Margin Of Overpull Drilling Calculations &
Excel Sheet
2017-11-06Drilling Manual
What Is The Overpull Drilling Definition
Contents hide
1 What Is The Overpull Drilling Definition
2 Maximum Overpull Calculations In Drilling
3 Margin Of Overpull In Drilling Calculations
4 Example On How To Calculate Margin Of Overpull In Drilling
4.1 Margin Of OverPull Calculator
The definition of Overpull Drilling is the maximum pull that can be exerted on stuck
drill pipe without causing failure in the Drill String. In this article we shall learn
more about margin of drill pipe overpull calculations and there is also online
calculator for it.
Maximum Overpull Calculations In Drilling
The maximum overpull that can be exerted on stuck drill pipe shall not exceed 80%
of the maximum tensile strength of the weakest grade Drill Pipe. In other words,
you must know which is the lowest grade drill pipes then get its tensile strength
then multiply it in 80% and this will be the maximum overpull you can reach while
any kind of stuck.
The maximum pull for each crossover point must be calculated to determine the
maximum pull that can be exerted on the Drill String. The calculation procedure is
illustrated in the following example.
Assume the Drilling Bit at 14000 ft & the drilling Bottom Hole Assembly
BHA would consist of the following:
Section 80% Tensile Section Strength Length, ft Air weight, lb
Bottom Hole Assembly – 1200 150,000 lb
5” Grade G Drill pipe 443,066 12,063 270,934 lb
5″ Grade S Drill pipe 569,656 737 17,245 lb
1- we check the maximum overpull on the weakest drill pipes.
The maximum overpull that can be exerted on the top of grade G drill
pipes without exceeding 80% of Grade G tensile strength is 443,066 lb.
2- Now calculate the maximum overpull in drilling string that can be exerted
on top of grade S drill pipes is,
Max overpull = 80% of Tensile Strength + weight of Grade S Drill Pipes
Max overpull = 443,066 + 17245 = 460,311 lb.
Since 460,311 lb are less than 80% of the grade S tensile strength (569,656 lb),
then it is safe to pull 460,311 lb.
So when we pull 460,311 lb at the surface
The pull exerted on top of Grade S DP is 460,311 lb.
The pull exerted on top of Grade G DP is 460,311 minus the weight of grade S DP,
or 460,311-17245 = 443,066 lb.
Margin Of Overpull In Drilling Calculations
Drill Pipe Overpull
calculations ( MArgin)
Margin of Overpull definition in drilling is the difference between the maximum
overpull in the drilling string and the current weight of your drilling string. off
course you shall consider the last recorded pick up weight as it is the weight of
your Drill String. Now, Let’s convert all these words above to an equation
Margin Of Overpull = Ta – Th
Where
Th is the hook load (excluding top drive weight), lb.
Ta is the maximum allowable tensile strength, lb.
You can also calculate the drill string weight from this equation
Th= Drill String Weight x Buoyancy Factor (BF)
Where you can calculate the drill string weight from below equation
Drill String Weight = (Lbha × Wbha) + (Ldc×Wdc) +(Lhwdp × Whwdp) + (Ldp × Wdp)
Wbha= Bottom Hole Assembly BHA weight
Lbha = bottom hole assembly length
Wdc= drill collar weight
Ldc = drill collar length
Whwdp= heavy weight drill pipe weight
Lhwdp = heavy weight drill pipe length
Wdp = drill pipe weight
Ldp = drill pipe length
Buoyancy Factor (BF) = (65.5 – MWT) ÷ 65.5
Example On How To Calculate Margin Of Overpull
In Drilling
Perform the drill pipe overpull margin calculations from the following
information:
The drill string consists of the following equipment:
5” DP S-135, 4-1/2” IF connection, adjusted weight of 23.5 ppf = 8,000 ft
5” HWDP S-135, 4-1/2” IF connection, adjusted weight of 58 ppf = 900 ft
Mud motor and MWD weight = 20 Klb
Lenght of mud motor and MWD = 90 ft
Mud weight is 9.2 ppg
Tensile strength of 5” DP S-135 (premium class) = 436 Klb
Tensile strength of 5” HWDP S-135 (premium class) = 1,100 Klb
90% of tensile strength is allowed to pull without permission from town.
Solution
1- Calculate the maximum tension will happen at the surface
5”DP will get the most tension when pulling and since only 90% of tensile strength
is allowed. The allowable tensile (Ta) is as follows;
Ta = 0.9 x 436 = 392 Klb
2- Calculate the buoyancy factorBuoyancy Factor
(BF) = (65.5 – 9.2) ÷ 65.5
Buoyancy Factor (BF) = 0.86
3- Calculate The String Weight from the following equation:
Drill String Weight = (Lbha × Wbha) + (Ldc×Wdc) +(Lhwdp × Whwdp) + (Ldp × Wdp)
Note: Weight of mud motor and MWD is given at 20 Klb.
Drill String Weight = (8,000 × 23.5) + (900 × 58) + (20,000)
Drill String Weight = 260 Klb
4- Calculate Tension on surface (Th)
Th= Drill String Weight x Buoyancy Factor (BF)
Th = 260 × 0.86 = 223.8 klb
5- Margin Of Overpull Calculations
Margin Of Overpull = Ta – Th
Margin of over pull = 392 – 223.8 = 168.2 Klb