0 ratings0% found this document useful (0 votes) 93 views4 pagesMOM PM 084 PRM 062 QRM 052 ESGRM 055 On 04 Oct 23 Signed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
& Shriram
Properties
Yemen athe nyo
MASTERS
fare o Projet:
eta
Meeting number
|aaenas
“MINUTES OF MEETING
Construction of Sub-Structure and Super- Structure Civil Works including part
Finidhing Works for Project ‘Sunshine One’, Shriram Grand City, Uttarpara
Progress Review Meeting
PM-64
Pam -62
gant 52
1) Review of Sole’ work progres of Towers cf Sunshine One wt Oct23 Work lan,
2) Review of satus of lesznescheversent at Sunshine One.
3) Simplex’ pian to complete Ping a Sunshine Two
49) Sper’ plan to complet Vernal Load Tet Sunshine Two.
5) RIG augrertaton plan for ping work.
16) Review of status of abou avalabity& Semper’ plan for medate augmentation, Tower-
Fishing Work
8) Target date for mottsing Passenger Hast at Towers 1A.
59) Review of projet Quay Practices and Manggerent satus,
10) Review of project HSE Practices and Managemere stats.
Meeting Date: o-0ct-23
Meeting Tene: 1:00.
ate o sue:
7) Singlets Foor Handover Pan for Proper Cebning and Repairs before Cammencerant of To sue
a
eee
— -
~ SPL ESats Private Uinta ‘madaabhe@shviam| =
1 (Mr. Madan Bhar - - me | 9916601502 he
bronertiescom _|
ee Seema [|e
7 ‘moroperties.com
aoa ERS a One — a esa pepe
5 ae ees
masta} scams tas — Pa a 4
FE a as mead — 3 esha
. ‘operties.com
Fe ser tans — PT a
—
a
1 mniplesinfra.com |
aR oR — RTE | (B—
° ‘nfrastructures.com
pra ape RT oe at
Re ease | ome ea G7
2 —
12| Madval Dal] si rasece4nd le
1
prea a TT TTT Pt HTS ea
5 aa a
Pe SFr RRS, | S| TT asst ha
8 “oo ; ww
na SCTE REET | IS | SESE
B mn
| cap en oust RTS TENTS |
i mn
aS RT TET ERTS] P|
18 mee
ear — a sgeataar far atari
Detaits of Minutes described in
Issued On'0410-2023,i Shriram
verties
Homes tha
MASTERS
MINUTES OF MEETING
Proares pertinent sues SSR © 5
> [fermenter & Fitters: been ctsranes aug the meeting Wat nad to camel te srucral werk o Tower SUEA Tar God age De mrad CrpOTaT B FRST 3 TIO st] Of Rana
|septovment "plan|20 by 15 February 2024, an Towers 3& and JAby 33 March 2028 Sl aie 1oseymt|DHt | Tower 14
lor van Work ne nner carpet ond fiers oe li)" st Nov 23 - Cumulative 80 nos. (existing contractort One more contractor to
Tower 28: 75 hos inerouces.
Fomor 36° 400 Nos,
rower A: 80 Nox. rower 28
Tota 255 Nae. |) 8y 4s tov 23- Cumulative 75 nos. exstag contractor)
Ioweve, of the cert dt, tere are only 120 Carpenters & Rtrs, whic ss ha}
ot ote requ manpower’ ts bee tna to Sit tat wth he xen map| rower 3
tenants ot pose to achieve the tgs. Therefore, SIL has commited to intredue| |2 29 t5t mov 23 - cumutative 100 nos. (aiting contractor + One more contractor to be}
ne ear contractors for tower 1A & 3E each in increas the existing contractor Sana |neroaucee)
loctower 38. Ist sal submit deta construction schedule with immeat effet
1 |Canareting JOU & POH naked wi SL repro te sas O he Cares pont fer Gelber SAUER [i raed te eons ces fan arent roth S| oa a
leropramme for|2023. spl har commited to sample 10 pours acors tee tors tuk tes esn/OM [Tower da 5 Octobe 2023
loce2022 timated Si that most of he sreqrame ee one agin gong te aad eto tient [Zor rior pour 2: ren oct23 (7 osobe 2003
Irons ttn Acar Pour 1317 oce23 Hedbe a3
ith Foor Pour 2 30m Oct 23 Sod 202
|romer 28 8 Gate 223,
[250 for Pour 2: 28 aber 2023
[240 tor our aoc 2003
{ra or Pour 2: 18m Oct 29
[150 lor Pour: Stet Oc 23
{rower
[Tn ris Powe: rd oct 22
{rt lor Pour 2: 150 oct 23
[itt lor Pour 2: 28t Oct 29
a 'SLER SI ras coved oi ong eR FR TG RIG [st rosario
‘deployment plan from
2 hige a 2, out of which only xg currenty operational.
sts mace’s cmt’ to cast 53 piles by the end of October 2023. However, & Nas bce
[unachievable since, a of & October 2023, Simplex could not manage to compete single ile
Page 1 0f2: i Shriram MASTERS
Homes that live in you
[SF 8 MD expose tor conern abet eden reodness and eRe ey ns IL has assured fo deploy adequate workoree with immelate elect fo ere the foo eases
isting work [ors cto te acorce wards onthe ofS
HO frestesuficert or ar er ete pecage cowaca ke waterprosing, punsng sing were
= [Pas aad Test | Sgex Fs bos ake io wart he pra ol ad tt (nok State WZ now: Byram) ISLA ST cold wot CONT WO Ry SPREE Gate Tor The Test, Tava Way ve A BCS 6 GST ae
pe te apport conutart at Sunshine 2 wow fossarthe caren
7 [Handing ovarf] Sc Fas on ase = Tandon we Actor Saxo HOTS TO Ton Oh SB Pow STEAL
I could wk CARIRTE OR Sake TOF Wie SE HORT BBE aan Fanos @ TE Tae
atutorm materia | rcn/cene Poor naten ato SPLEM riredey
OF SE Pee a
> Pes [Sretectas een otis eave pore iFieere PES © We Whours wofrg at sts SPLER. SIL eauld not comm any date Tor the seme: Foner ay OMMTiGT ace Fe PEs wit aan Treat
fron” area
‘5 [aly raccas and MaogemerE a 7 J =
| aes om TO] Sex Tse repay aaah nt ar of wa a rorsbuca oT SFL SHL cou nt comm any dol YO ew Tw, ey Fve Sel SOR Te coonersoreN Te
INS was at Tomestowing te soos retin rovde by the Src! Conair. Tis methodology be ferreating wok at Meco.
3 Secor." |wassmaied te Smplox on 27h Done 2022,
|wotes ro Recinients:
1 Departments in
dual ore expected to implement any action as noted
2 This minutes record the tue undesstanding ofthe concern and intenéed actin sing there fom. Your agreement that the minutes form a rue record of the dscussion wil be assumed unless adverse comments are received in writing within two}
Gays receipt ofthis MOM.
Page 20f 2‘Homes that ie in you
eeting
feeting. Number:
Jagenda:
(UTES OF MEETING
Project Review Meeting with Simplex Infrastructure
(PM 082 PRE 061 ORM 051 ESGRM 054)
Sub-Structure & Super-Strucure Civil Works with Part
Finishing work for Sunshine One and Piling work for
Sunshine Two.
Meeting Date:
Meeting Time:
Date of Issue:
Time of tssue
o4-0c-23
11:00 aM
w-0c-23
5:00PM
IM Madan Bhar ‘SPL Estes Prvste Ltd SPLEP) Developer
Tir A Sang LER Pa Una SALA 7S Devsioper
05 ie Subramanyam Guia SPL ESE ina ed SPER 36 Developer
‘Fe Ayan Basa alc SFL Eats Piva ed SPER) 7a Devcon
5 Mayan yal Base = ‘Sing Taro ned ST) 105 Conroe
05 ir Karte Paramanie™ ‘Se ross eS IY © Conroe
Tir Biswas Roy ‘Sapo arr aS SY Be Caer
08 |r Sk Sonewar Sipe aac ad TY = Caer
fe Uipal Das Sie nase Unitas I) 7 Cara
TO he Nanda Sh ‘Sp rar UTS TS 1S Convair
TD fir Fiat Da Sec aaa US TS 0 Convair
i fir Partha Giha Tas Davtapemat Wonagarren Ina) PEL, HOM) 7G [raja Management Constant
ifr Sop War Tastes Dever ManageTerETaR) Pe (WOM) ‘3K [raja Management Consutant
TA for Ashes Das airs Deve VanapRTCTETNGD) PE (OMY 7A Proje Managament Concent
TS [i Sudip i Ghosh Tiers DavSapema Naropa nda) Pre OMY SKE Proje Managarsent Consultant
Tir Praip Basa Tasers Doveopee HanopaenTnda) PRE (ORY 7B |Proeck Management Corautant
17 |i Syed VeESar aad Tsien Delon: Panama Pa) PE (POR) ‘SY |ProjatNenagament Conautane
Jp+ Personnels cout not attend.
Details of Minutes described in the next sheet(s).
Page 1 of 1
a2