3-Storey Building Site Plan
3-Storey Building Site Plan
ARCHITECTURAL
Roof Deck Floor Plan
Front Elevation
Right Elevation
Left Elevation
Rear Elevation
Section Thru A-A
Section Thru B-B
Foundation Plan
Schedule of Footings
Typical Column-Footing Detail
Second Flr. Framing Plan
Third Flr. Framing Plan
Schedule of Columns
Schedule of Beams
STRUCTURAL
Roof Deck Framing Plan
Corridor Detail
Typical Beam Detail
Typical Wall Footing Detail
PERSPECTIVE Schedule of Slabs
Structural Stairs Detail
Slab on Steel Deck
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
SITE DEVELOPMENT PLAN
LOCATION MAP
JOHN MICHAEL D. BOLOC
BSCE-3A
ENGR. EDGAR D. CELADA JR.
Instructor
PROPOSED 3-STOREY
COMMERCIAL BUILDING
VICINITY MAP 1
PERSPECTIVE
TABLE OF CONTENT
A B C D E F G H I J
A
29400mm
3250mm 3250mm 3150mm 3300mm 3350mm 3150mm 3500mm 3200mm 3250mm
FIRE WALL
LANDING
9
3200mm
10 7
11 6
12 5
13 4
1
6700mm
UP
HALLWAY
A
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
1450mm 3250mm 3250mm 3150mm 3300mm 3350mm 3150mm 3500mm 3200mm 3250mm 1450mm
FIRE WALL
1
LANDING
9
3200mm
1700mm
1700mm
10 7
11 6
12 5
13 4
14 3
15 2
16 1
6700mm
2 DOWN
8800mm
OFFICE OFFICE OFFICE OFFICE
B ROOM 1 ROOM 2 ROOM 3 ROOM 4
B
3500mm
1700mm
1700mm
3
CORRIDOR
RAILING RAILING
A
32300mm
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
1450mm 3250mm 3250mm 3150mm 3300mm 3350mm 3150mm 3500mm 3200mm 3250mm 1450mm
FIRE WALL
1
LANDING
24
3200mm
1700mm
1700mm
25 23
26 22
27 21
13 20
14 19
15 18
16 17
6700mm
2 DOWN UP
8800mm
OFFICE OFFICE OFFICE OFFICE
B ROOM 1 ROOM 2 ROOM 3 ROOM 4
B
3500mm
1700mm
1700mm
3
CORRIDOR
RAILING RAILING
A
32300mm
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
25 23
3390mm
26 22
27 21
28 20
29 19
30 18
31 17
6700mm
2 DOWN
B B
3500mm
A
ROOF DECK FLOOR PLAN
SCALE: 1:100M
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
3250mm
29400mm
3200mm
3250mm 3200mm 3500mm 3150mm 3350mm 3300mm 3150mm 3250mm 3250mm
500mm
ROOF DECK
CEILING HEIGHT
2800mm
400mm
2800mm
400mm
FRONT ELEVATION
SCALE: 1:100M
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
3490mm 3490mm
3200mm
3500mm 3200mm 3200mm 3500mm
500mm
500mm
TOP OF ROOF DECK PARAPET TOP OF ROOF DECK PARAPET
500mm
500mm
400mm
400mm
ROOF DECK ROOF DECK
CEILING HEIGHT CEILING HEIGHT
210mm
1000mm2800mm
1000mm2800mm
400mm
400mm
THIRD FLR. LINE THIRD FLR. LINE
CEILING HEIGHT CEILING HEIGHT
11200mm
11200mm
1000mm2800mm
1000mm2800mm
400mm
400mm
SECOND FLR. LINE SECOND FLR. LINE
CEILING HEIGHT CEILING HEIGHT
2800mm
2800mm
FIN. FLR. LINE FIN. FLR. LINE
630mm
630mm
NAT. GRND. LINE NAT. GRND. LINE
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
3250mm
ROOF DECK
CEILING HEIGHT
2800mm
400mm
2800mm
400mm
REAR ELEVATION
SCALE: 1:100M
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
500mm
TOP OF ROOF DECK PARAPET
500mm
400mm
ROOF DECK
CEILING HEIGHT
2800mm
400mm
THIRD FLR. LINE
CEILING HEIGHT
11200mm
2800mm
400mm
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
3250mm
29400mm
3200mm
3250mm 3250mm 3150mm 3300mm 3350mm 3150mm 3500mm 3200mm 3250mm
500mm
CEILING HEIGHT
2800mm
400mm
2800mm
400mm
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
COLUMN
SCHEDULE OF FOOTINGS
D
FTB FTB FTB FTB
Y
COLUMN COLUMN
X (width) Y (length) REBARS ALONG X REBARS ALONG Y TYPE
FOOTING T (mm) D (mm)
(mm) (mm)
T
PCS BAR Ø PCS BAR Ø
A B C D E F G H I J
29400mm
WF1
WF1
WF1
WF1
FTB
FTB
FTB
FTB
FTB
FTB
WF1
6700mm
2
C1/F2 C1/F3 C1/F2 C1/F3 C1/F2 C1/F2 C1/F3 C1/F2 C1/F3 C1/F2
WF1
WF1
WF1
WF1
3500mm
FTB
FTB
FTB
FTB
FTB
FTB
100 MM SLAB OF
FILL W/ 10MM∅ RSB
@ 600 OC BW
3
C1/F2 FTB C1/F1 FTB C1/F2 FTB C1/F1 FTB C1/F2 FTB C1/F2 FTB C1/F1 FTB C1/F2 FTB C1/F1 FTB C1/F2
A FOUNDATION PLAN
S 01 SCALE: 1:100M
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
FOUNDATION PLAN
JOHN MICHAEL D. BOLOC
BSCE-3A
ENGR. EDGAR D. CELADA JR.
Instructor
PROPOSED 3-STOREY
COMMERCIAL BUILDING
SCHEDULE OF FOOTINGS
TYPICAL COLUMN-FOOTING
11
DETAIL
NOTE: fc' = 3,000 psi (20.70 MPa)
B SCHEDULE OF COLUMNS SCHEDULE OF BEAMS: RSB: 20MM & BELOW (Gr. 40)
S 02 SCALE: 1:16M
25MM & ABOVE (Gr. 60)
Bar (mm) Support (pcs) Midspan (pcs)Stiffener Stirrups (mm)
B
BEAM (mm) D
300mm 300mm (mm) Diam Grade Top Bottom Top Bottom Diam Diam Spacing
-
B1 300 400 16 33 3 2 2 3 10 mm 4@50, 4@100, Rest@ 200
400mm
400mm
-
B2 300 400 16 33 4 2 2 4 10 mm 4@50, 4@100, Rest@ 200
16 33 5 2 2 5 - 4@50, 4@100, Rest@ 200
B3 300 400 10 mm
REBARS: REBARS:
20 33 4 2 2 4 - 4@50, 4@100, Rest@ 200
6 PCS. - 16 MMØ
TIES: 10 MMØ (1 SET)
6 PCS. - 16 MMØ
TIES: 10 MMØ (1 SET)
B4 300 400 10 mm
6@50, 6@100, REST 6@50, 6@100, REST
200 400 16 33 3 3 3 3 - 10 mm 4@50, 4@100, Rest@ 200
@150 TO MID HEIGHT @150 TO MID HEIGHT FTB
COLUMN 1 (C1) COLUMN 2 (C2)
A B C D E F G H I J
29400mm
1450mm 3250mm 3250mm 3150mm 3300mm 3350mm 3150mm 3500mm 3200mm 3250mm 1450mm
B1 B1 B1 B1 B1 B1 B1 B1 B1
1
STAIR
WELL
3200mm
B1
B1
B2
B3
B3
B2
B2
B2
B2
B2
S1 S1 S1 S2 S2 S1 S1 S1
B4 B4 B4 B4 B1 B4 B4 B4 B4
6700mm
S4 S4
3500mm
B1
B1
B2
B2
B2
B2
B2
B2
B2
B2
S1 S1 S1 S2 S3 S2 S1 S1 S1
B1 B1 B1 B1 B1 B1 B1 B1 B1
3
1950mm
S4
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
D
STIRRUPS
SPACING
300
BEAM BEAM 2 BARS STRAIGHT/CONTINUOUS
(BOTTOM BARS) BOTTOM BARS
L/5 L/5
ADDITIONAL BOTTOM
BARS CUT (@MIDSPAN) @ SUPPORT @ MIDSPAN
VARIABLE SPAN (L)
NOTE: NO SPLICE SHALL BE PERMITTED @
PLAN SECTION MIDSPAN FOR BOTTOM BARS OR
NEAR THE SUPPORTS FOR TOP BARS
C TYPICAL BEAM DETAIL MIN. SPLICE LENGTH: 40X BAR DIAM.
B
S 02
CORRIDOR DETAIL S 03 SCALE: NTS
SCALE NTS
A B C D E F G H I J
29400mm
B1 B1 B1 B1 B1 B1 B1 B1 B1
1
STAIR
WELL
3200mm
B1
B1
B3
B3
B2
B2
B2
B2
B2
B2
S1 S1 S1 S2 S2 S1 S1 S1
B4 B4 B4 B4 B1 B4 B4 B4 B4
6700mm
2
3500mm
B1
B1
B2
B2
B2
B2
B2
B2
B2
B2
S1 S1 S1 S2 S3 S2 S1 S1 S1
B1 B1 B1 B1 B1 B1 B1 B1 B1
3
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.
B SCHEDULE OF SLABS
THK
S 02
D SLAB ON STEEL DECK S2 200mm Use 12mmØ Mat Bars @ 200mm O.C. B.W. On Steel Deck
S 04 NTS
S3 200mm Use 12mmØ Mat Bars @ 200mm O.C. B.W. On Steel Deck
FGL
SLAB S4 300mm Use 12mmØ Mat Bars @ 200mm O.C. B.W. On Steel Deck
300MM
VARIABLE
BACKFILL GRADE
BEAM BACKFILL
10MMØ TIES
@ 300MM O.C.
10MMØ VERT. BARS 200 200
@ 600MM O.C. 25MM MIN.
12MMØ @ 200 O.C.
CONCRETE COVER
NGL
LANDING SLAB
300
400
400
STIRRUPS
10MMØ @ 300MM.O.C
@ MIDSPAN @ SUPPORT
300
3-12MMØ
w/ 10MMØ TIES SPACED
CONT. BARS
@ 300MM O.C.
STAIR BEAM
10MMØ TIES TYPICAL 1-10MMØ
@ 300MM O.C. 12MMØ BARS @ 100MM O.C.
BEND @ L/4 ALTERNATELY
300
TYPICAL
WITH 10MMØ TEMP. BARS
@250MM O.C.
200
600
300MM
12
800
12MMØ BARS @ 100M O.C.
5
WITH 10MMØ HORIZONTAL BARS @
250MM O.C.
200
4 PCS 12MMØ
SECTION PLAN
C STRUCTURAL STAIRS DETAIL
A TYPICAL WALL FOOTING DETAIL S 03 SCALE 1:20 M
S 01 SCALE NTS
SCHOOL: SUBMITTED BY: SUBMITTED TO: PROJECT TITLE: SHEET CONTENT: SHEET NO.