/DM/CPM-MRT/PKG08/057/1174 26-04-2021


aggregate Kotputli,
NONO Approved
(20mm & Rajasthan
10mm) NTPC/DM/CPM-MRT/PKG08/057/1490 14-06-2021
9
Charkhi
Coarse Dadri & Under
AFC/4559/NCRTC-Pkg8/2021/1279 14-10-2021
aggregate Yamuna Review
Nager
Fine Yamuna
10 NTPC/DM/CPM-MRT/PKG08/057/1174 26-04-2021 (NONO) Approved
aggregate Nager

83 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 84 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Ultratech
11 Cement OPC 53 NTPC/DM/CPM-MRT/PKG08/057/1174 26-04-2021 (NONO) Approved
Grade
Cement,
20mm,
10mm, Rsand
for Third party
As per
test at
12 source NCRTC letter to Govt Lab --
National
visit letter
Small
Industries
Corporation
Ltd

AFC-341 dt 26.03.2021

M/s Kunal
13 Admixture Conchem AFC-799 dt 15.07.2021 08.10.2021 (NONO) Approved
Pvt. Ltd.
NCRTC-DM-CPM-MRT-PKG8-057-2278

ATPL NCTRC/Design/Vendor/2021 16-09-2021 (NONO) Approved

Auracast
100 &
Auramix
NCRTC-DM-CPM-MRT-PKG8-057/1173 27.04.2021 (NONO) Approved
400
courced
from "M/s

84 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 85 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
Fosroc
Chemical
(India)
Pvt. Ltd."

Curing
14 ATPL NCTRC/Design/Vendor/2021 16-09-2021 (NONO) Approved
Compound

AFC/4559/NCRTC-Pkg8/2021/238 & 244 06-03-2021


Modi and
15 Welding Rod (NONO) Approved
D&H
NCRTC/DM/CPMMRT/PKG8/016/1139 16-042021

AFC/4559/NCRTC-Pkg8/2021/468 24-04-2021 Provisional


NONO
(Under
Welding Rod Weld Alloy received.
NCRTC/DM/CPM-MRT/PKG8/016/1273 07-05-2021 Review)
Awaited for
final NONO.
22-05-
AFC/4559/NCRTC-Pkg8/2021/562
2021

Steel Pipe of Sanfield AFC/4559/NCRTC/PKG08/2021/380 05.04.2021


16 50mm dia & 1 (India) (NONO) Approved
mm thick Pvt. Ltd.
NCRTC/DM/CPM/MRT/PKG08/057 23.04.2021

85 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 86 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

AFC/4559/NCRTC/PKG08/2021/549 19.05.2021

NCRTC/DM/CPM/MRT/PKG08/1554 24.06.2021

Glass fibre AFC/4559/NCRTC/PKG08/2021/599 02-06-2021


FireP
reinforced
17 Internation (NONO) Approved
Polymer
al AG NCRTC/DM/CPM/MRT/PKG08/057/1536 21-06-2021
(GRPF)

M/s Kunal AFC/4559/NCRTC-Pkg8/2021/341 26.03.2021


Sodium
18 Conchem (NONO) Approved
Silicate
Pv. Ltd NCRTC-DM-CPM-MRT/PKG8/057/1318 31.07.2021

M/s
AFC/4559/NCRTC-Pkg8/2021/792 12.07.2021
“Subham
Sodium
Mineral (NONO) Approved
Silicate
Company”
NCRTC-057-1786 dt 29.07.2021 17.07.2021
.

ELKEM AFC/4559/NCRTC-Pkg8/2021/823 21.07.2021


19 Micro silica Micro (NONO) Approved
silica NCRTC-057-1784 dt 29.07.2021 29.07.2021

Tunnel Segment material status


EPDM Rejected
20 AFC/4559/NCRTC-Pkg8/2021/309 (Rejected)
Gasket not in the

86 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 87 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
M/s approved
Algaher NCRTC/DM/CPM-MRT/PKG8/015/1121 22/03/2021 vendor list -
SA 15-05-2021
M/s
Sealable AFC/4559/NCRTC-Pkg8/2021/336 26-03-2021
Soln
GmbH Approved
EPDM
21 ( Formerly (NONO) for EPDM
Gasket,
known as NCRTC/DM/CPM-MRT/PKG8/057/1121 15-05-2021 gasket
M/s
DATWYL
ER)
Jointing bolts,
AFC/4559/NCRTC-Pkg8/2021/337 26-03-2021
Bolt socket, M/s
NONO with
Non Cooper 09-04-2021
NCRTC/DM/CPM-MRT/PKG8/057/1202 NONO with comment
22 returnable and 03-06-2021 comment 603/03-06-
valves, Grout Turner
2021
plug with O Ltd. AFC/4559/NCRTC-Pkg8/2021/603
ring

EPDM
Gasket, Bolt AFC/4559/NCRTC-Pkg8/2021/399
Socket, Grout
plug with M/s Fama Rejected for 07-04-2021
EPDM gasket due to not in the approved
23 (Rejected)
Hydrophilic O SPA 04-05-2021 vendor list.
ring, Non
NCRTC/DM/CPMMRT/PKG8/057/1246
returnable
AFC/4559/NCRTC-Pkg8/2021/399
valves

87 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 88 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`

AFC/4559/NCRTC-Pkg8/2021/397 07-04-2021 Rejected


not in the
approved
vendor list &
Bolts and M/s Delhi NCRTC/DM/CPMMRT/PKG8/057/1154 23-04-2021
24 (Rejected) Resubmitte
washer Industries
d for
approval &
22-05- Again
AFC/4559/NCRTC-Pkg8/2021/561 rejected.
2021

Daeryong NONO
25 EPDM gasket Ind. Co. NCRTC-DM-CPM-MRT-PKG8-057-2235 06.10.2021 C (Testing
Ltd Required)

Rejection of
EPDM
gasket due
to non-
conformanc
EPDM gasket Datwyler NCRTC-DM-CPM-MRT-PKG8-057-2236 06.10.2021 D
e to the
requirement
s of
Contract
Agreement

88 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 89 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
EPDM
Gasket, Bolt
Socket, Grout AFC/4559/NCRTC-Pkg8/2021/313 30-03-2021 C
M/s
plug with
Daeryoun NONO
Hydrophilic O
g
ring, Non-
returnable (Re-
valves NCRTC/DM/CPM-MRT/PKG8/057/1121 15-04-2021 Submission
)
M/s Rejected
Panchase not in the
AFC/4559/NCRTC-Pkg8/2021/398 30.03.2021 (Rejected)
el approved
Bolts and Fasteners vendor list
26
Accessories
M/s Delhi
NCRTC/DM/CPM MRT/PKG8/057/1154 15.04.2021 (NONO) NONO
Industries

AFC/4559/NCRTC-Pkg8/2021/765 07.07.2021
27 CANON (NONO) NONO
NCRTC/DM/CPM- 27.07.202
MRT/PKG8/057/1745 1

89 MPR April-2023
MONTHLY PROGRESS
REPORT

DOCUMENT No.
April-2023 PAGE 90 OF 90
NCRTC/DM099/AIL/RP/PL/M28
`
13.INSTRUMENTATION
The detailed instrumentation report for the month of April 2023 shall be submitted separately via correspondence.

90 MPR April-2023
DPR Summary Period of 26 Mar 23 - 25 Apr 23 (MPR April 2023) ANNEXURE - 1
Week 1 Week 2 Week 3 Week 4 Week 4

26-03-2023

27-03-2023

28-03-2023

29-03-2023

30-03-2023

31-03-2023

01-04-2023

02-04-2023

03-04-2023

04-04-2023

05-04-2023

06-04-2023

07-04-2023

08-04-2023

09-04-2023

10-04-2023

11-04-2023

12-04-2023

13-04-2023

14-04-2023

15-04-2023

16-04-2023

17-04-2023

18-04-2023

19-04-2023

20-04-2023

21-04-2023

22-04-2023

23-04-2023

24-04-2023

25-04-2023
Tentative Cum. Qty Till 25th
Location / Major Activities Unit Total FTM
Scope April 23

Permanent Column Base to Concourse Nos 29 1 1 1 1 1 1 1 1 1 9 19

Permanent Column Concourse to roof Nos 29 1 1 1 3 12

RCC wall concourse level Rm 1137 0 215

Meerut Central UPE wall Rm 1200 20 12 14 20 66 303

Platform Slab Casting Sqm 2940 294 294 939

Blockwork Cum 1450 2 2 2 3 2 3 2 2 1 2 1 1 1 2 2 4 4 4 2 1 2 2 2 2 51 226


1st stage concrete Sqm 4694 145 145 290 290
Base Slab Casting Sqm 8256 865 865 6845
Ancillary Building column Nos 84 1 1 82

Blockwork Cum 1400 3.5 3 4 5 4.5 5 4 4.5 4 3.5 5 4 4.5 4 4.5 3 66 542

UPE wall Rm 877 33 30 30 20 30 143 591

Internal RCC walls Concourse(Final lift) Rm 430 0 156

OTE DUCT SLAB Rm 380 32 32 64 157


Bhaisali Station Platform Slab Casting Sqm 3050 244 244 468

First stage concrete Sqm 4770 441 441 852

Permanent Column Base to Concourse Nos 36 2 2 34

Permanent Column Concourse to roof Nos 36 0 19

Entry Exit -2 Soldier Pile Nos 35 3 3 5 2 2 0 3 5 6 6 35 35

Entry Exit -2 Excavation Cum 3942 72 210 98 380 380

Base Slab Casting Sqm 6408 870 632 1502 3879

Blockwork Cum 1560 2 1 1.5 0 2 0.5 6.5 0 7.5 7.5 7.5 7.5 7.5 2.5 2.5 2.5 0 5 10 10 10 10 7.5 7.5 5 5 5 133.5 400

Earthmat Nos 3 1 1 3

UPE Wall Casting Rm 1024 20 20 20 20 80 202


Begumpul Station
Internal RCC walls Concourse(Final lift) Rm 315 52

Permanent Column Base to Concourse Nos 24 0 6

Permanent Column Concourse to Mezzannine Nos 24 3 3 3

Permanent Column Mezzannine to Roof Nos 24 2 1 3 3

Elevated Slab Sqm 2249 0 660

Base Slab casting (Elevated Ramp) Sqm 2249 0 1669


North Cut & Cover
Roof slab Sqm 2693 202 202 1682

RCC Wall (C/C, U G & Above ground Ramp) Rm 1776 13 30 30 30 30 30 30 30 223 1010

Soldier Pile Nos 920 2 4 3 3 2 2 1 2 1 1 1 2 1 2 1 2 2 32 814

Excavation Cum 101560 325 192 217 338 169 181 322 440 335 220 287 398 456 276 240 228 24 372 456 324 192 468 432 324 276 192 288 156 8128 46590

Base Slab casting (C/C & U Trough) Sqm 8100 339 325 219 883 4115
South Cut & Cover Base Slab (Box structure) Sqm 1276 0 946

Elevated Slab Casting Sqm 1672 0 330

RCC Wall Rm 2120 15 15 15 15 15 15 15 16 15 15 15 166 469

Kingpost Nos 60 1 1 2 57

TBM Drive Nos 4801 11 14 12 11 11 12 16 12 2 17 6 13 15 6 16 16 16 16 14 8 5 14 9 10 4 5 2 293 4001


Tunneling
1st stage concrete Rm 1528 0 762
NCRTC PCKG-8 ORGANISATION CHART
ANNEXURE - 2

PROJECT MANAGER

ALOK CHANDRA TIWARI

SR.OFFICER HSE
PERSONNEL & OFFICER
DESIGN & INTERFACING QA/QC
TUNNELS STATIONS & CASTING YARD MANAGER
ADMINISTRATION AKHILESH
SHUKLA VACANT
PRAMOD
KUMAR
OFFICER
QUALITY CHIEF SAFETY
ENGINEERING MANAGER ASSURANCE MANAGER
ENGINEERING MANAGER
CONSTRUCTION MANAGER (LEAD DESIGNER & MANAGER
CONSTRUCTION CONSTRUCTION MANAGER (GEOTECHNICAL DESIGN)
CONSTRUCTION MANAGER (CIVIL & (CASTING YARD) VACANT TECHNICAL SUPPORT)
CONSTRUCTION MANAGER MANAGER MANAGER (E&M)
(CIVIL & GEOTECHNICAL) GEOTECHNICAL) (ARCHITECTURAL)
ALOK TYAGI RAVINDRA
VACANT BUDDHADEB QUALITY RAMAYA
ENVIRONMENT
VACANT AMITAVA PAKHIRA CHAKRABORTY PRAVEEN KUMAR FLORIAN KRENN ASSURANCE MANAGER
VACANT VACANT
DESIGN QUALITY
MANAGER SENIOR HSE
MANAGER ENGINEER ASSURANCE MANAGER RAHUL KUMAR
CONSTRUCTION CONSTRUCTION ENGINEER CON. MANAGER SR ENGINEER MANAGER
MANAGER MANAGER
RAJESH KUMAR SURVEY
MANAGER
(INSTRUMENTATION) VACANT ENGINEERING MANAGER
R P GUPTA OM PRAKASH (LEAD DESIGNER CHECKER) BIM MANAGER SUMON
SAHADEV S.K.MISHRA VACANT
SINGH PAUL
VACANT PUSHPENDRA MANAGER SR. ENGINEER(REBAR)
SMARK KLAWKLA KUMAR ENGINER ENGINEER
SR. ENGINEER ENGINEER
KAJAL HALDAR VACANT VACANT PUGHAZENDHI GANESAN HIMANSHU AGGARWAL
PRABHAKAR SR ENGINEER SR ENGINEER
TYAGI TANMAY MANNA
CONSTRUCTION ABU SALEH CONSTRUCTION
SR ENGINEER MANAGER (STATION QUALITY CONTROL
PUSHKAR
STRUCTURE) MANAGER ABHAY SINGH
ENGINEERING MANAGER (CONSTRUCTION SINGH
MANAGER SR.ENGINEER ENGINEER
ASHWANI (ARCHITECTURAL DESIGN) DESIGN CONSOLIDATION SITE)
MITHILESH KR SINGH MANAGER
KUMAR
QS SARAVANA
NARAYAN DAS KUMAR VACANT
VACANT VACANT ENGINEER
SHARMISTA S YADAV SR. ENGINEER
SR.MANAGER MANAGER MANAGER QUALITY
ENGINEER ENGINEER
SR.ENGINEER CONTROL NARESH
NORTH & SOUTH C/C
GOPAL KUMAR
MANAGER AZHAR AHMAD
VACANT ANNIE SINHA VACANT CONSTRUCTION KUMAR
RAHUL TOMAR DANISH SHEIKH KASAV
ROY ENGINEERING MANAGER QUALITY CONTROL
RAJIV RANJAN SINGH SOUTH C/C CHIEF INTERFACE MANAGER (CASTING
(E&M DESIGN)
MANAGER YARD)
Sr. ENGINEER SR OFFICER
STORE ENGINEER
SR ENGINEER
STATION 3 SR OFFICER
STATION 2 MANAGER NARENDRA LAKSHMI NARAYAN JOYDEEP
STATION 1
NORTH C/C MANIKANDAN S VACANT BALASUBRAMANIAN GOSWASMI
MANAGER SHASHANK
MEERUT CENTRAL UJJAL KR
SR ENGINEER SR ENGINEER BEGUMPUL MANINDER SR OFFICER MEHTA
SR. ENGINEER
SABRAWAL KAILASH Ch. MANDAAL
BHAISALI
SANDEEP SHARMA MANISH
IMTIYAZ SIRAJ BILTU DAS
KUMAR SR.ENGINEER SR.ENGINEER PROCUREMENT AGRAWAL SR. ENGINEER
PATEL STATION MANAGER STATION MANAGER MANAGER ENGINEER
SR.ENGINEER
MANOJ RISHABH SR OFFICER SR.ENGINEER
H K PRASAD SR OFFICER
STATION MANAGER KUMAR KUMAR PRITAM TRIPATHI
VACANT
ENGINEER ENGINEER M VELMURUGAN SOMINDRA BACHAN SAJEEV P SR. ENGINEER SR.ENGINEER SR ENGINEER
GUPTA NIRANJAN
SR OFFICER SR OFFICER CHOUBEY SUDIP DAS
NITISH HARIOM RAI
PERVEZ ALAM DOCUMENT KUMAR
RANJAN CONTROL VACANT
ENGINEER RAHUL TYAGI VACANT
SR.ENGINEER SR.ENGINEER MANAGER MANAGER SR.ENGINEER THOMAS PIOUS K ANAND DIKSHIT
ENGINEER
MD RASHID SAZID AHMAD
HIMANSHU HUSSAIN ARNAB DAS SUSHIL KUMAR NITESH YADAV
YASH
PANESHAR ENGINEER
CHATURVEDI MANAGER ENGINEER
ENGINEER ENGINEER MANAGER
ENGINEER ACCOUNTS DIBYA
ENGINEER
VINAY BECHURAM SR ENGINEER ENGINEER ARGHYA SEN SUKESH KUMAR RANJAN BRIJ MOHAN
PANWAR MALO SUNDAR SAIN ANSHUL ENGINEER ENGINEER SINGH
NIKHIL RANDHEER
SINGH
TAXATION SR. OFFICER
TRIVEDI
SR.ENGINEER ENGINEER RAKESH JHA ABHISHEK MD TANWEER
ENGINEER
TRIPATHI
ENGINEER
SANJAY VERMA SURAJ PATALE SAURAV PARUI IT
SOMESH DOBHAL
ENGINEER ENGINEER

PLANNING & ENGINEER ENGINEER


SR. ENGINEER ENGINEER ENGINEER ENGINEER GAURAV RAI DEEPU C V
SCHEDULING ENGINEER
MANAGER RAKESH RAMESH
TAHA SAGHIR AKSHAY YADAV UPENDRA V VINOD V. DHANANJAY SHARMA KUMAR
PLANNING & VACANT JANJAL
SCHEDULING ENGINEER ENGINEER
CONTRACTS
PLANNING & ENGINEER ENGINEER PREM KUMAR
DEEPAK
SCHEDULING YADAV
KUMAR
MANAGER GOURAV
CPE GOEL NIKHIL SINGH
FABRICATION VACANT ENGINEER
SR.ENGINEER ENGINEER
MANAGER MANAGER SR ENGINEER MANAGER
ENGINEER NARENDRA
MIS
MAYANK PRATIK TANWAR
HIMANSHU RABIN BOSE
SAROJ KR DAS AVINASH KUMAR LOKHANDE MOHD.
CHOUDHARY SINGH
AHASAN

MANAGER MANAGER MANAGER


MANAGER
MANAGER MANAGER MANAGER MANAGER
MANAGER

SANJAY KR K NARENDRA P.D.DUTTA


DEEPAK VINOD KUMAR SUNIL KUMAR SUMAN TAPAS KR. DAS
G. SREENIVASULU HIMANSHU ARORA
AGRAWAL

SR SR SR ENGINEER ENGINEER ENGINEER


SR ENGINEER SR ENGINEER SR ENGINEER SR ENGINEER SR ENGINEER SR ENGINEER ENGINEER ENGINEER
ENGINEER ENGINEER ENGINEER ENGINEER
LEGEND:
SWARANJIT Md. NASIM MACHINENI PRASHANT KOUSHIK DEY SURAJIT
MONIK VIMAL SANGU SUVRA JYOTI SURAJ S DIXIT ANKUL SONI DEVRAJ DAS
RAMJEE RAMESH KR PAUL HASMI DISWAR CHAKRABORTY
KAPOOR SINGH RAJASEKHARA CHOWBEY SANDEEP KUMAR
KEY STAFF
ANNEXURE 3

03/04/2023 02:30 PM
SCC RCC wall deshuttering work in progress

10/04/2023 03:00 PM
SCC Base slab rebar work in progress
ANNEXURE 3

10/04/2023 11:30 AM

SCC Excavation work in progress

03/04/2023 04:30 PM

SCC Base slab casted (CH 66580 to 66555 UL)


ANNEXURE 3

22/04/2023 2:30 PM
SCC Base slab rebar work in progress

20/04/2023 10:30 AM
SCC RCC wall work in progress
ANNEXURE 3

19/04/2023 3:10 PM
SCC RCC wall R/F work in progress

30/03/2023 10:30 AM

MEEC Base slab casted - curing WIP (G 8+14m to 10+4 m)


ANNEXURE 3

30/03/2023 10:30 AM
MEEC Platform Slab Shuttering work in progress G15 –G19

14/04/2023 06:30 PM

Platform slab Rebar work in progress


ANNEXURE 3

30/03/2023 10:30 AM

MEEC Column Shuttering work in progress


ANNEXURE 3

30/03/2023 11:30 AM

MEEC TVS/ECS work in progress


ANNEXURE 3

3/04/2023 5:30 PM
MEEC Column casting work in progress
ANNEXURE 3

03/04/2023 10:30 AM

MEEC M10 ceiling putty work in progress

03/04/2023 10:30 AM
MEEC ASS room blockwork in progress

16/04/2023 10:30 AM
MEEC M09 Equipment room work in progress
ANNEXURE 3

22/04/2023 10:45 AM

Platform slab casted (Grid 14-16)

22/04/2023 11:45 AM
Concourse hanging slab work in progress (G 3 - 4 UL)
ANNEXURE 3

18/04/2023 01:30 PM
MEEC Column Shuttering & Reinforcement progress
ANNEXURE 3

20/04/2023 02:30 PM
MEEC First stage concrete done (Grid 19+6 to 21+8.5 DL)

03/04/2023 11:30 AM

North LS Cutout reinforcement closing work in progress


ANNEXURE 3

30/03/2023 05:30 PM

BHAI Platform work in progress

05/04/2023 03:30 PM

BHAI ECS room painting work in progress


ANNEXURE 3

01/04/2023 01:30 PM
BAHI LS 01 First stage concrete rebar work done
ANNEXURE 3

17/04/2023 01:30 PM

BHAI Grid 1 - 3 Reinforcement for concourse slab work in progress

17/04/2023 01:30 PM

BHAI Grid 3 - 4 Staging and shutter fixed work in progress


ANNEXURE 3

16/04/2023 05:30 PM

BHAI UPAS wall shuttering work in progress

15/04/2023 05:30 PM

BHAI Base level column reinforcement work in progress


ANNEXURE 3

15/04/2023 07:30 PM

BHAI Entry Exit 2 Soldier pile work in progress


ANNEXURE 3

BEGU Column Rebar work in progress

BEGU Concourse level Column Rebar work in progress


ANNEXURE 3

03/04/2023 10:37 AM

BEGU Base slab rebar work in progress

15/04/2023 12:30 PM
BEGU Base slab rebar work in progress
ANNEXURE 3

03/04/2023 10:48 AM

BEGU Earth mat work in progress

16/04/2023 01:30 PM
BEGU Base level column work in progress
ANNEXURE 3

05/04/2023 12:30 PM
BEGU TVS/ECS work in progress at Mezzanine level

01/04/2023 1:30 PM

BEGU Blockwork progress at Mezzanine level


ANNEXURE 3

16/04/2023 02:10 PM
BEGU Blockwork progress at Concourse level

16/04/2023 5:00 PM

BEGU RCC wall reinforcement work in progress


ANNEXURE 3

08/04/2023 2:30 PM

NCC RCC wall shuttering work in progress

12/04/2023 2:20 PM
NCC RCC wall casting work in progress
ANNEXURE 3

09/04/2023 1:00 PM

NCC RCC wall reinforcement in progress

20/04/2023 3:20 PM
CP 2 UL- Forepoling work completed Core cutting progress for Top Lintel Beam
ANNEXURE 3

22/04/2023 3:25 PM
CP 4 DL Core cutting & Drilling work in progress

23/04/2023 6:35 PM
CP 5 DL Core cutting & Drilling work in progress
ANNEXURE 3

23/04/2023 5:00 PM

CP 4 DL Core cutting & Drilling work in progress


Manpower Details for the Period of 26 Mar 23 - 25 April 23 (MPR April 23) ANNEXURE - 6

01-04-2023

02-04-2023

03-04-2023

04-04-2023

05-04-2023

06-04-2023

07-04-2023

08-04-2023

09-04-2023

10-04-2023

11-04-2023

12-04-2023

13-04-2023

14-04-2023

15-04-2023

16-04-2023

17-04-2023

18-04-2023

19-04-2023

20-04-2023

21-04-2023

22-04-2023

23-04-2023

24-04-2023

25-04-2023
26.03.2023

27.03.2023

28.03.2023

29.03.2023

30.03.2023

31.03.2023
Category
Sub-Con
Sub-Contractor Name Wise
Total

SK 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 60
VSG-Security
USK 13 13 13 13 13 38 38 38 38 38 38 27 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 1,004
SK 11 11 11 11 11 11 6 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 270
VSG-Marshal
USK 81 81 81 81 81 81 76 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 2,020
SK - 1 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 1 1 23
Rajesh Pandey
USK 12 12 12 12 21 - 23 23 22 23 22 22 - 23 21 22 22 21 21 - 22 22 22 22 21 - 0 11 15 469
KANCHAN GHOSH SK 2 - 2 1 2 1 1 1 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 36
YASH ENGINEERING USK 13 - 15 16 15 15 15 15 - 16 16 17 16 16 16 - 15 15 15 15 16 - 0 18 15 310
SK 5 5 5 5 11 - 6 15 15 14 15 15 - 15 15 14 15 15 15 - 15 15 15 15 15 - 0 15 14 304
SWETA CONS (hire)
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 2 - 2 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 40
SAINY HEAVY (hire)
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
REACH SK 2 2 2 2 1 - 1 1 1 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 1 1 28
INTERNATIONAL(hire) USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 48
Yadav Crane (hire)
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 8 8 8 8 9 - 8 7 6 7 8 9 - 6 7 8 9 9 9 - 7 7 7 6 6 - 0 7 7 181
RK ROAD LINES (hire)
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 2 2 2 2 - - - - - - - - - - - - - 2 - - - - - - - - 0 - - 10
Sarda Enterprise (Hire)
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 22 26 26 26 32 - 19 19 20 20 20 20 - 20 20 20 20 19 19 - 19 19 19 19 19 - 0 20 19 502
HARIOM Logistics
USK - - - - 2 - 2 2 3 4 4 3 - 3 3 3 3 3 3 - 3 3 3 3 3 - 0 4 3 60
SK 2 2 2 2 - - - - - 4 4 4 - - - - - 4 - - - - - - 1 - 0 - 1 26
Gayatri Logistic (Hire)
USK 2 2 1 - - - - - - - - - - - - - - - - - - - - - 1 - 0 - - 6
SK 4 4 3 3 - - - - - 2 2 2 - - - - - 2 2 - - - - - - - 0 - - 24
Candid Ventures
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 2 - 2 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 40
Jindal Crane ( hire)
USK 1 - 1 1 1 1 1 1 - 1 1 1 2 1 1 - 1 1 1 1 1 - 0 2 2 23
SK 2 - 2 - 2 2 2 2 - 2 2 2 2 1 2 - 2 2 2 2 2 - 0 2 2 37
Girdhar ( hire)
USK 1 - 2 - - 2 1 1 - - 1 1 1 1 1 - 1 1 1 1 1 - 0 2 1 20
SK 14 - 12 15 14 15 13 11 - 15 14 14 15 13 14 - 14 14 11 14 12 - 0 15 12 271
Ritika Fabricators
USK 5 - 3 3 2 4 4 3 - 4 4 5 2 4 4 - 5 4 2 2 4 - 0 2 4 70
SK 2 2 2 2 26 - 18 17 21 17 18 17 - 18 16 13 13 14 15 - 14 16 22 26 23 - 0 15 14 361
sajahan
USK 5 5 5 5 41 - 29 23 30 24 28 26 - 25 33 24 24 32 30 - 32 33 37 39 38 - 0 29 28 625
SK 3 - - - 1 - - - - - 1 - - 1 1 - 3 2 2 2 2 - 0 2 2 22
Tegiya construction
USK 2 - 2 - 3 2 1 1 - 3 1 2 2 1 1 - 2 4 2 3 3 - 0 2 3 40
SK 3 3 3 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 51
Dextra Pvt Ltd
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 3 3 2 3 24 - 23 22 24 25 21 18 - 20 22 20 21 20 24 - 22 23 18 23 14 - 0 17 18 430
R&S Rath
USK 7 6 6 6 45 - 54 57 52 55 54 55 - 47 51 40 48 44 46 - 46 52 43 54 28 - 0 54 44 994
SK - - - - - - - - - - - - - - - - - - - - - - - 1 - - 0 - - 1
Neelam Construction
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 4 6 5 6 8 - 9 6 9 4 9 5 - 8 6 1 2 6 4 - 4 4 3 2 - - 0 1 1 113
Daljit Singh
USK 2 1 2 2 8 - 7 6 8 8 8 9 - 9 8 9 5 6 6 - 8 8 8 7 6 - 0 3 6 150
SK 2 - 1 1 2 2 2 2 - 1 1 1 2 - 2 - 2 2 2 2 2 - 0 2 2 33
Sitholiwalls Viewconic
USK 21 - 16 15 16 17 14 16 - 21 18 22 21 8 18 - 20 20 15 21 21 - 0 22 18 360
SK 10 - 8 8 7 8 8 8 - 8 6 7 7 7 7 - 6 7 7 8 7 - 0 6 6 146
Rutu Raj
USK 3 - 3 3 3 3 4 3 - 3 3 3 3 3 3 - 3 4 3 4 3 - 0 3 3 63
SK 2 - 2 2 2 2 2 1 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 1 2 38
Neelkanth Construction
USK 1 - 2 2 1 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 - 1 21
SK - - - - 4 - 7 7 7 7 7 7 - 4 4 2 2 2 2 - - 3 4 4 4 - 0 3 4 84
Falcon Engineering
USK - - - - 8 - 15 20 20 20 20 20 - 11 8 8 8 8 8 - - 7 5 6 5 - 0 7 7 211
SK - - - - - - - - - - - 2 - 2 2 2 2 2 1 - 2 2 2 2 2 - 0 2 2 27
Tapas Kumar Das
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
Ganpati Freight Carriers SK - - - - 4 - 4 4 4 4 4 4 - 4 4 4 2 4 4 - 4 4 4 4 4 - 0 4 4 78
(Hire) USK - - - - - - 4 4 4 4 4 4 - 4 4 4 2 4 4 - 4 4 4 4 4 - 0 4 4 74
SK 2 - 2 2 2 1 2 2 - 3 2 2 2 2 2 - 2 2 2 2 2 - 0 1 1 38
Karan Enterprises (Hire)
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 4 - 4 4 4 4 4 4 - 4 4 4 4 4 4 - 4 4 4 4 4 - 0 4 4 80
Tara Chand
USK 2 - 2 2 3 3 3 3 - 3 3 3 4 3 3 - 3 3 3 3 4 - 0 4 4 61
Manpower Details for the Period of 26 Mar 23 - 25 April 23 (MPR April 23) ANNEXURE - 6
SK 3 - 3 2 4 3 3 3 - 2 3 3 3 3 2 - 3 3 2 2 2 - 0 2 2 53
Altech Equipment
USK - - 1 1 - 1 - 1 - 1 1 1 - - - - 1 1 1 1 1 - 0 1 1 14
SK 26 - 21 23 25 22 28 28 - 25 22 24 22 24 27 - 28 25 22 20 22 - 0 20 15 469
Shree Shyam Infra
USK 2 - 1 3 3 3 4 4 - 5 5 7 4 4 4 - 4 10 6 4 3 - 0 4 4 84
SK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SAI ENTERPRISES
USK 4 4 4 4 10 - 10 10 10 10 11 10 - 10 10 10 10 10 10 - 9 10 10 10 10 - 0 10 10 216
SK 2 - 2 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 40
G T NOVA
USK - - 1 1 1 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 35
SK 11 - 9 9 9 8 8 8 - 9 7 4 11 11 12 - 13 13 9 8 10 - 0 11 12 192
Shyam Earth Movers
USK 1 - - - - - - - - 1 1 1 2 2 2 - 2 2 1 2 3 - 0 3 2 25
SK 7 - - 6 6 1 5 3 - 3 6 6 5 1 5 - 5 5 3 5 5 - 0 5 4 86
Dinesh Fabrications
USK - - - 1 1 - - - - - - - - - - - - - - - - - 0 - - 2
SK 1 1 1 - - - - - - - - - - - - - - - - - - - - - - - 0 - - 3
Rise Wrold
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 5 5 5 5 5 - 1 1 1 1 1 1 - 1 - 1 1 2 - - 1 1 1 1 1 - 0 1 1 43
AVRM Infra
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 10 - 9 10 10 8 7 8 - 8 8 9 5 6 2 - 5 5 4 4 7 - 0 7 9 141
Anand Infra
USK 5 - 5 5 5 5 5 5 - 5 5 7 3 4 - - 4 4 5 4 3 - 0 4 4 87
SK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
VISHAL BABU
USK 4 - 4 4 4 4 4 4 - 3 3 2 3 3 3 - 3 3 2 2 2 - 0 2 2 61
SK 2 - 1 1 1 2 2 2 - 2 1 1 3 3 3 - 3 4 4 3 4 - 0 2 1 45
RIG Enterprise
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK - - - - 8 - 9 8 9 8 9 10 - 10 9 11 11 10 11 - 12 12 12 11 11 - 0 11 9 201
Shree Infrastructure
USK 7 7 6 6 104 - 104 101 101 108 114 118 - 111 113 107 103 105 114 - 115 118 119 113 116 - 0 101 105 2,216
SK - - - 1 - - - - - - - - 1 3 3 - - - 2 - - - 0 - - 10
Pure Lather
USK 2 - 2 2 2 4 4 4 - 4 4 4 1 1 3 - - - 1 1 1 - 0 1 1 42
SK 2 - - - - - - - - - - - - - - - - - - - - - 0 - - 2
UNDEROOT ENG
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 2 - 2 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 40
NAVEEN MERICO
USK 1 - 1 1 1 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 1 1 20
SK 2 - 2 2 2 2 2 2 - 1 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 39
SOURABH CRANE
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK - - - - 4 - 4 4 4 4 4 4 - 3 4 4 3 3 3 - - - - - - - 0 - - 48
GHALOT
USK - - - - 2 - 6 2 2 2 2 2 - 3 2 2 3 3 3 - - - - - - - 0 - - 34
SK - - - - 5 - 4 5 6 4 6 6 - 6 7 5 4 4 4 - 5 6 5 6 6 - 0 5 5 104
K. S. ENTERPRISES
USK 3 3 3 2 39 - 41 48 51 51 51 57 - 54 48 50 51 36 44 - 46 50 44 43 38 - 0 37 35 925
SK 2 - 2 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 40
APEX
USK - - - - - 1 1 1 - 1 2 2 2 2 2 - 1 1 1 1 1 - 0 1 1 21
SK 2 - 1 1 1 2 3 - - 1 1 1 1 1 1 - 1 - 1 - - - 0 1 1 20
SAI SAINTARY
USK 8 - 8 8 3 9 8 - - 8 8 8 7 8 8 - 8 - 8 - - - 0 8 8 123
G.S.SURVEY AND SK 3 - 4 4 4 4 4 4 - 4 4 4 4 4 4 - 4 4 4 4 4 - 0 4 4 79
ENGG USK 3 - 2 2 2 2 2 2 - 2 2 2 2 2 2 - 2 2 2 2 2 - 0 2 2 41
SK - - - - 1 1 - 1 - 1 1 1 1 - 1 - - - - - - - 0 1 14 23
SAI CONTSTRUCTION
USK - - - - - - - - - - - - - - - - - - - - - - 0 1 - 1
SK 8 8 8 8 6 - 6 6 6 6 6 6 - 6 6 6 6 6 6 - 6 6 6 6 6 - 0 6 6 152
ASSAM BOMBAY
USK 8 8 8 8 6 - 6 6 6 6 6 6 - 6 6 6 6 6 6 - 6 6 6 6 6 - 0 6 6 152
SK 2 2 2 2 2 - 1 1 1 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 1 1 29
NEHA TOURS
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 1 - - - - - - - - - - - - - - - 1 1 1 1 1 - 0 - - 6
KIN & PERKY TECHNIC
USK 3 - 4 4 3 3 3 4 - 4 3 3 4 3 3 - 3 2 3 3 3 - 0 4 3 65
SK - - - 1 1 1 - 1 - - 1 2 1 - - - - - - - - - 0 - - 8
BHAWNA ENG
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 1 - - - 1 1 7 1 - 1 - - 1 - - - - - - - - - 0 - - 13
UMESH CHAUDHARY
USK 13 - 19 11 11 11 4 12 - 10 16 10 17 19 10 - 13 18 11 15 15 - 0 9 8 252
SK 1 - 1 1 1 1 1 2 - 2 2 2 1 2 2 - 2 2 2 2 2 - 0 2 2 33
SIDDHARTH ENT
USK 21 - 18 11 19 22 22 18 - 19 11 12 11 19 17 - 17 21 20 18 21 - 0 25 23 365
SK - - - - - 1 - - - - - 2 2 2 3 - - - 3 - 3 - 0 - - 16
D K ASSOCIATE
USK - - 3 - - 3 2 - - - 2 - 1 1 - - - - - - - - 0 - - 12
SK 1 1 1 - 4 - 4 4 4 4 5 4 - 4 3 3 3 4 4 - 4 4 4 3 4 - 0 3 3 78
SURYA
USK 6 6 1 - 12 - 13 12 12 12 17 12 - 12 13 7 12 11 12 - 11 11 11 11 12 - 0 7 7 240
SK 6 - 4 4 4 6 6 6 - 6 4 2 2 2 4 - 2 2 7 7 4 - 0 5 2 85
SUN SHINE GROUP
USK 6 - 1 - - 2 2 2 - 2 2 - 3 3 3 - 2 1 6 6 2 - 0 6 5 54
SK 1 - 3 1 - - - - - - - - - - - - - - - - - - 0 - - 5
CHATTAR SINGH
USK - - 4 - - - - - - - - - - - - - - - - - - - 0 - - 4
ROSHAN LIFTERS SK - - - - - - - - - - - - - - - - - 1 1 1 1 - 0 1 - 5
(HIRE)
Manpower Details for the Period of 26 Mar 23 - 25 April 23 (MPR April 23) ANNEXURE - 6
(HIRE) USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 6 - 6 6 7 6 6 7 - 6 6 6 6 6 6 - 8 8 8 7 8 - 0 8 9 136
PRAYAG BUILDICON
USK 9 - 8 8 8 8 8 9 - 8 8 8 8 8 8 - 7 8 8 8 7 - 0 7 8 159
SK 5 - 4 4 5 4 4 3 - 5 4 5 5 5 5 - 5 5 5 5 6 - 0 6 5 95
SAHIN ENTERPRISES
USK 14 - 14 12 13 15 15 15 - 13 7 8 7 8 8 - 15 11 12 15 15 - 0 10 11 238
SK 2 - 2 2 2 2 2 2 - 2 1 2 2 2 2 - 2 2 2 2 2 - 0 2 2 39
SHREE BALA JI
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 1 - 2 2 1 2 2 2 - - 1 2 2 2 2 - 2 1 1 1 1 - 0 - - 27
NAMINDER SINGH
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 5 - 6 3 5 4 5 5 - 1 6 5 4 3 1 - - 1 - 6 5 - 0 3 5 73
SUMIT SANI
USK - - - - - - - - - - - - - - - - - 8 - - - - 0 - - 8
SK 4 - 4 4 4 4 3 4 - 4 4 4 4 4 4 - 6 6 6 6 6 - 0 4 4 89
N.S CONSTRUCTION
USK 3 - 5 5 5 5 5 - 4 5 5 5 5 5 - 5 4 4 7 5 - 0 4 3 89
SK - - - - - - - - - - - - - - - - - - - - - - - 1 1 - 0 - - 2
BAWA AUTOMOBILE
USK - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK - - - - 26 - 22 15 26 20 23 23 - 24 21 23 18 21 28 - 17 17 17 13 8 - 0 10 10 382
ISMAIL
USK - - - - 8 - 6 10 7 7 8 7 - 7 5 5 6 6 10 - 5 6 5 8 4 - 0 7 6 133
SK - - 2 4 5 4 4 4 - 3 4 1 2 3 5 - 2 2 2 1 - - 0 - - 48
SANGYA TRADERS
USK - - 2 3 4 6 5 3 - 2 4 1 1 2 2 - 4 2 2 5 - - 0 2 - 50
SK 4 - 4 4 4 4 2 4 - 4 4 4 4 4 4 - 5 5 5 5 5 - 0 5 5 85
SS GEOTECH
USK 2 - 2 2 2 2 1 2 - 2 2 2 2 2 2 - 1 1 1 1 1 - 0 1 1 32
SK 1 1 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 1 1 24
DUSHYANT
USK - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 6 - 5 5 6 5 5 6 - 6 5 5 5 5 5 - 5 4 3 6 7 - 0 7 7 108
KANCHAN GHOSH
USK 12 - 12 12 13 13 13 13 - 13 15 14 13 14 15 - 12 10 9 10 11 - 0 9 7 240
SK 7 - 8 10 10 12 12 3 - 9 9 9 9 9 12 - 13 14 14 13 14 - 0 16 19 222
DEMOLTECH ENG.
USK 7 - 5 8 2 2 2 1 - 2 3 3 3 3 6 - 4 3 4 4 5 - 0 5 10 82
SK - - - - 7 - 14 6 7 7 9 13 - 13 15 12 10 12 11 - 12 9 6 6 3 - 0 16 15 203
DEEPAK ENTERPRISES
USK - - - - 11 - 8 3 5 6 11 14 - 6 8 7 7 7 5 - 6 8 3 3 4 - 0 3 9 134
SK 5 - - - 14 - 14 3 4 3 3 4 - 3 2 3 3 3 3 - 3 2 2 2 1 - 0 1 1 79
GREEN VIEW
USK 3 - - - 16 - 17 7 7 8 8 8 - 7 7 8 8 8 8 - 6 5 4 4 5 - 0 1 1 146
SK 8 - 8 8 7 7 7 7 - 6 7 5 8 10 8 - 11 9 12 12 11 - 0 9 12 172
R K CONSTRUCTION
USK 44 - 34 40 30 32 36 36 - 24 35 33 41 44 43 - 36 40 39 37 36 - 0 36 28 724
SK 1 1 1 2 2 - - - 1 - - - - 1 - 2 1 1 - - - 2 2 2 4 - 0 - 4 27
VIVEK SHARMA
USK 16 16 16 16 1 - 1 - 1 1 2 2 - - 2 2 1 1 - - - - - - - - 0 1 3 82
SK 7 - 3 - 2 4 4 4 - 2 4 3 3 3 1 - 3 - 2 2 - - 0 - - 47
WIG BROTHERS
USK 6 - - - - - - - - - - - - - - - 3 - - - - - 0 - - 9
SK 4 - 4 3 3 3 3 2 - - - - - - - - - - - - - - 0 - 2 24
TRILOK WELDER
USK - - - 1 1 1 1 1 - - - - - - - - - - - - - - 0 - 1 6
SK 71 - 68 71 71 63 67 69 - 64 66 68 69 70 68 - 62 61 62 66 68 - 0 70 71 1,345
WARRIERS SECURITY
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SAKHWAT SK 5 - 8 4 3 2 6 6 - 6 6 4 4 4 4 - 3 4 4 4 3 - 0 3 - 83
CONTRACTOR USK 3 - 2 3 2 1 2 2 - 2 2 2 2 2 2 - 4 6 5 3 2 - 0 2 3 52
MANJI KUMAR SK - - - - - - - - - - - 2 2 2 2 - 2 2 2 2 2 - 0 2 2 22
MISHRA USK - - - - - - - - - - - 7 7 7 7 - 8 8 8 8 8 - 0 8 8 84
SK 2 - - - - - - - - - - 1 2 2 3 - 2 2 2 2 3 - 0 2 2 25
JMV LPS
USK - - - - - - - - - - - - 2 - 3 - - - - - - - 0 - - 5
SK 10 - 5 9 9 9 10 9 - 9 10 8 8 9 8 - 7 9 9 9 9 - 0 11 8 175
SRA CONSTRUCTION
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 5 - 4 4 2 6 7 7 - 5 6 6 7 5 6 - 6 7 4 5 6 - 0 4 5 107
M.V ENGINEERING
USK 2 - 1 1 2 1 2 2 - 1 1 1 2 1 1 - 1 1 3 3 4 - 0 2 2 34
SK 7 - 8 8 8 8 8 7 - 8 - 8 8 8 10 - 9 9 9 9 6 - 0 5 6 149
SANJAY KR RAY
USK 5 - 5 5 5 5 5 4 - 5 - 5 5 5 6 - 5 4 5 5 4 - 0 2 2 87
SK - - - - - - - - - - - - - - - - - - - - - - 0 1 - 1
STEEL CARRIERS
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 1 - 1 1 - 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 1 - 18
R.P MAHAJAN
USK - - 1 - - 1 1 1 - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 1 - 16
SK 7 - 12 18 12 17 11 16 - 14 19 10 19 18 17 - 12 13 15 21 18 - 0 13 18 300
OM ENG
USK 2 - 1 2 1 2 1 1 - 1 1 1 1 2 1 - 4 5 2 2 2 - 0 3 4 39
M.S & PP SK 4 - 14 12 15 15 15 15 - 14 13 15 14 14 16 - 20 16 17 15 17 - 0 10 10 281
CONSTRUCTION USK 10 - 10 18 16 20 19 20 - 18 19 16 19 19 20 - 10 18 16 12 19 - 0 9 10 318
SK 10 - 8 15 11 10 13 11 - 13 11 7 10 3 10 - 10 12 11 11 12 - 0 10 13 211
ROYAL ASSOCIATE
USK 30 - 21 21 24 22 20 18 - 17 18 23 12 14 27 - 18 18 22 24 24 - 0 24 17 414
SK 4 - 3 3 4 3 3 3 - 2 2 2 1 2 1 - 1 1 2 2 1 - 0 2 2 44
STARBAG
USK - - - - - - - - - - - - 1 - 1 - 1 1 1 1 1 - 0 1 1 9
Manpower Details for the Period of 26 Mar 23 - 25 April 23 (MPR April 23) ANNEXURE - 6
METROTECH SK 19 - 18 8 18 18 18 18 - 18 25 21 16 17 15 - 22 10 14 17 15 - 0 14 15 336
CONSTRUCTION USK 16 - 16 8 16 16 13 16 - 16 24 24 15 16 8 - 18 7 10 8 14 - 0 17 16 294
SK 5 - 3 2 3 2 - 2 - 3 4 4 1 - - - 3 5 4 3 4 - 0 4 4 56
GHOTHWAL& SONS
USK 3 - 2 4 4 3 - 5 - 4 2 2 4 - - - 4 4 5 2 4 - 0 4 3 59
JAMUNA SK 12 - 8 7 13 10 10 8 - 9 10 11 11 8 9 - 10 10 9 9 9 - 0 11 10 194
CONSTRUCTION USK 6 - 6 7 6 6 7 6 - 7 7 7 6 5 8 - 7 5 6 3 6 - 0 4 4 119
SK 3 - 3 3 2 3 3 3 - 3 3 3 3 3 3 - 3 3 2 2 - - 0 2 2 52
WINERY INDIA
USK 2 - 2 2 2 2 2 2 - 2 2 2 2 1 2 - 2 2 2 2 - - 0 2 2 37
SK 1 - 1 1 1 - 1 1 - 1 1 1 1 2 - - 2 2 2 2 2 - 0 - 2 24
ABDUL KALAM
USK 4 - 4 4 4 - 4 4 - 4 4 4 4 3 - - 4 4 4 4 2 - 0 - 2 63
SK 2 - 2 1 3 3 4 3 - 1 1 1 1 1 1 - - 2 2 - - - 0 - - 28
SS CONSTRUCTION
USK 3 - 2 2 1 1 1 1 - - 1 1 1 1 1 - - - 1 - - - 0 - - 17
PARWEJ SK 8 - 7 5 5 5 5 5 - 5 5 7 2 6 6 - 6 6 6 6 6 - 0 6 6 113
CONSTRUCTION USK 3 - 4 5 5 5 5 5 - 5 5 4 1 4 5 - 3 3 3 3 3 - 0 3 3 77
BHAGWAN SK 2 - 1 - - - - - - - 1 1 - 1 - - - 1 1 1 - - 0 - - 9
ENGINEERING USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK 4 - 3 4 4 5 5 4 - 4 4 - 4 4 4 - 5 5 5 5 5 - 0 4 4 82
AVD CONSTRUCTION
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK - - 2 2 2 2 2 2 - - - - 2 2 1 - - - - - - - 0 - - 17
MAA CONSTRUCTION
USK - - 1 1 1 1 2 1 - - - - - 1 1 - - - - - - - 0 - - 9
M/S SHEKHAWAT SK 1 - 1 1 1 1 1 - - - - - - - - - - - - - - - 0 - - 6
CONSTRUCTION USK 2 - - - - - - - - - - - - - - - - - - - - - 0 - - 2
SK 15 173 170 161 158 5 - 8 16 7 7 7 7 - 10 11 7 9 8 8 - 13 13 18 13 11 - 0 12 11 878
EFKONS
USK 13 - 11 10 15 12 14 16 - 9 9 13 12 12 12 - 9 8 7 9 9 - 0 16 18 234
SK 4 - 3 - 4 4 4 4 - 4 - - 4 4 4 - 4 4 4 4 - - 0 4 4 63
RAKHI ENTERPRISES
USK - - - - - - - - - - - - - - - - - - - - - - 0 - - -
SK - - - 3 - - 2 3 - 4 4 4 3 2 3 - 3 3 3 2 3 - 0 3 3 48
SHRI RAM
USK - - 1 - 2 3 - - - 1 1 1 1 1 1 - 1 1 1 1 1 - 0 1 1 19
SK 20 - 15 11 21 15 12 8 - 23 18 21 15 17 13 - 22 11 21 13 16 - 0 17 18 327
JS BUILDER
USK 15 - 8 8 11 5 6 3 - 8 6 6 5 7 3 - 10 5 5 8 8 - 0 11 10 148
RUDRA SK 5 - 5 4 8 7 6 7 - 8 12 10 9 8 10 - 11 11 7 9 10 - 0 7 10 164
CONSTRUCTION USK 2 - 3 1 6 3 6 3 - 6 7 1 4 5 8 - 7 5 6 9 7 - 0 6 8 103
SK 1 - - - - - - - - 1 1 2 1 1 1 - 1 - - - 1 - 0 1 2 13
GR INFRA (HIRE)
USK 1 - - - - - - - - 1 1 2 1 1 1 - 1 - - - 1 - 0 2 2 14
SK 1 - 2 2 2 2 2 2 - 1 1 1 2 1 1 - 2 2 2 2 2 - 0 2 2 34
PHARAUS (Starbag)
USK 3 - 1 1 1 1 1 1 - 2 2 2 2 2 2 - 2 8 2 2 2 - 0 2 2 41
SUPERMAC SK 4 - 4 3 4 3 - - - - - - - - - - - - - - - - 0 - - 18
ENTERPRISES USK 2 - 1 1 2 2 - - - - - - - - - - - - - - - - 0 - - 8
K.C VISHWAKARMA SK 5 - 3 3 4 5 5 4 - 4 4 4 4 4 4 - 4 4 - 4 4 - 0 - - 69
WELDING USK - - - - - - - - - - - - - - - - - - - - - - 0 - 3 3
SK 6 - 2 2 2 4 1 4 - 4 4 2 4 2 2 - 7 6 6 6 6 - 0 6 6 82
SIDHI VINAYAK
USK 2 - 9 6 7 8 11 11 - 10 8 11 11 7 11 - 3 3 3 4 3 - 0 3 4 135
SK - - - - - - - - - - - - - - - - - - - - - - 0 2 2 4
PRAYAG BUILDER
USK - - - - - - - - - - - - - - - - - - - - - - 0 2 2 4
SK - - - - - - - - - - - - - - - - - - - - - - 0 2 2 4
PAHARPUR
USK - - - - - - - - - - - - - - - - - - - - - - 0 1 1 2
M/S BHAWANI SINGH SK - - - - - - 4 4 - 5 5 5 3 1 - - 3 3 2 - 2 - 0 5 2 44
(CHAUDHARY) USK - - - - - - 5 5 - 4 4 4 4 1 - - 4 4 3 - 3 - 0 3 3 47
Total day wise 30 346 340 322 316 - 1,440 132 1,353 1,302 1,381 1,374 1,396 1,401 132 1,362 1,374 1,334 1,330 1,324 1,367 132 1,368 1,373 1,343 1,358 1,315 132 132 1,298 1,308
AFCONS INFRASTRUCTURE LIMITED
NCRTC -Pkg 08 - Key Staff Deployment Status
ANNEXURE 7

CV APPROVAL STATUS

SL NO KEY PERSONS ONBOARD STATUS


UNDER CLIENT
CV SUBMITTED APPRROVED IN PROCESS REJECTED Remarks
REVIEW

1 Project Manager Mr. Alok Chandra Tiwari is on Board √ √ Closed

2 Construction Manager (Casting yard)

3 Engineering Manager (Lead Designer and Technical Support) Mr. Praveen Kumar is on Board √ √ Closed

4 Engineering Manager (Lead Design Checker) Mr. Pughazendhi Ganesan √ √ Closed

5 Engineering Manager (Architectural Design) Ms. Sharmista S Yadav is on Board √ √ Closed

6 Engineering Manager (Geotechnical Design) Mr. Florian Krenn is on Board √ √ Closed

7 BIM Manager Himanshu Aggarwal is on Board √ √ Closed

8
Planning/ Scheduling Manager
9

10 Chief Interface Manager Mr. Lakshmi Naryana is on Board √ √ Closed

11 1. Mr. Rajiv Ranjan Singh is on Board √ √

12 Station Manager (Civil) 2. Mr. Pervez Alam is on Board √ √ Rejected

13 3. Mr. M.Velmurugan is on Board √ √ Closed

14 Chief Safety Manager Mr. Ravindran Ramaya is on Board √ √ Closed

15 Design Consolidation Manager

16 Mr. K.Dhanushkdi is on Board √ √ Closed


Engineering Manager (E&M Design)
17 Mr. Bala Subramanian is on Board √ √ Closed

18 Design Quality Assurance Manager

19 Quality Assurance Manager Mr. Alok Kumar Tyagi is on Board √ √ Closed

20 Construction Quality Control Manager (Construction Sites) Mr. Joydeep Goswami is on board √ √ Closed

21 Construction Quality Control Manager (Casting Yard) Mr. Santosh Patel is on board √ √ Closed

22 Environment Manager Mr. Rahul Kumar is on Board √ √ Closed

23
Construction Manager (Civil and Geotechnical)
24 Closed

25 Construction Manager (Station Structure) Mr. M.K Singh is on board √ √ Closed

26 Closed
Construction Manager (Tunnels)
27 Mr. Smark Klawkla is on board √ √

28 Construction Manager (Architectural)

29 Construction Manager (E&M.) Mr. Amitava Pakhira is on board √ √

TOTAL KEY STAFF NUMBERS - 28 19 1 15 2 1


Design Register for MPR APRIL 2023 (Period - 26th Mar 23 to 25th Apr 23) ANNEXURE 8

DATE OF WRENCH AFCONS ACTION BY


SR. NO. DESCRIPTION REV STAGE STATUS REMARK
SUBMISSION ID LETTER CPM

Shop drawing review


Submission of MEEC, BHAI & BEGU Fire Rated Door Shop Drawings
1 27.03.2023 07012 3940 Rev-0 COMMENTS COMMENTS under process DDC
(Rev-0)
Architech
Submission of Design Modification Report (DMR-64) for missing
2 27.03.2023 07013 3942 NIL NONO NONO
Connection Details of SCC & MEEC Station at South End
Construction Reference Drawing (CRD) Submission of Begumpul Station
3 27.03.2023 07014 3943 Rev-A CRD COMMENTS COMMENTS
Design & Reinforcement Details of Ancillary Building Columns (Rev A)

Revised Good For Construction (GFC) Submission of Construction


4 28.03.2023 06595 3945 Rev-E GFC COMMENTS COMMENTS
Sequence of Entry Exit ES-01 Begumpul Station (Rev-E)
Revised Good For Construction (GFC) for Tracing Submission of
AWAITING
5 Begumpul Station Intermediate Level (Except Entry/Exit Area) Wall 28.03.2023 06149 3950 Rev-D AWAITING REPLY
REPLY
Opening Drawings (Rev-D)
Submission of Design Modification Report (DMR-63) for providing steel
6 frame encased with concrete at the Junctions with running bored tunnels, 30.03.2023 06965 3958 NIL COMMENTS COMMENTS
complying with the clause 8 (7) Chapter 5 of ODS.
Construction Reference Drawing (CRD) Submission of Design & Details
7 of Plinth Slab & Plunge Column of Begumpul Station Ancillary Building 30.03.2023 07019 3960 Rev-A CRD COMMENTS COMMENTS
(Rev-A)
Definitive Design (DD) Submission of Architectural Volume 2B - Typical
8 30.03.2023 07020 3961 Rev-A DD COMMENTS COMMENTS
Detail Drawings (Part-2) (Rev-A)
Submission of Design Modification Report (DMR-65) for providing
9 missing details of catch Pit in Upline & Down Line Box Structure as per 30.03.2023 07037 3963 NIL NONO NONO
Plumbing Drawing.
Request for approval of CV for the post of “BIM Manager” (Mr. AWAITING
10 03.04.2023 07041 3976 NIL AWAITING REPLY
Himanshu Aggarwal) REPLY
Good For Construction (GFC) Submission of Meerut Central Station
11 04.04.2023 07042 3977 Rev-B GFC NONO NONO
Design & Reinforcement Details of Platform Slab (Grid 1-9) (Rev-B)
Construction Reference Drawing (CRD) Submission of Begumpul Station
NONO WITH NONO WITH
12 Ancillary Building SEM Layout Floor Opening Drawings (Rev-B) along 04.04.2023 06621 3978 Rev-B CRD
COMMENTS COMMENTS
with WIP BIM Model
Revised Good For Construction (GFC) Submission of Tracing Drawings of
AWAITING
13 Floor SEM Drawings of Intermediate Level of Begumpul (BEGU) Station 04.04.2023 05487 3979 Rev-G AWAITING REPLY
REPLY
(Rev-G)
Revised Good For Construction (GFC) Submission of Tracing Drawings of
AWAITING
14 Floor SEM Drawings of Concourse Level (Grid-01 to 16) of Begumpul 04.04.2023 06037 3980 Rev-H AWAITING REPLY
REPLY
(BEGU) Station (Rev-H)
Good For Construction (GFC) Submission of Meerut Central Station
NONO WITH NONO WITH
15 Concourse Level Wall Opening Layout Drawing for BOH Area from (Grid 04.04.2023 07043 3981 Rev-D GFC
COMMENTS COMMENTS
1-5 & 15-22) along with BIM Model (Rev-D)
Good for Construction (GFC) Submission of Begumpul Station Platform NONO WITH NONO WITH
16 06.04.2023 07090 4001 Rev-C GFC
Level Framing Plan & Section along With BIM Model (Rev-C) COMMENTS COMMENTS

Revised Good for Construction Drawings (GFC) Submission of Begumpul


NONO WITH NONO WITH
17 Station- Vol-1A Architectural General Arrangement Drawings of Entry 06.04.2023 07101 4002 Rev-H GFC
COMMENTS COMMENTS
Exit ES-1 ES-3 & Ancillary Building (Rev-H) Along With BIM Model
Definitive Design (DD) Submission of Meerut Central Station (MEEC)
NONO WITH NONO WITH
18 Architectural Finishes Vol.2A for Public Area (Rev-A) Along With WIP 07.04.2023 07122 4003 Rev-A DD
COMMENTS COMMENTS
BIM Model
Revised Good for Construction Drawings (GFC) Submission of North Cut
NONO WITH NONO WITH
19 & Cover Box Tunnel & Ramp General Arrangement Drawing & Section 07.04.2023 07093 4004 Rev-K GFC
COMMENTS COMMENTS
Details For Elevated Ramp & Sump Area (Rev-K)
Revised Good for Construction Drawings (GFC) Submission of North End
20 Launching Shaft Reinforcement Details of U-Trough Ramp (Chainage 07.04.2023 07094 4005 Rev-F GFC NONO NONO
71100 to71310) Rev-F
Good for Construction (GFC) Submission of Bhaisali Station
21 07.04.2023 7095 4007 Rev-C GFC NONO NONO
Reinforcement details of Platform Level Slab (Grid 1-16) Rev-C
Good for Construction (GFC) Submission of Bhaisali Station Design &
22 07.04.2023 7096 4008 Rev-B GFC NONO NONO
Details of Soldier Pile Wall for Entry Exit ES-2 (Rev-B)
Construction Reference Drawing (CRD) Submission of North Cut & Cover NONO WITH NONO WITH
23 07.04.2023 7097 4009 Rev-A CRD
Box Tunnel & Ramp Railing & Fencing Details (Rev-A) COMMENTS COMMENTS
Construction Reference Drawing (CRD) Submission of SOUTH Cut & NONO WITH NONO WITH
24 07.04.2023 7098 4010 Rev-A CRD
Cover RCC Parapet Wall GAD & Reinforcement Details (Rev-A) COMMENTS COMMENTS
Revised Good for Construction (GFC) Submission of General Arrangement
NONO WITH NONO WITH
25 Drawing (GAD) and Section details for South Cut & Cover box & 07.04.2023 7099 4011 Rev-K GFC
COMMENTS COMMENTS
Elevated Ramp (Rev-K)
Revised Good For Construction (GFC) Submission of South Cut and Cover
26 Reinforcement Details of U Trough (Chainage 66010m to Chainage 08.04.2023 4570 4012 Rev-E GFC NONO NONO
66254m) (Rev-E)
Revised Good For Construction (GFC) Submission of North Cut and Cover
& South End Design & Details of Box with Ramp Structure (Chainage
27 08.04.2023 4668 4013 Rev-E GFC NONO NONO
65860M to Chainage 66010M & Chainage 71310 to Chainage 71520)
(Rev-E)
Revised Good For Construction (GFC) Submission of South Cut & Cover
28 08.04.2023 5368 4014 Rev-D GFC NONO NONO
GAD & Reinforcement Details of Sump Area (Rev-D)
Good For Construction (GFC) Submission of Reinforcement Details of
29 11.04.2023 7173 4026 Rev-B GFC NONO NONO
Sump Cover Slab at Grid 2, 10 & 15 Begumpul Station (Rev-B)
Construction Reference Drawing (CRD) Submission of Design &
AWAITING
30 Reinforcement Details of Begumpul Station Maintenance Staircase (O- 11.04.2023 7174 4028 Rev-A CRD AWAITING REPLY
REPLY
23.6) between Grid 13 to 14 (Rev-A)
Construction Reference Drawing (CRD) Submission of Design &
AWAITING
31 Reinforcement Details of Begumpul Station Fireman Staircase (F-02.1) & 11.04.2023 7175 4029 Rev-A CRD AWAITING REPLY
REPLY
(F-02.2) (Rev-A)
Construction Reference Drawing (CRD) Submission of Meerut Central
AWAITING
32 (MEEC) Station Vol-2A Architectural Finishes Drawings for BOH Area 12.04.2023 6045 4038 Rev-B CRD AWAITING REPLY
REPLY
(Rev-B)
Submission of Design Modification Report (DMR)-66 for North Cut & AWAITING
33 13.04.2023 7183 4041 NIL AWAITING REPLY
Cover Walkway Slab REPLY
DATE OF WRENCH AFCONS ACTION BY
SR. NO. DESCRIPTION REV STAGE STATUS REMARK
SUBMISSION ID LETTER CPM

Revised Good for Construction (GFC) Submission of Begumpul Station


NONO WITH NONO WITH
34 Concourse Level BOH Area Wall Opening Drawings (Rev-D) along with 14.04.2023 6636 4050 Rev-D GFC
COMMENTS COMMENTS
WIP BIM Model
Revised Good For Construction Drawings (GFC) Submission of Begumpul
NONO WITH NONO WITH
35 Station- Vol-1A Platform Level Architectural General Arrangement 14.04.2023 7188 4051 Rev-K GFC
COMMENTS COMMENTS
Drawings (Rev-K)
Good For Construction (GFC) Submission of Entry-ES2 & Vent Shaft
36 15.04.2023 7196 4057 Rev-C GFC COMMENTS COMMENTS
Framing Plan for Bhaisali Station along with BIM Model (Rev-C)

Construction Reference Drawing (CRD) Submission of Begumpul Station


37 19.04.2023 7203 4069 Rev-A CRD NONO NONO
Platform Level Slab Design & Reinforcement details (Rev-A)
Revised Good For Construction (GFC) Submission of Begumpul Station
NONO WITH NONO WITH
38 Platform Level Framing Plan & Section along with WIP BIM Model (Rev- 19.04.2023 7090 4070 Rev-C GFC
COMMENTS COMMENTS
C)
Compliance to NCRTC Comments on Bhaisali Station Platform Level Slab AWAITING
39 24.04.2023 6841 4076 NIL GFC AWAITING REPLY
Shutter Design (Grid 19-22) REPLY
Revised Construction Reference Drawing (CRD) Submission of Entry-ES1
NONO WITH NONO WITH
40 & Ancillary Building Framing Plan for Begumpul Station Alongwith WIP 24.04.2023 6349 4078 Rev-B CRD
COMMENTS COMMENTS
BIM Model (Rev-B)
Construction Reference Drawing (CRD) Submission of Design & Details
41 of Plinth Slab & Plunge Column of Begumpul Station Ancillary Building 24.04.2023 7019 4089 Rev-A CRD COMMENTS COMMENTS
(Rev-A)
Construction Reference Drawing (CRD) Submission of Begumpul Station
42 24.04.2023 7014 4090 Rev-A CRD COMMENTS COMMENTS
Design & Reinforcement Details of Ancillary Building Columns (Rev A)
Submission of Cross Passage Shutter General Arrangement Drawings & AWAITING
43 25.04.2023 4092 NIL AWAITING REPLY
Fabrication Details REPLY
Submission of North & South Cut & Cover above Ground Wall Shutter
44 25.04.2023 7328 4093 NIL NONO NONO
Bracket Details
Revised Construction Reference Drawing (CRD) Submission of Bhaisali NONO WITH NONO WITH
45 24.04.2023 6944 4094 Rev-B CRD
Station Platform to Concourse Level Lift Details on Grid-"E" (Rev-B) COMMENTS COMMENTS
Construction Reference Drawing (CRD) Submission of Bhaisali Station
AWAITING
46 Ancillary Building SEM Layout - Wall Opening Drawings along with BIM 24.04.2023 6393 4095 Rev-C CRD AWAITING REPLY
REPLY
Model (Rev-C)
Construction Reference Drawing (CRD) Submission of Bhaisali Station AWAITING
47 25.04.2023 7329 4111 Rev-A CRD AWAITING REPLY
Design & Details of Strut & Waler for Entry Exit ES-02 (Rev-A) REPLY
Construction Reference Drawing (CRD) Submission of Begumpul Station
48 Design & Reinforcement Details of Entry Exit ES-01 Ancillary Building 25.04.2023 7330 4112 Rev-A CRD COMMENTS COMMENTS
Mezzanine Slab (Rev A)
ANNEXURE 9
PROJECT NAME : NCRTC PKG -8
CONTRACTOR : Afcons Infrastructure Ltd.
BEGUMPUL STATION
S. No. Dwg / Doc No. Rev Title DD CRD GFC DATE

1 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14000 AE DRAWING INDEX SHEET 1 CRD

2 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14001 C FRAMING PLAN AT ROOF LEVEL DD

3 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14002 C FRAMING PLAN AT MEZZANINE LEVEL DD

4 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14003 C FRAMING PLAN AT CONCOURSE LEVEL DD

5 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14004 C FRAMING PLAN AT PLATFORM AND UNDERCROFT LEVEL DD

6 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14005 C SECTION DD

7 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14006 A SECTION C-C CRD

8 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14007 B ENTRY-ES1 & ANCILLARY BUILDING SECTIONS CRD

9 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14008 B ENTRY-ES1 & ANCILLARY BUILDING SECTIONS CRD

10 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14009 B ENTRY-ES1 & ANCILLARY BUILDING SECTIONS CRD

11 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14010 B ENTRY-ES1 & ANCILLARY BUILDING SECTIONS CRD

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14011 TO 14200 NOT USED

12 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14201 E BEGUM PUL STATION - D WALL LAYOUT PLAN CRD

13 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14202 A BEGUM PUL STATION D-WALL ELEVATION CRD

14 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14204 A LOCATION FOR INCLINOMETER AND SONIC TESTING PIPES IN D-WALL CRD

15 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14205 A REINFORCEMENT DETAILS OF TEMPORARY GUIDE WALL PS

16 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14206 A LAYOUT PLAN OF PERMANENT COLUMNS CRD

17 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14207 C BEGUMPUL STATION D-WALL LAYOUT PLAN OF ANCILLARY BUILDING GFC

18 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14208 B LAYOUT PLAN OF STUB COLUMNS STARTING FROM UNDERCROFT SLAB GFC

19 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14209 A D-WALL REINFORCEMENT FOR PANEL DW38 & DW39 (SHEET 1 OF 2) GFC

20 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14210 A D-WALL REINFORCEMENT FOR PANEL DW38 & DW39 (SHEET 2 OF 2) GFC

D-WALL REINFORCEMENT F0R PANEL DW10 TO DW34 & DW65A, DW66 TO DW90
21 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14211 D GFC
(SHEET 01 OF 03)
D-WALL REINFORCEMENT F0R PANEL DW42 TO DW44 & DW53 TO DW55 (SHEET
22 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14212 C GFC
01 OF 03)

23 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14213 B D-WALL REINFORCEMENT FOR PANEL DW45 & DW52 (SHEET 1 OF 3) GFC

24 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14214 B D-WALL REINFORCEMENT FOR PANEL DW45 & DW52 (SHEET 2 OF 3) GFC

25 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14215 B D-WALL REINFORCEMENT FOR PANEL DW45 & DW52 (SHEET 3 OF 3) GFC

26 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14216 B D-WALL REINFORCEMENT FOR PANEL DW46, DW47 & DW50, DW51 (SHEET 1 OF 3) GFC

27 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14217 B D-WALL REINFORCEMENT FOR PANEL DW46, DW47 & DW50, DW51 (SHEET 2 OF 3) GFC

28 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14218 B D-WALL REINFORCEMENT FOR PANEL DW46, DW47 & DW50, DW51 (SHEET 3 OF 3) GFC

29 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14219 B D-WALL REINFORCEMENT FOR PANEL DW48 & DW59 (SHEET 1 OF 2) GFC

30 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14220 B D-WALL REINFORCEMENT FOR PANEL DW48 & DW59 (SHEET 2 OF 2) GFC

31 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14221 C D-WALL REINFORCEMENT FOR PANEL DW41,DW41A & DW56 (SHEET 1 OF 4) GFC

32 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14222 C D-WALL REINFORCEMENT FOR PANEL DW41,DW41A & DW56 (SHEET 2 OF 4) GFC

33 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14223 C D-WALL REINFORCEMENT FOR PANEL DW41,DW41A & DW56 (SHEET 3 OF 4) GFC

34 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14224 C D-WALL REINFORCEMENT FOR PANEL DW41,DW41A & DW56 (SHEET 4 OF 4) GFC

35 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14225 B D-WALL REINFORCEMENT FOR PANEL DW104 & DW105 (SHEET 1 OF 2) GFC

36 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14226 B D-WALL REINFORCEMENT FOR PANEL DW104 & DW105 (SHEET 2 OF 2) GFC

D-WALL REINFORCEMENT FOR PANEL DW102, DW103 & DW106 &, DW107 (SHET-1
37 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14227 B GFC
OF 3)
D-WALL REINFORCEMENT FOR PANEL DW102, DW103 & DW106 &, DW107 (SHET-2
38 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14228 B GFC
OF 3)
D-WALL REINFORCEMENT FOR PANEL DW102, DW103 & DW106 &, DW107(SHET-3
39 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14229 B GFC
OF 3)

40 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14230 B D-WALL REINFORCEMENT F0R PANEL DW98 ,DW99 & DW100 (SHEET 1 OF 2) GFC

41 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14231 B D-WALL REINFORCEMENT F0R PANEL DW98 ,DW99 & DW100 (SHEET 2 OF 2) GFC

42 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14232 B D-WALL REINFORCEMENT F0R PANEL DW109 & DW110 (SHEET 1 OF 2) GFC

43 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14233 B D-WALL REINFORCEMENT F0R PANEL DW109 & DW110 (SHEET 2 OF 2) GFC

44 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14234 B D-WALL REINFORCEMENT F0R PANEL DW108 (SHEET 1 OF 2) GFC

45 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14235 B D-WALL REINFORCEMENT F0R PANEL DW108 (SHEET 2 OF 2) GFC

D-WALL REINFORCEMENT FOR PANEL DW7A,DW8,DW9,DW94 & DW95 (SHEET 1


46 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14236 C GFC
OF 2)
D-WALL REINFORCEMENT FOR PANEL DW7A,DW8,DW9,DW94 & DW95 (SHEET 2
47 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14237 C GFC
OF 2)

48 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14238 B D-WALL REINFORCEMENT FOR PANEL DW101 (SHEET 1 OF 2) GFC

49 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14239 B D-WALL REINFORCEMENT FOR PANEL DW101 (SHEET 2 OF 2) GFC

50 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14240 B D-WALL REINFORCEMENT FOR PANEL DW111 (SHEET 1 OF 2) GFC

51 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14241 B D-WALL REINFORCEMENT FOR PANEL DW111 (SHEET 2 OF 2) GFC

52 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14242 B D-WALL REINFORCEMENT FOR PANEL DW112 (SHEET 1 OF 4) GFC

53 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14243 B D-WALL REINFORCEMENT FOR PANEL DW112 (SHEET 2 OF 4) GFC

54 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14244 B D-WALL REINFORCEMENT FOR PANEL DW112 (SHEET 3 OF 4) GFC

55 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14245 B D-WALL REINFORCEMENT FOR PANEL DW112 (SHEET 4 OF 4) GFC

56 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14246 C D-WALL REINFORCEMENT FOR PANEL DW3 , DW63 & DW64 (SHEET 1 OF 2) GFC

57 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14247 C D-WALL REINFORCEMENT FOR PANEL DW3 , DW63 & DW64 (SHEET 2 OF 2) GFC

58 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14248 C D-WALL REINFORCEMENT FOR PANEL DW58A (SHEET 1 OF 2) GFC

59 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14249 C D-WALL REINFORCEMENT FOR PANEL DW58A (SHEET 2 OF 2) GFC

D-WALL REINFORCEMENT FOR PANEL DW5, DW6, DW35, DW36, DW57, DW60 &
60 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14250 C GFC
DW61 (SHEET 1 OF 2)
D-WALL REINFORCEMENT FOR PANEL DW5, DW6, DW35, DW36, DW57, DW60 &
61 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14251 C GFC
DW61 (SHEET 2 OF 2)

62 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14252 C D-WALL REINFORCEMENT FOR PANEL DW91 & DW92 (SHEET 1 OF 2) GFC

63 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14253 C D-WALL REINFORCEMENT FOR PANEL DW91 & DW92 (SHEET 2 OF 2) GFC

64 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14254 C D-WALL REINFORCEMENT FOR PANEL DW58 (SHEET 1 OF 2) GFC

65 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14255 C D-WALL REINFORCEMENT F0R PANEL DW58 (SHEET 2 OF 2) GFC

66 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14256 B D-WALL REINFORCEMENT FOR PANEL DW97 (SHEET 1 OF 4) GFC

67 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14257 B D-WALL REINFORCEMENT FOR PANEL DW97 (SHEET 2 OF 4) GFC

68 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14258 B D-WALL REINFORCEMENT FOR PANEL DW97 (SHEET 3 OF 4) GFC

69 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14259 B D-WALL REINFORCEMENT FOR PANEL DW97 (SHEET 4 OF 4) GFC

70 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14260 B D-WALL REINFORCEMENT FOR PANEL DW56A (SHEET 1 OF 4) GFC

71 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14261 B D-WALL REINFORCEMENT FOR PANEL DW56A (SHEET 2 OF 4) GFC

72 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14262 B D-WALL REINFORCEMENT FOR PANEL DW56A (SHEET 3 OF 4) GFC

73 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14263 B D-WALL REINFORCEMENT FOR PANEL DW56A (SHEET 4 OF 4) GFC

74 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14264 C D-WALL REINFORCEMENT FOR PANEL DW1 (SHEET 1 OF 2) GFC

75 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14265 C D-WALL REINFORCEMENT FOR PANEL DW1 (SHEET 2 OF 2) GFC

76 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14266 C D-WALL REINFORCEMENT FOR PANEL DW96 (SHEET 1 OF 2) GFC

77 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14267 C D-WALL REINFORCEMENT FOR PANEL DW96 (SHEET 2 OF 2) GFC

78 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14268 C D-WALL REINFORCEMENT FOR PANEL DW65 (SHEET 1 OF 2) GFC

79 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14269 C D-WALL REINFORCEMENT FOR PANEL DW65 (SHEET 2 OF 2) GFC
80 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14270 C D-WALL REINFORCEMENT FOR PANEL DW34A & DW37 (SHEET 1 OF 3) GFC

81 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14271 C D-WALL REINFORCEMENT FOR PANEL DW34A & DW37 (SHEET 2 OF 3) GFC

82 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14272 C D-WALL REINFORCEMENT FOR PANEL DW34A & DW37 (SHEET 3 OF 3) GFC

83 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14273 C D-WALL REINFORCEMENT FOR PANEL DW62 (SHEET 1 OF 3) GFC

84 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14274 C D-WALL REINFORCEMENT FOR PANEL DW62 (SHEET 2 OF 3) GFC

85 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14275 C D-WALL REINFORCEMENT FOR PANEL DW62 (SHEET 3 OF 3) GFC

86 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14276 D D-WALL REINFORCEMENT FOR PANEL DW2A (SHEET 1 OF 2) GFC

87 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14277 D D-WALL REINFORCEMENT FOR PANEL DW2A (SHEET 2 OF 2) GFC

88 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14278 C D-WALL REINFORCEMENT FOR PANEL DW2 (SHEET 1 OF 2) GFC

89 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14279 C D-WALL REINFORCEMENT FOR PANEL DW2 (SHEET 2 OF 2) GFC

90 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14280 D D-WALL REINFORCEMENT FOR PANEL DW4 (SHEET 1 OF 3) GFC

91 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14281 D D-WALL REINFORCEMENT FOR PANEL DW4 (SHEET 2 OF 3) GFC

92 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14282 D D-WALL REINFORCEMENT FOR PANEL DW4 (SHEET 3 OF 3) GFC

93 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14283 C D-WALL REINFORCEMENT FOR PANEL DW59 (SHEET 1 OF 3) GFC

94 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14284 C D-WALL REINFORCEMENT FOR PANEL DW59 (SHEET 2 OF 3) GFC

95 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14285 C D-WALL REINFORCEMENT FOR PANEL DW59 (SHEET 3 OF 3) GFC

96 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14286 C D-WALL REINFORCEMENT FOR PANEL DW7 (SHEET 1 OF 2) GFC

97 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14287 C D-WALL REINFORCEMENT FOR PANEL DW7 (SHEET 2 OF 2) GFC

98 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14288 C D-WALL REINFORCEMENT FOR PANEL DW95A (SHEET 1 OF 2) GFC

99 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14289 C D-WALL REINFORCEMENT F0R PANEL DW95A (SHEET 2 OF 2) GFC

100 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14290 C D-WALL REINFORCEMENT F0R PANEL DW93 (SHEET 1 OF 2) GFC

101 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14291 C D-WALL REINFORCEMENT F0R PANEL DW93 (SHEET 2 OF 2) GFC

102 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14292 B D-WALL REINFORCEMENT FOR PANEL DW90A (SHEET 1 OF 2) GFC

103 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14293 B D-WALL REINFORCEMENT FOR PANEL DW90A (SHEET 2 OF 2) GFC

104 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14294 B D-WALL REINFORCEMENT F0R PANEL DW40 (SHEET 1 OF 2) GFC

105 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14295 B D-WALL REINFORCEMENT F0R PANEL DW40 (SHEET 2 OF 2) GFC

106 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14296 A D-WALL REINFORCEMENT F0R PANEL DW63 & DW64 (SHEET 1 OF 2) GFC

107 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14297 A D-WALL REINFORCEMENT F0R PANEL DW63 & DW64 (SHEET 2 OF 2) GFC

D-WALL REINFORCEMENT F0R PANEL DW35, DW36, DW57, DW60 & DW61 (SHEET
108 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14298 A GFC
1 OF 2)
D-WALL REINFORCEMENT F0R PANEL DW35,DW36, DW57, DW60 & DW61 (SHEET 2
109 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14299 A GFC
OF 2)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14300 NOT USED

110 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14301 C ROOF FRAMING PLAN PART-1 GFC

111 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14302 C ROOF FRAMING PLAN PART-2 GFC

112 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14303 C ROOF FRAMING PLAN PART-3 GFC

113 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14304 C ROOF FRAMING PLAN PART-4 GFC

114 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14305 C ROOF FRAMING PLAN PART-5 GFC

115 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14306 C ROOF LEVEL SECTION GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14307 TO 14310 NOT USED

116 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14311 E MEZZANINE FRAMING PLAN PART-1 GFC

117 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14312 E MEZZANINE FRAMING PLAN PART-2 GFC

118 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14313 D MEZZANINE FRAMING PLAN PART-3 GFC

119 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14314 E MEZZANINE FRAMING PLAN PART-4 GFC
120 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14315 E MEZZANINE FRAMING PLAN PART-5 GFC

121 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14316 D MEZZANINE LEVEL SECTIONS GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14317 NOT USED

122 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14318 D DOUBLE SLAB BETWEEN ROOF SLAB & MEZZANINE SLAB PART-1 GFC

123 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14319 D DOUBLE SLAB BETWEEN ROOF SLAB & MEZZANINE SLAB PART-2 GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14320 NOT USED

124 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14321 B CONCOURSE FRAMING PLAN PART-1 GFC

125 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14322 B CONCOURSE FRAMING PLAN PART-2 GFC

126 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14323 C CONCOURSE FRAMING PLAN PART-3 GFC

127 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14324 B CONCOURSE FRAMING PLAN PART-4 GFC

128 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14325 B CONCOURSE FRAMING PLAN PART-5 GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14326 TO 14350 NOT USED

129 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14351 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 14 TO 16 (SHEET- 1) GFC

130 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14352 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 14 TO 16 (SHEET- 2) GFC

131 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14353 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 14 TO 16 (SHEET- 3) GFC

132 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14354 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 14 TO 16 (SHEET- 4) GFC

133 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14355 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 14 TO 16 (SHEET- 5) GFC

134 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14356 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-1) GFC

135 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14357 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-2) GFC

136 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14358 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-3) GFC

137 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14359 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-4) GFC

138 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14360 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-5) GFC

139 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14361 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-6) GFC

140 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14362 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-7) GFC

141 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14363 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-8) GFC

142 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14364 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-9) GFC

143 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14365 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-10) GFC

144 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14366 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-11) GFC

145 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14367 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-12) GFC

146 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14368 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-13) GFC

147 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14369 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-14) GFC

148 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14370 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-15) GFC

149 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14371 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 12 (SH-16) GFC

150 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14372 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 12 TO 14 (SH-1) GFC

151 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14373 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 12 TO 14 (SH-2) GFC

152 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14374 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 12 TO 14 (SH-3) GFC

153 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14375 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 12 TO 14 (SH-4) GFC

154 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14376 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 12 TO 14 (SH-5) GFC

155 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14377 B REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 12 TO 14 (SH-6) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14378 TO 14380 NOT USED

156 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14381 D REINFORCEMENT DETAILS OF MEZZANINE SLAB FOR GRID 12 TO 16 (SHEET-1) GFC

157 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14382 D REINFORCEMENT DETAILS OF MEZZANINE SLAB FOR GRID 12 TO 16 (SHEET-2) GFC
158 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14383 D REINFORCEMENT DETAILS OF MEZZANINE SLAB FOR GRID 12 TO 16 (SHEET-3) GFC

159 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14384 D REINFORCEMENT DETAILS OF MEZZANINE SLAB FOR GRID 12 TO 16 (SHEET-4) GFC

160 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14385 D REINFORCEMENT DETAILS OF MEZZANINE SLAB FOR GRID 12 TO 16 (SHEET-5) GFC

161 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14386 D REINFORCEMENT DETAILS OF MEZZANINE SLAB FOR GRID 12 TO 16 (SHEET-6) GFC

162 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14387 E REINFORCEMENT DETAILS OF MEZZANINE SLAB FOR GRID 12 TO 16 (SHEET-7) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14388 NOT USED

DETAILS OF TEMPORARY STRUTS IN TC2 DURING CONSTRUCTION STAGE AT


163 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14389 C GFC
MEZZANINE LEVEL

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14390 NOT USED

164 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14391 C REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 05 TO 12 (SHEET-1) GFC

165 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14392 C REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 05 TO 12 (SHEET-2) GFC

166 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14393 C REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 05 TO 12 (SHEET-3) GFC

167 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14394 C REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 05 TO 12 (SHEET-4) GFC

168 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14395 C REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 05 TO 12 (SHEET-5) GFC

169 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14396 C REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 05 TO 12 (SHEET-6) GFC

170 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14397 D REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 05 TO 12 (SHEET-7) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14398 TO 14400 NOT USED

171 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14401 B REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 01 TO 05 (SHEET-1) GFC

172 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14402 B REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 01 TO 05 (SHEET-2) GFC

173 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14403 B REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 01 TO 05 (SHEET-3) GFC

174 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14404 B REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 01 TO 05 (SHEET-4) GFC

175 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14405 B REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 01 TO 05 (SHEET-5) GFC

176 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14406 B REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 01 TO 05 (SHEET-6) GFC

177 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14407 B REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 01 TO 05 (SHEET-7) GFC

178 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14408 B REINFORCEMENT DETAILS OF MEZZANINE SLAB FROM GRID 01 TO 05 (SHEET-8) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14409 TO 14420 NOT USED

179 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14421 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 12 TO 16 (SHEET-1) GFC

180 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14422 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 12 TO 16 (SHEET-2) GFC

181 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14423 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 12 TO 16 (SHEET-3) GFC

182 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14424 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 12 TO 16 (SHEET-4) GFC

183 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14425 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 12 TO 16 (SHEET-5) GFC

184 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14426 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 12 TO 16 (SHEET-6) GFC

185 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14427 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 12 TO 16 (SHEET-7) GFC

186 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14428 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 12 TO 16 (SHEET-8) GFC

DETAILS OF TEMPORARY STRUTS IN TC2 DURING CONSTRUCTION STAGE AT


187 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14429 C GFC
CONCOURSE LEVEL

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14430 NOT USED

188 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14431 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 06 TO 12 (SHEET-1) GFC

189 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14432 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 06 TO 12 (SHEET-2) GFC

190 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14433 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 06 TO 12 (SHEET-3) GFC

191 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14434 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 06 TO 12 (SHEET-4) GFC

192 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14435 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 06 TO 12 (SHEET-5) GFC

193 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14436 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 06 TO 12 (SHEET-6) GFC

194 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14437 C REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 06 TO 12 (SHEET-7) GFC
NCRTC-DM099-AIL-BEGU-STN-M2-IN-14438 TO 14440 NOT USED

195 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14441 B REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01 TO 06 (SHEET-1) GFC

196 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14442 B REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01 TO 06 (SHEET-2) GFC

197 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14443 B REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01 TO 06 (SHEET-3) GFC

198 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14444 B REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01 TO 06 (SHEET-4) GFC

199 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14445 B REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01 TO 06 (SHEET-5) GFC

200 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14446 B REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01 TO 06 (SHEET-6) GFC

201 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14447 B REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01 TO 06 (SHEET-7) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14448 TO 14500 NOT USED

202 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14501 E UNDERCROFT FRAMING PLAN PART-1 GFC

203 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14502 E UNDERCROFT FRAMING PLAN PART-2 GFC

204 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14503 E UNDERCROFT FRAMING PLAN PART-3 GFC

205 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14504 E UNDERCROFT FRAMING PLAN PART-4 GFC

206 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14505 E UNDERCROFT FRAMING PLAN PART-5 GFC

207 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14506 E SEEPAGE & SEEWAGE SUMP ROOM PLAN AT UNDERCROFT LEVEL GFC

208 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14507 E SEEPAGE SUMP ROOM PLAN & SECTIONS AT UNDERCROFT LEVEL GFC

209 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14511 E UNDERCROFT SECTIONS GFC

210 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14512 E UNDERCROFT SECTIONS GFC

211 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14513 E SEEPAGE & SEEWAGE SUMP ROOM SECTIONS AT UNDERCROFT LEVEL GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14514 TO 14520 NOT USED

212 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14521 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-1) GFC

213 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14522 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-2) GFC

214 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14523 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-3) GFC

215 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14524 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-4) GFC

216 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14525 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-5) GFC

217 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14526 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-6) GFC

218 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14527 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-7) GFC

219 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14528 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-8) GFC

220 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14529 C REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 12 TO 16 (SHEET-9) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14530 NOT USED

221 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14531 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-1) GFC

222 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14532 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-2) GFC

223 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14533 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-3) GFC

224 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14534 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-4) GFC

225 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14535 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-5) GFC

226 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14536 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-6) GFC

227 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14537 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-7) GFC

228 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14538 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-8) GFC

229 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14539 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-9) GFC

230 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14540 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-10) GFC

231 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14541 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 06 TO 12 (SHEET-11) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14542 TO 14545 NOT USED


232 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14546 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 01 TO 06 (SHEET-01 OF 08) GFC

233 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14547 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 01 TO 06 (SHEET-02 OF 08) GFC

234 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14548 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 01 TO 06 (SHEET-03 OF 08) GFC

235 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14549 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 01 TO 06 (SHEET-04 OF 08) GFC

236 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14550 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 01 TO 06 (SHEET-05 OF 08) GFC

237 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14551 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 01 TO 06 (SHEET-06 OF 08) GFC

238 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14552 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 01 TO 06 (SHEET-07 OF 08) GFC

239 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14553 B REINFORCEMENT DETAILS OF BASE SLAB FROM GRID 01 TO 06 (SHEET-08 OF 08) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14554 TO 14560 NOT USED

240 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14561 A1 SUMP COVER SLAB REINFORCEMENT (GRID 02 TO 03)

241 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14562 A1 SUMP COVER SLAB REINFORCEMENT (GRID 09 TO 10) YET TO BE SUBMITTED

242 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14563 A1 SUMP COVER SLAB REINFORCEMENT (GRID 14 TO 15)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14564 TO 14565 NOT USED

243 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14566 A1 DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET-1)

244 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14567 A1 DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET-2)

245 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14568 A1 DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET-3)

246 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14569 A1 DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET-4)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14570 NOT USED

LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT LEVEL (SHEET 1 OF


247 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14571 C GFC
4)
LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT LEVEL (SHEET 2 OF
248 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14572 C GFC
4)
LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT LEVEL (SHEET 3 OF
249 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14573 C GFC
4)
LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT LEVEL (SHEET 4 OF
250 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14574 C GFC
4)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14575 TO 14600 NOT USED

251 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14601 B PLATFORM FRAMING PLAN (PART-1) CRD

252 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14602 B PLATFORM FRAMING PLAN (PART-2) CRD

253 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14603 B PLATFORM FRAMING PLAN (PART-3) CRD

254 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14604 B PLATFORM FRAMING PLAN (PART-4) CRD

255 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14605 B PLATFORM FRAMING PLAN (PART-5) CRD

256 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14606 B PLATFORM FRAMING PLAN (PART-6) CRD

257 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14607 B PLATFORM FRAMING PLAN (PART-7) CRD

258 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14608 B PLATFORM FRAMING PLAN (PART-8) CRD

259 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14609 B PLATFORM SECTION CRD

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14610 NOT USED

260 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14611 A1 LIFT DETAILS ON GRID 'E' PLATFORM TO CONCOURSE (SHEET-1 OF 2) CRD

261 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14612 A1 LIFT DETAILS ON GRID 'E' PLATFORM TO CONCOURSE (SHEET-2 OF 2) CRD

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14613 TO 14700 NOT USED

262 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14701 C ENTRY EXIT ES-1 TEMPORARY STRUCTURE LAYOUT PLAN AND SECTION CRD

263 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14702 A DETAILS OF STRUT AND WALER FOR ENTRY EXIT STRUCTURE E1 (SHEET 1 OF 2) CRD

264 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14703 A DETAILS OF STRUT AND WALER FOR ENTRY EXIT STRUCTURE E1 (SHEET 1 OF 2) CRD

265 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14704 D CONSTRUCTION SEQUENCE ENTRY-EXIT ES1 (SHEET 1 OF 2) CRD

266 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14705 D CONSTRUCTION SEQUENCE ENTRY-EXIT ES1 (SHEET 2 OF 2) CRD

267 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14706 C STRUT AND WALER PLAN FOR ENTRY E2 CRD
268 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14707 C TEMPORARY WORKS DETAILS FOR ENTRY-E2 CRD

269 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14708 CONSTRUCTION SEQUENCE ENTRY-ES2 (SHEET 1 OF 3)

YET TO BE SUBMITTED
270 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14709 CONSTRUCTION SEQUENCE ENTRY-ES2 (SHEET 2 OF 3)
3 drgs

271 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14710 CONSTRUCTION SEQUENCE ENTRY-ES2 (SHEET 3 OF 3)

272 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14711 F TEMPORARY WORKS DETAILS FOR ENTRY-ES3 GFC

273 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14712 C CONSTRUCTION SEQUENCE ENTRY-ES3 (SHEET 1 OF 2) GFC

274 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14713 C CONSTRUCTION SEQUENCE ENTRY-ES3 (SHEET 2 OF 2) GFC

275 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14714 C DETAILS OF STRUT & WALER FOR ENTRY EXIT STRUCTURE ES3 (SHEET 1 OF 2) GFC

276 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14715 C DETAILS OF STRUT & WALER FOR ENTRY EXIT STRUCTURE ES3 (SHEET 2 OF 2) GFC

277 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14716 B STRUT AND WALER PLAN FOR ENTRY E4 DD

278 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14717 CONSTRUCTION SEQUENCE ENTRY-ES3 (SHEET 1 OF 3)

279 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14718 CONSTRUCTION SEQUENCE ENTRY-ES3 (SHEET 2 OF 3)


YET TO BE SUBMITTED
4 drgs
280 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14719 CONSTRUCTION SEQUENCE ENTRY-ES3 (SHEET 3 OF 3)

281 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14720 CONSTRUCTION SEQUENCE ENTRY-ES4 (SHEET 1 OF 1)

282 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14721 F CONSTRUCTION SEQUENCE FOR MAIN STATION GRID-3 TO 14 GFC

283 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14723 D CONSTRUCTION SEQUENCE FOR RETRIEVAL SHAFT GRID 01 TO 03 & 14 TO 16 GFC

DETAIL OF STRUT AND WALER FOR ENTRY EXIT STRUCTURE ES3 (SHEET 03 OF
284 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14725 A GFC
03)

285 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14726 C DETAIL OF CUTOFF WALL BETWEEN RETRIEVAL SHAFT AND STATION GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14727 TO 14730 NOT USED

286 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14731 ENTRY-ES2 BASE SLAB LEVEL FRAMING PLAN

287 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14732 ENTRY-ES2 BASE SLAB LEVEL FRAMING PLAN

288 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14733 ENTRY-ES2 ROOF LEVEL FRAMING PLAN

289 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14737 ENTRY-ES2 SECTION

290 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14738 ENTRY-ES2 SECTION

291 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14741 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 01)

292 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14742 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 02)

293 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14743 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 03)

294 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14744 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 04)

295 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14745 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 05)

296 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14751 ENTRY-ES3 BASE SLAB LEVEL FRAMING PLAN

297 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14752 ENTRY-ES3 BASE SLAB LEVEL FRAMING PLAN

298 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14753 ENTRY-ES3 ROOF LEVEL FRAMING PLAN

299 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14757 ENTRY-ES3 SECTION

300 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14758 ENTRY-ES3 SECTION


YET TO BE SUBMITTED
30 drgs
301 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14761 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 01)

302 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14762 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 02)

303 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14763 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 03)

304 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14764 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 04)

305 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14765 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 05)

306 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14771 ENTRY-ES4 BASE SLAB LEVEL FRAMING PLAN

307 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14772 ENTRY-ES4 BASE & ROOF LEVEL FRAMING PLAN

308 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14773 ENTRY-ES4 ROOF LEVEL FRAMING PLAN
309 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14774 ENTRY-ES4 SECTION

310 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14775 ENTRY-ES4 SECTION

311 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14776 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E4 (SHEET 01)

312 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14777 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E4 (SHEET 02)

313 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14778 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E4 (SHEET 03)

314 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14779 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E4 (SHEET 04)

315 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14780 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E4 (SHEET 05)

316 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14781 H LAYOUT PLAN OF TEMPORARY PLUNGE COLUMNS GFC

317 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14782 C PLUNGE COLUMN DETAILS (SHEET 1) GFC

318 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14783 C PLUNGE COLUMN DETAILS FOR PC28 TO PC33 AND PC62 TO PC67 GFC

319 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14784 C PLUNGE COLUMN DETAILS FOR PC34, PC68, PC71 & PC72 GFC

320 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14785 B COLUMN DETAILS FOR C22, C24 GFC

321 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14786 B CONSTRUCTION STAGE ROOF SLAB FRAMING BETWEEN GRID 14-16 GFC

322 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14787 B PLUNGE COLUMN DETAILS FOR PC1 TO PC6, PC35 TO 40 & PC73, PC74 GFC

323 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14788 B COLUMN DETAILS FOR C7 GFC

324 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14789 B COLUMN DETAILS FOR C1, C3, C4, C6 GFC

325 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14790 B COLUMN DETAILS FOR C2, C5 GFC

326 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14791 B COLUMN DETAILS FOR C14 GFC

327 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14792 B COLUMN DETAILS FOR C8 TO C13, C15 TO C18 GFC

328 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14793 B COLUMN DETAILS FOR C19, C20 GFC

329 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14794 B COLUMN DETAILS FOR C21 & C23 GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14795 TO 14800 NOT USED

330 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14801 B DIMENSIONAL DETAILS OF OTE DUCT (SHEET- 1) GFC

331 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14802 B DIMENSIONAL DETAILS OF OTE DUCT (SHEET- 2) GFC

332 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14803 B DIMENSIONAL DETAILS OF OTE DUCT (SHEET- 3) GFC

333 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14804 B DIMENSIONAL DETAILS OF OTE DUCT (SHEET- 4) GFC

334 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14806 B REINFORCEMENT DETAILS OF OTE DUCT (SHEET- 1) GFC

335 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14807 B REINFORCEMENT DETAILS OF OTE DUCT (SHEET- 2) GFC

336 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14808 B REINFORCEMENT DETAILS OF OTE DUCT (SHEET- 3) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14809 TO 14810 NOT USED

337 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14811 PUBLIC STAIRCASE ST-06 DIMENSIONAL DETAILS
YET TO BE SUBMITTED
2 drgs
338 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14812 PUBLIC STAIRCASE ST-06 REINFORCEMENT DETAILS

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14819 TO 14820 NOT USED

MEZZANINE TO CONCOURSE PUBLIC STAIRCASE ST-13 BETWEEN GRID 11 & 12


339 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14821 B GFC
DIMENSIONAL DETAILS
MEZZANINE TO CONCOURSE PUBLIC STAIRCASE ST-13 BETWEEN GRID 11 & 12
340 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14822 B GFC
REINFORCEMENT DETAILS

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14823 TO 14824 NOT USED

341 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14825 A PUBLIC STAIRCASE ST-01 BETWEEN GRID 06 TO 07 DIMENSIONAL DETAILS CRD

342 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14826 A PUBLIC STAIRCASE ST-01 BETWEEN GRID 06 TO 07 REINFORCEMENT DETAILS CRD

343 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14827 C PUBLIC STAIRCASE ST-02 BETWEEN GRID 07 & 08 DIMENSIONAL DETAILS GFC

344 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14828 C PUBLIC STAIRCASE ST-02 BETWEEN GRID 07 & 08 REINFORCEMENT DETAILS GFC

345 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14829 B PUBLIC STAIRCASE ST-03 BETWEEN GRID 08 & GRID 09 DIMENSIONAL DETAILS GFC
PUBLIC STAIRCASE ST-03 BETWEEN GRID 08 & GRID 09 REINFORCEMENT
346 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14830 B GFC
DETAILS

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14831 TO 14832 NOT USED

347 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14833 B PUBLIC STAIRCASE ST-04 BETWEEN GRID 09 & GRID 10 DIMENSIONAL DETAILS GFC

PUBLIC STAIRCASE ST-04 BETWEEN GRID 09 & GRID 10 REINFORCEMENT


348 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14834 B GFC
DETAILS

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14835 TO 14836 NOT USED

349 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14837 B PUBLIC STAIRCASE ST-05 BETWEEN GRID 10 & GRID 11 DIMENSIONAL DETAILS GFC

PUBLIC STAIRCASE ST-05 BETWEEN GRID 10 & GRID 11 REINFORCEMENT


350 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14838 B GFC
DETAILS

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14839 TO 14900 NOT USED

351 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14901 B ENTRY-ES1 & AB BASE LEVEL FRAMING PLAN CRD

352 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14902 B ENTRY-ES1 & AB BASE LEVEL FRAMING PLAN CRD

353 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14903 B ENTRY-ES1 & AB BASE LEVEL FRAMING PLAN CRD

354 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14904 B AB FIRST LEVEL & MUMTY LEVEL FRAMING PLAN CRD

355 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14905 B AB CANOPY & WATER TANK COVER LEVEL FRAMING PLAN CRD

356 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14906 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 01)

357 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14907 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 02)

YET TO BE SUBMITTED
358 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14908 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 03)
5 drgs

359 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14909 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 04)

360 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14910 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 05)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14906 TO 14910 NOT USED

D-WALL REINFORCEMENT FOR PANEL ADW1-2, ADW6-11, ADW13-16 & ADW18-21


361 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14911 B GFC
(SHEET 1 OF 2)
D-WALL REINFORCEMENT FOR PANEL ADW1-2, ADW6-11, ADW13-16 & ADW18-21
362 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14912 B GFC
(SHEET 2 OF 2)

363 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14913 B D-WALL REINFORCEMENT FOR PANEL ADW3 & ADW12 (SHEET 01 OF 02) GFC

364 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14914 B D-WALL REINFORCEMENT FOR PANEL ADW3 & ADW12 (SHEET 02 OF 02) GFC

365 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14915 B D-WALL REINFORCEMENT FOR PANEL ADW17 (SHEET 01 OF 02) GFC

366 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14916 B D-WALL REINFORCEMENT FOR PANEL ADW17 (SHEET 02 OF 02) GFC

367 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14917 B D-WALL REINFORCEMENT FOR PANEL ADW5 (SHEET 01 OF 02) GFC

368 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14918 B D-WALL REINFORCEMENT FOR PANEL ADW5 (SHEET 02 OF 02) GFC

369 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14919 B D-WALL REINFORCEMENT FOR PANEL ADW4 (SHEET 01 OF 02) GFC

370 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14920 B D-WALL REINFORCEMENT FOR PANEL ADW4 (SHEET 02 OF 02) GFC

371 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14921 B D-WALL REINFORCEMENT FOR PANEL ADW26 (SHEET 01 OF 02) GFC

372 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14922 B D-WALL REINFORCEMENT FOR PANEL ADW26 (SHEET 02 OF 02) GFC

373 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14923 B D-WALL REINFORCEMENT FOR PANEL ADW21 (SHEET 01 OF 02) GFC

374 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14924 B D-WALL REINFORCEMENT FOR PANEL ADW21 (SHEET 02 OF 02) GFC

375 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14925 B D-WALL REINFORCEMENT FOR PANEL ADW24 (SHEET 01 OF 02) GFC

376 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14926 B D-WALL REINFORCEMENT FOR PANEL ADW24 (SHEET 02 OF 02) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14927 TO 14928 NOT USED

377 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14929 B D-WALL REINFORCEMENT FOR PANEL ADW25 (SHEET 01 OF 02) GFC

378 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14930 B D-WALL REINFORCEMENT FOR PANEL ADW25 (SHEET 02 OF 02) GFC

379 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14931 B D-WALL REINFORCEMENT FOR PANEL ADW22 & ADW23 (SHEET 01 OF 02) GFC

380 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14932 B D-WALL REINFORCEMENT FOR PANEL ADW22 & ADW23 (SHEET 02 OF 02) GFC

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14933 TO 14935 NOT USED

381 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14936 ANCILLARY BUILDING BASE LEVEL FRAMING PLAN
382 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14937 ANCILLARY BUILDING BASE LEVEL FRAMING PLAN

383 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14938 ANCILLARY BUILDING BASE LEVEL FRAMING PLAN

384 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14939 ANCILLARY BUILDING BASE LEVEL FRAMING PLAN

385 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14940 ANCILLARY BUILDING BASE LEVEL FRAMING PLAN
YET TO BE SUBMITTED
10 drgs
386 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14946 REINFORCEMENT DETAILS OF ANCILLARY BUILDING (SHEET 01)

387 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14947 REINFORCEMENT DETAILS OF ANCILLARY BUILDING (SHEET 02)

388 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14948 REINFORCEMENT DETAILS OF ANCILLARY BUILDING (SHEET 03)

389 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14949 REINFORCEMENT DETAILS OF ANCILLARY BUILDING (SHEET 04)

390 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14950 REINFORCEMENT DETAILS OF ANCILLARY BUILDING (SHEET 05)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14951 TO 14960 NOT USED

TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS


391 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14961 D GFC
FOR RCC PLENUM WALLS AT MEZZANINE LEVEL (SHEET-1)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
392 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14962 D GFC
FOR RCC PLENUM WALLS AT MEZZANINE LEVEL (SHEET-2)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
393 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14963 D GFC
FOR RCC PLENUM WALLS AT MEZZANINE LEVEL (SHEET-3)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
394 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14964 D GFC
FOR RCC PLENUM WALLS AT MEZZANINE LEVEL (SHEET-4)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14965 NOT USED

TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS


395 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14966 D GFC
FOR RCC PLENUM WALLS AT MEZZANINE LEVEL (SHEET-1)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
396 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14967 D GFC
FOR RCC PLENUM WALLS AT MEZZANINE LEVEL (SHEET-2)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
397 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14968 D GFC
FOR RCC PLENUM WALLS AT MEZZANINE LEVEL (SHEET-3)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
398 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14969 D GFC
FOR RCC PLENUM WALLS AT MEZZANINE LEVEL (SHEET-4)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14970 NOT USED

TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS


399 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14971 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 01 TO 04 (SHEET-1)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
400 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14972 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 01 TO 04 (SHEET-2)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
401 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14973 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 01 TO 04 (SHEET-3)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
402 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14974 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 01 TO 04 (SHEET-4)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
403 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14975 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 01 TO 04 (SHEET-5)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
404 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14976 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 14 TO 16 (SHEET-1)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
405 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14977 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 14 TO 16 (SHEET-2)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
406 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14978 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 14 TO 16 (SHEET-3)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
407 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14979 B GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 14 TO 16 (SHEET-4)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING AROUND CUT OUTS
408 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14980 A GFC
FOR RCC PLENUM WALLS AT CONCOURSE LEVEL FROM GRID 14 TO 16 (SHEET-5)

NCRTC-DM099-AIL-BEGU-STN-M2-IN-14981 TO 14990 NOT USED

409 NCRTC-DM099-AIL-BEGU- STN- M2-IN- 14991 B ECS-TVS EQUIPMENT FOUNDATION AT CONCOURSE AND PLATFORM LEVEL SLAB GFC
PROJECT NAME : NCRTC PKG -8
CONTRACTOR : Afcons Infrastructure Ltd.
BHAISALI STATION
S. No. Dwg / Doc No. Rev Title DD CRD GFC DATE

1 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13000 Z DRAWING INDEX SHEET 1 CRD

2 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13001 E FRAMING PLAN AT ROOF LEVEL CRD

3 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13002 E FRAMING PLAN AT CONCOURSE LEVEL CRD

4 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13003 E FRAMING PLAN AT UNDERCROFT LEVEL CRD

5 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13004 E SECTION 1 CRD

6 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13005 E SECTION 3 CRD

7 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13006 B SECTION 4 CRD

8 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13007 A FRAMING PLAN AT PLATFORM LEVEL CRD

ROOF LEVEL FRAMING PLAN SHOWING PD AREA COLUMN &


9 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13008 B CRD
LIMITING DESIGN FORCES (SHEET 1 OF 2)
ROOF LEVEL FRAMING PLAN SHOWING PD AREA COLUMN &
10 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13009 B CRD
LIMITING DESIGN FORCES (SHEET 2 OF 2)

11 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13010 A SECTION-2 CRD

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13011 TO 13200 NOT USED

12 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13201 F D WALL LAYOUT PLAN GFC

LOCATION FOR INCLINOMETER AND SONIC TESTING PIPES IN D-


13 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13204 D GFC
WALLS
REINFORCEMENT DETAIL OF TEMPORARY GUIDE WALL FOR
14 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13205 D GFC
DWALL CONSTRUCTION

15 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13206 B LAYOUT PLANS FOR PERMANENT COLUMNS GFC

LAYOUT PLAN OF STUB COLUMN STARTING FROM UNDERCROFT


16 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13207 B GFC
SLAB

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13208 TO 13210 NOT USED

D-WALL REINFORRCEMENT FOR PANEL DW2 TO DW4 & DW107 TO


17 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13211 D CRD
DW112 (SHEET 1 & 2)
D-WALL REINFORRCEMENT FOR PANEL DW5 & DW106 (SHEET 1 &
18 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13212 B GFC
2)

19 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13213 C D-WALL REINFORRCEMENT FOR PANEL DW6 (SHEET 1 & 2) GFC

20 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13214 C D-WALL REINFORRCEMENT FOR PANEL DW7 (SHEET 1 & 2) GFC

21 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13215 D D-WALL REINFORRCEMENT FOR PANEL DW8 (SHEET 1 & 2) GFC

D-WALL REINFORRCEMENT FOR PANEL DW119, DW120, DW114 &


22 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13216 B GFC
DW115 (SHEET 1 & 4)
D-WALL REINFORRCEMENT FOR PANEL DW116 TO DW118 (SHEET
23 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13217 B GFC
1 & 2)
D-WALL REINFORRCEMENT FOR PANEL DW1 & DW113 (SHEET 1 &
24 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13218 B GFC
2)

25 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13219 B D-WALL REINFORRCEMENT FOR PANEL DW105 (SHEET 1 & 2) GFC

D-WALL REINFORRCEMENT FOR PANEL DW10 & DW104 (SHEET 1 &


26 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13220 C GFC
2)

27 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13221 C D-WALL REINFORRCEMENT FOR PANEL DW9 (SHEET 1 & 2) GFC

28 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13222 C D-WALL REINFORCEMENT FOR GRID 08 TO 15 (SHEET 1 & 2) GFC

29 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13223 C D-WALL REINFORCEMENT FOR GRID 08 TO 15 (SHEET 1 & 2) GFC

D-WALL REINFORCEMENT FO PANEL DW48 TO DW52 & DW62 TO


30 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13224 C GFC
DW68 (SHEET 1 & 2)
D-WALL REINFORCEMENT FO PANEL DW28A & DW84A (SHEET 1 &
31 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13225 B GFC
2).
D-WALL REINFORCEMENT FO PANEL DW54, DW55 & DW59, DW60
32 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13226 B GFC
(SHEET 1 TO 3)
D-WALL REINFORCEMENT FO PANEL DW54, DW55 & DW59, DW60
33 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13227 B GFC
(SHEET 2 TO 3)
D-WALL REINFORCEMENT FO PANEL DW54, DW55 & DW59, DW60
34 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13228 B GFC
(SHEET 3 TO 3)

35 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13229 B D-WALL REINFORCEMENT FO PANEL DW53 & DW61 (SHEET 1 OF 2) GFC

D-WALL REINFORCEMENT FOR PANEL DW53 & DW61 (SHEET 2 OF


36 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13230 B GFC
2)

37 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13231 B D-WALL REINFORCEMENT FOR PANEL DW69 (SHEET 1 OF 2) GFC

38 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13232 B D-WALL REINFORCEMENT FOR PANEL DW69 (SHEET 1 OF 2) GFC

39 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13233 B D-WALL REINFORCEMENT FOR PANEL DW70 (SHEET 1 OF 2) GFC

40 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13234 B D-WALL REINFORCEMENT FOR PANEL DW70 (SHEET 1 OF 2) GFC

D-WALL REINFORCEMENT FOR PANEL DW56, DW57 & DW58


41 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13235 B GFC
(SHEET 1 OF 2)
D-WALL REINFORCEMENT FOR PANEL DW56, DW57 & DW58
42 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13236 B GFC
(SHEET 1 OF 2)
D-WALL REINFORCEMENT FOR PANEL DW98 TO DW102 (SHEET 1
43 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13237 B GFC
OF 2)
D-WALL REINFORCEMENT FOR PANEL DW98 TO DW102 (SHEET 2
44 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13238 B GFC
OF 2)
D-WALL REINFORCEMENT FOR PANEL DW12 & DW13 (SHEET 1 OF
45 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13239 B GFC
2)
D-WALL REINFORCEMENT FOR PANEL DW12 & DW13 (SHEET 1 OF
46 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13240 B GFC
2)

47 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13241 B D-WALL REINFORCEMENT FOR PANEL DW14 (SHEET 1 OF 2)) GFC

48 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13242 B D-WALL REINFORCEMENT FOR PANEL DW14 (SHEET 1 OF 2)) GFC

49 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13243 B D-WALL REINFORCEMENT FOR PANEL DW103 (SHEET 1 OF 2) GFC

50 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13244 B D-WALL REINFORCEMENT FOR PANEL DW103 (SHEET 1 OF 2) GFC

51 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13245 B D-WALL REINFORCEMENT FOR PANEL DW11 (SHEET 1 OF 2) GFC

52 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13246 B D-WALL REINFORCEMENT FOR PANEL DW11 (SHEET 1 OF 2) GFC

D-WALL REINFORCEMENT FOR PANEL DW15 & DW16 (SHEET 1 OF


53 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13247 C GFC
2)
D-WALL REINFORCEMENT FOR PANEL DW15 & DW16 (SHEET 1 OF
54 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13248 C GFC
2)

55 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13249 B D-WALL REINFORCEMENT FOR PANEL DW17 (SHEET 1 OF 2) GFC

56 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13250 B D-WALL REINFORCEMENT FOR PANEL DW17 (SHEET 2 OF 2) GFC

57 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13251 B D-WALL REINFORCEMENT FOR PANEL DW20 (SHEET 1 OF 2) GFC

58 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13252 B D-WALL REINFORCEMENT FOR PANEL DW20 (SHEET 2 OF 2) GFC

59 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13253 B D-WALL REINFORCEMENT FOR PANEL DW19 (SHEET 1 OF 2) GFC

60 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13254 B D-WALL REINFORCEMENT FOR PANEL DW19 (SHEET 2 OF 2) GFC

61 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13255 B D-WALL REINFORCEMENT FOR PANEL DW21 (SHEET 1 OF 2) GFC

62 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13256 B D-WALL REINFORCEMENT FOR PANEL DW21 (SHEET 2 OF 2) GFC

63 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13257 B D-WALL REINFORCEMENT FOR PANEL DW47 (SHEET 1 OF 2) GFC

64 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13258 B D-WALL REINFORCEMENT FOR PANEL DW47 (SHEET 2 OF 2) GFC

65 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13259 B D-WALL REINFORCEMENT FOR PANEL DW46 (SHEET 1 OF 2) GFC

66 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13260 B D-WALL REINFORCEMENT FOR PANEL DW46 (SHEET 1 OF 2) GFC

67 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13261 C D-WALL REINFORCEMENT FOR PANEL DW45 (SHEET 1 OF 2) GFC

68 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13262 C D-WALL REINFORCEMENT FOR PANEL DW45 (SHEET 2 OF 2) GFC

69 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13263 B D-WALL REINFORCEMENT FOR PANEL DW44 (SHEET 1 OF 2) GFC

70 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13264 B D-WALL REINFORCEMENT FOR PANEL DW44 (SHEET 2 OF 2) GFC

71 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13265 B D-WALL REINFORCEMENT FOR PANEL DW97 (SHEET 1 OF 2) GFC
72 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13266 B D-WALL REINFORCEMENT FOR PANEL DW97 (SHEET 1 OF 2) GFC

D-WALL REINFORCEMENT FOR PANEL DW71 TO DW76 (SHEET 1


73 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13267 B GFC
OF 2)
D-WALL REINFORCEMENT FOR PANEL DW71 TO DW76 (SHEET 2
74 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13268 B GFC
OF 2)
D-WALL REINFORCEMENT FOR PANEL DW42 & DW43 (SHEET 1 OF
75 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13269 B GFC
2)
D-WALL REINFORCEMENT FOR PANEL DW42 & DW43 (SHEET 2 OF
76 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13270 B GFC
2)

77 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13271 B D-WALL REINFORCEMENT FOR PANEL DW41 (SHEET 1 OF 2) GFC

78 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13272 B D-WALL REINFORCEMENT FOR PANEL DW41 (SHEET 2 OF 2) GFC

D-WALL REINFORCEMENT FOR PANEL DW38 & DW39 (SHEET 1 OF


79 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13273 B GFC
2)
D-WALL REINFORCEMENT FOR PANEL DW38 & DW39 (SHEET 2 OF
80 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13274 B GFC
2)

81 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13275 B D-WALL REINFORCEMENT FOR PANEL DW37 (SHEET 1 OF 2) GFC

82 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13276 B D-WALL REINFORCEMENT FOR PANEL DW37 (SHEET 2 OF 2) GFC

83 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13277 B D-WALL REINFORCEMENT FOR PANEL DW40 (SHEET 1 OF 2) GFC

84 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13278 B D-WALL REINFORCEMENT FOR PANEL DW40 (SHEET 2 OF 2) GFC

85 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13279 B D-WALL REINFORCEMENT FOR PANEL DW18 (SHEET 1 OF 2) GFC

86 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13280 B D-WALL REINFORCEMENT FOR PANEL DW18 (SHEET 2 OF 2) GFC

87 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13281 B D-WALL REINFORCEMENT FOR PANEL DW48 (SHEET 1 OF 2) GFC

88 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13282 B D-WALL REINFORCEMENT FOR PANEL DW48 (SHEET 2 OF 2) GFC

89 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13283 B D-WALL REINFORCEMENT FOR PANEL DW21A (SHEET 1 OF 2) GFC

90 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13284 B D-WALL REINFORCEMENT FOR PANEL DW21A (SHEET 2 OF 2) GFC

91 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13285 B D-WALL REINFORCEMENT FOR PANEL DW22 (SHEET 1 OF 2) GFC

92 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13286 B D-WALL REINFORCEMENT FOR PANEL DW22 (SHEET 2 OF 2) GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13287 TO 13300 NOT USED

93 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13301 F ROOF FRAMING PLAN PART 1 GFC

94 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13302 F ROOF FRAMING PLAN PART 2 GFC

95 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13303 F ROOF FRAMING PLAN PART 3 GFC

96 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13304 F ROOF FRAMING PLAN PART 4 GFC

97 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13305 F ROOF FRAMING PLAN PART 5 GFC

98 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13306 C ROOF PART SECTION GFC


NCRTC-DM099-AIL-BHAI-STN-M2-IN-13307 TO 13310 NOT USED

99 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13311 D ANCILLARY BUILDING PLINTH LEVEL PLAN GFC

100 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13312 D ANCILLARY BUILDING FIRST FLOOR LEVEL PLAN GFC

101 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13313 D ANCILLARY BUILDING SECOND FLOOR LEVEL PLAN GFC

102 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13314 D ANCILLARY BUILDING MUMTY LEVEL PLAN GFC

103 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13315 D ANCILLARY BUILDING SECTIONS GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13316 TO 13330 NOT USED

REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 05 TO 08


104 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13331 B GFC
(SHEET 01)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 05 TO 08
105 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13332 B GFC
(SHEET 02)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 05 TO 08
106 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13333 B GFC
(SHEET 03)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 05 TO 08
107 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13334 B GFC
(SHEET 04)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 05 TO 08
108 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13335 B GFC
(SHEET 05)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
109 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13336 C GFC
(SHEET 01)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
110 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13337 C GFC
(SHEET 02)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
111 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13338 C GFC
(SHEET 03)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
112 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13339 C GFC
(SHEET 04)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
113 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13340 C GFC
(SHEET 05)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
114 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13341 C GFC
(SHEET 06)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
115 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13342 C GFC
(SHEET 07)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
116 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13343 C GFC
(SHEET 08)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
117 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13344 C GFC
(SHEET 09)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
118 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13345 C GFC
(SHEET 10)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 08 TO 15
119 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13346 C GFC
(SHEET 11)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13347 TO 13350 NOT USED

REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22


120 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13351 C GFC
(SHEET 01)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
121 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13352 B GFC
(SHEET 02)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
122 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13353 C GFC
(SHEET 03)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
123 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13354 B GFC
(SHEET 04)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
124 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13355 C GFC
(SHEET 05)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
125 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13356 B GFC
(SHEET 06)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
126 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13357 B GFC
(SHEET 07)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
127 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13358 B GFC
(SHEET 08)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
128 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13359 B GFC
(SHEET 09)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
129 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13360 C GFC
(SHEET 10)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
130 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13361 B GFC
(SHEET 11)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 15 TO 22
131 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13362 B GFC
(SHEET 12)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13363 TO 13370 NOT USED

REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 05


132 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13371 B GFC
(SHEET 1)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 05
133 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13372 B GFC
(SHEET 2)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 05
134 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13373 B GFC
(SHEET 3)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 05
135 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13374 B GFC
(SHEET 4)
REINFORCEMENT DETAILS OF ROOF SLAB FROM GRID 01 TO 05
136 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13375 B GFC
(SHEET 5)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13376 TO 13400 NOT USED

137 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13401 E CONCOURSE FRAMING PLAN PART-1 GFC

138 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13402 E CONCOURSE FRAMING PLAN PART-2 GFC

139 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13403 E CONCOURSE FRAMING PLAN PART-3 GFC

140 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13404 E CONCOURSE FRAMING PLAN PART-4 GFC

141 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13405 E CONCOURSE FRAMING PLAN PART-5 GFC

142 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13406 E CONCOURSE PART SECTIONS GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13407 TO 13410 NOT USED

143 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13411 B DOUBLE SLAB BETWEEN ROOF SLAB & CONCOURSE SLAB GFC

144 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13412 B DOUBLE SLAB BETWEEN ROOF SLAB & CONCOURSE SLAB GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13413 TO 13420 NOT USED

REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 15


145 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13421 C GFC
TO 22) (SHEET-1 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 15
146 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13422 C GFC
TO 22) (SHEET-2 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 15
147 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13423 C GFC
TO 22) (SHEET-3 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 15
148 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13424 C GFC
TO 22) (SHEET-4 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 15
149 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13425 C GFC
TO 22) (SHEET-5 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 15
150 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13426 C GFC
TO 22) (SHEET-6 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 15
151 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13427 C GFC
TO 22) (SHEET-7 OF 7)
NCRTC-DM099-AIL-BHAI-STN-M2-IN-13428 TO 13430 NOT USED

REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05


152 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13431 C GFC
TO 15) (SHEET-1 OF 9)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05
153 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13432 C GFC
TO 15) (SHEET-2 OF 9)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05
154 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13433 C GFC
TO 15) (SHEET-3 OF 9)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05
155 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13434 C GFC
TO 15) (SHEET-4 OF 9)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05
156 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13435 C GFC
TO 15) (SHEET-5 OF 9)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05
157 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13436 C GFC
TO 15) (SHEET-6 OF 9)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05
158 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13437 C GFC
TO 15) (SHEET-7 OF 9)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05
159 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13438 C GFC
TO 15) (SHEET-8 OF 9)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 05
160 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13439 C GFC
TO 15) (SHEET-9 OF 9)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13440 NOT USED

REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 1


161 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13441 B GFC
TO 5) (SHEET-1 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 1
162 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13442 B GFC
TO 5) (SHEET-2 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 1
163 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13443 B GFC
TO 5) (SHEET-3 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 1
164 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13444 B GFC
TO 5) (SHEET-4 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 1
165 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13445 B GFC
TO 5) (SHEET-5 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 1
166 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13446 B GFC
TO 5) (SHEET-6 OF 7)
REINFORCEMENT DETAILS OF CONCOURSE SLAB (FROM GRID 1
167 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13447 B GFC
TO 5) (SHEET-7 OF 7)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13448 TO 13500 NOT USED

168 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13501 D UNDERCROFT FRAMING PLAN PART-1 GFC

169 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13502 D UNDERCROFT FRAMING PLAN PART-2 GFC

170 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13503 D UNDERCROFT FRAMING PLAN PART-3 GFC

171 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13504 B UNDERCROFT FRAMING PLAN PART-4 GFC

172 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13505 B UNDERCROFT FRAMING PLAN PART-5 GFC

173 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13506 D SEWAGE & SEEPAGE SUMP PLAN & SECTIONS GFC

174 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13507 D SEEPAGE SUMP PLAN & SECTIONS GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13508 TO 13510 NOT USED

175 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13511 B UNDERCROFT SECTIONS GFC

176 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13512 B UNDERCROFT SECTIONS GFC

177 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13513 D UNDERCROFT SECTIONS GFC

178 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13514 D UNDERCROFT SECTIONS GFC

179 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13515 D UNDERCROFT SECTIONS GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13516 TO 13520 NOT USED

REINFORCEMENT DETAILS AT DROP BASE SLAB LEVEL FROM GRID


180 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13521 C GFC
01 TO 05 (SHEET-1 OF 6)
REINFORCEMENT DETAILS AT DROP BASE SLAB LEVEL FROM GRID
181 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13522 C GFC
01 TO 05 (SHEET- 2 OF 6)
REINFORCEMENT DETAILS AT DROP BASE SLAB LEVEL FROM GRID
182 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13523 C GFC
01 TO 05 (SHEET- 3 OF 6)
REINFORCEMENT DETAILS AT DROP BASE SLAB LEVEL FROM GRID
183 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13524 C GFC
01 TO 05 (SHEET- 4 OF 6)
REINFORCEMENT DETAILS AT DROP BASE SLAB LEVEL FROM GRID
184 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13525 C GFC
01 TO 05 (SHEET- 5 OF 6)
REINFORCEMENT DETAILS AT DROP BASE SLAB LEVEL FROM GRID
185 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13526 C GFC
01 TO 05 (SHEET- 6 OF 6)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13527 TO 13528 NOT USED

186 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13529 A REINFORCEMENT DETAILS OF SUMP COVER SLAB GRID 07 TO 09 CRD

187 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13530 A REINFORCEMENT DETAILS OF SUMP COVER SLAB GRID 15 TO 16 CRD

REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO


188 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13531 D GFC
22 (SHEET-1 OF 9)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO
189 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13532 D GFC
22 (SHEET-2 OF 9)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO
190 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13533 D GFC
22 (SHEET-3 OF 9)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO
191 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13534 D GFC
22 (SHEET-4 OF 9)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO
192 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13535 D GFC
22 (SHEET-5 OF 9)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO
193 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13536 D GFC
22 (SHEET-6 OF 9)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO
194 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13537 D GFC
22 (SHEET-7 OF 9)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO
195 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13538 D GFC
22 (SHEET-8 OF 9)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 16 TO
196 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13539 D GFC
22 (SHEET-9 OF 9)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13540 NOT USED

REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO


197 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13541 B GFC
16 (SHEET-01 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
198 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13542 B GFC
16 (SHEET-02 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
199 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13543 B GFC
16 (SHEET-03 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
200 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13544 B GFC
16 (SHEET-04 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
201 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13545 B GFC
16 (SHEET-05 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
202 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13546 B GFC
16 (SHEET-06 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
203 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13547 B GFC
16 (SHEET-07 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
204 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13548 B GFC
16 (SHEET-08 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
205 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13549 B GFC
16 (SHEET-09 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
206 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13550 B GFC
16 (SHEET-10 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
207 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13551 B GFC
16 (SHEET-11 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
208 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13552 B GFC
16 (SHEET-12 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
209 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13553 B GFC
16 (SHEET-13 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
210 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13554 B GFC
16 (SHEET-14 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
211 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13555 B GFC
16 (SHEET-15 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
212 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13556 B GFC
16 (SHEET-16 OF 17)
REINFORCEMENT DETAILS AT BASE SLAB LEVEL FROM GRID 05 TO
213 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13557 B GFC
16 (SHEET-17 OF 17)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13558 TO 13570 NOT USED

LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT


214 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13571 C GFC
LEVEL (SHEET 1 OF 4)
LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT
215 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13572 B GFC
LEVEL (SHEET 2 OF 4)
LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT
216 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13573 B GFC
LEVEL (SHEET 3 OF 4)
LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT
217 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13574 B GFC
LEVEL (SHEET 4 OF 4)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13575 TO 13600 NOT USED

218 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13601 E PLATFORM FRAMING PLAN PART-1 GFC
219 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13602 E PLATFORM FRAMING PLAN PART-2 GFC

220 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13603 E PLATFORM FRAMING PLAN PART-3 GFC

221 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13604 E PLATFORM FRAMING PLAN PART-4 GFC

222 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13605 E PLATFORM FRAMING PLAN PART-5 GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13606 TO 13610 NOT USED

LIFT DETAILS ON GRID 'E' PLATFORM TO CONCOURSE (SHEET-1 OF


223 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13611 A1 CRD
2)
LIFT DETAILS ON GRID 'E' PLATFORM TO CONCOURSE (SHEET-2 OF
224 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13612 A1 CRD
2)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13613 TO 13630 NOT USED

REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID


225 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13631 B GFC
16 TO 22 (SHEET 01)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
226 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13632 B GFC
16 TO 22 (SHEET 02)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
227 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13633 B GFC
16 TO 22 (SHEET 03)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
228 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13634 B GFC
16 TO 22 (SHEET 04)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
229 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13635 B GFC
16 TO 22 (SHEET 05)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
230 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13636 B GFC
16 TO 22 (SHEET 06)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13637 TO 13640 NOT USED

REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID


231 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13641 A CRD
01 TO 16 (SHEET-01)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
232 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13642 A CRD
01 TO 16 (SHEET-02)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
233 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13643 A CRD
01 TO 16 (SHEET-03)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
234 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13644 A CRD
01 TO 16 (SHEET-04)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
235 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13645 A CRD
01 TO 16 (SHEET-05)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
236 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13646 A CRD
01 TO 16 (SHEET-06)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
237 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13647 A CRD
01 TO 16 (SHEET-07)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
238 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13648 A CRD
01 TO 16 (SHEET-08)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
239 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13649 A CRD
01 TO 16 (SHEET-09)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
240 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13650 A CRD
01 TO 16 (SHEET-10)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
241 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13651 A CRD
01 TO 16 (SHEET-11)
REINFORCEMENT DETAILS AT PLATFORM SLAB LEVEL FROM GRID
242 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13652 A CRD
01 TO 16 (SHEET-12)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13653 TO 13700 NOT USED

243 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13701 B STRUT AND WALER LAYOUT PLAN FOR ENTRY E1 DD

244 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13702 C ENTRY - EXIT E1 TEMPORARY STRUCTURE LAYOUT PLAN GFC

DETAILS OF STRUT & WALER FOR ENTRY-EXIT STRUCTURES ES1


245 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13703 B GFC
SUBWAY & VENT SHAFT (SHEET 1 OF 2)
DETAILS OF STRUT & WALER FOR ENTRY-EXIT STRUCTURES ES1
246 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13704 B GFC
SUBWAY & VENT SHAFT (SHEET 2 OF 2)

247 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13705 C ENTRY - EXIT E1 CONSTRUCTION SEQUENCE GFC

248 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13706 B TEMPORARY STRUCTURE LAYOUT PLAN FOR ENTRY E3 CRD

249 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13707 B ENTRY EXIT E3 TEMPORARY STRUCTURE LAYOUT PLAN GFC

DETAIL OF STRUT AND WALER FOR ENTRY EXIT E3 (SHEET 01 OF


250 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13708 A CRD
02)
DETAIL OF STRUT AND WALER FOR ENTRY EXIT E3 (SHEET 02 OF
251 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13709 A CRD
02)

252 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13710 - DETAIL OF TEMPORARY WORKS YET TO BE SUBMITTED
253 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13711 B CONSTRUCTION SEQUENCE OF STATION (SHEET 01 OF 02) CRD

254 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13712 A CONSTRUCTION SEQUENCE OF STATION (SHEET 02 OF 02)

255 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13713 A1 ENTRY - EXIT E2 TEMPORARY STRUCTURE LAYOUT PLAN

256 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13714 - ENTRY - EXIT E2 TEMPORARY WORKS YET TO BE SUBMITTED

ENTRY - EXIT SUBWAY & VENT SHAFT TEMPORARY STRUCTURE


257 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13715 B GFC
LAYOUT PLAN

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13716 TO 13720 NOT USED

SCHEMATIC LAYOUT PLAN OF STRUT AND WALER FOR LAUNCH


258 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13721 C DD
SHAFT SOUTH LEVEL 1 TO 03 (SHEET 1 OF 03)

259 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13722 F LAUNCH SHAFT KING POST DETAIL (SHEET 01 OF 04) GFC

260 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13723 D SOUTH LAUNCH SHAFT DROP BASE SLAB LEVEL (SHEET 01 OF 02) GFC

261 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13724 D SOUTH LAUNCH SHAFT DROP BASE SLAB LEVEL (SHEET 02 OF 02) GFC

262 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13725 B SOUTH LAUNCH SHAFT CRANE GANTRY DETAIL (SHEET 01 OF 02) GFC

263 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13726 B SOUTH LAUNCH SHAFT CRANE GANTRY DETAIL (SHEET 02 OF 02) GFC

264 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13727 D NORTH LAUNCH SHAFT CRANE GANTRY DETAIL (SHEET 01 OF 02) GFC

265 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13728 D NORTH LAUNCH SHAFT CRANE GANTRY DETAIL (SHEET 02 OF 02) GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13729 & 13730 NOT USED

SOUTH DETAIL OF CUTOFF WALL BETWEEN LAUNCH SHAFT AND


266 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13731 D GFC
STATION

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13730 TO 13745 NOT USED

267 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13746 B ENTRY - EXIT E1 SUBWAY BOX REINFORCEMENT DETAIL GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13747 TO 13750 NOT USED

LAUNCH SHAFT CONSTRUCTION SEQUENCE DETAIL (SHEET 01 OF


268 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13751 A1 DD
02)

269 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13752 C CONSTRUCTION SEQUENCE FOR NORTH END LAUNCHING SHAFT GFC

LAUNCH SHAFT & VENT SHAFT CONSTRUCTION SEQUENCE


270 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13754 B GFC
DETAIL (SHEET 01 OF 02)
CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 04 TO 09
271 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13755 B GFC
(SHEET 1 OF 2)
CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 04 TO 09
272 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13756 B GFC
(SHEET 2 OF 2)
CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 15 TO 18
273 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13757 B GFC
(SHEET 1 OF 2)
CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 15 TO 18
274 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13758 B GFC
(SHEET 2 OF 2)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13759 TO 13772 NOT USED

DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH


275 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13773 C GFC
(LEVEL-1 TO 3) (SHEET 01 OF 08)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH
276 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13774 C GFC
(LEVEL-1 TO 3) (SHEET 02 OF 08)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH
277 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13775 C GFC
(LEVEL-1 TO 3) (SHEET 03 OF 08)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH
278 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13776 C GFC
(LEVEL-1 TO 3) (SHEET 04 OF 08)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH
279 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13777 C GFC
(LEVEL-1 TO 3) (SHEET 05 OF 08)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH
280 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13778 C GFC
(LEVEL-1 TO 3) (SHEET 06 OF 08)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH
281 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13779 C GFC
(LEVEL-1 TO 3) (SHEET 07 OF 08)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH
282 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13780 B
(LEVEL-1 TO 3) (SHEET 08 OF 08)

283 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13781 E LAYOUT PLAN OF TEMPORARY PLUNGE COLUMNS GFC

PLUNGE COLUMN DETAILS FOR PC1 TO PC7, PC35 TO PC41 (GRID


284 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13782 B GFC
05 TO 08)
PLUNGE COLUMN DETAILS FOR PC23 TO PC28, PC57 TO PC62
285 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13783 B GFC
(GRID 15 TO 18)
PLUNGE COLUMN DETAILS FOR PC8 TO PC22, PC42 TO PC56 (GRID
286 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13784 B GFC
8 TO 15)
PLUNGE COLUMN DETAILS FOR PC29 TO PC34, PC63 TO PC68
287 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13785 B GFC
(GRID 18 TO 22) (SHEET 1 OF 2)
PLUNGE COLUMN DETAILS FOR PC29 TO PC34, PC63 TO PC68
288 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13786 B GFC
(GRID 18 TO 22) (SHEET 2 OF 2)
BARRETE AND STEEL COLUMN DETAILS FOR PC101 TO PC104
289 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13787 B GFC
(GRID 10 TO 13)

290 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13788 C COLUMN DETAILS FOR C17 TO C20 (GRID 10 TO 13) GFC

291 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13789 C COLUMN DETAILS FOR C7, C8, C15, C16, C21, C29 GFC

292 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13790 B COLUMN DETAILS FOR C22 TO C28 & C30 TO C36 GFC

293 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13791 B COLUMN DETAILS FOR C5, C6, C13 & C14 GFC

DETAILS OF STRUT & WALER BETWEEN GRID 05 TO 06 AT LEVEL-2


294 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13792 B GFC
(215.900m)
CONSTRCUTION SEQUENCE FOR STRUT & WALER BETWEEN GRID
295 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13793 B GFC
05 TO 06 AT LEVEL-2 (215.900m)

296 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13794 B COLUMN DETAILS FOR C1 TO C4 & C9 TO C12 GFC

297 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13795 A PLUNGE COLUMN CUTTING SEQUENCE (SHEET 01) CRD

298 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13796 A PLUNGE COLUMN CUTTING SEQUENCE (SHEET 02) CRD

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13797 TO 13800 NOT USED

299 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13801 D DIMENSIONAL DETAILS OF OTE DUCT (SHEET- 1) GFC

300 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13802 D DIMENSIONAL DETAILS OF OTE DUCT (SHEET- 2) GFC

301 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13803 D DIMENSIONAL DETAILS OF OTE DUCT (SHEET- 3) GFC

302 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13804 D DIMENSIONAL DETAILS OF OTE DUCT (SHEET- 4) GFC

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13805 TO 13806 NOT USED

303 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13807 B REINFORCEMENT DETAIL OF OTE DUCT (SHEET-1) GFC

304 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13808 B REINFORCEMENT DETAIL OF OTE DUCT (SHEET-2) GFC

305 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13809 B REINFORCEMENT DETAIL OF OTE DUCT (SHEET-3) GFC

306 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13810 B REINFORCEMENT DETAIL OF OTE DUCT (SHEET-4) GFC

PUBLIC STAIRCASE ST-01 BETWEEN GRID 08 & 09 DIMENSIONAL


307 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13811 C GFC
DETAILS
PUBLIC STAIRCASE ST-01 BETWEEN GRID 08 & 09
308 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13812 C GFC
REINFORCEMENT DETAILS
PUBLIC STAIRCASE ST-02 BETWEEN GRID 14 & 15 DIMENSIONAL
309 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13813 C GFC
DETAILS
PUBLIC STAIRCASE ST-02 BETWEEN GRID 14 & 15
310 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13814 C GFC
REINFORCEMENT DETAILS
PUBLIC STAIRCASE ST-04 BETWEEN GRID 08 & 09 DIMENSIONAL
311 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13815
DETAILS
PUBLIC STAIRCASE ST-04 BETWEEN GRID 08 & 09
312 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13816
REINFORCEMENT DETAILS
PUBLIC STAIRCASE ST-05 BETWEEN GRID 17 & 18 DIMENSIONAL
313 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13817
DETAILS YET TO BE SUBMITTED
PUBLIC STAIRCASE ST-05 BETWEEN GRID 17 & 18 6 drgs
314 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13818
REINFORCEMENT DETAILS
PUBLIC STAIRCASE ST-06 BETWEEN GRID 04 & 05 DIMENSIONAL
315 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13819
DETAILS
PUBLIC STAIRCASE ST-06 BETWEEN GRID 04 & 05
316 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13820
REINFORCEMENT DETAILS

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13825 TO 13900 NOT USED

REINFORCEMENT DETAILS OF RCC WALLS AND WATER TANK AT


317 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13901 D GFC
ANCILLARY BUILDING (SHEET 1 OF 3)
REINFORCEMENT DETAILS OF RETAINING WALLS AND WATER
318 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13902 D GFC
TANK AT ANCILLARY BUILDING (SHEET 2 OF 3)
REINFORCEMENT DETAILS OF RETAINING WALLS AND WATER
319 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13903 D GFC
TANK AT ANCILLARY BUILDING (SHEET 3 OF 3)
REINFORCEMENT DETAILS OF BEAM, SLAB AT PLINTH LEVEL
320 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13904 D GFC
ANCILLARY BUILDING (SHEET 1 OF 4)
REINFORCEMENT DETAILS OF BEAM, SLAB AT PLINTH LEVEL
321 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13905 D GFC
ANCILLARY BUILDING (SHEET 2 OF 4)
REINFORCEMENT DETAILS OF BEAM, SLAB AT PLINTH LEVEL
322 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13906 D GFC
ANCILLARY BUILDING (SHEET 3 OF 4)
REINFORCEMENT DETAILS OF BEAM, SLAB AT PLINTH LEVEL
323 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13907 D GFC
ANCILLARY BUILDING (SHEET 4 OF 4)
REINFORCEMENT DETAILS OF COLUMNS AT ANCILLARY BUILDING
324 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13908 D GFC
(SHEET 1 OF 2)
REINFORCEMENT DETAILS OF COLUMNS AT ANCILLARY BUILDING
325 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13909 D GFC
(SHEET 2 OF 2)
REINFORCEMENT DETAILS OF BEAM, SLAB AT FIRST FLOOR LEVEL
326 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13910 D GFC
ANCILLARY BUILDING (SHEET 1 OF 4)
REINFORCEMENT DETAILS OF BEAM, SLAB AT FIRST FLOOR LEVEL
327 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13911 D GFC
ANCILLARY BUILDING (SHEET 2 OF 4)
REINFORCEMENT DETAILS OF BEAM, SLAB AT FIRST FLOOR LEVEL
328 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13912 D GFC
ANCILLARY BUILDING (SHEET 3 OF 4)
REINFORCEMENT DETAILS OF BEAM, SLAB AT FIRST FLOOR LEVEL
329 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13913 D GFC
ANCILLARY BUILDING (SHEET 4 OF 4)
REINFORCEMENT DETAILS OF BEAMS, SLAB AT SECOND FLOOR
330 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13914 D GFC
ANCILLARY BUILDING (SHEET 1 OF 4)
REINFORCEMENT DETAILS OF BEAMS, SLAB AT SECOND FLOOR
331 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13915 D GFC
ANCILLARY BUILDING (SHEET 2 OF 4)
REINFORCEMENT DETAILS OF BEAMS, SLAB AT SECOND FLOOR
332 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13916 D GFC
ANCILLARY BUILDING (SHEET 3 OF 4)
REINFORCEMENT DETAILS OF BEAMS, SLAB AT SECOND FLOOR
333 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13917 D GFC
ANCILLARY BUILDING (SHEET 4 OF 4)
REINFORCEMENT DETAILS AT MUMTY LEVEL ANCILLARY BUILDING
334 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13918 D GFC
(SHEET 1 OF 1)
ANCILLARY BUILDING - DETAILS OF MAINTENANCE STAIRCASE O-
335 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13919 C GFC
23

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13920 TO 13930 NOT USED

336 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13921 ENTRY-ES1 BASE SLAB LEVEL FRAMING PLAN

337 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13922 ENTRY-ES1 BASE & ROOF LEVEL FRAMING PLAN

338 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13923 ENTRY-ES1 ROOF LEVEL FRAMING PLAN

339 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13924 ENTRY-ES1 SECTION

340 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13925 ENTRY-ES1 SECTION


YET TO BE SUBMITTED
10 drgs
341 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13926 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 01)

342 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13927 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 02)

343 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13928 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 03)

344 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13929 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 04)

345 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13930 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 05)

346 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13931 A ENTRY-ES2 & VENT SHAFT BASE SLAB LEVEL FRAMING PLAN CRD

347 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13932 A ENTRY-ES2 SUBWAY BASE & ROOF LEVEL FRAMING PLAN CRD

348 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13933 A ENTRY-ES2 & VENT SHAFT ROOF LEVEL FRAMING PLAN CRD

349 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13934 A ENTRY-ES2 & VENT SHAFT PLINTH LEVEL FRAMING PLAN CRD

350 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13935 A ENTRY-ES2 & SUBWAY SECTION CRD

351 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13936 A ENTRY 2 SECTION CRD

352 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13937 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 01)

353 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13938 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 02)

YET TO BE SUBMITTED
354 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13939 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 03)
5 drgs

355 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13940 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 04)

356 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13941 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 05)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13942 TO 13945 NOT USED


357 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13946 ENTRY-ES3 BASE SLAB LEVEL FRAMING PLAN

358 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13947 ENTRY-ES3 BASE & ROOF LEVEL FRAMING PLAN

359 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13948 ENTRY-ES3 ROOF LEVEL FRAMING PLAN

360 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13949 ENTRY-ES3 SECTION

361 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13950 ENTRY-ES3 SECTION


YET TO BE SUBMITTED
10 drgs
362 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13951 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 01)

363 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13952 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 02)

364 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13953 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 03)

365 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13954 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 04)

366 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13955 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E3 (SHEET 05)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13956 TO 13960 NOT USED

TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING


367 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13961 C AROUND CUT OUTS FOR RCC PLENUM WALLS AT CONCOURSE GFC
LEVEL (SHEET-1)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING
368 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13962 C AROUND CUT OUTS FOR RCC PLENUM WALLS AT CONCOURSE GFC
LEVEL (SHEET-2)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING
369 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13963 C AROUND CUT OUTS FOR RCC PLENUM WALLS AT CONCOURSE GFC
LEVEL (SHEET-3)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING
370 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13964 C AROUND CUT OUTS FOR RCC PLENUM WALLS AT CONCOURSE GFC
LEVEL (SHEET-4)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING
371 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13965 C AROUND CUT OUTS FOR RCC PLENUM WALLS AT CONCOURSE GFC
LEVEL (SHEET-5)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING
372 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13966 C AROUND CUT OUTS FOR RCC PLENUM WALLS AT CONCOURSE GFC
LEVEL (SHEET-6)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHRNING
373 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13967 B AROUND CUTOUT FOR RCC PLENUM WALLS AT CONCOURS LEVEL GFC
FROM GRID 01 OF 07 (SHEET 1)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHRNING
374 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13968 B AROUND CUTOUT FOR RCC PLENUM WALLS AT CONCOURS LEVEL GFC
FROM GRID 01 OF 07 (SHEET 2)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHRNING
375 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13969 B AROUND CUTOUT FOR RCC PLENUM WALLS AT CONCOURS LEVEL GFC
FROM GRID 01 OF 07 (SHEET 3)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHRNING
376 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13970 B AROUND CUTOUT FOR RCC PLENUM WALLS AT CONCOURS LEVEL GFC
FROM GRID 01 OF 07 (SHEET 4)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHRNING
377 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13971 B AROUND CUTOUT FOR RCC PLENUM WALLS AT CONCOURS LEVEL GFC
FROM GRID 01 OF 07 (SHEET 5)
TYPICAL REINFORCEMENT DETAILS AND STRENGTHRNING
378 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13972 B AROUND CUTOUT FOR RCC PLENUM WALLS AT CONCOURS LEVEL GFC
FROM GRID 01 OF 07 (SHEET 6)

NCRTC-DM099-AIL-BHAI-STN-M2-IN-13973 TO 13990 NOT USED

ECS-TVS EQUIPMENT FOUNDATION AT CONCOURSE AND


379 NCRTC-DM099-AIL-BHAI- STN- M2-IN- 13991 B GFC
PLATFORM LEVEL SLAB
PROJECT NAME : NCRTC PKG -8
CONTRACTOR : Afcons Infrastructure Ltd.
GENERAL DRGS
S. No. Dwg / Doc No. Rev Title DD CRD GFC DATE

1 NCRTC-DM099-AIL-GEN- COM-M2-IN- 10000 K DRAWING INDEX CRD 10.08.2022


2 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10001 C GENERAL NOTES (SHEET 01 OF 02) GFC 14.06.2022
3 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10001 C GENERAL NOTES (SHEET 02 OF 02) GFC 14.06.2022
4 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10002 A TYPICAL CONSTRUCTION JOINT & WATERPROOFING DETAILS CRD 02.02.2022
5 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10003 A TYPICAL DETAIL OF LIFITING HOOK IN FLOOR SLAB CRD 17.02.2022
GENERAL DETAILS FIXING OF THE OHE MAST, RAILING,
6 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10004 C PARAPET FENCING, OHE BRACKET AND SHEAR CONNECTORS GFC 07.06.2022
FOR TRACK PLINTH (SHEET 01)
GENERAL DETAILS FIXING OF THE OHE MAST, RAILING,
7 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10005 C PARAPET FENCING, OHE BRACKET AND SHEAR CONNECTORS GFC 07.06.2022
FOR TRACK PLINTH (SHEET 02)
8 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10006 C TYPICAL DETAILS OF CORECTIONS FOR COUPLER TOLERANCE GFC 16.07.2022
9 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10007 A LINE DIAGRAM FOR EXACUATION SCHEME OF PKG 08 CRD 07.06.2022
BLOCK WORK GENERAL DRAWING FOR MILLIONS AND LINTELS
10 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10008 B GFC 10.08.2022
(SHEET 01 OF 03)
BLOCK WORK GENERAL DRAWING FOR MILLIONS AND LINTELS
11 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10009 B GFC 10.08.2022
(SHEET 02 OF 03)
BLOCK WORK GENERAL DRAWING FOR MILLIONS AND LINTELS
12 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10010 B GFC 10.08.2022
(SHEET 03 OF 03)
BLOCK WORK STRENGTHENING MULLIONS, LINTELS ETC. FOR
13 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10011 B GFC 10.08.2022
TRACK SIDE WALL BEYOND PSD AT PLATFORM LEVEL

TYPICAL REINFORCEMENT DETAILS AND STRENGTHENING


14 NCRTC-DM099-AIL-GEN- COM-M2-ST- 10012 A AROUND CUT OUTS FOR RCC PLENUM WALLS AT MEZZANINE CRD 05.08.2022
AND CONCOURSE LEVEL
PROJECT NAME : NCRTC PKG -8
CONTRACTOR : Afcons Infrastructure Ltd.
MEERUT CENTRAL STATION
S. No. Dwg / Doc No. Rev Title DD CRD GFC DATE

1 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12000 AF CRD

2 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12001 B FRAMING PLAN AT ROOF LEVEL CRD

3 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12002 B FRAMING PLAN AT CONCOURSE LEVEL CRD

4 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12003 B FRAMING PLAN UNDERCROFT LEVEL CRD

5 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12004 B CROSS-SECTION-5 CRD

2 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12005 D LONG-SECTION-1 CRD

3 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12006 B CROSS-SECTION-2 CRD

4 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12007 B ROOF LEVEL SECTION CRD

5 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12008 B CROSS-SECTION-1 CRD

6 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12009 A1 CROSS-SECTION-3 CRD

3 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12010 A1 CROSS-SECTION-4 CRD

4 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12011 A1 CROSS-SECTION-5 CRD

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12005 TO 12020 NOT USED

5 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12021 B FRAMING PLAN AT CONCOURSE LEVEL OF ENTRY E2 CRD

6 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12022 B FRAMING PLAN AT ROOF LEVEL OF ENTRY E2 CRD

7 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12023 B FRAMING PLAN AT CONCOURSE LEVEL OF ENTRY E1 GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12024 TO 12200 NOT USED

8 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12201 E D WALL LAYOUT PLAN GFC

9 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12202 A D WALL LAYOUT PLAN CRD

LOCATION FOR INCLINOMETER AND SONIC TESTING PIPES IN D-


10 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12204 B CRD
WALL

REINFORCEMENT DETAIL OF TEMPORARY GUIDE WALL FOR D-


11 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12205 A CRD
WALL CONSTRUCTION

12 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12206 A LAYOUT PLAN OF PERMANENT COLUMN GFC

LAYOUT PLAN OF STUB COLUMNS STARTING FROM


13 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12207 B CRD
UNDERCROFT SLAB

COLUMN LAYOUT PLAN FOR RANCILLARY BUILDING AND ENTRY


14 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12208
STRUCTURE

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12209 TO 12210 NOT USED

D-WALL REINFORCEMENT FOR PANELS DW26 TO DW35 & DW82


15 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12211 C GFC
TO DW9

D-WALL REINFORCEMENT FOR GRID 01 TO 07 (DW1 TO DW16 &


16 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12212 B GFC
DW106 TO DW121)

D-WALL REINFORCEMENT FOR GRID 17 TO 19 (DW41 TO DW47 &


17 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12213 B GFC
DW75 TO DW81)

D-WALL REINFORCEMENT FOR PANEL DW49 TO DW51 (SHEET 01


18 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12214 B GFC
OF 02)

D-WALL REINFORCEMENT FOR PANEL DW49 TO DW51 (SHEET 01


19 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12215 B GFC
OF 02)
D-WALL REINFORCEMENT FOR PANEL DW57 TO DW60 (SHEET 01
20 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12216 B GFC
OF 02)

D-WALL REINFORCEMENT FOR PANEL DW57 TO DW60 (SHEET 01


21 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12217 B GFC
OF 03)

22 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12218 B D-WALL REINFORCEMENT FOR PANEL DW55 (SHEET 01 OF 02) GFC

23 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12219 B D-WALL REINFORCEMENT FOR PANEL DW55 (SHEET 01 OF 02) GFC

D-WALL REINFORCEMENT FOR PANEL DW63 & DW64 (SHEET 01


24 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12220 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW63 & DW64 (SHEET 02


25 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12221 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW63 & DW64 (SHEET 03


26 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12222 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW53 & DW54 (SHEET 01


27 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12223 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW53 & DW54 (SHEET 02


28 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12224 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW53 & DW54 (SHEET 03


29 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12225 B GFC
OF 03)

30 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12226 B D-WALL REINFORCEMENT FOR PANEL DW56 (SHEET 01 OF 02) GFC

31 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12227 B D-WALL REINFORCEMENT FOR PANEL DW56 (SHEET 02 OF 02) GFC

32 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12228 B D-WALL REINFORCEMENT FOR PANEL DW62 (SHEET 01 OF 02) GFC

33 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12229 B D-WALL REINFORCEMENT FOR PANEL DW62 (SHEET 02 OF 02) GFC

D-WALL REINFORCEMENT FOR PANEL DW48 & DW48A (SHEET 01


34 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12230 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW48 & DW48A (SHEET 02


35 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12231 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW48 & DW48A (SHEET 03


36 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12232 B GFC
OF 03)

37 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12233 B D-WALL REINFORCEMENT FOR PANEL DW56 (SHEET 01 OF 03) GFC

38 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12234 B D-WALL REINFORCEMENT FOR PANEL DW56 (SHEET 02 OF 03) GFC

39 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12235 B D-WALL REINFORCEMENT FOR PANEL DW56 (SHEET 03 OF 03) GFC

40 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12236 B D-WALL REINFORCEMENT FOR PANEL DW61 (SHEET 01 OF 02) GFC

41 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12237 B D-WALL REINFORCEMENT FOR PANEL DW61 (SHEET 02 OF 02) GFC

D-WALL REINFORCEMENT FOR PANEL DW17 TO DW25 (SHEET 01


42 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12238 B GFC
OF 02)

D-WALL REINFORCEMENT FOR PANEL DW17 TO DW25 (SHEET 02


43 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12239 B GFC
OF 02)

D-WALL REINFORCEMENT FOR PANEL DW36A, DW37, DW39,


44 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12240 B GFC
DW40 (SHEET 01 OF 02)

D-WALL REINFORCEMENT FOR PANEL DW36A, DW37, DW39,


45 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12241 B GFC
DW40 (SHEET 02 OF 02)

46 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12242 B D-WALL REINFORCEMENT FOR PANEL DW38 (SHEET 01 OF 02) GFC

47 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12243 B D-WALL REINFORCEMENT FOR PANEL DW38 (SHEET 02 OF 02) GFC

48 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12244 B D-WALL REINFORCEMENT FOR PANEL DW41 (SHEET 01 OF 02) GFC

49 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12245 B D-WALL REINFORCEMENT FOR PANEL DW41 (SHEET 02 OF 02) GFC

50 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12246 B D-WALL REINFORCEMENT FOR PANEL DW36 (SHEET 01 OF 02) GFC

51 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12247 B D-WALL REINFORCEMENT FOR PANEL DW36 (SHEET 02 OF 02) GFC
D-WALL REINFORCEMENT FOR PANEL DW69 & DW69A (SHEET 01
52 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12248 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW69 & DW69A (SHEET 02


53 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12249 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW69 & DW69A (SHEET 03


54 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12250 B GFC
OF 03)

55 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12251 B D-WALL REINFORCEMENT FOR PANEL DW65 (SHEET 01 OF 02) GFC

56 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12252 B D-WALL REINFORCEMENT FOR PANEL DW65 (SHEET 02 OF 02) GFC

57 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12253 B D-WALL REINFORCEMENT FOR PANEL DW74 (SHEET 01 OF 02) GFC

58 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12254 B D-WALL REINFORCEMENT FOR PANEL DW74 (SHEET 02 OF 02) GFC

D-WALL REINFORCEMENT FOR PANEL DW66 TO DW68 (SHEET 01


59 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12255 B GFC
OF 02)

D-WALL REINFORCEMENT FOR PANEL DW66 TO DW68 (SHEET 02


60 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12256 B GFC
OF 02)

D-WALL REINFORCEMENT FOR PANEL DW70 TO DW73 (SHEET 01


61 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12257 B GFC
OF 02)

D-WALL REINFORCEMENT FOR PANEL DW70 TO DW73 (SHEET 02


62 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12258 B GFC
OF 02)

D-WALL REINFORCEMENT FOR PANEL DW122 & DW127 (SHEET 01


63 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12259 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW122 & DW127 (SHEET 02


64 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12260 B GFC
OF 03)

D-WALL REINFORCEMENT FOR PANEL DW122 & DW127 (SHEET 03


65 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12261 B GFC
OF 03)

66 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12262 B D-WALL REINFORCEMENT FOR PANEL DW124 (SHEET 01 OF 02) GFC

67 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12263 B D-WALL REINFORCEMENT FOR PANEL DW124 (SHEET 02 OF 02) GFC

68 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12264 B D-WALL REINFORCEMENT FOR PANEL DW125 (SHEET 01 OF 02) GFC

69 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12265 B D-WALL REINFORCEMENT FOR PANEL DW125 (SHEET 02 OF 02) GFC

70 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12266 B D-WALL REINFORCEMENT FOR PANEL DW123 (SHEET 01 OF 02) GFC

71 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12267 B D-WALL REINFORCEMENT FOR PANEL DW123 (SHEET 02 OF 02) GFC

72 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12268 B D-WALL REINFORCEMENT FOR PANEL DW126 (SHEET 01 OF 02) GFC

73 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12269 B D-WALL REINFORCEMENT FOR PANEL DW126 (SHEET 02 OF 02) GFC

D-WALL REINFORCEMENT FOR PANEL DW98, DW99, DW101,


74 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12270 B GFC
DW101A, DW103 & DW104 (SHEET 01 OF 02)

D-WALL REINFORCEMENT FOR PANEL DW98, DW99, DW101,


75 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12271 B GFC
DW101A, DW103 & DW104 (SHEET 02 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


76 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12272 B GFC
FOR PANELS DW100 (SHEET 01 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


77 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12273 B GFC
FOR PANELS DW100 (SHEET 02 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


78 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12274 B GFC
FOR PANELS DW102 (SHEET 01 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


79 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12275 B GFC
FOR PANELS DW102 (SHEET 02 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


80 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12276 B GFC
FOR PANELS DW97 (SHEET 01 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


81 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12277 B GFC
FOR PANELS DW97 (SHEET 02 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


82 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12278 B GFC
FOR PANELS DW104A (SHEET 01 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


83 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12279 B GFC
FOR PANELS DW104A (SHEET 02 OF 02)
D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT
84 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12280 B GFC
FOR PANELS DW105 (SHEET 01 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


85 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12281 B GFC
FOR PANELS DW105 (SHEET 02 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


86 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12282 B GFC
FOR PANELS DW96 (SHEET 01 OF 02)

D-WALL REINFORCEMENT FOR PANELS D-WALL REINFOREMENT


87 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12283 B GFC
FOR PANELS DW96 (SHEET 02 OF 02)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12284 TO 12301 NOT USED

88 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12302 C FRAMING PLAN ROOF PART LEVEL PART PLAN-1 GFC

89 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12303 C FRAMING PLAN ROOF PART LEVEL PART PLAN-2 GFC

90 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12304 C FRAMING PLAN ROOF PART LEVEL PART PLAN-3 GFC

91 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12305 C FRAMING PLAN ROOF PART LEVEL PART PLAN-4 GFC

92 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12306 C FRAMING PLAN ROOF PART LEVEL PART PLAN-5 GFC

93 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12307 C ROOF LEVEL SECTION GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12308 TO 12320 NOT USED

94 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12321 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 1 TO 7 (SHEET 1) GFC

95 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12322 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 1 TO 7 (SHEET 2) GFC

96 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12323 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 1 TO 7 (SHEET 3) GFC

97 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12324 B REINFORCEMENT DETAILS OF ROOF SLAB GRID 1 TO 7 (SHEET 4) GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12325 TO 12330 NOT USED

REINFORCEMENT DETAILS OF ROOF SLAB GRID 7 TO 17 (SHEET


98 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12331 B GFC
1)

REINFORCEMENT DETAILS OF ROOF SLAB GRID 7 TO 17 (SHEET


99 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12332 B GFC
2)

REINFORCEMENT DETAILS OF ROOF SLAB GRID 7 TO 17 (SHEET


100 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12333 B GFC
3)

REINFORCEMENT DETAILS OF ROOF SLAB GRID 7 TO 17 (SHEET


101 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12334 B GFC
4)

REINFORCEMENT DETAILS OF ROOF SLAB GRID 7 TO 17 (SHEET


102 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12335 B GFC
5)

REINFORCEMENT DETAILS OF ROOF SLAB GRID 7 TO 17 (SHEET


103 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12336 B GFC
6)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12337 TO 12350 NOT USED

REINFORCEMENT DETAILS OF ROOF SLAB GRID 17 TO 23 (SHEET


104 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12351 B GFC
1)

REINFORCEMENT DETAILS OF ROOF SLAB GRID 17 TO 23 (SHEET


105 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12352 B GFC
2)

REINFORCEMENT DETAILS OF ROOF SLAB GRID 17 TO 23 (SHEET


106 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12353 B GFC
3)

REINFORCEMENT DETAILS OF ROOF SLAB GRID 17 TO 23 (SHEET


107 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12354 B GFC
4)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12355 TO 12400 NOT USED

108 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12401 C FRAMING PLAN CONCOURSE LEVEL PART-1 GFC

109 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12402 C FRAMING PLAN CONCOURSE LEVEL PART-2 GFC

110 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12403 C FRAMING PLAN CONCOURSE LEVEL PART-3 GFC
111 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12404 C FRAMING PLAN CONCOURSE LEVEL PART-4 GFC

112 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12405 C FRAMING PLAN CONCOURSE LEVEL PART-5 GFC

113 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12406 C PLENUM LEVEL SECTION GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12407 TO 12410 NOT USED

114 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12411 C DOUBLE SLAB BETWEEN ROOF SLAB & CONCOUSE SLAB GFC

115 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12412 C DOUBLE SLAB BETWEEN ROOF SLAB & CONCOUSE SLAB GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12413 TO 12420 NOT USED

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


116 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12421 C GFC
TO 22 (SHEET 01)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


117 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12422 C GFC
TO 22 (SHEET 02)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


118 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12423 C GFC
TO 22 (SHEET 03)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


119 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12424 C GFC
TO 22 (SHEET 04)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


120 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12425 C GFC
TO 22 (SHEET 05)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


121 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12426 C GFC
TO 22 (SHEET 06)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


122 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12427 C GFC
TO 22 (SHEET 07)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


123 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12428 C GFC
TO 22 (SHEET 08)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 17


124 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12429 C GFC
TO 22 (SHEET 09)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12430 NOT USED

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


125 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12431 B GFC
TO 17 (SHEET 01)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


126 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12432 B GFC
TO 17 (SHEET 02)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


127 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12433 B GFC
TO 17 (SHEET 03)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


128 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12434 B GFC
TO 17 (SHEET 04)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


129 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12435 B GFC
TO 17 (SHEET 05)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


130 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12436 B GFC
TO 17 (SHEET 06)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


131 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12437 B GFC
TO 17 (SHEET 07)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


132 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12438 B GFC
TO 17 (SHEET 08)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


133 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12439 B GFC
TO 17 (SHEET 09)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 07


134 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12440 B GFC
TO 17 (SHEET 10)

135 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12441 B PRECAMBER DETAIL AT CONCOURSE SLAB GFC

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01


136 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12446 B GFC
TO 07 (SHEET 01)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01


137 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12447 B GFC
TO 07 (SHEET 02)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01


138 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12448 B GFC
TO 07 (SHEET 03)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01


139 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12449 B GFC
TO 07 (SHEET 04)
REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01
140 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12450 B GFC
TO 07 (SHEET 05)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01


141 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12451 B GFC
TO 07 (SHEET 06)

REINFORCEMENT DETAILS OF CONCOURSE SLAB FROM GRID 01


142 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12452 B GFC
TO 07 (SHEET 07)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12453 TO 12460 NOT USED

143 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12461 C PLATFORM LEVEL PART PLAN-1 GFC

144 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12462 C PLATFORM LEVEL PART PLAN-2 GFC

145 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12463 C PLATFORM LEVEL PART PLAN-3 GFC

146 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12464 C PLATFORM LEVEL PART PLAN-4 GFC

147 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12465 C PLATFORM LEVEL PART PLAN-5 GFC

148 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12466 C PLATFORM LEVEL PART PLAN-6 GFC

149 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12467 C PLATFORM LEVEL PART PLAN-7 GFC

150 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12468 C PLATFORM LEVEL PART PLAN-8 GFC

151 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12469 C PLATFORM LEVEL PART PLAN-9 GFC

152 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12470 C PLATFORM LEVEL PART PLAN-10 GFC

153 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12471 C PLATFORM SECTION GFC

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


154 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12475 C GFC
GRID 09 TO 22 (SHEET 01)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


155 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12476 C GFC
GRID 09 TO 22 (SHEET 02)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


156 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12477 C GFC
GRID 09 TO 22 (SHEET 03)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


157 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12478 C GFC
GRID 09 TO 22 (SHEET 04)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


158 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12479 C GFC
GRID 09 TO 22 (SHEET 05)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


159 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12480 C GFC
GRID 09 TO 22 (SHEET 06)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


160 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12481 C GFC
GRID 09 TO 22 (SHEET 07)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


161 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12482 C GFC
GRID 09 TO 22 (SHEET 08)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


162 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12483 C GFC
GRID 09 TO 22 (SHEET 09)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


163 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12484 C GFC
GRID 09 TO 22 (SHEET 10)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


164 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12485 C GFC
GRID 09 TO 22 (SHEET 11)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


165 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12486 C GFC
GRID 09 TO 22 (SHEET 12)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


166 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12487 C GFC
GRID 09 TO 22 (SHEET 13)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


167 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12488 A1
GRID 01 TO 09 (SHEET 01)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


168 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12489 A1
GRID 01 TO 09 (SHEET 02)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


169 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12490 A1
GRID 01 TO 09 (SHEET 03)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


170 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12491 A1
GRID 01 TO 09 (SHEET 04)
REINFORCEMENT DETAILS OFPLATFORM SLAB LEVEL FROM
171 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12492 A1
GRID 01 TO 09 (SHEET 05)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


172 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12493 A1
GRID 01 TO 09 (SHEET 06)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


173 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12494 A1
GRID 01 TO 09 (SHEET 07)

REINFORCEMENT DETAILS OF PLATFORM SLAB LEVEL FROM


174 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12495 A1
GRID 01 TO 09 (SHEET 08)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12496 TO 12520 NOT USED

REINFORCEMENT DETAILS OF BASE SLAB GRID 17 TO 22 (SHEET


175 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12521 C GFC
1)

REINFORCEMENT DETAILS OF BASE SLAB GRID 17 TO 22 (SHEET


176 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12522 C GFC
2)

REINFORCEMENT DETAILS OF BASE SLAB GRID 17 TO 22 (SHEET


177 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12523 C GFC
3)

REINFORCEMENT DETAILS OF BASE SLAB GRID 17 TO 22 (SHEET


178 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12524 C GFC
4)

REINFORCEMENT DETAILS OF BASE SLAB GRID 17 TO 22 (SHEET


179 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12525 C GFC
5)

REINFORCEMENT DETAILS OF BASE SLAB GRID 17 TO 2) (SHEET


180 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12526 C GFC
6)

REINFORCEMENT DETAILS OF BASE SLAB GRID 17 TO 22 (SHEET


181 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12527 C GFC
7)

REINFORCEMENT DETAILS OF BASE SLAB GRID 17 TO 22 (SHEET


182 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12528 C GFC
8)

REINFORCEMENT DETAILS OF SUMP COVER SLAB (FROM GRID 06


183 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12529 A1 CRD
TO 08)

REINFORCEMENT DETAILS OF SUMP COVER SLAB (FROM GRID 15


184 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12530 A1 CRD
TO 16)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12531 TO 12500 NOT USED

185 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12501 C FRAMING PLAN UNDERCROFT LEVEL PART 1 GFC

186 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12502 C FRAMING PLAN UNDERCROFT LEVEL PART 2 GFC

187 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12503 C FRAMING PLAN UNDERCROFT LEVEL PART 3 GFC

188 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12504 C FRAMING PLAN UNDERCROFT LEVEL PART 4 GFC

189 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12505 C FRAMING PLAN UNDERCROFT LEVEL PART 5 GFC

190 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12506 C SEEPAGE AND SEWAGE SUMP PLAN GFC

191 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12507 C SEEPAGE SUMP PLAN GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12508 TO 12510 NOT USED

192 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12511 C UNDERCROFT SECTIONS (SHEET 1) GFC

193 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12512 C UNDERCROFT SECTIONS (SHEET 2) GFC

194 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12513 C UNDERCROFT SECTIONS (SHEET 3) GFC

195 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12514 C UNDERCROFT SECTIONS (SHEET 4) GFC

196 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12515 C UNDERCROFT SECTIONS (SHEET 5) GFC

197 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12516 C UNDERCROFT SECTIONS (SHEET 6) GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12517 TO 12530 NOT USED

REINFORCEMENT DETAILS OF SUMP COVER SLAB (FROM GRID 06


198 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12529 A CRD
TO 08
REINFORCEMENT DETAILS OF SUMP COVER SLAB (FROM GRID 15
199 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12530 A CRD
TO 16)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


200 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12531 C GFC
01 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


201 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12532 C GFC
02 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


202 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12533 C GFC
03 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


203 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12534 C GFC
04 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


204 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12535 C GFC
05 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


205 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12536 C GFC
06 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


206 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12537 C GFC
07 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


207 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12538 C GFC
08 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


208 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12539 C GFC
09 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


209 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12540 C GFC
10 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


210 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12541 C GFC
11 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


211 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12542 C GFC
12 TO 13)

REINFORCEMENT DETAILS OF BASE SLAB FROM 05 TO 17 (SHEET


212 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12543 C GFC
13 TO 13)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12544 TO 12550 NOT USED

REINFORCEMENT DETAILS OF BASE SLAB FROM 01 TO 05 (SHEET


213 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12551 B GFC
01 TO 06)

REINFORCEMENT DETAILS OF BASE SLAB FROM 01 TO 05 (SHEET


214 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12552 B GFC
02 TO 06)

REINFORCEMENT DETAILS OF BASE SLAB FROM 01 TO 05 (SHEET


215 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12553 B GFC
03 TO 06)

REINFORCEMENT DETAILS OF BASE SLAB FROM 01 TO 05 (SHEET


216 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12554 B GFC
04 TO 06)

REINFORCEMENT DETAILS OF BASE SLAB FROM 01 TO 05 (SHEET


217 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12555 B GFC
05 TO 06)

REINFORCEMENT DETAILS OF BASE SLAB FROM 01 TO 05 (SHEET


218 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12556 B GFC
06 TO 06)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12557 TO 12570 NOT USED

LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT


219 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12571 C GFC
LEVEL (SHEET 01)

LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT


220 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12572 C GFC
LEVEL (SHEET 02)

LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT


221 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12573 C GFC
LEVEL (SHEET 03)

LAYOUT PLAN OF UPAS DUCT AND CUTOUT AT UNDERCROFT


222 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12574 C DD
LEVEL (SHEET 04)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12575 TO 12610 NOT USED

LIFT DETAILS BETWEEN GRID 9 & 10 PLATFORM TO CONCOURSE


223 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12611 A1 CRD
(SHEET-1 OF 2)

LIFT DETAILS BETWEEN GRID 9 & 10 PLATFORM TO CONCOURSE


224 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12612 A1 CRD
(SHEET-2 OF 2)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12613 TO 12700 NOT USED

GENERAL ARRANGEMENT DRAWING FOR STRUT AND WALER


225 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12701 A1
PLAN FOR ENTRY E1

GENERAL ARRANGEMENT DRAWING FOR STRUT AND WALER


226 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12702 A1
PLAN FOR ENTRY E1
227 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12703 CONSTRUCTION SEQUENCE FOR E1

YET TO BE SUBMITTED
228 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12704 TEMPORARY WORKS STRUT & WALER DETAILS OF E1(SHEET 01)
3 drgs

229 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12705 TEMPORARY WORKS STRUT & WALER DETAILS OF E1(SHEET 02)

GENERAL ARRANGEMENT DRAWING FOR STRUT AND WALER


230 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12706 A1
PLAN FOR ENTRY E2

231 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12707 CONSTRUCTION SEQUENCE FOR E1

232 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12708 TEMPORARY WORKS STRUT & WALER DETAILS OF E2(SHEET 01)
YET TO BE SUBMITTED
4 drgs
233 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12709 TEMPORARY WORKS STRUT & WALER DETAILS OF E2(SHEET 02)

234 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12710 TEMPORARY WORKS STRUT & WALER DETAILS OF E2(SHEET 03)

235 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12711 C CONSTRUCTION SEQUENCE OF STATION DD

236 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12712 B CONSTRUCTION SEQUENCE OF STATION GFC

CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 01 TO


237 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12713 B DD
07 (SHEET 1 & 2)

DETAILS OF SOLDIER PILE FOR TRAFFIC DIVERSION OVER THE


238 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12714 A CRD
STATION

CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 15 TO


239 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12715 A CRD
16 (SHEET 01 & 03)

CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 15 TO


240 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12716 A CRD
16 (SHEET 02 & 03)

CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 15 TO


241 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12717 A GFC
16 (SHEET 03 & 03)

CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 08 TO


242 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12718 B GFC
10 (SHEET 01 & 03)

CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 08 TO


243 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12719 B GFC
10 (SHEET 02 & 03)

CONSTRUCTION SEQUENCE OF STATION BETWEEN GRID 08 TO


244 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12720 B DD
10 (SHEET 03 & 03)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12721 TO 12730 NOT USED

STRUT AND WALER LAYOUT PLAN FOR RETRIEVAL SHAFT


245 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12731 B GFC
(SHEET 01)

STRUT AND WALER LAYOUT PLAN FOR RETRIEVAL SHAFT


246 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12732 B GFC
(SHEET 02)

247 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12733 B DETAILS OF TEMPORARY STEEL DECKING FOR OPENING TC7 GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12734 TO 12780 NOT USED

248 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12781 D LAYOUT PLAN OF TEMPORARY PLUNGE COLUMNS GFC

PLUNGE COLUMN DETAILS FOR PC7 TO PC28, PC30 TO PC38 AND


249 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12782 B GFC
PC49 TO PC80 (GRID 05 TO 18)

PLUNGE COLUMN DETAILS FOR PC39 TO PC72 AND PC81 TO


250 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12783 B GFC
PC84 (GRID 19 TO 22)

PLUNGE COLUMN DETAILS FOR PC1 TO PC6 AND PC43 TO PC48


251 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12784 B GFC
(GRID 01 TO 04)

252 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12785 B PLUNGE COLUMN DETAILS FOR PC29 GFC

253 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12786 C COLUMN DETAIL FOR C22 TO C29 GFC

254 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12787 B COLUMN DETAIL FOR C6 TO C12 GFC

255 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12788 B COLUMN DETAIL FOR C13 TO C20 AND C21 GFC

256 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12789 B COLUMN DETAIL FOR C1 TO C5 AND C7 TO C11 GFC
NCRTC-DM099-AIL-MEEC-STN-M2-IN-12790 TO 12800 NOT USED

257 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12801 B DIMENSIONAL DETAIL OF OTE DUCT (SH 1) GFC

258 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12802 B DIMENSIONAL DETAIL OF OTE DUCT (SH 2) GFC

259 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12803 B DIMENSIONAL DETAIL OF OTE DUCT (SH 3) GFC

260 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12804 B DIMENSIONAL DETAIL OF OTE DUCT (SH 4) GFC

261 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12806 B REINFORCEMENT DETAIL OF OTE DUCT (SHEET 01) GFC

262 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12807 B REINFORCEMENT DETAIL OF OTE DUCT (SHEET 02) GFC

263 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12808 B REINFORCEMENT DETAIL OF OTE DUCT (SHEET 03) GFC

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12809 TO 12810 NOT USED

PUBLIC STAIRCASE ST-01 BETWEEN GRID 07 & 08 DIMENSIONAL


264 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12811 C GFC
DETAILS (SHEET 01 OF 03)

PUBLIC STAIRCASE ST-01 BETWEEN GRID 07 & 08 DIMENSIONAL


265 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12812 C GFC
DETAILS (SHEET 02 OF 03)

PUBLIC STAIRCASE ST-01 BETWEEN GRID 07 & 08 DIMENSIONAL


266 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12813 C GFC
DETAILS (SHEET 03 OF 03)

PUBLIC STAIRCASE ST-02 NEAR GRID 09 DIMENSIONAL DETAILS


267 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12814 A CRD
(SHEET 01 OF 03)

PUBLIC STAIRCASE ST-02 NEAR GRID 09 DIMENSIONAL DETAILS


268 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12815 A CRD
(SHEET 02 OF 03)

PUBLIC STAIRCASE ST-02 NEAR GRID 09 REINFORCEMENT


269 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12816 A CRD
DETAILS (SHEET 03 OF 03)

PUBLIC STAIRCASE ST-03 NEAR GRID 13 TO 14 DIMENSIONAL


270 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12817 A CRD
DETAILS (SHEET 01 OF 03)

PUBLIC STAIRCASE ST-03 NEAR GRID 13 TO 14 DIMENSIONAL


271 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12818 A CRD
DETAILS (SHEET 02 OF 03)

PUBLIC STAIRCASE ST-03 NEAR GRID 13 TO 14 REINFORCEMENT


272 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12819 A CRD
DETAILS (SHEET 03 OF 03)

MAINTENANCE STAIRCASE 0-23.5 AT GRID 22-G DIMENSONAL


273 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12821 B GFC
DETAILS (SHEET 01)

MAINTENANCE STAIRCASE 0-23.5 AT GRID 22-G REINFORCEMENT


274 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12822 B GFC
DETAILS (SHEET 02)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12823 TO 12900 NOT USED

275 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12901 ENTRY-ES1 BASE SLAB LEVEL FRAMING PLAN

276 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12902 ENTRY-ES1 BASE & ROOF LEVEL FRAMING PLAN

277 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12905 ENTRY-ES1 SECTION

278 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12906 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 01)

279 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12907 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 02)

280 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12908 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E1 (SHEET 03)

281 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12911 ENTRY-ES2 & ANCILLARY BUILDING FRAMING PLAN

282 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12912 ENTRY-ES2 & ANCILLARY BUILDING FRAMING PLAN

283 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12913 ENTRY-ES2 & ANCILLARY BUILDING FRAMING PLAN

284 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12914 ENTRY-ES2 & ANCILLARY BUILDING FRAMING PLAN
YET TO BE SUBMITTED
20 drgs
285 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12921 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 01)
286 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12922 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 02)

287 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12923 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 03)

288 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12924 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 04)

289 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12925 REINFORCEMENT DETAILS OF ENTRY STRUCTURE E2 (SHEET 05)

REINFORCEMENT DETAILS OF ANCILLARY STRUCTURE E2


290 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12931
(SHEET 01)

REINFORCEMENT DETAILS OF ANCILLARY STRUCTURE E2


291 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12932
(SHEET 02)

REINFORCEMENT DETAILS OF ANCILLARY STRUCTURE E2


292 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12933
(SHEET 03)

REINFORCEMENT DETAILS OF ANCILLARY STRUCTURE E2


293 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12934
(SHEET 04)

REINFORCEMENT DETAILS OF ANCILLARY STRUCTURE E2


294 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12935
(SHEET 05)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12941 TO 12950 NOT USED

295 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12950 GENERAL ARRANGEMENT DRAWING FOR VENT SHAFT

296 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12951 GENERAL ARRANGEMENT DRAWING FOR VENT SHAFT

297 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12952 REINFORCEMENT DETAILS OF VENT SHAFT


YET TO BE SUBMITTED
6 drgs
298 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12953 REINFORCEMENT DETAILS OF VENT SHAFT

299 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12954 REINFORCEMENT DETAILS OF VENT SHAFT

300 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12955 REINFORCEMENT DETAILS OF VENT SHAFT

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12823 TO 12960 NOT USED

TYPICAL REINFORCEMENT DETAILS OF DOUBLE SLAB BETWEEN


301 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12961 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 03 TO 08 (SHEET-1)

TYPICAL REINFORCEMENT DETAILS OF DOUBLE SLAB BETWEEN


302 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12962 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 03 TO 08 (SHEET-2)

TYPICAL REINFORCEMENT DETAILS OF DOUBLE SLAB BETWEEN


303 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12963 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 03 TO 08 (SHEET-3)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12964 TO 12965 NOT USED

TYPICAL REINFORCEMENT DETAILS OF DOUBLE SLAB BETWEEN


304 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12966 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 16 TO 20 (SHEET-1)

TYPICAL REINFORCEMENT DETAILS OF DOUBLE SLAB BETWEEN


305 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12967 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 16 TO 20 (SHEET-2)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12968 TO 12970 NOT USED

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


306 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12971 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 01 TO 05 (SHEET-1)

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


307 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12972 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 01 TO 05 (SHEET-2)

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


308 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12973 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 01 TO 05 (SHEET-3)

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


309 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12974 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 01 TO 05 (SHEET-4)

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


310 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12975 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 01 TO 05 (SHEET-5)

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


311 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12976 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 16 TO 20 (SHEET-1)
TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN
312 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12977 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 16 TO 20 (SHEET-2)

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


313 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12978 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 16 TO 20 (SHEET-3)

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


314 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12979 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 16 TO 20 (SHEET-4)

TYPICAL REINFORCEMENT DETAILS OF PLENUM WALL BETWEEN


315 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12980 B GFC
ROOF AND CONCOURSE LEVEL FROM GRID 16 TO 20 (SHEET-5)

NCRTC-DM099-AIL-MEEC-STN-M2-IN-12981 TO 12990 NOT USED

316 NCRTC-DM099-AIL-MEEC- STN- M2-IN- 12991 B EQUIPMENT FOUNDATION PLINTH DETAILS GFC
PROJECT NAME : NCRTC PKG -8
CONTRACTOR : Afcons Infrastructure Ltd.
CUT AND COVER NORTH DRGS
S. No. Dwg / Doc No. Rev Title DD CRD GFC DATE

1 NCRTC-DM099-AIL-CCN- GAD-M2-IN- 11000 AT DRAWING INDEX CRD

2 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11101 D REINFORCEMENT DETAIL OF CHAINAGE 70940.560M TO 71000.00M GFC

3 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11102 D REINFORCEMENT DETAIL OF CHAINAGE 70965.035M TO 70971.035M GFC

4 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11103 D REINFORCEMENT DETAIL OF CHAINAGE 71000.00M TO 70100.00M GFC

5 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11104 B NORTH END LAUNCH SHAFT REINFORCEMENT DETAILS (SHEET 01 FO 7) CRD

6 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11105 B NORTH END LAUNCH SHAFT REINFORCEMENT DETAILS (SHEET 02 FO 7) CRD

7 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11106 B NORTH END LAUNCH SHAFT REINFORCEMENT DETAILS (SHEET 03 FO 7) CRD

8 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11107 B NORTH END LAUNCH SHAFT REINFORCEMENT DETAILS (SHEET 04 FO 7) CRD

9 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11108 B NORTH END LAUNCH SHAFT REINFORCEMENT DETAILS (SHEET 05 FO 7) CRD

10 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11109 B NORTH END LAUNCH SHAFT REINFORCEMENT DETAILS (SHEET 06 FO 7) CRD

11 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11110 B NORTH END LAUNCH SHAFT REINFORCEMENT DETAILS (SHEET 07 FO 7) CRD

CUT AND COVER NORTH END REINFORCEMENT DETAIL FOR C/C RAMP-
12 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11111 E GFC
71100M TO 71130.00M
CUT AND COVER NORTH END REINFORCEMENT DETAIL FOR C/C RAMP-
13 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11112 E GFC
71130M TO 71160.00M
CUT AND COVER NORTH END REINFORCEMENT DETAIL FOR C/C RAMP-
14 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11113 E GFC
71160M TO 71190.00M
CUT AND COVER NORTH END REINFORCEMENT DETAIL FOR C/C RAMP-
15 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11114 E GFC
71190M TO 71220.00M
CUT AND COVER NORTH END REINFORCEMENT DETAIL FOR C/C RAMP-
16 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11115 E GFC
71220M TO 71250.00M
CUT AND COVER NORTH END REINFORCEMENT DETAIL FOR C/C RAMP-
17 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11116 E GFC
71250M TO 71270.00M
CUT AND COVER NORTH END REINFORCEMENT DETAIL FOR C/C RAMP-
18 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11117 E GFC
71270M TO 71310.00M
CUT AND COVER NORTH END AND SOUTH END REINFORCEMENT DETAIL
19 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11118 D GFC
FOR CH 65856.438 TO 65940.00 & 71430.00M TO 71521.487M
CUT AND COVER NORTH END AND SOUTH END REINFORCEMENT DETAIL
20 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11119 D GFC
FOR CH 71310.00M TO 71430.00M & 65940.00M TO 66010.00M
CUT AND COVER NORTH END AND SOUTH END DETAILS OF CROSS BEAM
21 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11120 A1 CRD
AND SLAB AT INTERFACE LOCATION
CUT & COVER NORTH REINFORCEMENT DETAIL FOR SUMP AREA (SHEET
22 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11132 C GFC
01 OF 02)
CUT & COVER NORTH REINFORCEMENT DETAIL FOR SUMP AREA (SHEET
23 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11133 C GFC
01 OF 02)
CUT AND COVER NORTH PART PLAN SHOWING REINFORCEMENT DETAIL
24 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11134 C GFC
FOR CH 71061M TO 71100M (SHEET 01 OF 02)
CUT AND COVER NORTH PART PLAN SHOWING REINFORCEMENT DETAIL
25 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11135 D GFC
FOR CH 71061M TO 71100M (SHEET 02 OF 02)
DETAIL DRAWING WITH LONG SECTION FROMCHAINAGE : 70880m TO
26 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11051 J GFC
CHAINAGE : 71060m
DETAIL DRAWING WITH LONG SECTION FROMCHAINAGE : 71060m TO
27 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11052 H GFC
CHAINAGE : 71240m
DETAIL DRAWING WITH LONG SECTION FROMCHAINAGE : 71240m TO
28 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11053 H GFC
CHAINAGE : 71420m
DETAIL DRAWING WITH LONG SECTION FROMCHAINAGE : 71240 TO
29 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11054 H GFC
CHAINAGE : 71420m

30 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11055 H SECTIONS GFC

31 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11056 F SECTIONS GFC

32 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11057 C CUT & COVER NORTH GAD & SECTION DETAILS FOR SUMP AREA GFC

NORTH RAMP AT MES COLONY DETAILS OF ANCHOR BOLT FOR OHE & OPC
33 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11058 A1
FITTINGS IN CUT & COVER RAMP

34 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11061 D D-WALL LAYOUT PLAN AND CO-ORDINATES GFC

35 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11062 C D-WALL ELEVATIONS GFC

D-WALL REINFORCEMENT FOR PANEL LSDW2 TO LSDW4 & LSDW4 &


36 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11063 D GFC
LSDW13 TO LSDW15 (SHEET 01 OF 04)

37 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11064 B D WALL REINFORCEMENT FOR PANEL LSDW1 (SHEET 01 OF 02) GFC

38 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11065 C D WALL REINFORCEMENT FOR PANEL LSDW9 (SHEET 01 OF 02) GFC

D WALL REINFORCEMENT FOR PANEL LSDW5, LSDW12 & LSDW16 (SHEET


39 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11066 B GFC
01 OF 02)

40 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11067 C D WALL REINFORCEMENT FOR PANEL LSDW6 (SHEET 01 OF 02) GFC
PROJECT NAME : NCRTC PKG -8
CONTRACTOR : Afcons Infrastructure Ltd.
CUT AND COVER NORTH DRGS
S. No. Dwg / Doc No. Rev Title DD CRD GFC DATE

41 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11068 C D WALL REINFORCEMENT FOR PANEL LSDW17 (SHEET 01 OF 02) GFC

D WALL REINFORCEMENT FOR PANEL LSDW7, LSDW8 AND LSDW10,


42 NCRTC-DM099-AIL-CCN- RFT-M2-ST- 11069 C GFC
LSDW11 (SHEET 01 OF 02)
TEMPORARY WORKS DETAILED FROM CHAINAGE : 70938.682 TO 71023.682
43 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11071 D GFC
(SHEET 01 OF 04)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT NORTH (SHEET 01 OF
44 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11072 D GFC
06)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT NORTH (SHEET 02 OF
45 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11073 C GFC
06)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT NORTH (SHEET 03 OF
46 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11074 C GFC
06)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT NORTH (SHEET 04 OF
47 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11075 C GFC
06)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT NORTH (SHEET 05 OF
48 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11076 C GFC
06)
DETAILS OF STRUT AND WALER FOR LAUNCH SHAFT NORTH (SHEET 06 OF
49 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11077 C GFC
06)

50 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11081 C NORTH END LAUNCH SAHFT CONSTRUCTION SEQUENCE GFC

CUT & COVER NORTH END BOX TUNNEL & RAMP- SOLIER PILE LAYOUT
51 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11082 E GFC
FROM UP LINE CH: 71022.500M TO 71275.60M (SHEET 01 OF 02)
CUT & COVER NORTH END BOX TUNNEL & RAMP- SOLIER PILE LAYOUT
52 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11083 E GFC
FROM UP LINE CH: 71022.500M TO 71275.60M (SHEET 02 OF 02)
TEMPORARY WORKS DETAILS OR NORTH END LAUNCH SHAFT (SHEET 01
53 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11084 B GFC
OF 03)
TEMPORARY WORKS DETAILS OR NORTH END LAUNCH SHAFT (SHEET 02
54 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11085 B CRD
OF 03)
TEMPORARY WORKS DETAILS OR NORTH END LAUNCH SHAFT (SHEET 03
55 NCRTC-DM099-AIL-CCN- TMP-M2-ST- 11086 B CRD
OF 03)

56 NCRTC-DM099-AIL-CCN- GAD-M2-ST- 11204 B LOCATION FOR INCLINOMETER AND SONIC TESTING PIPES IN D WALL CRD

57 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 11211 C DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET 01) GFC

58 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 11212 C DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET 02) GFC

59 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 11213 C DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET 03) GFC

60 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 11214 C DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET 04) GFC

61 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 11215 C DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET 05) GFC

62 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 11216 D DETAILS OF SHEAR CONNECTOR FOR PRECAST TRACK PLINTH (SHEET 06) GFC

63 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 11221 C DETAILS OF RAILING IN OPEN RAMP AREA GFC

CONSTRUCTION SEQUENCE OF ELEVATED BOX SECTION AND OPEN RAMP


64 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 19051 D GFC
ZONE 10

65 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 19052 D CONSTRUCTION SEQUENCE OF RAMP ZONE-9 GFC

66 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 19053 D CONSTRUCTION SEQUENCE OF RAMP ZONE-8 GFC

CONSTRUCTION SEQUENCE OF TWIN BOX AND U-TROUGH STRUCTURE


67 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 19054 D GFC
(Zone 7)
CONSTRUCTION SEQUENCE OF TWIN BOX STRUCTURE FROM CH
68 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 19055 E GFC
70938.682M TO CH 71023.682M

69 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 19056 B CONSTRUCTION SEQUENCE FOR RETRIEVAL SHAFT DD

CONSTRUCTION SEQUENCE OF TWIN BOX STRUCTURE FROM CH : 71040m


70 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 19057 B DD
TO 71100m

71 NCRTC-DM099-AIL-CCN- RMP-M2-ST- 19058 B CONSTRUCTION SEQUENCE OF TWIN BOX STRUCTURE (ZONE 5 & 6) GFC
PROJECT NAME : NCRTC PKG -8
CONTRACTOR : Afcons Infrastructure Ltd.
CUT AND COVER SOUTH DRGS
S. No. Dwg / Doc No. Rev Title DD CRD GFC DATE

1 NCRTC-DM099-AIL-CCS- RMP-M2-IN- 19000 AM DRAWING INDEX CRD

DETAIL DRAWING WITH LONG SECTION FROM CHAINAGE: 65856.438M TO


2 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11001 H GFC 07.06.2022
66040.00
DETAIL DRAWING WITH LONG SECTION FROM CHAINAGE: 66040.00M TO
3 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11002 G GFC 07.06.2022
CHAINAGE: 66220.00M
DETAIL DRAWING WITH LONG SECTION FROM CHAINAGE: 66220.00M TO
4 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11003 H GFC 07.06.2022
CHAINAGE: 66400.00M
DETAIL DRAWING WITH LONG SECTION FROM CHAINAGE: 66400.00M TO
5 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11004 H GFC 28.07.2022
CHAINAGE: 66580.00M

6 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11005 H DETAIL DRAWING WITH SECTION GFC 07.06.2022

7 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11006 J DETAIL DRAWING WITH SECTION GFC 28.07.2022

8 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11007 D DETAIL DRAWING WITH SECTION GFC 28.07.2022

9 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11008 C GENERAL ARRANGEMENT DETAIL & SECTION DETAILS FOR SUMP AREA GFC 02.09.2022

SOUTH RAMP AT BRAHMPURI DETAILS OF ANCHOR BOLT FOR OHE & OPC
10 NCRTC-DM099-AIL-CCS- GAD-M2-ST- 11009 A1 CRD 04.10.2022
FITTINGS IN CUT & COVER RAMP
DETAIL DRAWING WITH LONG SECTION FROM CHAINAGE: 65839.58MM TO
11 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11026 B DD
CHAINAGE: 66020.00M
DETAIL DRAWING WITH LONG SECTION FROM CHAINAGE: 66020.00M TO
12 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11027 B DD
CHAINAGE: 66200.00M
DETAIL DRAWING WITH LONG SECTION FROM CHAINAGE: 66200.00M TO
13 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11028 B DD
CHAINAGE: 66380.00M
DETAIL DRAWING WITH LONG SECTION FROM CHAINAGE: 66500.00M TO
14 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11029 B DD
CHAINAGE: 66560.00M

15 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11030 B SECTIONS DD

16 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11031 B SOLDIER PILE LAYOUT FROM UP LINE CH 66040 TO 66080M TO CH 66080M GFC

17 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11032 B SOLDIER PILE LAYOUT FROM UP LINE CH 66080 TO 66170M SHEET 01 GFC

CUT AND COVER SOUTH BOX TUNNEL & RAMP SOLIER PILE LAYOUT FROM UP
18 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11033 C GFC
LINE CH 66170 TO 66580 (SHEET 01 OF 03)
CUT AND COVER SOUTH BOX TUNNEL & RAMP SOLIER PILE LAYOUT FROM UP
19 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11034 C GFC
LINE CH 66170 TO 66580 (SHEET 02 OF 03)
CUT AND COVER SOUTH BOX TUNNEL & RAMP SOLIER PILE LAYOUT FROM UP
20 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11035 C GFC
LINE CH 66170 TO 66580 (SHEET 03 OF 03)
CUT AND COVER SOUTH END DETAILS OF SHEAR CONNECTOR FOR PRECAST
21 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11211 D GFC
TRACK PLINTH (SHEET 01)
CUT AND COVER SOUTH END DETAILS OF SHEAR CONNECTOR FOR PRECAST
22 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11212 D GFC
TRACK PLINTH (SHEET 01)

23 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11221 C CUT AND COVER SOUTH END DETAILS OF RAILING IN OPEN RAMP AREA GFC

SOUTH CUT & COVER RAMP STRUCTURE LONG ELEVATION SHOWING FACIA
24 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11222 B1
PANELS WITH 3.5m HEIGHT RCC WALL
CONSTRUCTION SEQUENCE OF ELEVATED BOX SECTION AND OPEN RAMP
25 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19011 B CRD
FROM CH : 65840m TO CH : 66020m

26 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19012 B CONSTRUCTION SEQUENCE OF RAMP FROM CH :66020m TO CH : 66100m CRD

27 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19013 E CONSTRUCTION SEQUENCE OF RAMP (ZONE C) GFC

CONSTRUCTION SEQUENCE OF SUMP PIT AREA FROM CH : 66235m TO CH :


28 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19014 B DD
66240m
CONSTRUCTION SEQUENCE OF TWIN BOX STRUCTURE FROM CH : 66408.394m
29 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19015 D GFC
TO 66580.000m
CONSTRUCTION SEQUENCE OF TWIN BOX STRUCTURE FROM CH : 66408.394m
30 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19016 D GFC
TO 66580.000m
CONSTRUCTION SEQUENCE OF STRUCTURAL BOXES FROM 66240M TO
31 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19017 B DD
66300M
CONSTRUCTION SEQUENCE OF STRUCTURE BOXES FROM CH : 66300m TO
32 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19018 B DD
66400m
CONSTRUCTION SEQUENCE OF STRUCTURE BOXES FROM CH : 66340m TO
33 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19019 B GFC
66408.394m
CONSTRUCTION SEQUENCE OF STRUCTURE BOXES FROM CH : 66246.000m TO
34 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19020 B GFC
66340.000m
CONSTRUCTION SEQUENCE OF STRUCTURE BOXES FROM CH : 66170.000m TO
35 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19021 B GFC
66246.000m
CONSTRUCTION SEQUENCE OF STRUCTURE BOXES FROM CH : 66408.394m TO
36 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19022 B CRD
66413.968m (SHEET 01 OF 02)
CONSTRUCTION SEQUENCE OF STRUCTURE BOXES FROM CH : 66408.394m TO
37 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19023 B CRD
66413.968m (SHEET 02 OF 02)
CONSTRUCTION SEQUENCE OF STRUCTURE BOXES FROM CH : 66401.468m TO
38 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19024 C GFC
66408.394m
CONSTRUCTION SEQUENCE OF STRUCTURE BOXES FROM CH : 66277.5m TO
39 NCRTC-DM099-AIL-CCS- RMP-M2-ST- 19025 B CRD
66290.000m
DETAIL OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH ZONE-C TO TO
40 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 19038 B GFC
ZONE-I (SHEET 01)
PROJECT NAME : NCRTC PKG -8
CONTRACTOR : Afcons Infrastructure Ltd.
CUT AND COVER SOUTH DRGS
S. No. Dwg / Doc No. Rev Title DD CRD GFC DATE
DETAIL OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH ZONE-C TO TO
41 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 19039 B GFC
ZONE-I (SHEET 02)
DETAIL OF STRUT AND WALER FOR LAUNCH SHAFT SOUTH ZONE-C TO TO
42 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 19040 B GFC
ZONE-I (SHEET 03)
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR C/C RAMP UP LINE
43 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11101 D GFC 30.05.2022
CH 66010 TO 66040M
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR C/C RAMP UP LINE
44 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11102 D GFC 30.05.2022
CH 66040 TO 66070M
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR C/C RAMP UP LINE
45 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11103 D GFC
CH 66070 TO 66100M
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR C/C RAMP UP LINE
46 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11104 D GFC
CH 66100 TO 66130M
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR C/C RAMP UP LINE
47 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11105 D GFC
CH 66130 TO 66160M
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR C/C RAMP UP LINE
48 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11106 D GFC
CH 66160 TO 66190M
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR C/C RAMP UP LINE
49 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11107 D GFC
CH 66210 TO 66254M
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR C/C RAMP UP LINE
50 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11108 D GFC
CH 66190 TO 66210M
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR SUMP AREA (SHEET
51 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11109 C GFC
01 OF 02)
CUT & COVER SOUTH END REINFORCEMENT DETAIL FOR SUMP AREA (SHEET
52 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11110 C GFC
02 OF 02)

53 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11122 D REINFORCEMENT DETAIL FOR CH 66254.800 TO 66305M GFC

54 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11123 D REINFORCEMENT DETAIL FOR CH 66305 TO 66326.5M & 66332.5 TO 66354M GFC

55 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11124 D REINFORCEMENT DETAIL FOR CH 66326.5M TO 66332.5M GFC

56 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11125 D REINFORCEMENT DETAIL FOR CH 66354M TO 66380M GFC

REINFORCEMENT DETAIL FOR UP CH 66431.040M TO 66519.383M & 66430M TO


57 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11126 D GFC
66579.463M

58 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11127 D REINFORCEMENT DETAIL FOR UP CH 66519.383M & DN CH 66579.463M GFC

59 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11128 C CUT AND COVER SOUTH END D-WALL R/F FOR PANELS AT DARGAH LOCATION GFC

60 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11129 C CUT AND COVER SOUTH END D-WALL R/F FOR PANELS AT DARGAH LOCATION GFC

61 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11130 C CUT AND COVER SOUTH END D-WALL R/F FOR PANELS AT TEMPLE LOCATION GFC

62 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11131 C CUT AND COVER SOUTH END D-WALL R/F FOR PANELS AT TEMPLE LOCATION GFC

CUT END COVER SOUTH END PART PLAN SHOWING REINFORCEMENT DETAIL
63 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11132 B GFC
FOR CH 66380 TO 66431.04M (SHEET 01 OF 02)
PART PLAN SHOWING REINFORCEMENT DETAIL FOR CH 66380 TO 66431.04
64 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11133 B GFC
(SHEET 02 OF 02)
CUT & COVER SOUTH END PART PLAN SHOWING R/F DETAIL FOR CH 66277.50
65 NCRTC-DM099-AIL-CCS- RFT-M2-ST- 11134 B GFC
TO 66290M

66 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11032 B SOLDIER PILE LAYOUT FROM UP LINE CH 66080 TO CH 66170 GFC

CUT & COVER SOUTH BOX TUNNEL & RAMP SOLDIER PILE LAYOUT FROM UP
67 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11033 B GFC
LINE CH 66170 TO CH 66580 (SHEEET 01 OF 03)
CUT & COVER SOUTH BOX TUNNEL & RAMP SOLDIER PILE LAYOUT FROM UP
68 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11034 A GFC
LINE CH 66170 TO CH 66580 (SHEEET 02 OF 03)
CUT & COVER SOUTH BOX TUNNEL & RAMP SOLDIER PILE LAYOUT FROM UP
69 NCRTC-DM099-AIL-CCS- TMP-M2-ST- 11035 B GFC
LINE CH 66170 TO CH 66580 (SHEEET 03 OF 03)
NCRTC PACKAGE 8 THREE MONTH ROLLING PROGRAMME Page 1 of 8
(MAY'23 - JUL'23)
Activity ID Activity Name Planned BL1 Start BL1 Finish Start Finish 2023
Duration May Jun Jul

NCRTC8_DWP_R3 3M M-J-1 Detailed Program NCRTC 08 2041 06-Jan-21 08-Aug-24 05-Jan-21 A 30-Mar-26

NCRTC8_DWP_R3 3M M-J-1.PD Project Duration 1909 06-Jan-21 08-Aug-24 06-Jan-21 A 30-Mar-26


PD.010 Project Duration 1909 06-Jan-21 08-Aug-24 06-Jan-21 A 30-Mar-26
NCRTC8_DWP_R3 3M M-J-1.KD Key Dates 0 06-Apr-22 06-Apr-22 10-Jul-23 10-Jul-23

KD.009 Start of Initial drive for TBM-4 0 06-Apr-22 10-Jul-23* Start of Initial drive for TBM-4, 10-Jul-23*

NCRTC8_DWP_R3 3M M-J-1.PKD Planned Key Dates 0 06-Apr-22 06-Apr-22 10-Jul-23 10-Jul-23

KD.0090 Start of Initial drive for TBM-4 0 06-Apr-22 10-Jul-23* Start of Initial drive for TBM-4, 10-Jul-23*

NCRTC8_DWP_R3 3M M-J-1.EO Employers Obligation 164 05-Aug-21 22-Jun-23 08-Oct-21 A 24-Nov-23

NCRTC8_DWP_R3 3M M-J-1.EO.DAPP Design Approval 164 05-Aug-21 22-Jun-23 08-Oct-21 A 24-Nov-23


NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA Definitive Design Approval 134 05-Aug-21 20-May-23 13-Oct-21 A 29-Oct-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.BPS Begumpul Station 134 30-Aug-22 12-Jan-23 17-Dec-21 A 11-Sep-23
BPS.DDA.1130 Approval of E&M works Drawings 21 30-Aug-22 20-Sep-22 09-Jan-22 A 11-Sep-23
BPS.DDA.1132 Approval of SEM Drawings 21 22-Dec-22 12-Jan-23 23-May-22 A 01-Sep-23
BPS.DDA.1140 Approval of Architectural Works Drawings 21 30-Aug-22 20-Sep-22 17-Dec-21 A 31-Aug-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.MCS Meerut Central Station 44 02-Nov-21 04-Mar-22 13-Oct-21 A 29-Oct-23
MCS.DDA.1130 Approval of Entry /Exit Structures Drawings 21 02-Nov-21 22-Nov-21 13-Oct-21 A 08-Aug-23
MCS.DDA.1140 Approval of Ancillary Structures Drawings 21 11-Feb-22 04-Mar-22 12-Dec-21 A 29-Oct-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.T Tunneling works 93 05-Aug-21 04-Mar-23 25-Apr-23 26-Jul-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.T.TBM1&2 TBM1&2 - Bhaisali Station LS 1 to Meerut Central Station 21 18-Jan-23 07-Feb-23 06-Jul-23 26-Jul-23
TBM1&2.DDA.1060 Approval of Architecture Elements Drawings 21 18-Jan-23 07-Feb-23 06-Jul-23 26-Jul-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.T.TBM374.NCC-BPS TBM3&4- North C&C to Begumpul Station 21 07-Jan-23 28-Jan-23 06-Jul-23 26-Jul-23
TBM3&4_1.DDA.1060 Approval of Architecture Elements Drawings 21 07-Jan-23 28-Jan-23 06-Jul-23 26-Jul-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.T.TBM3&4.BS-BPS TBM 3&4- Bhaisali to Begumpul 93 05-Aug-21 04-Mar-23 25-Apr-23 26-Jul-23
TBM3&4_2.DDA.1000 Approval of I&M Drawings 21 05-Aug-21 25-Aug-21 25-Apr-23 15-May-23
TBM3&4_2.DDA.1060 Approval of Architecture Elements Drawings 21 11-Feb-23 04-Mar-23 06-Jul-23 26-Jul-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.SCC South Cut & Cover and Ramp 54 01-Mar-23 20-May-23 25-Apr-23 17-Jun-23
SCC.DDA.1060 Approval of E&M Drawings 21 01-Mar-23 22-Mar-23 25-Apr-23 15-May-23
SCC.DDA.1061 Approval of CSD 21 29-Apr-23 20-May-23 28-May-23 17-Jun-23
SCC.DDA.1070 Approval of Architecture Drawings 21 01-Mar-23 22-Mar-23 25-Apr-23 15-May-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.NCC North Cut and Cover Ramp 63 21-Feb-23 20-May-23 25-Apr-23 26-Jun-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.NCC.LS3 Launching Shaft 2 63 01-Mar-23 20-May-23 25-Apr-23 26-Jun-23
LS2.DDA.1240 Approval of E&M Drawings 21 01-Mar-23 22-Mar-23 25-Apr-23 15-May-23
LS2.DDA.1241 Approval of CSD 21 29-Apr-23 20-May-23 06-Jun-23 26-Jun-23
LS2.DDA.1250 Approval of Architecture Elements Drawings 21 01-Mar-23 22-Mar-23 25-Apr-23 15-May-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.DDA.NCC.NCC&R North Cut & Cover and Ramp 63 21-Feb-23 18-May-23 25-Apr-23 26-Jun-23
NCC.DDA.1060 Approval of E&M Drawings 21 21-Feb-23 14-Mar-23 25-Apr-23 15-May-23
NCC.DDA.1061 Approval of CSD 21 27-Apr-23 18-May-23 06-Jun-23 26-Jun-23
NCC.DDA.1070 Approval of Architecture Drawings 21 21-Feb-23 14-Mar-23 25-Apr-23 15-May-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA Construction Reference Drawings Approval 131 07-Sep-21 22-Jun-23 08-Oct-21 A 24-Nov-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA.BPS Begumpul Station 131 01-Oct-22 14-Feb-23 17-Dec-21 A 29-Sep-23
BPS.CRDA.1130 Construction Reference Drawing Approval for E&M works Drawings 21 01-Oct-22 22-Oct-22 09-Feb-22 A 29-Sep-23
BPS.CRDA.1132 Construction Reference Drawing Approval for SEM Drawings 21 24-Jan-23 14-Feb-23 25-Aug-22 A 06-Sep-23
BPS.CRDA.1140 Construction Reference Drawing Approval for Architectural Works Drawings 21 01-Oct-22 22-Oct-22 17-Dec-21 A 03-Sep-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA.MCS Meerut Central Station 43 04-Dec-21 06-Apr-22 08-Oct-21 A 24-Nov-23
MCS.CRDA.1130 Construction Reference Drawing Approval for Entry /Exit Structures Drawings 21 04-Dec-21 24-Dec-21 13-Dec-21 A 06-Sep-23
MCS.CRDA.1140 Construction Reference Drawing Approval for Ancillary Structures Drawings 21 16-Mar-22 06-Apr-22 08-Oct-21 A 24-Nov-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA.T Tunneling works 21 07-Sep-21 27-Sep-21 25-May-23 14-Jun-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA.T.TBM3&4.BS-BPS TBM 3&4- Bhaisali to Begumpul 21 07-Sep-21 27-Sep-21 25-May-23 14-Jun-23
TBM3&4_2.CRDA.1000Construction Reference Drawing Approval for I&M Drawings 21 07-Sep-21 27-Sep-21 25-May-23 14-Jun-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA.SCC South Cut & Cover and Ramp 62 03-Apr-23 22-Jun-23 21-May-23 21-Jul-23
SCC.CRDA.1060 Construction Reference Drawing Approval for E&M Drawings 21 03-Apr-23 24-Apr-23 21-May-23 10-Jun-23
SCC.CRDA.1061 Construction Reference Drawing Approval for CSD 21 01-Jun-23 22-Jun-23 01-Jul-23 21-Jul-23
SCC.CRDA.1070 Construction Reference Drawing Approval for Architecture Drawings 21 03-Apr-23 24-Apr-23 21-May-23 10-Jun-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA.NCC North Cut and Cover Ramp 70 25-Mar-23 22-Jun-23 21-May-23 29-Jul-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA.NCC.LS3 Launching Shaft 2 70 03-Apr-23 22-Jun-23 21-May-23 29-Jul-23
LS2.CRDA.1040 Construction Reference Drawing Approval for E&M Drawings 21 03-Apr-23 24-Apr-23 21-May-23 10-Jun-23
LS2.CRDA.1041 Construction Reference Drawing Approval for CSD 21 01-Jun-23 22-Jun-23 09-Jul-23 29-Jul-23
LS2.CRDA.1050 Construction Reference Drawing Approval for Architecture Elements Drawings 21 03-Apr-23 24-Apr-23 21-May-23 10-Jun-23
NCRTC8_DWP_R3 3M M-J-1.EO.DAPP.CRDA.NCC.NCC&R North Cut & Cover and Ramp 70 25-Mar-23 20-Jun-23 21-May-23 29-Jul-23

Actual Level of Effort Remaining Work Miles... Date Revision Checked Approved
EMPLOYER CONTRACTOR 01-Jun-23 3 Month Rolling ...
Actual Work Critical Remaining Work sum...
NCRTC AFCONS
NCRTC PACKAGE 8 THREE MONTH ROLLING PROGRAMME Page 2 of 8
(MAY'23 - JUL'23)
Activity ID Activity Name Planned BL1 Start BL1 Finish Start Finish 2023
Duration May Jun Jul
NCC.CRDA.1060 Construction Reference Drawing Approval for E&M Drawings 21 25-Mar-23 15-Apr-23 21-May-23 10-Jun-23
NCC.CRDA.1061 Construction Reference Drawing Approval for CSD 21 30-May-23 20-Jun-23 09-Jul-23 29-Jul-23
NCC.CRDA.1070 Construction Reference Drawing Approval for Architecture Drawings 21 25-Mar-23 15-Apr-23 21-May-23 10-Jun-23
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB General 2041 06-Jan-21 08-Aug-24 05-Jan-21 A 18-Jan-26

NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.Sub Submissions 1351 06-Jan-21 08-Aug-24 06-Jan-21 A 25-Jun-24


Sub.1020 Audits & all other Submissions as per contract requirement 1311 06-Jan-21 08-Aug-24 06-Jan-21 A 25-Jun-24
Sub.1030 As built Records 120 10-Apr-24 08-Aug-24 13-Dec-22 A 13-Jun-24
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.Safety SHE Requirements 1296 06-Jan-21 08-Aug-24 05-Jan-21 A 20-Jun-24
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.Safety.EQ Environment Awareness Programme 1 05-Jun-23 05-Jun-23 05-Jun-23 05-Jun-23
SR.AA.1020 Environment Awareness Programme for Year 2023 1 05-Jun-23 05-Jun-23 05-Jun-23 05-Jun-23
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.Safety.QE Quaterly External HSE Audit 1296 06-Jan-21 08-Aug-24 05-Jan-21 A 20-Jun-24
SR.QA.1000 Quaterly External HSE Audit 1296 06-Jan-21 08-Aug-24 05-Jan-21 A 20-Jun-24
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.Software Provision of Software 757 23-Feb-21 03-Apr-23 15-Apr-21 A 07-Aug-23
PS.1000 Providing and training of software 757 23-Feb-21 03-Apr-23 15-Apr-21 A 07-Aug-23
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM Preliminary work and Mobilisation 1755 22-Aug-21 07-Aug-24 20-Oct-21 A 18-Jan-26
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.ME Mobilisation of Major Equipment 60 02-Dec-21 30-Jan-22 04-May-23 02-Jul-23
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.ME.MET Mobilisation of Equipment for Tunnel 60 02-Dec-21 30-Jan-22 04-May-23 02-Jul-23
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.ME.MET.MTBM4 Mobilisation of TBM4 60 02-Dec-21 30-Jan-22 04-May-23 02-Jul-23
PTBM41020 Factory Testing of TBM 20 02-Dec-21 21-Dec-21 04-May-23 23-May-23
PTBM41030 Arrival of TBM at site 40 22-Dec-21 30-Jan-22 24-May-23 02-Jul-23
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.MEP Procurement of Major MEP Materials 1059 22-Aug-21 17-May-24 15-Nov-22 A 18-Jan-26
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.MEP.Ele Procurement of Major Electrical Materials 1028 22-Aug-21 17-May-24 15-Nov-22 A 05-May-25
P.MEM.1000 Procurement of LV Main Switch Boards, Sub main Switch Boards and other Electrical Panels
1000 22-Aug-21 17-May-24 11-Feb-23 A 25-Oct-24
P.MEM.1010 Procurement of Distribution Boards 1000 22-Aug-21 17-May-24 20-Feb-23 A 14-Dec-24
P.MEM.1020 Procurement of Cables, Cable Trays & Other Materials 1000 22-Aug-21 17-May-24 15-Nov-22 A 02-Mar-25
P.MEM.1030 Procurement of Wiring & Accesories 1000 22-Aug-21 17-May-24 13-Jan-23 A 02-Mar-25
P.MEM.1040 Procurement of Un-Interrupted Power Supply System 1000 22-Aug-21 17-May-24 10-Jan-23 A 05-May-25
P.MEM.1050 Procurement of Silent DG's with Related Accessories 1000 22-Aug-21 17-May-24 10-Jan-23 A 05-May-25
P.MEM.1060 Procurement of Lighting Materials 1000 22-Aug-21 17-May-24 15-Feb-23 A 16-Apr-25
P.MEM.1070 Procurement of Earthing Related Materials, Bus Duct Etc.. 1000 22-Aug-21 17-May-24 09-Jan-23 A 30-Dec-23
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.MEP.Plu Procurement of Major Plumbing Materials 1000 22-Aug-21 17-May-24 25-Apr-23 18-Jan-26
P.MPM.1000 Procurement of Pumps for Firefighting, Water Supply, Crosspassage, Sewage Etc. 1000 22-Aug-21 17-May-24 25-Apr-23 18-Jan-26
P.MPM.1010 Procurement of Pipes & Assesories for Water Supply, Sewage, Drainage system 1000 22-Aug-21 17-May-24 25-Apr-23 18-Jan-26
P.MPM.1020 Procurement of Sanitary Fittings 1000 22-Aug-21 17-May-24 25-Apr-23 18-Jan-26
P.MPM.1030 Procurement of Pipes & Materials for Rain water Harvesting System 1000 22-Aug-21 17-May-24 25-Apr-23 18-Jan-26
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.MEP.Fire Procurement of Major Fire Fighting Materials 1059 22-Aug-21 17-May-24 30-Dec-22 A 18-Jan-26
P.MFM.1000 Procurement of Pipe Line for Fire Fighting System 1000 22-Aug-21 17-May-24 30-Dec-22 A 12-Jan-24
P.MFM.1010 Procurement of Pipe Line Assesories for Fire Fighting System 1000 22-Aug-21 17-May-24 30-Dec-22 A 12-Jan-24
P.MFM.1020 Procurement of Fire Hydrants 1000 22-Aug-21 17-May-24 04-Feb-23 A 29-Jan-25
P.MFM.1030 Procurement of Fire Sprinklers, Fire Alarm, Smoke Detectors etc. 1000 22-Aug-21 17-May-24 04-Feb-23 A 29-Jan-25
P.MFM.1040 Procurement of Gas Suppression System 1000 22-Aug-21 17-May-24 25-Apr-23 18-Jan-26
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.Arch Procurement of Major Architectural Materials 400 22-Mar-23 25-Apr-24 08-Feb-23 A 14-Sep-24
P.MAM.1000 Procurement of Flooring & Wall Finishing Materials 400 22-Mar-23 25-Apr-24 08-Feb-23 A 14-Sep-24
P.MAM.1010 Procurement of Paints 400 22-Mar-23 25-Apr-24 08-Feb-23 A 25-Aug-24
P.MAM.1020 Procurement of Glazing, Hand rails Etc. 400 22-Mar-23 25-Apr-24 08-Feb-23 A 14-Sep-24
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.BCS Building Condition Survey & Monitoring 1456 04-Oct-21 07-Aug-24 20-Oct-21 A 21-Nov-24
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.BCS.BSCM Building Condition Monitoring 1456 04-Oct-21 07-Aug-24 20-Oct-21 A 21-Nov-24
NCRTC8_DWP_R3 3M M-J-1.GEN.SUB.PWM.BCS.BSCM.RBCS Report for Building Condition Monitoring 1456 04-Oct-21 07-Aug-24 20-Oct-21 A 21-Nov-24
RBCM.010 Report of Building Condition Monitoring 700 04-Oct-21 01-Feb-24 20-Oct-21 A 23-Mar-24
RBCM.020 Rectifications work if any 820 10-Nov-21 07-Aug-24 10-Jun-22 A 21-Nov-24
NCRTC8_DWP_R3 3M M-J-1.D.MS Design & Method Statement 165 28-Jul-21 01-Jun-23 21-Nov-21 A 07-Nov-23

NCRTC8_DWP_R3 3M M-J-1.D.MS.DS Design Submissions 165 28-Jul-21 01-Jun-23 21-Nov-21 A 07-Nov-23


NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.DDS Definitive Design Submission 129 28-Jul-21 11-Apr-23 26-Nov-21 A 26-Oct-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.DDS.MCS Meerut Central Station 129 28-Jul-21 11-Feb-22 26-Nov-21 A 26-Oct-23
MCS.DDS.1130 Preparation and Submission of Entry /Exit Structures Drawings 80 28-Jul-21 01-Nov-21 25-Apr-23 28-Jul-23
MCS.DDS.1140 Preparation and Submission of Ancillary Structures Drawings 60 02-Dec-21 11-Feb-22 26-Nov-21 A 26-Oct-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.DDS.T Tunneling works 80 29-Oct-22 11-Apr-23 21-Dec-22 A 02-Sep-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.DDS.T.TBM1&2 TBM1&2 - Bhaisali Station LS 1 to Meerut Central Station 64 09-Nov-22 11-Mar-23 21-Dec-22 A 28-Aug-23
TBM1&2.DDS.1050 Preparation and Submission of E&M Drawings 60 31-Dec-22 11-Mar-23 21-Dec-22 A 28-Aug-23
TBM1&2.DDS.1060 Preparation and Submission of Architecture Elements Drawings 60 09-Nov-22 17-Jan-23 25-Apr-23 05-Jul-23

Actual Level of Effort Remaining Work Miles... Date Revision Checked Approved
EMPLOYER CONTRACTOR 01-Jun-23 3 Month Rolling ...
Actual Work Critical Remaining Work sum...
NCRTC AFCONS
NCRTC PACKAGE 8 THREE MONTH ROLLING PROGRAMME Page 3 of 8
(MAY'23 - JUL'23)
Activity ID Activity Name Planned BL1 Start BL1 Finish Start Finish 2023
Duration May Jun Jul
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.DDS.T.TBM374.NCC-BPS TBM3&4- North C&C to Begumpul Station 79 29-Oct-22 13-Feb-23 21-Dec-22 A 09-Aug-23
TBM3&4_1.DDS.1050 Preparation and Submission of E&M Drawings 60 03-Dec-22 13-Feb-23 21-Dec-22 A 09-Aug-23
TBM3&4_1.DDS.1060 Preparation and Submission of Architecture Elements Drawings 60 29-Oct-22 07-Jan-23 25-Apr-23 05-Jul-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.DDS.T.TBM3&4.BS-BPS TBM 3&4- Bhaisali to Begumpul 61 02-Dec-22 11-Apr-23 21-Dec-22 A 02-Sep-23
TBM3&4_2.DDS.1050 Preparation and Submission of E&M Drawings 60 31-Jan-23 11-Apr-23 21-Dec-22 A 02-Sep-23
TBM3&4_2.DDS.1060 Preparation and Submission of Architecture Elements Drawings 60 02-Dec-22 11-Feb-23 25-Apr-23 05-Jul-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.CRDS Construction Reference Drawings Submission 145 23-Nov-21 01-Jun-23 21-Nov-21 A 07-Nov-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.CRDS.BPS Begumpul Station 131 20-Sep-22 24-Jan-23 21-Nov-21 A 20-Sep-23
BPS.CRDS.1130 Preparation and Submission of E&M works Drawings 10 20-Sep-22 01-Oct-22 08-Feb-22 A 12-Sep-23
BPS.CRDS.1131 Preparation and Submission of CSD 10 12-Jan-23 24-Jan-23 07-Nov-22 A 20-Sep-23
BPS.CRDS.1132 Preparation and Submission of SEM Drawings 10 12-Jan-23 24-Jan-23 24-Aug-22 A 02-Sep-23
BPS.CRDS.1140 Preparation and Submission of Architectural Works Drawings 10 20-Sep-22 01-Oct-22 21-Nov-21 A 01-Sep-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.CRDS.MCS Meerut Central Station 68 23-Nov-21 16-Mar-22 12-Dec-21 A 07-Nov-23
MCS.CRDS.1130 Preparation and Submission of Entry /Exit Structures Drawings 10 23-Nov-21 03-Dec-21 12-Dec-21 A 18-Aug-23
MCS.CRDS.1140 Preparation and Submission of Ancillary Structures Drawings 10 04-Mar-22 16-Mar-22 12-Dec-21 A 07-Nov-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.CRDS.SCC South Cut & Cover and Ramp 10 20-May-23 01-Jun-23 19-Jun-23 30-Jun-23
SCC.CRDS.1061 Preparation and Submission of CSD 10 20-May-23 01-Jun-23 19-Jun-23 30-Jun-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.CRDS.NCC North Cut and Cover Ramp 10 18-May-23 01-Jun-23 27-Jun-23 08-Jul-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.CRDS.NCC.LS3 Launching Shaft 2 10 20-May-23 01-Jun-23 27-Jun-23 08-Jul-23
LS2.CRDS.1901 Preaparation and Submission of CSD 10 20-May-23 01-Jun-23 27-Jun-23 08-Jul-23
NCRTC8_DWP_R3 3M M-J-1.D.MS.DS.CRDS.NCC.NCC&R North Cut & Cover and Ramp 10 18-May-23 30-May-23 27-Jun-23 08-Jul-23
NCC.CRDS.1061 Preaparation and Submission of CSD 10 18-May-23 30-May-23 27-Jun-23 08-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS Construction 634 02-Feb-22 31-May-24 21-Nov-21 A 01-Nov-24

NCRTC8_DWP_R3 3M M-J-1.CONS.SC Station Construction 380 12-Feb-22 11-Aug-23 02-Aug-22 A 19-Jun-24


NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS Meerut Central Station 305 21-Jun-22 11-Aug-23 25-Nov-22 A 04-Jun-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS Main Station Box Top Down Construction 88 21-Jun-22 13-Jan-23 07-Apr-23 A 07-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2 Phase 2 88 21-Jun-22 13-Jan-23 07-Apr-23 A 07-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.BS Construction of Base Slab 45 24-Sep-22 24-Nov-22 03-Jun-23 03-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.BS.BS1 Casting of Base Slab 45 24-Sep-22 24-Nov-22 03-Jun-23 03-Aug-23
MSC.BS.CW.1030Grid 6-7.5 15 24-Sep-22 12-Oct-22 03-Jun-23 23-Jun-23
MSC.BS.CW.1040Grid 7.5-9 15 20-Oct-22 07-Nov-22 26-Jun-23 17-Jul-23
MSC.BS.CW.1050Grid 9-10.5 15 08-Nov-22 24-Nov-22 18-Jul-23 03-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.PS Platform Slab 42 18-Aug-22 05-Jan-23 03-Jun-23 31-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.PS.EX Construction of UPE wall 37 18-Aug-22 08-Nov-22 03-Jun-23 25-Jul-23
MCS.CS.UPE.1000
Grid 1-2.5 8 18-Aug-22 26-Aug-22 03-Jun-23 12-Jun-23
MCS.CS.UPE.1010
Grid 2.5-4 8 12-Sep-22 20-Sep-22 13-Jun-23 26-Jun-23
MCS.CS.UPE.1020
Grid 4-6 8 06-Oct-22 14-Oct-22 28-Jun-23 10-Jul-23
MCS.CS.UPE.1030
Grid 6-7.5 8 31-Oct-22 08-Nov-22 17-Jul-23 25-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.PS.BS1 Casting of Platform Slab 35 02-Sep-22 05-Jan-23 12-Jun-23 31-Jul-23
MCS.CS.PF.1000Grid 1-2.5 12 02-Sep-22 15-Sep-22 13-Jun-23 05-Jul-23
MCS.CS.PF.1010Grid 2.5-4 12 30-Sep-22 14-Oct-22 18-Jul-23 31-Jul-23
MCS.CS.PF.1070Grid 12-14.5 12 23-Dec-22 05-Jan-23 12-Jun-23 03-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.COL Column Casting 82 21-Jun-22 05-Jan-23 07-Apr-23 A 07-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.COL.CsL Casting of Column at Concourse to Roof 36 21-Jun-22 07-Sep-22 03-Jun-23 24-Jul-23
MCS.Col.1015 Grid 2.5-4 Part II 12 21-Jun-22 04-Jul-22 03-Jun-23 17-Jun-23
MCS.Col.1020 Grid 4-6 12 05-Jul-22 20-Jul-22 19-Jun-23 10-Jul-23
MCS.Col.1030 Grid 6-7.5 12 22-Jul-22 05-Aug-22 11-Jul-23 24-Jul-23
MCS.Col.1070 Grid 12-14.5 6 01-Sep-22 07-Sep-22 19-Jun-23 30-Jun-23
MCS.Col.1080 Grid 14.5-16.5 12 17-Aug-22 30-Aug-22 03-Jun-23 17-Jun-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.COL.Col. Bsl Casting of Column at Base Slab to Concourse
53 31-Oct-22
Slab 05-Jan-23 07-Apr-23 A 07-Aug-23
MCS.Col.1150 Grid 6-7.5 12 31-Oct-22 12-Nov-22 17-Jul-23 29-Jul-23
MCS.Col.1180 Grid 10.5-12 6 30-Dec-22 05-Jan-23 07-Apr-23 A 07-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.CO Closing of Opening 25 30-Sep-22 13-Jan-23 27-May-23 03-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.CO.CL Grid 2-3 14 30-Sep-22 17-Oct-22 08-Jun-23 03-Jul-23
MSC.CO.1000 Concourse Level 7 30-Sep-22 08-Oct-22 08-Jun-23 17-Jun-23
MSC.CO.1010 Roof Level 7 10-Oct-22 17-Oct-22 19-Jun-23 03-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.CO.3 Grid 20-22 ( Retrival Shaft) 14 29-Dec-22 13-Jan-23 27-May-23 12-Jun-23
MSC.CO.1100 Concourse Level 7 29-Dec-22 05-Jan-23 27-May-23 03-Jun-23
MSC.CO.1110 Roof Level 7 06-Jan-23 13-Jan-23 05-Jun-23 12-Jun-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.MS.P2.CO.4 Grid 22-24 ( Retrival Shaft) 14 27-Dec-22 11-Jan-23 06-Jun-23 26-Jun-23

Actual Level of Effort Remaining Work Miles... Date Revision Checked Approved
EMPLOYER CONTRACTOR 01-Jun-23 3 Month Rolling ...
Actual Work Critical Remaining Work sum...
NCRTC AFCONS
NCRTC PACKAGE 8 THREE MONTH ROLLING PROGRAMME Page 4 of 8
(MAY'23 - JUL'23)
Activity ID Activity Name Planned BL1 Start BL1 Finish Start Finish 2023
Duration May Jun Jul
MSC.CO.1120 Concourse Level 7 27-Dec-22 03-Jan-23 06-Jun-23 13-Jun-23
MSC.CO.1130 Roof Level 7 04-Jan-23 11-Jan-23 14-Jun-23 26-Jun-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.IS Internal Structures 287 10-Sep-22 11-Aug-23 25-Nov-22 A 04-Jun-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.IS.G1 Group 1 upto Degree 3 151 10-Sep-22 22-Feb-23 25-Nov-22 A 26-Dec-23
MCS.G1.1000 Platform Level 110 15-Oct-22 22-Feb-23 27-Mar-23 A 26-Dec-23
MCS.G1.1010 Concourse Level 135 10-Sep-22 18-Feb-23 25-Nov-22 A 05-Dec-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.IS.STA Station Track Area 10 24-May-23 03-Jun-23 10-Apr-23 A 16-Feb-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.IS.STA.DL Downline Track 10 24-May-23 03-Jun-23 10-Apr-23 A 16-Feb-24
MSC.TA.DL.1020 1st Stage Concrete 10 24-May-23 03-Jun-23 10-Apr-23 A 16-Feb-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.IS.G21 Group 2/Other rooms upto Degree 3 7 04-Aug-23 11-Aug-23 15-Feb-23 A 04-Jun-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.MCS.IS.G21.18 DB Room 7 04-Aug-23 11-Aug-23 15-Feb-23 A 04-Jun-24
MCS.R.G2.13.1000 Blockwork 7 04-Aug-23 11-Aug-23 15-Feb-23 A 04-Jun-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS Begumpul Station 348 12-Feb-22 02-Jun-23 11-Nov-22 A 10-Feb-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB Main Station BoxTop Down Construction 76 13-Aug-22 12-Dec-22 29-Apr-23 07-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.CRS111 Construction of Base Slab 40 19-Aug-22 10-Oct-22 10-May-23 05-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.CRS111.PCC.CE Area Dressing, PCC, Coupl er Exposing 20 19-Aug-22 21-Sep-22 10-May-23 02-Jun-23
BPS.BS.PCC.CE1020
Grid 4-5 10 19-Aug-22 30-Aug-22 10-May-23 22-May-23
BPS.BS.PCC.CE1030
Grid 5-6 10 10-Sep-22 21-Sep-22 22-May-23 02-Jun-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.CRS111.CRS Casting of Base Slab 30 01-Sep-22 10-Oct-22 22-May-23 05-Jul-23
BPS.RS.BS.Cs.1020Grid 4-5 15 01-Sep-22 17-Sep-22 22-May-23 08-Jun-23
BPS.RS.BS.Cs.1030Grid 5-6 15 22-Sep-22 10-Oct-22 08-Jun-23 05-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.CC Construction of Column 68 13-Aug-22 12-Dec-22 29-Apr-23 28-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.CC.C Construction of Column Base to Concourse slab 60 15-Sep-22 12-Dec-22 10-May-23 28-Jul-23
BPS.BS.CC.1010 Construction of Column BS-CS in Grid 2.5-4 6 15-Sep-22 21-Sep-22 10-May-23 17-May-23
BPS.BS.CC.1020 Construction of Column BS-CS in Grid 4-5 12 27-Sep-22 11-Oct-22 17-Jun-23 10-Jul-23
BPS.BS.CC.1030 Construction of Column BS-CS in Grid 5-6 6 28-Oct-22 03-Nov-22 21-Jul-23 28-Jul-23
BPS.BS.CC.1040 Construction of Column BS-CS in Grid 6-7 6 18-Nov-22 24-Nov-22 05-Jul-23 12-Jul-23
BPS.BS.CC.1050 Construction of Column BS-CS in Grid 7-8 6 06-Dec-22 12-Dec-22 05-Jul-23 12-Jul-23
BPS.BS.CC.1070 Construction of Column BS-CS in Grid 9-10.5 12 22-Oct-22 05-Nov-22 12-May-23 25-May-23
BPS.BS.CC.1080 Construction of Column BS-CS in Grid 10.5-12 6 04-Oct-22 11-Oct-22 24-May-23 30-May-23
BPS.BS.CC.1090 Construction of Column BS-CS in Grid 12-13 6 16-Sep-22 22-Sep-22 23-May-23 30-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.CC.C1 Construction of Column Concourse to Mezzanine slab36
slab 13-Aug-22 11-Oct-22 10-May-23 26-Jun-23
BPS.CS.CC.1010 Construction of Column CS-MS in Grid 2.5-4 6 13-Aug-22 20-Aug-22 10-May-23 17-May-23
BPS.CS.CC.1020 Construction of Column CS-MS in Grid 4-5 12 22-Aug-22 05-Sep-22 17-May-23 31-May-23
BPS.CS.CC.1030 Construction of Column CS-MS in Grid 5-6 6 06-Sep-22 12-Sep-22 31-May-23 07-Jun-23
BPS.CS.CC.1040 Construction of Column CS-MS in Grid 6-7 6 13-Sep-22 19-Sep-22 07-Jun-23 14-Jun-23
BPS.CS.CC.1050 Construction of Column CS-MS in Grid 7-8 6 20-Sep-22 26-Sep-22 14-Jun-23 26-Jun-23
BPS.CS.CC.1060 Construction of Column CS-MS in Grid 8-9 6 04-Oct-22 11-Oct-22 07-Jun-23 14-Jun-23
BPS.CS.CC.1070 Construction of Column CS-MS in Grid 9-10.5 12 20-Sep-22 03-Oct-22 24-May-23 07-Jun-23
BPS.CS.CC.1080 Construction of Column CS-MS in Grid 10.5-12 6 13-Sep-22 19-Sep-22 17-May-23 24-May-23
BPS.CS.CC.1090 Construction of Column CS-MS in Grid 12-13 6 06-Sep-22 12-Sep-22 10-May-23 17-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.CC.C11 Construction of Column Mezzanine to Roof slab 44 13-Aug-22 18-Oct-22 29-Apr-23 26-Jun-23
BPS.MS.CC.1010 Construction of Column MS-RS in Grid 2.5-4 6 13-Aug-22 20-Aug-22 10-May-23 17-May-23
BPS.MS.CC.1020 Construction of Column MS-RS in Grid 4-5 12 22-Aug-22 05-Sep-22 17-May-23 31-May-23
BPS.MS.CC.1030 Construction of Column MS-RS in Grid 5-6 6 06-Sep-22 12-Sep-22 31-May-23 07-Jun-23
BPS.MS.CC.1040 Construction of Column MS-RS in Grid 6-7 6 13-Sep-22 19-Sep-22 07-Jun-23 14-Jun-23
BPS.MS.CC.1050 Construction of Column MS-RS in Grid 7-8 6 12-Oct-22 18-Oct-22 14-Jun-23 26-Jun-23
BPS.MS.CC.1060 Construction of Column MS-RS in Grid 8-9 6 04-Oct-22 11-Oct-22 29-May-23 05-Jun-23
BPS.MS.CC.1070 Construction of Column MS-RS in Grid 9-10.5 12 20-Sep-22 03-Oct-22 15-May-23 29-May-23
BPS.MS.CC.1080 Construction of Column MS-RS in Grid 10.5-12 6 13-Sep-22 19-Sep-22 08-May-23 15-May-23
BPS.MS.CC.1090 Construction of Column MS-RS in Grid 12-13 6 06-Sep-22 12-Sep-22 29-Apr-23 08-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.PS Construction of Platform Slab 68 01-Sep-22 05-Dec-22 10-May-23 07-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.PS.PW Construction of UPE wall 62 01-Sep-22 05-Nov-22 10-May-23 31-Jul-23
BPS.PS.PW.1010 Construction Platform Wall for Grid 2.5-4 8 15-Sep-22 23-Sep-22 10-May-23 19-May-23
BPS.PS.PW.1020 Construction Platform Wall for Grid 4-5 8 27-Sep-22 06-Oct-22 17-Jun-23 05-Jul-23
BPS.PS.PW.1030 Construction Platform Wall for Grid 5-6 8 28-Oct-22 05-Nov-22 21-Jul-23 31-Jul-23
BPS.PS.PW.1080 Construction Platform Wall for Grid 10.5-12 9 30-Sep-22 11-Oct-22 30-May-23 09-Jun-23
BPS.PS.PW.1090 Construction Platform Wall for Grid 12-13 9 13-Sep-22 22-Sep-22 19-May-23 30-May-23
BPS.PS.PW.1100 Construction Platform Wall for Grid 13-14.5 8 01-Sep-22 09-Sep-22 10-May-23 19-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.MSB.PS.P Construction of Platform Slab 60 10-Sep-22 05-Dec-22 19-May-23 07-Aug-23
BPS.PS.1010 Construction Platform Slab for Grid 2.5-4 12 24-Sep-22 08-Oct-22 19-May-23 02-Jun-23

Actual Level of Effort Remaining Work Miles... Date Revision Checked Approved
EMPLOYER CONTRACTOR 01-Jun-23 3 Month Rolling ...
Actual Work Critical Remaining Work sum...
NCRTC AFCONS
NCRTC PACKAGE 8 THREE MONTH ROLLING PROGRAMME Page 5 of 8
(MAY'23 - JUL'23)
Activity ID Activity Name Planned BL1 Start BL1 Finish Start Finish 2023
Duration May Jun Jul
BPS.PS.1020 Construction Platform Slab for Grid 4-5 12 12-Oct-22 26-Oct-22 10-Jul-23 24-Jul-23
BPS.PS.1060 Construction Platform Slab for Grid 8-9 12 22-Nov-22 05-Dec-22 24-Jul-23 07-Aug-23
BPS.PS.1070 Construction Platform Slab for Grid 9-10.5 12 08-Nov-22 21-Nov-22 10-Jul-23 24-Jul-23
BPS.PS.1080 Construction Platform Slab for Grid 10.5-12 12 12-Oct-22 26-Oct-22 17-Jun-23 10-Jul-23
BPS.PS.1090 Construction Platform Slab for Grid 12-13 12 24-Sep-22 08-Oct-22 02-Jun-23 17-Jun-23
BPS.PS.1100 Construction Platform Slab for Grid 13-14.5 12 10-Sep-22 23-Sep-22 19-May-23 02-Jun-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.BPS.EE Entry Exit 32 21-Mar-22 13-Jul-22 19-Nov-22 A 08-Sep-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.BPS.EE.2 Construction of Entry Exit2 24 21-Mar-22 16-Apr-22 03-Jul-23 01-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.BPS.EE.2.ERS Earth Retaining Structures 24 21-Mar-22 16-Apr-22 03-Jul-23 01-Aug-23
BPS.EE2.1000 Soldier Pile - Part I 12 21-Mar-22 02-Apr-22 03-Jul-23 18-Jul-23
BPS.EE2.4070 Soldier Pile - Part II 12 04-Apr-22 16-Apr-22 18-Jul-23 01-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.BPS.EE.3 Construction of Entry Exit3 19 02-Jun-22 13-Jul-22 19-Nov-22 A 08-Sep-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.BPS.EE.3.ERS Earth Retaining Structures 19 02-Jun-22 13-Jul-22 19-Nov-22 A 08-Sep-23
BPS.EE3.4090 Soldier Pile - Part II 12 02-Jun-22 15-Jun-22 19-Nov-22 A 31-Aug-23
BPS.EE3.4110 Soldier Pile - Part IV 12 30-Jun-22 13-Jul-22 14-Feb-23 A 08-Sep-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.AB Ancillary Building 40 12-Feb-22 31-Mar-22 05-Jun-23 29-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.AB.CSW Civil, E&M and Architecture Works 40 12-Feb-22 31-Mar-22 05-Jun-23 29-Jul-23
BPS.AB.CSW.1010 Excavation for 1st Layer Strut Level- Soil 9 12-Feb-22 23-Feb-22 05-Jun-23 14-Jun-23
BPS.AB.CSW.1020 Fixing of 1st Layer Strut 9 23-Feb-22 05-Mar-22 15-Jun-23 03-Jul-23
BPS.AB.CSW.1030 Excavation for 2nd Layer Strut Level- Soil 15 14-Mar-22 31-Mar-22 13-Jul-23 29-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.IS Internal Structures 348 01-Jul-22 02-Jun-23 11-Nov-22 A 10-Feb-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.IS.G1 Group 1 Rooms- Upto Degree 3 b/w Grid (2.5-14.5) 190 01-Jul-22 20-Feb-23 11-Nov-22 A 12-Dec-23
BPS.G1.1000 Concourse Level 190 01-Jul-22 17-Feb-23 16-Nov-22 A 12-Dec-23
BPS.G1.1020 Mezzanine Level 190 04-Jul-22 20-Feb-23 11-Nov-22 A 12-Dec-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.IS.G11 Group 1 Rooms- Upto Degree 3 b/w Grid (14.5 to 16) 164 02-Sep-22 24-Feb-23 07-Dec-22 A 16-Jan-24
BPS.G1.R2.1000 Platform UPE Wall Construction 8 02-Sep-22 10-Sep-22 10-Jul-23 18-Jul-23
BPS.G1.R2.1010 Platform Slab Construction 12 12-Sep-22 24-Sep-22 19-Jul-23 01-Aug-23
BPS.G1.R2.1060 Rooms at Concourse Level 100 31-Oct-22 24-Feb-23 15-Dec-22 A 16-Jan-24
BPS.G1.R2.1070 Rooms at Mezzanine Level 100 31-Oct-22 24-Feb-23 07-Dec-22 A 16-Jan-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.IS.G111 Group 1 Rooms- Upto Degree 3 b/w Grid (1 to 2.5) 32 25-Apr-23 02-Jun-23 12-Dec-22 A 10-Feb-24
BPS.G1.R3.1402 Rooms at Concourse Level 30 25-Apr-23 31-May-23 20-Dec-22 A 07-Feb-24
BPS.G1.R3.1403 Rooms at Mezzanine Level 25 04-May-23 02-Jun-23 12-Dec-22 A 10-Feb-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS.IS.OTE Installation of OTE Duct 15 12-Nov-22 29-Nov-22 21-Jul-23 08-Aug-23
BPS.OTE.DL.100 Installation of OTE Duct in Down-line Part I 15 12-Nov-22 29-Nov-22 21-Jul-23 08-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1 Bhaisali Station 308 09-May-22 05-Jul-23 02-Aug-22 A 19-Jun-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.LS1 Launching Shaft 01 (Tunneling from Bhaisali Station to Meerut Central
48 27-Sep-22
Station) 05-Dec-22 27-May-23 01-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.LS1.SC Launching Shaft 01Construction 48 27-Sep-22 05-Dec-22 27-May-23 01-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.LS1.SC.B.UP Bottom up Construction 48 27-Sep-22 05-Dec-22 27-May-23 01-Aug-23
LS1.CO.1110 Shaft Ready after TBM Works 1 27-Sep-22 27-Sep-22 27-May-23 27-May-23
LS1.CO.1120 Construction of UPE wall 10 28-Sep-22 10-Oct-22 29-May-23 08-Jun-23
LS1.CO.1145 Construction of Concourse Slab - Reinforcement & Concreting 13 26-Oct-22 09-Nov-22 12-Jun-23 06-Jul-23
LS1.CO.1150 Construction of Column at Concourse Level 10 10-Nov-22 21-Nov-22 06-Jul-23 18-Jul-23
LS1.CO.1160 Construction of Roof Slab - Staging & Shuttering 12 22-Nov-22 05-Dec-22 18-Jul-23 01-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.1 Main Station Box Top down Construction 89 09-May-22 13-Jan-23 27-Apr-23 21-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.1.Platform Cons Platform Construction 78 22-Aug-22 01-Dec-22 27-Apr-23 05-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.1.Platform Cons.PC Platform Sab Construction 78 22-Aug-22 01-Dec-22 27-Apr-23 05-Aug-23
BS.PSC.1020 Grid 5-7 12 22-Aug-22 05-Sep-22 12-May-23 25-May-23
BS.PSC.1030 Grid 7-8.5 12 06-Sep-22 19-Sep-22 26-May-23 08-Jun-23
BS.PSC.1040 Grid 8.5-10 12 29-Sep-22 13-Oct-22 09-Jun-23 28-Jun-23
BS.PSC.1050 Grid 10-11.5 12 18-Oct-22 01-Nov-22 30-Jun-23 15-Jul-23
BS.PSC.1060 Grid 11.5-13.5 12 02-Nov-22 15-Nov-22 17-Jul-23 29-Jul-23
BS.PSC.1070 Grid 13.5-15 12 18-Oct-22 01-Nov-22 15-May-23 29-May-23
BS.PSC.1080 Grid 15-16.5 12 29-Sep-22 13-Oct-22 27-Apr-23 11-May-23
BS.PSC.1110 Grid 21-23 12 18-Nov-22 01-Dec-22 22-Jul-23 05-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.1.1 Column Construction 52 09-May-22 11-Oct-22 27-Apr-23 06-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.1.1.BS-CS Column for Base slab to Concourse Slab 12 27-Sep-22 11-Oct-22 27-Apr-23 11-May-23
BS.Col. BS-CS.1050Grid 10-11.5 12 27-Sep-22 11-Oct-22 27-Apr-23 11-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.1.1.CS-RS Column from Concourse Slab to Roof Slab 48 09-May-22 02-Jul-22 02-May-23 06-Jul-23
BS.Col.CS-BS.1035 Grid 7-8.5 - Part II 12 09-May-22 21-May-22 02-May-23 16-May-23
BS.Col.CS-BS.1040 Grid 8.5-10 12 23-May-22 04-Jun-22 16-May-23 30-May-23
BS.Col.CS-BS.1050 Grid 10-11.5 12 06-Jun-22 18-Jun-22 30-May-23 13-Jun-23

Actual Level of Effort Remaining Work Miles... Date Revision Checked Approved
EMPLOYER CONTRACTOR 01-Jun-23 3 Month Rolling ...
Actual Work Critical Remaining Work sum...
NCRTC AFCONS
NCRTC PACKAGE 8 THREE MONTH ROLLING PROGRAMME Page 6 of 8
(MAY'23 - JUL'23)
Activity ID Activity Name Planned BL1 Start BL1 Finish Start Finish 2023
Duration May Jun Jul
BS.Col.CS-BS.1060 Grid 11.5-13.5 12 20-Jun-22 02-Jul-22 13-Jun-23 06-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.1.CO Closing Of Opening 63 02-Nov-22 13-Jan-23 29-May-23 21-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.1.CO.2 Grid 15-17 63 02-Nov-22 13-Jan-23 29-May-23 21-Aug-23
BS.CO.CL.1040 Concourse Level 28 02-Nov-22 03-Dec-22 29-May-23 10-Jul-23
BS.CO.CL.1050 Roof Level 28 13-Dec-22 13-Jan-23 18-Jul-23 21-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.EE Entry Exit 32 04-Nov-22 18-Jan-23 19-Jun-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.EE.EE1 Construction of Entry Exit 1 & 2 32 04-Nov-22 16-Dec-22 19-Jun-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.EE.EE1.ERS Earth Retaining Structures 10 04-Nov-22 15-Nov-22 19-Jun-23 07-Jul-23
BS.EE1.1220 Soldier Pile - Part III 10 04-Nov-22 15-Nov-22 19-Jun-23 07-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.EE.EE1.BS Base Slab 17 28-Nov-22 16-Dec-22 14-Jul-23 02-Aug-23
BS.EE1.1010 Excavation for 1st Layer Strut Level- Soil 7 28-Nov-22 05-Dec-22 14-Jul-23 21-Jul-23
BS.EE1.1020 Fixing of 1st Layer Strut 10 06-Dec-22 16-Dec-22 22-Jul-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.EE.EE2 Construction of Entry Exit 3 17 30-Dec-22 18-Jan-23 14-Jul-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.EE.EE2.BS Base Slab 17 30-Dec-22 18-Jan-23 14-Jul-23 02-Aug-23
BS.EE3.1010 Excavation for 1st Layer Strut Level- Soil 7 30-Dec-22 06-Jan-23 14-Jul-23 21-Jul-23
BS.EE3.1020 Fixing of 1st Layer Strut 10 07-Jan-23 18-Jan-23 22-Jul-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.AB Ancillary Building 55 25-Nov-22 15-Feb-23 08-Jun-23 22-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.AB.CSW Civil, E&M and Architectural Works 55 25-Nov-22 15-Feb-23 08-Jun-23 22-Aug-23
BS.AB.1100 Pedestals in Utility Gallery 30 25-Nov-22 29-Dec-22 08-Jun-23 22-Jul-23
BS.AB.1110 Fixing of Cable Tray With Bracket in Utility Gallery & Shaft 25 30-Dec-22 28-Jan-23 22-Jul-23 22-Aug-23
BS.AB.1140 Architecture Finish works of Group 1 Upto Degree 3 in Ancillary Building 45 24-Dec-22 15-Feb-23 08-Jun-23 09-Aug-23
BS.AB.1150 E&M of Group 1 Rooms Upto Degree 3 in Ancillary Building 45 24-Dec-22 15-Feb-23 08-Jun-23 09-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS Internal Structures 196 07-Nov-22 05-Jul-23 02-Aug-22 A 19-Jun-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.G1 Group 1 Rooms Upto Degree 3 87 07-Nov-22 17-Feb-23 27-Sep-22 A 14-Feb-24
BS.G1.1010 Concourse Level Rooms 87 07-Nov-22 17-Feb-23 27-Sep-22 A 14-Feb-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.OTE Installation of OTE Duct 62 12-Dec-22 14-Jan-23 02-Jan-23 A 28-Aug-23
BS.OTE.1020 Installation of OTE Duct in Down-line - Part II 15 12-Dec-22 28-Dec-22 25-Feb-23 A 21-Aug-23
BS.OTE.1030 Installation of OTE Duct in Down-line - Part III 15 29-Dec-22 14-Jan-23 02-Jan-23 A 28-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.STA Station Track Area 72 22-May-23 01-Jun-23 08-Mar-23 A 20-Dec-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.STA.UL Upline Track 10 22-May-23 01-Jun-23 31-Mar-23 A 20-Dec-23
BS.TW.1020 1st Stage Concrete 10 22-May-23 01-Jun-23 31-Mar-23 A 20-Dec-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.STA.DL Downline Track 10 22-May-23 01-Jun-23 08-Mar-23 A 20-Dec-23
BS.TW.1060 1st Stage Concrete 10 22-May-23 01-Jun-23 08-Mar-23 A 20-Dec-23
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.G21 Group 2/Other rooms upto Degree 3 104 23-Feb-23 05-Jul-23 02-Aug-22 A 19-Jun-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.G21.13 Refuse Room 15 09-Jun-23 05-Jul-23 02-Aug-22 A 19-Jun-24
BS.G2.D3.1910 RCC wall/ Blockwork 15 09-Jun-23 05-Jul-23 02-Aug-22 A 19-Jun-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.G21.7 Unpaid Concourse Area 85 23-Feb-23 03-Jun-23 02-Aug-22 A 16-Mar-24
BS.G2.D3.2920 Blockwork 85 23-Feb-23 03-Jun-23 02-Aug-22 A 16-Mar-24
NCRTC8_DWP_R3 3M M-J-1.CONS.SC.BPS1.IS.G21.6 Paid Concourse 85 23-Feb-23 03-Jun-23 02-Aug-22 A 16-Mar-24
BS.G2.D3.3050 Blockwork 85 23-Feb-23 03-Jun-23 02-Aug-22 A 16-Mar-24
NCRTC8_DWP_R3 3M M-J-1.CONS.TC Tunnel Construction 121 31-May-22 28-Mar-23 06-Apr-23 A 23-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CTBS-MC11 Construction of Tunnel from Bhaisali to Begumpul 78 31-May-22 31-Dec-22 25-Apr-23 03-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CTBS-MC11. INS1 Installation work for TBM4 Assembly at Bhaisali Station 8 31-May-22 06-Aug-22 25-Apr-23 04-May-23
BS.TBM4.1020 Installation of Tunnel Ventilation Fans Tunnel 4 7 31-May-22 07-Jun-22 25-Apr-23 03-May-23
BS.TBM4.1030 Installation of Muck Tilting Device-4 8 29-Jul-22 06-Aug-22 25-Apr-23 04-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CTBS-MC11. TBM11 Construction of Tunnel 3 from Bhaisali station to Begumpul
14 Station
16-Dec-22 31-Dec-22 11-Jul-23 27-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CTBS-MC11.TBM11.MD Main Drive 14 16-Dec-22 31-Dec-22 11-Jul-23 27-Jul-23
BS.TBM3.Tun.1170 Tunneling from Bhaisali to Begumpul - 150m 14 16-Dec-22 31-Dec-22 11-Jul-23 27-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CTBS-MC11. TBM111 Construction of Tunnel 4 from Bhaisali station to Begumpul
22 29-Oct-22
Station 23-Nov-22 10-Jul-23 03-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CTBS-MC11.TBM111.ID Innitial Drive 7 29-Oct-22 05-Nov-22 10-Jul-23 17-Jul-23
BS.TBM4.Tun.1040 Installations of Track system in Shaft Bottom 7 29-Oct-22 05-Nov-22 10-Jul-23 17-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CTBS-MC11.TBM111.MD Main Drive 15 07-Nov-22 23-Nov-22 18-Jul-23 03-Aug-23
BS.TBM4.Tun.1050 Commencement of Main Drive 1 07-Nov-22 07-Nov-22 18-Jul-23 18-Jul-23
BS.TBM4.Tun.1060 Tunneling from Bhaisali to Begumpul Station - 150m 14 08-Nov-22 23-Nov-22 19-Jul-23 03-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CP Cross Passage 94 05-Dec-22 28-Mar-23 06-Apr-23 A 23-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CP.CP1 Cross Passage 1 55 23-Jan-23 28-Mar-23 27-May-23 09-Aug-23
CP.1030 Excavation, lattice girder fixing and shotcreting - Stage I 10 23-Jan-23 03-Feb-23 27-May-23 08-Jun-23
CP.1035 Excavation, lattice girder fixing and shotcreting - Stage II 10 04-Feb-23 15-Feb-23 08-Jun-23 23-Jun-23
CP.1038 Excavation, lattice girder fixing and shotcreting - Stage III 10 16-Feb-23 27-Feb-23 23-Jun-23 11-Jul-23
CP.1040 Water proofing - Invert 10 28-Feb-23 10-Mar-23 11-Jul-23 22-Jul-23
CP.1045 Reinforcement tying & Concrete- Invert 15 11-Mar-23 28-Mar-23 22-Jul-23 09-Aug-23

Actual Level of Effort Remaining Work Miles... Date Revision Checked Approved
EMPLOYER CONTRACTOR 01-Jun-23 3 Month Rolling ...
Actual Work Critical Remaining Work sum...
NCRTC AFCONS
NCRTC PACKAGE 8 THREE MONTH ROLLING PROGRAMME Page 7 of 8
(MAY'23 - JUL'23)
Activity ID Activity Name Planned BL1 Start BL1 Finish Start Finish 2023
Duration May Jun Jul
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CP.CP2 Cross Passage 2 40 21-Jan-23 09-Mar-23 06-Jun-23 31-Jul-23
CP.1120 Excavation, lattice girder fixing and shotcreting - Stage I 10 21-Jan-23 02-Feb-23 06-Jun-23 17-Jun-23
CP.1123 Excavation, lattice girder fixing and shotcreting - Stage II 10 03-Feb-23 14-Feb-23 19-Jun-23 07-Jul-23
CP.1125 Excavation, lattice girder fixing and shotcreting - Stage III 10 15-Feb-23 25-Feb-23 08-Jul-23 19-Jul-23
CP.1130 Water proofing - Invert 10 27-Feb-23 09-Mar-23 20-Jul-23 31-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CP.CP3 Cross Passage 3 40 05-Dec-22 19-Jan-23 07-Jun-23 02-Aug-23
CP.1182 Coring & Grouting Works - Bottom 10 05-Dec-22 15-Dec-22 07-Jun-23 21-Jun-23
CP.1185 Coring & Grouting Works - Left 10 16-Dec-22 27-Dec-22 21-Jun-23 10-Jul-23
CP.1187 Coring & Grouting Works - Right 10 28-Dec-22 07-Jan-23 10-Jul-23 21-Jul-23
CP.1190 Lintel fixing and removal of segments 10 09-Jan-23 19-Jan-23 21-Jul-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CP.CP4 Cross Passage 4 32 21-Jan-23 28-Feb-23 06-Apr-23 A 23-Aug-23
CP.1260 Coring & Grouting Works - Top 8 21-Jan-23 31-Jan-23 06-Apr-23 A 14-Aug-23
CP.1263 Coring & Grouting Works - Bottom 8 01-Feb-23 09-Feb-23 06-Apr-23 A 17-Aug-23
CP.1265 Coring & Grouting Works - Left 8 10-Feb-23 18-Feb-23 06-Apr-23 A 19-Aug-23
CP.1267 Coring & Grouting Works - Right 8 20-Feb-23 28-Feb-23 06-Apr-23 A 23-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CP.CP5 Cross Passage 5 8 21-Jan-23 31-Jan-23 15-Apr-23 A 14-Aug-23
CP.1340 Coring & Grouting Works - Top 8 21-Jan-23 31-Jan-23 15-Apr-23 A 14-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.CP.CP6 Cross Passage 6 21 12-Dec-22 05-Jan-23 10-Jul-23 02-Aug-23
CP.1410 Survey and Marking of coordinates 1 12-Dec-22 13-Dec-22 10-Jul-23 10-Jul-23
CP.1420 Coring & Grouting Works - Top 10 13-Dec-22 24-Dec-22 11-Jul-23 21-Jul-23
CP.1423 Coring & Grouting Works - Bottom 10 24-Dec-22 05-Jan-23 22-Jul-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.TFD1 Tunnel Finishes With Degree 1 Completion-TBM 50 19-Sep-22 20-Dec-22 27-May-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.TFD1.IC Invert Concrete 50 19-Sep-22 20-Dec-22 27-May-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.TFD1.IC.IC.BS-MC Invert Concrete Bhaisali to Meerut Central 45 19-Oct-22 20-Dec-22 27-May-23 27-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.TFD1.IC.IC.BS-MC.UL Invert Conerete Upline Bhaisali to Meerut Central45
Central 19-Oct-22 10-Dec-22 27-May-23 27-Jul-23
IC.UP.BS-MC.1070 Removal of Supply Pipelines - Part I 15 19-Oct-22 05-Nov-22 27-May-23 13-Jun-23
IC.UP.BS-MC.1075 Removal of Supply Pipelines - Part II 15 07-Nov-22 23-Nov-22 14-Jun-23 10-Jul-23
IC.UP.BS-MC.1080 Removal of Temporary Rail lines & Sleepers - Part I 15 24-Nov-22 10-Dec-22 11-Jul-23 27-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.TFD1.IC.IC.BS-MC.DL Invert Conerete Downline Bhaisali to Meerut Central
45 29-Oct-22 20-Dec-22 27-May-23 27-Jul-23
IC.DL.BS-MC.1000 Removal of Supply Pipelines - Part I 15 29-Oct-22 15-Nov-22 27-May-23 13-Jun-23
IC.DL.BS-MC.1005 Removal of Supply Pipelines - Part II 15 16-Nov-22 02-Dec-22 14-Jun-23 10-Jul-23
IC.DL.BS-MC.1010 Removal of Temporary Rail lines & Sleepers - Part I 15 03-Dec-22 20-Dec-22 11-Jul-23 27-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.TFD1.IC.IC.BS-NC Invert Conrete North C&C to Begumpul 30 19-Sep-22 25-Oct-22 23-Jun-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.TFD1.IC.IC.BS-NC.UL Invert Concrete Upline North C&C to Begumpul 30 19-Sep-22 25-Oct-22 23-Jun-23 02-Aug-23
IC.UP.BS-NC.1070 Removal of Supply Pipelines - Part I 15 19-Sep-22 06-Oct-22 23-Jun-23 15-Jul-23
IC.UP.BS-NC.1075 Removal of Supply Pipelines - Part II 15 07-Oct-22 25-Oct-22 17-Jul-23 02-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.TC.TFD1.IC.IC.BS-NC.DL Invert Concrete Downline North C&C to Begumpul15
Begumpul 19-Sep-22 06-Oct-22 14-Jul-23 31-Jul-23
IC.DL.BS-NC.1000 Removal of Supply Pipelines - Part I 15 19-Sep-22 06-Oct-22 14-Jul-23 31-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC Construction of Cut & Cover and Ramp 634 02-Feb-22 31-May-24 21-Nov-21 A 01-Nov-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C North Side Cut and Cover & Ramp Construction 579 26-Aug-22 31-May-24 19-Dec-22 A 01-Nov-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.SC LS-02 (Tunneling from North Cut and Cover to Behumpul) /C&C
427Tunnel
26-Aug-22
Section 07-Feb-24 14-Jan-23 A 19-Oct-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.SC.RS RCC Wall 56 26-Aug-22 03-Nov-22 29-Jan-23 A 05-Sep-23
NCC-BS.LS2.1110 Completion of TBM work and Shaft cleaning 15 26-Aug-22 13-Sep-22 10-Jul-23 26-Jul-23
NCC.LS2.RCC.1000 RCC Wall Pour 1 - Part I 14 14-Sep-22 29-Sep-22 29-Jan-23 A 10-Aug-23
NCC.LS2.RCC.1005 RCC Wall Pour 1 - Part III 14 18-Oct-22 03-Nov-22 04-Feb-23 A 05-Sep-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.SC.RS1 Roof Slab 89 21-Nov-22 10-Mar-23 14-Jan-23 A 26-Oct-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.SC.RS1.AD.PCC Staging & Shuttering 89 21-Nov-22 10-Mar-23 14-Jan-23 A 11-Oct-23
NCC.LS2..RS.PCC.1000
Roof Slab Staging & Shuttering, Pour 1 10 21-Nov-22 01-Dec-22 15-Feb-23 A 28-Sep-23
NCC.LS2..RS.PCC.1010
Roof Slab Staging & Shuttering, Pour 2 10 09-Jan-23 19-Jan-23 06-Feb-23 A 05-Oct-23
NCC.LS2..RS.PCC.1020
Roof Slab Staging & Shuttering, Pour 3 10 28-Feb-23 10-Mar-23 14-Jan-23 A 11-Oct-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.SC.RS1.CRS Roof Slab Construction 54 02-Dec-22 18-Feb-23 21-Feb-23 A 26-Oct-23
NCC.LS2..RS.CRS.1000
Roof Slab Construction Pour 1 15 02-Dec-22 19-Dec-22 05-Mar-23 A 07-Oct-23
NCC.LS2..RS.CRS.1010
Roof Slab Construction Pour 2 15 02-Feb-23 18-Feb-23 21-Feb-23 A 26-Oct-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.SC.BA Backfilling 158 01-Aug-23 07-Feb-24 05-Feb-23 A 19-Oct-24
NCC.LS2.BF.1030 Backfilling Pour 4 50 01-Aug-23 29-Sep-23 05-Feb-23 A 12-Jun-24
NCC.LS2.RES.1160 Retrieval of soldier piles 60 28-Nov-23 07-Feb-24 10-Feb-23 A 19-Oct-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.NCC North Cut and Cover Open U- Trough 269 10-Jan-24 31-May-24 19-Dec-22 A 01-Nov-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.NCC.BA Backfilling 269 10-Jan-24 31-May-24 19-Dec-22 A 01-Nov-24
NCC.UT.BF.1050 Backfilling Pour 6 40 10-Jan-24 26-Feb-24 19-Dec-22 A 25-Jul-23
NCC.UT.RES.1050 Retrieval of Soldier Pile 96 08-Feb-24 31-May-24 29-Dec-22 A 01-Nov-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.1 North Cut and Cover Ramp with Retaining Wall 85 27-Oct-22 08-Apr-23 25-Apr-23 11-Aug-23

Actual Level of Effort Remaining Work Miles... Date Revision Checked Approved
EMPLOYER CONTRACTOR 01-Jun-23 3 Month Rolling ...
Actual Work Critical Remaining Work sum...
NCRTC AFCONS
NCRTC PACKAGE 8 THREE MONTH ROLLING PROGRAMME Page 8 of 8
(MAY'23 - JUL'23)
Activity ID Activity Name Planned BL1 Start BL1 Finish Start Finish 2023
Duration May Jun Jul
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.1.BS Base Slab 25 27-Oct-22 29-Nov-22 25-Apr-23 24-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.1.BS.AD.PCC Area Dressing, PCC 10 27-Oct-22 07-Nov-22 25-Apr-23 06-May-23
NCC.RW.BS.PCC.1040
Base Slab Area Dressing, Pour 5 10 27-Oct-22 07-Nov-22 25-Apr-23 06-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.1.BS.CRS Base Slab Construction 15 12-Nov-22 29-Nov-22 08-May-23 24-May-23
NCC.RW.BS.CRS.1040
Base Slab Construction Pour 5 15 12-Nov-22 29-Nov-22 08-May-23 24-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.1.RCC.Wall RCC Wall 60 05-Dec-22 13-Feb-23 25-Apr-23 13-Jul-23
NCC.RW.RCC.1020 RCC Wall Pour 3 - Part I 15 05-Dec-22 21-Dec-22 25-Apr-23 12-May-23
NCC.RW.RCC.1025 RCC Wall Pour 3 - Part II 15 22-Dec-22 07-Jan-23 13-May-23 30-May-23
NCC.RW.RCC.1030 RCC Wall Pour 4 - Part I 15 09-Jan-23 25-Jan-23 31-May-23 17-Jun-23
NCC.RW.RCC.1035 RCC Wall Pour 4 - Part II 15 27-Jan-23 13-Feb-23 19-Jun-23 13-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.1.BA Backfilling 55 09-Jan-23 14-Mar-23 31-May-23 11-Aug-23
NCC.RW.BF.1020 Backfilling Pour 3 25 09-Jan-23 07-Feb-23 31-May-23 07-Jul-23
NCC.RW.BF.1030 Backfilling Pour 4 25 14-Feb-23 14-Mar-23 14-Jul-23 11-Aug-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.1.TLS Track Level Slab & Parapet Wall 40 01-Feb-23 08-Apr-23 05-Jun-23 31-Jul-23
NCC.RW.CTS.1010 Track Slab Construction Pour 2 Part I 13 01-Feb-23 15-Feb-23 05-Jun-23 23-Jun-23
NCC.RW.CTS.1015 Track Slab Construction Pour 2 Part II 13 16-Feb-23 02-Mar-23 23-Jun-23 14-Jul-23
NCC.RW.PW.1050 Construction of Parapet wall Pour 1 14 23-Mar-23 08-Apr-23 14-Jul-23 31-Jul-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.NR&C&C.HO Tunnel Finishes With Degree 1 Completion-North cut & cover25
& Ramp
13-Mar-23 10-Apr-23 20-Feb-23 A 10-Nov-23
NCC.TW.D1.1010 Invert Concrete for Tunnel 25 13-Mar-23 10-Apr-23 20-Feb-23 A 10-Nov-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1 South Side Cut and Cover & Ramp Construction-1 330 02-Feb-22 13-Apr-23 21-Nov-21 A 09-Apr-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.SR&CC South Side Cut and Cover 330 02-Feb-22 27-Jan-23 10-Mar-22 A 09-Apr-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.SR&CC.ERS Earth Retaining Structures 14 02-Feb-22 17-Feb-22 13-May-23 29-May-23
SCC.1006 Soldier Pile - Part VII 14 02-Feb-22 17-Feb-22 13-May-23 29-May-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.SR&CC.EX.ST Excavation and Installation of Strut and Waller 227 18-Feb-22 20-Sep-22 10-Mar-22 A 22-Nov-23
SCC.1010 Excavation for 1st Layer Strut Level- Soil Part I 14 18-Feb-22 05-Mar-22 10-Mar-22 A 15-Oct-23 A
SCC.1035 Excavation for 2nd Layer Strut Level- Soil Part II 14 08-Apr-22 23-Apr-22 21-Jun-23 14-Jul-23
SCC.1036 Excavation for 2nd Layer Strut Level- Soil Part III 14 25-Apr-22 11-May-22 14-Jul-23 31-Jul-23
SCC.1038 Excavation for 2nd Layer Strut Level- Soil Part IV 14 12-May-22 27-May-22 16-Dec-22 A 08-Aug-23
SCC.1042 Fixing of 2nd Layer Strut - Part II 14 25-Apr-22 11-May-22 14-Jul-23 31-Jul-23
SCC.1047 Fixing of 2nd Layer Strut - Part IV 14 06-Jun-22 21-Jun-22 05-Jan-23 A 25-Aug-23
SCC.1057 Excavation for 3rd Layer Strut Level- Soil Part IV 14 30-Jun-22 16-Jul-22 20-Jan-23 A 20-Sep-23
SCC.1060 Fixing of 3rd Layer Strut - Part I 14 12-May-22 27-May-22 02-Apr-23 A 03-Aug-23
SCC.1067 Fixing of 3rd Layer Strut - Part IV 14 18-Jul-22 05-Aug-22 05-Feb-23 A 07-Oct-23
SCC.1110 Excavation upto Base Slab - Pour 5 15 03-Sep-22 20-Sep-22 20-Feb-23 A 22-Nov-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.SR&CC.BS Base Slab 25 21-Sep-22 20-Oct-22 06-Mar-23 A 21-Dec-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.SR&CC.BS.AD.PCC Area Dressing, PCC 10 21-Sep-22 01-Oct-22 06-Mar-23 A 01-Dec-23
SCC.BS.AD.PCC.1040
Base Slab Area Dressing, Pour 5 10 21-Sep-22 01-Oct-22 06-Mar-23 A 01-Dec-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.SR&CC.BS.CRS Base Slab Construction 15 03-Oct-22 20-Oct-22 16-Mar-23 A 21-Dec-23
SCC.BS.CRS.1040 Base Slab Construction Pour 5 15 03-Oct-22 20-Oct-22 16-Mar-23 A 21-Dec-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.SR&CC.RCC Wall RCC Wall Construction 28 26-Dec-22 27-Jan-23 28-Mar-23 A 09-Apr-24
SCC.RCC.1040 RCC Wall Pour 5 - Part I 14 26-Dec-22 10-Jan-23 12-Apr-23 A 26-Mar-24
SCC.RCC.1045 RCC Wall Pour 5 - Part II 14 11-Jan-23 27-Jan-23 28-Mar-23 A 09-Apr-24
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.oUt South Cut and Cover Open U- Trough 70 24-Nov-22 14-Feb-23 03-Jun-23 04-Sep-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.oUt.BA Backfilling 70 24-Nov-22 14-Feb-23 03-Jun-23 04-Sep-23
SCC.UT.BF1000 Backfilling Pour 1 35 24-Nov-22 03-Jan-23 03-Jun-23 24-Jul-23
SCC.UT.BF1010 Backfilling Pour 2 35 04-Jan-23 14-Feb-23 24-Jul-23 04-Sep-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.1 South Cut and Cover Ramp with Retaining Wall 63 17-Dec-22 13-Apr-23 21-Nov-21 A 22-Sep-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.1.BA Backfilling 63 17-Dec-22 13-Apr-23 21-Nov-21 A 22-Sep-23
SCC.RW.BF1000 Backfilling Pour 1 25 17-Dec-22 14-Jan-23 13-Jun-23 20-Jul-23
SCC.RW.BF1010 Backfilling Pour 2 25 16-Jan-23 14-Feb-23 21-Jul-23 19-Aug-23
SCC.RW.BF1030 Backfilling Pour 4 25 16-Mar-23 13-Apr-23 21-Nov-21 A 22-Sep-23
NCRTC8_DWP_R3 3M M-J-1.CONS.R&CC.1.1.TLS Track Level Slab & Parapet Wall 36 17-Dec-22 28-Jan-23 13-Jun-23 02-Aug-23
SCC.RW.CTS.1000 Track Slab Construction Pour 1 - Part I 12 17-Dec-22 30-Dec-22 13-Jun-23 05-Jul-23
SCC.RW.CTS.1005 Track Slab Construction Pour 1 - Part II 12 31-Dec-22 13-Jan-23 06-Jul-23 19-Jul-23
SCC.RW.CTS.1010 Track Slab Construction Pour 2 - Part I 12 14-Jan-23 28-Jan-23 20-Jul-23 02-Aug-23

Actual Level of Effort Remaining Work Miles... Date Revision Checked Approved
EMPLOYER CONTRACTOR 01-Jun-23 3 Month Rolling ...
Actual Work Critical Remaining Work sum...
NCRTC AFCONS