Job Number Sheet
C008 1
Job Title
Proposed Beam in CHWP Plinth Area
Client
Your details here CHEC
Calcs by Checked by Date
JANAKA JANAKA 10/30/2023
Continuous Beam: deisel tank area ground beam (Code of Practice : BS8110 - 1997)
10/30/2023 12:03:40 AM C01
Input Tables
fcu (MPa) 45
fy (MPa) 420
fyv (MPa) 420
% Redistribution 0
(O)ptimised or (D)ownward redistribution D
Top Cover :Reinforcement centre (mm) 30
Bottom Cover :Reinforcement centre (mm) 30
Dead load factor 1.4
Live load factor 1.6
Concrete density (kN/m3) 24
% of live load considered as permament 25
Ø (Creep coefficient) 2
Ecs (Shrinkage strain) 300E-6
Bw D Bf-top Hf-top Bf-bottom Hf-bottom Y-offset Web Flange
Section number (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset
1 450 435 820 150
Span Section Section Section
number length (m) number left number right
1 0.9 1
2 2.7 1
3 2.65 1
4 2.65 1
5 1.3 1
Support Code Column below Code Column above Code
number C,F F,P F,P
D (mm) B (mm) H (mm) D (mm) B (mm) H (mm)
1 C
6 C
Load W-left W-right a b P a M a Load
Case Span (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m) Description
L 1 27.86 0.26 Load from the equipment
2 27.86 1.145 Load from the equipment
3 27.86 0.666 Load from the equipment
3 27.86 2.347 Load from the equipment
4 27.86 2 Load from the equipment
5 27.86 1.04 Load from the equipment
D 4 30 1.5 point load
3 30 0.15 point load
Span M left M right
number kNm kNm
Job Number Sheet
C008 2
Job Title
Proposed Beam in CHWP Plinth Area
Client
Your details here CHEC
Calcs by Checked by Date
JANAKA JANAKA 10/30/2023
Sections
450
285
150
820
SECTION 1
Beam Elevation
1SPAN 12 SPAN 2 3 SPAN 3 4 SPAN 4 5 SPAN 5 6
Live
27.86 27.86 27.86 27.86 27.86 27.86
Dead+
Own weight 6.03 30.00 30.00
0.900 2.700 2.650 2.650 1.300
Job Number Sheet
C008 3
Job Title
Proposed Beam in CHWP Plinth Area
Client
Your details here CHEC
Calcs by Checked by Date
JANAKA JANAKA 10/30/2023
Deflection, Shear, Moment and Steel diagrams. Spans 1-5
Elastic Deflections (Alternate spans loaded) Def max = .3240mm @ 10.2m
-.100
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.0
.100
.200
.300
Long-term Deflections (All spans loaded - using entered reinforcement) Def max = .6406mm @ 10.2m
-.100
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.0
.100
.200
.300
.400
.500
.600
SHEAR: X-X V max = 89.82kN @ 3.60m
80.0
60.0
40.0
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.0
20.0
-20.0
-40.0
-60.0
-80.0
MOMENTS: X-X M max = -53.49kNm @ 8.90m
-40.0
-20.0
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.0
20.0
Shear Reinforcement: X-X Asv max = .5331mm²/mm @ 3.60m
.500
.400
.300
.200
.100
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.0
Bending Reinforcement: X-X As max = -380.7mm2 @ 8.90m
-300
-200
-100
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.0
100
200