JSA (Job Safety Analysis) Sheet
Activity Name:- Batching plant erection Ref-
Location:- Date :
Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Untrained worker,lack Only inducted worker shall be deputed at the work place.
1 Manpower Mobilization Personal injury
of skill awareness
Given Tool Box Talk to all workers.
2 Foundation Work
Excavator having valid fittness cetificate should be deployed for
the work.
Excavator should be inspected before use.
Uninspected Personal injury, Operator having valid driving licences.
machinay Property damage Banks man should be provide for giving signal.
Excaveted material shall be kept min.1mtr.away from the Pit /
Trench edge.
3 Excavation upto 2mtr. Ensure no person working intrenchduring excavation.
Hard barrication 1.5mtr away from edge. Hard barrication will
be provided surrounded pits
Ensure no person working intrenchduring excavation.
Fall, slip Personal injury
Provide caution sign board.
Entry of personnel is strictly restricted in the area swing of
boom.
Work shall be carried out under supervision.
Unappoved access Personal injury Proper access, railing should be provide.
4 PCC Provide rubber hand gloves, dust mask should provide
Wet cement Skin irreation
Provide Eye & hand wash facility near work area
Improper material Personal injury, Material handling should be done manually.
5 Shutrring
handling Property damage Shoulder pad shall be provide for worker.
Sharp edge Cut injury Leather hand gloves shall be provide
6 RCC Dust mask and hand ash facility should be provide.
Wet cement Skin irreation
Proper house keeping should be maintain.
Only Third party inspected and havin valid Form 12 Telescopic
crane having capasity of 40T should be use.
Another crane with capasity 12T which is also third party
Uninspected lifting Personal injury, inspected and having valid Form 12 shall be use if requried.
media Property damage Third party inspected and having valid form 12 D'shakle with
capasity 5t (4no.) sling with capacity 5T (4no.)should be use.
Erection for Mixer Unit
7 Operator having valid driving licences.
App. Wt 12T
Banks man should be provide for giving signal.
16mm nylon rope should be tied at both end of structer to
avoid swining of material.
Swing of material Personal injury No work and worker should be deployed under suspended load.
Work area should be barricated to avoid unauthorised entry.
Work shall be carried out under supervision.
Ensure proper illumination during dark hours.
Darkness, fall of Personal
Work during dark Electrical cable should lead min 2 m height. No exposed
8 person, fall of injury,damage to
hours electrical wire.Earthing.
machinery property
Route shall be illuminated.
Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________
Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______