Electrical - Infineon Batam3
Electrical - Infineon Batam3
NOTES :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
3'RD FLOOR
NO REVISION DATE
0 FIRST ISSUED -
2'ND FLOOR
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
3'RD FLOOR
2'ND FLOOR
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
GENSET SCHEMATIC-1
ELECTRICAL DISTRIBUTION PLAN
MAIN BUILDING
B.I.C SUBSTATION
G
PHASE.1-1
3~ DE
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
B.I.C DIPERIKSA : RH
SG 201 APPROVED BY :
DISETUJUI : AN
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
4'th FLOOR
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
3'rd FLOOR Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
B.I.C SUBSTATION
DRAWING TITLE
JUDUL GAMBAR
SCHEMATIC-2
B.I.C ELECTRICAL DISTRIBUTION PLAN
SG 201 EAST WING
PHASE-1-1
DRAWN BY :
AF
UTILITY ROOM - 3 DIGAMBAR :
B.I.C CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
DRAWING NUMBER
NOMOR GAMBAR
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 14750 15000 14750 3715
112500 48215
A A'
AHU AHU
6000
7000
SUPPORT & MATERIAL
B
B'
VACANT NO REVISION DATE
6000
8000
PM WB
C ACMS (PRODUCTION)
0 FIRST ISSUED -
END OF LINE
6000
(PRODUCTION FOL)
ASM AD
C'
D
8000
FORMING GAS AREA
(BY OTHERS)
6000
EXIT
PM & ACMS
D'
IN
E
8000
(PRODUCTION FOL)
6000
MATERIAL
F PROJECT
PM F'
PROYEK
6000
TEMPORARY PM
8000
PLASMA CLEAN ASM MOLDING
G
FLUX CLEANING VACANT BATAM 3 PROJECT
6000
G'
H VACANT Jl. BERINGIN LOT 201 & 202A
8000
AT BATAMINDO INDUSTRIAL PARK,
6000
CHEMICAL ROOM
MUKAKUNING
H'
I
RACK MATERIAL & SUPPORT
8000
6000
OWNER
SNP1 PEMILIK
110000
J
110500
J'
6000
VACANT VACANT
8000
K
VACANT
VACANT
6000
8000
PT INFINEON TECHNOLOGIES BATAM
6000
8000
MALE TOILET
6000
EXIT EXIT
N"
PT. DACREA Design and Engineering Consultants
MACHINE TRANSFER
PASS
BOX UP
COLD STORAGE SUMP SNP
8000
10000
DISPLAY
CHANGING ROOM W-2.4 H-2.6
MACHINE TRANSFER DACREA
CORRIDOR
O"
O
8000
5625
LOCKER AREA
ROOM (OPEN SPACE)
8000
WWTP
Q SITE PLAN
CLINIC LIGHTING INSTALLATION
5625
CORRIDOR
Q'
LOCKET
7000
UP
ELECTRICAL RECEIVING TRANSIT AREA
5625
TRANSFOMER
ROOM CORRIDOR NAME SIG. DATE :
S UP UP UP
R'
UP UP DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
SITEPLAN
SCALE 1 : 350 R.2
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
POWER METER
NO REVISION DATE
TOTAL
PROJECT
PROYEK
POWER METER
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DEMAND FACTOR
GRAND TOTAL
MSB-3A DRAWING TITLE
JUDUL GAMBAR
380/220V, 3Ph, 50Hz
WIRING DIAGRAM
POWER METER
MSB-1A, 2A & 3A
(MAIN BUILDING)
PHASE-1-1
NAME SIG. DATE :
DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
R.0
FOR :
CONSTRUCTION DRAWING
TOTAL
DRAWING NUMBER
NOMOR GAMBAR
DEMAND FACTOR
GRAND TOTAL ACM / 323 / MEP / GF / 1.1 / EL-104
D-PROJECT
NOTES :
NEW DB-AHU.1
380/220V, 3Ph, 50Hz
M
POWER METER 3~
M
3~
PROJECT
PROYEK
OWNER
PEMILIK
NEW DB-AHU.2
380/220V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
M
POWER METER 3~
M DRAWING TITLE
3~ JUDUL GAMBAR
SETTING :
ELR : 5A / 0.3 (SECOND) WIRING DIAGRAM
NEW DB-AHU.1 & NEW DB-AHU.2
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.1/PHASE 1.1
380/220V, 3Ph, 50Hz
B B
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.1
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
TOTAL CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.2/PHASE 1.1
380/220V, 3Ph, 50Hz
B B
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
L21/MB-2
L22/MB-2
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.2
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
TOTAL FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.3/PHASE 1.1
NO REVISION DATE
380/220V, 3Ph, 50Hz
B
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.3
PHASE 1.1
TOTAL
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.4/PHASE 1.1
380/220V, 3Ph, 50Hz
B B
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.4
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
TOTAL
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.5/PHASE 1.1
380/220V, 3Ph, 50Hz
B
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.5 & DB-CHEMICAL
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
PP-IDEAL MOLD
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
TOTAL
LP-D1
380/220V, 3Ph, 50Hz B PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-IDEAL MOLD & LP-D1
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
TOTAL
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PP-Z1.1/PHASE 1.1
380/220V, 3Ph, 50Hz
B
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z1.1
PHASE 1.1
DRAWN BY :
AF
TOTAL DIGAMBAR :
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
B B
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z1.3
PHASE 1.1
TOTAL
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-HSOF8
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-HSOF8
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
0 FIRST ISSUED -
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
PT. DACREA Design and Engineering Consultants
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-HSOF8.1~34
(TYPIKAL)
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-ASM.DA
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-ASM DA
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
TOTAL DIPERIKSA :
APPROVED BY :
RH
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-ASM.DA.1
380/230V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
MINI DB-ASM.DA.2
380/230V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM DA.1 &
MINI DB-ASM DA.2
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-ASM.DA.3
380/230V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
MINI DB-ASM.DA.4
380/230V, 3Ph, 50Hz PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM DA.3 &
MINI DB-ASM DA.4
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-PLASMA
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
MINI DB-PLASMA.1
DRAWING TITLE
JUDUL GAMBAR
380/230V, 3Ph, 50Hz
WIRING DIAGRAM
DB-PLASMA &
MINI DB-PLASMA.1
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
TOTAL DRAWING NUMBER
NOMOR GAMBAR
DB-HELLER REFLOW
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
TOTAL
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-HELLER REFLOW &
MINI DB-HELLER
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-FLUX.C
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
MINI DB-FLUX.C.1
380/230V, 3Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-FLUX.C &
MINI DB-FLUX.C
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-CD
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
TOTAL OWNER
PEMILIK
MINI DB-CD.1
380/230V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-CD &
MINI DB-CD.1
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
TOTAL CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-HSF05
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
MINI DB-HSF05.1
380/230V, 3Ph, 50Hz
PT. DACREA Design and Engineering Consultants
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-HSOF5 &
MINI DB-HSOF5.1
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
TOTAL
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
MSB-FL.1
380/220V, 3Ph, 50Hz
POWER METER
0 FIRST ISSUED -
PROJECT
PROYEK
MSB-FL.2
OWNER
380/220V, 3Ph, 50Hz PEMILIK
POWER METER
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
WIRING DIAGRAM
DB-FL.1 & DB-FL.2
PHASE 1.1
DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
R.0
FOR :
PP-Z2.1
380/220V, 3Ph, 50Hz
NO REVISION DATE
B B B B
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z2.1
PHASE 1.1
DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PP-Z2.2
380/220V, 3Ph, 50Hz
B B B
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z2.2
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
TOTAL DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-REFLOW
380/220V, 3Ph, 50Hz
NO REVISION DATE
POWER METER
0 FIRST ISSUED -
PROJECT
SETTING :
PROYEK
ELR : 5A / 0.3 (SECOND)
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
TOTAL KONSULTAN RENCANA
WIRING DIAGRAM
DB-REFLOW & MINI DB-REFLOW
PHASE 1.1
R.2
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
POWER METER
NO REVISION DATE
0 FIRST ISSUED -
TOTAL
MINI DB-TNF.1
380/230V, 3Ph, 50Hz
PROJECT
PROYEK
BATAM 3 PROJECT
TOTAL Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
OWNER
PEMILIK
MINI DB-SONOSCAN
380/230V, 3Ph, 50Hz
DESIGN CONSULTANT
TOTAL KONSULTAN RENCANA
MINI DB-TE
380/230V, 3Ph, 50Hz
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LM+TF & MINI DB-
TOTAL PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
MINI DB-LC DISETUJUI : AN
R.2
FOR :
TOTAL
SETTING : CONSTRUCTION DRAWING
ELR : 5A / 0.3 (SECOND)
DRAWING NUMBER
NOMOR GAMBAR
POWER METER
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
MINI DB-EAV.ACE.1~2 (TYPIKAL)
380/230V, 3Ph, 50Hz PT. DACREA Design and Engineering Consultants
DACREA
DRAWING TITLE
JUDUL GAMBAR
TOTAL
WIRING DIAGRAM
DB-EAV & MINI DB-EAV
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
MINI DB-EAV.COHU CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
380/230V, 3Ph, 50Hz DISETUJUI : AN
FOR :
TOTAL
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-WORK BENCH.2
380/220V, 3Ph, 50Hz
POWER METER
SETTING :
ELR : 5A / 0.3 (SECOND)
TOTAL
NO REVISION DATE
0 FIRST ISSUED -
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
PT. DACREA Design and Engineering Consultants
DACREA
MINI DB-SMARTSCOPE
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
DB-WORKBENCH.2 &
MINI DB-WORKBENCH
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-TSP.2
380/220V, 3Ph, 50Hz
NO REVISION DATE
POWER METER
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
WIRING DIAGRAM
DB-TSP.2 & MINI DB-TSP.2
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
RH
TOTAL DIPERIKSA :
APPROVED BY :
DISETUJUI : AN
R.2
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
0 FIRST ISSUED -
380/220V, 3Ph, 50Hz
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z3.1
PHASE 1.1
TOTAL
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PP-Z3.2
380/220V, 3Ph, 50Hz
B B B NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z3.2
PHASE 1.1
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-TDSON
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
PT. DACREA Design and Engineering Consultants
DACREA
MINI DB-TDSON.1
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
DB-TDSON & MINI DB-TDSON.1
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
TOTAL APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
MSB-FL.3
380/220V, 3Ph, 50Hz
POWER METER
NO REVISION DATE
0 FIRST ISSUED -
SETTING :
EFR DTL : 100A/0.5 (SECOND)
OCR IDMTL : 2240A/5.0 (SECOND)
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
TOTAL
DEMAND FACTOR
GRAND TOTAL
MSB-FL.4
PT INFINEON TECHNOLOGIES BATAM
380/220V, 3Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-FL.3 & DB-FL.4
PHASE 1.1
R.0
FOR :
TOTAL
CONSTRUCTION DRAWING
DEMAND FACTOR
GRAND TOTAL DRAWING NUMBER
NOMOR GAMBAR
DB-FLEX
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
POWER METER
PROJECT
PROYEK
OWNER
PEMILIK
TOTAL
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
TOTAL DB-FLEX & MINI DB-FLEX
PHASE 1.1
SETTING :
ELR : 5A / 0.3 (SECOND)
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-TSP.3
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
POWER METER
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-TSP & MINI DB-TSP
PHASE 1.1
TOTAL
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
POWER METER
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
TOTAL
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
TOTAL DB-MSP, MINI DB-PEGASUS, SRM,
& MINI DB-OVEN
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
MINI DB-OVEN APPROVED BY :
DISETUJUI : AN
380/230V, 3Ph, 50Hz
SCALE DRAWING : N.T.S
REFERENSI : REV :
R.0
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-MFS
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
POWER METER
PROJECT
PROYEK
BATAM 3 PROJECT
TOTAL
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
380/230V, 3Ph, 50Hz
DRAWING TITLE
JUDUL GAMBAR
TOTAL
WIRING DIAGRAM
DB-MFS & MINI DB-MFS
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-WORK BENCH.3
380/220V, 3Ph, 50Hz
POWER METER
NO REVISION DATE
TOTAL
0 FIRST ISSUED -
PROJECT
PROYEK
MINI DB-DRY PACK.1~2 (TYPIKAL)
380/230V, 3Ph, 50Hz BATAM 3 PROJECT
OWNER
PEMILIK
TOTAL
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-WORK BENCH, MINI DB-DRY
PACK & MINI DB-WORK BENCH.3
PHASE 1.1
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
0 FIRST ISSUED -
DB-PROD.GF-1
380/220V, 3Ph, 50Hz
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
TOTAL JUDUL GAMBAR
WIRING DIAGRAM
DB-PROD.GF-1
PHASE.1-1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.1
PHASE.1-1
DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.2
PHASE.1-1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
TOTAL APPROVED BY :
AN
DISETUJUI :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
0 FIRST ISSUED -
380/230V, 3Ph, 50Hz
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-HYDRANT
380/220V, 3Ph, 50Hz
M
POWER METER 3~
M
3~
NO REVISION DATE
SETTING :
ELR : 5A / 0.3 (SECOND) 0 FIRST ISSUED -
PROJECT
PROYEK
TOTAL
BATAM 3 PROJECT
DB-PLUMBING
OWNER
380/220V, 3Ph, 50Hz PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
POWER METER
SETTING :
ELR : 5A / 0.3 (SECOND) DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-HYDRANT & DB-PLUMBING
PHASE.1-1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
TOTAL
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SDB-COMPRESSOR
380/220V, 3Ph, 50Hz
M
3~
NO REVISION DATE
M
3~ 0 FIRST ISSUED -
M
3~
POWER METER
PROJECT
PROYEK
M BATAM 3 PROJECT
3~
SETTING :
ELR : 5A / 0.3 (SECOND) Jl. BERINGIN LOT 201 & 202A
M AT BATAMINDO INDUSTRIAL PARK,
3~
MUKAKUNING
M
3~
OWNER
PEMILIK
M
3~
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
SDB-COMPRESOR
PHASE-1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
DF
TOTAL FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
0 FIRST ISSUED -
DB-SERVICE 2'ND
380/220V, 3Ph, 50Hz B B
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-SERVICE 2'ND
PHASE-1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-SNP+A2
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
TOTAL
BATAM 3 PROJECT
DRAWING TITLE
JUDUL GAMBAR
MINI DB-SNP.1~2 (TYPIKAL) WIRING DIAGRAM
DB-SNP+A2 & MINI DB-SNP+A2
380/230V, 3Ph, 50Hz
1~2 (TYPICAL)
PHASE.1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
TOTAL
SCALE DRAWING : N.T.S
REFERENSI : REV :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-LDF.2 SDB-LDF.2
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DB-LDF.3 SDB-LDF.3
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LDF.2 & DB-LDF.3
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-LDF.4 SDB-LDF.4
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DB-LDF.5 SDB-LDF.5
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LDF.4 & DB-LDF.5
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-LDF.6 SDB-LDF.6
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DB-LDF.7 SDB-LDF.7
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LDF.6 & DB-LDF.7
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LDF.9
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SDB-EMERGENCY
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
POWER METER PROYEK
BATAM 3 PROJECT
SETTING :
ELR : 5A / 0.3 (SECOND) OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
SDB-EMERGENCY
PHASE-1.1
DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SDB-SERVER
DB-SERVER.1
380/220V, 3Ph, 50Hz
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-SERVER.1 & DB-SERVER.2
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
DB-VACUM PROYEK
OWNER
PEMILIK
M
3~
SETTING :
ELR : 5A / 0.3 (SECOND)
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-VACUM
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-CANTEEN 2'ND
380/220V, 3Ph, 50Hz
B B
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
TOTAL OWNER
PEMILIK
DB-CANTEEN 3'RD
PT INFINEON TECHNOLOGIES BATAM
380/220V, 3Ph, 50Hz
B DESIGN CONSULTANT
B B
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-CANTEEN 2'ND & 3'RD
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
AN
TOTAL DISETUJUI :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-FICO.MOLD
380/220V, 3Ph, 50Hz
POWER METER
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
DB-ASM.MOLD PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
POWER METER
PT. DACREA Design and Engineering Consultants
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-FICO MOLD & DB-ASM.MOLD
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
TOTAL
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
6000
9700
B
6000
C
8300
B B
6000
B
6000
B B
E B B
NO REVISION DATE
6000
B
20500
0 FIRST ISSUED -
F B
B B
6000
G B B
78000
6000
3000
B PROJECT
B B PROYEK
H
6000
BATAM 3 PROJECT
B B
J OWNER
PEMILIK
30500
6000
B
K B
6000
M B
PT. DACREA Design and Engineering Consultants
3000
B
6000
DACREA
3000
N
DRAWING TITLE
JUDUL GAMBAR
10000
B GROUND FLOOR
LIGHTING INSTALLATION PLAN
B B B
PHASE.1-1, SHEET.2-1
O
5625
DRAWN BY :
AF -
DIGAMBAR :
P CHECKED BY :
RH
B
DIPERIKSA :
5625
APPROVED BY :
AN
DISETUJUI :
22500
B R.0
R FOR :
5625
CONSTRUCTION DRAWING
S
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.1 / EL-200
NOTES :
DB-ASM.AD
380/220V, 3Ph, 50Hz
POWER METER
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
TOTAL
DESIGN CONSULTANT
380/220V, 3Ph, 50Hz KONSULTAN RENCANA
POWER METER
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-ASM.AD & DB-PMC
PHASE 1.1
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
TOTAL
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
3700
B B B
B
B B
18975
B
B
B B B B
B
B B B
NO REVISION DATE
B B B
0 FIRST ISSUED -
B
B B
B B B
PROJECT
PROYEK
BATAM 3 PROJECT
B B B B B
OWNER
110000
PEMILIK
B B
78325
B
DESIGN CONSULTANT
B B KONSULTAN RENCANA
WAITING
B
PT. DACREA Design and Engineering Consultants
DACREA
B
B
B DRAWING TITLE
JUDUL GAMBAR
B
2000
B B B
B B
B R.0
FOR :
7000
B B B
CONSTRUCTION DRAWING
UP UP DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.1 / EL-201
NOTES :
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
A B
B
CORRIDOR
B
6000
B B
B IT ROOM
B
NO REVISION DATE
6000
EXISTING EXISTING
C 0 FIRST ISSUED -
6000
AHU
D
B B
PP-Z2.1
6000
E
B
6000
PROJECT
UP DN
PROYEK
F
B
6000
BATAM 3 PROJECT
G
Jl. BERINGIN LOT 201 & 202A
78000
B B
6000
AHU
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
H
CORRIDOR
B
6000
OWNER
PEMILIK
I B B
B
6000
B
PANEL
B
ROOM
LP2-EM
J
PP-Z2.1
VACANT B
6000
B B B
PP-Z2.2
6000
KONSULTAN RENCANA
L B B
B
6000
AHU
PT. DACREA Design and Engineering Consultants
EL.+3.500
M
PP-Z2.2 DACREA
6000
EL.+3.500
B B
N
B DN UP
B B DRAWING TITLE
B UP DN
JUDUL GAMBAR
10000
CORRIDOR
B
B PHASE.1-1
5625
VOID B B B B
WD2 COOPERATIVE ROOM
P DN B
B
B
NAME SIG. DATE :
VOID AHU
5625
B B B
DRAWN BY :
VOID AF -
VOID DIGAMBAR :
22500
UP
Q VOID
GRID SWITCH-4 B B
B
B
CHECKED BY :
RH
6 GANG
B DIPERIKSA :
B B B B
5625
10
10
10
10
B
APPROVED BY :
10
10
10
10
AN
TOILET
DB-SERVICE.2ND DISETUJUI :
5
R B
B
CHANGING ROOM B B B
SCALE DRAWING : 1:300
PRAYING ROOM
5625
B
B B B B B REFERENSI : REV :
CORRIDOR
S UP
R.0
DN
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
20750 23750
A
6000
B B
B
6000
NO REVISION DATE
23175
C VACANT 0 FIRST ISSUED -
B B
6000
D
6000
B B
2500
6000
PROJECT
UP DN
PROYEK
F
6000
B B
BATAM 3 PROJECT
G
Jl. BERINGIN LOT 201 & 202A
78000
6000
PP-Z3.1
B B
6000
OWNER
I PEMILIK
PP-Z3.2
6000
VACANT B
53325
B B
110000
6000
PP-Z3.1
DESIGN CONSULTANT
KONSULTAN RENCANA
L
6000
3000
DN UP
B
B B UP DN DRAWING TITLE
JUDUL GAMBAR
10000
DB-CANTEEN
B 3'RD FLOOR
O B B
LIFT
LIGHTING INSTALLATION PLAN
LIFT
LOG MAT'L
PHASE.1-1
5625
B B
B B
24275
P B
PRAYER ROOM B
NAME SIG. DATE :
5625
VACANT
B
DISPLAY
B
PP-Z3.2 DRAWN BY :
AF
22500
CH ROOM
DIGAMBAR :
Q ABLUTION ROOM CANTEEN B B
CHECKED BY :
RH
DIPERIKSA :
5625
APPROVED BY :
AN
TOILET B
DISETUJUI :
R B
B
B B B
3725
B
B
REFERENSI : REV :
S UP
DN
R.0
DB-CANTEEN PP-Z3.2
4105 3100
FOR :
8720 2540 14850 2040 7205 3250 14575 23750
84000 28150 48780
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
B
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
1660
A
6000
WEIGHT 16.000 KG
B
BLOWER BLOWER BLOWER BLOWER BLOWER CH-04 (NEW)
300 KG 300 KG 300 KG 300 KG 300 KG
B BLOWERB BLOWER
300 KG 300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG NO REVISION DATE
WEIGHT 16.000 KG
CH-03 (NEW)
6000
0 FIRST ISSUED -
C B
WEIGHT 16.000 KG
CH-02 (NEW)
27000
6000
CT-01
EXISTING
COOLING TOWER
WEIGHT 15.500 KG
CT-02
EXISTING CH-01 (EXISTING)
D COOLING TOWER
WEIGHT 15.500 KG
CT-03
EXISTING
COOLING TOWER
6000
WEIGHT 15.500 KG
WEIGHT 15.000 KG
WEIGHT 500 KG
CHWP-4
NEW
E B
WEIGHT 500 KG
CHWP-3
NEW
NEW NEW
COOLING TOWER
WEIGHT 22.000 KG WEIGHT 500 KG
CHWP-1
PROYEK
NEW
DN
F
CT-05
BATAM 3 PROJECT
6000
NEW
COOLING TOWER
WEIGHT 22.000 KG
CT-06
MUKAKUNING
6000
NEW
COOLING TOWER
WEIGHT 22.000 KG
H
SCRUBBER
OWNER
6000
WEIGHT 4.000 KG
PEMILIK
I SCRUBBER
B KG
WEIGHT 4.000
6000
SCRUBBER
WEIGHT 4.000 KG
110000
6000
SCRUBBER
WEIGHT 4.000 KG PT INFINEON TECHNOLOGIES BATAM
K
64590
DESIGN CONSULTANT
B
KONSULTAN RENCANA
6000
L
PT. DACREA Design and Engineering Consultants
6000
DACREA
M
6000
N DRAWING TITLE
JUDUL GAMBAR
DN
DN
10000
4'TH FLOOR
WEIGHT 8000 KG
LIGHTING INSTALLATION PLAN
PHASE.1-1
O LIFT
5625
B
NAME SIG. DATE :
P DRAWN BY :
AF
AD-1 AD-2 AD-3 AD-4 AD-5 AD-6 AD-7
5625
DIPERIKSA :
Q
15000
APPROVED BY :
AN
5625
B B DISETUJUI :
MXS1050
MXS1050
MXS1050
MXS1050
AR-1
9000 L AR-6
AD-1 AD-2 AD-3 AD-4 (EXISTING) 9000 L
(NEW)
(EXISTING)
4 X 550 KG
2540 KG
2540 KG
AC-1 AC-2 AC-3 AC-4 AC-5
SCALE DRAWING : 1 : 300
R ZR450
(NEW)
8400 KG
ZR450
(NEW)
8400 KG
ZR450
(NEW)
8400 KG
ZR450
(NEW)
8400 KG
ZR450
(NEW)
8400 KG
AR-4
2500 L
AR-3
3000 L
AR-2
9000 L
(EXISTING)
AR-5
9000 L
(NEW)
2540 KG
REFERENSI : REV :
5625
R.0
S UP
1750
DN
FOR :
164645
112500 44500
1660
A 6000
WEIGHT 16.000 KG
B BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
BLOWER
300 KG
CB-EXISTING
WEIGHT 16.000 KG
CH-03 (NEW)
6000
C WEIGHT 16.000 KG
CH-02 (NEW)
27000
6000
CT-01
EXISTING
COOLING TOWER
WEIGHT 15.500 KG
CT-02
EXISTING CH-01 (EXISTING)
D COOLING TOWER
WEIGHT 15.500 KG CB-EXISTING
CT-03
EXISTING
WEIGHT 15.500 KG
WEIGHT 15.000 KG
WEIGHT 500 KG
CHWP-4
NEW
E WEIGHT 500 KG
CHWP-3
NEW
NO REVISION DATE
CT-04 WEIGHT 500 KG
CHWP-2
6000
NEW NEW
COOLING TOWER
WEIGHT 22.000 KG WEIGHT 500 KG
CHWP-1
NEW
DN
0 FIRST ISSUED -
F
CT-05
6000
NEW
COOLING TOWER
WEIGHT 22.000 KG
G CB-EXISTING
78000
CT-06
6000
NEW
COOLING TOWER
WEIGHT 22.000 KG
CB-EXISTING
H
SECTION-A SCRUBBER
PROJECT
6000
WEIGHT 4.000 KG
PROYEK
DETAIL-A
I SCRUBBER
WEIGHT 4.000 KG
BATAM 3 PROJECT
6000
SCRUBBER
J SECTION-B
WEIGHT 4.000 KG
Jl. BERINGIN LOT 201 & 202A
110000
AT BATAMINDO INDUSTRIAL PARK,
6000
SCRUBBER
MUKAKUNING
WEIGHT 4.000 KG
CB-EXISTING
K CB-EXISTING
64590
OWNER
6000
PEMILIK
L
CB-EXISTING
6000
M
6000
WEIGHT 8000 KG
PT. DACREA Design and Engineering Consultants
O
CB-EXISTING LIFT
DACREA
5625
CB-EXISTING
P
AD-1 AD-2 AD-3 AD-4 AD-5 AD-6 AD-7
5625
15000
4'TH FLOOR
5625
CB-EXISTING
MXS1050
MXS1050
MXS1050
MXS1050
AR-1
AR-6
R AR-2
AR-5
9000 L
ZR450
(NEW)
8400 KG
ZR450
(NEW)
8400 KG
ZR450
(NEW)
8400 KG
ZR450
(NEW)
8400 KG
ZR450
(NEW)
8400 KG
PHASE 1.1
AR-4 AR-3 9000 L (NEW)
(EXISTING) 2540 KG
2500 L 3000 L
5625
1750
CB-EXISTING DN
CB-EXISTING DRAWN BY :
DIGAMBAR : AF
CB-EXISTING CB-EXISTING CB-EXISTING
CB-EXISTING CHECKED BY :
DIPERIKSA : RH
1920 24000 8260 41000 1750
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DETAIL-A SECTION--A SECTION--B
ACM / 323 / MEP / 4'TH / 1.1 / EL-205
D-PROJECT
NOTES :
A
AHU
6000
9700
B
6000
AD8312+
AD8312+
C
ASM
ASM
SSI
8300
6000
AD8312+
AD8312+
ASM
ASM
ASM AD
(S7)
D
DMC
(S7)
E
NO REVISION DATE
6000
20500
(OUT)
WIP
0
WIP
FIRST ISSUED -
(IN)
TUBE MAX = 20M
SUPPLY
GAS
F
MARCH
Technic
RACK
(S7) FICO
(S7) (S7) (S7) SON
CHILLER
6000
1490
HELLER
WIP
(IN)
(OUT)
WIP
VACUUM
PUMP
G
SWITCH GAS
AUTO
78000
6000
R FICO FICO
(S7) (S7) (S7) SON SON
3000
PROJECT
PROYEK
H
6000
FICO FICO
BATAM 3 PROJECT
SON SON SON SON SON SON
J OWNER
PEMILIK
30500
6000
K
6000
AD8312+
AD8312+
ASM
ASM
TDSON
sTOLL
CB
CB
RO
REEL
3000
6000
DACREA
3000
N
DRAWING TITLE
JUDUL GAMBAR
10000
GROUND FLOOR
POWER OUTLET INSTALLATION PLAN
PHASE.1-1, SHEET.2-1
O
5625
CHECKED BY :
ORP 1
RH
CRN 32
DIPERIKSA :
5625
AREA
Q WWTP
FLOCCULATION
SCALE DRAWING : 1:225
REFERENSI : REV :
CLINIC
5625
TRANSFER
THICKENER TANK CATRIDGE BRINE
SOFTENER VESSEL
FILTER TANK
R.0
CIP TANK
CATRIDGE
R FILTER
PRESS
FILTER BRINE
TANK
FOR :
HMR VESSEL
SOFTENER VESSEL C
5625
A S
R A
B N
O D
S N F
F A F I
TO BATAMINDO
SEWER LINE
PC PA NaOH
CL
AT
I N
D
F
I
I
L
T
E
L
T
E
R
CONSTRUCTION DRAWING
RE
S
L R T
BR T A
T T
O E A N
A
N R N K
N
K T K
HCl FeCl3 A
Na2SO4
N
K
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.1 / EL-300
NOTES :
3700
BLUE M BLUE M
crb11 crb11
18975
n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U
NO REVISION DATE
0 FIRST ISSUED -
AMSi
VAC PUMP
Height = 2240, port/pellet buffer = ?
BLUE M
BLUE M
CD-A2-WJ
BLUE M
BLUE M
FICO
SON
PROJECT
PROYEK
FICO
BATAM 3 PROJECT
SON
CD OWNER
110000
PEMILIK
78325
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
WAITING
DRAWING TITLE
JUDUL GAMBAR
GROUND FLOOR
POWER OUTLET INSTALLATION PLAN
PHASE.1-1, SHEET.2-2
DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
2000
R.0
FOR :
7000
CONSTRUCTION DRAWING
UP UP DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.1 / EL-301
NOTES :
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
A
CORRIDOR
6000
B IT ROOM
NO REVISION DATE
6000
EXISTING EXISTING
C 0 FIRST ISSUED -
6000
AHU
D
PP-Z2.1
6000
E
6000
PROJECT
UP DN
PROYEK
F DB-REFLOW
6000
BATAM 3 PROJECT
G REFLOW BTU-SON
REFLOW
BTU PMAX Jl. BERINGIN LOT 201 & 202A
78000
6000
AHU
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
EMPTY
TUBE
H
HANMI PMRTHAN005 SON DEC/18
B H= 538 mm
SDB-AHU.Z3
LM-TF SON
CORRIDOR
6000
OWNER
DB-LM+TF PEMILIK
I
6000
PANEL
PC
ROOM
LP2-EM
J TF1 - S7
2.6
PP-Z2.1
DBC
WS
VACANT
6000
LC - S7
PT INFINEON TECHNOLOGIES BATAM
K
TUBES
EMPTY
DESIGN CONSULTANT
PP-Z2.2
6000
LOT (INPUT)
TROLLEY
LOT
UNIT
REJECTS
TROLLEY
LOT (INPUT)
LOT
L
EMPTY
TUBES
6000
TUBES
EMPTY
LOT (INPUT)
TROLLEY
LOT
UNIT
REJECTS
AHU
EL.+3.500
M DB-LDF.7
PP-Z2.2 DACREA
6000
EL.+3.500
N
DN UP
DRAWING TITLE
UP DN
JUDUL GAMBAR
DB-EAV
10000
EOL Buyoff
EOL Buyoff
Trolley
Trolley
4x PWT 1x LAN Port 4x PWT 1x LAN Port
EOL Buyoff
EOL Buyoff
Trolley
Trolley
O
CORRIDOR
Scope
Smart
8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
PHASE.1-1
5625
VOID
WD2 COOPERATIVE ROOM
DB-TSP.2 DRAWN BY :
VOID AF -
VOID DIGAMBAR :
22500
UP
Q VOID CHECKED BY :
RH
DIPERIKSA :
TSP
5625
Output
Input Trolley Turret W/Station
Trolley with Spool
10
10
10
10
(Reel)
IP IP
APPROVED BY :
10
10
10
10
Handler PC
IP Tester /
IP Inductor
IP Tester /
DISETUJUI :
IP Inductor
IP Tester /
Handler PC
IP Tester /
5
REFERENSI : REV :
CORRIDOR
S UP
R.0
DN
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
20750 23750
A
FG Room
6000
B DRY PACK
DB-WORK BENCH.3
6000
AFTER
AFTER
NO REVISION DATE
DB-MFS
DP
DP
23175
VACANT
BEFORE
BEFORE
C 0 FIRST ISSUED -
6000
D
6000
2500
MATERIAL & SUPPORT
3x PEGASUS
6000
PROJECT
PEGASUS
UP DN
PROYEK
F
DB-MSP
6000
PEGASUS
BATAM 3 PROJECT
G Bake-in
MSP Jl. BERINGIN LOT 201 & 202A
78000
6000
PEGASUS
AT BATAMINDO INDUSTRIAL PARK,
LD
MUKAKUNING
H
PP-Z3.1
MF
6000
MSB-FL.3 OWNER
I PEMILIK
PP-Z3.2
6000
VACANT
53325
LP3-EM
J
110000
6000
PP-Z3.1
DESIGN CONSULTANT
KONSULTAN RENCANA
L
6000
DB-TSP.3
N STRIP TESTER
5x Flex
3000
DN UP
LGC UP DN DRAWING TITLE
JUDUL GAMBAR
10000
LGC
LGC
24275
P
PRAYER ROOM NAME SIG. DATE :
5625
DISPLAY
VACANT DRAWN BY :
AF
22500
CH ROOM
DIGAMBAR :
Q ABLUTION ROOM CANTEEN
CHECKED BY :
RH
DIPERIKSA :
5625
APPROVED BY :
AN
TOILET LN2 Refilling
DISETUJUI :
R LN2
LN2
LN2 LN2
3725
LN2 LN2
LN2 LN2
REFERENSI : REV :
TOOL
LN2 LN2
S UP
DN
R.0
DB-CANTEEN PP-Z3.2
4105 3100
FOR :
8720 2540 14850 2040 7205 3250 14575 23750
84000 28150 48780
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
1 2 3 4 5 6 7 8 9 10 11 SYMBOL DESCRIPTION
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
DB-AHU.4
A ELP1-5 SDB-GF.1-1
3700
AHU
AHU AHU
LP-D1
6000
9700
BLUE M BLUE M
crb11 crb11
PM WB NO REVISION DATE
AD8312+
AD8312+
C
ASM
ACMS
ASM
73CM 73CM 73CM 73CM 73CM
(PRODUCTION)
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
SSI
18975
n o i t a t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D L U
DB-LDF.4
LD Station
8300
0
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
FIRST ISSUED -
6000
AD8312+
AD8312+
(PRODUCTION FOL)
n o i t a t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
ASM
ASM
ASM AD n o i t a t n
K 5CTU
S o i LD Station
D t
73CM
L a U t n
K 5CTU
S o iLD Station
D t
73CM
L a U t n
K 5CTU
S o iLD Station
D t
73CM
L a U t n
K 5CTU
S o iLD Station
D t
73CM
L a U t
K 5CTU
S D
LD Station
73CM
L U
ASM AD
SUPPORT & MATERIAL (S7)
D 73CM 73CM 73CM 73CM 73CM
FORMING GAS AREA
PP-Z1.1
(BY OTHERS)
PP-MB.1
Support SUPPORT MALE'S TOILET PP-MB.3 FEMALE'S TOILET LP-E1
VACANT Material
EXIT
PM & ACMS ELP1-4
ELP1-3 D M C
E IN
DB-LDF.2 (S7)
DB-PLASMA A2P1
(PRODUCTION FOL) DB-CHEMICAL
6000
(OUT)
BUND WALL H.150mm
WIP
WIP
(IN)
PROJECT
SUPPLY
GAS
F
MARCH
Technic DB-PROD.GF.1 PROYEK
RACK
DB-ASM.MOLD
AMSi
VAC PUMP
FICO
PM (S7) (S7) (S7) (S7) SON
BUND WALL H.150mm
CHILLER
6000
TEMPORARY PM
BLUE M
HELLER
WIP
(IN)
BLUE M
DB-PMC
(OUT)
CD-A2-WJ
WIP
PLASMA CLEAN ASM MOLDING
BLUE M
G BATAM 3 PROJECT
BLUE M
VACANT
SWITCH GAS
FLUX CLEANING
AUTO
78000
6000
R FICO FICO
(S7) (S7) (S7) SON SON
3000
CHEMICAL ROOM
FICO FICO
SON SON SON SON SON SON
DB-CD
OWNER
I DB-SNP+A2 SNP1
PEMILIK
RACK MATERIAL & SUPPORT PP-MB.4 MSB-FL.1
6000
LP1-EM
DB-ASM.AD
CD
J
110000
30500
6000
78325
PT INFINEON TECHNOLOGIES BATAM
6000
(PRODUCTION FOL)
ASM AD CB RO
DESIGN CONSULTANT
L DB-TDSON
KONSULTAN RENCANA
ASM AD-CB-RO
DB-HSOF5
6000
AD8312+
AD8312+
ASM
SDB-AHU.3
ASM
PP-MB.2
VACANT
TDSON
sTOLL
SDB-EMERGENCY
CB
PUMP HOUSE
M
RO
REEL
ELP1-2 ELP1-1
DB-LDF.3
3000
MALE TOILET
6000
MSB-A1 SDB-AHU.2
DACREA
3000
EXIT EXIT
PASS
BOX
MSB-A2 UP
MSB-A3 COLD STORAGE SUMP SNP DRAWING TITLE
10000
CORRIDOR
GROUND FLOOR
O PKG
CABLE LADDER INSTALLATION PLAN
5625
GENSET LDF
A2 EQUALIZING TANK Sn EQUALIZING TANK
RO
PRODUCT
TANK
WTP
RO
PRODUCT
TANK HIGH
PHASE 1.1
RO UNIT 2 RO UNIT 1
TRANSFORMER ROOM VOLTAGE
P MIXED BED PROCESS
ORP 1
CRN 32 SDB-U.AC-3
CHEMICAL STORAGE ATTIRE CANTEEN
5625
LOCKER AREA
ORP 2
CRN 64
NAME SIG. DATE :
SEDIMENTATION TANK
COAGULATION
ROOM (OPEN SPACE)
22500
2000
CLINIC
5625
CORRIDOR CHECKED BY :
TRANSFER
RH
THICKENER TANK CATRIDGE BRINE
DIPERIKSA :
SOFTENER VESSEL
FILTER TANK
LOCKET
CIP TANK
CATRIDGE
APPROVED BY :
R FILTER
PRESS
FILTER BRINE
TANK
7000
HMR VESSEL
SOFTENER VESSEL C
ELECTRICAL RECEIVING TRANSIT AREA
DB-HOUSEREEL
5625
A S
R A
SCALE DRAWING :
N
1:300
B
O D
TRANSFOMER
F
S
A
N
F
F
I PP-IDEALMOLD CORRIDOR
TO BATAMINDO I N
D
I L
T ROOM
SDB-EMG.EXTENTION
L
SEWER LINE
PC PA CL F T E
NaOH
AT
REFERENSI : REV :
I E R
RE
S
L R T
BR
OT
N A
T
E
R
T
A
A
N
K
UP
UP
N N
T K
UP UP
K
HCl Na2SO4 FeCl3 A
N
K
R.0
18000 18000
36000 24000 4800 19200 2425 27325 14750
FOR :
84000 2795 25585 4050 44500
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SYMBOL DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
2450
CORRIDOR
6000
NO REVISION DATE
B IT ROOM
0 FIRST ISSUED -
6000
C
6000
AHU
32140
D
PP-Z2.1
SDB-AHU.Z4
6000
PROJECT
PROYEK
E
TOILET
6000
UP DN
BATAM 3 PROJECT
F
Jl. BERINGIN LOT 201 & 202A
6000
AHU
DB-REFLOW OWNER
EMPTY
TUBE
SDB-AHU.Z3 PEMILIK
H
HANMI PMRTHAN005 SON DEC/18
CORRIDOR
H= 538 mm
LM-TF SON
6000
MSB-FL.2
I DB-LM+TF
6000
TOILET PANEL
PC
ROOM LP2-EM
J TF1 - S7
110000
2.6
DBC
PT INFINEON TECHNOLOGIES BATAM
WS
VACANT
6000
LC - S7 DESIGN CONSULTANT
KONSULTAN RENCANA
K
TUBES
EMPTY
6000
LOT (INPUT)
TROLLEY
LOT
UNIT
REJECTS
TROLLEY
LOT (INPUT)
LOT
L
64110
EMPTY
TUBES
DACREA
6000
TUBES
EMPTY
LOT (INPUT)
TROLLEY
LOT
72710
UNIT
REJECTS
DB-LDF.7 AHU
M
PP-Z2.2
6000
DRAWING TITLE
SDB-AHU.Z2
JUDUL GAMBAR
N DB-EAV
DN UP DB-WORK BENCH.2 UP DN
2'ND FLOOR
CABLE LADDER INSTALLATION PLAN
10000
EOL Buyoff
EOL Buyoff
TOILET
Trolley
Trolley
4x PWT 1x LAN Port 4x PWT 1x LAN Port
EOL Buyoff
EOL Buyoff
Trolley
Trolley
CORRIDOR
O Scope
Smart
8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
NAME DATE :
EL.+6.000
SIG.
5625
WASERDA
ENTRANCE
COOPERATIVE ROOM DRAWN BY :
FOOD DISPLAY AF
EL.+5.500 DIGAMBAR :
P DN UNION ROOM SDB-AHU.Z1 CHECKED BY :
RH
EL.+5.000 AHU DIPERIKSA :
5625
RAILING
COFFEE
CORNER APPROVED BY :
AN
DISETUJUI :
22500
UP
Q VOID
TSP
SCALE DRAWING : 1:300
5625
Output
Input Trolley Turret W/Station
Trolley with Spool
10
10
10
10
(Reel)
RAILING
IP IP
10
10
10
10
8600
CANTEEN INDOOR CANTEEN OUTDOOR
REFERENSI : REV :
Handler PC
IP Tester /
IP Inductor
IP Tester /
EL.+6.000 EL.+4.500
IP Inductor
IP Tester /
Handler PC
IP Tester /
5
TOILET
R.0
with Spool (Reel) Trolley
Turret W/Station Trolley Input
Output
RAILING
DB-SERVICE.2ND
2700
CORRIDOR
FOR :
S DN
UP
DN
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SYMBOL DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
20750 23750
NO REVISION DATE
A
0 FIRST ISSUED -
FG Room
6000
B DRY PACK
DB-WORK BENCH.3
6000
AFTER
AFTER
DB-MFS
DP
DP
23175
VACANT
BEFORE
BEFORE
C
6000
PROJECT
D PROYEK
6000
BATAM 3 PROJECT
E
2500
MATERIAL & SUPPORT
3x PEGASUS Jl. BERINGIN LOT 201 & 202A
6000
PEGASUS
MUKAKUNING
UP DN
F
DB-MSP
6000
PEGASUS
OWNER
G Bake-in PEMILIK
MSP
78000
6000
PEGASUS
LD
H
MF
6000
MSB-FL.3
I PT INFINEON TECHNOLOGIES BATAM
6000
53325
LP3-EM
KONSULTAN RENCANA
J
110000
6000
PP-Z3.1
PT. DACREA Design and Engineering Consultants
K
DACREA
6000
DB-TSP.3
L
DB-LDF.8
6000
DRAWING TITLE
JUDUL GAMBAR
M
3'RD FLOOR
6000
3000
DN UP
LGC UP DN
10000
LGC
PP-Z3.2 APPROVED BY :
24275
P SCALE DRAWING : 1:300
PRAYER ROOM
DB-CANTEEN
5625
DISPLAY
VACANT REFERENSI : REV :
22500
CH ROOM
Q ABLUTION ROOM CANTEEN
R.0
5625
FOR :
TOILET LN2 Refilling
R LN2
LN2
LN2 LN2
CONSTRUCTION DRAWING
3725
LN2 LN2
LN2 LN2
S UP
DN
DRAWING NUMBER
NOMOR GAMBAR
SYMBOL DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11
112500 48215
A A'
6000
7000
B NO REVISION DATE
CHILLER-4 B'
6000
0 FIRST ISSUED -
8000
CT-4
CHILLER-3
C CT-2
6000
CT-2
CHILLER-2
C'
D CT-1
8000
6000
CHILLER-1
DB-CT
SDB-CHILLER CWP-3 CHWP-4 D'
E MCC-CH CWP-3 CHWP-3 PROJECT
DB-CWP+CHWP PROYEK
6000
8000
CWP-2 CHWP-2
CWP-1 CHWP-1
F
F' BATAM 3 PROJECT
6000
8000
Jl. BERINGIN LOT 201 & 202A
G AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
78000
6000
G'
H
8000
OWNER
6000
PEMILIK
MSB-FL.4
H'
I
6000
8000
DB-ROOF
J
110000
J'
6000
8000
K DESIGN CONSULTANT
KONSULTAN RENCANA
6000
K'
L
8000
PT. DACREA Design and Engineering Consultants
6000
L' DACREA
M
6000
8000
DRAWING TITLE
N
N" JUDUL GAMBAR
10000
10000
8000
4'TH FLOOR
PC CT-2 PC CT-1 CABLE LADDER INSTALLATION PLAN
O" PHASE.1-1
O
5625
8000
DB-VACUM NAME SIG. DATE :
PC-CP.1
P DRAWN BY :
AD-1 AD-2 AD-3 AD-4 AD-5 AD-6 AD-7 AD-8 AD-9 AD-10
P' DIGAMBAR :
AF -
5625
(NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW)
2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG 2800 KG SDB-COMP.
CHECKED BY :
PC-AD.1 PC-AD.4 PC-AD.6 PC-AD.8 PC-AD.10 PC-CP.2 RH
DIPERIKSA :
8000
22500
(NEW)
9000 KG
AR-2
9000 L
(EXISTING)
AR-4
2500 L
(EXISTING)
PC-AC.6
9000 KG
PC-AC.5
AC-6
ZR450
PC-AC.4
AC-5
ZR450
PC-AC.3
AC-4
ZR450
PC-AC.2
AC-3
ZR450
PC-AC.1
AC-2
ZR450
AC-1
ZR450
Q' SCALE DRAWING : 1:300
R
2500 KG (NEW) (NEW) (NEW) (NEW) (NEW) (NEW)
7000
(EXISTING)
AR-3 9000 KG
3000 L
(EXISTING)
5625
3000 KG
R.0
S R'
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
NO. DRAWING NO. TITTLE DRAWING SCALE REV. DUE DATE 53 ACM / 323 / MEP / GF / 1.2 / EL-151 WIRING DIAGRAM MINI DB-ASM.DA 16~18 PHASE-1.2 NTS R0 -
0. GENERAL 54 ACM / 323 / MEP / GF / 1.2 / EL-152 WIRING DIAGRAM MINI DB-ASM.DA 19~21 PHASE-1.2 NTS R0 -
1 ACM / 323 / MEP / GN / 1.2 / EL-001 DRAWING LIST ELECTRICAL PHASE-1.2 NTS R0 - 55 ACM / 323 / MEP / GF / 1.2 / EL-153 WIRING DIAGRAM MINI DB-ASM.DA 22~23 PHASE-1.2 NTS R0 -
2 ACM / 323 / MEP / GN / 1.2 / EL-101 SCHEMATIC-1 ELECTRICAL DISTRIBUTION PLAN PHASE-1.2 NTS R0 - 56 ACM / 323 / MEP / GF / 1.2 / EL-154 WIRING DIAGRAM DB-FLUX.C PHASE-1.2 NTS R0 -
3 ACM / 323 / MEP / GN / 1.2 / EL-102 SCHEMATIC-2 ELECTRICAL DISTRIBUTION PLAN PHASE-1.2 NTS R0 - 57 ACM / 323 / MEP / GF / 1.2 / EL-155 WIRING DIAGRAM MINI DB-FLUX.C 1~3 PHASE-1.2 NTS R0 -
NO REVISION DATE
4 ACM / 323 / MEP / GN / 1.2 / EL-103 SITE PLAN LIGHTING INSTALLATION 1:350 R0 - 58 ACM / 323 / MEP / GF / 1.2 / EL-156 WIRING DIAGRAM DB-CD PHASE-1.2 NTS R0 -
59 ACM / 323 / MEP / GF / 1.2 / EL-157 WIRING DIAGRAM MINI DB-CD 1~3 PHASE-1.2 NTS R0 -
60 ACM / 323 / MEP / GF / 1.2 / EL-158 NTS R0 - 0 FIRST ISSUED -
1. WIRING DIAGRAM WIRING DIAGRAM DB-HSFO5 PHASE-1.2
5 ACM / 323 / MEP / GF / 1.2 / EL-104 WIRING DIAGRAM MSB 1A, 2A, 3A PHASE-1.2 NTS R0 - 61 ACM / 323 / MEP / GF / 1.2 / EL-159 WIRING DIAGRAM MINI DB-HSFO5. 1 ~ 3 PHASE-1.2 NTS R0 -
6 ACM / 323 / MEP / GF / 1.2 / EL-105 WIRING DIAGRAM SDB GF1.1, SDB-2'ND, SDB-EMERGENCY PHASE-1.2 NTS R0 - 62 ACM / 323 / MEP / GF / 1.2 / EL-160 WIRING DIAGRAM MINI DB-HSFO5. 4 ~ 6 PHASE-1.2 NTS R0 -
7 ACM / 323 / MEP / GF / 1.2 / EL-106 WIRING DIAGRAM SDB AHU.1 & SDB-AHU.4 PHASE-1.2 NTS R0 - 63 ACM / 323 / MEP / GF / 1.2 / EL-161 WIRING DIAGRAM MINI DB-HSFO5. 7 & 8 PHASE-1.2 NTS R0 -
8 ACM / 323 / MEP / GF / 1.2 / EL-107 WIRING DIAGRAM PP-MB.1 PHASE-1.2 NTS R0 - 64 ACM / 323 / MEP / GF / 1.2 / EL-162 WIRING DIAGRAM DB-TDSON & MINI TDSON 1~8 (TYPICAL) PHASE-1.2 NTS R0 -
9 ACM / 323 / MEP / GF / 1.2 / EL-108 WIRING DIAGRAM PP-MB.2 PHASE-1.2 NTS R0 - 65 ACM / 323 / MEP / GF / 1.2 / EL-163 WIRING DIAGRAM PP-Z3.1 PHASE-1.2 NTS R0 -
10 ACM / 323 / MEP / GF / 1.2 / EL-109 WIRING DIAGRAM PP-MB.3 PHASE-1.2 NTS R0 66 ACM / 323 / MEP / GF / 1.2 / EL-164 WIRING DIAGRAM PP-Z3.2 PHASE-1.2 NTS R0 -
11 ACM / 323 / MEP / GF / 1.2 / EL-110 WIRING DIAGRAM PP-MB.4 PHASE-1.2 NTS R0 - 67 ACM / 323 / MEP / GF / 1.2 / EL-165 WIRING DIAGRAM DB-TSP & MINI DB-TSP (TYPIKAL) PHASE.1-2 NTS R0 -
PROJECT
12 ACM / 323 / MEP / GF / 1.2 / EL-111 WIRING DIAGRAM PP-MB.5 PHASE-1.2 NTS R0 - 68 ACM / 323 / MEP / GF / 1.2 / EL-166 WIRING DIAGRAM MINI DB-WORK BENCH.2 & MINI DB-WORK BENCH PHASE.1-2 NTS R0 - PROYEK
13 ACM / 323 / MEP / GF / 1.2 / EL-112 WIRING DIAGRAM PP-Z1.1 PHASE-1.2 NTS R0 - 69 ACM / 323 / MEP / GF / 1.2 / EL-167 WIRING DIAGRAM MINI DB-EAV & MINI DB-EAV PHASE.1-2 NTS R0 -
14 ACM / 323 / MEP / GF / 1.2 / EL-113 WIRING DIAGRAM PP-Z1.3 PHASE-1.2 NTS R0 - 70 ACM / 323 / MEP / GF / 1.2 / EL-168 WIRING DIAGRAM DB-LM+TF & MINI DB-LM+TF PHASE.1-2 NTS R0 -
15 NTS R0 - 71 ACM / 323 / MEP / GF / 1.2 / EL-169 WIRING DIAGRAM MINI DB-REFLOW & MINI DB-REFLOW PHASE.1-2 NTS R0 - BATAM 3 PROJECT
16 ACM / 323 / MEP / GF / 1.2 / EL-114 WIRING DIAGRAM DB-HSFO8 & MINI DB-HSOF8.1 ~ 18 PHASE-1.2 NTS R0 - 72 ACM / 323 / MEP / GF / 1.2 / EL-170 WIRING DIAGRAM DB-V93K & MINI DB-V93K PHASE.1-2 NTS R0 -
17 ACM / 323 / MEP / GF / 1.2 / EL-115 WIRING DIAGRAM DB-HELLER REFLOW & MINI DB-REFLOW.1 ~ 4 (TYPIKAL) PHASE-1.2 NTS R0 - 73 ACM / 323 / MEP / GF / 1.2 / EL-171 WIRING DIAGRAM DB-FLEX & MINI DB-FLEX.1~9 (TYPIKAL) PHASE.1-2 NTS R0 - Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
18 ACM / 323 / MEP / GF / 1.2 / EL-116 WIRING DIAGRAM PP-Z2.1 PHASE-1.2 NTS R0 - 74 ACM / 323 / MEP / GF / 1.2 / EL-172 WIRING DIAGRAM DB-TSP.3 & MINI DB-TSP.1~15 (TYPIKAL) PHASE.1-2 NTS R0 -
MUKAKUNING
19 ACM / 323 / MEP / GF / 1.2 / EL-117 WIRING DIAGRAM PP-Z2.2 PHASE-1.2 NTS R0 - 75 ACM / 323 / MEP / GF / 1.2 / EL-173 WIRING DIAGRAM DB-MSP & MINI DB-PEGASUS, SRM & MINI DB-OVEN (TYPIKAL) PHASE.1-2 NTS R0 -
20 ACM / 323 / MEP / GF / 1.2 / EL-118 WIRING DIAGRAM MSB-FL.1 & MSB-FL.1 PHASE-1.2 NTS R0 - 76 ACM / 323 / MEP / GF / 1.2 / EL-174 WIRING DIAGRAM DB-MFS & MINI DB-MFS.1~4 (TYPIKAL) PHASE.1-2 NTS R0 -
21 ACM / 323 / MEP / GF / 1.2 / EL-119 WIRING DIAGRAM DB-PROD. GF.1 PHASE-1.2 NTS R0 - 77 ACM / 323 / MEP / GF / 1.2 / EL-175 WIRING DIAGRAM DB-WORKBENCH.3 & MINI DB-DRY PACK MINI DB-WORKBENCH.3 PHASE.1-2 NTS R0 - OWNER
22 ACM / 323 / MEP / GF / 1.2 / EL-120 WIRING DIAGRAM MINI DB-UTC.5K GF.1 PHASE-1.2 NTS R0 - 78 ACM / 323 / MEP / GF / 1.2 / EL-176 WIRING DIAGRAM DB-HYDRANT & PLUMBING PHASE.1-2 NTS R0 - PEMILIK
23 ACM / 323 / MEP / GF / 1.2 / EL-121 WIRING DIAGRAM MINI DB-UTC.5K GF.2 PHASE-1.2 NTS R0 - 79 ACM / 323 / MEP / GF / 1.2 / EL-177 WIRING DIAGRAM DB-COMPRESSOR PHASE.1-2 NTS R0 -
24 ACM / 323 / MEP / GF / 1.2 / EL-122 WIRING DIAGRAM MINI DB-UTC.5K GF.3 PHASE-1.2 NTS R0 - 80 ACM / 323 / MEP / GF / 1.2 / EL-178 WIRING DIAGRAM DB-VACUM & DB-LIFT PHASE.1-2 NTS R0 -
25 ACM / 323 / MEP / GF / 1.2 / EL-123 WIRING DIAGRAM MINI DB-UTC.5K GF.4 PHASE-1.2 NTS R0 - 81 ACM / 323 / MEP / GF / 1.2 / EL-179 WIRING DIAGRAM DB-CANTEEN 2'ND & DB-CANTEEN 3'RD PHASE.1-2 NTS R0 -
26 ACM / 323 / MEP / GF / 1.2 / EL-124 WIRING DIAGRAM MINI DB-UTC.5K GF.5 PHASE-1.2 NTS R0 - 82 ACM / 323 / MEP / GF / 1.2 / EL-180 WIRING DIAGRAM DB-LDF 2 & DB-LDF 3 PHASE.1-2 NTS R0 -
27 ACM / 323 / MEP / GF / 1.2 / EL-125 WIRING DIAGRAM MINI DB-UTC.5K GF.6 PHASE-1.2 NTS R0 - 83 ACM / 323 / MEP / GF / 1.2 / EL-181 WIRING DIAGRAM DB-LDF 4 & DB-LDF 5 PHASE.1-2 NTS R0 -
28 ACM / 323 / MEP / GF / 1.2 / EL-126 WIRING DIAGRAM MINI DB-UTC.5K GF.7 PHASE-1.2 NTS R0 - 84 ACM / 323 / MEP / GF / 1.2 / EL-182 WIRING DIAGRAM DB-LDF 6 & DB-LDF 7 PHASE.1-2 NTS R0 - PT INFINEON TECHNOLOGIES BATAM
29 ACM / 323 / MEP / GF / 1.2 / EL-127 WIRING DIAGRAM MINI DB-UTC.5K GF.8 PHASE-1.2 NTS R0 - 85 ACM / 323 / MEP / GF / 1.2 / EL-183 WIRING DIAGRAM DB-LDF 9 PHASE.1-2 NTS R0 -
30 ACM / 323 / MEP / GF / 1.2 / EL-128 WIRING DIAGRAM MINI DB-DELOVOTEC GF.9 PHASE-1.2 NTS R0 - 86 ACM / 323 / MEP / GF / 1.2 / EL-184 WIRING DIAGRAM SDB-EMERGENCY PHASE.1-2 NTS R0 - DESIGN CONSULTANT
31 ACM / 323 / MEP / GF / 1.2 / EL-129 WIRING DIAGRAM MINI DB-DELOVOTEC GF.10 PHASE-1.2 NTS R0 - 87 ACM / 323 / MEP / GF / 1.2 / EL-185 WIRING DIAGRAM DB-SERVER.2 & DB-SERVER.2 PHASE.1-2 NTS R0 - KONSULTAN RENCANA
32 ACM / 323 / MEP / GF / 1.2 / EL-130 WIRING DIAGRAM DB-PROD.GF.2 PHASE-1.2 NTS R0 - 88 ACM / 323 / MEP / GF / 1.2 / EL-186 WIRING DIAGRAM MSB-FL.3 & MSB-FL.4 PHASE-1.2 NTS R0 -
33 ACM / 323 / MEP / GF / 1.2 / EL-131 WIRING DIAGRAM MINI DB-DELOVOTEC GF.10 PHASE-1.2 NTS R0 - 89 ACM / 323 / MEP / GF / 1.2 / EL-187 WIRING DIAGRAM DB-SCRUBBER PHASE.1-2 NTS R0 -
34 ACM / 323 / MEP / GF / 1.2 / EL-132 WIRING DIAGRAM MINI DB-FAV GF.12 PHASE-1.2 NTS R0 - 90 ACM / 323 / MEP / GF / 1.2 / EL-188 WIRING DIAGRAM DB-ASM.MOLD & DB-FICO MOLD PHASE.1-2 NTS R0 - PT. DACREA Design and Engineering Consultants
35 ACM / 323 / MEP / GF / 1.2 / EL-133 WIRING DIAGRAM MINI DB-FAV GF.13 PHASE-1.2 NTS R0 - 91 ACM / 323 / MEP / GF / 1.2 / EL-189 WIRING DIAGRAM DB-ASM.AD & DB-PMC PHASE.1-2 NTS R0 -
DACREA
36 ACM / 323 / MEP / GF / 1.2 / EL-134 WIRING DIAGRAM MINI DB-FAV GF.14 PHASE-1.2 NTS R0 - 92 ACM / 323 / MEP / GF / 1.2 / EL-190 WIRING DIAGRAM DB-SNP+A2 & PP-IDEAL MOLD PHASE.1-2 NTS R0 -
37 ACM / 323 / MEP / GF / 1.2 / EL-135 WIRING DIAGRAM MINI DB-FAV GF.15 PHASE-1.2 NTS R0 -
38 ACM / 323 / MEP / GF / 1.2 / EL-136 WIRING DIAGRAM MINI DB-FAV GF.16 PHASE-1.2 NTS R0 - 2. LAYOUT LIGHTING
39 ACM / 323 / MEP / GF / 1.2 / EL-137 WIRING DIAGRAM MINI DB-FAV GF.17 PHASE-1.2 NTS R0 - 93 ACM / 323 / MEP / GF / 1.2 / EL-200 GROUND FLOOR LIGHTING INSTALLATION PLAN PHASE-1.2, SHEET.2-1 1:225 R0 - DRAWING TITLE
40 ACM / 323 / MEP / GF / 1.2 / EL-138 WIRING DIAGRAM MINI DB-FAV GF.18 PHASE-1.2 NTS R0 - 94 ACM / 323 / MEP / GF / 1.2 / EL-201 GROUND FLOOR LIGHTING INSTALLATION PLAN PHASE-1.2, SHEET.2-2 1:225 R0 - JUDUL GAMBAR
41 ACM / 323 / MEP / GF / 1.2 / EL-139 WIRING DIAGRAM MINI DB-FAV GF.19 PHASE-1.2 NTS R0 - 95 ACM / 323 / MEP / 2'ND / 1.2 / EL-202 2'ND FLOOR LIGHTING INSTALLATION PLAN PHASE-1.2 1:300 R0 -
42 ACM / 323 / MEP / GF / 1.2 / EL-140 WIRING DIAGRAM MINI DB-FAV GF.20 PHASE-1.2 NTS R0 - 96 ACM / 323 / MEP / 3'RD / 1.2 / EL-203 3'RD FLOOR LIGHTING INSTALLATION PLAN PHASE-1.2 1:300 R0 - DRAWING LIST
43 ACM / 323 / MEP / GF / 1.2 / EL-141 WIRING DIAGRAM DB-PLASMA PHASE-1.2 NTS R0 - ELECTRICAL
44 ACM / 323 / MEP / GF / 1.2 / EL-142 WIRING DIAGRAM MINI DB-PLASMA 1~3 PHASE-1.2 NTS R0 - 3. LAYOUT SOCKET OUTLET & CABLE LADDER PHASE-1.2
45 ACM / 323 / MEP / GF / 1.2 / EL-143 WIRING DIAGRAM MINI DB-PLASMA 4~6 PHASE-1.2 NTS R0 - 97 ACM / 323 / MEP / GF / 1.2 / EL-300 GROUND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE-1.2, SHEET.2-1 1:225 R0 -
46 ACM / 323 / MEP / GF / 1.2 / EL-144 WIRING DIAGRAM MINI DB-PLASMA 7~8 PHASE-1.2 NTS R0 - 98 ACM / 323 / MEP / GF / 1.2 / EL-301 GROUND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE-1.2, SHEET.2-2 1:225 R0 -
NAME SIG. DATE :
47 ACM / 323 / MEP / GF / 1.2 / EL-145 WIRING DIAGRAM DB-ASM.DA PHASE-1.2 NTS R0 - 99 ACM / 323 / MEP / 2'ND / 1.2 / EL-302 2'ND FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE-1.2 1:300 R0 -
DRAWN BY :
48 ACM / 323 / MEP / GF / 1.2 / EL-146 WIRING DIAGRAM MINI DB-ASM.DA 1~3 PHASE-1.2 NTS R0 - 100 ACM / 323 / MEP / 3'RD / 1.2 / EL-303 3'RD FLOOR SOCKET OUTLET INSTALLATION PLAN PHASE-1.2 1:300 R0 - DIGAMBAR : AF
49 ACM / 323 / MEP / GF / 1.2 / EL-147 WIRING DIAGRAM MINI DB-ASM.DA 4~6 PHASE-1.2 NTS R0 - 101 ACM / 323 / MEP / GF / 1.2 / EL-304 GROUND FLOOR CABLE LADDER INSTALLATION PLAN PHASE-1.2 1:300 R0 - CHECKED BY :
DIPERIKSA : RH
50 ACM / 323 / MEP / GF / 1.2 / EL-148 WIRING DIAGRAM MINI DB-ASM.DA 7~9 PHASE-1.2 NTS R0 - 102 ACM / 323 / MEP / GF / 1.2 / EL-305 2'ND FLOOR CABLE LADDER INSTALLATION PLAN PHASE-1.2 1:300 R0 -
APPROVED BY :
51 ACM / 323 / MEP / GF / 1.2 / EL-149 WIRING DIAGRAM MINI DB-ASM.DA 10~12 PHASE-1.2 NTS R0 - 103 ACM / 323 / MEP / 2'ND / 1.2 / EL-306 3'RD FLOOR CABLE LADDER INSTALLATION PLAN PHASE-1.2 1:300 R0 - DISETUJUI : AN
52 ACM / 323 / MEP / GF / 1.2 / EL-150 WIRING DIAGRAM MINI DB-ASM.DA 13~15 PHASE-1.2 NTS R0 -
SCALE DRAWING : N.T.S
REFERENSI : REV :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
3'RD FLOOR
NO REVISION DATE
0 FIRST ISSUED -
2'ND FLOOR
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
3'RD FLOOR
2'ND FLOOR
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
B.I.C DIPERIKSA :
APPROVED BY :
SG 201 DISETUJUI :
AN
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
4'th FLOOR
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
BY B.I.C BY BAT-3
2'nd FLOOR PT. DACREA Design and Engineering Consultants
DACREA
UTILITY ROOM - 2
B.I.C
SCHEMATIC-2
ELECTRICAL DISTRIBUTION PLAN
B.I.C EAST WING
SG 201 PHASE-1.2
NAME SIG. DATE :
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
UTILITY ROOM - 3 APPROVED BY :
B.I.C AN
DISETUJUI :
R.0
FOR :
CONSTRUCTION DRAWING
FROM GENSET AT MAIN BUILDING
GF FLOOR
DRAWING NUMBER
NOMOR GAMBAR
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 14750 15000 14750 3715
112500 48215
570000
700000
600000
60000
70000
600000
585108
570000
1865000
335000
2502750
60000
190000
A A'
6000
7000
800054.8726
520000
8000
C
6055
C'
ASM AD DAV-FAV S-7 SON WB-UTC5K-S7
FORMING GAS AREA ( BY OTHERS )
8000
Support SUPPORT
6000
8000
LAB
6000
30000 30000
MATL
F PROJECT
F'
PLASMA
PM PROYEK
6000
CLEAN PM TEMP
SON PMC
8000
ASM MOLD MOLDING FICO MOLD
FLUX CLEANING
G (S7) SON
PPB
BATAM 3 PROJECT
6000
8000
(SON)
CHEMICAL ROOM AT BATAMINDO INDUSTRIAL PARK,
3000
6000
MUKAKUNING
H'
I
RACK Material & Support : thawing compound
8000
6000
LAB OWNER
PEMILIK
110000
J
110500
J'
6000
8000
K
30000
6000
8000
PT INFINEON TECHNOLOGIES BATAM
6000
122445.1274 800054.8726
8000
6000
N W.2.4 H.2.6
EOL
N"
PASS
BOX
CHANGING ROOM
MACHINE
TRANSFER PT. DACREA Design and Engineering Consultants
EOL COLD STORAGE
8000
SUMP SNP
10000
MACHINE
16000
TRANSFER
AUTO DOOR W.2.4 H.2.6 DACREA
O"
O
LIFT
8000
5625
LDF
Sn EQUALIZING TANK
A2 EQUALIZING TANK GENSET
DRAWING TITLE
RO RO
PRODUCT
TANK
PRODUCT
TANK
TRANSFORMER HIGH
P RO UNIT 1 RO UNIT 2 MIXED BED PROCESS
ORP 2
WWTP
8000
FLOCCULATION
Q SITE PLAN
CATRIDGE
FILTER
CLINIC
LIGHTING INSTALLATION
5625
CIP
FeCl3 TANK
Q'
NaOH
SOFTENER VESSEL
Na2SO4 PA
R
BRINE BRINE
TANK TANK
1020000
HCl PC FILTER
7000
PRESS
C
A S
R
B
A
N
SOFTENER VESSEL
THICKENER O D
C
N F
I A
F S R
I L
R'
R I
A I
T L
S
L
A N T
K T
N E E
K
DRAWN BY :
R R
T T
A A
HMR VESSEL
N
K
N
K LOADING DOCK AF
DIGAMBAR :
60000 56430 2935 41565 625000
CHECKED BY :
RH
675000
DIPERIKSA :
APPROVED BY :
AN
1000000
DISETUJUI :
SITEPLAN
SCALE 1 : 350 R.0
500000
79450
400000
120000 120000
FOR :
100000 100000 100000
CONSTRUCTION DRAWING
450000 450000 450000
DRAWING NUMBER
NOMOR GAMBAR
POWER METER
NO REVISION DATE
TOTAL
POWER METER
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
WIRING DIAGRAM
POWER METER
MSB-1A, 2A & 3A
PHASE-1-2
DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
TOTAL
NOMOR GAMBAR
DEMAND FACTOR
GRAND TOTAL ACM / 323 / MEP / GF / 1.2 / EL-104
D-PROJECT
NOTES :
NEW DB-AHU.1
380/220V, 3Ph, 50Hz
M
POWER METER 3~
M
3~
PROJECT
PROYEK
OWNER
PEMILIK
NEW DB-AHU.2
380/220V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
M
POWER METER 3~
M DRAWING TITLE
3~ JUDUL GAMBAR
SETTING :
ELR : 5A / 0.3 (SECOND) WIRING DIAGRAM
NEW DB-AHU.1 & NEW DB-AHU.2
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
R.0
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.1/PHASE 1.2
380/220V, 3Ph, 50Hz
NO REVISION DATE
B B
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.1
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.2/PHASE 1.2
380/220V, 3Ph, 50Hz
B B
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.2
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.3
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.4/PHASE 1.2
380/220V, 3Ph, 50Hz
B B
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.4
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PP-MB.5/PHASE 1.2
380/220V, 3Ph, 50Hz
B
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DB-CHEMICAL
380/220V, 3Ph, 50Hz B
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-MB.5 & DB-CHEMICAL
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PP-Z1.1/PHASE 1.2
380/220V, 3Ph, 50Hz
NO REVISION DATE
B
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z1.1
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PP-Z1.2 / PHASE 1.2
380/220V, 3Ph, 50Hz
B B
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z1.2
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-HSOF8
380/220V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
MINI DB-HSOF8.1~18 (TYPIKAL) JUDUL GAMBAR
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-HELLER REFLOW
380/220V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
TOTAL
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-HELLER REFLOW &
MINI DB-REFLOW
PHASE 1.2
NAME SIG. DATE :
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PP-Z2.1
380/220V, 3Ph, 50Hz
B B B B
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z2.1
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PP-Z2.2
380/220V, 3Ph, 50Hz
B B B
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z2.2
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MSB-FL.1
380/220V, 3Ph, 50Hz
POWER METER
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
TOTAL
BATAM 3 PROJECT
DEMAND FACTOR
GRAND TOTAL Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
MSB-FL.2
OWNER
380/220V, 3Ph, 50Hz PEMILIK
POWER METER
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-FL.1 & DB-FL.2
PHASE.1-2
DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
R.0
FOR :
CONSTRUCTION DRAWING
TOTAL
DRAWING NUMBER
NOMOR GAMBAR
DEMAND FACTOR
GRAND TOTAL ACM / 323 / MEP / GF / 1.2 / EL-118
D-PROJECT
NOTES :
NO REVISION DATE
DB-PROD.GF-1
380/220V, 3Ph, 50Hz
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.1
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.2
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.3
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.4
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.5
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.6
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.7
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-UTC.5K GF.8
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-DELOVOTEC GF.9
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-DELOVOTEC GF.10
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
DB-PROD.GF-2
380/220V, 3Ph, 50Hz
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
TOTAL
WIRING DIAGRAM
DB-PROD.GF-2
PHASE.1-2
NAME SIG. DATE :
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-DELOVOTEC GF.11
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.12
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
MINI DB-FAV GF.13
380/230V, 3Ph, 50Hz
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.13
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
MINI DB-FAV GF.14
380/230V, 3Ph, 50Hz
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.14
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.15
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.16
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.17
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.18
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.19
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-FAV GF.20
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-PLASMA
380/220V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-PLASMA
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-PLASMA.1
380/230V, 3Ph, 50Hz
NO REVISION DATE
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-PLASMA.3
DRAWING TITLE
380/230V, 3Ph, 50Hz
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-PLASMA.1~3
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-PLASMA.4
380/230V, 3Ph, 50Hz
NO REVISION DATE
MINI DB-PLASMA.5
PROJECT
380/230V, 3Ph, 50Hz PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
WIRING DIAGRAM
MINI DB-PLASMA.4~6
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-PLASMA.7
380/230V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
MINI DB-PLASMA.8 PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-PLASMA.7~8
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-ASM.DA
380/220V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
TOTAL
DRAWING TITLE
JUDUL GAMBAR
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-ASM.DA.1
380/230V, 3Ph, 50Hz
NO REVISION DATE
MINI DB-ASM.DA.2
PROJECT
380/230V, 3Ph, 50Hz PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-ASM.DA.3
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM.DA 1~3
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-ASM.DA.4
380/230V, 3Ph, 50Hz
NO REVISION DATE
MINI DB-ASM.DA.5
380/230V, 3Ph, 50Hz PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-ASM.DA.6
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM.DA 4~6
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-ASM.DA.7
380/230V, 3Ph, 50Hz
NO REVISION DATE
MINI DB-ASM.DA.8
380/230V, 3Ph, 50Hz PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-ASM.DA.9
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM.DA 7~9
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
MINI DB-ASM.DA.11
PROJECT
PROYEK
380/230V, 3Ph, 50Hz
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
MINI DB-ASM.DA.14
380/230V, 3Ph, 50Hz PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-ASM.DA.15
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM.DA 13~15
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
MINI DB-ASM.DA.17
380/230V, 3Ph, 50Hz PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-ASM.DA.18
DRAWING TITLE
380/230V, 3Ph, 50Hz
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM.DA 16~18
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
MINI DB-ASM.DA.20
380/230V, 3Ph, 50Hz PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-ASM.DA.21
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM.DA 19~21
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-ASM.DA.22
380/230V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
MINI DB-ASM.DA.23
380/230V, 3Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-ASM.DA 22~23
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
DB-FLUX.C
380/220V, 3Ph, 50Hz PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-FLUX.C
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-FLUX.C.1
380/230V, 3Ph, 50Hz
NO REVISION DATE
MINI DB-FLUX.C.2
PROJECT
PROYEK
380/230V, 3Ph, 50Hz
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-FLUX.C.3
DRAWING TITLE
JUDUL GAMBAR
380/230V, 3Ph, 50Hz
WIRING DIAGRAM
MINI DB-FLUX C. 1~3
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
DB-CD
380/220V, 3Ph, 50Hz
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
TOTAL
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-CD
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-CD.1
380/230V, 3Ph, 50Hz
NO REVISION DATE
MINI DB-CD.2
PROJECT
PROYEK
380/230V, 3Ph, 50Hz
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-CD.3
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-CD. 1~3
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-HSF05
380/220V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-HSFO5
PHASE.1-2
TOTAL
NAME SIG. DATE :
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-HSF05.1
380/230V, 3Ph, 50Hz
NO REVISION DATE
MINI DB-HSF05.2
PROJECT
PROYEK
380/230V, 3Ph, 50Hz
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-HSF05.3
DRAWING TITLE
JUDUL GAMBAR
380/230V, 3Ph, 50Hz
WIRING DIAGRAM
MINI DB-HSFO5. 1~3
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-HSF05.4
380/230V, 3Ph, 50Hz
NO REVISION DATE
MINI DB-HSF05.5
PROJECT
PROYEK
380/230V, 3Ph, 50Hz
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
MINI DB-HSF05.6
DRAWING TITLE
380/230V, 3Ph, 50Hz JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-HSFO5. 4~6
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
MINI DB-HSF05.7
380/230V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
MINI DB-HSF05.8
380/230V, 3Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-HSFO5. 7 & 8
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-TDSON
380/220V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
WIRING DIAGRAM
DB-TDSON & MINI DB-TDSON.1~8
(TYPIKAL)
PHASE.1-2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
NO REVISION DATE
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
TOTAL JUDUL GAMBAR
WIRING DIAGRAM
PP-Z3.1
PHASE 1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PP-Z3.2/PHASE 1.2
380/220V, 3Ph, 50Hz
B NO REVISION DATE
B B
PROJECT
PROYEK
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
PP-Z3.2
PHASE 1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
SCALE DRAWING :
REFERENSI : REV :
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-TSP.2
380/220V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
SETTING :
ELR : 5A / 0.3 (SECOND)
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
TOTAL SCALE DRAWING : N.T.S
REFERENSI : REV :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-WORK BENCH.2
380/220V, 3Ph, 50Hz
POWER METER
SETTING :
ELR : 5A / 0.3 (SECOND)
0 FIRST ISSUED -
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
PT. DACREA Design and Engineering Consultants
DACREA
MINI DB-SMARTSCOPE
DRAWING TITLE
380/230V, 3Ph, 50Hz
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-WORK BENCH.2 &
MINI DB-WORK BENCH
PHASE.1-2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
TOTAL
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
POWER METER
NO REVISION DATE
0 FIRST ISSUED -
SETTING :
ELR : 5A / 0.3 (SECOND)
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
MINI DB-EAV.ACE.1~15 (TYPIKAL)
380/230V, 3Ph, 50Hz PT. DACREA Design and Engineering Consultants
DACREA
DRAWING TITLE
JUDUL GAMBAR
TOTAL WIRING DIAGRAM
MINI DB-EAV & MINI DB-EAV
PHASE.1-2
DRAWN BY :
DIGAMBAR : AF
MINI DB-EAV.COHU.1~8 (TYPIKAL) CHECKED BY :
DIPERIKSA : RH
380/230V, 3Ph, 50Hz APPROVED BY :
DISETUJUI : AN
R.0
FOR :
TOTAL
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
POWER METER
SETTING :
ELR : 5A / 0.3 (SECOND)
NO REVISION DATE
0 FIRST ISSUED -
TOTAL
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
TOTAL KONSULTAN RENCANA
WIRING DIAGRAM
DB-LM+TF &
MINI DB-LM+TF
TOTAL PHASE.1-2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
MINI DB-LC.1~2 (TYPIKAL) DISETUJUI : AN
R.0
FOR :
TOTAL
SETTING : CONSTRUCTION DRAWING
ELR : 5A / 0.3 (SECOND)
DRAWING NUMBER
NOMOR GAMBAR
DB-REFLOW
380/220V, 3Ph, 50Hz
NO REVISION DATE
PROJECT
PROYEK
SETTING :
ELR : 5A / 0.3 (SECOND)
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
PT. DACREA Design and Engineering Consultants
DACREA
MINI DB-REFLOW.1~11 (TYPIKAL)
380/230V, 3Ph, 50Hz DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MINI DB-REFLOW &
MINI DB-REFLOW
PHASE.1-2
DRAWN BY :
TOTAL DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
SETTING :
APPROVED BY :
ELR : 5A / 0.3 (SECOND) DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-V93K
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
POWER METER
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
WIRING DIAGRAM
DB-V93K & MINI DB-V93K
PHASE.1-2
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-FLEX
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
POWER METER
PROJECT
PROYEK
SETTING :
BATAM 3 PROJECT
ELR : 5A / 0.3 (SECOND)
OWNER
PEMILIK
TOTAL
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
MINI DB-FLEX.1~9 (TYPIKAL) KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-FLEX &
TOTAL MINI DB-FLEX.1~9 (TYPIKAL)
PHASE.1-2
SETTING :
ELR : 5A / 0.3 (SECOND)
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-TSP.3
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
POWER METER
PROJECT
PROYEK
BATAM 3 PROJECT
SETTING : Jl. BERINGIN LOT 201 & 202A
ELR : 5A / 0.3 (SECOND) AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-TSP.3 &
MINI DB-TSP.1~15 (TYPIKAL)
PHASE.1-2
TOTAL
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
POWER METER
SETTING :
ELR : 5A / 0.3 (SECOND)
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
TOTAL
Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
MUKAKUNING
TOTAL
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
TOTAL DB-MSP & MINI DB-PEGASUS, SRM,
& MINI DB-OVEN (TYPIKAL)
PHASE.1-2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
MINI DB-OVEN.1~4 (TYPIKAL) APPROVED BY :
AN
DISETUJUI :
380/230V, 3Ph, 50Hz
SCALE DRAWING : N.T.S
REFERENSI : REV :
R.0
FOR :
DRAWING NUMBER
NOMOR GAMBAR
DB-MFS
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
POWER METER
PROJECT
PROYEK
SETTING :
ELR : 5A / 0.3 (SECOND) BATAM 3 PROJECT
TOTAL
OWNER
PEMILIK
DESIGN CONSULTANT
380/230V, 3Ph, 50Hz KONSULTAN RENCANA
DRAWING TITLE
TOTAL JUDUL GAMBAR
WIRING DIAGRAM
DB-MFS & MINI DB-MFS.1~4 (TYPIKAL)
PHASE.1-2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-WORK BENCH.3
380/220V, 3Ph, 50Hz
POWER METER
PROJECT
PROYEK
MINI DB-DRY PACK.1~3 (TYPIKAL)
380/230V, 3Ph, 50Hz BATAM 3 PROJECT
OWNER
PEMILIK
TOTAL
DESIGN CONSULTANT
KONSULTAN RENCANA
WIRING DIAGRAM
DB-WORKBENCH.3 & MINI DB-DRY PACK
MINI DB-WORKBENCH.3
PHASE.1-2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
TOTAL
DRAWING NUMBER
NOMOR GAMBAR
DB-HYDRANT
380/220V, 3Ph, 50Hz
M
POWER METER 3~
M
3~
NO REVISION DATE
SETTING :
0 FIRST ISSUED -
ELR : 5A / 0.3 (SECOND)
PROJECT
PROYEK
TOTAL
BATAM 3 PROJECT
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-HYDRANT & DB-PLUMBING
PHASE.1-2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
TOTAL R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SDB-COMPRESSOR
380/220V, 3Ph, 50Hz
M
3~
NO REVISION DATE
M
3~
0 FIRST ISSUED -
M
3~
POWER METER
M
3~
M
3~
M
PROJECT
3~ PROYEK
M
3~
SETTING :
ELR : 5A / 0.3 (SECOND)
BATAM 3 PROJECT
M
3~
Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
M
3~ MUKAKUNING
M
3~
OWNER
M
PEMILIK
3~
M
3~
M
3~
M
3~
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
M
3~ KONSULTAN RENCANA
M
3~
M
PT. DACREA Design and Engineering Consultants
3~
DACREA
M
3~
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
SDB-COMPRESOR
PHASE-1.2
DRAWN BY :
DIGAMBAR : AF
DF CHECKED BY :
RH
DIPERIKSA :
TOTAL
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-VACUM
380/220V, 3Ph, 50Hz
NO REVISION DATE
M
POWER METER 3~ 0 FIRST ISSUED -
M
3~
SETTING : PROJECT
ELR : 5A / 0.3 (SECOND) PROYEK
BATAM 3 PROJECT
DB-LIFT NEW
380/220V, 3Ph, 50Hz
PT INFINEON TECHNOLOGIES BATAM
DESIGN CONSULTANT
M KONSULTAN RENCANA
POWER METER 3~
SETTING :
DRAWING TITLE
ELR : 5A / 0.3 (SECOND)
JUDUL GAMBAR
WIRING DIAGRAM
DB-VACUM & DB-LIFT.NEW
PHASE 1.2
DRAWN BY :
DIGAMBAR : AF
TOTAL CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-CANTEEN 2'ND
380/220V, 3Ph, 50Hz
B B
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
TOTAL OWNER
PEMILIK
DB-CANTEEN 3'RD
PT INFINEON TECHNOLOGIES BATAM
380/220V, 3Ph, 50Hz
B DESIGN CONSULTANT
B B
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-CANTEEN 2'ND & 3'RD
PHASE 1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
AN
TOTAL DISETUJUI :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-LDF.2 SDB-LDF.2
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DB-LDF.3 SDB-LDF.3
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LDF.2 & DB-LDF.3
PHASE 1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-LDF.4 SDB-LDF.4
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DB-LDF.5 SDB-LDF.5
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LDF.4 & DB-LDF.5
PHASE 1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-LDF.6 SDB-LDF.6
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DB-LDF.7 SDB-LDF.7
380/220V, 3Ph, 50Hz 220/230V, 1Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LDF.6 & DB-LDF.7
PHASE 1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-LDF.9
PHASE 1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SDB-EMERGENCY
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
POWER METER
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
SDB-EMERGENCY
PHASE-1.2
TOTAL
NAME SIG. DATE :
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SDB-SERVER
DB-SERVER.1
380/220V, 3Ph, 50Hz
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-SERVER.1 & DB-SERVER.2
PHASE 1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
MSB-FL.3
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
TOTAL PEMILIK
DEMAND FACTOR
GRAND TOTAL
MSB-FL.4
PT INFINEON TECHNOLOGIES BATAM
380/220V, 3Ph, 50Hz
DESIGN CONSULTANT
KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
MSB-FL.3 & MSB-FL.4
PHASE-1.2
DRAWN BY :
AF -
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
R.0
TOTAL FOR :
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
DB-SCRUBBER
BY OTHER
380/220V, 3Ph, 50Hz
BATAM 3 PROJECT
OWNER
PEMILIK
DESIGN CONSULTANT
KONSULTAN RENCANA
TOTAL
PT. DACREA Design and Engineering Consultants
DACREA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-SCRUBBER
PHASE-1.2
DRAWN BY :
AF
DIGAMBAR :
CHECKED BY :
RH
DIPERIKSA :
APPROVED BY :
AN
DISETUJUI :
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-ASM.MOLD
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
TOTAL
DESIGN CONSULTANT
380/220V, 3Ph, 50Hz KONSULTAN RENCANA
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-ASM.MOLD & FICO.MOLD
PHASE-1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
TOTAL FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
DB-ASM.AD
380/220V, 3Ph, 50Hz
NO REVISION DATE
0 FIRST ISSUED -
PROJECT
PROYEK
BATAM 3 PROJECT
OWNER
PEMILIK
TOTAL
DRAWING TITLE
JUDUL GAMBAR
WIRING DIAGRAM
DB-ASM.AD & DB-PMC
PHASE-1.2
DRAWN BY :
DIGAMBAR : AF
CHECKED BY :
DIPERIKSA : RH
APPROVED BY :
DISETUJUI : AN
R.0
TOTAL FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
6000
9700
B FFL.±0.000
B B
FFL.±0.000 B
Vacant
6000
C B
8300
6000
VacantVACANT
D
DMC
(BY OTHERS)
6000
EXIT
B NO REVISION DATE
IN
E
0 FIRST ISSUED -
6000
20500
F
B
6000
G PROJECT
PHASE 1.1 PROYEK
78000
6000
3000
B
H BATAM 3 PROJECT
6000
OWNER
PEMILIK
PHASE 1.1
Vacant
30500
6000
DESIGN CONSULTANT
KONSULTAN RENCANA
L
PT. DACREA Design and Engineering Consultants
6000
DACREA
M
3000
6000
3000
EXIT EXIT
ELECTRICAL ROOM MINISTORE DRAWING TITLE
IN IN ELECTRICAL ROOM
JUDUL GAMBAR
N
GROUND FLOOR
MOBILE COMPACTOR AREA
PHASE 1.1
CHANGING ROOM LIGHTING INSTALLATION PLAN
10000
PHASE.1-2, SHEET.2-1
W.1.8
CORRIDOR
NAME SIG. DATE :
O DRAWN BY :
DIGAMBAR : AF
5625
PHASE 1.1
REFERENSI : REV :
22500
WWTP
Q PHASE 1.1 R.0
5625
FOR :
R CONSTRUCTION DRAWING
5625
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225 S
ACM / 323 / MEP / GF / 1.2 / EL-200
D-PROJECT
NOTES :
PHASE 1.1
FEMALE'S TOILET
A-DOOR
DOOR
NO REVISION DATE
BUND WALL H.150mm
76600
MATERIAL SUPPORT AREA
0 FIRST ISSUED -
BUND WALL H.150mm
PHASE 1.1
BUND WALL H.150mm
B B
PROJECT
110000
B B
PROYEK
B B
PM
SUPPORT & MATERIAL AREA BATAM 3 PROJECT
CD/SnP
B B
Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
FFL.±0.000
MUKAKUNING
B B
OWNER
VACANT PEMILIK
VACANT
B B
ELECTRICAL ROOM
PT INFINEON TECHNOLOGIES BATAM
PHASE 1.1
UP DESIGN CONSULTANT
EXIT
SUMP SNP
3850
COLD STORAGE KONSULTAN RENCANA
DISPLAY
AUTO DOOR FOOD DISPLAY
CORRIDOR
B B B PT. DACREA Design and Engineering Consultants
DACREA
LDF
16850
HIGH
FFL.±0.000
TRANSFORMER ROOM VOLTAGE
OPEN SPACE
PHASE 1.1 DRAWING TITLE
JUDUL GAMBAR
LOCKER AREA
ATTIRE CANTEEN B B B
2000
CORRIDOR
LOCKET
PHASE 1.1
7000
FEMALE TOILET
DRAWN BY :
ELECTRICAL AF
SECURITY
DIGAMBAR :
MALE TOILET
TRANSFOMER
FFL.-0.050 CORRIDOR FFL.±0.000 FFL.±0.000 CHECKED BY :
RH
ROOM DIPERIKSA :
APPROVED BY :
UP DISETUJUI : AN
UP UP UP
SCALE DRAWING : 1:225
REFERENSI : REV :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.2 / EL-201
D-PROJECT
NOTES :
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
B
A
CORRIDOR
6000
Spare Parts Spare Parts Spare Parts Spare Parts Spare Parts
Cabinet Cabinet Cabinet Cabinet Cabinet
Spare Parts
Cabinet
IT
ROOM NO REVISION DATE
B
Work Station Work Station
B B
3x5
Sp part PM
6000
0 FIRST ISSUED -
C B B
6000
AHU
D
PP-Z2.1
6000
B B
E PROJECT
TOILET
PROYEK
6000
UP DN
F REFLOW
BATAM 3 PROJECT
B B
6000
VACANT AHU
H OWNER
CORRIDOR
PEMILIK
6000
I
6000
TOILET PANEL
ROOM
LC & DBC
LP2-EM
J
PP-Z2.1
PT INFINEON TECHNOLOGIES BATAM
6000
DESIGN CONSULTANT
K KONSULTAN RENCANA
PP-Z2.2
6000
PHASE 1.1
L EAV
PT. DACREA Design and Engineering Consultants
6000
AHU
DACREA
M
PP-Z2.2
6000
DRAWING TITLE
N JUDUL GAMBAR
B
DN UP
UP DN
2'ND FLOOR
10000
Utility
UTILITY
PHASE 1.1
12 Visual INSP
TESTING AREA
LIGHTING INSTALLATION PLAN
PHASE 1.1
TOILET
B B
PHASE.1-2
O
CORRIDOR
MATERIAL & SUPPORT
5625
Turret
DRAWN BY :
P DN UNION ROOM
W/Station
with
Spool
DIGAMBAR :
AF -
VOID AHU
5625
RH
B B
DIPERIKSA :
VOID
22500
UP APPROVED BY :
RAILING
10
10
10
TOILET
REFERENSI : REV :
10
10
10
10
PRAYING ROOM
OFFICE
5625
RAILING
R.0
CORRIDOR
S UP
FOR :
DN
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3750 B
112500 44500
6980 38320 18100 49100 42000 2500
A A'
7000
6000
B B
8000
22700
0 FIRST ISSUED -
C
B B
C'
6000
8000
D
6000
B B
D'
E
PROJECT
8000
6000
PROYEK
F F'
BATAM 3 PROJECT
6000
B B
8000
G Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
G'
6000
MUKAKUNING
8000
H
PP-Z3.1
B B
OWNER
6000
56300
PEMILIK
H'
I
8000
PP-Z3.2
6000
B B
110000
J
110500
J'
6000
MC transfer
PP-Z3.1 PT INFINEON TECHNOLOGIES BATAM
8000
K
78100
DESIGN CONSULTANT
B
8000
L
PT. DACREA Design and Engineering Consultants
6000
L'
M DACREA
8000
B
6000
B
B B B
8000
10000
LIFT
8000
Log Mat'l
5625
B B B
B B
NAME SIG. DATE :
P
Praying Room
FOOD DISPLAY
B P' DRAWN BY :
AF
5625
B
B DIGAMBAR :
PP-Z3.2
8000
B
CHANGING ROOM CHECKED BY :
23300
RH
DIPERIKSA :
Q ABLUTION ROOM B B B
APPROVED BY :
2200
AN
5625
B
CANTEEN DISETUJUI :
Q'
B SCALE DRAWING : 1:300
R B
7000
7000
B
B B B
B B
R' R.0
S L I F T L I F T
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
6000
25x DA SMART 7
9700
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
ASM
ASM
ASM
ASM
ASM
ASM
B FFL.±0.000 FFL.±0.000
SSI
SSI
SSI
Vacant
SSI
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
6000
ASM
ASM
ASM
ASM
ASM
ASM
SSI
SSI
SSI
SSI
SSI
SSI
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
SSI
ASM
ASM
ASM
ASM
ASM
ASM
SSI
C
SSI
SSI
SSI
SSI
8300
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
6000
SSI
ASM
ASM
ASM
ASM
ASM
ASM
ssi-HSOF8
SSI
Vacant VACANT
D
DMC
DMC
(BY OTHERS)
Forming Gas Mixer (170sqm)
6000
EXIT
R
SWITCH GAS
AUTO
NO REVISION DATE
CHILLER
1490
Vacant
IN
E
VACUUM
HELLER
PUMP
HELLER
0 FIRST ISSUED -
VACUUM
PUMP
6000
CHILLER
Batamindo Sewerline pipe
20500
SWITCH GAS
AUTO
R
SUPPLY
GAS
F heller REFLOW
RACK
MARCH
MARCH
Technic
Technic
R
RACK
SUPPLY
GAS
SUPPLY
GAS
SWITCH GAS
AUTO
RACK
2000
MARCH
CHILLER
6000
MARCH
1490
RACK
SUPPLY
VACUUM
GAS
SUPPLY
HELLER
GAS
PUMP
HELLER
RACK
MARCH
MARCH
1396
RACK
VACUUM
SUPPLY
GAS
PUMP
SUPPLY
GAS
G
RACK
MARCH
CHILLER
MARCH
Flux Cleaning
RACK
PROJECT
SWITCH GAS
SUPPLY
FINNSONIC
GAS
AUTO
PHASE 1.1 PC PROYEK
78000
TDSON+HSOF5
6000
R
area
3000
Support & Matl
H BATAM 3 PROJECT
Chemical
6000
OWNER
PEMILIK
PHASE 1.1
Vacant
Chemical Storage 70sqm
30500
6000
Vacant
K PT INFINEON TECHNOLOGIES BATAM
VACANT
6000
REEL
DESIGN CONSULTANT
RO
AD8312+
AD8312+
ASM
ASM
CB
CB
RO
KONSULTAN RENCANA
sTOLL
sTOLL
TDSON
TDSON
CB
AD8312+
CB
L
AD8312+
ASM
RO
ASM
RO
REEL
REEL
PT. DACREA Design and Engineering Consultants
6000
RO
AD8312+
AD8312+
ASM
ASM
CB
CB
RO
sTOLL
TDSON
TDSON
sTOLL
AD8312+
CB
CB
1588
AD8312+
ASM
RO
ASM
DACREA
RO
M
REEL
3000
6000
Compressor
3000
EXIT EXIT
ELECTRICAL ROOM MINISTORE DRAWING TITLE
ELECTRICAL ROOM
Compressor
IN IN
JUDUL GAMBAR
N
GROUND FLOOR
MOBILE COMPACTOR AREA
CHANGING ROOM PHASE 1.1 POWER OUTLET INSTALLATION PLAN
10000
PHASE.1-2, SHEET.2-1
W.1.8
CORRIDOR
NAME SIG. DATE :
O DRAWN BY :
DIGAMBAR : AF
5625
PHASE 1.1
REFERENSI : REV :
22500
WWTP
Q PHASE 1.1 R.0
5625
FOR :
R CONSTRUCTION DRAWING
5625
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225 S
ACM / 323 / MEP / GF / 1.2 / EL-300
D-PROJECT
NOTES :
PHASE 1.1
73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM
A-DOOR
n o i t a t S LD Station nD oL Ui t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U
FEMALE'S TOILET
DAGE
K5CTU
73CM
K5CTU
73CM
K5CTU
73CM
K5CTU
73CM
K5CTU
73CM
K5CTU
73CM
A2P2
(OUT)
(OUT)
WIP
WIP
WIP
(IN)
73CM 73CM 73CM 73CM 73CM 73CM 73CM
BUND WALL H.150mm K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU
WIP
AMSi
VAC PUMP
AMSi
n o i t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station n D o L i U t a t S LD Station D L U
area
BLUE M
VAC PUMP
BUND WALL H.150mm
PM
BLUE M
K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU
BUND WALL H.150mm n o i t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
n D o L i U t a t S
LD Station
D L U
WIP
(IN)
TUBE MAX = 20M
BLUE M
WIP
(IN)
(OUT)
WIP
(OUT)
WIP
CD-A2-WJ
BUND WALL H.150mm
BLUE M
(OUT)
(OUT)
(OUT)
WIP
WIP
WIP
WIP
(IN)
VACANT
WIP
BLUE M
K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU K5CTU
VACANT
TUBE MAX = 20M
PC PHASE 1.1
BLUE M
AMSi
VAC PUMP
AMSi
(TOLL) (TOLL) (TOLL)
DEL_G5 DEL_G5 DEL_G5 DEL_G5
area
VAC PUMP
BLUE M
Height = 2240, port/pellet buffer = ?
NO REVISION DATE
BLUE M
BUND WALL H.150mm
WIP
76600
(IN)
TUBE MAX = 20M
ESB
WIP
(IN)
(OUT)
(OUT)
WIP
(OUT)
ESB
WIP
BLUE M
MOLDING BUND WALL H.150mm
0 FIRST ISSUED -
(OUT)
(OUT)
(OUT)
PHASE 1.1
WIP
WIP
WIP
WIP
WIP
(IN)
BLUE M
DEL_G5 DEL_G5 DEL_G5 DEL_G5
WIP
VAC PUMP
AMSi
VAC PUMP
(OUT)
WIP
(IN)
WIP
WIP
(OUT)
(OUT)
WIP
WIP
LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station
ASM-TDSON hsof5
(OUT)
(OUT)
(OUT)
(OUT)
WIP
WIP
WIP
WIP
SNP1
WIP
ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station
Height = 2240, port/pellet buffer = ?
LAB
TUBE MAX = 20M
AMSi
VAC PUMP
AMSi
VAC PUMP
PROJECT
110000
Height = 2240, port/pellet buffer = ?
PROYEK
WIP
(IN)
TUBE MAX = 20M
(OUT)
(OUT)
WIP
(IN)
WIP
WIP
(OUT)
(OUT)
WIP
WIP
SNP2 PM
PM
BATAM 3 PROJECT
MATL SUPPORT & MATERIAL AREA
Vacant OWNER
VACANT PEMILIK
21xFAV Smart7
VACANT
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
ELECTRICAL ROOM 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
PHASE 1.1
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
UP
cold storage SUMP DESIGN CONSULTANT
EXIT
SUMP SNP
3850
KONSULTAN RENCANA
145sqm
COLD STORAGE
DISPLAY SNP 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
CORRIDOR 2ndOC 2ndOC 2ndOC 2ndOC PT. DACREA Design and Engineering Consultants
DACREA
FOL CH Room
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
LDF 2ndOC
24x 2nd OC
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
16850
HIGH
FFL.±0.000
TRANSFORMER ROOM VOLTAGE
OPEN SPACE
PHASE 1.1 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
DRAWING TITLE
JUDUL GAMBAR
LOCKER AREA
ATTIRE CANTEEN 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
2000
CORRIDOR
LOCKET
CDAF
F105
F104 NAME SIG. DATE :
F103
PHASE 1.1
7000
DRAWN BY :
FEMALE TOILET
ELECTRICAL
F102
AF
SECURITY
DIGAMBAR :
MALE TOILET
F101
TRANSFOMER
ROOM
FFL.-0.050 CORRIDOR FFL.±0.000 FFL.±0.000 CHECKED BY :
DIPERIKSA : RH
F104
F103
F102
F101
F105
CDAF
APPROVED BY :
UP DISETUJUI : AN
UP UP UP
SCALE DRAWING : 1:225
REFERENSI : REV :
R.0
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.2 / EL-301
D-PROJECT
NOTES :
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3715
164645
112500 44500
A
CORRIDOR
6000
Spare Parts Spare Parts Spare Parts Spare Parts Spare Parts
Cabinet Cabinet Cabinet Cabinet Cabinet
Spare Parts
Cabinet
IT
ROOM NO REVISION DATE
B
Work Station Work Station
3x5
Sp part PM
6000
0 FIRST ISSUED -
C
REFLOW REFLOW
6000
D
REFLOW REFLOW
BTU PMAX BTU PMAX
PP-Z2.1
6000
REFLOW REFLOW
BTU PMAX BTU PMAX
E REFLOW
BTU PMAX
REFLOW
BTU PMAX
PROJECT
TOILET
PROYEK
6000
REFLOW
BTU PMAX
UP DN
F REFLOW
REFLOW
BTU PMAX Jl. BERINGIN LOT 201 & 202A
AT BATAMINDO INDUSTRIAL PARK,
G REFLOW
MUKAKUNING
BTU PMAX
78000
6000
VACANT AHU
EMPTY
TUBE
H
HANMI PMRTHAN005 SON DEC/18
B H= 538 mm
OWNER
CORRIDOR
B
H= 538 mm
PEMILIK
6000
EMPTY
TUBE
JIG
DB-FL.2
I
PC
(TOLL)
DB-LM+TF
6000
TOILET PANEL
(TOLL)
PC
JIG ROOM
LC & DBC
LP2-EM
J 2.6
PP-Z2.1
DBC
DBC
2.6
DESIGN CONSULTANT
K KONSULTAN RENCANA
PP-Z2.2
6000
ECA
ECA
ECA
ECA
ECA
PHASE 1.1
L EAV
PT. DACREA Design and Engineering Consultants
6000
DACREA
ECA
ECA
ECA
ECA
ECA
AHU
M DB-LDF.7
ECA
ECA
ECA
ECA
ECA
PP-Z2.2
6000
DRAWING TITLE
TUBES
TUBES
TUBES
TUBES
LOTEMPTY
LOTEMPTY
LOTEMPTY
LOTEMPTY
N JUDUL GAMBAR
TROLLEY
TROLLEY
TROLLEY
(INPUT)
(INPUT)
(INPUT)
(INPUT)
TROLLEY
LOT
LOT
LOT
LOT
UNIT UNIT UNIT UNIT
REJECTS REJECTS REJECTS REJECTS
EAV
TROLLEY
TROLLEY
TROLLEY
TROLLEY
DN UP REJECTS REJECTS REJECTS REJECTS
(INPUT)
(INPUT)
(INPUT)
(INPUT)
2'ND FLOOR
LOT
LOT
LOT
LOT
UNIT UNIT UNIT UNIT
UP DN
LOTEMPTY
LOTEMPTY
LOTEMPTY
LOTEMPTY
TUBES
TUBES
TUBES
TUBES
10000
Utility
UTILITY
PHASE 1.1
MINI DB-WORK
TESTING AREA
BENC.2
12 Visual INSP MINI DB-WORK BENC.1
SOCKET OUTLET INSTALLATION PLAN
PHASE 1.1
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
EOL
EOL
EOL
EOL
EOL
EOL
EOL
EOL
EOL
EOL
TOILET
DB-WORK BENCH.2
4x PWT 1x LAN Port
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
EOL Buyoff
Working Table
Working Table
EOL Buyoff
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
Buyoff
EOL
EOL
EOL
EOL
EOL
EOL
EOL
EOL
EOL
EOL
EOL
EOL
Port Port Port Port Port Port Port
O
, 2x , 2x , 2x , 2x , 2x , 2x , 2x
CORRIDOR
Scope Bench
WorkPoint Scope Bench
Work PointScope Bench
WorkPoint Scope Bench
Work Point Scope Bench
Work Point Scope Bench
Work Point Scope Bench
Work Point
Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower Smart Scope
SmartPower
8x 8x 8x 8x 8x 8x 8x
VOID Input
Trolley
MINI DB-WORK BENC.2 NAME SIG. DATE :
IP
Container
COOPERATIVE ROOM
Empty
Tube
Inductor
Tester /
IP IP
HandlerIP
DRAWN BY :
/
OutputTurret OutputTurret OutputTurret
Tester
P
PC
Input W/Station Input W/Station Input W/Station
Trolley
Trolley
(Reel)with
Trolley
Trolley
(Reel)with
Trolley
Trolley
(Reel)with AF -
IP 028 Spool IP Spool IP 028 Spool
DIGAMBAR :
Container
Container
Container
DN UNION ROOM Spool
Empty
Empty
Empty
Tube
Tube
Tube
(Reel)with
HandlerIP
HandlerIP
HandlerIP
Inductor
Inductor
Inductor
Tester
Tester
Tester
VOID
/
/
Trolley
AHU
Tester
Tester
Tester
W/Station
PC
PC
PC
IP IP
IP IP
IP IP
IP IP
HandlerIP
IP IP
HandlerIP
IP IP
HandlerIP
OutputTurret
5625
Inductor
Inductor
Inductor
PHASE 1.1 CHECKED BY :
Tester
Tester
Tester
/
/
OutputTurret
RAILING
Tester
Tester
Tester
/
/
PC
PC
PC
Container
Container
Container
Input W/Station
Empty
Empty
Empty
Trolley
RH
Tube
Tube
Tube
Trolley
(Reel) with
/
/
IP Spool IP
DIPERIKSA :
Container
Container
Spool IP Spool IP Spool IP
Empty
Empty
Tube
Tube
(Reel)with (Reel) with (Reel)with
Trolley Trolley Trolley
HandlerIP
Inductor
Inductor
VOID
Tester
/
/
Trolley Trolley Trolley
Tester
Tester
W/Station W/Station W/Station
PC
Input Input Input
22500
IP IP
IP IP
HandlerIP
IP IP
HandlerIP
UP
OutputTurret OutputTurret OutputTurret
Inductor
APPROVED BY :
Tester
/
PHASE 1.1
Tester
Tester
Q
/
PC
PC
Container
DB-TSP.2
Empty
VOID AN
Tube
/
Spool
(Reel)with
Trolley
Trolley
IP 028 Spool
(Reel)with
Trolley
DISETUJUI :
OutputTurret OutputTurret
W/Station Input W/Station
OutputTurret Output
5625
Container
Container
Container
Empty
Empty
Empty
Tube
Tube
Tube
HandlerIP
HandlerIP
Inductor
Inductor
Inductor
Tester
Tester
/
/
Tester
Tester
Tester
PC
PC
IP IP
IP IP
IP IP
HandlerIP
IP IP
HandlerIP
IP IP
HandlerIP
Inductor
Inductor
Tester
Tester
/
/
10
10
10
10
Tester
Tester
Tester
/
/
PC
PC
PC
Container
Container
TOILET
REFERENSI : REV :
Empty
Empty
Tube
Tube
10
10
10
10
R PHASE 1.1
/
Ch Room CHANGING ROOM Spool
(Reel)with
IP Spool
(Reel)with
IP Spool
(Reel)with
Trolley Trolley
Trolley Trolley Trolley
5
RAILING
R.0
CORRIDOR
S UP
FOR :
DN
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3750
112500 44500
6980 38320 18100 49100 42000 2500
A A'
FG Room
7000
6000
Q-Gate
DB-WORK BENCH.3
AFTER
AFTER
AFTER
6000
AFTER
MATERIAL & SUPPORT
DP
DP
DP
DP
8000
22700
DB-MFS 0 FIRST ISSUED -
BEFORE
BEFORE
BEFORE
BEFORE
C
C'
6000
4 MF
8000
D
6000
D'
E
PROJECT
8000
6000
PROYEK
PEGASUS
PEGASUS
8000
PEGASUS
BAKE in Jl. BERINGIN LOT 201 & 202A
G
AT BATAMINDO INDUSTRIAL PARK,
G'
6000
PEGASUS
PEGASUS
MUKAKUNING
VACANT
PEGASUS
8000
H
OWNER
PEGASUS
PEGASUS
6000
56300
PEMILIK
PEGASUS
MSP DB-FL.3 H'
I
PEGASUS
PEGASUS
8000
PEGASUS
6000
LD
LP3-EM
110000
LD
PEGASUS
PEGASUS
110500
J'
PEGASUS
LD
6000
PP-Z3.1
MC transfer
PT INFINEON TECHNOLOGIES BATAM
8000
K MC transfer
78100
DESIGN CONSULTANT
K' KONSULTAN RENCANA
6000
Output Output
Trolley Turret W/Station Input Trolley Turret W/Station Input
(Reel) with Spool Trolley (Reel) with Spool Trolley
IP IP
Handler PC
IP Tester /
IP Tester /
IP Inductor
IP Inductor
IP Tester /
IP Tester /
8000
L
IP Inductor
IP Inductor
IP Tester /
IP Tester /
Handler PC
Handler PC
IP Tester /
IP Tester /
Empty Tube Container
IP IP
Handler PC
Handler PC
Handler PC
IP Tester /
IP Tester /
IP Tester /
IP Inductor
IP Inductor
IP Tester /
IP Tester /
IP Inductor
IP Inductor
IP Inductor
IP Tester /
IP Tester /
IP Tester /
Handler PC
Handler PC
IP Tester /
IP Tester /
M DACREA
DB-TSP.3
Trolley with Spool (Reel) Trolley with Spool (Reel) Trolley
Input Turret W/Station Trolley Input Turret W/Station Trolley Input
Output Output
8000
Output Output Output
Trolley Turret W/Station Input Trolley Turret W/Station Input Trolley Turret W/Station
(Reel) with Spool Trolley (Reel) with Spool Trolley (Reel) with Spool
6000
DB-LDF.8
IP IP
Handler PC
Handler PC
IP Tester /
IP Tester /
IP Tester /
IP Inductor
IP Inductor
IP Tester /
IP Tester /
IP Inductor
IP Inductor
IP Inductor
IP Tester /
Handler PC
IP Tester /
Handler PC
IP Tester /
IP Tester /
IP Tester /
Empty Tube Container
N MC transfer Trolley
Input
with Spool
Turret W/Station
(Reel)
Trolley
Output
Trolley
Input
with Spool
Turret W/Station
(Reel)
Trolley
Output
Trolley
Input
LGC LGC
8000
10000
9x Flex
3'RD FLOOR
O PHASE.1-2
LIFT
8000
Log Mat'l
5625
DIGAMBAR :
8000
CHANGING ROOM CHECKED BY :
23300
RH
DIPERIKSA :
Q ABLUTION ROOM
APPROVED BY :
2200
AN
5625
CANTEEN DISETUJUI :
LN2 Refilling
Q'
SCALE DRAWING : 1:300
R
7000
7000
LN2
AHU
LN2 LN2 LN2 LN2
LN2 REFERENSI : REV :
5625
R' R.0
S L I F T L I F T
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SYMBOL DESCRIPTION
1 2 3 4 5 6 7 8 9 14750
10 11 LEGEND :
22500 22500 22500 22500 22500 3930 14750 15000 3715
: PHASE 1.1 SCOPE
164645
112500 44500 : PHASE 1.2 SCOPE
11475 33525 30700 10900 29830 41500 3000
: PHASE EIM
14325 9900 8350 950 5300 25400 2700 22155 4975 41500
25x DA SMART 7
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
ASM
ASM
ASM
ASM
ASM
ASM
B FFL.±0.000 FFL.±0.000 NO REVISION DATE
SSI
SSI
DB Cure
SSI
Vacant
SSI
VACANT OFFICE
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
6000
BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M BLUE M
ASM
ASM
ASM
ASM
ASM
ASM
SSI
crb13 crb12 crb11 crb11 crb13 crb13 crb13 crb12 crb11 crb11
SSI
SSI
SSI
0 FIRST ISSUED -
SSI
SSI
73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM
PHASE 1.1
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
n o i t a t n S o i D
LD Station t L aU t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
SSI
ASM
ASM
ASM
ASM
ASM
ASM
SSI
C
SSI
SSI
73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM
SSI
SSI
DB-LDF.4 n o i t a t n S o i D
LD Station tL aU t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
AD8312+
6000
SSI
ASM
ASM
ASM
ssi-HSOF8
ASM
ASM
ASM
73CM 73CM 73CM 73CM 73CM 73CM 73CM 73CM
n o i t a t n S o i D
LD Station t L aU t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
n o i t a t
K 5CTU
n S o i D
LD Station
73CM
tL aU t n
K 5CTU
S o
90 WB x SMART 7
i LD Station
D t
73CM
L a U t n
K 5CTU
S o iLD Station
D t
73CM
L a U t n
K 5CTU
S o iLD Station
D t
73CM
L a U t n
K 5CTU
S o i LD Station
D t
73CM
L a U t n
K 5CTU
S o i LD Station
D t
73CM
L a U t n
K 5CTU
S o iLD Station
D t
73CM
L a U t
K 5CTU
S D
LD Station
73CM
L U
DB-PROD.GF.1
Vacant VACANT
D
FORMING GAS AREA
PP-Z1.1
DMC
FFL.±0.000 FFL.±0.000 FFL.±0.000
n o i t a t n S o i D
LD Station t L aU t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
DMC
PHASE 1.1
(BY OTHERS)
DB-HSOF8 DB-ASM.DA
Forming Gas Mixer (170sqm)
PP-MB.3
6000
LP-E1
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
EXIT
R
ELP1-4
DAGE
SWITCH GAS
ELP1-3
AUTO
CHILLER
1490
DOOR A2P1 Plasma
Vacant
IN
E DB-LDF.2
VACUUM
HELLER
PUMP
HELLER
DB-PLASMA PROJECT
VACUUM
PHASE 1.1
PUMP
DB-CHEMICAL
6000
PROYEK
LAB
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
CHILLER
PASS BOX
Batamindo Sewerline pipe
DB-HELLER
A2P2
SWITCH GAS
AUTO
(OUT)
(OUT)
WIP
WIP
WIP
(IN)
73CM 73CM 73CM 73CM 73CM 73CM 73CM
BUND WALL H.150mm K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
WIP
SUPPLY
n o i t a t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
GAS
RACK
PM
MARCH
DB-PLUX.C
RACK
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
AMSi
VAC PUMP
AMSi
DB-ASM.MOLD
SUPPLY
GAS
BATAM 3 PROJECT
n o i t a t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
SUPPLY
GAS
SWITCH GAS
area
BLUE M
VAC PUMP
AUTO
RACK
2000
MARCH
BUND WALL H.150mm
PM
CHILLER
MARCH
1490
RACK
73CM 73CM 73CM 73CM 73CM 73CM 73CM
BLUE M
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
SUPPLY
VACUUM
GAS
SUPPLY
HELLER
GAS
n o i t a t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
PUMP
HELLER
DB-PROD.GF.2
RACK
WIP
MARCH
(IN)
TUBE MAX = 20M
BLUE M
WIP
(IN)
(OUT)
MARCH
WIP
DB-PMC
(OUT)
WIP
1396
73CM 73CM 73CM 73CM 73CM 73CM 73CM
RACK
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
CD-A2-WJ
VACUUM
SUPPLY
GAS
Jl. BERINGIN LOT 201 & 202A
SUPPLY
n o i t a t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
GAS
BLUE M
(OUT)
(OUT)
(OUT)
G
WIP
WIP
RACK
WIP
MARCH
WIP
(IN)
VACANT
CHILLER
MARCH
WIP
Flux Cleaning
BLUE M
K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU K 5CTU
SWITCH GAS
SUPPLY
FINNSONIC
n o i t a t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t n S o i LD Station
D t L a U t n S o iLD Station
D t L a U t n S o iLD Station
D t L a U t S D
LD Station L U
BLUE M
AMSi
VAC PUMP
AMSi
6000
R DEL_G5
(TOLL)
DEL_G5
(TOLL)
DEL_G5
(TOLL)
DEL_G5
area
VAC PUMP
Support & Matl
BLUE M
Height = 2240, port/pellet buffer = ?
BLUE M
BUND WALL H.150mm
WIP
(IN)
TUBE MAX = 20M
ESB
WIP
(IN)
(OUT)
(OUT)
MATERIAL SUPPORT AREA
H
WIP
WIP
(OUT)
ESB
WIP
DEL_G5 DEL_G5 DEL_G5 DEL_G5 DEL_G5
1x1 (TOLL) (TOLL) (TOLL) (TOLL) (TOLL)
BLUE M
MOLDING BUND WALL H.150mm
OWNER
(OUT)
(OUT)
(OUT)
(OUT)
PHASE 1.1
WIP
WIP
WIP
WIP
WIP
(IN)
(TOLL) (TOLL) (TOLL) (TOLL)
BLUE M
DEL_G5 DEL_G5 DEL_G5 DEL_G5
WIP
PEMILIK
AMSi
VAC PUMP
AMSi
DB-CD
VAC PUMP
WIP
(IN)
TUBE MAX = 20M
(OUT)
(OUT)
WIP
(IN)
WIP
WIP
(OUT)
(OUT)
MSB-FL.1
WIP
WIP
LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station LD Station ULD Station
(OUT)
(OUT)
(OUT)
WIP
WIP
6000
WIP
WIP
PHASE 1.1 LAB
WIP
(IN)
SNP1 LP1-EM
WIP
AMSi
VAC PUMP
AMSi
VAC PUMP
J
PHASE 1.1
WIP
(IN)
TUBE MAX = 20M
(OUT)
(OUT)
WIP
(IN)
WIP
WIP
6000
(OUT)
(OUT)
WIP
WIP
SNP2
Vacant
FFL.±0.000
REEL
RO
AD8312+
AD8312+
ASM
ASM
CB
CB
RO
sTOLL
sTOLL
TDSON
TDSON
CB
AD8312+
CB
L
AD8312+
ASM
RO
ASM
Vacant
RO
REEL
DB-TDSON
VACANT PT. DACREA Design and Engineering Consultants
REEL
DB-HSOF5
6000
RO
AD8312+
AD8312+
ASM
ASM
CB
CB
SDB-AHU.3
RO
sTOLL
PP-MB.2
TDSON
sTOLL
TDSON
AD8312+
CB
21xFAV Smart7
CB
1588
AD8312+
ASM
DACREA
RO
SDB-EMERGENCY
ASM
RO
M
REEL
ELP1-2 DB-LDF.3
ELP1-1 VACANT
6000
Compressor
MSB-A1 SDB-AHU.2 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
EXIT EXIT
ELECTRICAL ROOM MINISTORE
ELECTRICAL ROOM
Compressor
IN IN
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
N DRAWING TITLE
37x 2nd OC SON JUDUL GAMBAR
PHASE 1.1
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
UP
MOBILE COMPACTOR AREA MSB-A2
PHASE 1.1 cold storage SUMP
EXIT
CHANGING ROOM MSB-A3 SUMP SNP
COLD STORAGE
SNP
10000
FOL CH Room
2ndOC 2ndOC 2ndOC 2ndOC 2ndOC 2ndOC
24x 2nd OC
5625
PHASE 1.1
CORRIDOR
LOCKET
CDAF
F105 SCALE DRAWING : 1:300
R
F104
DB-SPRINKLER PUMP
F103
F102
ELECTRICAL
SECURITY
DB-HOUSEREEL
5625
MALE TOILET
F101
TRANSFOMER
ROOM
FFL.-0.050 PP-IDEALMOLD CORRIDOR FFL.±0.000 FFL.±0.000 R.0
SDB-EMG.EXTENTION
F104
F103
F102
F101
F105
CDAF
S UP
UP
UP UP FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
LAYOUT - GROUND FLOOR NOMOR GAMBAR
SCALE 1 : 225
ACM / 323 / MEP / GF / 1.2 / EL-304
D-PROJECT
NOTES :
SYMBOL DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3750
112500 44500
6980 38320 18100 49100 42000 2500
A A'
XRAY
6000
7000
XRAY Spare Parts
Cabinet
Spare Parts
Cabinet
Spare Parts
Cabinet
Spare Parts
Cabinet
Spare Parts
Cabinet
Spare Parts
LDF7
Cabinet
IT
ROOM
NO REVISION DATE
B
Work Station Work Station
3x5
Sp part PM B'
17400
6000
0 FIRST ISSUED -
8000
22700
C
REFLOW REFLOW
6000
8000
BTU PMAX BTU PMAX
PP-Z2.1
SDB-AHU.Z1
6000
REFLOW REFLOW
BTU PMAX BTU PMAX
D' PROJECT
E REFLOW
BTU PMAX
REFLOW
BTU PMAX
PROYEK
8000
6000
REFLOW
DB-REFLOW BTU PMAX
REFLOW
Jl. BERINGIN LOT 201 & 202A
8000
BTU PMAX
G'
EMPTY
TUBE
SDB-AHU.Z2
H OWNER
HANMI PMRTHAN005 SON DEC/18
8000
H= 538 mm
B
H= 538 mm
PEMILIK
6000
EMPTY
TUBE
JIG
MSB-FL.2 H'
I
PC
(TOLL)
DB-LM+TF
8000
6000
(TOLL)
JIG PC
LP2-EM
LC & DBC
110000
J
110500
2.6
DBC
J'
PT INFINEON TECHNOLOGIES BATAM
WS
6000
8000
DBC 2.6
DESIGN CONSULTANT
K
78100
KONSULTAN RENCANA
6000
ECA
ECA
ECA
ECA
ECA
K'
L EAV PT. DACREA Design and Engineering Consultants
8000
6000
ECA
ECA
ECA
ECA
ECA
DACREA
L'
M DB-LDF.7
ECA
ECA
ECA
ECA
ECA
PP-Z2.2
8000
6000
SDB-AHU.Z3
DRAWING TITLE
TUBES
TUBES
TUBES
TUBES
EMPTY
EMPTY
EMPTY
EMPTY
N JUDUL GAMBAR
LOT (INPUT)
LOT (INPUT)
LOT (INPUT)
LOT (INPUT)
TROLLEY
TROLLEY
TROLLEY
TROLLEY
LOT
LOT
LOT
LOT
N"
UNIT UNIT UNIT UNIT
REJECTS REJECTS REJECTS REJECTS
EAV
13500
TROLLEY
TROLLEY
TROLLEY
TROLLEY
LOT (INPUT)
LOT (INPUT)
LOT (INPUT)
LOT (INPUT)
LOT
LOT
LOT
LOT
DB-EAV 2'ND FLOOR
EMPTY
EMPTY
EMPTY
EMPTY
TUBES
TUBES
TUBES
TUBES
8000
10000
Utility
12 Visual
DB-WORK INSP
BENCH.2
DB-CANTEEN.2 CABLE LADDER INSTALLATION PLAN
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port
PHASE.1-2
EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff
Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table
Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table Working Table
EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff EOL Buyoff
4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port 4x PWT 1x LAN Port
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
EOL Buyoff
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
Trolley
ROSTER ROSTER ROSTER ROSTER 5x PC Gate O"
O 8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
8x Power Point , 2x LAN Port
Work Bench
Smart Scope
Scope
Smart
8000
5625
FFL.+6.000
WASERDA
IP
Input
Trolley
IP Inductor
IP Tester /
DRAWN BY :
P
Handler PC
IP Tester /
Output Output Output
Input Turret W/Station Input Turret W/Station Input Turret W/Station
AF
Trolley Trolley Trolley
Trolley (Reel) with Spool Trolley (Reel) with Spool Trolley (Reel) with Spool
Handler PC
Handler PC
Handler PC
IP Tester /
IP Tester /
IP Tester /
IP Inductor
IP Inductor
IP Inductor
IP Tester /
IP Tester /
IP Tester /
Output
FFL.+5.000
5625
COFFEE CHECKED BY :
IP Inductor
IP Inductor
IP Inductor
IP Tester /
IP Tester /
IP Tester /
Handler PC
Handler PC
Handler PC
IP Tester /
IP Tester /
IP Tester /
Output
Input Trolley Turret W/Station
RH
Trolley (Reel) with Spool
Empty Tube Container
8000
with Spool (Reel) Trolley with Spool (Reel) Trolley with Spool (Reel) Trolley
Trolley Trolley Trolley
Handler PC
Turret W/Station Turret W/Station Turret W/Station
IP Tester /
Input Input Input
IP Inductor
IP Inductor
IP Tester /
IP Tester /
Output Output Output
APPROVED BY :
SUPPORT
Q
IP Inductor
IP Tester /
Handler PC
Handler PC
IP Tester /
IP Tester /
AN
2200
with Spool Trolley with Spool
Turret W/Station Trolley Input Turret W/Station Trolley
Output Output
RAILING
5625
Output Output
Input Trolley Turret W/Station Input Trolley Turret W/Station Input
Trolley (Reel) with Spool Trolley (Reel) with Spool Trolley
IP IP IP
SCALE DRAWING : 1 : 300
Q'
Handler PC
IP Tester /
IP Tester /
IP Inductor
IP Inductor
IP Inductor
IP Tester /
IP Tester /
IP Tester /
CANTEEN INDOOR CHANGING ROOM
IP Inductor
IP Inductor
IP Tester /
IP Tester /
Handler PC
Handler PC
Handler PC
IP Tester /
IP Tester /
IP Tester /
CANTEEN OUTDOOR
R FFL.+6.000 REFERENSI : REV :
7000
7000
PRAYING ROOM
with Spool (Reel) Trolley with Spool (Reel) Trolley with Spool (Reel)
Turret W/Station Trolley Input Turret W/Station Trolley Input Turret W/Station Trolley
DB-SERVICE.2ND
Output Output Output
DB-TSP.2 OFFICE
RAILING
AUTO DOOR
5625
R.0
MOVABLE STAGE
S R'
FOR :
CAPACITY ALL AREA : 309 PAX
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR
SYMBOL DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11
22500 22500 22500 22500 22500 3930 14750 15000 14750 3750
112500 44500
6980 38320 18100 49100 42000 2500
A A'
FG Room
7000
6000
Q-Gate
DB-WORK BENCH.3
AFTER
AFTER
AFTER
6000
AFTER
MATERIAL & SUPPORT
DP
DP
DP
DP
8000
22700
DB-MFS 0 FIRST ISSUED -
BEFORE
BEFORE
BEFORE
BEFORE
C
C'
6000
4 MF
8000
D
6000
D'
E
PROJECT
8000
6000
PROYEK
PEGASUS
PEGASUS
8000
PEGASUS
BAKE in Jl. BERINGIN LOT 201 & 202A
G
AT BATAMINDO INDUSTRIAL PARK,
G'
6000
PEGASUS
PEGASUS
MUKAKUNING
VACANT
PEGASUS
8000
H
OWNER
PEGASUS
PEGASUS
6000
56300
PEMILIK
PEGASUS
MSP MSB-FL.3 H'
I
PEGASUS
PEGASUS
8000
PEGASUS
6000
LD
LP3-EM
110000
LD
PEGASUS
PEGASUS
110500
J'
PEGASUS
LD
6000
PP-Z3.1
MC transfer
PT INFINEON TECHNOLOGIES BATAM
8000
K MC transfer
78100
DESIGN CONSULTANT
K' KONSULTAN RENCANA
6000
8000
L
PT. DACREA Design and Engineering Consultants
6000
L'
M DACREA
DB-TSP.3
8000
6000
DB-LDF.8
LGC LGC
8000
10000
9x Flex
3'RD FLOOR
O PHASE.1-2
LIFT
8000
Log Mat'l
5625
DIGAMBAR :
8000
CHANGING ROOM CHECKED BY :
23300
RH
DIPERIKSA :
Q ABLUTION ROOM
APPROVED BY :
2200
AN
5625
CANTEEN DISETUJUI :
LN2 Refilling
Q'
SCALE DRAWING : 1:300
R
7000
7000
LN2
AHU
LN2 LN2 LN2 LN2
LN2 REFERENSI : REV :
5625
R' R.2
S L I F T L I F T
FOR :
CONSTRUCTION DRAWING
DRAWING NUMBER
NOMOR GAMBAR