The document lists pricing information for various construction materials in Indonesia. It includes 83 items such as water, aluminum foil, asphalt roofing, bamboo, concrete blocks, rebar, hollow steel, wood boards, tiles, paint, mortar, nails and more. The pricing is in Indonesian Rupiah (Rp.) per unit with the unit of measure such as liter, square meter, sheet, piece, kilogram or cubic meter specified for each item.

Uploaded by

TengkuSyafari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views20 pages

Rab Wonosari 2023

The document lists pricing information for various construction materials in Indonesia. It includes 83 items such as water, aluminum foil, asphalt roofing, bamboo, concrete blocks, rebar, hollow steel, wood boards, tiles, paint, mortar, nails and more. The pricing is in Indonesian Rupiah (Rp.) per unit with the unit of measure such as liter, square meter, sheet, piece, kilogram or cubic meter specified for each item.

Uploaded by

TengkuSyafari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 20

### #NAME?

### #NAME?
### #NAME?
### #NAME?
### #NAME?

HARGA DASAR SATUAN BAHAN

Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

1 Air Liter Rp. 65.00


2 Alluminium Foil DS m2 Rp. 16,000.00
3 Atap Aspal Bitumen CT3 Lembar Rp. 172,000.00
4 Underlayment Anti Bocor Atap m2 Rp. 64,000.00
5 Bambu Batang Rp. 123,000.00
6 Batu Bata Buah Rp. 700.00
7 Bata Ringan Tebal 7.5 cm Bh Rp. 9,000.00
8 Bata Ringan Tebal 10 cm Bh Rp. 12,000.00
9 Batu Kali / Batu Belah (Sungai / Gunung) M3 Rp. 185,000.00
10 Batang Kelapa Batang Rp. 307,500.00
11 Batu pecah 2-3 cm (1350 Kg/m3) M3 Rp. 330,000.00
12 Batu pecah 2-3 cm Kg Rp. 244.44
13 Batu Granit Kg Rp. 16,000.00
14 Batu Tempel Bh Rp. 16,500.00
15 Baut Kap Ø 1/2 - 8 Buah Rp. 5,535.00
16 Bensin (Industri) Liter Rp. 12,300.00
17 Besi Beton Polos Kg Rp. 12,000.00
18 Besi Beton Ulir Kg Rp. 14,000.00
19 Besi Hollow 40.40.2 mm m Rp. 22,000.00
20 Besi Profil Kg Rp. 16,700.00
21 Besi Siku L 30.30.3 Kg Rp. 12,500.00
22 Beton Rooster / Kerawang Buah Rp. 4,000.00
23 Bubungan Atap Aspal Bitumen M' Rp. 51,950.00
24 Cat Dasar Kg Rp. 28,000.00
25 Cat Kayu Mengkilat Kg Rp. 71,340.00
26 Cat Menie Kg Rp. 30,750.00
27 Cat Penutup Exterior Setara Jotun Kg Rp. 35,000.00
28 Cat Penutup Interior Setara Jotun Kg Rp. 65,000.00
29 Dempul Kg Rp. 30,750.00
30 Floor Drain Setara Toto Buah Rp. 280,000.00
31 Gypsum ( 120 x 240 cm ) Lembar Rp. 116,850.00
32 Gravel M3 Rp. 160,000.00
33 Granit Uk. 60 x 60 cm Polished Bh Rp. 86,400.00
34 Granit Uk. 60 x 60 cm Unpolished Bh Rp. 115,200.00
35 Granit Uk. 40 x 40 cm Bh Rp. 56,000.00
36 Granit Uk. 60 x 120 cm Bh Rp. 380,000.00
37 Ijuk Kg Rp. 12,300.00
38 Ijuk m3 Rp. 400,000.00
39 Kawat Beton Kg Rp. 22,000.00
40 Kawat Las Kg Rp. 18,700.00
41 Kayu Kelas I M3 Rp. 5,000,000.00
42 Kayu Kelas II M3 Rp. 2,800,000.00
43 Kayu Kelas III M3 Rp. 2,500,000.00
44 Kayu Kelas IV M3 Rp. 1,990,100.00
45 Kayu Dolken Ø 8-10/400 cm Batang Rp. 17,000.00
46 Kayu 5 x 7, Kayu Kelas II M3 Rp. 2,800,000.00
47 Kayu Reng, Kayu Kelas II M3 Rp. 2,800,000.00
48 Keramik Uk. 20 x 20 cm (Polished) Bh Rp. 2,853.60
49 Keramik Uk. 30 x 30 cm (Polished) Bh Rp. 6,642.00
50 Keramik Uk. 33 x 33 cm (Polished) Bh Rp. 8,036.82
51 Keramik Uk. 40 x 40 cm (Polished) Bh Rp. 12,792.00
52 Keramik Uk. 20 x 20 cm (Unpolished) Bh Rp. 3,198.00
53 Keramik Uk. 30 x 30 cm (Unpolished) Bh Rp. 7,195.50
54 Keramik Uk. 33 x 33 cm (Unpolished) Bh Rp. 8,706.56
55 Keramik Uk. 40 x 40 cm (Unpolished) Bh Rp. 12,792.00
56 Kerosen / Minyak Tanah (Industri) Liter Rp. 15,375.00
57 Kerosen / Minyak Tanah (Subsidi) Liter Rp. 11,070.00
58 Kertas Amplas Lembar Rp. 6,150.00
59 Kerikil (1350 kg/m3) M3 Rp. 250,000.00
60 Kerikil Kg Rp. 185.19
61 Kloset Duduk Keramik Buah Rp. 3,280,000.00
62 Kloset Jongkok Keramik Buah Rp. 860,000.00
### #NAME?
### #NAME?
### #NAME?
### #NAME?
### #NAME?

HARGA DASAR SATUAN BAHAN

Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

63 Koral Beton M3 Rp. 140,000.00


64 Kran Air Dia. 1/2" - 3/4" Bh Rp. 512,000.00
65 Minyak Cat Liter Rp. 30,000.00
66 Minyak Bekesting Liter Rp. 6,500.00
67 Minyak Pelumas Liter Rp. 12,400.00
68 Mortar Siap Pakai (MSP) Kg Rp. 6,000.00
69 Mortar Utama 380 ( 40 kg ) Zak Rp. 28,000.00
70 Multipleks 3 mm Lembar Rp. 55,350.00
71 Multipleks 4 mm Lembar Rp. 79,950.00
72 Multipleks 6 mm Lembar Rp. 104,550.00
73 Multipleks 9 mm Lembar Rp. 135,000.00
74 Paku Tripleks Kg Rp. 22,140.00
75 Paku Beton 8" Kotak Rp. 18,400.00
76 Paku Beton 4" Kotak Rp. 24,000.00
77 Paku 12 cm Bh Rp. 150.00
78 Paku Kayu 2" - 3" Kg Rp. 20,000.00
79 Paku Biasa 1/2" - 1" Kg Rp. 20,000.00
80 Paku Biasa 5 cm - 10 cm Kg Rp. 20,000.00
81 Paku Biasa 5 cm - 12 cm Kg Rp. 20,000.00
82 Paku Kayu Kg Rp. 20,000.00
83 Paku Reng Kg Rp. 15,498.00
84 Paku Seng Kg Rp. 18,450.00
85 Paku skrup 10 cm Kg Rp. 35,000.00
86 Papan Kayu Kelas I m3 Rp. 5,000,000.00
87 Papan Kayu Kelas II m3 Rp. 2,800,000.00
88 Papan Kayu Kelas III m3 Rp. 2,500,000.00
89 Papan Kayu Plafond Kelas II m3 Rp. 5,640,000.00
90 Pasir Batu (Sirtu) M3 Rp. 280,000.00
91 Pasir Beton (1400 kg/m3) M3 Rp. 180,000.00
92 Pasir Beton Kg Rp. 128.57
93 Pasir Pasang (1400 kg/m3) M3 Rp. 217,000.00
94 Pasir Pasang Kg Rp. 155.00
95 Pasir Urug M3 Rp. 124,000.00
96 Pasir Silika Bangka Kg Rp. 10,000.00
97 Paving Block M2 Rp. 98,400.00
98 Penjaga Jarak Bekesting (Spacer) bh Rp. 25,000.00
99 Pipa Ø 1" Galvanis Tebal 3.2 mm m' Rp. 50,225.00
100 Pipa Ø 3/4" Galvanis Tebal 3.2 mm m' Rp. 38,333.33
101 Pipa Ø 1/2" Galvanis Tebal 3.2 mm m' Rp. 30,750.00
102 Pipa Ø 1 1/2" Galvanis Tebal 3.2 mm m' Rp. 69,700.00
103 Pipa Ø 2" Galvanis Tebal 3.2 mm m' Rp. 88,150.00
104 Pipa Ø 3" Galvanis Tebal 3.2 mm m' Rp. 112,750.00
105 Pipa Ø 4" Galvanis Tebal 3.2 mm m' Rp. 176,300.00
106 Pipa Ø 6" Galvanis Tebal 3.2 mm m' Rp. 291,100.00
107 Pipa PVC Ø 1/2" Kualitas AWE (United) m' Rp. 6,300.00
108 Pipa PVC Ø 3/4" m' Rp. 8,300.00
109 Pipa PVC Ø 1" m' Rp. 11,200.00
110 Pipa PVC Ø 1 1/2" m' Rp. 19,500.00
111 Pipa PVC Ø 2" m' Rp. 25,000.00
112 Pipa PVC Ø 2 1/2" m' Rp. 36,500.00
113 Pipa PVC Ø 3" m' Rp. 50,000.00
114 Pipa PVC Ø 4" m' Rp. 77,400.00
115 Pipa PVC Ø 6" m' Rp. 168,750.00
116 Plamur Kg Rp. 22,000.00
117 Plint Keramik Granit 10 x 40 Bh Rp. 8,600.00
118 Plint Keramik Granit 10 x 60 Bh Rp. 12,800.00
119 Plywood 4 mm ( Ukuran 90 x 220 cm ) Lembar Rp. 78,000.00
120 Plywood 6 mm Lembar Rp. 86,000.00
121 Plywood 9 mm Lembar Rp. 135,000.00
122 Ramset Buah Rp. 350.00
123 Rangka Baja Ringan C75 kg Rp. 12,000.00
124 Rangka Baja Ringan C125 m' Rp. 122,000.00
125 Residu Kg Rp. 8,500.00
126 Roof Light Fibreglass 90 x 180 cm Lbr Rp. 260,000.00
127 Seal Tape Bh Rp. 3,500.00
128 Seng BJLS 0.20 Lbr Rp. 34,000.00
129 Semen @ 40 Kg Zak Rp. 70,400.00
130 Semen @ 40 Kg Kg Rp. 1,760.00
131 Semen @ 50 Kg Zak Rp. 88,000.00
132 Semen @ 50 Kg Kg Rp. 1,760.00
### #NAME?
### #NAME?
### #NAME?
### #NAME?
### #NAME?

HARGA DASAR SATUAN BAHAN

Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

133 Semen Warna @ 50 Kg Zak Rp. 150,000.00


134 Semen Warna @ 50 Kg Kg Rp. 3,000.00
### #NAME?
### #NAME?
### #NAME?
### #NAME?
### #NAME?

HARGA DASAR SATUAN BAHAN

Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

135 Sirap Kayu Bh Rp. 12,000.00


136 Skrup Fixer Bh Rp. 200.00
137 Solar (Industri) Liter Rp. 9,000.00
138 Stop Kontak + Instalasi Titik Rp. 73,800.00
139 Storox - 100 Kg Rp. 120,000.00
140 Stut Werk M3 Rp. 2,890,500.00
141 Tanah Liat M3 Rp. 40,000.00
142 Tanah Timbun M3 Rp. 70,000.00
143 Tanah Timbun Pilihan - Material Jalan M3 Rp. 140,000.00
144 Wastafel Bh Rp. 380,000.00
145 Waterdrain Bh Rp. 45,000.00
146 Waterstop PVC Lebar 150 mm m Rp. 24,500.00
147 Waterstop PVC Lebar 200 mm m Rp. 30,500.00
148 Waterstop Lebar 230 mm - 320 mm m Rp. 38,500.00
149 Wiremesh (Ulir) Dia. 5.0 Kg Rp. 10,000.00
150 Wiremesh (Ulir) Dia. 6.0 Kg Rp. 10,450.00
151 Besi Strip tebal 5 mm Kg Rp. 12,500.00
152 Seng Plat 3 x kk bjls 30 Lbr Rp. 84,000.00
153 Atap Apandek 0.30 mm M2 Rp. 70,000.00
154 Paku skrup + Mur bh Rp. 1,000.00
155 Biaya Penyambungan (BP) & UJL va Rp. 1,525.00
156 Biaya Pemeriksaan Instalasi (SLI) va Rp. 250.00

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
REKAPITULASI
BILL OF QUANTITY (BOQ)

KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI KABUPATEN/KOTA
SUB KEGIATAN : PERLUASAN SPAM JARINGAN PERPIPAAN DI KAWASAN PERDESAAN TAHUN ANGGARAN 2023
PEKERJAAN : PERLUASAN JARINGAN PERPIPAAN DAN SAMBUNGAN RUMAH SPAM PERDESAAN DESA WONOSARI
LOKASI : DESA WONOSARI
PAGU DANA : Rp198,000,000

NO URAIAN PEKERJAAN JUMLAH HARGA

4
1 2
5
I RENCANA ANGGARAN BIAYA SPAM DESA WONOSARI
A PEKERJAAN PEMBANGUNAN TOWER RESERVOIR KAP.30 M3
B PEKERJAAN PEMBANGUNAN INTAKE
C PEKERJAAN MEKANIKAL DAN SUMBER ENERGI Rp 15,317,000
D PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI Rp 91,197,793
& SAMBUNGAN RUMAH

JUMLAH Rp 106,514,793
PPN 11 % Rp 11,716,627
JUMLAH TOTAL Rp 118,231,420
PEMBULATAN Rp 118,232,000
TERBILANG SERATUS SEMBILAN PULUH DELAPAN JUTA RUPIAH

Pematang Reba, 15 Desember 2023


Di Hitung Oleh :
KONSULTAN PERENCANAAN
CV. ARITAMA KREASI KONSULTAN

TENGKU SYAFARI, ST
Direktur
REKAPITULASI

BILL OF QUANTITY (BOQ)

KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI KABUPATEN/KOTA
SUB KEGIATAN : PERLUASAN SPAM JARINGAN PERPIPAAN DI KAWASAN PERDESAAN TAHUN ANGGARAN 2023
PEKERJAAN : PERLUASAN JARINGAN PERPIPAAN DAN SAMBUNGAN RUMAH SPAM PERDESAAN DESA WONOSARI
LOKASI : DESA WONOSARI
PAGU DANA : Rp198,000,000

NO URAIAN PEKERJAAN JUMLAH HARGA


4
1 2
5
C PEKERJAAN MEKANIKAL DAN SUMBER ENERGI
I PEKERJAAN PENGADAAN DAN PEMASANGAN SUMBER ENERGI & POMPA Rp 15,317,000

JUMLAH Rp 15,317,000
PPN 11 % Rp 1,684,870
JUMLAH TOTAL Rp 17,001,870
PEMBULATAN Rp 17,000,000
TERBILANG TUJUH BELAS JUTA RUPIAH

Pematang Reba, 15 Desember 2023


Di Hitung Oleh :
KONSULTAN PERENCANAAN
CV. ARITAMA KREASI KONSULTAN

TENGKU SYAFARI, ST
Direktur
BILL OF QUANTITY (BOQ)

KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI KABUPATEN/KOTA
SUB KEGIATAN : PERLUASAN SPAM JARINGAN PERPIPAAN DI KAWASAN PERDESAAN TAHUN ANGGARAN 2023
PEKERJAAN : PERLUASAN JARINGAN PERPIPAAN DAN SAMBUNGAN RUMAH SPAM PERDESAAN DESA WONOSARI
LOKASI : DESA WONOSARI
PAGU DANA : Rp198,000,000.00

JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp.)
(Rp.)
1 2 3 4 5 6 = 3x5
C PEKERJAAN MEKANIKAL DAN SUMBER ENERGI
I PEKERJAAN PENGADAAN DAN PEMASANGAN SUMBER ENERGI & POMPA
1 Pek. Pengadaan dan Pemasangan KwH Meter 4400 VA, 1 Phase, 1 Unit Rp 5,942,000 Rp 5,942,000
2 Pek. Pengadaan dan Pemasangan Pompa Intake Submersible, Kap.1,5 Ltr/Det, Head 30 M, 1 Unit Rp 9,375,000 Rp 9,375,000
2 Hp/1 Phase, Lengkap Dengan Asesories

Jumlah SUB I Rp 15,317,000


REKAPITULASI

BILL OF QUANTITY (BOQ)

KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI KABUPATEN/KOTA
SUB KEGIATAN : PERLUASAN SPAM JARINGAN PERPIPAAN DI KAWASAN PERDESAAN TAHUN ANGGARAN 2023
PEKERJAAN : PERLUASAN JARINGAN PERPIPAAN DAN SAMBUNGAN RUMAH SPAM PERDESAAN DESA WONOSARI
LOKASI : DESA WONOSARI
PAGU DANA : Rp198,000,000

NO URAIAN PEKERJAAN JUMLAH HARGA


4
1 2
5
D PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI & SAMBUNGAN RUMAH
I PEKERJAAN PENDAHULUAN Rp 3,842,000
II PEKERJAAN GALIAN TANAH PIPA DISTRIBUSI Rp 6,467,819
III PENGADAAN DAN PEMASANGAN PIPA DAN FITTING PIPA PVC Rp 48,838,282
IV PEKERJAAN URUGAN KEMBALI GALIAN TANAH PIPA DISTRIBUSI Rp 5,050,955
V PEKERJAAN CROSSING PIPA PVC Rp -
VI PEKERJAAN PENGADAAN DAN PEMASANGAN SAMBUNGAN RUMAH Rp 26,998,737
VII PEKERJAAN LAIN-LAIN Rp -

JUMLAH Rp 91,197,793
PPN 11 % Rp 10,031,757
JUMLAH TOTAL Rp 101,229,550
PEMBULATAN Rp 101,300,000

TERBILANG SERATUS SEMBILAN PULUH DELAPAN JUTA RUPIAH

Pematang Reba, 15 Desember 2023


Di Hitung Oleh :
KONSULTAN PERENCANAAN
CV. ARITAMA KREASI KONSULTAN

TENGKU SYAFARI, ST
Direktur
BILL OF QUANTITY (BOQ)

KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI KABUPATEN/KOTA
SUB KEGIATAN : PERLUASAN SPAM JARINGAN PERPIPAAN DI KAWASAN PERDESAAN TAHUN ANGGARAN 2023
PEKERJAAN : PERLUASAN JARINGAN PERPIPAAN DAN SAMBUNGAN RUMAH SPAM PERDESAAN DESA WONOSARI
LOKASI : DESA WONOSARI
PAGU DANA : Rp198,000,000.00

JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp.)
(Rp.)
1 2 3 4 5 6 = 3x5
D PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI & SAMBUNGAN RUMAH
I PEKERJAAN PENDAHULUAN
1 Pek. Papan Nama Proyek 1 Ls Rp 200,000 Rp 200,000
2 Sistem Manajemen Kesehatan Keselamatan Konstruksi (SMK 3) 1 Ls Rp 3,642,000 Rp 3,642,000

Jumlah SUB I Rp 3,842,000


II PEKERJAAN GALIAN TANAH PIPA DISTRIBUSI
1 Pek. Galian Tanah Pipa PVC S 12.5 Dia 90 mm 74.88 M3 Rp 78,375 Rp 5,868,720
2 Pek. Galian Tanah Pipa PVC S 12.5 Dia 63 mm 7.488 M3 Rp 78,375 Rp 586,872
3 Pek. Galian Tanah Pipa PVC S 12.5 Dia 50 mm 0.156 M3 Rp 78,375 Rp 12,227

Jumlah SUB II Rp 6,467,819


III PENGADAAN DAN PEMASANGAN PIPA DAN FITTING PIPA PVC
1 Pek. Pengadaan dan Pemasangan Pipa PVC S 12.5 Dia 90 mm 42 M Rp 143,530 Rp 6,028,260
2 Pek. Pengadaan dan Pemasangan Pipa PVC S 12.5 Dia 63 mm 480 M Rp 76,523 Rp 36,731,040
3 Pek. Pengadaan dan Pemasangan Pipa PVC S 12.5 Dia 50 mm 48 M Rp 54,131 Rp 2,598,288
4 Pek. Pengadaan dan Pemasangan Fitting Pipa PVC 1 Set Rp 3,480,694 Rp 3,480,694

Jumlah SUB III Rp 48,838,282


IV PEKERJAAN URUGAN KEMBALI GALIAN TANAH PIPA DISTRIBUSI
1 Pek. Urugan Kembali Galian Tanah Pipa PVC S 12.5 Dia 63 mm 6.34 M3 Rp 57,750 Rp 366,271
2 Pek. Urugan Kembali Galian Tanah Pipa PVC S 12.5 Dia 63 mm 73.71 M3 Rp 57,750 Rp 4,256,523
3 Pek. Urugan Kembali Galian Tanah Pipa PVC S 12.5 Dia 63 mm 7.41 M3 Rp 57,750 Rp 428,162

Jumlah SUB IV Rp 5,050,955


V PEKERJAAN CROSSING PIPA PVC
1 Pek. Crossing Pipa PVC S 12.5 Dia. 63 mm 0 Unit Rp 3,850,000 Rp -

Jumlah SUB V Rp -
VI PEKERJAAN PENGADAAN DAN PEMASANGAN SAMBUNGAN RUMAH
1 Pek. Pengadaan dan Pemasangan Fitting dan Accesories Sambungan Rumah
17 Unit Rp 1,588,161 Rp 26,998,737

Jumlah SUB VI Rp 26,998,737


VII PEKERJAAN LAIN-LAIN
1 Pek. Perbaikan kembali sarana yang rusak (cor beton)) 0 M3 Rp 1,181,570 Rp -

Jumlah SUB VII Rp -


ANALISA BIAYA SMK3 KONSTRUKSI

NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4 5 6 [3x5]

I Penyiapan RK3K
1 Pembuatan Kartu Identitas Pekerja (KIP) 5.00 Lb Rp 10,000 Rp 50,000

Sub Jumlah Rp 50,000


II Sosialisasi dan Promosi 3K
1 Spanduk (benner) 1.00 Lbr Rp 350,000 Rp 350,000

Sub Jumlah Rp 350,000


III Alat Pelindung Kerja
1 Pembatas Area (Restricted Area ) 1.00 Ls Rp 300,000 Rp 300,000

Sub Jumlah Rp 300,000


IV Pelindung Diri
1 Topi Pelindung (Safety Helmet) 5.00 Bh Rp 50,000 Rp 250,000
2 Sarung Tangan (Safety Gloves) 5.00 Bh Rp 10,000 Rp 50,000
3 Sepatu Keselamatan (Safety Shoes) 5.00 Bh Rp 300,000 Rp 1,500,000
4 Rompi Keselamatan (Safety Vest) 5.00 Bh Rp 50,000 Rp 250,000

Sub Jumlah Rp 2,050,000


V Asuransi dan Perijinan
1 BPJS Ketenagakerjaan Dan Kesehatan Kerja 1.00 Ls Rp 392,000 Rp 392,000

Sub Jumlah Rp 392,000


VI Fasilitas Sarana Kesehatan
1 Peralatan P3K 1.00 Ls Rp 300,000 Rp 300,000

Sub Jumlah Rp 300,000


VII Rambu-Rambu
1 Rambu Peringatan 2.00 Bh Rp 100,000 Rp 200,000

Sub Jumlah Rp 200,000


JUMLAH Rp. 3,642,000
PERHITUNGAN IURAN JAMINAN KECELAKAAN KERJA DAN JAMINAN KEMATIAN
PROGRAM JASA KONSTRUKSI
SESUAI PP Nomor 44 Tahun 2015 Pasal 54 Dan Pasal 55
NAMA PERUSAHAAN : ………………………..
TDK SEBAGAI BUKTI PEMBAYARAN IURAN
NILAI KONTRAK SESUAI SPK 198,000,000.00
NILAI KONTRAK SEBELUM PPN 11 % 180,000,000.00

TDK SEBAGAI BUKTI PEMBAYARAN IURAN


No Tarif Perhitungan Jumlah Iuran Keterangan

1 Tarif 1 JKK 0.21% 210,000.00 Nilai Kontrak 0 s/d 100 Juta


x 100,000,000.00
JKM 0.03% 30,000.00

2 Tarif 2 JKK 0.17% 136,000.00 Nilai Kontrak 100 Juta s/d 500 Juta
x 80,000,000.00
JKM 0.02% 16,000.00

3 Tarif 3 JKK 0.13% - Nilai Kontrak 500 Juta s/d 1 Milyar


x -
JKM 0.02% -

4 Tarif 4 JKK 0.11% - Nilai Kontrak 1 Milyar s/d 5 Milyar


x -
JKM 0.01% -

5 Tarif 5 JKK 0.09% - Nilai Kontrak diatas 5 Milyar


x -
JKM 0.01% -

TOTAL 392,000.00
TDK SEBAGAI BUKTI PEMBAYARAN IURAN

Catatan :
Cukup diisi Nilai Kontrak yang di beri tanda KUNING

PEMBAYARAN IURAN KE REKENING ATAS NAMA BPJS KETENAGAKERJAAN :


BPD No. Rek 102-06-02510

TDK SEBAGAI BUKTI PEMBAYARAN IURAN TDK SEBAGAI BUKTI PEMBAYARAN IURAN
ANALISA HARGA SATUAN PEKERJAAN

AHSP A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

Analisa : AHSP A.2.3.1.1


Item : Menggali Tanah Biasa Sedalam 1 m
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.750 Rp. 90,000.00 Rp. 67,500.00
Tukang L.02 OH - Rp. 120,000.00 Rp -
Kepala Tukang L.03 OH - Rp. 150,000.00 Rp -
Mandor L.04 OH 0.025 Rp. 150,000.00 Rp. 3,750.00
Jumlah Tenaga Kerja (A) Rp. 71,250.00
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 71,250.00
E Overhead & Profit 10% x D Rp. 7,125.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 78,375.00
G Dibulatkan Rp. 78,375.00

Analisa : AHSP A.2.3.1.9


Item : Pengurugan Kembali Galian Tanah
Satuan : m3

Pengurugan Kembali 1 m3 Galian Dihitung dari 1/3 kali Koefisien Pekerjaan Galian
Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 Rp. 90,000.00 Rp. 45,000.00
Tukang L.02 OH - Rp. 120,000.00 Rp -
Kepala Tukang L.03 OH - Rp. 150,000.00 Rp -
Mandor L.04 OH 0.050 Rp. 150,000.00 Rp. 7,500.00
Jumlah Tenaga Kerja (A) Rp. 52,500.00
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 52,500.00
E Overhead & Profit 10% x D Rp. 5,250.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 57,750.00
G Dibulatkan Rp. 57,750.00
ANALISA HARGA SATUAN PEKERJAAN

AHSP A.4.1.1. HARGA SATUAN PEKERJAAN BETON

Analisa : AHSP A.4.1.1.5


Item : Membuat Beton Mutu f'c = 14.5 MPa (K-175), Slump (12 ± 2 ) cm, w/c = 0.66
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 90,000.00 Rp. 148,500.00
Tukang L.02 OH 0.275 Rp. 120,000.00 Rp. 33,000.00
Kepala Tukang L.03 OH 0.028 Rp. 150,000.00 Rp. 4,200.00
Mandor L.04 OH 0.083 Rp. 150,000.00 Rp. 12,450.00
Jumlah Tenaga Kerja (A) Rp. 198,150.00
B BAHAN
Semen @ 40 Kg Kg 326.000 Rp. 1,760.00 Rp. 573,760.00
Pasir Beton (1400 kg/m3) Kg 760.000 Rp. 128.57 Rp. 97,714.29
Kerikil (1350 kg/m3) Kg 1,029.000 Rp. 185.19 Rp. 190,555.56
Air Liter 215.000 Rp. 65.00 Rp. 13,975.00

Jumlah Harga Bahan (B) Rp. 876,004.84


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,074,154.84
E Overhead & Profit 10% x D Rp. 107,415.48
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,181,570.33
G Dibulatkan Rp. 1,181,570.33
ANALISA HARGA SATUAN PEKERJAAN PERPIPAAN

Analisa :
Item : MEMASANG 1 M PIPA PVC DIA 090 MM
Satuan : M

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.094 Rp. 90,000.00 Rp. 8,460.00
Tukang Pipa L.02 OH 0.047 Rp. 120,000.00 Rp. 5,640.00
Kepala Tukang L.03 OH - Rp. 150,000.00 Rp -
Mandor L.04 OH 0.009 Rp. 150,000.00 Rp. 1,350.00

Jumlah Tenaga Kerja (A) Rp. 15,450.00


B BAHAN
Pipa PVC DIA 090 MM M' 1.000 Rp. 115,032.00 Rp. 115,032.00

Jumlah Harga Bahan (B) Rp. 115,032.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 130,482.00
E Overhead & Profit 10% x D Rp. 13,048.20
F Harga Satuan Pekerjaan ( D + E ) Rp. 143,530.20
G Dibulatkan Rp. 143,530.00

Analisa :
Item : MEMASANG 1 M PIPA PVC DIA 063 MM
Satuan : M

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.081 Rp. 90,000.00 Rp. 7,290.00
Tukang Pipa L.02 OH 0.041 Rp. 120,000.00 Rp. 4,920.00
Kepala Tukang L.03 OH - Rp. 150,000.00 Rp -
Mandor L.04 OH 0.008 Rp. 150,000.00 Rp. 1,200.00

Jumlah Tenaga Kerja (A) Rp. 13,410.00


B BAHAN
Pipa PVC DIA 063 MM M' 1.000 Rp. 56,157.00 Rp. 56,157.00

Jumlah Harga Bahan (B) Rp. 56,157.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 69,567.00
E Overhead & Profit 10% x D Rp. 6,956.70
F Harga Satuan Pekerjaan ( D + E ) Rp. 76,523.70
G Dibulatkan Rp. 76,523.00

Analisa :
Item : MEMASANG 1 M PIPA PVC DIA 050 MM
Satuan : M

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.081 Rp. 90,000.00 Rp. 7,290.00
Tukang Pipa L.02 OH 0.041 Rp. 120,000.00 Rp. 4,920.00
Kepala Tukang L.03 OH - Rp. 150,000.00 Rp -
Mandor L.04 OH 0.008 Rp. 150,000.00 Rp. 1,200.00

Jumlah Tenaga Kerja (A) Rp. 13,410.00


B BAHAN
Pipa PVC DIA 063 MM M' 1.000 Rp. 35,800.00 Rp. 35,800.00

Jumlah Harga Bahan (B) Rp. 35,800.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 49,210.00
E Overhead & Profit 10% x D Rp. 4,921.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 54,131.00
G Dibulatkan Rp. 54,131.00
Analisa :
Item : MEMASANG 1 UNIT CROSSING PIPA PVC DIA 063 MM
Satuan : Unit

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pengeboran Tanah Ls 1.000 Rp. 3,500,000.00 Rp. 3,500,000.00

Jumlah Tenaga Kerja (A) Rp. 3,500,000.00


B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 3,500,000.00
E Overhead & Profit 10% x D Rp. 350,000.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 3,850,000.00
G Dibulatkan Rp. 3,850,000.00

Analisa :
Item : PENGADAAN DAN PEMASANGAN FITTING PIPA PVC
Satuan : SET

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pemasangan Fitting Pipa PVC Ls 1.000 Rp. 250,000.00 Rp. 250,000.00

Jumlah Tenaga Kerja (A) Rp. 250,000.00


B BAHAN
Tee PVC Dia. 90 x 90 x 90 Buah 1.000 Rp. 583,280.00 Rp. 583,280.00
Tee PVC Dia. 63 x 63 x 63 Buah 3.000 Rp. 386,028.00 Rp. 1,158,084.00
Reducer PVC Dia. 90 x 63 Buah 2.000 Rp. 415,300.00 Rp. 830,600.00
End Cap Dia. 63 Buah 4.000 Rp. 85,576.00 Rp. 342,304.00

Jumlah Harga Bahan (B) Rp. 2,914,268.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 3,164,268.00
E Overhead & Profit 10% x D Rp. 316,426.80
F Harga Satuan Pekerjaan ( D + E ) Rp. 3,480,694.80
G Dibulatkan Rp. 3,480,694.00
ANALISA HARGA SATUAN PEKERJAAN PEMASANGAN SR

Analisa : AHSP A.2.2.1.4


Item : PENGADAAN DAN PEMASANGAN FITTING DAN ACCESORIES SAMBUNGAN RUMAH 1 UNIT (PIPA INDUK DIA 063 MM)
Satuan : Unit

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pemasangan SR dan Cor Dudukan Box Meter Unit 1.000 Rp. 300,000.00 Rp. 300,000.00
Jumlah Tenaga Kerja (A) Rp. 300,000.00
B BAHAN
Ferrule Cutter PP Compress 20 mm x 1-1/4 Inch Buah 1.000 Rp. 108,000.00 Rp. 108,000.00
Pipa HDPE 20 mm [SNI 4829.2-2015 (PN 16)] M 12.000 Rp. 9,800.00 Rp. 117,600.00
Male Thread Adaptor PP Compress 20 mm x 1/2 Inch Buah 1.000 Rp. 11,074.00 Rp. 11,074.00
Elbow 90 GI 1/2 Inch Buah 5.000 Rp. 10,900.00 Rp. 54,500.00
Plug Kran Kuningan 1/2 Inch Buah 1.000 Rp. 65,000.00 Rp. 65,000.00
Double Nepple GI 1/2 Inch Buah 2.000 Rp. 9,300.00 Rp. 18,600.00
Water Meter Brass 1/2" (multi jet) SNI 2547 - 2008 Buah 1.000 Rp. 420,000.00 Rp. 420,000.00
Brass Gate Valve 1/2 Inch Buah 1.000 Rp. 89,040.00 Rp. 89,040.00
Tee GI 1/2 Inch Buah 1.000 Rp. 13,200.00 Rp. 13,200.00
Pipa Galvanis Medium 1/2 Inch (panjang 20 cm, sney kanan kiri) Buah 2.000 Rp. 13,960.00 Rp. 27,920.00
Pipa Galvanis Medium 1/2 Inch (panjang 50 cm, sney kanan kiri) Buah 2.000 Rp. 34,900.00 Rp. 69,800.00
Stop Kran Galvanis 1/2 Inch Buah 1.000 Rp. 23,340.00 Rp. 23,340.00
Plug PVC 1/2" Buah 1.000 Rp. 5,000.00 Rp. 5,000.00
Box Meter PP Buah 1.000 Rp. 68,256.00 Rp. 68,256.00
Seal Tape 12 mm Set 1.000 Rp. 4,230.00 Rp. 4,230.00
Clamp Sadlle PP 63 x 1-1/4" Buah 1.000 Rp. 48,223.00 Rp. 48,223.00

Jumlah Harga Bahan (B) Rp. 1,143,783.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,443,783.00
E Overhead & Profit 10% x D Rp. 144,378.30
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,588,161.30
G Dibulatkan Rp. 1,588,161.00
HARGA DASAR SATUAN UPAH

Harga Satuan (Rp.)


No. Tenaga Kerja Kode Satuan Keterangan
Jam Hari

1 Pekerja L.01 OH Rp. 11,200.00 Rp. 90,000.00


2 Tukang L.02 OH Rp. 15,000.00 Rp. 120,000.00
3 Tukang Gali L.02 OH Rp. 15,000.00 Rp. 120,000.00
4 Tukang Batu L.02 OH Rp. 15,000.00 Rp. 120,000.00
5 Tukang Kayu L.02 OH Rp. 15,000.00 Rp. 120,000.00
6 Tukang Besi L.02 OH Rp. 15,000.00 Rp. 120,000.00
7 Tukang Pipa L.02 OH Rp. 15,000.00 Rp. 120,000.00
8 Tukang Cat / Pelitur L.02 OH Rp. 15,000.00 Rp. 120,000.00
9 Tukang Pipa / Operator Pompa L.02 OH Rp. 15,000.00 Rp. 120,000.00
10 Tukang Pengayam Bronjong L.02 OH Rp. 15,000.00 Rp. 120,000.00
11 Tukang Tebas L.02 OH Rp. 15,000.00 Rp. 120,000.00
12 Kepala Tukang L.03 OH Rp. 18,700.00 Rp. 150,000.00
13 Mandor L.04 OH Rp. 18,700.00 Rp. 150,000.00
HARGA DASAR SATUAN BAHAN PIPA
HARGA
NO. JENIS UPAH DAN BAHAN SATUAN
(Rp.)
1 2 3 4

1 PIPA PVC [SNI 06.0084-2002 CLASS S. 12.5]


Pipa PVC DIA 040 SC M1 Rp 23,275.00
Pipa PVC DIA 050 SC M1 Rp 35,800.00
Pipa PVC DIA 063 RR M1 Rp 56,157.00
Pipa PVC DIA 075 RR M1 Rp 82,333.00
Pipa PVC DIA 090 RR M1 Rp 115,032.00
Pipa PVC DIA 110 RR M1 Rp 167,747.00

2 TEE PVC ALL RR


Tee PVC All RR DIA 063 X 063 Buah Rp 386,028.00
Tee PVC All RR DIA 090 X 090 Buah Rp 583,280.00
Tee PVC All RR DIA 110 X 110 Buah Rp 803,112.00

3 BEND PVC 90 RR
Bend PVC 90 RR DIA 063 Buah Rp 174,100.00
Bend PVC 90 RR DIA 075 Buah Rp 295,300.00
Bend PVC 90 RR DIA 090 Buah Rp 308,080.00
Bend PVC 90 RR DIA 110 Buah Rp 489,120.00

4 BEND PVC 45 RR
Bend PVC 45 RR DIA 063 Buah Rp 156,240.00
Bend PVC 45 RR DIA 075 Buah Rp 267,750.00
Bend PVC 45 RR DIA 090 Buah Rp 273,200.00
Bend PVC 45 RR DIA 110 Buah Rp 416,480.00

5 END CAP PVC RR


End Cap PVC DIA 063 Buah Rp 85,576.00
End Cap PVC DIA 090 Buah Rp 164,064.00
End Cap PVC DIA 110 Buah Rp 241,024.00

6 REDUCER TEE PVC ALL RR


Reducer TEE PVC DIA 090 X 063 Buah Rp 415,300.00
Reducer TEE PVC DIA 110 X 063 Buah Rp 957,850.00
Reducer TEE PVC DIA 110 X 090 Buah Rp 712,450.00

7 REDUCER PVC ALL RR


Reducer PVC DIA 090 X 063 Buah Rp 243,850.00
Reducer PVC DIA 110 X 063 Buah Rp 393,300.00

8 BAHAN SAMBUNGAN RUMAH


Ferrule Cutter PP Compress 20 mm x 1-1/4 Inch Buah Rp 108,000.00
Pipa HDPE 20 mm [SNI 4829.2-2015 (PN 16)] M Rp 9,800.00
Male Thread Adaptor PP Compress 20 mm x 1/2 Inch Buah Rp 11,074.00
Elbow 90 GI 1/2 Inch Buah Rp 10,900.00
Plug Kran Kuningan 1/2 Inch Buah Rp 65,000.00
Double Nepple GI 1/2 Inch Buah Rp 9,300.00
Water Meter Brass 1/2" (multi jet) SNI 2547 - 2008 Buah Rp 420,000.00
Brass Gate Valve 1/2 Inch Buah Rp 89,040.00
Tee GI 1/2 Inch Buah Rp 13,200.00
Pipa Galvanis Medium 1/2 Inch (panjang 20 cm, sney kanan kiri) Buah Rp 13,960.00
Pipa Galvanis Medium 1/2 Inch (panjang 50 cm, sney kanan kiri) Buah Rp 34,900.00
Stop Kran Galvanis 1/2 Inch Buah Rp 23,340.00
Plug PVC 1/2" Buah Rp 5,000.00
Box Meter PP Buah Rp 68,256.00
Seal Tape 12 mm Set Rp 4,230.00
Clamp Sadlle PP 63 x 1-1/4" Buah Rp 48,223.00
Clamp Sadlle PP 90 x 1-1/4" Buah Rp 85,000.00
Baut DN 5/8'' X 3'' Buah Rp 15,000.00
PROYEKSI KEBUTUHAN AIR BERSIH
DESA WONOSARI KECAMATAN LIRIK
TAHUN 2023

Tahun Proyeksi Ke n ANALISA PERHITUNGAN


No Uraian Satuan Tahun KETERANGAN
5th 10th 15th KODE CARA HITUNG
perenc.
100 KK
1 Jumlah penduduk ( Dusun 2 ) jiwa 500 553 610 673 1 rata2 kenaikan 2 % pertahun
Pelayanan penduduk % 100 100 100 100 2 juklak 100% pelayanan
jiwa 500 553 610 673 3
2 Pelayanan SR % 100 100 100 100 4 juklak / survei
jiwa 500 553 610 673 5 (5)= ((4)*(3))/100
jiwa/sb 5 5 5 5 6 juklak
Jmlh. Sb 100 111 122 135 7 (7)= (5) / (6)
Pemakaian Air Lt/org/hr 90 90 90 90 8 juklak
Lt/sb/hr 450 450 450 450 9 (9)= (8) x (17)
Lt/det 0.52 0.58 0.64 0.70 10 (10)=(5)x(8)/86400

3 Pelayanan KU / HU % - - - 11 (11)= 100 - (4)


jiwa - - - - 12 (12)=(11)/100*(3)
jiwa/HU 100 100 100 100 13 juklak
Jmlh. HU - - - - 14 (14)=(12)/(13)
Pemakaian Air Lt/org/hr 60 60 60 60 15 juklak
Lt/HU/hr 6,000 6,000 6,000 6,000 16 (16)=(25)*(27)
Lt/det - - - - 17 (17)=(12)*(15)/86400
4 Total Domestik Lt/det 0.52 0.58 0.64 0.70 18 (18)=(10)+(17)

5 Total Non Domestik % 0 0 0 0 19


Lt/det - - - - 20
6 Total Kebutuhan Air Lt/det 0.52 0.58 0.64 0.70 21 (21)=(18) + (20)

7 Kehilangan Air % 20 20 20 20 22 juklak


Lt/det 0.10 0.12 0.13 0.14 23 (23)=(21)*(22)/100
8 Kebutuhan Air
- Rata-rata Lt/det 0.63 0.69 0.76 0.84 24 (24)=(21)+ 23)
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 25 juklak
Lt/det 0.69 0.76 0.84 0.93 26 (26)=(24)* 25)
m3/jam 2.48 2.74 3.02 3.33 26a (26a)=(24)*3600/1000
m3/hr 59.40 65.70 72.47 79.95 26b (26b)=(26a)*24
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 27 juklak (minimum)
Lt/det 0.94 1.04 1.14 1.26 28 (28)=(24)*(27)
9 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 29 faktor keamanan
Lt/det 2.06 2.28 2.52 2.78 30 (30)=(26)*(29) Besarnya debit perencanaan
3X kebutuhan air baku
10 Kapasitas Minimum M3 11.9 13.1 14.5 16.0 31 (31)=(26b)*20%
Bak Penampung

Sumber : Analisa Konsultan, tahun 2023


PERHITUNGAN DESIGN RESERVOIR SARANA AIR BERSIH
DESA WONOSARI
KECAMATAN LIRIK KABUPATEN INDRAGIRI HULU

Jumlah penduduk sekarang Po = 500 jiwa


15 tahun yang akan datang : Pn = 673 Jiwa

Kebutuhan air untuk 15 tahun yang akan datang :


- Kebutuhan air rata-rata Qr = 0.84 lt/dt
- Kebutuhan air harian puncak Qmd = 0.93 lt/dt
- Kebutuhan air jam puncak Qp = 1.26 lt/dt

Volume Reservoir yang dibutuhkan :


= kebutuhan air harian puncak x %kapasitas minimum x jam operasi

Jam operasi = 24.00 jam


%kapasitas minimum reservoar = 20.00 %

Jadi Volume Reservoir yang dibutuhkan


V Reservoir = 15.99 m3

Dimensi Existing Reservoar


Panjang p = 3.00 m
Lebar l = 3.00 m
Tinggi t , 2.00 m

V R Reservoir = PxLxT
= 18.00 m3

V R Reservoir > V Reservoir


18.00 > 15.99 OK

Freeboard 20 - 30 cm
Kapasitas Reservoar = 18.00
Kapasitas Freeboard = Vol. Reservoar rencana - Vol. Reservoar Kebutuhan
= 18.00 - 15.99
= 2.01

Tinggi Freeboard = Selisih Volume / Luas Reservoar Rencana


= 2.01 : 9.0
= 0.22 m Krietria desain 20 - 30 cm
= 22 cm > 20 cm --------------> OK