NO. SYSTEM CODE SYSTEM NAME SYSTEM CATEGORY SYSTEM WALKDOWN DATE A B C (A) (B) (C) ( A) ( B) ( C) ISSUED DATE STATUS
1 100 PV PLANT
2 101 PV FARM
3 102 MAIN STATION
4 200 NSEC TAKE OFF
5 300 SWITCHING SUBSTATION
6 400 69Kv TRANSMISSION LINE
7 500 NGCP CURRIMAO
8 600 OVERALL
Page 1 of
000000Security level: RINA/CL/SENSITIVE#
Page 2 of
SITE INSPECTION PUNCH LIST
68MWAC Currimao Solar Power Project
LOCATION TOTAL PUNCHLIST CLOSED PUNCHLIST
OVERALL PERCENTAGE
Major Punchlist
Total
Closed
Balance
Minor Punchlist
Total
Closed
Balance
oject
CLOSED PUNCHLIST, %
0
0
0
0
0
0
0
0 0
4
unchlist
unchlist
Version :
SITE INSPECTION PUNCH LIST Date Creation :
68MWAC Currimao Solar Power Project
Last Revision Date :
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
TOTAL PUNCHLISTS:
APPROVED PUNCHLISTS: PENCIL CLOSED
Remarks