0% found this document useful (0 votes)
94 views174 pages

Electrical - Infineon Batam3

This document provides a list of electrical construction drawings for Phase 1.1 of the Infineon Batam Project. It includes 58 drawings covering wiring diagrams, electrical distribution plans, lighting installation plans, and site plans. The drawings are numbered and provide titles and scales for each plan.

Uploaded by

Windy Anjeli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views174 pages

Electrical - Infineon Batam3

This document provides a list of electrical construction drawings for Phase 1.1 of the Infineon Batam Project. It includes 58 drawings covering wiring diagrams, electrical distribution plans, lighting installation plans, and site plans. The drawings are numbered and provide titles and scales for each plan.

Uploaded by

Windy Anjeli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 174

ELECTRICAL

NOTES :

CONSTRUCTION DRAWING - PHASE-1.1


INFINEON BATAM PROJECT
ELECTRICAL DRAWING NO REVISION DATE
NO. DRAWING NO. TITTLE DRAWING SCALE REV. DUE DATE 39 ACM / 323 / MEP / GF / 1.1 / EL-132 WIRING DIAGRAM DB-TSP & MINI DB-TSP PHASE-1.1 NTS R0 -
0. GENERAL 40 ACM / 323 / MEP / GF / 1.1 / EL-133 WIRING DIAGRAM DB-MSP, MINI DB-PEGASUS, SRM, & MINI DB-OVEN PHASE-1.1 NTS R0 - 0 FIRST ISSUED -
1 ACM / 323 / MEP / GN / 1.1 / EL-001 DRAWING LIST ELECTRICAL PHASE-1.1 NTS R0 - 41 ACM / 323 / MEP / GF / 1.1 / EL-134 WIRING DIAGRAM DB-MFS & MINI DB-MFS PHASE-1.1 NTS R0 -
2 ACM / 323 / MEP / GN / 1.1 / EL-101 SCHEMATIC-1 ELECTRICAL DISTRIBUTION PLAN PHASE-1.1 NTS R0 - 42 ACM / 323 / MEP / GF / 1.1 / EL-135 WIRING DIAGRAM DB-WORK BENCH, MINI DB-DRY PACK & MINI DB-WORK BENCH.3 PHASE-1.1 NTS R0 -
3 ACM / 323 / MEP / GN / 1.1 / EL-102 SCHEMATIC-2 ELECTRICAL DISTRIBUTION PLAN PHASE-1.1 NTS R0 - 43 ACM / 323 / MEP / GF / 1.1 / EL-136 WIRING DIAGRAM DB-PROD.GF-1 PHASE-1.1 NTS R0 -
4 ACM / 323 / MEP / GN / 1.1 / EL-103 SITE PLAN LIGHTING INSTALLATION 1:350 R0 - 44 ACM / 323 / MEP / GF / 1.1 / EL-137 WIRING DIAGRAM MINI DB-UTC.5K GF.1 PHASE-1.1 NTS R0 -
45 ACM / 323 / MEP / GF / 1.1 / EL-138 WIRING DIAGRAM MINI DB-UTC.5K GF.2 PHASE-1.1 NTS R0 -
1. WIRING DIAGRAM 46 ACM / 323 / MEP / GF / 1.1 / EL-139 WIRING DIAGRAM MINI DB-UTC.5K GF.3 PHASE-1.1 NTS R0 -
5 ACM / 323 / MEP / GF / 1.1 / EL-104 WIRING DIAGRAM MSB-1A, 2A, 3A PHASE-1.1 NTS R0 - 47 ACM / 323 / MEP / GF / 1.1 / EL-140 WIRING DIAGRAM DB-HYDRANT & DB-PLUMBING PHASE-1.1 NTS R0 - PROJECT
6 ACM / 323 / MEP / GF / 1.1 / EL-105 WIRING DIAGRAM SDB GF1.1, SDB-2'ND, SDB-EMERGENCY PHASE-1.1 NTS R0 - 48 ACM / 323 / MEP / GF / 1.1 / EL-141 WIRING DIAGRAM SDB-COMPRESSOR PHASE-1.1 NTS R0 - PROYEK
7 ACM / 323 / MEP / GF / 1.1 / EL-106 WIRING DIAGRAM NEW DB AHU.1 & NEW DB-AHU.2 PHASE-1.1 NTS R0 - 49 ACM / 323 / MEP / GF / 1.1 / EL-142 WIRING DIAGRAM DB-SERVICE 2'ND PHASE-1.1 NTS R0 -
8 ACM / 323 / MEP / GF / 1.1 / EL-107 WIRING DIAGRAM PP-MB.1 PHASE-1.1 NTS R0 - 50 ACM / 323 / MEP / GF / 1.1 / EL-143 WIRING DIAGRAM DB-SNP+A2 & MINI DB-SNP+A2 PHASE-1.1 NTS R0 -
9 ACM / 323 / MEP / GF / 1.1 / EL-108 WIRING DIAGRAM PP-MB.2 PHASE-1.1 NTS R0 - 51 ACM / 323 / MEP / GF / 1.1 / EL-144 WIRING DIAGRAM DB-LDF.2 & DB-LDF.3 PHASE-1.1 NTS R0 - BATAM 3 PROJECT
10 ACM / 323 / MEP / GF / 1.1 / EL-109 WIRING DIAGRAM PP-MB.3 PHASE-1.1 NTS R0 - 52 ACM / 323 / MEP / GF / 1.1 / EL-145 WIRING DIAGRAM DB-LDF.4 & DB-LDF.5 PHASE-1.1 NTS R0 -
Jl. BERINGIN LOT 201 & 202A
11 ACM / 323 / MEP / GF / 1.1 / EL-110 WIRING DIAGRAM PP-MB.4 PHASE-1.1 NTS R0 - 53 ACM / 323 / MEP / GF / 1.1 / EL-146 WIRING DIAGRAM DB-LDF.6 & DB-LDF.7 PHASE-1.1 NTS R0 - AT BATAMINDO INDUSTRIAL PARK,
12 ACM / 323 / MEP / GF / 1.1 / EL-111 WIRING DIAGRAM PP-MB.5 & DB-CHEMICAL PHASE-1.1 NTS R0 - 54 ACM / 323 / MEP / GF / 1.1 / EL-147 WIRING DIAGRAM DB-LDF.9 PHASE-1.1 NTS R0 - MUKAKUNING
13 ACM / 323 / MEP / GF / 1.1 / EL-112 WIRING DIAGRAM PP-IDEAL MOLD & LP-D1 PHASE-1.1 NTS R0 - 55 ACM / 323 / MEP / GF / 1.1 / EL-148 WIRING DIAGRAM SDB-EMERGENCY PHASE-1.1 NTS R0 -
14 ACM / 323 / MEP / GF / 1.1 / EL-113 WIRING DIAGRAM PP-Z1.1 PHASE-1.1 NTS R0 - 56 ACM / 323 / MEP / GF / 1.1 / EL-149 WIRING DIAGRAM DB-SERVER.1 & DB-SERVER0 PHASE-1.1 NTS R0 -
OWNER
15 ACM / 323 / MEP / GF / 1.1 / EL-114 WIRING DIAGRAM PP-Z1.3 PHASE-1.1 NTS R0 - 57 ACM / 323 / MEP / GF / 1.1 / EL-150 WIRING DIAGRAM DB-VACUM PHASE-1.1 NTS R0 - PEMILIK
16 ACM / 323 / MEP / GF / 1.1 / EL-115 WIRING DIAGRAM DB-HSFO8 PHASE-1.1 NTS R0 - 58 ACM / 323 / MEP / GF / 1.1 / EL-151 WIRING DIAGRAM DB-CANTEEN 2'ND & DB-CANTEEN 3'RD PHASE-1.1 NTS R0 -
17 ACM / 323 / MEP / GF / 1.1 / EL-115.1 WIRING DIAGRAM MINI DB-HSFO8.1~34 (TYPICAL) PHASE-1.1 NTS R0 - 59 ACM / 323 / MEP / GF / 1.1 / EL-152 WIRING DIAGRAM DB-FICO MOLD & DB-ASM.MOLD PHASE-1.1 NTS R0 -
18 ACM / 323 / MEP / GF / 1.1 / EL-116 WIRING DIAGRAM DB-ASM.DA PHASE-1.1 NTS R0 - 60 ACM / 323 / MEP / GF / 1.1 / EL-153 WIRING DIAGRAM DB-ASM.AD & DB-PMC PHASE-1.1 NTS R0 -
19 ACM / 323 / MEP / GF / 1.1 / EL-116.1 WIRING DIAGRAM MINI DB-ASM.DA.1 & MINI DB-ASM.DA.2 PHASE-1.1 NTS R0 -
20 ACM / 323 / MEP / GF / 1.1 / EL-116.2 WIRING DIAGRAM MINI DB-ASM.DA.3 & MINI DB-ASM.DA.4 PHASE-1.1 NTS R0 - 2. LAYOUT LIGHTING & LIGHTNING
21 ACM / 323 / MEP / GF / 1.1 / EL-116.3 WIRING DIAGRAM DB-PLASMA & MINI DB-PLASMA.1 PHASE-1.1 NTS R0 - 61 ACM / 323 / MEP / GF / 1.1 / EL-200 GROUND FLOOR LIGHTING INSTALLATION PLAN PHASE.1-1, SHEET.2-1 1:225 R0 -
PT INFINEON TECHNOLOGIES BATAM
22 ACM / 323 / MEP / GF / 1.1 / EL-117 WIRING DIAGRAM DB-HELLER REFLOW & MINI DB-HELLER .1 PHASE-1.1 NTS R0 - 62 ACM / 323 / MEP / GF / 1.1 / EL-201 GROUND FLOOR LIGHTING INSTALLATION PLAN PHASE.1-1, SHEET.2-2 1:225 R0 -
23 ACM / 323 / MEP / GF / 1.1 / EL-118 WIRING DIAGRAM DB-FLUX.C & MINI DB-FLUX.C.1 PHASE-1.1 NTS R0 - 63 ACM / 323 / MEP / 2'ND / 1.1 / EL-202 2'ND FLOOR LIGHTING INSTALLATION PLAN PHASE.1-1 1:300 R0 - DESIGN CONSULTANT
24 ACM / 323 / MEP / GF / 1.1 / EL-118.1 WIRING DIAGRAM DB-CD & MINI DB-CD.1 PHASE-1.1 NTS R0 - 64 ACM / 323 / MEP / 3'RD / 1.1 / EL-203 3'RD FLOOR LIGHTING INSTALLATION PLAN PHASE.1-1 1:300 R0 - KONSULTAN RENCANA
25 ACM / 323 / MEP / GF / 1.1 / EL-118.2 WIRING DIAGRAM DB-HSFO5 & MINI DB-HSFO5.1 PHASE-1.1 NTS R0 - 65 ACM / 323 / MEP / 4'TH / 1.1 / EL-204 4'TH FLOOR LIGHTING INSTALLATION PLAN PHASE.1-1 1:300 R0 -
26 ACM / 323 / MEP / GF / 1.1 / EL-119 WIRING DIAGRAM PP-Z2.1 PHASE -1.1 NTS R0 - 66 ACM / 323 / MEP / 4'TH / 1.1 / EL-205 4'TH FLOOR LIGHTNING PROTECTION PLAN PHASE.1-1 1:300 R0 -
27 ACM / 323 / MEP / GF / 1.1 / EL-120 WIRING DIAGRAM PP-Z2.2 PHASE-1.1 NTS R0 - PT. DACREA Design and Engineering Consultants
28 ACM / 323 / MEP / GF / 1.1 / EL-121 WIRING DIAGRAM MSB-FL.1 & MSB-FL.2 PHASE-1.1 NTS R0 - 3. LAYOUT SOCKET OUTLET & CABLE LADDER
DACREA
29 ACM / 323 / MEP / GF / 1.1 / EL-122 WIRING DIAGRAM DB-REFLOW & MINI DB-REFLOW PHASE-1.1 NTS R0 - 67 ACM / 323 / MEP / GF / 1.1 / EL-300 GROUND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE.1-1, SHEET.2-1 1:225 R0 -
30 ACM / 323 / MEP / GF / 1.1 / EL-123 WIRING DIAGRAM DB-LM+TF & MINI DB-LM+TF PHASE-1.1 NTS R0 - 68 ACM / 323 / MEP / GF / 1.1 / EL-301 GROUND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE.1-1, SHEET.2-2 1:225 R0 -
31 ACM / 323 / MEP / GF / 1.1 / EL-124 WIRING DIAGRAM DB-EAV PHASE-1.1 NTS R0 - 69 ACM / 323 / MEP / 2'ND / 1.1 / EL-302 2'ND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE.1-1 1:300 R0 -
DRAWING TITLE
32 ACM / 323 / MEP / GF / 1.1 / EL-125 WIRING DIAGRAM DB-WORKBENCH 2 & MINI DB-WORKBENCH 2 (TYPICAL) PHASE-1.1 NTS R0 - 70 ACM / 323 / MEP / 3'RD / 1.1 / EL-303 3'RD FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE.1-1 1:300 R0 -
JUDUL GAMBAR
33 ACM / 323 / MEP / GF / 1.1 / EL-126 WIRING DIAGRAM DB-TSP.2 PHASE-1.1 & MINI DB-TSP.1~2 (TYPICAL) PHASE-1.1 NTS R0 - 71 ACM / 323 / MEP / 4'TH / 1.1 / EL-304 4'TH FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE.1-1 1:300 R0 -
34 ACM / 323 / MEP / GF / 1.1 / EL-127 WIRING DIAGRAM PP-Z3.1 PHASE-1.1 NTS R0 - 72 ACM / 323 / MEP / GF / 1.1 / EL-305 GROUND FLOOR CABLE LADDER INSTALLATION PLAN PHASE.1-1 1:300 R0 - DRAWING LIST
35 ACM / 323 / MEP / GF / 1.1 / EL-128 WIRING DIAGRAM PP-Z3.2 PHASE-1.1 NTS R0 - 73 ACM / 323 / MEP / GF / 1.1 / EL-306 2'ND FLOOR CABLE LADDER INSTALLATION PLAN PHASE.1-1 1:300 R0 -
ELECTRICAL
36 ACM / 323 / MEP / GF / 1.1 / EL-129 WIRING DIAGRAM DB-TDSON & MINI DB-TDSON.1 PHASE-1.1 NTS R0 - 74 ACM / 323 / MEP / 2'ND / 1.1 / EL-307 3'RD FLOOR CABLE LADDER INSTALLATION PLAN PHASE.1-1 1:300 R0 -
37 ACM / 323 / MEP / GF / 1.1 / EL-130 WIRING DIAGRAM MSB-FL.3 & MSB-FL.4 PHASE-1.1 NTS R0 - 75 ACM / 323 / MEP / 3'RD / 1.1 / EL-308 4'TH FLOOR CABLE LADDER INSTALLATION PLAN PHASE.1-1 1:300 R0 -
PHASE-1.1
38 ACM / 323 / MEP / GF / 1.1 / EL-131 WIRING DIAGRAM DB-FLEX & MINI DB-FLEX PHASE-1.1 NTS R0 -
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.1 / EL-001


D-PROJECT
NOTES :

NO. NAME OF PANEL SERVICE

3'RD FLOOR

NO REVISION DATE

0 FIRST ISSUED -

2'ND FLOOR

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


EXTENTION BUILDING AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK
3'RD FLOOR

2'ND FLOOR
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


MSB-A1 MSB-A2 MSB-A3 DACREA
BAT-3 BAT-3 BAT-3
SDB-EMG
1'st FLOOR
DRAWING TITLE
EMERGENCY SYSTEM JUDUL GAMBAR

GENSET SCHEMATIC-1
ELECTRICAL DISTRIBUTION PLAN
MAIN BUILDING
B.I.C SUBSTATION
G
PHASE.1-1
3~ DE
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
B.I.C DIPERIKSA : RH

SG 201 APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :
UTILITY ROOM.1 - B.I.C
R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.1 / EL-101


NOTES :

NO. NAME OF PANEL SERVICE

4'th FLOOR

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT
3'rd FLOOR Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

BY B.I.C BY BAT-3 2'nd FLOOR


PT. DACREA Design and Engineering Consultants
UTILITY ROOM - 2
B.I.C DACREA

B.I.C SUBSTATION
DRAWING TITLE
JUDUL GAMBAR

SCHEMATIC-2
B.I.C ELECTRICAL DISTRIBUTION PLAN
SG 201 EAST WING
PHASE-1-1

NAME SIG. DATE :

DRAWN BY :
AF
UTILITY ROOM - 3 DIGAMBAR :
B.I.C CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

FROM GENSET AT MAIN BUILDING


GF FLOOR CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.1 / EL-102


NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 14750 15000 14750 3715
112500 48215

A A'
AHU AHU
6000

7000
SUPPORT & MATERIAL
B
B'
VACANT NO REVISION DATE
6000

8000
PM WB
C ACMS (PRODUCTION)
0 FIRST ISSUED -
END OF LINE
6000

(PRODUCTION FOL)
ASM AD
C'
D

8000
FORMING GAS AREA
(BY OTHERS)
6000

SUPPORT MALE'S TOILET


FEMALE'S TOILET
VACANT

EXIT
PM & ACMS
D'

IN
E

8000
(PRODUCTION FOL)
6000

HELLER REFLOW LAB


PASSBOX A2P1

MATERIAL
F PROJECT
PM F'
PROYEK
6000

TEMPORARY PM

8000
PLASMA CLEAN ASM MOLDING
G
FLUX CLEANING VACANT BATAM 3 PROJECT
6000

G'
H VACANT Jl. BERINGIN LOT 201 & 202A

8000
AT BATAMINDO INDUSTRIAL PARK,
6000

CHEMICAL ROOM
MUKAKUNING
H'
I
RACK MATERIAL & SUPPORT

8000
6000

OWNER
SNP1 PEMILIK

110000
J
110500

J'
6000

VACANT VACANT

8000
K
VACANT
VACANT
6000

(PRODUCTION FOL) K'


ASM AD CB RO

8000
PT INFINEON TECHNOLOGIES BATAM
6000

CLEANER ROOM &


FEMALE TOILET
WAITING
PAYROLL
PUMP HOUSE
L' DESIGN CONSULTANT
M
KONSULTAN RENCANA

8000
MALE TOILET
6000

EXIT EXIT

ELECTRICAL ROOM MINI STORE IN IN ELECTRICAL ROOM


N W-2.4 H-2.6

N"
PT. DACREA Design and Engineering Consultants
MACHINE TRANSFER

PASS
BOX UP
COLD STORAGE SUMP SNP

8000
10000

DISPLAY
CHANGING ROOM W-2.4 H-2.6
MACHINE TRANSFER DACREA
CORRIDOR
O"
O

8000
5625

WTP GENSET LDF


HIGH DRAWING TITLE
TRANSFORMER ROOM VOLTAGE
P JUDUL GAMBAR
CHEMICAL STORAGE ATTIRE CANTEEN P'
5625

LOCKER AREA
ROOM (OPEN SPACE)

8000
WWTP
Q SITE PLAN
CLINIC LIGHTING INSTALLATION
5625

CORRIDOR
Q'
LOCKET

7000
UP
ELECTRICAL RECEIVING TRANSIT AREA
5625

TRANSFOMER
ROOM CORRIDOR NAME SIG. DATE :
S UP UP UP
R'
UP UP DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : 1:350


REFERENSI : REV :
BV.1

SITEPLAN
SCALE 1 : 350 R.2

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.1 / EL-103


NOTES :
MSB-1A
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE
TOTAL

DEMAND FACTOR 0 FIRST ISSUED -


GRAND TOTAL
MSB-2A
380/220V, 3Ph, 50Hz

PROJECT
PROYEK

POWER METER

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA
TOTAL

DEMAND FACTOR
GRAND TOTAL
MSB-3A DRAWING TITLE
JUDUL GAMBAR
380/220V, 3Ph, 50Hz

WIRING DIAGRAM
POWER METER
MSB-1A, 2A & 3A
(MAIN BUILDING)
PHASE-1-1
NAME SIG. DATE :

DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

TOTAL
DRAWING NUMBER
NOMOR GAMBAR
DEMAND FACTOR
GRAND TOTAL ACM / 323 / MEP / GF / 1.1 / EL-104
D-PROJECT
NOTES :

NEW DB-AHU.1
380/220V, 3Ph, 50Hz

M
POWER METER 3~

M
3~

SETTING : NO REVISION DATE


ELR : 5A / 0.3 (SECOND)
0 FIRST ISSUED -

0 TENDER DRAWING 02-03-2023

PROJECT
PROYEK

TOTAL BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

NEW DB-AHU.2
380/220V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
M
POWER METER 3~

M PT. DACREA Design and Engineering Consultants


3~
DACREA
M
3~

M DRAWING TITLE
3~ JUDUL GAMBAR
SETTING :
ELR : 5A / 0.3 (SECOND) WIRING DIAGRAM
NEW DB-AHU.1 & NEW DB-AHU.2
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

TOTAL CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-106


NOTES :

PP-MB.1/PHASE 1.1
380/220V, 3Ph, 50Hz
B B
NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.1
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
TOTAL CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-107


NOTES :

PP-MB.2/PHASE 1.1
380/220V, 3Ph, 50Hz
B B

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

L21/MB-2
L22/MB-2

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.2
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

TOTAL FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-108


NOTES :

PP-MB.3/PHASE 1.1
NO REVISION DATE
380/220V, 3Ph, 50Hz
B
0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.3
PHASE 1.1
TOTAL
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-109


NOTES :

PP-MB.4/PHASE 1.1
380/220V, 3Ph, 50Hz
B B

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.4
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0
TOTAL
FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-110


NOTES :

PP-MB.5/PHASE 1.1
380/220V, 3Ph, 50Hz
B

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT

DB-CHEMICAL KONSULTAN RENCANA

380/220V, 3Ph, 50Hz B PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.5 & DB-CHEMICAL
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

TOTAL DRAWING NUMBER


NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-111


NOTES :

PP-IDEAL MOLD
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK
TOTAL

LP-D1
380/220V, 3Ph, 50Hz B PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-IDEAL MOLD & LP-D1
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

TOTAL
CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-112


NOTES :

PP-Z1.1/PHASE 1.1
380/220V, 3Ph, 50Hz
B

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z1.1
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
AF
TOTAL DIGAMBAR :
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-113


NOTES :

PP-Z1.3 / PHASE 1.1 NO REVISION DATE

380/220V, 3Ph, 50Hz 0 FIRST ISSUED -

B B

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z1.3
PHASE 1.1
TOTAL
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-114


NOTES :

DB-HSOF8
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-HSOF8
PHASE 1.1

TOTAL NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-115


NOTES :

NO REVISION DATE

0 FIRST ISSUED -

MINI DB-HSOF8.1~34 (TYPIKAL) PROJECT


PROYEK

380/230V, 3Ph, 50Hz


BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
PT. DACREA Design and Engineering Consultants
DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-HSOF8.1~34
(TYPIKAL)
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-115.1


NOTES :

DB-ASM.DA
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-ASM DA
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
TOTAL DIPERIKSA :
APPROVED BY :
RH

DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-116


NOTES :

MINI DB-ASM.DA.1
380/230V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

TOTAL Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

MINI DB-ASM.DA.2
380/230V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM DA.1 &
MINI DB-ASM DA.2
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


TOTAL REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-116.1


NOTES :

MINI DB-ASM.DA.3
380/230V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


TOTAL AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

MINI DB-ASM.DA.4
380/230V, 3Ph, 50Hz PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM DA.3 &
MINI DB-ASM DA.4
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S

TOTAL REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-116.2


NOTES :

DB-PLASMA
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

TOTAL PT. DACREA Design and Engineering Consultants


DACREA

MINI DB-PLASMA.1
DRAWING TITLE
JUDUL GAMBAR
380/230V, 3Ph, 50Hz
WIRING DIAGRAM
DB-PLASMA &
MINI DB-PLASMA.1
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING
TOTAL DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-116.3


NOTES :

DB-HELLER REFLOW
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL

MINI DB-HELLER.1 PT INFINEON TECHNOLOGIES BATAM

380/230V, 3Ph, 50Hz DESIGN CONSULTANT


KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-HELLER REFLOW &
MINI DB-HELLER
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


TOTAL
REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-117


NOTES :

DB-FLUX.C
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
TOTAL
OWNER
PEMILIK

MINI DB-FLUX.C.1
380/230V, 3Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-FLUX.C &
MINI DB-FLUX.C
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-118


NOTES :

DB-CD
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

TOTAL OWNER
PEMILIK

MINI DB-CD.1
380/230V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-CD &
MINI DB-CD.1
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF

TOTAL CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-118.1


NOTES :

DB-HSF05
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
MINI DB-HSF05.1
380/230V, 3Ph, 50Hz
PT. DACREA Design and Engineering Consultants
DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-HSOF5 &
MINI DB-HSOF5.1
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0
TOTAL
FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-118.2


NOTES :

MSB-FL.1
380/220V, 3Ph, 50Hz

POWER METER

EFR DTL : 100A/0.5 (SECOND)


OCR IDMTL : 2240A/5.0 (SECOND)
SETTING :
NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

TOTAL BATAM 3 PROJECT

DEMAND FACTOR Jl. BERINGIN LOT 201 & 202A


GRAND TOTAL AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

MSB-FL.2
OWNER
380/220V, 3Ph, 50Hz PEMILIK

POWER METER
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA
SETTING :
EFR DTL : 100A/0.5 (SECOND)
OCR IDMTL : 2240A/5.0 (SECOND)
DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-FL.1 & DB-FL.2
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

TOTAL CONSTRUCTION DRAWING

DEMAND FACTOR DRAWING NUMBER


GRAND TOTAL NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-121


D-PROJECT
NOTES :

PP-Z2.1
380/220V, 3Ph, 50Hz
NO REVISION DATE
B B B B

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z2.1
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-119


NOTES :

PP-Z2.2
380/220V, 3Ph, 50Hz
B B B

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z2.2
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
TOTAL DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-120


NOTES :

DB-REFLOW
380/220V, 3Ph, 50Hz

NO REVISION DATE
POWER METER
0 FIRST ISSUED -

PROJECT
SETTING :
PROYEK
ELR : 5A / 0.3 (SECOND)

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
TOTAL KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


MINI DB-REFLOW.1 DACREA

380/230V, 3Ph, 50Hz


DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-REFLOW & MINI DB-REFLOW
PHASE 1.1

NAME SIG. DATE :


TOTAL
DRAWN BY :
DIGAMBAR : AF
SETTING :
CHECKED BY :
ELR : 5A / 0.3 (SECOND) DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.2

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-122


NOTES :
DB-LM+TF
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE

0 FIRST ISSUED -

TOTAL

MINI DB-TNF.1
380/230V, 3Ph, 50Hz
PROJECT
PROYEK

BATAM 3 PROJECT
TOTAL Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

MINI DB-SONOSCAN
380/230V, 3Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
TOTAL KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

MINI DB-TE
380/230V, 3Ph, 50Hz
DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LM+TF & MINI DB-
TOTAL PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
MINI DB-LC DISETUJUI : AN

380/230V, 3Ph, 50Hz SCALE DRAWING : N.T.S


REFERENSI : REV :

R.2

FOR :
TOTAL
SETTING : CONSTRUCTION DRAWING
ELR : 5A / 0.3 (SECOND)

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-123


NOTES :
DB-EAV
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
MINI DB-EAV.ACE.1~2 (TYPIKAL)
380/230V, 3Ph, 50Hz PT. DACREA Design and Engineering Consultants
DACREA

DRAWING TITLE
JUDUL GAMBAR

TOTAL
WIRING DIAGRAM
DB-EAV & MINI DB-EAV
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
MINI DB-EAV.COHU CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
380/230V, 3Ph, 50Hz DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :
R.0

FOR :

TOTAL
CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-124


NOTES :

DB-WORK BENCH.2
380/220V, 3Ph, 50Hz

POWER METER

SETTING :
ELR : 5A / 0.3 (SECOND)

TOTAL
NO REVISION DATE

0 FIRST ISSUED -

MINI DB-WORK BENCH.2


(TYPICAL)
PROJECT
380/230V, 3Ph, 50Hz PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

TOTAL
PT. DACREA Design and Engineering Consultants
DACREA

MINI DB-SMARTSCOPE
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
DB-WORKBENCH.2 &
MINI DB-WORKBENCH
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

TOTAL CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-125


NOTES :

DB-TSP.2
380/220V, 3Ph, 50Hz

NO REVISION DATE
POWER METER
0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

TOTAL PT. DACREA Design and Engineering Consultants


DACREA

MINI DB-TSP.1~2 (TYPIKAL)


DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
DB-TSP.2 & MINI DB-TSP.2
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
RH
TOTAL DIPERIKSA :
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.2

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-126


NOTES :

PP-Z3.1 NO REVISION DATE

0 FIRST ISSUED -
380/220V, 3Ph, 50Hz

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z3.1
PHASE 1.1
TOTAL
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-127


NOTES :

PP-Z3.2
380/220V, 3Ph, 50Hz

B B B NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z3.2
PHASE 1.1

NAME SIG. DATE :


TOTAL
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-128


NOTES :

DB-TDSON
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

TOTAL
PT. DACREA Design and Engineering Consultants
DACREA

MINI DB-TDSON.1
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
DB-TDSON & MINI DB-TDSON.1
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
TOTAL APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1/ EL-129


NOTES :

MSB-FL.3
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE

0 FIRST ISSUED -

SETTING :
EFR DTL : 100A/0.5 (SECOND)
OCR IDMTL : 2240A/5.0 (SECOND)

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK
TOTAL
DEMAND FACTOR
GRAND TOTAL
MSB-FL.4
PT INFINEON TECHNOLOGIES BATAM
380/220V, 3Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


POWER METER DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-FL.3 & DB-FL.4
PHASE 1.1

SETTING : NAME SIG. DATE :


EFR DTL : 100A/0.5 (SECOND)
OCR IDMTL : 2240A/5.0 (SECOND) DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :
TOTAL
CONSTRUCTION DRAWING
DEMAND FACTOR
GRAND TOTAL DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-130


D-PROJECT
NOTES :

DB-FLEX
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

POWER METER

PROJECT
PROYEK

SETTING : BATAM 3 PROJECT


ELR : 5A / 0.3 (SECOND)
Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT

MINI DB-FLEX.1~5 (TYPIKAL) KONSULTAN RENCANA

380/230V, 3Ph, 50Hz PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
TOTAL DB-FLEX & MINI DB-FLEX
PHASE 1.1
SETTING :
ELR : 5A / 0.3 (SECOND)
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-131


NOTES :

DB-TSP.3
380/220V, 3Ph, 50Hz
NO REVISION DATE

0 FIRST ISSUED -

POWER METER

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

MINI DB-TSP.1 PT. DACREA Design and Engineering Consultants


380/230V, 3Ph, 50Hz DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-TSP & MINI DB-TSP
PHASE 1.1
TOTAL
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-132


NOTES :
DB-MSP
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

TOTAL Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

MINI DB-PEGASUS.1~15 (TYPIKAL)


380/230V, 3Ph, 50Hz
OWNER
PEMILIK

TOTAL
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


MINI DB-SRM.1~3 (TYPIKAL)
DACREA
380/230V, 3Ph, 50Hz

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
TOTAL DB-MSP, MINI DB-PEGASUS, SRM,
& MINI DB-OVEN
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
MINI DB-OVEN APPROVED BY :
DISETUJUI : AN
380/230V, 3Ph, 50Hz
SCALE DRAWING : N.T.S
REFERENSI : REV :

R.0

FOR :

TOTAL CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-133


NOTES :

DB-MFS
380/220V, 3Ph, 50Hz
NO REVISION DATE

0 FIRST ISSUED -
POWER METER

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

TOTAL
OWNER
PEMILIK

MINI DB-MFS PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
380/230V, 3Ph, 50Hz

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR
TOTAL
WIRING DIAGRAM
DB-MFS & MINI DB-MFS
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-134


NOTES :

DB-WORK BENCH.3
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE
TOTAL
0 FIRST ISSUED -

PROJECT
PROYEK
MINI DB-DRY PACK.1~2 (TYPIKAL)
380/230V, 3Ph, 50Hz BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


MINI DB-WORK BENCH.3
DACREA
380/230V, 3Ph, 50Hz

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-WORK BENCH, MINI DB-DRY
PACK & MINI DB-WORK BENCH.3
PHASE 1.1
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

TOTAL CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-135


NOTES :

NO REVISION DATE

0 FIRST ISSUED -

DB-PROD.GF-1
380/220V, 3Ph, 50Hz

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
TOTAL JUDUL GAMBAR

WIRING DIAGRAM
DB-PROD.GF-1
PHASE.1-1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-136


NOTES :

MINI DB-UTC.5K GF.1


NO REVISION DATE
380/230V, 3Ph, 50Hz
0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.1
PHASE.1-1

NAME SIG. DATE :

DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-137


NOTES :

MINI DB-UTC.5K GF.2


380/230V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.2
PHASE.1-1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
TOTAL APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-138


NOTES :

MINI DB-UTC.5K GF.3 NO REVISION DATE

0 FIRST ISSUED -
380/230V, 3Ph, 50Hz

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

TOTAL WIRING DIAGRAM


MINI DB-UTC.5K GF.3
PHASE.1-1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-139


NOTES :

DB-HYDRANT
380/220V, 3Ph, 50Hz

M
POWER METER 3~

M
3~

NO REVISION DATE
SETTING :
ELR : 5A / 0.3 (SECOND) 0 FIRST ISSUED -

PROJECT
PROYEK

TOTAL
BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

DB-PLUMBING
OWNER
380/220V, 3Ph, 50Hz PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
POWER METER

PT. DACREA Design and Engineering Consultants


DACREA

SETTING :
ELR : 5A / 0.3 (SECOND) DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-HYDRANT & DB-PLUMBING
PHASE.1-1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :
TOTAL
CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-140


NOTES :

SDB-COMPRESSOR
380/220V, 3Ph, 50Hz

M
3~
NO REVISION DATE

M
3~ 0 FIRST ISSUED -

M
3~

POWER METER

PROJECT
PROYEK

M BATAM 3 PROJECT
3~
SETTING :
ELR : 5A / 0.3 (SECOND) Jl. BERINGIN LOT 201 & 202A
M AT BATAMINDO INDUSTRIAL PARK,
3~
MUKAKUNING

M
3~
OWNER
PEMILIK
M
3~

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
SDB-COMPRESOR
PHASE-1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0
DF
TOTAL FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.1 / EL-141


NOTES :

NO REVISION DATE

0 FIRST ISSUED -

DB-SERVICE 2'ND
380/220V, 3Ph, 50Hz B B
PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

TOTAL
DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-SERVICE 2'ND
PHASE-1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-142


NOTES :

DB-SNP+A2
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK
TOTAL
BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MINI DB-A2.1~2 (TYPIKAL) MUKAKUNING

380/230V, 3Ph, 50Hz OWNER


PEMILIK

PT INFINEON TECHNOLOGIES BATAM

TOTAL DESIGN CONSULTANT


KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR
MINI DB-SNP.1~2 (TYPIKAL) WIRING DIAGRAM
DB-SNP+A2 & MINI DB-SNP+A2
380/230V, 3Ph, 50Hz
1~2 (TYPICAL)
PHASE.1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
TOTAL
SCALE DRAWING : N.T.S
REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-143


NOTES :

DB-LDF.2 SDB-LDF.2
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

DB-LDF.3 SDB-LDF.3
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LDF.2 & DB-LDF.3
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-144


NOTES :

DB-LDF.4 SDB-LDF.4
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

DB-LDF.5 SDB-LDF.5
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LDF.4 & DB-LDF.5
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-145


NOTES :

DB-LDF.6 SDB-LDF.6
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

DB-LDF.7 SDB-LDF.7
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LDF.6 & DB-LDF.7
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-146


NOTES :

DB-LDF.9 SDB-LDF.9 NO REVISION DATE

380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz


0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LDF.9
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-147


NOTES :

SDB-EMERGENCY
380/220V, 3Ph, 50Hz
NO REVISION DATE

0 FIRST ISSUED -

PROJECT
POWER METER PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

SETTING :
ELR : 5A / 0.3 (SECOND) OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
SDB-EMERGENCY
PHASE-1.1

NAME SIG. DATE :

DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-148


NOTES :

SDB-SERVER
DB-SERVER.1
380/220V, 3Ph, 50Hz
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM


DB-SERVER.2
DESIGN CONSULTANT
380/220V, 3Ph, 50Hz KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-SERVER.1 & DB-SERVER.2
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-149


NOTES :

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
DB-VACUM PROYEK

380/220V, 3Ph, 50Hz


BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
M MUKAKUNING
POWER METER 3~

OWNER
PEMILIK
M
3~

SETTING :
ELR : 5A / 0.3 (SECOND)
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

TOTAL PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-VACUM
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-150


NOTES :

DB-CANTEEN 2'ND
380/220V, 3Ph, 50Hz
B B

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

TOTAL OWNER
PEMILIK

DB-CANTEEN 3'RD
PT INFINEON TECHNOLOGIES BATAM
380/220V, 3Ph, 50Hz
B DESIGN CONSULTANT
B B
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-CANTEEN 2'ND & 3'RD
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
AN
TOTAL DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-151


NOTES :

DB-FICO.MOLD
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

TOTAL Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
DB-ASM.MOLD PEMILIK

380/220V, 3Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

POWER METER
PT. DACREA Design and Engineering Consultants
DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-FICO MOLD & DB-ASM.MOLD
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0
TOTAL
FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-152


NOTES :

6000

9700
B

6000
C

8300
B B

6000
B

FORMING GAS AREA


(BY OTHERS)
B B

6000
B B

E B B

NO REVISION DATE

6000
B

20500
0 FIRST ISSUED -
F B

B B

6000
G B B

78000
6000

3000
B PROJECT
B B PROYEK
H
6000

BATAM 3 PROJECT
B B

I Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
6000

J OWNER
PEMILIK
30500
6000

B
K B
6000

PT INFINEON TECHNOLOGIES BATAM


L DESIGN CONSULTANT
KONSULTAN RENCANA
6000

M B
PT. DACREA Design and Engineering Consultants
3000

B
6000

DACREA
3000

N
DRAWING TITLE
JUDUL GAMBAR
10000

B GROUND FLOOR
LIGHTING INSTALLATION PLAN
B B B
PHASE.1-1, SHEET.2-1
O
5625

NAME SIG. DATE :

DRAWN BY :
AF -
DIGAMBAR :
P CHECKED BY :
RH
B
DIPERIKSA :
5625

APPROVED BY :
AN
DISETUJUI :
22500

Q SCALE DRAWING : 1:225


REFERENSI : REV :
5625

B R.0

R FOR :
5625

CONSTRUCTION DRAWING
S
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.1 / EL-200
NOTES :

DB-ASM.AD
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK
TOTAL

DB-PMC PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
380/220V, 3Ph, 50Hz KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

POWER METER

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-ASM.AD & DB-PMC
PHASE 1.1

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :
TOTAL
CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-153


NOTES :

3700
B B B

B
B B

18975
B
B

B B B B
B

B B B

NO REVISION DATE
B B B

0 FIRST ISSUED -
B

B B

B B B

PROJECT
PROYEK

BATAM 3 PROJECT
B B B B B

SNP1 Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER

110000
PEMILIK
B B

78325
B

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
B B KONSULTAN RENCANA

WAITING

B
PT. DACREA Design and Engineering Consultants
DACREA
B
B

B DRAWING TITLE
JUDUL GAMBAR
B

B NAME SIG. DATE :


B B
DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
B
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
B
SCALE DRAWING : 1:225
REFERENSI : REV :

2000
B B B
B B
B R.0

FOR :

7000
B B B
CONSTRUCTION DRAWING

UP UP DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.1 / EL-201
NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

A B
B
CORRIDOR
B
6000

B B

B IT ROOM

B
NO REVISION DATE
6000

EXISTING EXISTING
C 0 FIRST ISSUED -
6000

AHU

D
B B
PP-Z2.1
6000

E
B
6000

PROJECT
UP DN
PROYEK
F
B
6000

BATAM 3 PROJECT
G
Jl. BERINGIN LOT 201 & 202A
78000

B B
6000

AHU
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
H

CORRIDOR
B
6000

OWNER
PEMILIK
I B B

B
6000

B
PANEL
B
ROOM
LP2-EM
J

PP-Z2.1
VACANT B
6000

B B B

PT INFINEON TECHNOLOGIES BATAM


K
DESIGN CONSULTANT

PP-Z2.2
6000

KONSULTAN RENCANA
L B B

B
6000

AHU
PT. DACREA Design and Engineering Consultants
EL.+3.500
M
PP-Z2.2 DACREA
6000

EL.+3.500

B B

N
B DN UP
B B DRAWING TITLE
B UP DN
JUDUL GAMBAR
10000

UTILITY TESTING AREA B


B
B B
2'ND FLOOR
B B

LIGHTING INSTALLATION PLAN


O

CORRIDOR
B
B PHASE.1-1
5625

VOID B B B B
WD2 COOPERATIVE ROOM

P DN B
B
B
NAME SIG. DATE :
VOID AHU
5625

B B B

DRAWN BY :
VOID AF -
VOID DIGAMBAR :
22500

UP
Q VOID
GRID SWITCH-4 B B
B
B
CHECKED BY :
RH
6 GANG
B DIPERIKSA :
B B B B
5625

10

10

10

10

B
APPROVED BY :
10

10

10

10

AN
TOILET

DB-SERVICE.2ND DISETUJUI :
5

R B
B
CHANGING ROOM B B B
SCALE DRAWING : 1:300
PRAYING ROOM
5625

B
B B B B B REFERENSI : REV :
CORRIDOR

S UP
R.0
DN

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 2'ND / 1.1 / EL-202


D-PROJECT
NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

20750 23750

A
6000

B B

B
6000

NO REVISION DATE

23175
C VACANT 0 FIRST ISSUED -
B B
6000

D
6000

B B

2500
6000

PROJECT
UP DN

PROYEK
F
6000

B B

BATAM 3 PROJECT
G
Jl. BERINGIN LOT 201 & 202A
78000
6000

AT BATAMINDO INDUSTRIAL PARK,


MUKAKUNING
H

PP-Z3.1
B B
6000

OWNER
I PEMILIK

PP-Z3.2
6000

VACANT B

53325
B B

110000
6000

PP-Z3.1

K PT INFINEON TECHNOLOGIES BATAM


6000

DESIGN CONSULTANT
KONSULTAN RENCANA
L
6000

PT. DACREA Design and Engineering Consultants


M
DACREA
6000

3000
DN UP
B
B B UP DN DRAWING TITLE
JUDUL GAMBAR
10000

DB-CANTEEN
B 3'RD FLOOR
O B B

LIFT
LIGHTING INSTALLATION PLAN
LIFT
LOG MAT'L
PHASE.1-1
5625

B B

B B

24275
P B
PRAYER ROOM B
NAME SIG. DATE :
5625

VACANT
B
DISPLAY
B
PP-Z3.2 DRAWN BY :
AF
22500

CH ROOM
DIGAMBAR :
Q ABLUTION ROOM CANTEEN B B
CHECKED BY :
RH
DIPERIKSA :
5625

APPROVED BY :
AN
TOILET B
DISETUJUI :
R B
B

AHU SCALE DRAWING : 1:300


5625

B B B

3725
B
B

REFERENSI : REV :
S UP

DN
R.0
DB-CANTEEN PP-Z3.2
4105 3100
FOR :
8720 2540 14850 2040 7205 3250 14575 23750
84000 28150 48780
CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 3'RD / 1.1 / EL-203


D-PROJECT
NOTES :

B
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

1660
A
6000

WEIGHT 16.000 KG
B
BLOWER BLOWER BLOWER BLOWER BLOWER CH-04 (NEW)
300 KG 300 KG 300 KG 300 KG 300 KG

B BLOWERB BLOWER
300 KG 300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG NO REVISION DATE
WEIGHT 16.000 KG
CH-03 (NEW)
6000

0 FIRST ISSUED -
C B
WEIGHT 16.000 KG
CH-02 (NEW)

27000
6000

CT-01
EXISTING
COOLING TOWER
WEIGHT 15.500 KG

CT-02
EXISTING CH-01 (EXISTING)

D COOLING TOWER
WEIGHT 15.500 KG

CT-03
EXISTING
COOLING TOWER
6000

WEIGHT 15.500 KG
WEIGHT 15.000 KG

WEIGHT 500 KG
CHWP-4
NEW

E B
WEIGHT 500 KG
CHWP-3
NEW

CT-04 WEIGHT 500 KG


CHWP-2
PROJECT
6000

NEW NEW

COOLING TOWER
WEIGHT 22.000 KG WEIGHT 500 KG
CHWP-1
PROYEK
NEW

DN

F
CT-05
BATAM 3 PROJECT
6000

NEW
COOLING TOWER
WEIGHT 22.000 KG

Jl. BERINGIN LOT 201 & 202A


G AT BATAMINDO INDUSTRIAL PARK,
78000

CT-06

MUKAKUNING
6000

NEW
COOLING TOWER
WEIGHT 22.000 KG

H
SCRUBBER
OWNER
6000

WEIGHT 4.000 KG
PEMILIK

I SCRUBBER
B KG
WEIGHT 4.000
6000

SCRUBBER
WEIGHT 4.000 KG

110000
6000

SCRUBBER
WEIGHT 4.000 KG PT INFINEON TECHNOLOGIES BATAM
K

64590
DESIGN CONSULTANT
B
KONSULTAN RENCANA
6000

L
PT. DACREA Design and Engineering Consultants
6000

DACREA
M
6000

N DRAWING TITLE
JUDUL GAMBAR
DN
DN
10000

4'TH FLOOR
WEIGHT 8000 KG
LIGHTING INSTALLATION PLAN
PHASE.1-1
O LIFT
5625

B
NAME SIG. DATE :
P DRAWN BY :
AF
AD-1 AD-2 AD-3 AD-4 AD-5 AD-6 AD-7
5625

(NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW)


DIGAMBAR :
2250 KG 2250 KG 2250 KG 2250 KG 2250 KG 2250 KG 2250 KG
COMPRESSOR
COMPRESSOR
ROOM ROOM
WEIGHT 500 KG WEIGHT 500 KG CHECKED BY :
RH
22500

DIPERIKSA :
Q

15000
APPROVED BY :
AN
5625

B B DISETUJUI :

MXS1050

MXS1050

MXS1050

MXS1050
AR-1
9000 L AR-6
AD-1 AD-2 AD-3 AD-4 (EXISTING) 9000 L
(NEW)
(EXISTING)
4 X 550 KG
2540 KG
2540 KG
AC-1 AC-2 AC-3 AC-4 AC-5
SCALE DRAWING : 1 : 300
R ZR450
(NEW)

8400 KG
ZR450
(NEW)

8400 KG
ZR450
(NEW)

8400 KG
ZR450
(NEW)

8400 KG
ZR450
(NEW)

8400 KG

AR-4
2500 L
AR-3
3000 L
AR-2
9000 L
(EXISTING)
AR-5
9000 L
(NEW)
2540 KG
REFERENSI : REV :
5625

(EXISTING) (EXISTING) 2540 KG


850 KG 850 KG

R.0
S UP

1750
DN
FOR :

1920 24000 8260 41000 1750 CONSTRUCTION DRAWING


84000 28150 48780
DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 4'TH / 1.1 / EL-204


D-PROJECT
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715 NOTES :

164645

112500 44500

CB-EXISTING CB-EXISTING CB-EXISTING CB-EXISTING CB-EXISTING CB-EXISTING CB-EXISTING CB-EXISTING

1660
A 6000

WEIGHT 16.000 KG

BLOWER BLOWER BLOWER BLOWER BLOWER CH-04 (NEW)


300 KG 300 KG 300 KG 300 KG 300 KG

B BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
CB-EXISTING
WEIGHT 16.000 KG
CH-03 (NEW)
6000

C WEIGHT 16.000 KG
CH-02 (NEW)

27000
6000

CT-01
EXISTING
COOLING TOWER
WEIGHT 15.500 KG

CT-02
EXISTING CH-01 (EXISTING)

D COOLING TOWER
WEIGHT 15.500 KG CB-EXISTING
CT-03
EXISTING

CB-EXISTING COOLING TOWER


6000

WEIGHT 15.500 KG
WEIGHT 15.000 KG

WEIGHT 500 KG
CHWP-4
NEW

E WEIGHT 500 KG
CHWP-3
NEW
NO REVISION DATE
CT-04 WEIGHT 500 KG
CHWP-2
6000

NEW NEW

COOLING TOWER
WEIGHT 22.000 KG WEIGHT 500 KG
CHWP-1
NEW

DN
0 FIRST ISSUED -
F
CT-05
6000

NEW
COOLING TOWER
WEIGHT 22.000 KG

G CB-EXISTING
78000

CT-06
6000

NEW
COOLING TOWER
WEIGHT 22.000 KG

CB-EXISTING
H
SECTION-A SCRUBBER
PROJECT
6000

WEIGHT 4.000 KG

PROYEK
DETAIL-A
I SCRUBBER
WEIGHT 4.000 KG

BATAM 3 PROJECT
6000

SCRUBBER

J SECTION-B
WEIGHT 4.000 KG
Jl. BERINGIN LOT 201 & 202A

110000
AT BATAMINDO INDUSTRIAL PARK,
6000

SCRUBBER
MUKAKUNING
WEIGHT 4.000 KG

CB-EXISTING
K CB-EXISTING

64590
OWNER
6000

PEMILIK

L
CB-EXISTING
6000

M
6000

PT INFINEON TECHNOLOGIES BATAM


N DESIGN CONSULTANT
DN
DN KONSULTAN RENCANA
CB-EXISTING
10000

WEIGHT 8000 KG
PT. DACREA Design and Engineering Consultants
O
CB-EXISTING LIFT
DACREA
5625

CB-EXISTING

P
AD-1 AD-2 AD-3 AD-4 AD-5 AD-6 AD-7
5625

(NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW)

2250 KG 2250 KG 2250 KG 2250 KG 2250 KG 2250 KG 2250 KG


COMPRESSOR
COMPRESSOR
ROOM ROOM DRAWING TITLE
WEIGHT 500 KG WEIGHT 500 KG
JUDUL GAMBAR
22500

15000
4'TH FLOOR
5625

CB-EXISTING

MXS1050

MXS1050

MXS1050

MXS1050
AR-1
AR-6

LIGHTNING PROTECTION PLAN


9000 L
AD-1 AD-2 AD-3 AD-4 (EXISTING) 9000 L
2540 KG (NEW)
(EXISTING) 2540 KG
4 X 550 KG
AC-1 AC-2 AC-3 AC-4 AC-5

R AR-2
AR-5
9000 L
ZR450
(NEW)

8400 KG
ZR450
(NEW)

8400 KG
ZR450
(NEW)

8400 KG
ZR450
(NEW)

8400 KG
ZR450
(NEW)

8400 KG
PHASE 1.1
AR-4 AR-3 9000 L (NEW)
(EXISTING) 2540 KG
2500 L 3000 L
5625

(EXISTING) (EXISTING) 2540 KG


850 KG 850 KG

S UP NAME SIG. DATE :

1750
CB-EXISTING DN

CB-EXISTING DRAWN BY :
DIGAMBAR : AF
CB-EXISTING CB-EXISTING CB-EXISTING
CB-EXISTING CHECKED BY :
DIPERIKSA : RH
1920 24000 8260 41000 1750
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : 1 : 300


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR
DETAIL-A SECTION--A SECTION--B
ACM / 323 / MEP / 4'TH / 1.1 / EL-205
D-PROJECT
NOTES :

A
AHU

6000

9700
B

6000

AD8312+

AD8312+
C

ASM

ASM
SSI
8300
6000

AD8312+

AD8312+
ASM

ASM
ASM AD
(S7)
D

FORMING GAS AREA


(BY OTHERS)
6000
Support
Material

DMC
(S7)
E
NO REVISION DATE

6000

20500

(OUT)
WIP
0

WIP
FIRST ISSUED -

(IN)
TUBE MAX = 20M
SUPPLY
GAS
F

MARCH
Technic

RACK
(S7) FICO
(S7) (S7) (S7) SON

CHILLER
6000
1490

HELLER

WIP
(IN)
(OUT)
WIP
VACUUM
PUMP
G

SWITCH GAS
AUTO
78000
6000
R FICO FICO
(S7) (S7) (S7) SON SON

3000
PROJECT
PROYEK
H
6000

FICO FICO
BATAM 3 PROJECT
SON SON SON SON SON SON

I Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
6000

J OWNER
PEMILIK
30500
6000

K
6000

PT INFINEON TECHNOLOGIES BATAM


L DESIGN CONSULTANT
ASM AD-CB-RO KONSULTAN RENCANA
6000

AD8312+
AD8312+

ASM
ASM
TDSON

sTOLL

CB
CB

RO

M PT. DACREA Design and Engineering Consultants


RO

REEL
3000
6000

DACREA
3000

N
DRAWING TITLE
JUDUL GAMBAR
10000

GROUND FLOOR
POWER OUTLET INSTALLATION PLAN
PHASE.1-1, SHEET.2-1
O
5625

NAME SIG. DATE :


A2 EQUALIZING TANK Sn EQUALIZING TANK
RO RO
PRODUCT PRODUCT
TANK TANK
DRAWN BY :
RO UNIT 2 RO UNIT 1 AF -
DIGAMBAR :
P MIXED BED PROCESS

CHECKED BY :
ORP 1
RH
CRN 32
DIPERIKSA :
5625

CHEMICAL STORAGE AREA


ORP 2
CRN 64
APPROVED BY :
SEDIMENTATION TANK
COAGULATION
AN
DISETUJUI :
22500

AREA
Q WWTP
FLOCCULATION
SCALE DRAWING : 1:225
REFERENSI : REV :
CLINIC
5625

TRANSFER
THICKENER TANK CATRIDGE BRINE
SOFTENER VESSEL

FILTER TANK
R.0
CIP TANK
CATRIDGE

R FILTER
PRESS
FILTER BRINE
TANK

FOR :
HMR VESSEL
SOFTENER VESSEL C
5625

A S
R A
B N
O D
S N F
F A F I
TO BATAMINDO
SEWER LINE
PC PA NaOH
CL
AT
I N
D
F
I
I
L
T
E
L
T
E
R
CONSTRUCTION DRAWING
RE

S
L R T
BR T A
T T
O E A N
A
N R N K
N
K T K
HCl FeCl3 A
Na2SO4
N
K
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.1 / EL-300
NOTES :

3700
BLUE M BLUE M
crb11 crb11

73CM 73CM 73CM 73CM 73CM

K5CTU K5CTU K5CTU K5CTU K5CTU

18975
n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

73CM 73CM 73CM 73CM 73CM

K5CTU K5CTU K5CTU K5CTU K5CTU


n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

73CM 73CM 73CM 73CM 73CM

K5CTU K5CTU K5CTU K5CTU K5CTU


n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

73CM 73CM 73CM 73CM 73CM

K5CTU K5CTU K5CTU K5CTU K5CTU


n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

NO REVISION DATE

0 FIRST ISSUED -
AMSi

VAC PUMP
Height = 2240, port/pellet buffer = ?

TUBE MAX = 20M

BLUE M
BLUE M

CD-A2-WJ
BLUE M
BLUE M

FICO
SON

PROJECT
PROYEK

FICO
BATAM 3 PROJECT
SON

SNP1 Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

CD OWNER

110000
PEMILIK

Support & Material Support & Material

78325
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

WAITING

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

GROUND FLOOR
POWER OUTLET INSTALLATION PLAN
PHASE.1-1, SHEET.2-2

NAME SIG. DATE :

DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : 1:225


REFERENSI : REV :

2000
R.0

FOR :

7000
CONSTRUCTION DRAWING

UP UP DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.1 / EL-301
NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

A
CORRIDOR
6000

B IT ROOM

NO REVISION DATE
6000

EXISTING EXISTING
C 0 FIRST ISSUED -
6000

AHU

D
PP-Z2.1
6000

E
6000

PROJECT
UP DN
PROYEK
F DB-REFLOW
6000

BATAM 3 PROJECT
G REFLOW BTU-SON
REFLOW
BTU PMAX Jl. BERINGIN LOT 201 & 202A
78000
6000

AHU
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

EMPTY
TUBE
H
HANMI PMRTHAN005 SON DEC/18
B H= 538 mm

SDB-AHU.Z3
LM-TF SON

CORRIDOR
6000

OWNER
DB-LM+TF PEMILIK
I
6000

PANEL
PC
ROOM
LP2-EM
J TF1 - S7
2.6

PP-Z2.1
DBC
WS

VACANT
6000

LC - S7
PT INFINEON TECHNOLOGIES BATAM
K

TUBES
EMPTY
DESIGN CONSULTANT

PP-Z2.2
6000

LOT (INPUT)

TROLLEY
LOT
UNIT
REJECTS

EAV Cohu- Son REJECTS


UNIT
KONSULTAN RENCANA

TROLLEY

LOT (INPUT)
LOT
L

EMPTY
TUBES
6000

PT. DACREA Design and Engineering Consultants

TUBES
EMPTY
LOT (INPUT)

TROLLEY
LOT
UNIT
REJECTS

AHU
EL.+3.500
M DB-LDF.7
PP-Z2.2 DACREA
6000

EL.+3.500

N
DN UP
DRAWING TITLE
UP DN
JUDUL GAMBAR
DB-EAV
10000

UTILITY DB-WORK BENCH.2 TESTING AREA


2'ND FLOOR

EOL Buyoff

EOL Buyoff
Trolley

Trolley
4x PWT 1x LAN Port 4x PWT 1x LAN Port

EOL Buyoff EOL Buyoff


Working Table Working Table

Working Table Working Table

POWER OUTLET INSTALLATION PLAN


EOL Buyoff EOL Buyoff

4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port

EOL Buyoff

EOL Buyoff
Trolley

Trolley
O

CORRIDOR
Scope
Smart
8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart
PHASE.1-1
5625

VOID
WD2 COOPERATIVE ROOM

P DN NAME SIG. DATE :


VOID AHU
5625

DB-TSP.2 DRAWN BY :
VOID AF -
VOID DIGAMBAR :
22500

UP
Q VOID CHECKED BY :
RH
DIPERIKSA :
TSP
5625

Output
Input Trolley Turret W/Station
Trolley with Spool
10

10

10

10

(Reel)

IP IP
APPROVED BY :
10

10

10

10

Empty Tube Container


AN
TOILET

Handler PC
IP Tester /
IP Inductor
IP Tester /
DISETUJUI :

IP Inductor
IP Tester /
Handler PC
IP Tester /
5

Empty Tube Container


R CHANGING ROOM
with Spool
Turret W/Station
(Reel)
Trolley
Output
Trolley
Input
IP

SCALE DRAWING : 1:300


DB-SERVICE.2ND PRAYING ROOM
5625

REFERENSI : REV :
CORRIDOR

S UP
R.0
DN

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 2'ND / 1.1 / EL-302


D-PROJECT
NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

20750 23750

A
FG Room
6000

B DRY PACK
DB-WORK BENCH.3
6000

AFTER

AFTER
NO REVISION DATE
DB-MFS

DP
DP

23175
VACANT

BEFORE

BEFORE
C 0 FIRST ISSUED -
6000

D
6000

2500
MATERIAL & SUPPORT
3x PEGASUS
6000

PROJECT

PEGASUS
UP DN

PROYEK
F
DB-MSP
6000

PEGASUS
BATAM 3 PROJECT
G Bake-in
MSP Jl. BERINGIN LOT 201 & 202A
78000
6000

PEGASUS
AT BATAMINDO INDUSTRIAL PARK,
LD

MUKAKUNING
H

PP-Z3.1
MF
6000

MSB-FL.3 OWNER
I PEMILIK

PP-Z3.2
6000

VACANT

53325
LP3-EM
J

110000
6000

PP-Z3.1

K PT INFINEON TECHNOLOGIES BATAM


6000

DESIGN CONSULTANT
KONSULTAN RENCANA
L
6000

PT. DACREA Design and Engineering Consultants


M
DACREA
6000

DB-TSP.3
N STRIP TESTER
5x Flex

3000
DN UP
LGC UP DN DRAWING TITLE
JUDUL GAMBAR
10000

LGC

LGC LGC 3'RD FLOOR


O LIFT
POWER OUTLET INSTALLATION PLAN
LIFT
LOG MAT'L
DB-CANTEEN PHASE.1-1
5625

LGC

MATERIAL & SUPPORT


PP-Z3.2
DB-V93K

24275
P
PRAYER ROOM NAME SIG. DATE :
5625

DISPLAY
VACANT DRAWN BY :
AF
22500

CH ROOM
DIGAMBAR :
Q ABLUTION ROOM CANTEEN
CHECKED BY :
RH
DIPERIKSA :
5625

APPROVED BY :
AN
TOILET LN2 Refilling
DISETUJUI :
R LN2

AHU LN2 LN2


SCALE DRAWING : 1:300
5625

LN2
LN2 LN2

3725
LN2 LN2

LN2 LN2

REFERENSI : REV :
TOOL

LN2 LN2

S UP

DN
R.0
DB-CANTEEN PP-Z3.2
4105 3100
FOR :
8720 2540 14850 2040 7205 3250 14575 23750
84000 28150 48780
CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 3'RD / 1.1 / EL-303


D-PROJECT
NOTES :

1 2 3 4 5 6 7 8 9 10 11 SYMBOL DESCRIPTION
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

11475 33525 30700 14460 26100 41670 3000

14325 9900 8350 950 5300 25400

DB-AHU.4
A ELP1-5 SDB-GF.1-1

3700
AHU
AHU AHU
LP-D1
6000

9700

SUPPORT & MATERIAL


B
VACANT
6000

BLUE M BLUE M
crb11 crb11

PM WB NO REVISION DATE

AD8312+

AD8312+
C

ASM
ACMS

ASM
73CM 73CM 73CM 73CM 73CM

(PRODUCTION)
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
SSI

18975
n o i t a t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D L U

DB-LDF.4
LD Station
8300

END OF LINE 73CM 73CM 73CM 73CM 73CM

0
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU

FIRST ISSUED -
6000

AD8312+

AD8312+
(PRODUCTION FOL)
n o i t a t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

ASM

ASM
ASM AD n o i t a t n
K 5CTU
S o i LD Station
D t
73CM

L a U t n
K 5CTU
S o iLD Station
D t
73CM

L a U t n
K 5CTU
S o iLD Station
D t
73CM

L a U t n
K 5CTU
S o iLD Station
D t
73CM

L a U t
K 5CTU
S D
LD Station
73CM

L U

ASM AD
SUPPORT & MATERIAL (S7)
D 73CM 73CM 73CM 73CM 73CM
FORMING GAS AREA

K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU


n o i t a t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

PP-Z1.1
(BY OTHERS)

DB-HSOF8 DB-ASM.DA 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC


6000

PP-MB.1
Support SUPPORT MALE'S TOILET PP-MB.3 FEMALE'S TOILET LP-E1
VACANT Material

EXIT
PM & ACMS ELP1-4
ELP1-3 D M C
E IN
DB-LDF.2 (S7)
DB-PLASMA A2P1
(PRODUCTION FOL) DB-CHEMICAL
6000

MATERIAL SUPPORT AREA


DB-HELLER LAB
20500

HELLER REFLOW PASSBOX

(OUT)
BUND WALL H.150mm

WIP

WIP
(IN)
PROJECT

TUBE MAX = 20M

BUND WALL H.150mm


DB-PLUX.C

SUPPLY
GAS
F

MARCH
Technic DB-PROD.GF.1 PROYEK

RACK
DB-ASM.MOLD

AMSi

VAC PUMP
FICO
PM (S7) (S7) (S7) (S7) SON
BUND WALL H.150mm
CHILLER
6000

TEMPORARY PM

Height = 2240, port/pellet buffer = ?


1490
DB-FICO.MOLD

TUBE MAX = 20M

BLUE M
HELLER

WIP
(IN)

BLUE M
DB-PMC

(OUT)

CD-A2-WJ
WIP
PLASMA CLEAN ASM MOLDING

BUND WALL H.150mm

BUND WALL H.150mm


VACUUM
PUMP

BLUE M
G BATAM 3 PROJECT

BLUE M
VACANT
SWITCH GAS

FLUX CLEANING
AUTO
78000
6000

R FICO FICO
(S7) (S7) (S7) SON SON
3000

Jl. BERINGIN LOT 201 & 202A


BUND WALL H.150mm

MATERIAL SUPPORT AREA


AT BATAMINDO INDUSTRIAL PARK,
H MUKAKUNING
6000

CHEMICAL ROOM
FICO FICO
SON SON SON SON SON SON
DB-CD
OWNER
I DB-SNP+A2 SNP1
PEMILIK
RACK MATERIAL & SUPPORT PP-MB.4 MSB-FL.1
6000

LP1-EM
DB-ASM.AD
CD
J

110000
30500
6000

VACANT Support & Material


MATERIAL SUPPORT AREA

Support & Material


VACANT
K
VACANT VACANT

78325
PT INFINEON TECHNOLOGIES BATAM
6000

(PRODUCTION FOL)
ASM AD CB RO
DESIGN CONSULTANT
L DB-TDSON
KONSULTAN RENCANA
ASM AD-CB-RO
DB-HSOF5
6000

AD8312+
AD8312+

ASM

SDB-AHU.3
ASM

PP-MB.2
VACANT
TDSON

sTOLL

CLEANER ROOM &


CB

SDB-EMERGENCY
CB

PUMP HOUSE

PT. DACREA Design and Engineering Consultants


RO

FEMALE TOILET PAYROLL


WAITING

M
RO

REEL

ELP1-2 ELP1-1
DB-LDF.3
3000

MALE TOILET
6000

MSB-A1 SDB-AHU.2
DACREA
3000

EXIT EXIT

ELECTRICAL ROOM MINI STORE IN IN ELECTRICAL ROOM


N W-2.4 H-2.6
MACHINE TRANSFER

PASS
BOX
MSB-A2 UP
MSB-A3 COLD STORAGE SUMP SNP DRAWING TITLE
10000

PP-MB.5 SDB-U1 DISPLAY


CHANGING ROOM
ESDB-U1 JUDUL GAMBAR
DB-PROD.GF.2
W-2.4 H-2.6
MACHINE TRANSFER

CORRIDOR
GROUND FLOOR
O PKG
CABLE LADDER INSTALLATION PLAN
5625

GENSET LDF
A2 EQUALIZING TANK Sn EQUALIZING TANK
RO
PRODUCT
TANK
WTP
RO
PRODUCT
TANK HIGH
PHASE 1.1
RO UNIT 2 RO UNIT 1
TRANSFORMER ROOM VOLTAGE
P MIXED BED PROCESS

ORP 1
CRN 32 SDB-U.AC-3
CHEMICAL STORAGE ATTIRE CANTEEN
5625

CHEMICAL STORAGE AREA

LOCKER AREA
ORP 2
CRN 64
NAME SIG. DATE :
SEDIMENTATION TANK
COAGULATION
ROOM (OPEN SPACE)
22500

AREA WWTP DRAWN BY :


Q
FLOCCULATION
WWTP
AF -
DIGAMBAR :

2000
CLINIC
5625

CORRIDOR CHECKED BY :
TRANSFER
RH
THICKENER TANK CATRIDGE BRINE
DIPERIKSA :
SOFTENER VESSEL

FILTER TANK
LOCKET

CIP TANK
CATRIDGE
APPROVED BY :
R FILTER
PRESS
FILTER BRINE
TANK

DB-SPRINKLER PUMP DISETUJUI :


AN

7000
HMR VESSEL
SOFTENER VESSEL C
ELECTRICAL RECEIVING TRANSIT AREA
DB-HOUSEREEL
5625

A S
R A

SCALE DRAWING :
N

1:300
B
O D
TRANSFOMER
F
S
A
N
F
F
I PP-IDEALMOLD CORRIDOR
TO BATAMINDO I N
D
I L
T ROOM
SDB-EMG.EXTENTION
L
SEWER LINE
PC PA CL F T E
NaOH
AT

REFERENSI : REV :
I E R
RE

S
L R T
BR
OT
N A
T
E
R
T
A
A
N
K
UP
UP
N N
T K

UP UP
K
HCl Na2SO4 FeCl3 A
N
K

R.0
18000 18000
36000 24000 4800 19200 2425 27325 14750
FOR :
84000 2795 25585 4050 44500

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.1 / EL-305


NOTES :

SYMBOL DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

2100 32600 2500 7300

5000 7650 19950

2450
CORRIDOR
6000

NO REVISION DATE

B IT ROOM
0 FIRST ISSUED -
6000

C
6000

AHU

32140
D
PP-Z2.1
SDB-AHU.Z4
6000

PROJECT
PROYEK
E
TOILET
6000

UP DN
BATAM 3 PROJECT
F
Jl. BERINGIN LOT 201 & 202A
6000

AT BATAMINDO INDUSTRIAL PARK,


REFLOW BTU-SON MUKAKUNING
G REFLOW
BTU PMAX
78000
6000

AHU
DB-REFLOW OWNER

EMPTY
TUBE
SDB-AHU.Z3 PEMILIK
H
HANMI PMRTHAN005 SON DEC/18

CORRIDOR
H= 538 mm

LM-TF SON
6000

MSB-FL.2
I DB-LM+TF
6000

TOILET PANEL
PC
ROOM LP2-EM

J TF1 - S7

110000
2.6
DBC
PT INFINEON TECHNOLOGIES BATAM
WS

VACANT
6000

LC - S7 DESIGN CONSULTANT
KONSULTAN RENCANA
K

TUBES
EMPTY
6000

LOT (INPUT)

TROLLEY
LOT
UNIT
REJECTS

EAV Cohu- Son REJECTS


UNIT
PT. DACREA Design and Engineering Consultants

TROLLEY

LOT (INPUT)
LOT
L

64110
EMPTY
TUBES
DACREA
6000

TUBES
EMPTY
LOT (INPUT)

TROLLEY
LOT

72710
UNIT
REJECTS

DB-LDF.7 AHU
M
PP-Z2.2
6000

DRAWING TITLE
SDB-AHU.Z2
JUDUL GAMBAR
N DB-EAV
DN UP DB-WORK BENCH.2 UP DN
2'ND FLOOR
CABLE LADDER INSTALLATION PLAN
10000

UTILITY TESTING AREA


PHASE.1-1

EOL Buyoff

EOL Buyoff
TOILET

Trolley

Trolley
4x PWT 1x LAN Port 4x PWT 1x LAN Port

EOL Buyoff EOL Buyoff


Working Table Working Table

Working Table Working Table


EOL Buyoff EOL Buyoff

4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port

EOL Buyoff

EOL Buyoff
Trolley

Trolley

CORRIDOR
O Scope
Smart
8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart

NAME DATE :
EL.+6.000
SIG.
5625

WASERDA
ENTRANCE
COOPERATIVE ROOM DRAWN BY :
FOOD DISPLAY AF
EL.+5.500 DIGAMBAR :
P DN UNION ROOM SDB-AHU.Z1 CHECKED BY :
RH
EL.+5.000 AHU DIPERIKSA :
5625

RAILING

COFFEE
CORNER APPROVED BY :
AN
DISETUJUI :
22500

UP
Q VOID
TSP
SCALE DRAWING : 1:300
5625

Output
Input Trolley Turret W/Station
Trolley with Spool
10

10

10

10

(Reel)
RAILING

IP IP
10

10

10

10

8600
CANTEEN INDOOR CANTEEN OUTDOOR
REFERENSI : REV :

Empty Tube Container

Handler PC
IP Tester /
IP Inductor
IP Tester /
EL.+6.000 EL.+4.500

IP Inductor
IP Tester /
Handler PC
IP Tester /
5

TOILET

Empty Tube Container


R CHANGING ROOM IP

R.0
with Spool (Reel) Trolley
Turret W/Station Trolley Input
Output

PRAYING ROOM DB-TSP.2


5625

RAILING

DB-SERVICE.2ND

2700
CORRIDOR
FOR :
S DN
UP

DN

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 2'ND / 1.1 / EL-306


D-PROJECT
NOTES :

SYMBOL DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

20750 23750

NO REVISION DATE

A
0 FIRST ISSUED -
FG Room
6000

B DRY PACK
DB-WORK BENCH.3
6000

AFTER

AFTER
DB-MFS

DP
DP

23175
VACANT

BEFORE

BEFORE
C
6000

PROJECT
D PROYEK
6000

BATAM 3 PROJECT
E

2500
MATERIAL & SUPPORT
3x PEGASUS Jl. BERINGIN LOT 201 & 202A
6000

AT BATAMINDO INDUSTRIAL PARK,

PEGASUS
MUKAKUNING
UP DN

F
DB-MSP
6000

PEGASUS
OWNER
G Bake-in PEMILIK

MSP
78000
6000

PEGASUS
LD

H
MF
6000

MSB-FL.3
I PT INFINEON TECHNOLOGIES BATAM
6000

VACANT DESIGN CONSULTANT

53325
LP3-EM
KONSULTAN RENCANA
J

110000
6000

PP-Z3.1
PT. DACREA Design and Engineering Consultants
K
DACREA
6000

DB-TSP.3

L
DB-LDF.8
6000

DRAWING TITLE
JUDUL GAMBAR
M
3'RD FLOOR
6000

CABLE LADDER INSTALLATION PLAN


N STRIP TESTER PHASE.1-1
5x Flex

3000
DN UP
LGC UP DN
10000

NAME SIG. DATE :


LGC
DRAWN BY :
LGC LGC AF
DIGAMBAR :
O LIFT
LIFT
CHECKED BY :
RH
LOG MAT'L DIPERIKSA :
5625

LGC

PP-Z3.2 APPROVED BY :

MATERIAL & SUPPORT


AN
DB-V93K DISETUJUI :

24275
P SCALE DRAWING : 1:300
PRAYER ROOM
DB-CANTEEN
5625

DISPLAY
VACANT REFERENSI : REV :
22500

CH ROOM
Q ABLUTION ROOM CANTEEN
R.0
5625

FOR :
TOILET LN2 Refilling

R LN2

AHU LN2 LN2


5625

LN2
LN2 LN2

CONSTRUCTION DRAWING

3725
LN2 LN2

LN2 LN2 TOOL

LN2 LN2

S UP

DN
DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 3'RD / 1.1 / EL-307


D-PROJECT
NOTES :

SYMBOL DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11
112500 48215

22500 22500 22500 22500 22500 14750 15000 14750 3715

A A'
6000

7000
B NO REVISION DATE
CHILLER-4 B'
6000

0 FIRST ISSUED -

8000
CT-4
CHILLER-3
C CT-2
6000

CT-2
CHILLER-2
C'
D CT-1

8000
6000

CHILLER-1
DB-CT
SDB-CHILLER CWP-3 CHWP-4 D'
E MCC-CH CWP-3 CHWP-3 PROJECT
DB-CWP+CHWP PROYEK
6000

8000
CWP-2 CHWP-2
CWP-1 CHWP-1

F
F' BATAM 3 PROJECT
6000

8000
Jl. BERINGIN LOT 201 & 202A
G AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
78000
6000

G'
H

8000
OWNER
6000

PEMILIK
MSB-FL.4
H'
I
6000

8000
DB-ROOF
J

110000
J'
6000

PT INFINEON TECHNOLOGIES BATAM

8000
K DESIGN CONSULTANT
KONSULTAN RENCANA
6000

K'
L

8000
PT. DACREA Design and Engineering Consultants
6000

L' DACREA
M
6000

8000
DRAWING TITLE
N
N" JUDUL GAMBAR
10000
10000

8000
4'TH FLOOR
PC CT-2 PC CT-1 CABLE LADDER INSTALLATION PLAN
O" PHASE.1-1
O
5625

8000
DB-VACUM NAME SIG. DATE :
PC-CP.1
P DRAWN BY :
AD-1 AD-2 AD-3 AD-4 AD-5 AD-6 AD-7 AD-8 AD-9 AD-10
P' DIGAMBAR :
AF -
5625

(NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW)

2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG SDB-COMP.
CHECKED BY :
PC-AD.1 PC-AD.4 PC-AD.6 PC-AD.8 PC-AD.10 PC-CP.2 RH
DIPERIKSA :

8000
22500

PC-AD.2 PC-AD.3 PC-AD.5 PC-AD.7 PC-AD.9


Q APPROVED BY :
AR-5 AN
9000 L
DISETUJUI :
5625

(NEW)
9000 KG
AR-2
9000 L
(EXISTING)

AR-4
2500 L
(EXISTING)
PC-AC.6
9000 KG
PC-AC.5
AC-6
ZR450
PC-AC.4
AC-5
ZR450
PC-AC.3
AC-4
ZR450
PC-AC.2
AC-3
ZR450
PC-AC.1
AC-2
ZR450
AC-1
ZR450
Q' SCALE DRAWING : 1:300
R
2500 KG (NEW) (NEW) (NEW) (NEW) (NEW) (NEW)

8400 KG 8400 KG 8400 KG 8400 KG 8400 KG 8400 KG


AR-1
9000 L
REFERENSI : REV :

7000
(EXISTING)
AR-3 9000 KG
3000 L
(EXISTING)
5625

3000 KG

R.0
S R'
FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 4'TH / 1.1 / EL-308


D-PROJECT
NOTES :

CONSTRUCTION DRAWING - PHASE-1.2


INFINEON BATAM PROJECT
ELECTRICAL DRAWING

NO. DRAWING NO. TITTLE DRAWING SCALE REV. DUE DATE 53 ACM / 323 / MEP / GF / 1.2 / EL-151 WIRING DIAGRAM MINI DB-ASM.DA 16~18 PHASE-1.2 NTS R0 -
0. GENERAL 54 ACM / 323 / MEP / GF / 1.2 / EL-152 WIRING DIAGRAM MINI DB-ASM.DA 19~21 PHASE-1.2 NTS R0 -
1 ACM / 323 / MEP / GN / 1.2 / EL-001 DRAWING LIST ELECTRICAL PHASE-1.2 NTS R0 - 55 ACM / 323 / MEP / GF / 1.2 / EL-153 WIRING DIAGRAM MINI DB-ASM.DA 22~23 PHASE-1.2 NTS R0 -
2 ACM / 323 / MEP / GN / 1.2 / EL-101 SCHEMATIC-1 ELECTRICAL DISTRIBUTION PLAN PHASE-1.2 NTS R0 - 56 ACM / 323 / MEP / GF / 1.2 / EL-154 WIRING DIAGRAM DB-FLUX.C PHASE-1.2 NTS R0 -
3 ACM / 323 / MEP / GN / 1.2 / EL-102 SCHEMATIC-2 ELECTRICAL DISTRIBUTION PLAN PHASE-1.2 NTS R0 - 57 ACM / 323 / MEP / GF / 1.2 / EL-155 WIRING DIAGRAM MINI DB-FLUX.C 1~3 PHASE-1.2 NTS R0 -
NO REVISION DATE
4 ACM / 323 / MEP / GN / 1.2 / EL-103 SITE PLAN LIGHTING INSTALLATION 1:350 R0 - 58 ACM / 323 / MEP / GF / 1.2 / EL-156 WIRING DIAGRAM DB-CD PHASE-1.2 NTS R0 -
59 ACM / 323 / MEP / GF / 1.2 / EL-157 WIRING DIAGRAM MINI DB-CD 1~3 PHASE-1.2 NTS R0 -
60 ACM / 323 / MEP / GF / 1.2 / EL-158 NTS R0 - 0 FIRST ISSUED -
1. WIRING DIAGRAM WIRING DIAGRAM DB-HSFO5 PHASE-1.2
5 ACM / 323 / MEP / GF / 1.2 / EL-104 WIRING DIAGRAM MSB 1A, 2A, 3A PHASE-1.2 NTS R0 - 61 ACM / 323 / MEP / GF / 1.2 / EL-159 WIRING DIAGRAM MINI DB-HSFO5. 1 ~ 3 PHASE-1.2 NTS R0 -
6 ACM / 323 / MEP / GF / 1.2 / EL-105 WIRING DIAGRAM SDB GF1.1, SDB-2'ND, SDB-EMERGENCY PHASE-1.2 NTS R0 - 62 ACM / 323 / MEP / GF / 1.2 / EL-160 WIRING DIAGRAM MINI DB-HSFO5. 4 ~ 6 PHASE-1.2 NTS R0 -
7 ACM / 323 / MEP / GF / 1.2 / EL-106 WIRING DIAGRAM SDB AHU.1 & SDB-AHU.4 PHASE-1.2 NTS R0 - 63 ACM / 323 / MEP / GF / 1.2 / EL-161 WIRING DIAGRAM MINI DB-HSFO5. 7 & 8 PHASE-1.2 NTS R0 -
8 ACM / 323 / MEP / GF / 1.2 / EL-107 WIRING DIAGRAM PP-MB.1 PHASE-1.2 NTS R0 - 64 ACM / 323 / MEP / GF / 1.2 / EL-162 WIRING DIAGRAM DB-TDSON & MINI TDSON 1~8 (TYPICAL) PHASE-1.2 NTS R0 -
9 ACM / 323 / MEP / GF / 1.2 / EL-108 WIRING DIAGRAM PP-MB.2 PHASE-1.2 NTS R0 - 65 ACM / 323 / MEP / GF / 1.2 / EL-163 WIRING DIAGRAM PP-Z3.1 PHASE-1.2 NTS R0 -
10 ACM / 323 / MEP / GF / 1.2 / EL-109 WIRING DIAGRAM PP-MB.3 PHASE-1.2 NTS R0 66 ACM / 323 / MEP / GF / 1.2 / EL-164 WIRING DIAGRAM PP-Z3.2 PHASE-1.2 NTS R0 -
11 ACM / 323 / MEP / GF / 1.2 / EL-110 WIRING DIAGRAM PP-MB.4 PHASE-1.2 NTS R0 - 67 ACM / 323 / MEP / GF / 1.2 / EL-165 WIRING DIAGRAM DB-TSP & MINI DB-TSP (TYPIKAL) PHASE.1-2 NTS R0 -
PROJECT
12 ACM / 323 / MEP / GF / 1.2 / EL-111 WIRING DIAGRAM PP-MB.5 PHASE-1.2 NTS R0 - 68 ACM / 323 / MEP / GF / 1.2 / EL-166 WIRING DIAGRAM MINI DB-WORK BENCH.2 & MINI DB-WORK BENCH PHASE.1-2 NTS R0 - PROYEK
13 ACM / 323 / MEP / GF / 1.2 / EL-112 WIRING DIAGRAM PP-Z1.1 PHASE-1.2 NTS R0 - 69 ACM / 323 / MEP / GF / 1.2 / EL-167 WIRING DIAGRAM MINI DB-EAV & MINI DB-EAV PHASE.1-2 NTS R0 -
14 ACM / 323 / MEP / GF / 1.2 / EL-113 WIRING DIAGRAM PP-Z1.3 PHASE-1.2 NTS R0 - 70 ACM / 323 / MEP / GF / 1.2 / EL-168 WIRING DIAGRAM DB-LM+TF & MINI DB-LM+TF PHASE.1-2 NTS R0 -
15 NTS R0 - 71 ACM / 323 / MEP / GF / 1.2 / EL-169 WIRING DIAGRAM MINI DB-REFLOW & MINI DB-REFLOW PHASE.1-2 NTS R0 - BATAM 3 PROJECT
16 ACM / 323 / MEP / GF / 1.2 / EL-114 WIRING DIAGRAM DB-HSFO8 & MINI DB-HSOF8.1 ~ 18 PHASE-1.2 NTS R0 - 72 ACM / 323 / MEP / GF / 1.2 / EL-170 WIRING DIAGRAM DB-V93K & MINI DB-V93K PHASE.1-2 NTS R0 -
17 ACM / 323 / MEP / GF / 1.2 / EL-115 WIRING DIAGRAM DB-HELLER REFLOW & MINI DB-REFLOW.1 ~ 4 (TYPIKAL) PHASE-1.2 NTS R0 - 73 ACM / 323 / MEP / GF / 1.2 / EL-171 WIRING DIAGRAM DB-FLEX & MINI DB-FLEX.1~9 (TYPIKAL) PHASE.1-2 NTS R0 - Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
18 ACM / 323 / MEP / GF / 1.2 / EL-116 WIRING DIAGRAM PP-Z2.1 PHASE-1.2 NTS R0 - 74 ACM / 323 / MEP / GF / 1.2 / EL-172 WIRING DIAGRAM DB-TSP.3 & MINI DB-TSP.1~15 (TYPIKAL) PHASE.1-2 NTS R0 -
MUKAKUNING
19 ACM / 323 / MEP / GF / 1.2 / EL-117 WIRING DIAGRAM PP-Z2.2 PHASE-1.2 NTS R0 - 75 ACM / 323 / MEP / GF / 1.2 / EL-173 WIRING DIAGRAM DB-MSP & MINI DB-PEGASUS, SRM & MINI DB-OVEN (TYPIKAL) PHASE.1-2 NTS R0 -
20 ACM / 323 / MEP / GF / 1.2 / EL-118 WIRING DIAGRAM MSB-FL.1 & MSB-FL.1 PHASE-1.2 NTS R0 - 76 ACM / 323 / MEP / GF / 1.2 / EL-174 WIRING DIAGRAM DB-MFS & MINI DB-MFS.1~4 (TYPIKAL) PHASE.1-2 NTS R0 -
21 ACM / 323 / MEP / GF / 1.2 / EL-119 WIRING DIAGRAM DB-PROD. GF.1 PHASE-1.2 NTS R0 - 77 ACM / 323 / MEP / GF / 1.2 / EL-175 WIRING DIAGRAM DB-WORKBENCH.3 & MINI DB-DRY PACK MINI DB-WORKBENCH.3 PHASE.1-2 NTS R0 - OWNER
22 ACM / 323 / MEP / GF / 1.2 / EL-120 WIRING DIAGRAM MINI DB-UTC.5K GF.1 PHASE-1.2 NTS R0 - 78 ACM / 323 / MEP / GF / 1.2 / EL-176 WIRING DIAGRAM DB-HYDRANT & PLUMBING PHASE.1-2 NTS R0 - PEMILIK
23 ACM / 323 / MEP / GF / 1.2 / EL-121 WIRING DIAGRAM MINI DB-UTC.5K GF.2 PHASE-1.2 NTS R0 - 79 ACM / 323 / MEP / GF / 1.2 / EL-177 WIRING DIAGRAM DB-COMPRESSOR PHASE.1-2 NTS R0 -
24 ACM / 323 / MEP / GF / 1.2 / EL-122 WIRING DIAGRAM MINI DB-UTC.5K GF.3 PHASE-1.2 NTS R0 - 80 ACM / 323 / MEP / GF / 1.2 / EL-178 WIRING DIAGRAM DB-VACUM & DB-LIFT PHASE.1-2 NTS R0 -
25 ACM / 323 / MEP / GF / 1.2 / EL-123 WIRING DIAGRAM MINI DB-UTC.5K GF.4 PHASE-1.2 NTS R0 - 81 ACM / 323 / MEP / GF / 1.2 / EL-179 WIRING DIAGRAM DB-CANTEEN 2'ND & DB-CANTEEN 3'RD PHASE.1-2 NTS R0 -
26 ACM / 323 / MEP / GF / 1.2 / EL-124 WIRING DIAGRAM MINI DB-UTC.5K GF.5 PHASE-1.2 NTS R0 - 82 ACM / 323 / MEP / GF / 1.2 / EL-180 WIRING DIAGRAM DB-LDF 2 & DB-LDF 3 PHASE.1-2 NTS R0 -
27 ACM / 323 / MEP / GF / 1.2 / EL-125 WIRING DIAGRAM MINI DB-UTC.5K GF.6 PHASE-1.2 NTS R0 - 83 ACM / 323 / MEP / GF / 1.2 / EL-181 WIRING DIAGRAM DB-LDF 4 & DB-LDF 5 PHASE.1-2 NTS R0 -
28 ACM / 323 / MEP / GF / 1.2 / EL-126 WIRING DIAGRAM MINI DB-UTC.5K GF.7 PHASE-1.2 NTS R0 - 84 ACM / 323 / MEP / GF / 1.2 / EL-182 WIRING DIAGRAM DB-LDF 6 & DB-LDF 7 PHASE.1-2 NTS R0 - PT INFINEON TECHNOLOGIES BATAM
29 ACM / 323 / MEP / GF / 1.2 / EL-127 WIRING DIAGRAM MINI DB-UTC.5K GF.8 PHASE-1.2 NTS R0 - 85 ACM / 323 / MEP / GF / 1.2 / EL-183 WIRING DIAGRAM DB-LDF 9 PHASE.1-2 NTS R0 -
30 ACM / 323 / MEP / GF / 1.2 / EL-128 WIRING DIAGRAM MINI DB-DELOVOTEC GF.9 PHASE-1.2 NTS R0 - 86 ACM / 323 / MEP / GF / 1.2 / EL-184 WIRING DIAGRAM SDB-EMERGENCY PHASE.1-2 NTS R0 - DESIGN CONSULTANT
31 ACM / 323 / MEP / GF / 1.2 / EL-129 WIRING DIAGRAM MINI DB-DELOVOTEC GF.10 PHASE-1.2 NTS R0 - 87 ACM / 323 / MEP / GF / 1.2 / EL-185 WIRING DIAGRAM DB-SERVER.2 & DB-SERVER.2 PHASE.1-2 NTS R0 - KONSULTAN RENCANA
32 ACM / 323 / MEP / GF / 1.2 / EL-130 WIRING DIAGRAM DB-PROD.GF.2 PHASE-1.2 NTS R0 - 88 ACM / 323 / MEP / GF / 1.2 / EL-186 WIRING DIAGRAM MSB-FL.3 & MSB-FL.4 PHASE-1.2 NTS R0 -
33 ACM / 323 / MEP / GF / 1.2 / EL-131 WIRING DIAGRAM MINI DB-DELOVOTEC GF.10 PHASE-1.2 NTS R0 - 89 ACM / 323 / MEP / GF / 1.2 / EL-187 WIRING DIAGRAM DB-SCRUBBER PHASE.1-2 NTS R0 -
34 ACM / 323 / MEP / GF / 1.2 / EL-132 WIRING DIAGRAM MINI DB-FAV GF.12 PHASE-1.2 NTS R0 - 90 ACM / 323 / MEP / GF / 1.2 / EL-188 WIRING DIAGRAM DB-ASM.MOLD & DB-FICO MOLD PHASE.1-2 NTS R0 - PT. DACREA Design and Engineering Consultants
35 ACM / 323 / MEP / GF / 1.2 / EL-133 WIRING DIAGRAM MINI DB-FAV GF.13 PHASE-1.2 NTS R0 - 91 ACM / 323 / MEP / GF / 1.2 / EL-189 WIRING DIAGRAM DB-ASM.AD & DB-PMC PHASE.1-2 NTS R0 -
DACREA
36 ACM / 323 / MEP / GF / 1.2 / EL-134 WIRING DIAGRAM MINI DB-FAV GF.14 PHASE-1.2 NTS R0 - 92 ACM / 323 / MEP / GF / 1.2 / EL-190 WIRING DIAGRAM DB-SNP+A2 & PP-IDEAL MOLD PHASE.1-2 NTS R0 -
37 ACM / 323 / MEP / GF / 1.2 / EL-135 WIRING DIAGRAM MINI DB-FAV GF.15 PHASE-1.2 NTS R0 -
38 ACM / 323 / MEP / GF / 1.2 / EL-136 WIRING DIAGRAM MINI DB-FAV GF.16 PHASE-1.2 NTS R0 - 2. LAYOUT LIGHTING
39 ACM / 323 / MEP / GF / 1.2 / EL-137 WIRING DIAGRAM MINI DB-FAV GF.17 PHASE-1.2 NTS R0 - 93 ACM / 323 / MEP / GF / 1.2 / EL-200 GROUND FLOOR LIGHTING INSTALLATION PLAN PHASE-1.2, SHEET.2-1 1:225 R0 - DRAWING TITLE
40 ACM / 323 / MEP / GF / 1.2 / EL-138 WIRING DIAGRAM MINI DB-FAV GF.18 PHASE-1.2 NTS R0 - 94 ACM / 323 / MEP / GF / 1.2 / EL-201 GROUND FLOOR LIGHTING INSTALLATION PLAN PHASE-1.2, SHEET.2-2 1:225 R0 - JUDUL GAMBAR

41 ACM / 323 / MEP / GF / 1.2 / EL-139 WIRING DIAGRAM MINI DB-FAV GF.19 PHASE-1.2 NTS R0 - 95 ACM / 323 / MEP / 2'ND / 1.2 / EL-202 2'ND FLOOR LIGHTING INSTALLATION PLAN PHASE-1.2 1:300 R0 -
42 ACM / 323 / MEP / GF / 1.2 / EL-140 WIRING DIAGRAM MINI DB-FAV GF.20 PHASE-1.2 NTS R0 - 96 ACM / 323 / MEP / 3'RD / 1.2 / EL-203 3'RD FLOOR LIGHTING INSTALLATION PLAN PHASE-1.2 1:300 R0 - DRAWING LIST
43 ACM / 323 / MEP / GF / 1.2 / EL-141 WIRING DIAGRAM DB-PLASMA PHASE-1.2 NTS R0 - ELECTRICAL
44 ACM / 323 / MEP / GF / 1.2 / EL-142 WIRING DIAGRAM MINI DB-PLASMA 1~3 PHASE-1.2 NTS R0 - 3. LAYOUT SOCKET OUTLET & CABLE LADDER PHASE-1.2
45 ACM / 323 / MEP / GF / 1.2 / EL-143 WIRING DIAGRAM MINI DB-PLASMA 4~6 PHASE-1.2 NTS R0 - 97 ACM / 323 / MEP / GF / 1.2 / EL-300 GROUND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE-1.2, SHEET.2-1 1:225 R0 -
46 ACM / 323 / MEP / GF / 1.2 / EL-144 WIRING DIAGRAM MINI DB-PLASMA 7~8 PHASE-1.2 NTS R0 - 98 ACM / 323 / MEP / GF / 1.2 / EL-301 GROUND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE-1.2, SHEET.2-2 1:225 R0 -
NAME SIG. DATE :
47 ACM / 323 / MEP / GF / 1.2 / EL-145 WIRING DIAGRAM DB-ASM.DA PHASE-1.2 NTS R0 - 99 ACM / 323 / MEP / 2'ND / 1.2 / EL-302 2'ND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE-1.2 1:300 R0 -
DRAWN BY :
48 ACM / 323 / MEP / GF / 1.2 / EL-146 WIRING DIAGRAM MINI DB-ASM.DA 1~3 PHASE-1.2 NTS R0 - 100 ACM / 323 / MEP / 3'RD / 1.2 / EL-303 3'RD FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE-1.2 1:300 R0 - DIGAMBAR : AF
49 ACM / 323 / MEP / GF / 1.2 / EL-147 WIRING DIAGRAM MINI DB-ASM.DA 4~6 PHASE-1.2 NTS R0 - 101 ACM / 323 / MEP / GF / 1.2 / EL-304 GROUND FLOOR CABLE LADDER INSTALLATION PLAN PHASE-1.2 1:300 R0 - CHECKED BY :
DIPERIKSA : RH
50 ACM / 323 / MEP / GF / 1.2 / EL-148 WIRING DIAGRAM MINI DB-ASM.DA 7~9 PHASE-1.2 NTS R0 - 102 ACM / 323 / MEP / GF / 1.2 / EL-305 2'ND FLOOR CABLE LADDER INSTALLATION PLAN PHASE-1.2 1:300 R0 -
APPROVED BY :
51 ACM / 323 / MEP / GF / 1.2 / EL-149 WIRING DIAGRAM MINI DB-ASM.DA 10~12 PHASE-1.2 NTS R0 - 103 ACM / 323 / MEP / 2'ND / 1.2 / EL-306 3'RD FLOOR CABLE LADDER INSTALLATION PLAN PHASE-1.2 1:300 R0 - DISETUJUI : AN
52 ACM / 323 / MEP / GF / 1.2 / EL-150 WIRING DIAGRAM MINI DB-ASM.DA 13~15 PHASE-1.2 NTS R0 -
SCALE DRAWING : N.T.S
REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.2 / EL-001


D-PROJECT
NOTES :

NO. NAME OF PANEL SERVICE

3'RD FLOOR

NO REVISION DATE

0 FIRST ISSUED -

2'ND FLOOR
PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
EXTENTION BUILDING MUKAKUNING

OWNER
PEMILIK
3'RD FLOOR

2'ND FLOOR
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


MSB-A1 MSB-A2 MSB-A3 DACREA
BAT-3 BAT-3 BAT-3
SDB-EMG
1'st FLOOR DRAWING TITLE
JUDUL GAMBAR
EMERGENCY SYSTEM
GENSET SCHEMATIC-1
ELECTRICAL DISTRIBUTION PLAN
MAIN BUILDING
B.I.C SUBSTATION PHASE.1-2
G DE
3~
NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
B.I.C DIPERIKSA :
APPROVED BY :
SG 201 DISETUJUI :
AN

SCALE DRAWING : N.T.S


REFERENSI : REV :
UTILITY ROOM.1 - B.I.C R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.2 / EL-101


D-PROJECT
NOTES :

NO. NAME OF PANEL SERVICE

4'th FLOOR

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

3'rd FLOOR Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

BY B.I.C BY BAT-3
2'nd FLOOR PT. DACREA Design and Engineering Consultants
DACREA
UTILITY ROOM - 2
B.I.C

B.I.C SUBSTATION DRAWING TITLE


JUDUL GAMBAR

SCHEMATIC-2
ELECTRICAL DISTRIBUTION PLAN
B.I.C EAST WING
SG 201 PHASE-1.2
NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
UTILITY ROOM - 3 APPROVED BY :
B.I.C AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING
FROM GENSET AT MAIN BUILDING
GF FLOOR
DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GN / 1.2 / EL-102


NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 14750 15000 14750 3715
112500 48215

30000 30000 30000

50000 50000 50000

570000

700000

600000

60000

70000

New Barrier Gate


230000

600000

585108

570000

1865000

335000

2502750

60000

190000

A A'
6000

7000
800054.8726

Support & Mat'l


B
B'
DB CURE-S7 NO REVISION DATE
OFFICE
6000

520000

8000
C
6055

WB-UTC5K-S7 0 FIRST ISSUED -


DA SSi
6000

C'
ASM AD DAV-FAV S-7 SON WB-UTC5K-S7
FORMING GAS AREA ( BY OTHERS )

Support & Material (S7) EE


D

8000
Support SUPPORT
6000

Material PM & ACMS MALE'S TOILET


FEMALE'S TOILET ISP S-7 SON PLASMA-S7
D'
E
DMC
(S7)

8000
LAB
6000

30000 30000

MATL
F PROJECT
F'
PLASMA
PM PROYEK
6000

CLEAN PM TEMP
SON PMC

8000
ASM MOLD MOLDING FICO MOLD
FLUX CLEANING
G (S7) SON
PPB
BATAM 3 PROJECT
6000

HELLER REFLOW G'


Support & Matl ASM MOLD
H Jl. BERINGIN LOT 201 & 202A

8000
(SON)
CHEMICAL ROOM AT BATAMINDO INDUSTRIAL PARK,
3000
6000

MUKAKUNING
H'
I
RACK Material & Support : thawing compound

8000
6000

LAB OWNER
PEMILIK

110000
J
110500

J'
6000

Support & Material PM

8000
K
30000
6000

ASM AD-CB-RO Vacant Area K'


L

8000
PT INFINEON TECHNOLOGIES BATAM
6000

122445.1274 800054.8726

FEMALE TOILET L' DESIGN CONSULTANT


M
Sliding Door Sliding Door
MALE TOILET
KONSULTAN RENCANA

8000
6000

ELECTRICAL ROOM MINISTORE

N W.2.4 H.2.6
EOL
N"
PASS
BOX

CHANGING ROOM
MACHINE
TRANSFER PT. DACREA Design and Engineering Consultants
EOL COLD STORAGE

8000
SUMP SNP
10000

MACHINE
16000

TRANSFER
AUTO DOOR W.2.4 H.2.6 DACREA
O"
O
LIFT

8000
5625

LDF
Sn EQUALIZING TANK
A2 EQUALIZING TANK GENSET
DRAWING TITLE
RO RO
PRODUCT
TANK
PRODUCT
TANK
TRANSFORMER HIGH
P RO UNIT 1 RO UNIT 2 MIXED BED PROCESS

VOLTAGE JUDUL GAMBAR


ORP 1 OPEN SPACE
WTP LOCKER AREA P'
120x60
5625

ORP 2

COAGULATION SEDIMENTAION TANK


ATTIRE ROOM
CANTEEN TEMPORARY
12000

WWTP

8000
FLOCCULATION

Q SITE PLAN
CATRIDGE
FILTER
CLINIC
LIGHTING INSTALLATION
5625

CIP
FeCl3 TANK

Q'
NaOH

SOFTENER VESSEL
Na2SO4 PA

R
BRINE BRINE
TANK TANK
1020000

HCl PC FILTER

7000
PRESS
C
A S
R
B
A
N
SOFTENER VESSEL

RECEIVING TRANSIT AREA


5625

THICKENER O D
C
N F
I A
F S R
I L

NAME SIG. DATE :


A B
L T N O
T E D
TRANSFER CATRIDGE R N
E F
TANK FILTER F
T

R'
R I
A I
T L

S
L
A N T
K T
N E E
K

DRAWN BY :
R R
T T
A A

HMR VESSEL
N
K
N
K LOADING DOCK AF
DIGAMBAR :
60000 56430 2935 41565 625000

CHECKED BY :
RH
675000
DIPERIKSA :
APPROVED BY :
AN
1000000

600000 330000 580000 430000 1490000

DISETUJUI :

SCALE DRAWING : 1:350


REFERENSI : REV :
BV.1

SITEPLAN
SCALE 1 : 350 R.0
500000

600000 400000 600000 1200000 600000

79450
400000
120000 120000

FOR :
100000 100000 100000

CONSTRUCTION DRAWING
450000 450000 450000

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.2 / EL-103


D-PROJECT
NOTES :
MSB-1A
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE
TOTAL

DEMAND FACTOR 0 FIRST ISSUED -


GRAND TOTAL
MSB-2A
380/220V, 3Ph, 50Hz

POWER METER

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


TOTAL DACREA
DEMAND FACTOR
GRAND TOTAL

MSB-3A DRAWING TITLE


JUDUL GAMBAR
380/220V, 3Ph, 50Hz

WIRING DIAGRAM
POWER METER
MSB-1A, 2A & 3A
PHASE-1-2

NAME SIG. DATE :

DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : 1:300


N.T.S
REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
TOTAL
NOMOR GAMBAR
DEMAND FACTOR
GRAND TOTAL ACM / 323 / MEP / GF / 1.2 / EL-104
D-PROJECT
NOTES :

NEW DB-AHU.1
380/220V, 3Ph, 50Hz

M
POWER METER 3~

M
3~

SETTING : NO REVISION DATE


ELR : 5A / 0.3 (SECOND)
0 FIRST ISSUED -

PROJECT
PROYEK

TOTAL BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

NEW DB-AHU.2
380/220V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
M
POWER METER 3~

M PT. DACREA Design and Engineering Consultants


3~
DACREA
M
3~

M DRAWING TITLE
3~ JUDUL GAMBAR
SETTING :
ELR : 5A / 0.3 (SECOND) WIRING DIAGRAM
NEW DB-AHU.1 & NEW DB-AHU.2
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

TOTAL CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-106


D-PROJECT
NOTES :

PP-MB.1/PHASE 1.2
380/220V, 3Ph, 50Hz

NO REVISION DATE

B B

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.1
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-107


D-PROJECT
NOTES :

PP-MB.2/PHASE 1.2
380/220V, 3Ph, 50Hz
B B

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.2
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-108


D-PROJECT
NOTES :

PP-MB.3/PHASE 1.2 NO REVISION DATE

380/220V, 3Ph, 50Hz


B

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.3
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-109


D-PROJECT
NOTES :

PP-MB.4/PHASE 1.2
380/220V, 3Ph, 50Hz
B B

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.4
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-110


D-PROJECT
NOTES :

PP-MB.5/PHASE 1.2
380/220V, 3Ph, 50Hz
B

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA
DB-CHEMICAL
380/220V, 3Ph, 50Hz B

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-MB.5 & DB-CHEMICAL
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 /EL-111


D-PROJECT
NOTES :

PP-Z1.1/PHASE 1.2
380/220V, 3Ph, 50Hz
NO REVISION DATE
B

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z1.1
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-112


D-PROJECT
NOTES :

NO REVISION DATE
PP-Z1.2 / PHASE 1.2
380/220V, 3Ph, 50Hz
B B

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z1.2
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-113


D-PROJECT
NOTES :

DB-HSOF8
380/220V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
MINI DB-HSOF8.1~18 (TYPIKAL) JUDUL GAMBAR

380/230V, 3Ph, 50Hz


WIRING DIAGRAM
DB-HSOF8 & MINI DB-HSOF8
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-114


D-PROJECT
NOTES :

DB-HELLER REFLOW
380/220V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

TOTAL

MINI DB-HELLER.1~4 (TYPIKAL)


380/230V, 3Ph, 50Hz DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-HELLER REFLOW &
MINI DB-REFLOW
PHASE 1.2
NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-115


D-PROJECT
NOTES :

PP-Z2.1
380/220V, 3Ph, 50Hz

B B B B

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z2.1
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-116


D-PROJECT
NOTES :

PP-Z2.2
380/220V, 3Ph, 50Hz
B B B

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z2.2
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-117


D-PROJECT
NOTES :

MSB-FL.1
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

TOTAL
BATAM 3 PROJECT
DEMAND FACTOR
GRAND TOTAL Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
MSB-FL.2
OWNER
380/220V, 3Ph, 50Hz PEMILIK

POWER METER

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-FL.1 & DB-FL.2
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING
TOTAL
DRAWING NUMBER
NOMOR GAMBAR
DEMAND FACTOR
GRAND TOTAL ACM / 323 / MEP / GF / 1.2 / EL-118
D-PROJECT
NOTES :

NO REVISION DATE

DB-PROD.GF-1
380/220V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

TOTAL WIRING DIAGRAM


DB-PROD.GF-1
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-119


NOTES :

MINI DB-UTC.5K GF.1


NO REVISION DATE

380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.1
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-120


NOTES :

MINI DB-UTC.5K GF.2


380/230V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.2
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-121


NOTES :

MINI DB-UTC.5K GF.3


380/230V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.3
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-122


NOTES :

MINI DB-UTC.5K GF.4


380/230V, 3Ph, 50Hz
NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.4
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-123


NOTES :

MINI D-BUTC.5K GF.5


380/230V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.5
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-124


NOTES :

MINI DB-UTC.5K GF.6


380/230V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.6
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-125


NOTES :

MINI DB-UTC.5K GF.7


380/230V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.7
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-126


NOTES :

MINI DB-UTC.5K GF.8


NO REVISION DATE
380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-UTC.5K GF.8
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-127


NOTES :

NO REVISION DATE

MINI DB-DELOVOTEC GF.9


380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-DELOVOTEC GF.9
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-128


NOTES :

MINI DB-DELOVOTEC GF.10


380/230V, 3Ph, 50Hz
NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-DELOVOTEC GF.10

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-129


NOTES :

NO REVISION DATE

DB-PROD.GF-2
380/220V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

TOTAL
WIRING DIAGRAM
DB-PROD.GF-2
PHASE.1-2
NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-130


NOTES :

MINI DB-DELOVOTEC GF.11


380/230V, 3Ph, 50Hz NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-DELOVOTEC GF.11
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-131


NOTES :

MINI DB-FAV GF.12 NO REVISION DATE

380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.12
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-132


NOTES :

NO REVISION DATE
MINI DB-FAV GF.13
380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.13
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-133


NOTES :

NO REVISION DATE
MINI DB-FAV GF.14
380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.14
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-134


NOTES :

MINI DB-FAV GF.15 NO REVISION DATE

380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.15
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-135


NOTES :

MINI DB-FAV GF.16 NO REVISION DATE

380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.16
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-136


NOTES :

NO REVISION DATE

MINI DB-FAV GF.17


380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.17
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-137


NOTES :

NO REVISION DATE

MINI DB-FAV GF.18


380/230V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.18
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-138


NOTES :

NO REVISION DATE

MINI DB-FAV GF.19


380/230V, 3Ph, 50Hz
PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.19
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-139


NOTES :

NO REVISION DATE

MINI DB-FAV GF.120


PROJECT
PROYEK
380/230V, 3Ph, 50Hz

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-FAV GF.20
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

D-PROJECT ACM / 323 / MEP / GF / 1.2 / EL-140


NOTES :

DB-PLASMA
380/220V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-PLASMA
PHASE.1-2

TOTAL NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-141


D-PROJECT
NOTES :

MINI DB-PLASMA.1
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-PLASMA.2 PROJECT


PROYEK
380/230V, 3Ph, 50Hz

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-PLASMA.3
DRAWING TITLE
380/230V, 3Ph, 50Hz
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-PLASMA.1~3
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-142


D-PROJECT
NOTES :

MINI DB-PLASMA.4
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-PLASMA.5
PROJECT
380/230V, 3Ph, 50Hz PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

MINI DB-PLASMA.6 DACREA

380/230V, 3Ph, 50Hz


DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-PLASMA.4~6
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-143


D-PROJECT
NOTES :

MINI DB-PLASMA.7
380/230V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
MINI DB-PLASMA.8 PEMILIK

380/230V, 3Ph, 50Hz

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-PLASMA.7~8
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-144


D-PROJECT
NOTES :

DB-ASM.DA
380/220V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA
TOTAL
DRAWING TITLE
JUDUL GAMBAR

MINI DB-DMC.1~3 (TYPIKAL) WIRING DIAGRAM


DB-ASM.DA & MINI DB-DMC.1~3
380/230V, 3Ph, 50Hz (TYPIKAL)
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-145


D-PROJECT
NOTES :

MINI DB-ASM.DA.1
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-ASM.DA.2
PROJECT
380/230V, 3Ph, 50Hz PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-ASM.DA.3
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM.DA 1~3
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-146


D-PROJECT
NOTES :

MINI DB-ASM.DA.4
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-ASM.DA.5
380/230V, 3Ph, 50Hz PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-ASM.DA.6
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM.DA 4~6
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-147


D-PROJECT
NOTES :

MINI DB-ASM.DA.7
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-ASM.DA.8
380/230V, 3Ph, 50Hz PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-ASM.DA.9
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM.DA 7~9
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-148


D-PROJECT
MINI DB-ASM.DA.10
NOTES :

380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-ASM.DA.11
PROJECT
PROYEK
380/230V, 3Ph, 50Hz

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-ASM.DA.12 DRAWING TITLE


JUDUL GAMBAR
380/230V, 3Ph, 50Hz
WIRING DIAGRAM
MINI DB-ASM.DA 10~12
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-149


D-PROJECT
NOTES :
MINI DB-ASM.DA.13
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-ASM.DA.14
380/230V, 3Ph, 50Hz PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-ASM.DA.15
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM.DA 13~15
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-150


D-PROJECT
NOTES :
MINI DB-ASM.DA.16
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-ASM.DA.17
380/230V, 3Ph, 50Hz PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-ASM.DA.18
DRAWING TITLE
380/230V, 3Ph, 50Hz
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM.DA 16~18
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-151


D-PROJECT
NOTES :
MINI DB-ASM.DA.19
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-ASM.DA.20
380/230V, 3Ph, 50Hz PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-ASM.DA.21
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM.DA 19~21
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-152


D-PROJECT
NOTES :

MINI DB-ASM.DA.22
380/230V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

MINI DB-ASM.DA.23
380/230V, 3Ph, 50Hz

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-ASM.DA 22~23
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-153


D-PROJECT
NOTES :

NO REVISION DATE

DB-FLUX.C
380/220V, 3Ph, 50Hz PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

TOTAL DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-FLUX.C
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-154


D-PROJECT
NOTES :

MINI DB-FLUX.C.1
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-FLUX.C.2
PROJECT
PROYEK
380/230V, 3Ph, 50Hz

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-FLUX.C.3
DRAWING TITLE
JUDUL GAMBAR
380/230V, 3Ph, 50Hz
WIRING DIAGRAM
MINI DB-FLUX C. 1~3
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-155


D-PROJECT
NOTES :

NO REVISION DATE

DB-CD
380/220V, 3Ph, 50Hz

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

TOTAL
DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-CD
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-156


D-PROJECT
NOTES :

MINI DB-CD.1
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-CD.2
PROJECT
PROYEK
380/230V, 3Ph, 50Hz

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-CD.3
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-CD. 1~3
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-157


D-PROJECT
NOTES :

DB-HSF05
380/220V, 3Ph, 50Hz
NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-HSFO5
PHASE.1-2

TOTAL
NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-158


D-PROJECT
NOTES :

MINI DB-HSF05.1
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-HSF05.2
PROJECT
PROYEK
380/230V, 3Ph, 50Hz

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-HSF05.3
DRAWING TITLE
JUDUL GAMBAR
380/230V, 3Ph, 50Hz
WIRING DIAGRAM
MINI DB-HSFO5. 1~3
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-159


D-PROJECT
NOTES :

MINI DB-HSF05.4
380/230V, 3Ph, 50Hz

NO REVISION DATE

MINI DB-HSF05.5
PROJECT
PROYEK
380/230V, 3Ph, 50Hz

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

MINI DB-HSF05.6
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-HSFO5. 4~6
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-160


D-PROJECT
NOTES :

MINI DB-HSF05.7
380/230V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

MINI DB-HSF05.8
380/230V, 3Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-HSFO5. 7 & 8
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-161


D-PROJECT
NOTES :

DB-TDSON
380/220V, 3Ph, 50Hz

NO REVISION DATE

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

MINI DB-TDSON.1~8 (TYPIKAL) DACREA

380/230V, 3Ph, 50Hz


DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-TDSON & MINI DB-TDSON.1~8
(TYPIKAL)
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-162


D-PROJECT
NOTES :

NO REVISION DATE

PP-Z3.1/PHASE 1.2 0 FIRST ISSUED -

380/220V, 3Ph, 50Hz


B

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
TOTAL JUDUL GAMBAR

WIRING DIAGRAM
PP-Z3.1
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-163


D-PROJECT
NOTES :

PP-Z3.2/PHASE 1.2
380/220V, 3Ph, 50Hz
B NO REVISION DATE
B B

PROJECT
PROYEK

OWNER
PEMILIK

DESIGN CONSULTANT
KONSULTAN RENCANA

DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
PP-Z3.2
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING :
REFERENSI : REV :

FOR :

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-164


D-PROJECT
NOTES :

DB-TSP.2
380/220V, 3Ph, 50Hz

NO REVISION DATE

POWER METER 0 FIRST ISSUED -

PROJECT
PROYEK
SETTING :
ELR : 5A / 0.3 (SECOND)
BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


TOTAL
DACREA

MINI DB-TSP.1~15 (TYPIKAL) DRAWING TITLE


JUDUL GAMBAR

380/230V, 3Ph, 50Hz WIRING DIAGRAM


DB-TSP & MINI DB-TSP (TYPIKAL)
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
TOTAL SCALE DRAWING : N.T.S
REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-165


NOTES :

DB-WORK BENCH.2
380/220V, 3Ph, 50Hz

POWER METER

SETTING :
ELR : 5A / 0.3 (SECOND)

TOTAL NO REVISION DATE

0 FIRST ISSUED -

MINI DB-WORK BENCH.2-1~2


(TYPICAL)
PROJECT
380/230V, 3Ph, 50Hz PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

TOTAL
PT. DACREA Design and Engineering Consultants
DACREA

MINI DB-SMARTSCOPE
DRAWING TITLE
380/230V, 3Ph, 50Hz
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-WORK BENCH.2 &
MINI DB-WORK BENCH
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :
TOTAL
CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-166


NOTES :
DB-EAV
380/220V, 3Ph, 50Hz

POWER METER

NO REVISION DATE

0 FIRST ISSUED -

SETTING :
ELR : 5A / 0.3 (SECOND)

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
MINI DB-EAV.ACE.1~15 (TYPIKAL)
380/230V, 3Ph, 50Hz PT. DACREA Design and Engineering Consultants
DACREA

DRAWING TITLE
JUDUL GAMBAR
TOTAL WIRING DIAGRAM
MINI DB-EAV & MINI DB-EAV
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
MINI DB-EAV.COHU.1~8 (TYPIKAL) CHECKED BY :
DIPERIKSA : RH
380/230V, 3Ph, 50Hz APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :
TOTAL
CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-167


NOTES :
DB-LM+TF
380/220V, 3Ph, 50Hz

POWER METER

SETTING :
ELR : 5A / 0.3 (SECOND)

NO REVISION DATE

0 FIRST ISSUED -

TOTAL

MINI DB-TNF.1~4 (TYPIKAL)


380/230V, 3Ph, 50Hz PROJECT
PROYEK

BATAM 3 PROJECT

TOTAL Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

MINI DB-SONOSCAN.1~2 (TYPIKAL)


380/230V, 3Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
TOTAL KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

MINI DB-TE.1~2 (TYPIKAL)


380/230V, 3Ph, 50Hz DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LM+TF &
MINI DB-LM+TF
TOTAL PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
MINI DB-LC.1~2 (TYPIKAL) DISETUJUI : AN

380/230V, 3Ph, 50Hz SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

TOTAL
SETTING : CONSTRUCTION DRAWING
ELR : 5A / 0.3 (SECOND)

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-168


NOTES :

DB-REFLOW
380/220V, 3Ph, 50Hz

NO REVISION DATE

POWER METER 0 FIRST ISSUED -

PROJECT
PROYEK
SETTING :
ELR : 5A / 0.3 (SECOND)
BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
PT. DACREA Design and Engineering Consultants
DACREA
MINI DB-REFLOW.1~11 (TYPIKAL)
380/230V, 3Ph, 50Hz DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MINI DB-REFLOW &
MINI DB-REFLOW
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
SETTING :
APPROVED BY :
ELR : 5A / 0.3 (SECOND) DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-169


NOTES :

DB-V93K
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

POWER METER

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


SETTING :
AT BATAMINDO INDUSTRIAL PARK,
ELR : 5A / 0.3 (SECOND) MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL

PT. DACREA Design and Engineering Consultants


MINI DB-V93K.1~15 (TYPIKAL) DACREA

380/230V, 3Ph, 50Hz


DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-V93K & MINI DB-V93K
PHASE.1-2

NAME SIG. DATE :


TOTAL
DRAWN BY :
DIGAMBAR : AF
SETTING :
CHECKED BY :
ELR : 5A / 0.3 (SECOND) DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-170


NOTES :

DB-FLEX
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

POWER METER

PROJECT
PROYEK

SETTING :
BATAM 3 PROJECT
ELR : 5A / 0.3 (SECOND)

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
MINI DB-FLEX.1~9 (TYPIKAL) KONSULTAN RENCANA

380/230V, 3Ph, 50Hz PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-FLEX &
TOTAL MINI DB-FLEX.1~9 (TYPIKAL)
PHASE.1-2
SETTING :
ELR : 5A / 0.3 (SECOND)
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-171


NOTES :

DB-TSP.3
380/220V, 3Ph, 50Hz
NO REVISION DATE

0 FIRST ISSUED -

POWER METER

PROJECT
PROYEK

BATAM 3 PROJECT
SETTING : Jl. BERINGIN LOT 201 & 202A
ELR : 5A / 0.3 (SECOND) AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

MINI DB-TSP.1~15 (TYPIKAL) PT. DACREA Design and Engineering Consultants


380/230V, 3Ph, 50Hz DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-TSP.3 &
MINI DB-TSP.1~15 (TYPIKAL)
PHASE.1-2
TOTAL
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-172


NOTES :
DB-MSP
380/220V, 3Ph, 50Hz

POWER METER

SETTING :
ELR : 5A / 0.3 (SECOND)

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT
TOTAL
Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

MINI DB-PEGASUS.1~15 (TYPIKAL)


OWNER
380/230V, 3Ph, 50Hz
PEMILIK

TOTAL
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


MINI DB-SRM.1~3 (TYPIKAL)
DACREA
380/230V, 3Ph, 50Hz

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
TOTAL DB-MSP & MINI DB-PEGASUS, SRM,
& MINI DB-OVEN (TYPIKAL)
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
MINI DB-OVEN.1~4 (TYPIKAL) APPROVED BY :
AN
DISETUJUI :
380/230V, 3Ph, 50Hz
SCALE DRAWING : N.T.S
REFERENSI : REV :

R.0

FOR :

TOTAL CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-173


NOTES :

DB-MFS
380/220V, 3Ph, 50Hz
NO REVISION DATE

0 FIRST ISSUED -

POWER METER

PROJECT
PROYEK

SETTING :
ELR : 5A / 0.3 (SECOND) BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

TOTAL
OWNER
PEMILIK

MINI DB-MFS.1~4 (TYPIKAL) PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
380/230V, 3Ph, 50Hz KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
TOTAL JUDUL GAMBAR

WIRING DIAGRAM
DB-MFS & MINI DB-MFS.1~4 (TYPIKAL)
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-174


NOTES :

DB-WORK BENCH.3
380/220V, 3Ph, 50Hz

POWER METER

SETTING : NO REVISION DATE


ELR : 5A / 0.3 (SECOND) TOTAL
0 FIRST ISSUED -

PROJECT
PROYEK
MINI DB-DRY PACK.1~3 (TYPIKAL)
380/230V, 3Ph, 50Hz BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


MINI DB-WORK BENCH.3 DACREA

380/230V, 3Ph, 50Hz


DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-WORKBENCH.3 & MINI DB-DRY PACK
MINI DB-WORKBENCH.3
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING
TOTAL
DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-175


NOTES :

DB-HYDRANT
380/220V, 3Ph, 50Hz

M
POWER METER 3~

M
3~

NO REVISION DATE

SETTING :
0 FIRST ISSUED -
ELR : 5A / 0.3 (SECOND)

PROJECT
PROYEK
TOTAL
BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
DB-PLUMBING
380/220V, 3Ph, 50Hz OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

POWER METER DESIGN CONSULTANT


KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA
SETTING :
ELR : 5A / 0.3 (SECOND)

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-HYDRANT & DB-PLUMBING
PHASE.1-2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

TOTAL R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-176


NOTES :

SDB-COMPRESSOR
380/220V, 3Ph, 50Hz

M
3~
NO REVISION DATE

M
3~
0 FIRST ISSUED -

M
3~

POWER METER
M
3~

M
3~

M
PROJECT
3~ PROYEK

M
3~
SETTING :
ELR : 5A / 0.3 (SECOND)
BATAM 3 PROJECT
M
3~
Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
M
3~ MUKAKUNING

M
3~
OWNER
M
PEMILIK
3~

M
3~

M
3~

M
3~
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
M
3~ KONSULTAN RENCANA

M
3~

M
PT. DACREA Design and Engineering Consultants
3~
DACREA
M
3~

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
SDB-COMPRESOR
PHASE-1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
DF CHECKED BY :
RH
DIPERIKSA :
TOTAL
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GN / 1.2 / EL-177


NOTES :

DB-VACUM
380/220V, 3Ph, 50Hz

NO REVISION DATE

M
POWER METER 3~ 0 FIRST ISSUED -

M
3~

SETTING : PROJECT
ELR : 5A / 0.3 (SECOND) PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
TOTAL
OWNER
PEMILIK

DB-LIFT NEW
380/220V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
M KONSULTAN RENCANA
POWER METER 3~

PT. DACREA Design and Engineering Consultants


M
3~ DACREA

SETTING :
DRAWING TITLE
ELR : 5A / 0.3 (SECOND)
JUDUL GAMBAR

WIRING DIAGRAM
DB-VACUM & DB-LIFT.NEW
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
TOTAL CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-178


NOTES :

DB-CANTEEN 2'ND
380/220V, 3Ph, 50Hz
B B

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

TOTAL OWNER
PEMILIK

DB-CANTEEN 3'RD
PT INFINEON TECHNOLOGIES BATAM
380/220V, 3Ph, 50Hz
B DESIGN CONSULTANT
B B
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-CANTEEN 2'ND & 3'RD
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
AN
TOTAL DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-179


NOTES :

DB-LDF.2 SDB-LDF.2
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

DB-LDF.3 SDB-LDF.3
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LDF.2 & DB-LDF.3
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-180


NOTES :

DB-LDF.4 SDB-LDF.4
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

DB-LDF.5 SDB-LDF.5
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LDF.4 & DB-LDF.5
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-181


NOTES :

DB-LDF.6 SDB-LDF.6
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

DB-LDF.7 SDB-LDF.7
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LDF.6 & DB-LDF.7
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-182


NOTES :

DB-LDF.9 SDB-LDF.9 NO REVISION DATE

380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz


0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-LDF.9
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-183


NOTES :

SDB-EMERGENCY
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

POWER METER

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
SETTING : MUKAKUNING
ELR : 5A / 0.3 (SECOND)

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
SDB-EMERGENCY
PHASE-1.2
TOTAL
NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-184


NOTES :

SDB-SERVER
DB-SERVER.1
380/220V, 3Ph, 50Hz
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM


DB-SERVER.2
DESIGN CONSULTANT
380/220V, 3Ph, 50Hz KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-SERVER.1 & DB-SERVER.2
PHASE 1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-185


NOTES :

MSB-FL.3
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
TOTAL PEMILIK

DEMAND FACTOR
GRAND TOTAL
MSB-FL.4
PT INFINEON TECHNOLOGIES BATAM
380/220V, 3Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
MSB-FL.3 & MSB-FL.4
PHASE-1.2

NAME SIG. DATE :

DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

TOTAL FOR :

DEMAND FACTOR CONSTRUCTION DRAWING


GRAND TOTAL
DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-186


D-PROJECT
NOTES :

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK
DB-SCRUBBER
BY OTHER
380/220V, 3Ph, 50Hz
BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
KONSULTAN RENCANA

TOTAL
PT. DACREA Design and Engineering Consultants
DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-SCRUBBER
PHASE-1.2

NAME SIG. DATE :

DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :

SCALE DRAWING : N.T.S


REFERENSI : REV :

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-187


D-PROJECT
NOTES :

DB-ASM.MOLD
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL

DB-FICO.MOLD PT INFINEON TECHNOLOGIES BATAM

DESIGN CONSULTANT
380/220V, 3Ph, 50Hz KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-ASM.MOLD & FICO.MOLD
PHASE-1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0
TOTAL FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-188


NOTES :

DB-ASM.AD
380/220V, 3Ph, 50Hz

NO REVISION DATE

0 FIRST ISSUED -

PROJECT
PROYEK

BATAM 3 PROJECT

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING

OWNER
PEMILIK

TOTAL

DB-PMC PT INFINEON TECHNOLOGIES BATAM

380/220V, 3Ph, 50Hz DESIGN CONSULTANT


KONSULTAN RENCANA

PT. DACREA Design and Engineering Consultants


DACREA

DRAWING TITLE
JUDUL GAMBAR

WIRING DIAGRAM
DB-ASM.AD & DB-PMC
PHASE-1.2

NAME SIG. DATE :

DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN

SCALE DRAWING : N.T.S


REFERENSI : REV :

R.0

TOTAL FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / GF / 1.2 / EL-189


NOTES :

6000

9700
B FFL.±0.000
B B
FFL.±0.000 B

Vacant

6000
C B

8300
6000

VacantVACANT
D

FORMING GAS AREA

DMC
(BY OTHERS)
6000

EXIT
B NO REVISION DATE

IN
E
0 FIRST ISSUED -

6000

20500
F
B

6000
G PROJECT
PHASE 1.1 PROYEK
78000
6000

3000
B
H BATAM 3 PROJECT
6000

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
I SUPPORT & MATERIAL
6000

OWNER
PEMILIK

PHASE 1.1

Vacant
30500
6000

K PT INFINEON TECHNOLOGIES BATAM


VACANT
6000

DESIGN CONSULTANT
KONSULTAN RENCANA
L
PT. DACREA Design and Engineering Consultants
6000

DACREA
M
3000
6000

3000

EXIT EXIT
ELECTRICAL ROOM MINISTORE DRAWING TITLE
IN IN ELECTRICAL ROOM
JUDUL GAMBAR
N
GROUND FLOOR
MOBILE COMPACTOR AREA
PHASE 1.1
CHANGING ROOM LIGHTING INSTALLATION PLAN
10000

PHASE.1-2, SHEET.2-1
W.1.8
CORRIDOR
NAME SIG. DATE :
O DRAWN BY :
DIGAMBAR : AF
5625

WTP GENSET CHECKED BY :


DIPERIKSA : RH
TRANSFORMER ROOM APPROVED BY :
P DISETUJUI : AN

CHEMICAL STORAGE SCALE DRAWING : 1:225


5625

PHASE 1.1

REFERENSI : REV :
22500

WWTP
Q PHASE 1.1 R.0
5625

FOR :

R CONSTRUCTION DRAWING
5625

DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225 S
ACM / 323 / MEP / GF / 1.2 / EL-200
D-PROJECT
NOTES :

FFL.±0.000 FFL.±0.000 FFL.±0.000

PHASE 1.1
FEMALE'S TOILET
A-DOOR
DOOR

PASS BOX PHASE 1.1

MATERIAL SUPPORT AREA


BUND WALL H.150mm
B B

BUND WALL H.150mm


BUND WALL H.150mm

BUND WALL H.150mm

BUND WALL H.150mm

BUND WALL H.150mm


VACANT

BUND WALL H.150mm

BUND WALL H.150mm


PHASE 1.1 VACANT B B

NO REVISION DATE
BUND WALL H.150mm

76600
MATERIAL SUPPORT AREA

0 FIRST ISSUED -
BUND WALL H.150mm

BUND WALL H.150mm

PHASE 1.1
BUND WALL H.150mm

B B

PHASE 1.1 LAB

PROJECT

110000
B B
PROYEK

B B

PM
SUPPORT & MATERIAL AREA BATAM 3 PROJECT
CD/SnP

B B
Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
FFL.±0.000
MUKAKUNING

B B
OWNER
VACANT PEMILIK

VACANT
B B
ELECTRICAL ROOM
PT INFINEON TECHNOLOGIES BATAM

PHASE 1.1
UP DESIGN CONSULTANT

EXIT
SUMP SNP

3850
COLD STORAGE KONSULTAN RENCANA
DISPLAY
AUTO DOOR FOOD DISPLAY

CORRIDOR
B B B PT. DACREA Design and Engineering Consultants
DACREA

LDF

16850
HIGH
FFL.±0.000
TRANSFORMER ROOM VOLTAGE
OPEN SPACE
PHASE 1.1 DRAWING TITLE
JUDUL GAMBAR
LOCKER AREA
ATTIRE CANTEEN B B B

ROOM GROUND FLOOR


CANTEEN TEMPORARY ST
materials & support LIGHTING INSTALLATION PLAN
CLINIC
WF PHASE.1-2, SHEET.2-2

2000
CORRIDOR
LOCKET

NAME SIG. DATE :

PHASE 1.1

7000
FEMALE TOILET

DRAWN BY :
ELECTRICAL AF
SECURITY

DIGAMBAR :
MALE TOILET

TRANSFOMER
FFL.-0.050 CORRIDOR FFL.±0.000 FFL.±0.000 CHECKED BY :
RH
ROOM DIPERIKSA :
APPROVED BY :
UP DISETUJUI : AN
UP UP UP
SCALE DRAWING : 1:225
REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.2 / EL-201
D-PROJECT
NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500
B

A
CORRIDOR
6000

Spare Parts Spare Parts Spare Parts Spare Parts Spare Parts
Cabinet Cabinet Cabinet Cabinet Cabinet

Spare Parts
Cabinet
IT
ROOM NO REVISION DATE
B
Work Station Work Station

IT ROOM Work Station Work Station

B B
3x5
Sp part PM
6000

0 FIRST ISSUED -

C B B
6000

AHU

D
PP-Z2.1
6000

B B

E PROJECT
TOILET
PROYEK
6000

UP DN

F REFLOW

BATAM 3 PROJECT
B B
6000

Jl. BERINGIN LOT 201 & 202A


AT BATAMINDO INDUSTRIAL PARK,
G MUKAKUNING
78000
6000

VACANT AHU

H OWNER

CORRIDOR
PEMILIK
6000

I
6000

TOILET PANEL
ROOM

LC & DBC
LP2-EM
J

PP-Z2.1
PT INFINEON TECHNOLOGIES BATAM
6000

DESIGN CONSULTANT
K KONSULTAN RENCANA

PP-Z2.2
6000

PHASE 1.1

L EAV
PT. DACREA Design and Engineering Consultants
6000

AHU
DACREA
M
PP-Z2.2
6000

DRAWING TITLE
N JUDUL GAMBAR
B
DN UP
UP DN

2'ND FLOOR
10000

Utility

UTILITY
PHASE 1.1
12 Visual INSP
TESTING AREA
LIGHTING INSTALLATION PLAN

PHASE 1.1
TOILET

B B
PHASE.1-2
O

CORRIDOR
MATERIAL & SUPPORT
5625

VOID NAME SIG. DATE :


COOPERATIVE ROOM B B

Turret
DRAWN BY :
P DN UNION ROOM
W/Station
with
Spool
DIGAMBAR :
AF -
VOID AHU
5625

PHASE 1.1 CHECKED BY :


RAILING

RH
B B
DIPERIKSA :
VOID
22500

UP APPROVED BY :

TEST MATERIAL & SUPPORT


PHASE 1.1
Q VOID
DISETUJUI :
AN
5625

RAILING

SCALE DRAWING : 1:300


CHANGING
VOID
10

10

10

10

TOILET
REFERENSI : REV :
10

10

10

10

R Ch Room CHANGING ROOM


PHASE 1.1
5

PRAYING ROOM
OFFICE
5625

RAILING

R.0
CORRIDOR

S UP
FOR :
DN

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 2'ND / 1.2 / EL-202


D-PROJECT
NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3750 B
112500 44500
6980 38320 18100 49100 42000 2500

A A'

7000
6000

B B

B B' NO REVISION DATE


17400
6000

8000
22700
0 FIRST ISSUED -
C
B B

C'
6000

8000
D
6000

B B
D'
E
PROJECT

8000
6000

PROYEK

F F'
BATAM 3 PROJECT
6000

B B

8000
G Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
G'
6000

MUKAKUNING

8000
H

PP-Z3.1
B B

OWNER
6000

56300

PEMILIK
H'
I

8000
PP-Z3.2
6000

B B

110000
J
110500

J'
6000

MC transfer
PP-Z3.1 PT INFINEON TECHNOLOGIES BATAM

8000
K

78100
DESIGN CONSULTANT
B

K' KONSULTAN RENCANA


6000

8000
L
PT. DACREA Design and Engineering Consultants
6000

L'
M DACREA

8000
B
6000

N N" DRAWING TITLE


JUDUL GAMBAR
13500

B
B B B

8000
10000

DB-3 3'RD FLOOR


DB-CANTEEN
LIGHTING INSTALLATION PLAN
B
O" PHASE.1-2
O B B

LIFT

8000
Log Mat'l
5625

B B B

B B
NAME SIG. DATE :
P
Praying Room
FOOD DISPLAY
B P' DRAWN BY :
AF
5625

B
B DIGAMBAR :
PP-Z3.2

8000
B
CHANGING ROOM CHECKED BY :
23300

RH
DIPERIKSA :
Q ABLUTION ROOM B B B
APPROVED BY :

2200
AN
5625

B
CANTEEN DISETUJUI :
Q'
B SCALE DRAWING : 1:300
R B

7000

7000
B

AHU REFERENSI : REV :


5625

B B B

B B

R' R.0
S L I F T L I F T

DB-CANTEEN PP-Z3.2 FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 3'RD / 1.2 / EL-203


D-PROJECT
NOTES :

6000
25x DA SMART 7

9700

AD8312+

AD8312+
AD8312+

AD8312+

AD8312+
AD8312+

ASM

ASM
ASM

ASM

ASM
ASM
B FFL.±0.000 FFL.±0.000

SSI

SSI
SSI
Vacant

SSI

AD8312+

AD8312+
AD8312+

AD8312+

AD8312+
AD8312+
6000

ASM

ASM
ASM

ASM

ASM
ASM
SSI
SSI
SSI

SSI

SSI

SSI

AD8312+

AD8312+
AD8312+

AD8312+

AD8312+
AD8312+
SSI

ASM

ASM
ASM

ASM

ASM
ASM
SSI
C

SSI

SSI

SSI
SSI
8300

AD8312+

AD8312+
AD8312+

AD8312+

AD8312+
AD8312+
6000

SSI

ASM

ASM
ASM

ASM

ASM
ASM
ssi-HSOF8

SSI
Vacant VACANT
D

FORMING GAS AREA

DMC
DMC
(BY OTHERS)
Forming Gas Mixer (170sqm)
6000

EXIT
R

SWITCH GAS
AUTO
NO REVISION DATE

CHILLER
1490

Vacant

IN
E

VACUUM

HELLER
PUMP

HELLER
0 FIRST ISSUED -

VACUUM
PUMP
6000

CHILLER
Batamindo Sewerline pipe
20500

SWITCH GAS
AUTO
R

SUPPLY
GAS
F heller REFLOW

RACK

MARCH
MARCH
Technic
Technic
R

RACK
SUPPLY
GAS

SUPPLY
GAS
SWITCH GAS
AUTO

RACK
2000

MARCH
CHILLER
6000

MARCH
1490

RACK
SUPPLY
VACUUM

GAS

SUPPLY
HELLER

GAS
PUMP

HELLER

RACK

MARCH
MARCH
1396

RACK
VACUUM

SUPPLY
GAS
PUMP

SUPPLY
GAS
G

RACK

MARCH
CHILLER

MARCH
Flux Cleaning

RACK
PROJECT

SWITCH GAS

SUPPLY
FINNSONIC

GAS
AUTO
PHASE 1.1 PC PROYEK
78000
TDSON+HSOF5
6000
R

area

3000
Support & Matl

H BATAM 3 PROJECT

Chemical
6000

Jl. BERINGIN LOT 201 & 202A


room AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
I SUPPORT & MATERIAL
6000

OWNER
PEMILIK

PHASE 1.1

Vacant
Chemical Storage 70sqm
30500
6000

Vacant
K PT INFINEON TECHNOLOGIES BATAM
VACANT
6000

REEL
DESIGN CONSULTANT

RO
AD8312+

AD8312+
ASM

ASM
CB

CB
RO
KONSULTAN RENCANA

sTOLL
sTOLL

TDSON
TDSON
CB

AD8312+

CB
L

AD8312+
ASM

RO
ASM

RO
REEL

REEL
PT. DACREA Design and Engineering Consultants
6000

RO

AD8312+
AD8312+

ASM
ASM

CB

CB
RO
sTOLL

TDSON
TDSON
sTOLL

AD8312+
CB

CB
1588

AD8312+
ASM

RO
ASM
DACREA

RO
M

REEL
3000
6000

Compressor
3000

EXIT EXIT
ELECTRICAL ROOM MINISTORE DRAWING TITLE
ELECTRICAL ROOM
Compressor

IN IN

JUDUL GAMBAR
N
GROUND FLOOR
MOBILE COMPACTOR AREA
CHANGING ROOM PHASE 1.1 POWER OUTLET INSTALLATION PLAN
10000

PHASE.1-2, SHEET.2-1
W.1.8
CORRIDOR
NAME SIG. DATE :
O DRAWN BY :
DIGAMBAR : AF
5625

WTP GENSET CHECKED BY :


DIPERIKSA : RH
TRANSFORMER ROOM APPROVED BY :
P DISETUJUI : AN

CHEMICAL STORAGE SCALE DRAWING : 1:225


5625

PHASE 1.1

REFERENSI : REV :
22500

WWTP
Q PHASE 1.1 R.0
5625

FOR :

R CONSTRUCTION DRAWING
5625

DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225 S
ACM / 323 / MEP / GF / 1.2 / EL-300
D-PROJECT
NOTES :

73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM

K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU

FFL.±0.000 FFL.±0.000 FFL.±0.000


n o i t a t S LD Station nD oL Ui t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

PHASE 1.1
73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM

K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU

A-DOOR
n o i t a t S LD Station nD oL Ui t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

FEMALE'S TOILET
DAGE

DOOR A2P1 Plasma


PASS BOX PHASE 1.1 LAB
K5CTU
73CM

K5CTU
73CM

K5CTU
73CM

K5CTU
73CM

K5CTU
73CM

K5CTU
73CM

K5CTU
73CM

MATERIAL SUPPORT AREA


n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

A2P2

(OUT)
(OUT)

WIP
WIP

WIP
(IN)
73CM 73CM 73CM 73CM 73CM 73CM 73CM

BUND WALL H.150mm K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU

WIP

TUBE MAX = 20M


(IN)
n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

BUND WALL H.150mm


PM

Height = 2240, port/pellet buffer = ?


TUBE MAX = 20M
73CM 73CM 73CM 73CM 73CM 73CM 73CM

K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU

AMSi

VAC PUMP
AMSi
n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

area

BLUE M
VAC PUMP
BUND WALL H.150mm

PM

Height = 2240, port/pellet buffer = ?

TUBE MAX = 20M


73CM 73CM 73CM 73CM 73CM 73CM 73CM

BLUE M
K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU
BUND WALL H.150mm n o i t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
D L U

WIP
(IN)
TUBE MAX = 20M

BLUE M
WIP
(IN)
(OUT)
WIP
(OUT)
WIP

73CM 73CM 73CM 73CM 73CM 73CM 73CM

K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU

CD-A2-WJ
BUND WALL H.150mm

BUND WALL H.150mm


n o i t a t S n D o L i U t a t S n D o L i U t a t S n D o L i U t a t S n D o L i U t a t S n D o L i U t a t S n D o L i U t a t S D L U
LD Station LD Station LD Station LD Station LD Station LD Station LD Station

BLUE M
(OUT)

(OUT)
(OUT)
WIP

WIP
WIP

WIP
(IN)
VACANT
WIP

TUBE MAX = 20M


(IN)
73CM 73CM 73CM 73CM 73CM 73CM 73CM

BLUE M
K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU

BUND WALL H.150mm

BUND WALL H.150mm


Height = 2240, port/pellet buffer = ?
n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U

VACANT
TUBE MAX = 20M

PC PHASE 1.1

BLUE M
AMSi

VAC PUMP
AMSi
(TOLL) (TOLL) (TOLL)
DEL_G5 DEL_G5 DEL_G5 DEL_G5

area
VAC PUMP

BLUE M
Height = 2240, port/pellet buffer = ?
NO REVISION DATE

TUBE MAX = 20M


WB DEL

BLUE M
BUND WALL H.150mm

WIP

76600
(IN)
TUBE MAX = 20M

ESB
WIP
(IN)
(OUT)

(OUT)

MATERIAL SUPPORT AREA


WIP

WIP
(OUT)

ESB
WIP

DEL_G5 DEL_G5 DEL_G5 DEL_G5 DEL_G5


1x1 (TOLL) (TOLL) (TOLL) (TOLL) (TOLL)

BLUE M
MOLDING BUND WALL H.150mm
0 FIRST ISSUED -
(OUT)

(OUT)

BUND WALL H.150mm


(OUT)

(OUT)

PHASE 1.1
WIP

WIP
WIP

WIP

WIP
(IN)

(TOLL) (TOLL) (TOLL) (TOLL)

BLUE M
DEL_G5 DEL_G5 DEL_G5 DEL_G5
WIP

TUBE MAX = 20M


(IN)
Height = 2240, port/pellet buffer = ?
TUBE MAX = 20M

BUND WALL H.150mm


AMSi

VAC PUMP
AMSi
VAC PUMP

Height = 2240, port/pellet buffer = ?

DEL_G5 DEL_G5 DEL_G5 DEL_G5 DEL_G5


(TOLL) (TOLL) (TOLL) (TOLL) (TOLL)
TUBE MAX = 20M
WIP
(IN)
TUBE MAX = 20M
(OUT)

(OUT)

WIP
(IN)
WIP

WIP
(OUT)

(OUT)
WIP

WIP

LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station

ASM-TDSON hsof5
(OUT)

(OUT)
(OUT)

(OUT)
WIP

WIP
WIP

WIP

PHASE 1.1 LAB


WIP
(IN)

SNP1
WIP

TUBE MAX = 20M


(IN)

ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station
Height = 2240, port/pellet buffer = ?

LAB
TUBE MAX = 20M

AMSi

VAC PUMP
AMSi
VAC PUMP

PROJECT

110000
Height = 2240, port/pellet buffer = ?

TUBE MAX = 20M

PROYEK
WIP
(IN)
TUBE MAX = 20M
(OUT)

(OUT)

WIP
(IN)
WIP

WIP
(OUT)

(OUT)
WIP

WIP

SNP2 PM
PM
BATAM 3 PROJECT
MATL SUPPORT & MATERIAL AREA

CD/SnP FAV 22hsof-tdson


Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
FFL.±0.000 MUKAKUNING

Vacant OWNER
VACANT PEMILIK

21xFAV Smart7
VACANT
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

ELECTRICAL ROOM 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

PT INFINEON TECHNOLOGIES BATAM


37x 2nd OC SON

PHASE 1.1
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
UP
cold storage SUMP DESIGN CONSULTANT

EXIT
SUMP SNP

3850
KONSULTAN RENCANA

145sqm
COLD STORAGE
DISPLAY SNP 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

AUTO DOOR FOOD DISPLAY 2ndOC 2ndOC 2ndOC 2ndOC

CORRIDOR 2ndOC 2ndOC 2ndOC 2ndOC PT. DACREA Design and Engineering Consultants
DACREA

FOL CH Room
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

LDF 2ndOC
24x 2nd OC
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

16850
HIGH
FFL.±0.000
TRANSFORMER ROOM VOLTAGE
OPEN SPACE
PHASE 1.1 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
DRAWING TITLE
JUDUL GAMBAR
LOCKER AREA
ATTIRE CANTEEN 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

ROOM CANTEEN GROUND FLOOR


600sqm
CANTEEN TEMPORARY
materials
materials & support
& support POWER OUTLET INSTALLATION PLAN
CLINIC
PHASE.1-2, SHEET.2-2

2000
CORRIDOR
LOCKET

CDAF
F105
F104 NAME SIG. DATE :
F103

PHASE 1.1

7000
DRAWN BY :
FEMALE TOILET

ELECTRICAL
F102
AF
SECURITY

DIGAMBAR :
MALE TOILET

F101

TRANSFOMER
ROOM
FFL.-0.050 CORRIDOR FFL.±0.000 FFL.±0.000 CHECKED BY :
DIPERIKSA : RH
F104

F103

F102

F101
F105
CDAF

APPROVED BY :
UP DISETUJUI : AN
UP UP UP
SCALE DRAWING : 1:225
REFERENSI : REV :

R.0

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.2 / EL-301
D-PROJECT
NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715

164645

112500 44500

A
CORRIDOR
6000

Spare Parts Spare Parts Spare Parts Spare Parts Spare Parts
Cabinet Cabinet Cabinet Cabinet Cabinet

Spare Parts
Cabinet
IT
ROOM NO REVISION DATE
B
Work Station Work Station

IT ROOM Work Station Work Station

3x5
Sp part PM
6000

0 FIRST ISSUED -

C
REFLOW REFLOW
6000

BTU PMAX BTU PMAX AHU

D
REFLOW REFLOW
BTU PMAX BTU PMAX
PP-Z2.1
6000

REFLOW REFLOW
BTU PMAX BTU PMAX

E REFLOW
BTU PMAX
REFLOW
BTU PMAX
PROJECT
TOILET
PROYEK
6000

REFLOW
BTU PMAX

UP DN

F REFLOW

DB-REFLOW BATAM 3 PROJECT


6000

REFLOW
BTU PMAX Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
G REFLOW
MUKAKUNING
BTU PMAX
78000
6000

VACANT AHU

EMPTY
TUBE
H
HANMI PMRTHAN005 SON DEC/18
B H= 538 mm

OWNER

CORRIDOR
B
H= 538 mm
PEMILIK
6000

HANMI PMRTHAN005 SON DEC/18

EMPTY
TUBE
JIG
DB-FL.2
I
PC
(TOLL)

DB-LM+TF
6000

TOILET PANEL
(TOLL)
PC
JIG ROOM

LC & DBC
LP2-EM
J 2.6

PP-Z2.1
DBC

PT INFINEON TECHNOLOGIES BATAM


WS
6000

DBC
2.6
DESIGN CONSULTANT
K KONSULTAN RENCANA

PP-Z2.2
6000

ECA

ECA

ECA

ECA

ECA
PHASE 1.1

L EAV
PT. DACREA Design and Engineering Consultants
6000

DACREA

ECA

ECA

ECA

ECA

ECA
AHU

M DB-LDF.7

ECA

ECA

ECA

ECA

ECA
PP-Z2.2
6000

DRAWING TITLE

TUBES

TUBES

TUBES

TUBES
LOTEMPTY

LOTEMPTY

LOTEMPTY

LOTEMPTY
N JUDUL GAMBAR

TROLLEY

TROLLEY

TROLLEY
(INPUT)

(INPUT)

(INPUT)

(INPUT)
TROLLEY

LOT

LOT

LOT
LOT
UNIT UNIT UNIT UNIT
REJECTS REJECTS REJECTS REJECTS
EAV

TROLLEY

TROLLEY

TROLLEY

TROLLEY
DN UP REJECTS REJECTS REJECTS REJECTS

(INPUT)

(INPUT)

(INPUT)

(INPUT)
2'ND FLOOR

LOT

LOT

LOT

LOT
UNIT UNIT UNIT UNIT
UP DN

LOTEMPTY

LOTEMPTY

LOTEMPTY

LOTEMPTY
TUBES

TUBES

TUBES

TUBES
10000

Utility

UTILITY
PHASE 1.1
MINI DB-WORK
TESTING AREA
BENC.2
12 Visual INSP MINI DB-WORK BENC.1
SOCKET OUTLET INSTALLATION PLAN

PHASE 1.1

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley
Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff
EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL
TOILET
DB-WORK BENCH.2
4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


4x PWT 1x LAN Port

EOL Buyoff
Working Table

Working Table
EOL Buyoff

4x PWT 1x LAN Port


PHASE.1-2

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley
Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff

Buyoff
EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL

EOL
Port Port Port Port Port Port Port

DB-EAV LAN LAN LAN LAN LAN LAN LAN


5x PC Gate

O
, 2x , 2x , 2x , 2x , 2x , 2x , 2x

CORRIDOR
Scope Bench
WorkPoint Scope Bench
Work PointScope Bench
WorkPoint Scope Bench
Work Point Scope Bench
Work Point Scope Bench
Work Point Scope Bench
Work Point
Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower
8x 8x 8x 8x 8x 8x 8x

MATERIAL & SUPPORT


5625

VOID Input
Trolley
MINI DB-WORK BENC.2 NAME SIG. DATE :
IP

Container
COOPERATIVE ROOM

Empty
Tube
Inductor
Tester /
IP IP

HandlerIP
DRAWN BY :

/
OutputTurret OutputTurret OutputTurret

Tester
P

PC
Input W/Station Input W/Station Input W/Station
Trolley
Trolley
(Reel)with
Trolley
Trolley
(Reel)with
Trolley
Trolley
(Reel)with AF -
IP 028 Spool IP Spool IP 028 Spool
DIGAMBAR :
Container

Container

Container
DN UNION ROOM Spool
Empty

Empty

Empty
Tube

Tube

Tube
(Reel)with
HandlerIP

HandlerIP

HandlerIP
Inductor

Inductor

Inductor
Tester

Tester

Tester
VOID
/

/
Trolley
AHU
Tester

Tester

Tester
W/Station
PC

PC

PC
IP IP

IP IP

IP IP
IP IP

HandlerIP

IP IP

HandlerIP

IP IP

HandlerIP
OutputTurret
5625

Inductor

Inductor

Inductor
PHASE 1.1 CHECKED BY :
Tester

Tester

Tester
/

/
OutputTurret
RAILING

Tester

Tester

Tester
/

/
PC

PC

PC
Container

Container

Container
Input W/Station
Empty

Empty

Empty
Trolley
RH
Tube

Tube

Tube
Trolley
(Reel) with
/

/
IP Spool IP
DIPERIKSA :

Container

Container
Spool IP Spool IP Spool IP

Empty

Empty
Tube

Tube
(Reel)with (Reel) with (Reel)with
Trolley Trolley Trolley

HandlerIP
Inductor

Inductor
VOID

Tester
/

/
Trolley Trolley Trolley

Tester

Tester
W/Station W/Station W/Station

PC
Input Input Input
22500

IP IP
IP IP

HandlerIP

IP IP

HandlerIP
UP
OutputTurret OutputTurret OutputTurret

Inductor
APPROVED BY :

Tester

TEST MATERIAL & SUPPORT


/

/
PHASE 1.1

Tester

Tester
Q

/
PC

PC
Container
DB-TSP.2

Empty
VOID AN

Tube

/
Spool
(Reel)with
Trolley
Trolley
IP 028 Spool
(Reel)with
Trolley
DISETUJUI :
OutputTurret OutputTurret
W/Station Input W/Station
OutputTurret Output
5625

Input W/Station Input W/Station Turret Input


Trolley Trolley
RAILING

Trolley Trolley Trolley


(Reel)with (Reel) with
VOID
CHANGING
IP Spool IP Spool IP
SCALE DRAWING : 1:300

Container

Container

Container
Empty

Empty

Empty
Tube

Tube

Tube
HandlerIP

HandlerIP
Inductor

Inductor

Inductor
Tester

Tester
/

/
Tester

Tester

Tester
PC

PC
IP IP

IP IP
IP IP

HandlerIP

IP IP

HandlerIP

IP IP

HandlerIP
Inductor

Inductor
Tester

Tester
/

/
10

10

10

10

Tester

Tester

Tester
/

/
PC

PC

PC
Container

Container
TOILET
REFERENSI : REV :

Empty

Empty
Tube

Tube
10

10

10

10

R PHASE 1.1

/
Ch Room CHANGING ROOM Spool
(Reel)with
IP Spool
(Reel)with
IP Spool
(Reel)with
Trolley Trolley
Trolley Trolley Trolley
5

W/Station Input W/Station Input W/Station


PRAYING ROOM OutputTurret OutputTurret OutputTurret
OFFICE
5625

RAILING

R.0
CORRIDOR

S UP
FOR :
DN

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 2'ND / 1.2 / EL-302


D-PROJECT
NOTES :

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3750
112500 44500
6980 38320 18100 49100 42000 2500

A A'
FG Room

7000
6000

Q-Gate

B DRY PACK B' NO REVISION DATE


17400

DB-WORK BENCH.3

AFTER

AFTER
AFTER
6000

AFTER
MATERIAL & SUPPORT

DP
DP

DP
DP

8000
22700
DB-MFS 0 FIRST ISSUED -

BEFORE
BEFORE

BEFORE

BEFORE
C
C'
6000

4 MF

8000
D
6000

D'
E
PROJECT

8000
6000

PROYEK

F 15x PEGASUS F'


DB-MSP BATAM 3 PROJECT
6000

PEGASUS

PEGASUS

8000
PEGASUS
BAKE in Jl. BERINGIN LOT 201 & 202A
G
AT BATAMINDO INDUSTRIAL PARK,
G'
6000

PEGASUS

PEGASUS
MUKAKUNING

VACANT

PEGASUS

8000
H
OWNER

PEGASUS

PEGASUS
6000

56300

PEMILIK

PEGASUS
MSP DB-FL.3 H'
I

PEGASUS
PEGASUS

8000
PEGASUS
6000

LD

LP3-EM

110000
LD

PEGASUS
PEGASUS
110500

J'

PEGASUS
LD
6000

PP-Z3.1

MC transfer
PT INFINEON TECHNOLOGIES BATAM

8000
K MC transfer

78100
DESIGN CONSULTANT
K' KONSULTAN RENCANA
6000

Output Output
Trolley Turret W/Station Input Trolley Turret W/Station Input
(Reel) with Spool Trolley (Reel) with Spool Trolley

IP IP

Empty Tube Container

Empty Tube Container


Handler PC

Handler PC
IP Tester /

IP Tester /
IP Inductor

IP Inductor
IP Tester /

IP Tester /

8000
L

IP Inductor

IP Inductor
IP Tester /

IP Tester /
Handler PC

Handler PC
IP Tester /

IP Tester /
Empty Tube Container

Empty Tube Container


PT. DACREA Design and Engineering Consultants
IP 028 IP 028

Trolley with Spool (Reel) Trolley with Spool (Reel)


Input Turret W/Station Trolley Input Turret W/Station Trolley
Output Output
6000

Output Output Output


Trolley Turret W/Station Input Trolley Turret W/Station Input Trolley Turret W/Station
(Reel) with Spool Trolley (Reel) with Spool Trolley (Reel) with Spool

IP IP

Empty Tube Container

Empty Tube Container


L'

Handler PC

Handler PC

Handler PC
IP Tester /

IP Tester /

IP Tester /
IP Inductor

IP Inductor
IP Tester /

IP Tester /
IP Inductor

IP Inductor

IP Inductor
IP Tester /

IP Tester /

IP Tester /
Handler PC

Handler PC
IP Tester /

IP Tester /
M DACREA

Empty Tube Container

Empty Tube Container

Empty Tube Container


IP 028 IP 028 IP 028

DB-TSP.3
Trolley with Spool (Reel) Trolley with Spool (Reel) Trolley
Input Turret W/Station Trolley Input Turret W/Station Trolley Input
Output Output

8000
Output Output Output
Trolley Turret W/Station Input Trolley Turret W/Station Input Trolley Turret W/Station
(Reel) with Spool Trolley (Reel) with Spool Trolley (Reel) with Spool
6000

DB-LDF.8
IP IP

Empty Tube Container

Empty Tube Container


Handler PC

Handler PC

Handler PC
IP Tester /

IP Tester /

IP Tester /
IP Inductor

IP Inductor
IP Tester /

IP Tester /
IP Inductor

IP Inductor

IP Inductor
IP Tester /

Handler PC

IP Tester /

Handler PC

IP Tester /
IP Tester /

IP Tester /
Empty Tube Container

Empty Tube Container

Empty Tube Container


IP IP IP

N MC transfer Trolley
Input
with Spool
Turret W/Station
(Reel)
Trolley
Output
Trolley
Input
with Spool
Turret W/Station
(Reel)
Trolley
Output
Trolley
Input

N" DRAWING TITLE


JUDUL GAMBAR
13500

LGC LGC

8000
10000

9x Flex
3'RD FLOOR

MATERIAL & SUPPORT


LGC LGC

SOCKET OUTLET INSTALLATION PLAN


O"
LGC LGC

O PHASE.1-2
LIFT

8000
Log Mat'l
5625

LGC LGC LGC

13x V93K PP-Z3.2


DB-V93K NAME SIG. DATE :
P DB-3
Praying Room
FOOD DISPLAY
P' DRAWN BY :
AF
DB-CANTEEN
5625

DIGAMBAR :

8000
CHANGING ROOM CHECKED BY :
23300

RH
DIPERIKSA :
Q ABLUTION ROOM
APPROVED BY :

2200
AN
5625

CANTEEN DISETUJUI :
LN2 Refilling
Q'
SCALE DRAWING : 1:300
R

7000

7000
LN2

AHU
LN2 LN2 LN2 LN2
LN2 REFERENSI : REV :
5625

LN2 LN2 LN2 LN2

LN2 LN2 LN2 LN2

LN2 LN2 LN2 LN2 TOOL

LN2 LN2 LN2 LN2

R' R.0
S L I F T L I F T

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 3'RD / 1.2 / EL-303


D-PROJECT
NOTES :

SYMBOL DESCRIPTION

1 2 3 4 5 6 7 8 9 14750
10 11 LEGEND :
22500 22500 22500 22500 22500 3930 14750 15000 3715
: PHASE 1.1 SCOPE
164645
112500 44500 : PHASE 1.2 SCOPE
11475 33525 30700 10900 29830 41500 3000
: PHASE EIM
14325 9900 8350 950 5300 25400 2700 22155 4975 41500

VLM VLM VLM


DB-AHU.4
A ELP1-5 SDB-GF.1-1
LP-D1
6000

25x DA SMART 7

AD8312+

AD8312+
AD8312+

AD8312+

AD8312+
AD8312+

ASM

ASM
ASM

ASM

ASM
ASM
B FFL.±0.000 FFL.±0.000 NO REVISION DATE

SSI

SSI
DB Cure
SSI

Vacant

SSI
VACANT OFFICE

AD8312+

AD8312+
AD8312+

AD8312+

AD8312+
AD8312+
6000

BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M

ASM

ASM
ASM

ASM

ASM
ASM
SSI
crb13 crb12 crb11 crb11 crb13 crb13 crb13 crb12 crb11 crb11

SSI
SSI

SSI
0 FIRST ISSUED -

SSI

SSI
73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM

PHASE 1.1
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
n o i t a t n S o i D
LD Station t L aU t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

AD8312+

AD8312+
AD8312+

AD8312+

AD8312+
AD8312+
SSI

ASM

ASM
ASM

ASM

ASM
ASM
SSI

C
SSI

SSI
73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM

K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU

SSI

SSI
DB-LDF.4 n o i t a t n S o i D
LD Station tL aU t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

AD8312+

AD8312+
AD8312+

AD8312+

AD8312+
AD8312+
6000

SSI

ASM

ASM
ASM
ssi-HSOF8

ASM

ASM
ASM
73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM

K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU


SSI

n o i t a t n S o i D
LD Station t L aU t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

n o i t a t
K 5CTU
n S o i D
LD Station
73CM

tL aU t n
K 5CTU
S o
90 WB x SMART 7
i LD Station
D t
73CM

L a U t n
K 5CTU
S o iLD Station
D t
73CM

L a U t n
K 5CTU
S o iLD Station
D t
73CM

L a U t n
K 5CTU
S o i LD Station
D t
73CM

L a U t n
K 5CTU
S o i LD Station
D t
73CM

L a U t n
K 5CTU
S o iLD Station
D t
73CM

L a U t
K 5CTU
S D
LD Station
73CM

L U
DB-PROD.GF.1
Vacant VACANT

D
FORMING GAS AREA

73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM

K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU

PP-Z1.1

DMC
FFL.±0.000 FFL.±0.000 FFL.±0.000
n o i t a t n S o i D
LD Station t L aU t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

DMC

PHASE 1.1
(BY OTHERS)

DB-HSOF8 DB-ASM.DA
Forming Gas Mixer (170sqm)

PP-MB.3
6000

73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM

LP-E1
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU

PP-MB.1 FEMALE'S TOILET


A-DOOR
n o i t a t n S o LD Station
i D tL aU t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t S LD Station
D L U

EXIT
R

ELP1-4
DAGE
SWITCH GAS

ELP1-3
AUTO

CHILLER

1490
DOOR A2P1 Plasma
Vacant

IN

E DB-LDF.2
VACUUM

HELLER
PUMP

HELLER

DB-PLASMA PROJECT
VACUUM

PHASE 1.1
PUMP

DB-CHEMICAL
6000

73CM 73CM 73CM 73CM 73CM 73CM 73CM

PROYEK
LAB
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
CHILLER

PASS BOX
Batamindo Sewerline pipe

DB-HELLER

MATERIAL SUPPORT AREA


n o i t a t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

A2P2
SWITCH GAS
AUTO

(OUT)
(OUT)

WIP
WIP

WIP
(IN)
73CM 73CM 73CM 73CM 73CM 73CM 73CM

BUND WALL H.150mm K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU

WIP

TUBE MAX = 20M


(IN)
R

SUPPLY
n o i t a t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

GAS

BUND WALL H.150mm


F heller REFLOW

RACK
PM

MARCH
DB-PLUX.C

Height = 2240, port/pellet buffer = ?


TUBE MAX = 20M
MARCH
Technic
Technic

73CM 73CM 73CM 73CM 73CM 73CM 73CM


R

RACK
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU

AMSi

VAC PUMP
AMSi
DB-ASM.MOLD

SUPPLY
GAS
BATAM 3 PROJECT
n o i t a t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

SUPPLY
GAS
SWITCH GAS

area

BLUE M
VAC PUMP
AUTO

RACK
2000

MARCH
BUND WALL H.150mm

PM
CHILLER

Height = 2240, port/pellet buffer = ?


6000

MARCH
1490

TUBE MAX = 20M


DB-FICO.MOLD

RACK
73CM 73CM 73CM 73CM 73CM 73CM 73CM

BLUE M
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU

SUPPLY
VACUUM

BUND WALL H.150mm

GAS

SUPPLY
HELLER

GAS
n o i t a t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
PUMP

HELLER

DB-PROD.GF.2
RACK

WIP
MARCH

(IN)
TUBE MAX = 20M

BLUE M
WIP
(IN)
(OUT)
MARCH

WIP
DB-PMC

(OUT)
WIP
1396
73CM 73CM 73CM 73CM 73CM 73CM 73CM

RACK
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU

CD-A2-WJ
VACUUM

SUPPLY
GAS
Jl. BERINGIN LOT 201 & 202A

BUND WALL H.150mm

BUND WALL H.150mm


PUMP

SUPPLY
n o i t a t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

GAS

BLUE M
(OUT)

(OUT)
(OUT)
G

WIP

WIP
RACK

WIP
MARCH

WIP
(IN)
VACANT
CHILLER

MARCH

WIP
Flux Cleaning

TUBE MAX = 20M


(IN)
AT BATAMINDO INDUSTRIAL PARK,
RACK
73CM 73CM 73CM 73CM 73CM 73CM 73CM

BLUE M
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
SWITCH GAS

SUPPLY
FINNSONIC

BUND WALL H.150mm

BUND WALL H.150mm


GAS

Height = 2240, port/pellet buffer = ?


AUTO

n o i t a t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U

PHASE 1.1 VACANT

TUBE MAX = 20M


TDSON+HSOF5 PC PHASE 1.1 MUKAKUNING
78000

BLUE M
AMSi

VAC PUMP
AMSi
6000

R DEL_G5
(TOLL)
DEL_G5
(TOLL)
DEL_G5
(TOLL)
DEL_G5

area

VAC PUMP
Support & Matl

BLUE M
Height = 2240, port/pellet buffer = ?

TUBE MAX = 20M


WB DEL

BLUE M
BUND WALL H.150mm

WIP
(IN)
TUBE MAX = 20M
ESB

WIP
(IN)
(OUT)

(OUT)
MATERIAL SUPPORT AREA
H

WIP

WIP
(OUT)
ESB

WIP
DEL_G5 DEL_G5 DEL_G5 DEL_G5 DEL_G5
1x1 (TOLL) (TOLL) (TOLL) (TOLL) (TOLL)

BLUE M
MOLDING BUND WALL H.150mm

OWNER

(OUT)

(OUT)
(OUT)

(OUT)

BUND WALL H.150mm

PHASE 1.1
WIP

WIP
WIP

WIP

WIP
(IN)
(TOLL) (TOLL) (TOLL) (TOLL)

BLUE M
DEL_G5 DEL_G5 DEL_G5 DEL_G5

WIP

TUBE MAX = 20M


(IN)
Chemical
6000

PEMILIK

Height = 2240, port/pellet buffer = ?


room

TUBE MAX = 20M


BUND WALL H.150mm

AMSi

VAC PUMP
AMSi
DB-CD

VAC PUMP

Height = 2240, port/pellet buffer = ?


DEL_G5 DEL_G5 DEL_G5 DEL_G5 DEL_G5
(TOLL) (TOLL) (TOLL) (TOLL) (TOLL)

TUBE MAX = 20M


I SUPPORT & MATERIAL DB-SNP+A2

WIP
(IN)
TUBE MAX = 20M
(OUT)

(OUT)

WIP
(IN)
WIP

WIP
(OUT)

(OUT)
MSB-FL.1
WIP

WIP
LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station

PP-MB.4 ASM-TDSON hsof5


(OUT)

(OUT)
(OUT)

(OUT)
WIP

WIP
6000

WIP

WIP
PHASE 1.1 LAB

WIP
(IN)
SNP1 LP1-EM

WIP

TUBE MAX = 20M


(IN)
ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station

Height = 2240, port/pellet buffer = ?


DB-ASM.AD LAB

TUBE MAX = 20M

AMSi

VAC PUMP
AMSi
VAC PUMP
J
PHASE 1.1

Height = 2240, port/pellet buffer = ?


Vacant

TUBE MAX = 20M


Chemical Storage 70sqm

WIP
(IN)
TUBE MAX = 20M
(OUT)

(OUT)

WIP
(IN)
WIP

WIP
6000

(OUT)

(OUT)
WIP

WIP

SNP2
Vacant

PM PT INFINEON TECHNOLOGIES BATAM


PM

K MATL SUPPORT & MATERIAL AREA

CD/SnP FAV 22hsof-tdson DESIGN CONSULTANT


KONSULTAN RENCANA
VACANT
6000

FFL.±0.000
REEL

RO
AD8312+

AD8312+
ASM

ASM
CB

CB
RO
sTOLL
sTOLL

TDSON
TDSON
CB

AD8312+

CB

L
AD8312+
ASM

RO
ASM

Vacant
RO
REEL

DB-TDSON
VACANT PT. DACREA Design and Engineering Consultants
REEL

DB-HSOF5
6000

RO

AD8312+
AD8312+

ASM
ASM

CB

CB

SDB-AHU.3
RO
sTOLL

PP-MB.2
TDSON
sTOLL

TDSON
AD8312+
CB

21xFAV Smart7
CB

1588
AD8312+
ASM

DACREA
RO

SDB-EMERGENCY
ASM

RO

M
REEL

ELP1-2 DB-LDF.3
ELP1-1 VACANT
6000

Compressor

MSB-A1 SDB-AHU.2 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

EXIT EXIT
ELECTRICAL ROOM MINISTORE
ELECTRICAL ROOM
Compressor

IN IN
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

N DRAWING TITLE
37x 2nd OC SON JUDUL GAMBAR

PHASE 1.1
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
UP
MOBILE COMPACTOR AREA MSB-A2
PHASE 1.1 cold storage SUMP

EXIT
CHANGING ROOM MSB-A3 SUMP SNP
COLD STORAGE
SNP
10000

2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC


SDB-U1
PP-MB.5
ESDB-U1 AUTO DOOR
145sqm DISPLAY
FOOD DISPLAY 2ndOC 2ndOC 2ndOC 2ndOC
GROUND FLOOR
W.1.8 CABLE LADDER INSTALLATION PLAN
CORRIDOR 2ndOC 2ndOC 2ndOC 2ndOC
PHASE 1.2
O PKG

FOL CH Room
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

24x 2nd OC
5625

WTP GENSET LDF 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

HIGH NAME SIG. DATE :


FFL.±0.000
P
TRANSFORMER ROOM VOLTAGE PHASE 1.1 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC

SDB-U.AC-3 OPEN SPACE DRAWN BY :


CHEMICAL STORAGE LOCKER AREA
CANTEEN 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
DIGAMBAR : AF
ATTIRE
5625

PHASE 1.1

ROOM CANTEEN CHECKED BY :


RH
600sqm
CANTEEN TEMPORARY
materials
materials & support DIPERIKSA :
22500

WWTP & support


Q PHASE 1.1 APPROVED BY :
CLINIC DISETUJUI : AN
5625

CORRIDOR
LOCKET

CDAF
F105 SCALE DRAWING : 1:300
R
F104

DB-SPRINKLER PUMP
F103

PHASE 1.1 REFERENSI : REV :


FEMALE TOILET

F102
ELECTRICAL
SECURITY

DB-HOUSEREEL
5625

MALE TOILET

F101

TRANSFOMER
ROOM
FFL.-0.050 PP-IDEALMOLD CORRIDOR FFL.±0.000 FFL.±0.000 R.0
SDB-EMG.EXTENTION

F104

F103

F102

F101
F105
CDAF
S UP
UP
UP UP FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.2 / EL-304
D-PROJECT
NOTES :

SYMBOL DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3750
112500 44500
6980 38320 18100 49100 42000 2500

A A'
XRAY
6000

7000
XRAY Spare Parts
Cabinet
Spare Parts
Cabinet
Spare Parts
Cabinet
Spare Parts
Cabinet
Spare Parts
Cabinet

Spare Parts
LDF7

Cabinet
IT
ROOM
NO REVISION DATE
B
Work Station Work Station

Work Station Work Station

3x5
Sp part PM B'
17400
6000

0 FIRST ISSUED -

8000
22700
C
REFLOW REFLOW
6000

BTU PMAX BTU PMAX


C'
D
REFLOW REFLOW

8000
BTU PMAX BTU PMAX
PP-Z2.1
SDB-AHU.Z1
6000

REFLOW REFLOW
BTU PMAX BTU PMAX

D' PROJECT
E REFLOW
BTU PMAX
REFLOW
BTU PMAX
PROYEK

8000
6000

REFLOW
DB-REFLOW BTU PMAX

F REFLOW BATAM 3 PROJECT


F'
6000

REFLOW
Jl. BERINGIN LOT 201 & 202A

8000
BTU PMAX

AT BATAMINDO INDUSTRIAL PARK,


G REFLOW
BTU PMAX MUKAKUNING
6000

G'

EMPTY
TUBE
SDB-AHU.Z2
H OWNER
HANMI PMRTHAN005 SON DEC/18

8000
H= 538 mm

B
H= 538 mm
PEMILIK
6000

HANMI PMRTHAN005 SON DEC/18


56300

EMPTY
TUBE
JIG
MSB-FL.2 H'
I
PC
(TOLL)
DB-LM+TF

8000
6000

(TOLL)
JIG PC

LP2-EM
LC & DBC

110000
J
110500

2.6
DBC
J'
PT INFINEON TECHNOLOGIES BATAM
WS
6000

8000
DBC 2.6
DESIGN CONSULTANT
K

78100
KONSULTAN RENCANA
6000

ECA

ECA

ECA

ECA

ECA
K'
L EAV PT. DACREA Design and Engineering Consultants

8000
6000

ECA

ECA

ECA

ECA

ECA
DACREA
L'
M DB-LDF.7

ECA

ECA

ECA

ECA

ECA
PP-Z2.2

8000
6000

SDB-AHU.Z3
DRAWING TITLE

TUBES

TUBES

TUBES

TUBES
EMPTY

EMPTY

EMPTY

EMPTY
N JUDUL GAMBAR

LOT (INPUT)

LOT (INPUT)

LOT (INPUT)

LOT (INPUT)
TROLLEY

TROLLEY

TROLLEY
TROLLEY

LOT

LOT

LOT
LOT
N"
UNIT UNIT UNIT UNIT
REJECTS REJECTS REJECTS REJECTS

EAV
13500

REJECTS REJECTS REJECTS REJECTS


UNIT UNIT UNIT UNIT

TROLLEY

TROLLEY

TROLLEY

TROLLEY
LOT (INPUT)

LOT (INPUT)

LOT (INPUT)

LOT (INPUT)
LOT

LOT

LOT

LOT
DB-EAV 2'ND FLOOR

EMPTY

EMPTY

EMPTY

EMPTY
TUBES

TUBES

TUBES

TUBES

8000
10000

Utility
12 Visual
DB-WORK INSP
BENCH.2
DB-CANTEEN.2 CABLE LADDER INSTALLATION PLAN

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff
Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley
4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port

PHASE.1-2
EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff
Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table

Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table
EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff

4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff

EOL Buyoff
Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley

Trolley
ROSTER ROSTER ROSTER ROSTER 5x PC Gate O"
O 8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port

Work Bench
Smart Scope
Scope
Smart

HANDWASH / WATER FOUNTAIN


MATERIAL & SUPPORT LIFT

8000
5625

FFL.+6.000
WASERDA
IP
Input
Trolley

NAME SIG. DATE :


ENTRANCE

Empty Tube Container


FOOD DISPLAY FFL.+5.500 COOPERATIVE ROOM
SDB-AHU.Z4

IP Inductor
IP Tester /
DRAWN BY :
P

Handler PC
IP Tester /
Output Output Output
Input Turret W/Station Input Turret W/Station Input Turret W/Station

AF
Trolley Trolley Trolley
Trolley (Reel) with Spool Trolley (Reel) with Spool Trolley (Reel) with Spool

UNION ROOM IP 028 IP IP 028


DIGAMBAR :
P'
Empty Tube Container

Empty Tube Container

Empty Tube Container


with Spool (Reel)
Turret W/Station Trolley
RAILING

Handler PC

Handler PC

Handler PC
IP Tester /

IP Tester /

IP Tester /
IP Inductor

IP Inductor

IP Inductor
IP Tester /

IP Tester /

IP Tester /
Output

FFL.+5.000
5625

COFFEE CHECKED BY :
IP Inductor

IP Inductor

IP Inductor
IP Tester /

IP Tester /

IP Tester /
Handler PC

Handler PC

Handler PC
IP Tester /

IP Tester /

IP Tester /
Output
Input Trolley Turret W/Station

RH
Trolley (Reel) with Spool
Empty Tube Container

Empty Tube Container

Empty Tube Container


CORNER

TEST MATERIAL &


IP IP IP IP IP
DIPERIKSA :

Empty Tube Container

Empty Tube Container


23300

8000
with Spool (Reel) Trolley with Spool (Reel) Trolley with Spool (Reel) Trolley
Trolley Trolley Trolley

Handler PC
Turret W/Station Turret W/Station Turret W/Station

IP Tester /
Input Input Input

IP Inductor

IP Inductor
IP Tester /

IP Tester /
Output Output Output

APPROVED BY :

SUPPORT
Q

IP Inductor
IP Tester /
Handler PC

Handler PC
IP Tester /

IP Tester /
AN

Empty Tube Container


(Reel)
IP 028
(Reel)
DISETUJUI :

2200
with Spool Trolley with Spool
Turret W/Station Trolley Input Turret W/Station Trolley
Output Output
RAILING
5625

HANDWASH / WATER FOUNTAIN

Output Output
Input Trolley Turret W/Station Input Trolley Turret W/Station Input
Trolley (Reel) with Spool Trolley (Reel) with Spool Trolley

IP IP IP
SCALE DRAWING : 1 : 300
Q'

Empty Tube Container

Empty Tube Container

Empty Tube Container


Handler PC

Handler PC
IP Tester /

IP Tester /
IP Inductor

IP Inductor

IP Inductor
IP Tester /

IP Tester /

IP Tester /
CANTEEN INDOOR CHANGING ROOM

IP Inductor

IP Inductor
IP Tester /

IP Tester /
Handler PC

Handler PC

Handler PC
IP Tester /

IP Tester /

IP Tester /
CANTEEN OUTDOOR
R FFL.+6.000 REFERENSI : REV :

Empty Tube Container

Empty Tube Container


FFL.+4.500 IP IP

7000

7000
PRAYING ROOM
with Spool (Reel) Trolley with Spool (Reel) Trolley with Spool (Reel)
Turret W/Station Trolley Input Turret W/Station Trolley Input Turret W/Station Trolley

DB-SERVICE.2ND
Output Output Output

DB-TSP.2 OFFICE
RAILING

AUTO DOOR
5625

R.0
MOVABLE STAGE

S R'
FOR :
CAPACITY ALL AREA : 309 PAX

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 2'ND / 1.2 / EL-305


D-PROJECT
NOTES :

SYMBOL DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3750
112500 44500
6980 38320 18100 49100 42000 2500

A A'
FG Room

7000
6000

Q-Gate

B DRY PACK B' NO REVISION DATE


17400

DB-WORK BENCH.3

AFTER

AFTER
AFTER
6000

AFTER
MATERIAL & SUPPORT

DP
DP

DP
DP

8000
22700
DB-MFS 0 FIRST ISSUED -

BEFORE
BEFORE

BEFORE

BEFORE
C
C'
6000

4 MF

8000
D
6000

D'
E
PROJECT

8000
6000

PROYEK

F 15x PEGASUS F'


DB-MSP BATAM 3 PROJECT
6000

PEGASUS

PEGASUS

8000
PEGASUS
BAKE in Jl. BERINGIN LOT 201 & 202A
G
AT BATAMINDO INDUSTRIAL PARK,
G'
6000

PEGASUS

PEGASUS
MUKAKUNING

VACANT

PEGASUS

8000
H
OWNER

PEGASUS

PEGASUS
6000

56300

PEMILIK

PEGASUS
MSP MSB-FL.3 H'
I

PEGASUS
PEGASUS

8000
PEGASUS
6000

LD

LP3-EM

110000
LD

PEGASUS
PEGASUS
110500

J'

PEGASUS
LD
6000

PP-Z3.1

MC transfer
PT INFINEON TECHNOLOGIES BATAM

8000
K MC transfer

78100
DESIGN CONSULTANT
K' KONSULTAN RENCANA
6000

8000
L
PT. DACREA Design and Engineering Consultants
6000

L'
M DACREA
DB-TSP.3

8000
6000

DB-LDF.8

N MC transfer N" DRAWING TITLE


JUDUL GAMBAR
13500

LGC LGC

8000
10000

9x Flex
3'RD FLOOR

MATERIAL & SUPPORT


LGC LGC

CABLE LADDER INSTALLATION PLAN


O"
LGC LGC

O PHASE.1-2
LIFT

8000
Log Mat'l
5625

LGC LGC LGC

13x V93K PP-Z3.2


DB-V93K NAME SIG. DATE :
P DB-3
Praying Room
FOOD DISPLAY
P' DRAWN BY :
AF
DB-CANTEEN.3
5625

DIGAMBAR :

8000
CHANGING ROOM CHECKED BY :
23300

RH
DIPERIKSA :
Q ABLUTION ROOM
APPROVED BY :

2200
AN
5625

CANTEEN DISETUJUI :
LN2 Refilling
Q'
SCALE DRAWING : 1:300
R

7000

7000
LN2

AHU
LN2 LN2 LN2 LN2
LN2 REFERENSI : REV :
5625

LN2 LN2 LN2 LN2

LN2 LN2 LN2 LN2

LN2 LN2 LN2 LN2 TOOL

LN2 LN2 LN2 LN2

R' R.2
S L I F T L I F T

FOR :

CONSTRUCTION DRAWING

DRAWING NUMBER
NOMOR GAMBAR

ACM / 323 / MEP / 3'RD / 1.2 / EL-306


D-PROJECT

You might also like