Internal Plastering 16

This document is a quality control card used to inspect internal plastering work at a Lodha Group construction site. It lists checks to be performed before, during, and after plastering under sections A, B, and C. Tolerances are provided for thickness of plaster and corners. The contractor, project execution team, and quality department must all perform observations and sign off to confirm the plastering work meets specifications.

Uploaded by

manish260320
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

Internal Plastering 16

This document is a quality control card used to inspect internal plastering work at a Lodha Group construction site. It lists checks to be performed before, during, and after plastering under sections A, B, and C. Tolerances are provided for thickness of plaster and corners. The contractor, project execution team, and quality department must all perform observations and sign off to confirm the plastering work meets specifications.

Uploaded by

manish260320
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Lodha Group of Companies QC CARD

INTERNAL PLASTERING
LODHA UPPER THANE INSPECTION Request No-

Building Name : Structure:


Level: Date of Installation :
Location :

Contractor Execution QA Department


Sr.No Perticulars Tolerances Remarks
Observation Observation Observation

A Pre Plaster Checks:

String/ wire passed through conceiled electric line checked before plastering. Nil

Electrical / plumbing lines/ modular boxes fittings should be completed before


Nil
starting plaster with respect to finished surface.

Hacking to concrete surface done /bonding agent e.g. hack-aid plast applied Nil

Wetting of surfaces to be plastered 48 hours before plaster.


Nil

Surface dressing, if required, done with respect to line & plumb. Nil

Use of pharma done for batching of sand for mortars. Nil

Leakages, if observed, should be treated before plastering. Nil

Nails, binding wire, masking tape etc. removed from concrete surface. Nil

All the RCC & Masonry joints & chased area should be treated with Non
Nil
Shrink Mortar e.g. CNS 50

Application of chicken mesh on RCC-Masonry joints (horizantal as well as


Nil
vertical) and over rendering on chases of plumbing line & electrical line done.

All electrical boxes protected by plastic sheet Nil

B During Plaster Checks:

Peg marking done as per line & plumb. Nil

Thickness of plaster maintained as per specification 15mm

Back coat done, if thickness exceeds allowable limits Nil

Proper consistency maintained as required with optimum use of water. Nil

Use of tray for mixing of mortar and pharma for batching of sand done Nil

Mortar utilised within 90 minutes of preparation Nil

All corners checked for right angles.(3-4-5 Method) 3mm

Level and offset distance of beam soffits, window sills, jams etc checked. 5mm

Mortar for plaster / Gypsum plaster cut for skirting at required level in straight
Nil
line.
Plaster checked for uneven or undulations in surface ( walls & ceiling) with
3mm
line dori & aluminum patti.
Roughening of plaster surface done where ever required Nil

C Post Plaster Checks:

Curing to plastered surface done for desired period Nil

All the cleaning work done after the day work. Nil

Display of date doen for monitoring curing Nil

QC BY (Contractor) QC BY (Project Execution) QE BY (Quality Dept.)


Name : Name : Name :
Signature: Signature: Signature:
Date & time: Date & time: Date & time:
Format No-LUT/QA/QF-016 R0 Dt-20-8-18