I’m currently spearheading as Senior Planning Engineer in VA Tech Wabag, India. I Possess hands-on-experience
in Planning, Progress Monitoring, Dashboard Reports, Monthly Report, KPI.
I have a Bachelor’s degree in Electrical and Electronics Engineering from Anna University, Chennai, India.
Key Skills:
Primavera P6 MS Office Progress Reporting Project management Delay Analyst Attention to detail
Analytical skills Cross-functional Coordination
PROFESSIONAL EXPERIENCE
Prepare the baseline schedule as per the contract and scope of work.
Coordinate with engineering, procurement and construction stakeholders for the logical relationship and
duration for the activities.
Liaise with the project team and update the engineering & procurement status.
Update the P6 schedule.
Attend the project progress meeting and advise the team when there are any slippages against LD.
Coordinate with the team for the forecast dates.
Monitor and track the project progress.
Communicate the monthly and weekly reports to the team.
Coordinate with the other projects’ planner to gather the project data to prepare the MIS reports.
Supported in preparation of three Commissioning & Start Up Programme for Al Zour Refinery, Kuwait
Integrated Petroleum Industries Company (KIPIC), Kuwait during my support services as consultant.
Created WBS as per the project requirement.
Developed project control tools like trackers, initial delivery plan for the entire scope of work for the technical
documentation for the refinery units.
Continuously collaborated with the cost management team for all the required activities/exercises.
Supported cost management team in forecasting the invoice submission to the client.
Responsible in solving the invoice related issues and maintained tracking of cost progress.
Communicated the monthly and weekly reports to the management.
Reviewed actual vs projected costs periodically.
Monitored and updated the tracker daily and resolve if any deviation from the contracted scope of work.
Responsible for monitoring documentation plan and distribute the progress report.
Provided project control support to project manager if any slippages in the document delivery plan.
Prepared monthly report as per the client’s requirement.
Maintained an inventory of Daily works of Technical Writers and their productivity.
Responsible for assigning works for the technical writers to develop as per plan.
Delivered any ad hoc activities of internal teams or client’s requirement.
As a Planning & Claims Consultant, Powsh prepared Programme in P6, Assisted & Collaborated with Director,
Associate Directors & Senior Consultants in Preparation of Extension of Time Claims, Assessing the
Contractor’s EOT, and many ad-hoc tasks like preparing chronologies, As-Built Data, etc.
Al Jaber LEGT Electromechanical Contracting, Dubai, UAE Jan. 2015– Jan 2017
Planning Engineer
Responsible for updating the project program as per the actual site status/ records.
Regularly coordinated the collection of data and issue the Project Progress Reports (Weekly/ Monthly) as
per project requirements.
Responsible for preparing the material & procurement schedule with dates required on the site as per the
baseline program.
Communicate agreed program and coordination schedules with project team.
Ensured project reports are interfaced between all discipline managers to maintain awareness of project
progress.
Project constraints, risks and ideas to overcome are discussed with the site team and project manager.
Tracked the productivity and performance of site team.
Advised Project Manager of progress slippages to activities for corrective action to be taken.
Assisted in formulation of delays/claims/notifications.
Updated all kinds of project progress reports.
Analyzed the critical path weekly and highlighted those activities to the team for the action.
Prepared program for the project with the sequence of activities linked together in the Primavera P6.
Responsible for monitoring and tracking the project progress.
Prepared project baseline program and updating it, progress S-curve etc.
Coordinated with site engineers to prepare the site constraint list and discuss it with manager to overcome
it.
Prepared the two weeks look ahead schedule.
Scheduled the working program weekly and identify the project is in the line of completion date.
KPI’s are updated weekly in order to keep an eye on the MEP quantities installed at the site.
Efficiencies are tracked daily by updating the efficiency report.
Reviewed the drawings and site works to track the weekly progress.
Frequent contacts are maintained with engineering, procurement and construction teams to manage the
project till the handover.
ACCENTURE, CHENNAI Apr. 2014 – Sep. 2014
Process Associate
EDUCATIONAL CREDENTIALS
Computer Proficiency:
Primavera P6, MS Office (Excel, Word, Power Point & Outlook)