0% found this document useful (0 votes)
232 views7 pages

Cpec Mid Mcqs

The document contains 40 multiple choice questions about the China-Pakistan Economic Corridor (CPEC). CPEC is a collection of infrastructure projects currently under construction that are aimed at connecting China's western province of Xinjiang to Gwadar Port in Pakistan. Some key points covered are: - CPEC's total length is 2442 km and connects Gwadar Port to Kashgar, China. - It is considered an extension of China's One Belt, One Road initiative and is part of China's 13th five-year development plan. - Gwadar Port is envisioned as the link between China's One Belt, One Road project and its Mar

Uploaded by

raza gujjar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
232 views7 pages

Cpec Mid Mcqs

The document contains 40 multiple choice questions about the China-Pakistan Economic Corridor (CPEC). CPEC is a collection of infrastructure projects currently under construction that are aimed at connecting China's western province of Xinjiang to Gwadar Port in Pakistan. Some key points covered are: - CPEC's total length is 2442 km and connects Gwadar Port to Kashgar, China. - It is considered an extension of China's One Belt, One Road initiative and is part of China's 13th five-year development plan. - Gwadar Port is envisioned as the link between China's One Belt, One Road project and its Mar

Uploaded by

raza gujjar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

MCQS CPEC MID TERM 4TH SEMSTER BUSINESS MANAGEMENT

1. China Pakistan Economics Corridor (CPEC) totalslength? (Ch # 1)


(a) 2896 KM (b) 7200 KM

(c)2442 KM (d) 4400 KM

2. The China Pakistan Economic Corridor is considered to be an extension of China’s ambitious


proposed 21st century Silk Road initiative and the importance of CPEC to China is reflected
by its inclusion as part of China’s (Ch # 2)
(a)11thfive-yeardevelopmentplan
(b) 12th five-year development plan
(c) 13th five-year development plan
(d) 15th five-year development plan
3. Which city of Pakistan is the crux of the CPEC project, as it is envisaged to be the link between
China’s ambitious One Belt, One Road project, and its Maritime Silk Road project? (Ch # 1)
(a)Islamabad
(b)Lahore
(c)Gwadar
(d) Karachi
4. The Silk Road Economic Belt and the 21st-century Maritime Silk Road is also known as(Ch #
1)
(a) One Belt, One Road
(b) Two Belts, One Road
(c) One Belt, Two Roads
(d) Two Belts, Two Roads
5. The Belt and Road Initiative is a development strategy and framework, proposed by which
Chinese paramount leader? (Ch # 1)
(a) Hu Jintao
(b) Ye Jianying
(c) Xi Jinping
(d) Liu Shaoq
6. What is the total length of Western Route (Route-1 via Quetta) of the China Pakistan
Economic Corridor? (Ch # 2)
(a) 2674 Km
(b) 2756 km
(c) 2781 km
(d) 2956 Km

7. What is the total length of Central Route (Route-2 via Indus Highway) of the China Pakistan
Economic Corridor? (Ch # 3)
(a) 2674 Km
(b) 2756 km
(c) 2781 km
(d) 2956 Km
8. What is the total length of Eastern Route (Route-2 via Motorway) of the China Pakistan
Economic Corridor? (Ch # 3)
(a) 2674 Km
(b) 2756 km
(c) 2781 km
(d) 2956 Km
9. China has invited countries belonging to which group to join its ‘One Belt, One Road’
initiative?
(Ch # 1)
(a) BRICS
(b) EU
(c) CPEC
(d) SAARC.
10. Pakistan and China inked five Agreements and a Memorandum of Understanding for
strengthening collaboration between Gwadar and the Chinese port cities on: (Ch # 2)
(a) 28th January 2018
(b) 29th January 2018
(c) 30th January 2018
(d) 31st January 2018
11. The MoU on Gwadar Poverty Alleviation Initiative was inked between Gwadar district
government and (Ch # 3)
(a) Nepal Overseas Ports Holding Company
(b) Hong Kong Overseas Ports Holding Company
(c) Singapore Overseas Ports Holding Company
(d) China Overseas Ports Holding Company
12. Which Prime Minister of Pakistan formally inaugurated the first phase of Gwadar Free Zone –
an important node of China Pakistan Economic Corridor on 29th January 2018? (Ch # 2)
(a) Doctor Abdul Malik
(b) Mian Nawaz Sharif
(c) ShahidKhaqanAbbasi
(d) MianShahbaz Sharif
13. Who is current Chairman of Gwadar Port Authority? (Ch # 2)
(a) ZubairMahmood Hayat
(b) Mir HasilBizenjo
(c) Dostain Khan Jamaldini
(d) Marriyum Aurangzeb
14. Who current China’s ambassador to Pakistan? (Ch # 1)
(a) Yu-Fei Marine
(b) Yao Jing
(c) Zhang Baozhong
(d) Zhang Yao Wan
15. Pakistan-China economic Corridor is a proposal to create an Economic Corridor from
Gwadar in Baluchistan to _________in the Western Chinese province of Sinkiang (Ch # 3)
(a) Beijing
(b) Sinkiang
(c) Kashgar
(d) Shanghai
16. When China and Pakistan signed an agreement on China Pakistan Economic Corridor
(CPEC) plan?

(a) 21 April 2015


(b) 23 April 2015
(c) 27 April 2015
(d) 29 April 2015
17. The China Pakistan Economic Corridor often referred to by the acronym CPEC, is a collection
of projects currently under construction at a cost of (Ch # 2)

(a) $44 billion


(b) $45 billion
(c) $46 billion
(d) $50 billion

18. On 21st April 2015 China, Pakistan signed an agreement on Economic Corridor plan worth 46
billion US dollars. What is the name of Economic Corridor? (Ch # 2)

(a) China Friendship Economic Corridor (CFEC)


(b) China Korakaram Economic Corridor (CKEC)
(c) China Pak Economic Corridor (CPEC)
(d) China Pak Peace Economic Corridor (CPPEC)
19. The economic corridor is considered central to China–Pakistan relations and will run from
Gwadar to Kashgar with length of (Ch # 1)

(a) 2,700 km
(b) 3,800 km
(c) 3,800 km
(d) 3,000 km
20. Under Pak-China Economic Corridor, a high-speed railway track will be laid at a cost of 2.8
billion dollars from Peshawar to (Ch # 1)
(a) Lahore
(b) Karachi
(c) Gwadar
(d) Kashgar
21. The first modern Special Economic Zone (SEZ) was developed in…… (Ch # 2)

(a) 1959 (b) 1950


(c) 1846 (d) 1940
22. EC related financial regulations should be established in …… priorities areas (Ch # 2)
(a)4 (b) 3
(c) 2 (d) 5
23. EC developments must be based on integrated and ……planning. (Ch # 2)
(a) Detailed (b) comprehensive
(c) executing (d) None of these
24. Which is not the factor of the EC Planning in order to ensure a successful implementation
(Ch # 2)
(a) Instructional capacities (b) Ability to reform
(c) Human resources and management capacities (d) Existence of driving forces
25. SOEs stands for? (Ch # 3)
(a) Chinese overseas activities (b) Central overseas activities
(c) Chinese overall activities (d) None of these

26. The Silk Road Fund(SRF)also called? (Ch # 3)


(a) Asian Infrastructure bank (AIB) (b) Asian Infrastructure Investment bank(AIIB)
(c) Asian bank (AB) (d) None of these
27. China wishes to expand its maritime facilities in which ocean: (Ch # 3)
(a) Indian ocean (b) pacific ocean
(c) Atlantic ocean (d) Arctic ocean
28. Pakistan is the focal point of the CPEC project which is not the economic and social dimensions from
the following: (Ch # 4)
(a) Improving Economic and social conditions (b) energy security
(c) Improving infrastructure (d) increasing unemployment
29. CPEC have a positive impact on the …… overall mindset of Pakistan.(Ch # 4)
(a) Population’s (b) economy
(c) Unemployment (d) None of these
30. Which is the major pillars of the Vision 2025 of the Government of Pakistan. (Ch # 4)
(a) Development (b) Inclusive growth
(c) Sustainable growth (d) b,c
31. Those activities that contradict to the legislation in place .(Ch # 4)

(a) Legal economic activities

(b) Economic activities


(c)Illegal economic activities.

(d) None of these

32. A major dimension of CPEC for Pakistan is:(Ch # 4)


(a)Reducing Pakistan’s dependency on the West (b)reducingdependency on China
(c)Increase Pakistan’s dependency on the West (d)none
33. Which is the least populated region in Pakistan. (Ch # 5)
a. Punjab b. sindh
c. Baluchistan d. GilgitBaltistan
34. The Uyghur are mostly Sunni Muslim ethnic community residing in… .(Ch # 5)
a. China’s Xinjiang b. Eastern Turkic
c. Central Asia d. Middle Asia
35. Which is the core problem that affect the country’s governance and administration.(Ch # 5)
a. Terrorism b. Corruption
c. Inequity d. Inefficient Bureaucracy
36. CPPEC long term plan has different phases the phase-I consist on the year….(Ch # 1)
a. 2015-2020 b. 2020-2025
c. 2025-2030 d. 2030-2035
37. CPPEC long term plan has different phases the phase-II consist on the year….(Ch # 1)
a. 2015-2020 b. 2020-2025
c. 2025-2030 d. 2030-2035
38. The current CPEC portfolio how many projects are working..(Ch # 1)
a. 43 projects b. 50 projects
c. 61 projects d. 30 projects
39. FAGIA stands for.. (Ch # 1)
a. Foreign Aid and Government sponsored Instructions Activities
b. Foreign Aid and group sponsored Investment Activities
c. Foreign Aid and Government sponsored Investment Activities
d. Foreign Aid and Group sponsored Instructions Activities
40. CPEC joint the China with Middle east and …… to increases the imports of Oil. (Ch # 2)
a. North Africa b. South Africa
c. UAE d. none
Solution Paper (Economic Perspective of CPEC)

Q No. Correct option Q No. Correct option

1 C 21 A

2 C 22 B

3 C 23 B

4 A 24 D

5 C 25 A

6 A 26 B

7 B 27 A

8 C 28 D

9 C 29 A

10 B 30 D

11 D 31 C

12 C 32 A

13 C 33 C

14 B 34 A

15 C 35 B

16 A 36 A

17 C 37 B

18 C 38 A

19 D 39 C

20 B 40 A

You might also like